crossroads hollywood mou invoice...f r om : v icente c or der o [ma ilto:...
TRANSCRIPT
3/2/2017 City of Los Angeles Mail Crossroads Hollywood MOU invoice
https://mail.google.com/mail/u/0/?ui=2&ik=f6ce74f7d4&view=pt&cat=Hollywood%20Crossroads&search=cat&th=150ed7e8c8824e46&siml=150ed7e8c8824e4… 1/10
Wes Pringle <[email protected]>
Crossroads Hollywood MOU invoice 7 messages
Vicente Cordero <[email protected]> Mon, Nov 9, 2015 at 10:25 AMTo: Emily Wong <[email protected]>Cc: Sarah Drobis <[email protected]>Bcc: [email protected]
Hi Emily,
Please find attached the invoice for the expedited MOU review fee. Please make the check payable to LADOT and send it to myattention.
To pay online, please go to http://ladot.lacity.org/HowDoI/HowDoIMakeanOnlinePayment/DeveloperFees/index.htm and input thefollowing:
LADOT Staff who prepared the invoice: Vicente Cordero
Invoice number: 804692
Amount: 1,978.85
Attached are the instructions for online payment. Please email me a copy of the confirmation page. Let me know if you have anyquestions.
Regards,
Vicente Cordero, P.E. Metro Development Review | Transportation Engineering Associate III Los Angeles Department of Transportation 100 S. Main Street, 9th Floor, Mail Stop 725, Los Angeles, CA 90012 Tel.: (213) 9728473 Los Angeles Tel.: (818) 3744697 Van Nuys
2 attachments
Online Payments Applicants_sept 2013.pdf258K
CEN 1543805_6701 W. Sunset Bl_mu_MOU fee.pdf 533K
Vicente Cordero <[email protected]> Thu, Nov 12, 2015 at 6:55 PMTo: Emily Wong <[email protected]>Cc: Sarah Drobis <[email protected]>Bcc: [email protected]
Will do!
Submitting Developer Fee Payments Online
Before you start, have the following items ready to process your payment: • The 6-digit Invoice Number (8XXXXX) for your payment • Credit Card* (Only VISA or MasterCard credit cards are currently accepted) • Customer Card ID Number (CCV2) from the back of your credit card • Name of the LADOT Staff who prepared the invoice * Please note, debit cards are not accepted.
1. Open the webpage http://ladot.lacity.org/HowDoI/HowDoIMakeanOnlinePayment/DeveloperFees/index.htm
Select the appropriate LADOT Staff member from the drop-down list, enter your invoice number and click the “Proceed” button.
2. Enter your information on the following screen: Leave CVV2 Indicator as “Present” Enter CVV2 number from the back of your card
When you are finished, click on the “Process” button. If there are any transaction errors, you will receive a message indicating so. In such cases, you will need to start over from the beginning. If there are no transaction errors, you will be taken to the confirmation page. Please print out the confirmation page for your records, and also create a PDF copy or copy and paste the information and email it to the appropriate LADOT staff. If you are unable to print out the confirmation information, at a minimum, please retain the 6-digit Approval Code and the Date and Time of the transaction. Once the staff engineer has confirmed that the payment has been processed, they will proceed with the project clearance.
