![Page 2: CRM Control Room ManagementControl Room Management NPRM... · Implement API RP-1168 Section 5 (incorporated 1168, Section 5, ... An operator shall seek control room or control room](https://reader035.vdocuments.us/reader035/viewer/2022062600/5acf330e7f8b9ae2138c3b5e/html5/thumbnails/2.jpg)
PHMSA Training and Qualification h // h d / i li /TQhttp://www.phmsa.dot.gov/pipeline/TQ
PHMSA Pipeline Safety Regulationshttp://www.phmsa.dot.gov/pipeline/TQ/Regulations
7/14/2009 2
![Page 3: CRM Control Room ManagementControl Room Management NPRM... · Implement API RP-1168 Section 5 (incorporated 1168, Section 5, ... An operator shall seek control room or control room](https://reader035.vdocuments.us/reader035/viewer/2022062600/5acf330e7f8b9ae2138c3b5e/html5/thumbnails/3.jpg)
Project DriversProject Drivers
Pipeline Safety Improvement Act of 2002
Study control room operations to Study control room operations to enhance pipeline safety
Provide report to Congress
NTSB
SCADA Safety Study, based on Liquid y y qPipeline Systems
7/14/2009 3
![Page 4: CRM Control Room ManagementControl Room Management NPRM... · Implement API RP-1168 Section 5 (incorporated 1168, Section 5, ... An operator shall seek control room or control room](https://reader035.vdocuments.us/reader035/viewer/2022062600/5acf330e7f8b9ae2138c3b5e/html5/thumbnails/4.jpg)
PIPES Act of 2006 (Sections 12, 19, 20)
Establish human factors management plan
Reduce risks associated with human factors
Program to assure safe operation of pipelines
NTSB Recommendations RP 1165NTSB Recommendations – RP 1165
Displays, Alarms and Training
d / d f h bAccident/incident form changes on Fatigue by Dec. 31, 2007
NPRM p blished Sept 12 2008NPRM published Sept 12, 2008
7/14/2009 4
![Page 5: CRM Control Room ManagementControl Room Management NPRM... · Implement API RP-1168 Section 5 (incorporated 1168, Section 5, ... An operator shall seek control room or control room](https://reader035.vdocuments.us/reader035/viewer/2022062600/5acf330e7f8b9ae2138c3b5e/html5/thumbnails/5.jpg)
PHMSA ObjectivejIdentify CRM enhancement areas to help assure and promote the p pController’s ability to succeed in maintaining pipeline safety and integrityintegrity
The following addresses the NPRM
7/14/2009 5
![Page 6: CRM Control Room ManagementControl Room Management NPRM... · Implement API RP-1168 Section 5 (incorporated 1168, Section 5, ... An operator shall seek control room or control room](https://reader035.vdocuments.us/reader035/viewer/2022062600/5acf330e7f8b9ae2138c3b5e/html5/thumbnails/6.jpg)
Alarm: Part § 192/195Alarm: Part § 192/195Means an audible or visible means of indicating to the controller an equipment or process is to the controller an equipment or process is outside operator defined safety-related parametersp
7/14/2009 6
![Page 7: CRM Control Room ManagementControl Room Management NPRM... · Implement API RP-1168 Section 5 (incorporated 1168, Section 5, ... An operator shall seek control room or control room](https://reader035.vdocuments.us/reader035/viewer/2022062600/5acf330e7f8b9ae2138c3b5e/html5/thumbnails/7.jpg)
Controller Part § 192/195Controller, Part § 192/195Means a qualified individual whose function is to remotely monitor and control the safety-is to remotely monitor and control the safety-related operations of entire or multiple sections of pipeline systems via a SCADA p p ysystem from a pipeline control room and who has operational authority and accountability for the daily remote operational functions of pipeline systems as defined by the pipeline operatoroperator.
