CROST FOR LONDON. Presentation to GLA and TfL Thursday 4th Dec. By CROST Group. National Audit Office Report April 2004. UK projects twice as expensive as equivalent on Continent. TfL tramways after NAO. TOTAL = £685m ( £26million/km). West London Tramway. - PowerPoint PPT PresentationTRANSCRIPT
![Page 1: CROST FOR LONDON](https://reader035.vdocuments.us/reader035/viewer/2022081519/56814449550346895db0e7b3/html5/thumbnails/1.jpg)
CROST FOR LONDON
Presentation to GLA and TfL
Thursday 4th Dec.
By CROST Group
![Page 2: CROST FOR LONDON](https://reader035.vdocuments.us/reader035/viewer/2022081519/56814449550346895db0e7b3/html5/thumbnails/2.jpg)
National Audit Office Report April 2004
UK projects twice as expensive
as equivalent on Continent
![Page 3: CROST FOR LONDON](https://reader035.vdocuments.us/reader035/viewer/2022081519/56814449550346895db0e7b3/html5/thumbnails/3.jpg)
TfL tramways after NAO
Cross River Oxford St.
TfL Plan £1300m £500m
CR less branch £870m £500m
After NAO £435m £250m
TOTAL = £685m ( £26million/km)
![Page 4: CROST FOR LONDON](https://reader035.vdocuments.us/reader035/viewer/2022081519/56814449550346895db0e7b3/html5/thumbnails/4.jpg)
West London Tramway
Residents’ objections
2 of 3 Labour Boroughs lost
Scheme abandoned
![Page 5: CROST FOR LONDON](https://reader035.vdocuments.us/reader035/viewer/2022081519/56814449550346895db0e7b3/html5/thumbnails/5.jpg)
Croydon Tramlink
99 year Commercial Contract
Conflict over political objectives
Competition from buses ?
Court cases
Municipalisation
![Page 6: CROST FOR LONDON](https://reader035.vdocuments.us/reader035/viewer/2022081519/56814449550346895db0e7b3/html5/thumbnails/6.jpg)
Environmental Problems
Air quality poor: due to motor traffic
Exceeds UK & EU limits
~ 5000 die pa from traffic fumes
Air quality 2006PM10 60days > EU 50µg/m3
NO2 70 µg/m3 > EU 40 µg/m3
Greenhouse emissions
Imported oil
![Page 7: CROST FOR LONDON](https://reader035.vdocuments.us/reader035/viewer/2022081519/56814449550346895db0e7b3/html5/thumbnails/7.jpg)
The GLUAS Project
![Page 8: CROST FOR LONDON](https://reader035.vdocuments.us/reader035/viewer/2022081519/56814449550346895db0e7b3/html5/thumbnails/8.jpg)
How GLUAS is funded
Privately50% from Corporate and
individual Equity investors
50% commercial loan from EIB
www.GLUAS.com
![Page 9: CROST FOR LONDON](https://reader035.vdocuments.us/reader035/viewer/2022081519/56814449550346895db0e7b3/html5/thumbnails/9.jpg)
GLUAS Facts
Galway population = 85,000
Network length = 21km
Number of Lines = 2
Number of trams = 17
First year patronage = 4 million
Total capital cost = €200million
Cost per km = €9.5million (£8m)
![Page 10: CROST FOR LONDON](https://reader035.vdocuments.us/reader035/viewer/2022081519/56814449550346895db0e7b3/html5/thumbnails/10.jpg)
TfL Cross River Tramway
Over 10 years gestation
Objectives ?Link Waterloo and Euston/Kings X/St Pancras
Regeneration of Peckham etc
Etc.
![Page 11: CROST FOR LONDON](https://reader035.vdocuments.us/reader035/viewer/2022081519/56814449550346895db0e7b3/html5/thumbnails/11.jpg)
TfL CRT and Oxford St.
