crosslam intro presentation 6-28-16
TRANSCRIPT
![Page 1: CrossLam Intro Presentation 6-28-16](https://reader031.vdocuments.us/reader031/viewer/2022021814/58e8edd01a28ab1f248b4b55/html5/thumbnails/1.jpg)
INNOVATIVE TIMBER SPECIALISTS
STRUCTURLAM
Changing the way we build.www.structurlam.com
CROSS LAMINATED TIMBERCROSS LAMINATED TIMBERCROSS LAMINATED TIMBERCROSS LAMINATED TIMBER
![Page 2: CrossLam Intro Presentation 6-28-16](https://reader031.vdocuments.us/reader031/viewer/2022021814/58e8edd01a28ab1f248b4b55/html5/thumbnails/2.jpg)
CrossLam by Structurlam
• Material: SPF, Douglas Fir
• Grade: #2+, J-Grade, Lamstock
• Moisture content: 12 % +/- 2 %
• Bonding adhesive: Purbond - Polyurethane
• Layers: 3, 5, 7 and 9
• Lamella thickness 38mm and 35mm
• Maximum dimensions: 12.2” x 10’ x 40’
Over 200
Cross Laminated timber
projects built in the US and
Canada
Meets Standards:ANSI/APA PRG 320State of Oregon BCD 15-01AWC NDS-2015
2015 IBC & NBC-084-2015ICC ESR March 2016
![Page 3: CrossLam Intro Presentation 6-28-16](https://reader031.vdocuments.us/reader031/viewer/2022021814/58e8edd01a28ab1f248b4b55/html5/thumbnails/3.jpg)
Structural Strength & Stability
![Page 4: CrossLam Intro Presentation 6-28-16](https://reader031.vdocuments.us/reader031/viewer/2022021814/58e8edd01a28ab1f248b4b55/html5/thumbnails/4.jpg)
Structural Benefits
•Lower material weight at comparable
strength (6 times lighter than concrete).
•Seismic performance.
•Panels span in both directions.
•Dimensional stability with minimal shrinkage
in building height.
•Versatility and ability to integrate with other
materials.
•Minimal site waste
![Page 5: CrossLam Intro Presentation 6-28-16](https://reader031.vdocuments.us/reader031/viewer/2022021814/58e8edd01a28ab1f248b4b55/html5/thumbnails/5.jpg)
Environmental Benefits
![Page 6: CrossLam Intro Presentation 6-28-16](https://reader031.vdocuments.us/reader031/viewer/2022021814/58e8edd01a28ab1f248b4b55/html5/thumbnails/6.jpg)
Negative carbon footprint
Environmental - Carbon Sequestration
A typical 2,400 square
foot wood-frame
residence holds 28.5
tons of carbon dioxide,
roughly equal to
removing a small car
from the roads for
seven years.
![Page 7: CrossLam Intro Presentation 6-28-16](https://reader031.vdocuments.us/reader031/viewer/2022021814/58e8edd01a28ab1f248b4b55/html5/thumbnails/7.jpg)
Structurlam is a pioneer in linking 3D
modeling to CNC machinery
![Page 8: CrossLam Intro Presentation 6-28-16](https://reader031.vdocuments.us/reader031/viewer/2022021814/58e8edd01a28ab1f248b4b55/html5/thumbnails/8.jpg)
Mass Timber Construction as a
Customized Kit of Materials
In the past, conventional wood construction consisted of ordering lifts of lumber and bundles of glulam to be framed on-site.
With today’s mass timber construction, the column grid is designed to optimize a timber structure, and every stair opening and doorframe is considered early in the design process well ahead of construction start.
Now, with 3D modeling and CNC framing, every beam, column and panel is custom-designed, produced and CNC framed for a specific location in the structure.