7/14/2009 7
![Page 8: CRM Control Room ManagementControl Room Management NPRM... · Implement API RP-1168 Section 5 (incorporated 1168, Section 5, ... An operator shall seek control room or control room](https://reader035.vdocuments.us/reader035/viewer/2022062600/5acf330e7f8b9ae2138c3b5e/html5/thumbnails/8.jpg)
Control Room: Part § 192/195Control Room: Part § 192/195Means an operations center staffed by personnel charged with the responsibility for personnel charged with the responsibility for remotely monitoring and controlling entire or multiple sections of pipeline systems.p p p y
7/14/2009 8
![Page 9: CRM Control Room ManagementControl Room Management NPRM... · Implement API RP-1168 Section 5 (incorporated 1168, Section 5, ... An operator shall seek control room or control room](https://reader035.vdocuments.us/reader035/viewer/2022062600/5acf330e7f8b9ae2138c3b5e/html5/thumbnails/9.jpg)
SCADA: Meansa computer-based system or systems that a computer based system or systems that collects and displays information about pipeline facilities and has the ability to send p p ycommands back to the pipeline facilitiesOR – a system that is a combination of ycomputer hardware and software used to send commands and acquire data for the purpose of monitoring and controlling pipelines
7/14/2009 9
![Page 10: CRM Control Room ManagementControl Room Management NPRM... · Implement API RP-1168 Section 5 (incorporated 1168, Section 5, ... An operator shall seek control room or control room](https://reader035.vdocuments.us/reader035/viewer/2022062600/5acf330e7f8b9ae2138c3b5e/html5/thumbnails/10.jpg)
API Recommended Practice 1165Recommended practice for Pipeline SCADA p pDisplays (in part)API Recommended Practice 1168Recommended practice “Pipeline Control Room Management”(in part)g ( p )
7/14/2009 10
![Page 11: CRM Control Room ManagementControl Room Management NPRM... · Implement API RP-1168 Section 5 (incorporated 1168, Section 5, ... An operator shall seek control room or control room](https://reader035.vdocuments.us/reader035/viewer/2022062600/5acf330e7f8b9ae2138c3b5e/html5/thumbnails/11.jpg)
CRM Procedures:The applicable procedures must be included in pp p§ 192.605 and/or 195.402
7/14/2009 11
![Page 12: CRM Control Room ManagementControl Room Management NPRM... · Implement API RP-1168 Section 5 (incorporated 1168, Section 5, ... An operator shall seek control room or control room](https://reader035.vdocuments.us/reader035/viewer/2022062600/5acf330e7f8b9ae2138c3b5e/html5/thumbnails/12.jpg)
Roles and ResponsibilitiesProvide Adequate Informationq
SCADA Displays
Fatigue MitigationFatigue MitigationAlarm ManagementChange ManagementChange ManagementOperating ExperienceTrainingQualificationValidation
7/14/2009 12
![Page 13: CRM Control Room ManagementControl Room Management NPRM... · Implement API RP-1168 Section 5 (incorporated 1168, Section 5, ... An operator shall seek control room or control room](https://reader035.vdocuments.us/reader035/viewer/2022062600/5acf330e7f8b9ae2138c3b5e/html5/thumbnails/13.jpg)
Scope:Scope:Control room management rule applies to any controller working in a control room who controller working in a control room who monitors and controls all or part of a pipeline system through a SCADA system. y g y
7/14/2009 13
![Page 14: CRM Control Room ManagementControl Room Management NPRM... · Implement API RP-1168 Section 5 (incorporated 1168, Section 5, ... An operator shall seek control room or control room](https://reader035.vdocuments.us/reader035/viewer/2022062600/5acf330e7f8b9ae2138c3b5e/html5/thumbnails/14.jpg)
General Requirements:General Requirements:At least One controller, One Control RoomRoomWritten procedures to implement these
irequirementsEXCEPT:
Gas Distribution with less than 250,000 servicesGas Transmission without a compressor station
7/14/2009 14
![Page 15: CRM Control Room ManagementControl Room Management NPRM... · Implement API RP-1168 Section 5 (incorporated 1168, Section 5, ... An operator shall seek control room or control room](https://reader035.vdocuments.us/reader035/viewer/2022062600/5acf330e7f8b9ae2138c3b5e/html5/thumbnails/15.jpg)
General Requirements:General Requirements:Procedures integrated as appropriate with operating and emergency plans required by operating and emergency plans required by §192.605, 192.615, and 195.402Plan must be developed in 18 months and a ust be deve oped 8 o t s a d implemented no later than 36 months after issuance of the final rule.