No public funding before 2018
NEED NOT GONE AWAY
Environmental and traffic benefits not possible with bus only road system
![Page 12: CROST FOR LONDON](https://reader035.vdocuments.us/reader035/viewer/2022081519/56814449550346895db0e7b3/html5/thumbnails/12.jpg)
The London Travel MarketLarge inward commutingLarge central London movement
Tourism (27million in 2006)
In 2006, > one billion trip on Underground.4% car trips to public transport ( Congestion Charge )
8,600 buses:1.81 billion trips, with anaverage 6.3 million daily tripsAverage trips per bus =733 per day
40% increase in total demand by 2024
![Page 13: CROST FOR LONDON](https://reader035.vdocuments.us/reader035/viewer/2022081519/56814449550346895db0e7b3/html5/thumbnails/13.jpg)
Travel in London 2006 (%trips)
Mode Central Inner Outer GB
Car 11 31 63 71
Rail 40 16 14 8
Tube 28 19 5 2
Bus 12 16 14 8
![Page 14: CROST FOR LONDON](https://reader035.vdocuments.us/reader035/viewer/2022081519/56814449550346895db0e7b3/html5/thumbnails/14.jpg)
AM Central commuting (million trips)
Year All Rail Tube Bus Car Other
1991 1042 426 347 74 155 21
2006 1114 491 380 124 85 33
![Page 15: CROST FOR LONDON](https://reader035.vdocuments.us/reader035/viewer/2022081519/56814449550346895db0e7b3/html5/thumbnails/15.jpg)
Personal Mode Choice(trips per week)
Mode Male Female
Rail 1.2 0.8
Tube 1.7 1.2
Bus 3.1 3.2
Car 7.7 7.4
Walk 5.4 6.8
TOTAL 19.3 20.0
![Page 16: CROST FOR LONDON](https://reader035.vdocuments.us/reader035/viewer/2022081519/56814449550346895db0e7b3/html5/thumbnails/16.jpg)
CROST Capital InvestmentInfrastructure only for tram operationsNo civic/public space enhancementsMinimal relocation of utilitiesFully DDA compliantMaximum priority over general trafficTraffic signal pre-emptionTotal Cost/km = £19million (GLUAS £8m)
![Page 17: CROST FOR LONDON](https://reader035.vdocuments.us/reader035/viewer/2022081519/56814449550346895db0e7b3/html5/thumbnails/17.jpg)
CROST Viability
Option Ops Costs Pax
(million)
Revenue IRR %
Oxford St £6.0m 12.24 £30.6m 10.25
Cross River
£4.7m 9.98 £24.4m 9.58
CROST £9.8m 26.59 £66.5m 12.69
![Page 18: CROST FOR LONDON](https://reader035.vdocuments.us/reader035/viewer/2022081519/56814449550346895db0e7b3/html5/thumbnails/18.jpg)
QuickTime™ and aTIFF (Uncompressed) decompressor
are needed to see this picture.
CROST Routes
![Page 19: CROST FOR LONDON](https://reader035.vdocuments.us/reader035/viewer/2022081519/56814449550346895db0e7b3/html5/thumbnails/19.jpg)
Achieving CROST (1)
Private promotion
Private investment
Open in less than 5 years
Commercial operation without grant aid ?
Track laid like kerbs, one rail at a time
Few utility diversions
Rapid progress: 100m pw completed
![Page 20: CROST FOR LONDON](https://reader035.vdocuments.us/reader035/viewer/2022081519/56814449550346895db0e7b3/html5/thumbnails/20.jpg)
Achieving CROST (2)
Agreement with Public Authorities
Set up implementation company
Apply for planning permission
Detailed engineering designs
Private capital raised (not on PSBR)
Construction and commissioning
Operation with agreed bus feeders
CROST same fare support as buses
CROST is not a PFI or PPP
![Page 21: CROST FOR LONDON](https://reader035.vdocuments.us/reader035/viewer/2022081519/56814449550346895db0e7b3/html5/thumbnails/21.jpg)
Getting CROST on track
Agreement for progress
Implementation Company set up
Submits Planning Application
Consults with frontagers and community
Gets agreement for delivery timetable
Begins construction
Commissions and opens service
A Win - Win offer for TfL & the Councils
![Page 22: CROST FOR LONDON](https://reader035.vdocuments.us/reader035/viewer/2022081519/56814449550346895db0e7b3/html5/thumbnails/22.jpg)
Tram Tracks - 1Sheffield Manchester
![Page 23: CROST FOR LONDON](https://reader035.vdocuments.us/reader035/viewer/2022081519/56814449550346895db0e7b3/html5/thumbnails/23.jpg)
LR55 200mm deep 400mm wide
Sheffield since 1996
Maintenance free
Tram Tracks - 2
![Page 24: CROST FOR LONDON](https://reader035.vdocuments.us/reader035/viewer/2022081519/56814449550346895db0e7b3/html5/thumbnails/24.jpg)
Tram OHL : not WCML •Survived storms
•Quick installation
•Low cost
•Low visual impact
•Minimum poles
•Maximum wall fixings
![Page 25: CROST FOR LONDON](https://reader035.vdocuments.us/reader035/viewer/2022081519/56814449550346895db0e7b3/html5/thumbnails/25.jpg)
City Class in Birkenhead
![Page 26: CROST FOR LONDON](https://reader035.vdocuments.us/reader035/viewer/2022081519/56814449550346895db0e7b3/html5/thumbnails/26.jpg)
2022 or CROST ?
No public funds = no TfL trams till 2022