3D Model & CNC Framing
![Page 9: CrossLam Intro Presentation 6-28-16](https://reader031.vdocuments.us/reader031/viewer/2022021814/58e8edd01a28ab1f248b4b55/html5/thumbnails/9.jpg)
3D Model
Resolve conflicts in the Architectural
and Structural 3D models
![Page 10: CrossLam Intro Presentation 6-28-16](https://reader031.vdocuments.us/reader031/viewer/2022021814/58e8edd01a28ab1f248b4b55/html5/thumbnails/10.jpg)
Lakeshore Instal lation
![Page 11: CrossLam Intro Presentation 6-28-16](https://reader031.vdocuments.us/reader031/viewer/2022021814/58e8edd01a28ab1f248b4b55/html5/thumbnails/11.jpg)
CLT Manufacturing
![Page 12: CrossLam Intro Presentation 6-28-16](https://reader031.vdocuments.us/reader031/viewer/2022021814/58e8edd01a28ab1f248b4b55/html5/thumbnails/12.jpg)
CNC Technology
![Page 13: CrossLam Intro Presentation 6-28-16](https://reader031.vdocuments.us/reader031/viewer/2022021814/58e8edd01a28ab1f248b4b55/html5/thumbnails/13.jpg)
Shipped to site
![Page 14: CrossLam Intro Presentation 6-28-16](https://reader031.vdocuments.us/reader031/viewer/2022021814/58e8edd01a28ab1f248b4b55/html5/thumbnails/14.jpg)
FP Innovations US CLT Handbook
www.masstimber.com
![Page 15: CrossLam Intro Presentation 6-28-16](https://reader031.vdocuments.us/reader031/viewer/2022021814/58e8edd01a28ab1f248b4b55/html5/thumbnails/15.jpg)
CrossLam Design Guide
![Page 16: CrossLam Intro Presentation 6-28-16](https://reader031.vdocuments.us/reader031/viewer/2022021814/58e8edd01a28ab1f248b4b55/html5/thumbnails/16.jpg)
Typical Panel Connectors
![Page 17: CrossLam Intro Presentation 6-28-16](https://reader031.vdocuments.us/reader031/viewer/2022021814/58e8edd01a28ab1f248b4b55/html5/thumbnails/17.jpg)
Panel Joint Connection
![Page 18: CrossLam Intro Presentation 6-28-16](https://reader031.vdocuments.us/reader031/viewer/2022021814/58e8edd01a28ab1f248b4b55/html5/thumbnails/18.jpg)
Panel to Panel Connection
![Page 19: CrossLam Intro Presentation 6-28-16](https://reader031.vdocuments.us/reader031/viewer/2022021814/58e8edd01a28ab1f248b4b55/html5/thumbnails/19.jpg)
Earth Systems Science Building, UBC
![Page 20: CrossLam Intro Presentation 6-28-16](https://reader031.vdocuments.us/reader031/viewer/2022021814/58e8edd01a28ab1f248b4b55/html5/thumbnails/20.jpg)
UBC Earth System Science Building
![Page 21: CrossLam Intro Presentation 6-28-16](https://reader031.vdocuments.us/reader031/viewer/2022021814/58e8edd01a28ab1f248b4b55/html5/thumbnails/21.jpg)
UBC Earth System Science
Building
Roof and floor panel
installation
![Page 22: CrossLam Intro Presentation 6-28-16](https://reader031.vdocuments.us/reader031/viewer/2022021814/58e8edd01a28ab1f248b4b55/html5/thumbnails/22.jpg)
![Page 23: CrossLam Intro Presentation 6-28-16](https://reader031.vdocuments.us/reader031/viewer/2022021814/58e8edd01a28ab1f248b4b55/html5/thumbnails/23.jpg)
Elkford Community Center
Wall panels
![Page 24: CrossLam Intro Presentation 6-28-16](https://reader031.vdocuments.us/reader031/viewer/2022021814/58e8edd01a28ab1f248b4b55/html5/thumbnails/24.jpg)
Schedule – Rapid Assembly
![Page 25: CrossLam Intro Presentation 6-28-16](https://reader031.vdocuments.us/reader031/viewer/2022021814/58e8edd01a28ab1f248b4b55/html5/thumbnails/25.jpg)
![Page 26: CrossLam Intro Presentation 6-28-16](https://reader031.vdocuments.us/reader031/viewer/2022021814/58e8edd01a28ab1f248b4b55/html5/thumbnails/26.jpg)
Elkford Community Centre
![Page 27: CrossLam Intro Presentation 6-28-16](https://reader031.vdocuments.us/reader031/viewer/2022021814/58e8edd01a28ab1f248b4b55/html5/thumbnails/27.jpg)
Elkford Community Centre
![Page 28: CrossLam Intro Presentation 6-28-16](https://reader031.vdocuments.us/reader031/viewer/2022021814/58e8edd01a28ab1f248b4b55/html5/thumbnails/28.jpg)
Shoreline Medical ClinicShoreline, WA
![Page 29: CrossLam Intro Presentation 6-28-16](https://reader031.vdocuments.us/reader031/viewer/2022021814/58e8edd01a28ab1f248b4b55/html5/thumbnails/29.jpg)
Crosslam SLT3 panels attached to wide
flange steel beams with screws through the
top flange from below……
The first of three truckloads of panels went
up in 3 hours, 5,000 sq ft.