7/14/2009 15
![Page 16: CRM Control Room ManagementControl Room Management NPRM... · Implement API RP-1168 Section 5 (incorporated 1168, Section 5, ... An operator shall seek control room or control room](https://reader035.vdocuments.us/reader035/viewer/2022062600/5acf330e7f8b9ae2138c3b5e/html5/thumbnails/16.jpg)
Define roles and responsibilitiesDefine roles and responsibilitiesController authority and responsibility to make decisions and take actions during normalgoperationsControllers role when an AOC is detected; what actions to take and what communications are requiredC t ll l d i h t Controllers role during an emergency; what actions to take and what communications are requiredrequired
7/14/2009 16
![Page 17: CRM Control Room ManagementControl Room Management NPRM... · Implement API RP-1168 Section 5 (incorporated 1168, Section 5, ... An operator shall seek control room or control room](https://reader035.vdocuments.us/reader035/viewer/2022062600/5acf330e7f8b9ae2138c3b5e/html5/thumbnails/17.jpg)
(continued)
D l h d f di h Develop a method of recording when a controller is responsible for monitoring or controlling any portion of a pipeline facility.g y p p p y
7/14/2009 17
![Page 18: CRM Control Room ManagementControl Room Management NPRM... · Implement API RP-1168 Section 5 (incorporated 1168, Section 5, ... An operator shall seek control room or control room](https://reader035.vdocuments.us/reader035/viewer/2022062600/5acf330e7f8b9ae2138c3b5e/html5/thumbnails/18.jpg)
Each operator must:Each operator must:Provide the controller with the information, tools, processes and procedures necessary to carry out the roles and responsibilities defined by the operatorWhenever a SCADA system is expanded or replaced the operator must implement API-RP replaced, the operator must implement API RP 1165 incorporated by reference (see § 192.7 or 195.3) unless they can demonstrate it is not applicable or i ti blimpracticable
7/14/2009 18
![Page 19: CRM Control Room ManagementControl Room Management NPRM... · Implement API RP-1168 Section 5 (incorporated 1168, Section 5, ... An operator shall seek control room or control room](https://reader035.vdocuments.us/reader035/viewer/2022062600/5acf330e7f8b9ae2138c3b5e/html5/thumbnails/19.jpg)
Conduct and document a point-to-point p pverification between SCADA displays and related field equipment when field equipment is added or moved and when other changes that affect pipeline moved and when other changes that affect pipeline safety are made to field equipment or SCADA displaysVerify that SCADA displays accurately depict field configuration when any modification is made to field equipment or applicable software and field equipment or applicable software and conduct point-to-point verification for associated changes
7/14/2009 19
![Page 20: CRM Control Room ManagementControl Room Management NPRM... · Implement API RP-1168 Section 5 (incorporated 1168, Section 5, ... An operator shall seek control room or control room](https://reader035.vdocuments.us/reader035/viewer/2022062600/5acf330e7f8b9ae2138c3b5e/html5/thumbnails/20.jpg)
Test and verify an internal communication plan to y pprovide adequate means for manual operation, start-up and shut-down of the pipeline safely at least once each calendar year but at intervals not to least once each calendar year but at intervals not to exceed 15 monthsTest any backup SCADA system(s) at least once each calendar year but at intervals not to exceed 15 monthsImplement API RP 1168 Section 5 (incorporated Implement API RP-1168, Section 5, (incorporated by reference, see § 192.7 or 195.3) to establish procedures for when a different controller assumes responsibility
7/14/2009 20
![Page 21: CRM Control Room ManagementControl Room Management NPRM... · Implement API RP-1168 Section 5 (incorporated 1168, Section 5, ... An operator shall seek control room or control room](https://reader035.vdocuments.us/reader035/viewer/2022062600/5acf330e7f8b9ae2138c3b5e/html5/thumbnails/21.jpg)
Establish shift lengths and schedule grotations that provide controllers off-duty time sufficient to achieve eight hours of continuous sleepEducate controllers and supervisors in fatigue mitigation strategies and how off-duty activities contribute to fatigueTrain the controller and supervisor to recognize the effects of fatigue; and
7/14/2009 21
![Page 22: CRM Control Room ManagementControl Room Management NPRM... · Implement API RP-1168 Section 5 (incorporated 1168, Section 5, ... An operator shall seek control room or control room](https://reader035.vdocuments.us/reader035/viewer/2022062600/5acf330e7f8b9ae2138c3b5e/html5/thumbnails/22.jpg)