830011
Developers Fee
User: LA41393
Payment Type: CREDITCARD
Transaction Type: SALE
Transaction 10: 1016414721D72379D5-F028-5A9F-ODA6-8EF34909AD12
Date! Time: 12/02/2010 04:00:23 PMResponse: AA
Message: APPROVAL
Approval Code: 00747CAVS Response: Y
CW2 Response: M
Account Balance: 0.00
Transaction Reference Number: 1203000023
Credit Card Number: 46********8206
Expiration Date(MM.YY):0111
Amount: 400.00
Customer Code:
Invoice Number:
Description:
Continue Shopping
https://www~myvirtualmerchant.com/VirtualMerchant/process.do
Page 1 of 1
12/2/2010 ~
Department of Transportation City of Los Angeles
Bureau of Accounting 100 S. Main St. 10th Floor
PAYMENT RECORD Invoice #:
Receipt #: Payment Entered on:
Los Angeles, CA 90012 Payment Processed on: Phone No. (213) 972 - 5906 Amount:
Processed By: ANTONIO VILLARAIGOSA
Mayor
Company
Phone
Fund Fund Description Fund Type Distribution Desc Amount
Total:
If payment is deposited by someone other than the name listed above, fill in this section. Otherwise, just initial next to your name above. Received By Print Name Signature Date
Case No: Project ID:
Project Address:
Project Description:
Printed on:
804692109886
November 9, 2015
$1,978.85
vicente
CRE-HAR Crossroads SPV, LLC
6363 Wilshire Blvd., #600
Los Angeles
(323) 658-1511
CA 90048
100
100
General Fund
General Fund
3973-Traffic Study MOU
3973-OTHER
Fund Type: 4240
Expedited 50Y -4673
$1,175.00
$803.85
$1,978.85
HWD 15-103738
6701 W SUNSET BOULEVARD
Crossroads Hollywood Mixed-Use Project
November 09, 2015
Authorization Code:
Payer Same as Applicant
43805
3/2/2017 City of Los Angeles Mail Crossroads Hollywood MOU invoice
https://mail.google.com/mail/u/0/?ui=2&ik=f6ce74f7d4&view=pt&cat=Hollywood%20Crossroads&search=cat&th=150ed7e8c8824e46&siml=150ed7e8c8824e4… 2/10
Vicente
On Thu, Nov 12, 2015 at 3:58 PM, Emily Wong <[email protected]> wrote:
Hi Vicente,
The review fee check has been mailed to your office. Please let me know if you do not receive it in the next few days.
Also, could you please send us a receipt upon receiving the review fee check?
Thank you!
Emily
From: Vicente Cordero [mailto:[email protected]] Sent: Monday, November 09, 2015 10:25 AM To: Emily Wong Cc: Sarah Drobis Subject: Crossroads Hollywood MOU invoice
Hi Emily,
Please find attached the invoice for the expedited MOU review fee. Please make the check payable to LADOT and send it to myattention.
To pay online, please go to http://ladot.lacity.org/HowDoI/HowDoIMakeanOnlinePayment/DeveloperFees/index.htm and input thefollowing:
LADOT Staff who prepared the invoice: Vicente Cordero
Invoice number: 804692
Amount: 1,978.85
Attached are the instructions for online payment. Please email me a copy of the confirmation page. Let me know if you have anyquestions.
Regards,
Vicente Cordero, P.E. Metro Development Review | Transportation Engineering Associate III Los Angeles Department of Transportation 100 S. Main Street, 9th Floor, Mail Stop 725, Los Angeles, CA 90012 Tel.: (213) 9728473 Los Angeles Tel.: (818) 3744697 Van Nuys
3/2/2017 City of Los Angeles Mail Crossroads Hollywood MOU invoice
https://mail.google.com/mail/u/0/?ui=2&ik=f6ce74f7d4&view=pt&cat=Hollywood%20Crossroads&search=cat&th=150ed7e8c8824e46&siml=150ed7e8c8824e4… 3/10
Vicente Cordero, P.E. Metro Development Review | Transportation Engineering Associate III Los Angeles Department of Transportation 100 S. Main Street, 9th Floor, Mail Stop 725, Los Angeles, CA 90012 Tel.: (213) 9728473 Los Angeles Tel.: (818) 3744697 Van Nuys
Vicente Cordero <[email protected]> Wed, Nov 18, 2015 at 11:13 AMTo: Emily Wong <[email protected]>, Sarah Drobis <[email protected]>Bcc: [email protected]
Hi Emily,
Attached please find a copy of the MOU review fee payment received this morning.
As previousluy requested, we still need to have documentation of existing use in order to determine the total existing credit for this project.Please provide this information at your earliest convenience along with a revised MOU for our review and approval. Please note that the TripCredit table in the MOU indicates NO previous land use credit. Thanks.