Shoreline Medical ClinicShoreline, WA
![Page 30: CrossLam Intro Presentation 6-28-16](https://reader031.vdocuments.us/reader031/viewer/2022021814/58e8edd01a28ab1f248b4b55/html5/thumbnails/30.jpg)
Washington State University
Pullman, WA
![Page 31: CrossLam Intro Presentation 6-28-16](https://reader031.vdocuments.us/reader031/viewer/2022021814/58e8edd01a28ab1f248b4b55/html5/thumbnails/31.jpg)
Washington State University
Clean Technology Lab
![Page 32: CrossLam Intro Presentation 6-28-16](https://reader031.vdocuments.us/reader031/viewer/2022021814/58e8edd01a28ab1f248b4b55/html5/thumbnails/32.jpg)
![Page 33: CrossLam Intro Presentation 6-28-16](https://reader031.vdocuments.us/reader031/viewer/2022021814/58e8edd01a28ab1f248b4b55/html5/thumbnails/33.jpg)
Stanford Energy Center
![Page 34: CrossLam Intro Presentation 6-28-16](https://reader031.vdocuments.us/reader031/viewer/2022021814/58e8edd01a28ab1f248b4b55/html5/thumbnails/34.jpg)
Cooley Landing Education Center
![Page 35: CrossLam Intro Presentation 6-28-16](https://reader031.vdocuments.us/reader031/viewer/2022021814/58e8edd01a28ab1f248b4b55/html5/thumbnails/35.jpg)
Rocky Mountain Institute
ZGF Architects
![Page 36: CrossLam Intro Presentation 6-28-16](https://reader031.vdocuments.us/reader031/viewer/2022021814/58e8edd01a28ab1f248b4b55/html5/thumbnails/36.jpg)
Rocky Mountain Institute
![Page 37: CrossLam Intro Presentation 6-28-16](https://reader031.vdocuments.us/reader031/viewer/2022021814/58e8edd01a28ab1f248b4b55/html5/thumbnails/37.jpg)
Wood Innovation and Design CentreWood Innovation and
Design Centre (WIDC) Prince George, British Columbia,
Canada
![Page 38: CrossLam Intro Presentation 6-28-16](https://reader031.vdocuments.us/reader031/viewer/2022021814/58e8edd01a28ab1f248b4b55/html5/thumbnails/38.jpg)
Wood Innovation & Design Center
![Page 39: CrossLam Intro Presentation 6-28-16](https://reader031.vdocuments.us/reader031/viewer/2022021814/58e8edd01a28ab1f248b4b55/html5/thumbnails/39.jpg)
Wood Innovation & Design Center
![Page 40: CrossLam Intro Presentation 6-28-16](https://reader031.vdocuments.us/reader031/viewer/2022021814/58e8edd01a28ab1f248b4b55/html5/thumbnails/40.jpg)
Up Next 18 Stories
UBC Brock Commons
![Page 41: CrossLam Intro Presentation 6-28-16](https://reader031.vdocuments.us/reader031/viewer/2022021814/58e8edd01a28ab1f248b4b55/html5/thumbnails/41.jpg)
Kris Spickler | Heavy Timber SpecialistHeavy Timber Group - Structurlam Products LP
4120 Douglas Blvd. #306-502 | Granite Bay, CA 95746
Office: (916) 797-5588 | Mobile: (916) 759-9320
Email address: [email protected]
website: www.structurlam.com
CrossLamTM by Structurlam