Establish a maximum limit on controller Establish a maximum limit on controller hours-of-service
Exceptions may be given during an emergency Exceptions may be given during an emergency with management approval but only when the deviation has been defined in the operators
dprocedures
7/14/2009 22
![Page 23: CRM Control Room ManagementControl Room Management NPRM... · Implement API RP-1168 Section 5 (incorporated 1168, Section 5, ... An operator shall seek control room or control room](https://reader035.vdocuments.us/reader035/viewer/2022062600/5acf330e7f8b9ae2138c3b5e/html5/thumbnails/23.jpg)
Each operator using a SCADA system p g ymust have a written alarm management plan based on accepted industry p p ypractices.An operators plan must include An operators plan must include provisions to:
Review SCADA alarm as indicated in an operators Review SCADA alarm as indicated in an operators Alarm Management PlanPlan should detail
7/14/2009 23
![Page 24: CRM Control Room ManagementControl Room Management NPRM... · Implement API RP-1168 Section 5 (incorporated 1168, Section 5, ... An operator shall seek control room or control room](https://reader035.vdocuments.us/reader035/viewer/2022062600/5acf330e7f8b9ae2138c3b5e/html5/thumbnails/24.jpg)
The process the operator uses to ensure alarms t d t t ll b th SCADA t presented to controllers by the SCADA system are
accurate and support safe pipeline operationsIdentify points impacting safety that have been taken off y p p g yscan in the SCADA host or that have had forced or manual values for extended periods on a monthly basis, andandVerify the correct alarm set-point values and descriptions each calendar year, but at intervals not to exceed 15 monthsmonths
The plan should detail the records maintained by the operator that demonstrate the plan is being followedp p g
7/14/2009 24
![Page 25: CRM Control Room ManagementControl Room Management NPRM... · Implement API RP-1168 Section 5 (incorporated 1168, Section 5, ... An operator shall seek control room or control room](https://reader035.vdocuments.us/reader035/viewer/2022062600/5acf330e7f8b9ae2138c3b5e/html5/thumbnails/25.jpg)
Verify the correct set-point values and Verify the correct set point values and descriptions on alarm set-points when associated field instruments are calibrated or changed, and each calendar year, but at intervals not to exceed 15 months.Review, and if necessary update, the operator’s alarm management plan each calendar year, not to exceed 15 months to determine the to exceed 15 months to determine the effectiveness of the plan.
7/14/2009 25
![Page 26: CRM Control Room ManagementControl Room Management NPRM... · Implement API RP-1168 Section 5 (incorporated 1168, Section 5, ... An operator shall seek control room or control room](https://reader035.vdocuments.us/reader035/viewer/2022062600/5acf330e7f8b9ae2138c3b5e/html5/thumbnails/26.jpg)
Monitor the content and volume of activity Monitor the content and volume of activity being directed to each controllers to assure controllers have sufficient time to analyze and react to incoming alarms. Address all deficiencies identified in the annual alarm management plan reviews.
7/14/2009 26
![Page 27: CRM Control Room ManagementControl Room Management NPRM... · Implement API RP-1168 Section 5 (incorporated 1168, Section 5, ... An operator shall seek control room or control room](https://reader035.vdocuments.us/reader035/viewer/2022062600/5acf330e7f8b9ae2138c3b5e/html5/thumbnails/27.jpg)
Each operator shall implement API RP-1168 Each operator shall implement API RP-1168, Section 7 (incorporated by reference, see §192.7/195.3)/ )Each operator must establish communications between control room representatives, pmanagement, and field personnel when planning and implementing physical changes to pipeline
i fi i equipment or configuration.
7/14/2009 27
![Page 28: CRM Control Room ManagementControl Room Management NPRM... · Implement API RP-1168 Section 5 (incorporated 1168, Section 5, ... An operator shall seek control room or control room](https://reader035.vdocuments.us/reader035/viewer/2022062600/5acf330e7f8b9ae2138c3b5e/html5/thumbnails/28.jpg)
Field personnel must be required to notify the controller when emergency conditions exist g yand when making field changes that affect control room operations.An operator shall seek control room or control room management participation prior to i l t ti f i ifi t i li implementation of significant pipeline hydraulic or configuration changes.An operator must document each of these An operator must document each of these occurrences and keep records for a minimum of five years.of five years.
