CRITICAL VARIABLES PROGRAM
Get plant operating results with aninexpensive and simple
implementation using onlyPI-ProcessBook and PI-DataLink
(NO Programming and LOW maintenance!)
![Page 2: CRITICAL VARIABLES PROGRAM Get plant operating results with an inexpensive and simple implementation using only PI-ProcessBook and PI-DataLink (NO Programming](https://reader033.vdocuments.us/reader033/viewer/2022061413/56649c935503460f9494fde3/html5/thumbnails/2.jpg)
AGENDA
• Introduction• Problem: Unit Operating
Settings• Proposed Solution & Game Plan• Details of Critical Variables
Program– Displays for current plant status– Reports for deviation tracking
• Results: Successes & Failures
![Page 3: CRITICAL VARIABLES PROGRAM Get plant operating results with an inexpensive and simple implementation using only PI-ProcessBook and PI-DataLink (NO Programming](https://reader033.vdocuments.us/reader033/viewer/2022061413/56649c935503460f9494fde3/html5/thumbnails/3.jpg)
GENERAL INFO
• Carolyn Przybylski (sha–BILL–skee)– B.S. Chemical Engineering (1987)– Started with Cytec as Process Engineer ->
Production Engineer -> Process Control Engineer– Currently Sr. Manufacturing Systems Engineer– PI System Manager (4 years)
• Cytec Industries – Fortier Plant– New Orleans, LA– Chemical Manufacturing plant– Continuous Processes (24/7/365)– 440+ Cytec employees & 150+ contractors
onsite
![Page 4: CRITICAL VARIABLES PROGRAM Get plant operating results with an inexpensive and simple implementation using only PI-ProcessBook and PI-DataLink (NO Programming](https://reader033.vdocuments.us/reader033/viewer/2022061413/56649c935503460f9494fde3/html5/thumbnails/4.jpg)
PI SYSTEM LAYOUT
• Separate Networks (Process & Office)• Two 50K tag servers with PI-to-PI
interface• Interfaces:
– 6 DCS (GSE D/3 & Yokogawa)– 20+ PLC (Square D, Allen Bradley)– 2 APC Systems– Laboratory Mgmt System (LIMS)– Environmental Mgmt System (EMIS)
PROCESS NETWORK
OFFICE NETWORK
Routers/Firewall
DCS & PLC
Process PI Server
(50k)APC
Office PI
Server (50k)
PI-to-PI Server
EMIS
LIMS
Clients
![Page 5: CRITICAL VARIABLES PROGRAM Get plant operating results with an inexpensive and simple implementation using only PI-ProcessBook and PI-DataLink (NO Programming](https://reader033.vdocuments.us/reader033/viewer/2022061413/56649c935503460f9494fde3/html5/thumbnails/5.jpg)
![Page 6: CRITICAL VARIABLES PROGRAM Get plant operating results with an inexpensive and simple implementation using only PI-ProcessBook and PI-DataLink (NO Programming](https://reader033.vdocuments.us/reader033/viewer/2022061413/56649c935503460f9494fde3/html5/thumbnails/6.jpg)
PROBLEM
• Spent a lot of time & money improving control loops to enable finer control closer to constraints
• Plant was still being run at “easy” settings rather than economical
• Some settings could be detrimental to process (plugging) or equipment (corrosion) over the long term
• Advanced Control option too expensive
![Page 7: CRITICAL VARIABLES PROGRAM Get plant operating results with an inexpensive and simple implementation using only PI-ProcessBook and PI-DataLink (NO Programming](https://reader033.vdocuments.us/reader033/viewer/2022061413/56649c935503460f9494fde3/html5/thumbnails/7.jpg)
“CHEAP & EASY” SOLUTION
Needed a system to maintain the plant attarget operating points and
to track excursions from target• CHEAP – used existing PI Clients of
ProcessBook and DataLink• EASY – no special programming required, just
standard ProcessBook, DataLink, and Excel functions
• Focused effort on developing list of key parameters and their targets/limits and then following up to ensure that unit was run within those limits
![Page 8: CRITICAL VARIABLES PROGRAM Get plant operating results with an inexpensive and simple implementation using only PI-ProcessBook and PI-DataLink (NO Programming](https://reader033.vdocuments.us/reader033/viewer/2022061413/56649c935503460f9494fde3/html5/thumbnails/8.jpg)
WHY USE PI INSTEAD OF DCS?