Regards,
Vicente
>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>
Sarah DrobisOct 27, 2015
Nov 12 (6 days ago)to me, Emily, Tomas
Thank you. We will inquire with the team about the exisΆng buildings and uses on the site and let you know.
Sarah
Sarah M. Drobis, P.E. Principal Associate
Gibson Transportation Consulting, Inc.
3/2/2017 City of Los Angeles Mail Crossroads Hollywood MOU invoice
https://mail.google.com/mail/u/0/?ui=2&ik=f6ce74f7d4&view=pt&cat=Hollywood%20Crossroads&search=cat&th=150ed7e8c8824e46&siml=150ed7e8c8824e4… 4/10
523 W. 6th Street, Suite 1234 Los Angeles, CA 90014 www.gibsontransportation.com (213) 6830088 phone (213) 6830033 fax
From: Vicente Cordero [mailto:[email protected]] Sent: Tuesday, October 27, 2015 1:45 PMTo: Sarah DrobisCc: Emily Wong; Tomas CarranzaSubject: Crossroads Hollywood
Hi Sarah,
It was great seeing you and Emily this morning.
In doing a preliminary assessment of this project's MOU, I noticed that the description of the project indicates185,000 sf of commercial/retailuses (including existing uses to be retained). However, the trip generation estimates table shows a total of 185,000 sf of new proposedcommercial/retail uses. Could you please provide adequate documentation to verify the total square footage size of the existingcommercial/retail use to be retained as well as the number of apartment units to be removed in order to determine the total existing usecredit? Thanks.
Regards,
Vicente Cordero, P.E. Metro Development Review | Transportation Engineering Associate III Los Angeles Department of Transportation 100 S. Main Street, 9th Floor, Mail Stop 725, Los Angeles, CA 90012 Tel.: (213) 9728473 Los Angeles Tel.: (818) 3744697 Van Nuys
[Quoted text hidden]
CEN 1543805_Crossroads Hollywood MOU paid.pdf136K
Vicente Cordero <[email protected]> Mon, Dec 14, 2015 at 8:50 AMTo: Emily Wong <[email protected]>Cc: Sarah Drobis <[email protected]>Bcc: [email protected]
Hi Emily, I hope you are doing well. I was just wondering about any updates regarding the status of a revised MOU for this project? Thanks.
3/2/2017 City of Los Angeles Mail Crossroads Hollywood MOU invoice
https://mail.google.com/mail/u/0/?ui=2&ik=f6ce74f7d4&view=pt&cat=Hollywood%20Crossroads&search=cat&th=150ed7e8c8824e46&siml=150ed7e8c8824e4… 5/10
Happy Holidays!! Vicente
On Wed, Nov 18, 2015 at 11:18 AM, Emily Wong <[email protected]> wrote:
Hi Vicente,
Thank you for sending this over.
We are currently working on updating the MOU to incorporate the existing/previous land uses of the project site. We will be sending you arevised MOU soon.
Thank you,
Emily
From: Vicente Cordero [mailto:[email protected]] Sent: Wednesday, November 18, 2015 11:13 AM To: Emily Wong; Sarah Drobis Subject: Fwd: Crossroads Hollywood MOU invoice
Hi Emily,
Attached please find a copy of the MOU review fee payment received this morning.
As previousluy requested, we still need to have documentation of existing use in order to determine the total existing credit for this project.Please provide this information at your earliest convenience along with a revised MOU for our review and approval. Please note that the TripCredit table in the MOU indicates NO previous land use credit. Thanks.