7/14/2009 28
![Page 29: CRM Control Room ManagementControl Room Management NPRM... · Implement API RP-1168 Section 5 (incorporated 1168, Section 5, ... An operator shall seek control room or control room](https://reader035.vdocuments.us/reader035/viewer/2022062600/5acf330e7f8b9ae2138c3b5e/html5/thumbnails/29.jpg)
The operator must review control room operations following any event that must b d d d dbe reported as an accident or incident and correct, where necessary, deficiencies
l drelated to:Controller Fatigue
i ld iField EquipmentThe operation of any relief device
7/14/2009 29
![Page 30: CRM Control Room ManagementControl Room Management NPRM... · Implement API RP-1168 Section 5 (incorporated 1168, Section 5, ... An operator shall seek control room or control room](https://reader035.vdocuments.us/reader035/viewer/2022062600/5acf330e7f8b9ae2138c3b5e/html5/thumbnails/30.jpg)
ProceduresProceduresSCADA configurationSCADA performancepEach operator must include lessons learned from the operator’s experience into their training program, whether the training programs are simulator or nonwhether the training programs are simulator or non-simulator based.
7/14/2009 30
![Page 31: CRM Control Room ManagementControl Room Management NPRM... · Implement API RP-1168 Section 5 (incorporated 1168, Section 5, ... An operator shall seek control room or control room](https://reader035.vdocuments.us/reader035/viewer/2022062600/5acf330e7f8b9ae2138c3b5e/html5/thumbnails/31.jpg)
Each operator must establish a training program and review the training program content to and review the training program content to identify potential improvements at least once each calendar year but at intervals not to exceed each calendar year but at intervals not to exceed 15 months.
An operator must train each controller to carry An operator must train each controller to carry out the roles and responsibilities defined by the operator operator.
The training program must include the f ll i l tfollowing elements:
7/14/2009 31
![Page 32: CRM Control Room ManagementControl Room Management NPRM... · Implement API RP-1168 Section 5 (incorporated 1168, Section 5, ... An operator shall seek control room or control room](https://reader035.vdocuments.us/reader035/viewer/2022062600/5acf330e7f8b9ae2138c3b5e/html5/thumbnails/32.jpg)
Responding to abnormal operating conditions likely to occur simultaneously or in sequencelikely to occur simultaneously or in sequence
Use of a simulator or non-computerized (table-top) method to train controllers to recognize top) method to train controllers to recognize abnormal operating conditions, particularly leak eventsevents.
Training controllers on their responsibilities for i i d h ’ communication under the operator’s emergency
response procedures.
7/14/2009 32
![Page 33: CRM Control Room ManagementControl Room Management NPRM... · Implement API RP-1168 Section 5 (incorporated 1168, Section 5, ... An operator shall seek control room or control room](https://reader035.vdocuments.us/reader035/viewer/2022062600/5acf330e7f8b9ae2138c3b5e/html5/thumbnails/33.jpg)
Training that is sufficient to obtain a working knowledge of the pipeline system especially knowledge of the pipeline system, especially during the development of abnormal operating conditions.conditions.
For pipeline operating setups that are periodically but infrequently used provide an periodically, but infrequently used, provide an opportunity to review procedures in advance of applicationapplication.
7/14/2009 33
![Page 34: CRM Control Room ManagementControl Room Management NPRM... · Implement API RP-1168 Section 5 (incorporated 1168, Section 5, ... An operator shall seek control room or control room](https://reader035.vdocuments.us/reader035/viewer/2022062600/5acf330e7f8b9ae2138c3b5e/html5/thumbnails/34.jpg)
Upon request, operators must submit their Upon request, operators must submit their completed programs to PHMSA or, in the case of an intrastate pipeline facility regulated by a State, to the appropriate State agency.
7/14/2009 34
![Page 35: CRM Control Room ManagementControl Room Management NPRM... · Implement API RP-1168 Section 5 (incorporated 1168, Section 5, ... An operator shall seek control room or control room](https://reader035.vdocuments.us/reader035/viewer/2022062600/5acf330e7f8b9ae2138c3b5e/html5/thumbnails/35.jpg)
Permitted only qualified controllers to operate the i lipipeline
Implemented the requirements of this section
Continued to address ergonomic and fatigue factors and
I l d ll i fi di i d Involved controllers in finding ways to sustain and improve safety and pipeline integrity through control room managementroom management
7/14/2009 35
![Page 36: CRM Control Room ManagementControl Room Management NPRM... · Implement API RP-1168 Section 5 (incorporated 1168, Section 5, ... An operator shall seek control room or control room](https://reader035.vdocuments.us/reader035/viewer/2022062600/5acf330e7f8b9ae2138c3b5e/html5/thumbnails/36.jpg)
An operator must maintain for review An operator must maintain for review during inspection:
d h d lio Records that demonstrate compliance with this section
o Documentation of decisions and analyses to support any deviation from analyses to support any deviation from the procedures required by this section
7/14/2009 36
![Page 37: CRM Control Room ManagementControl Room Management NPRM... · Implement API RP-1168 Section 5 (incorporated 1168, Section 5, ... An operator shall seek control room or control room](https://reader035.vdocuments.us/reader035/viewer/2022062600/5acf330e7f8b9ae2138c3b5e/html5/thumbnails/37.jpg)
Amend Sec. 192.605 by adding paragraph Amend Sec. 192.605 by adding paragraph (b)(12) to read as follows:
Sec. 192.605 Procedural manual for operations, maintenance, and emergencies.* * * * *(b) * * *( )(12) Implementing the applicable control
room management procedures required by Sec. 192.631.
7/14/2009 37
![Page 38: CRM Control Room ManagementControl Room Management NPRM... · Implement API RP-1168 Section 5 (incorporated 1168, Section 5, ... An operator shall seek control room or control room](https://reader035.vdocuments.us/reader035/viewer/2022062600/5acf330e7f8b9ae2138c3b5e/html5/thumbnails/38.jpg)
192.615 by adding paragraph (a)(11) to read as 192.615 by adding paragraph (a)(11) to read as follows:Sec. 192.615 Emergency plans.g y p
(a) * * *(11) Actions required to be taken by a (11) Actions required to be taken by a
controller during an emergency in accordance with Sec. 192.631.
7/14/2009 38
![Page 39: CRM Control Room ManagementControl Room Management NPRM... · Implement API RP-1168 Section 5 (incorporated 1168, Section 5, ... An operator shall seek control room or control room](https://reader035.vdocuments.us/reader035/viewer/2022062600/5acf330e7f8b9ae2138c3b5e/html5/thumbnails/39.jpg)
195.402 by adding paragraphs (c)(15) and 195.402 by adding paragraphs (c)(15) and (e)(10) to read as follows:Sec. 195.402 Procedural manual for operations, maintenance, and emergencies. * * * * * (c) * * * (15) Implementing the applicable control room management procedures required by S Sec.
7/14/2009 39
![Page 40: CRM Control Room ManagementControl Room Management NPRM... · Implement API RP-1168 Section 5 (incorporated 1168, Section 5, ... An operator shall seek control room or control room](https://reader035.vdocuments.us/reader035/viewer/2022062600/5acf330e7f8b9ae2138c3b5e/html5/thumbnails/40.jpg)
195.454.* * * * * 195.454. (e) * * * (10) Implementing actions required to be (10) Implementing actions required to be taken by a controller during an emergency, in accordance with Sec. 195.454.
7/14/2009 40
![Page 41: CRM Control Room ManagementControl Room Management NPRM... · Implement API RP-1168 Section 5 (incorporated 1168, Section 5, ... An operator shall seek control room or control room](https://reader035.vdocuments.us/reader035/viewer/2022062600/5acf330e7f8b9ae2138c3b5e/html5/thumbnails/41.jpg)
Wallace (Wally) McGaugheyWallace (Wally) McGaugheyWallace (Wally) McGaugheyWallace (Wally) McGaugheyPipeline Safety SpecialistPipeline Safety Specialist
U S Department of Transportation U S Department of Transportation U.S. Department of Transportation U.S. Department of Transportation PHMSA Office of Training and QualificationsPHMSA Office of Training and Qualifications
Office (405) 954Office (405) 954--68066806Fax Fax (405) 954(405) 954--02060206Email [email protected] [email protected]
7/14/2009