Regards,
Vicente
>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>
Sarah Drobis
Oct 27, 2015
Nov 12 (6 daysago)
to me, Emily, Tomas
3/2/2017 City of Los Angeles Mail Crossroads Hollywood MOU invoice
https://mail.google.com/mail/u/0/?ui=2&ik=f6ce74f7d4&view=pt&cat=Hollywood%20Crossroads&search=cat&th=150ed7e8c8824e46&siml=150ed7e8c8824e4… 6/10
[Quoted text hidden]
[Quoted text hidden]
[Quoted text hidden][Quoted text hidden][Quoted text hidden]
[Quoted text hidden] Vicente Cordero, P.E. Metro Development Review | Transportation Engineering Associate III Los Angeles Department of Transportation 100 S. Main Street, 9th Floor, Mail Stop 725, Los Angeles, CA 90012 Tel.: (213) 9728473 Los Angeles Tel.: (818) 3744697 Van Nuys
[Quoted text hidden][Quoted text hidden]
[Quoted text hidden]
Vicente Cordero <[email protected]> Tue, Dec 22, 2015 at 11:41 AMTo: Emily Wong <[email protected]>Cc: Sarah Drobis <[email protected]>, Tomas Carranza <[email protected]>Bcc: [email protected]
Hi Emily,
Following up on our MOU review, Tommy and I had an internal discussion regarding the use of condominium rates (5.81) versus the highrise condominium rates (4.18). As a rule of thumb (unwritten policy) we prefer the use of the condominium rate instead of the highrisecondominium rate for a couple of reasons: the use of the higher condominium rate yields a more conservative study and because thenumber of surveys used to develop the highrise is very low (based on 4 surveys). The low number of surveys for highrise condominiumsis the main reason that we prefer the use of condominium rate.
With regards to the list of the 104 proposed study intersections, we think that this is a lengthy list and perhaps you may not need to includeall these locations in the traffic study. However, we realize that this a large project for the Hollywood area and having a wider scope ofintersections may offer a more conservative study. Please let us know if you would like to keep the 104 study intersections or if you wouldlike to reduce the number of intersections.
Lastly, please confirm that the unofficial related project list provided by DOT has been verified out in the field and/or with City Planning tomake sure that these projects have not been built yet. Thanks.
3/2/2017 City of Los Angeles Mail Crossroads Hollywood MOU invoice
https://mail.google.com/mail/u/0/?ui=2&ik=f6ce74f7d4&view=pt&cat=Hollywood%20Crossroads&search=cat&th=150ed7e8c8824e46&siml=150ed7e8c8824e4… 7/10
Regards,
Vicente
On Tue, Dec 22, 2015 at 8:45 AM, Emily Wong <[email protected]> wrote:
Hi Vicente,
We will update the MOU cover sheet, and provide a new MOU pending any further comments you may have.
Just FYI, I will be out of the office tomorrow, and our office will be closed December 24 through January 3. However, I will be availablevia email.
Thank you!
Emily
From: Vicente Cordero [mailto:[email protected]] Sent: Tuesday, December 22, 2015 8:33 AM To: Emily Wong Cc: Sarah Drobis Subject: Fwd: Crossroads Hollywood MOU invoice
Hi Emily,
I just got your voicemail. I was in the Valley office yesterday so I did not know you had called. Since I work in two separate offices thebest way to reach me is via email :)
We would like for you to use the updated MOU cover page which addresses the Caltrans screening filter note. I'm meeting with Tommythis afternoon to go over this MOU. I'll let you know if there are any other comments so ythat they can also be included in the revisedMOU. I'll let you know.
Thanks ~ Vicente
Forwarded message From: Vicente Cordero <[email protected]> Date: Mon, Dec 21, 2015 at 1:25 PM Subject: Re: Crossroads Hollywood MOU invoice To: Emily Wong <[email protected]> Cc: Sarah Drobis <[email protected]>
Attached please find the latest MOU cover sheet. I'll meet with Tommy tomorrow to finalize our review.
Regards,
3/2/2017 City of Los Angeles Mail Crossroads Hollywood MOU invoice
https://mail.google.com/mail/u/0/?ui=2&ik=f6ce74f7d4&view=pt&cat=Hollywood%20Crossroads&search=cat&th=150ed7e8c8824e46&siml=150ed7e8c8824e4… 8/10
Vicente
On Mon, Dec 21, 2015 at 12:47 PM, Vicente Cordero <[email protected]> wrote:
Hi Emily,
We noticed that the revised MOU does not include the freeway agreement screening filter or a statement indicating that you will work withCaltrans to prepare a freeway analysis beyond the CMP requirement. Could you please clarify? Thanks.
Vicente
On Tue, Dec 15, 2015 at 11:20 AM, Emily Wong <[email protected]> wrote:
Hi Vicente,
Attached for your review is the revised MOU for Crossroads Hollywood. Please feel free to contact us should you have any questions orcomments.
Thank you,
Emily
From: Vicente Cordero [mailto:[email protected]] Sent: Monday, December 14, 2015 9:23 AM To: Emily Wong Cc: Sarah Drobis Subject: Re: Crossroads Hollywood MOU invoice
No rush!
Thanks for letting me know.
Vicente
On Mon, Dec 14, 2015 at 9:11 AM, Emily Wong <[email protected]> wrote:
Hi Vicente,
We will send you the revised MOU tomorrow. Thank you!
Emily
From: Vicente Cordero [mailto:[email protected]] Sent: Monday, December 14, 2015 8:51 AM
3/2/2017 City of Los Angeles Mail Crossroads Hollywood MOU invoice
https://mail.google.com/mail/u/0/?ui=2&ik=f6ce74f7d4&view=pt&cat=Hollywood%20Crossroads&search=cat&th=150ed7e8c8824e46&siml=150ed7e8c8824e4… 9/10
To: Emily Wong Cc: Sarah Drobis
[Quoted text hidden]
[Quoted text hidden][Quoted text hidden][Quoted text hidden][Quoted text hidden][Quoted text hidden]
[Quoted text hidden]
Vicente Cordero <[email protected]> Wed, Jan 6, 2016 at 1:18 PMTo: Emily Wong <[email protected]>, Sarah Drobis <[email protected]>Cc: Tomas Carranza <[email protected]>, Wes Pringle <[email protected]>
Hi Emily,
It was nice meeting with you and Sarah this morning. Attached please find the approved MOU for this project. Please let me know if youhave any questions.
Regards,
Vicente
On Tue, Dec 22, 2015 at 12:17 PM, Vicente Cordero <[email protected]> wrote: Excellent!!! Thanks ~ Vicente On Tue, Dec 22, 2015 at 12:08 PM, Emily Wong <[email protected]> wrote:
Hi Vicente,
Thank you for providing your comments. We will revise the trip generation table using condominium rates in place of the highrisecondominium rates. Also, we would like to keep our study area as is, so as to provide a more conservative analysis given the size ofour Project. We have conducted field reviews of the related projects, and we have also considered projects from the City Planningmajor projects list.
A revised MOU will be sent to you by the end of the day.
Please feel free to contact me if you have any other questions or comments.
Thank you,
Emily
From: Vicente Cordero [mailto:[email protected]] Sent: Tuesday, December 22, 2015 11:41 AM To: Emily Wong Cc: Sarah Drobis; Tomas Carranza
[Quoted text hidden]
[Quoted text hidden][Quoted text hidden]
[Quoted text hidden]
Crossroads Hollywood MOU_signed 1616.pdf1401K
3/2/2017 City of Los Angeles Mail Crossroads Hollywood MOU invoice
https://mail.google.com/mail/u/0/?ui=2&ik=f6ce74f7d4&view=pt&cat=Hollywood%20Crossroads&search=cat&th=150ed7e8c8824e46&siml=150ed7e8c8824e… 10/10
Emily Wong <[email protected]> Wed, Jan 6, 2016 at 1:23 PMTo: Vicente Cordero <[email protected]>Cc: Tomas Carranza <[email protected]>, Wes Pringle <[email protected]>, Sarah Drobis <[email protected]>
Thank you, Vicente! It was great meeting with you all today.
Emily
From: Vicente Cordero [mailto:[email protected]] Sent: Wednesday, January 06, 2016 1:18 PMTo: Emily Wong; Sarah DrobisCc: Tomas Carranza; Wes Pringle
[Quoted text hidden]
[Quoted text hidden]