• Lab sample results do not reside in DCS, but do reside in PI
• Some key parameters are calculations that are done in PI, not on DCS
• Future parameters from other units that were in PI
• Limited DCS screens used for control; can use PC screen for PI
• Easy to make changes (more people trained on PI-ProcessBook and Excel than on DCS)
![Page 9: CRITICAL VARIABLES PROGRAM Get plant operating results with an inexpensive and simple implementation using only PI-ProcessBook and PI-DataLink (NO Programming](https://reader033.vdocuments.us/reader033/viewer/2022061413/56649c935503460f9494fde3/html5/thumbnails/9.jpg)
GAME PLAN
• Step 1: Establish list of critical variables as key indices for the plant and include ranges for TARGET, HI/LO, and HIHI/LOLO
• Step 2: Develop ProcessBook display to show where plant is currently operating in relation to established targets (snapshot view)
• Step 3: Develop daily DataLink report to show how much time was spent in each range (% of time) for monitoring off-shift periods
![Page 10: CRITICAL VARIABLES PROGRAM Get plant operating results with an inexpensive and simple implementation using only PI-ProcessBook and PI-DataLink (NO Programming](https://reader033.vdocuments.us/reader033/viewer/2022061413/56649c935503460f9494fde3/html5/thumbnails/10.jpg)
HOW ARE WE DOING RIGHT NOW?
![Page 11: CRITICAL VARIABLES PROGRAM Get plant operating results with an inexpensive and simple implementation using only PI-ProcessBook and PI-DataLink (NO Programming](https://reader033.vdocuments.us/reader033/viewer/2022061413/56649c935503460f9494fde3/html5/thumbnails/11.jpg)
NO VBA PROGRAMMING:MULTISTATE SYMBOLS, ONLY
![Page 12: CRITICAL VARIABLES PROGRAM Get plant operating results with an inexpensive and simple implementation using only PI-ProcessBook and PI-DataLink (NO Programming](https://reader033.vdocuments.us/reader033/viewer/2022061413/56649c935503460f9494fde3/html5/thumbnails/12.jpg)
HOW HAVE WE DONE IN THE PAST?
![Page 13: CRITICAL VARIABLES PROGRAM Get plant operating results with an inexpensive and simple implementation using only PI-ProcessBook and PI-DataLink (NO Programming](https://reader033.vdocuments.us/reader033/viewer/2022061413/56649c935503460f9494fde3/html5/thumbnails/13.jpg)
![Page 14: CRITICAL VARIABLES PROGRAM Get plant operating results with an inexpensive and simple implementation using only PI-ProcessBook and PI-DataLink (NO Programming](https://reader033.vdocuments.us/reader033/viewer/2022061413/56649c935503460f9494fde3/html5/thumbnails/14.jpg)
PI TIME FILTER FUNCTION
![Page 15: CRITICAL VARIABLES PROGRAM Get plant operating results with an inexpensive and simple implementation using only PI-ProcessBook and PI-DataLink (NO Programming](https://reader033.vdocuments.us/reader033/viewer/2022061413/56649c935503460f9494fde3/html5/thumbnails/15.jpg)
TIME INTERVAL FORMATTING
=($B$4-$B$3)*24&"h"
![Page 16: CRITICAL VARIABLES PROGRAM Get plant operating results with an inexpensive and simple implementation using only PI-ProcessBook and PI-DataLink (NO Programming](https://reader033.vdocuments.us/reader033/viewer/2022061413/56649c935503460f9494fde3/html5/thumbnails/16.jpg)
CRITICAL LIMITSENTRY FOR REPORT
Cell “$L10” used in Time
Filter Formula
![Page 17: CRITICAL VARIABLES PROGRAM Get plant operating results with an inexpensive and simple implementation using only PI-ProcessBook and PI-DataLink (NO Programming](https://reader033.vdocuments.us/reader033/viewer/2022061413/56649c935503460f9494fde3/html5/thumbnails/17.jpg)
TIME FILTER FUNCTION EXPRESSION (LO/HI)
![Page 18: CRITICAL VARIABLES PROGRAM Get plant operating results with an inexpensive and simple implementation using only PI-ProcessBook and PI-DataLink (NO Programming](https://reader033.vdocuments.us/reader033/viewer/2022061413/56649c935503460f9494fde3/html5/thumbnails/18.jpg)
TIME FILTER FUNCTION EXPRESSION (LOLO/HIHI)
![Page 19: CRITICAL VARIABLES PROGRAM Get plant operating results with an inexpensive and simple implementation using only PI-ProcessBook and PI-DataLink (NO Programming](https://reader033.vdocuments.us/reader033/viewer/2022061413/56649c935503460f9494fde3/html5/thumbnails/19.jpg)
• % Time in Target Ranges:– Unit 1 = 95%– Unit 2 = 80%
• Steam Savings of M$1.6• Long term savings: TBD
– Extend equipment life?– Reduce outages due to plugging?
• Communication key to success (supervisors, operators, engineers)
RESULTS
![Page 20: CRITICAL VARIABLES PROGRAM Get plant operating results with an inexpensive and simple implementation using only PI-ProcessBook and PI-DataLink (NO Programming](https://reader033.vdocuments.us/reader033/viewer/2022061413/56649c935503460f9494fde3/html5/thumbnails/20.jpg)
• Originally one display and one report applied to operating parameters for one unit
• Now three units using displays and reports for operating parameters
• As successes are realized, more units should begin similar implementations
• Have added displays and reports for Cooling Tower Operation and Quality Control
ADDITIONAL STEPS
![Page 21: CRITICAL VARIABLES PROGRAM Get plant operating results with an inexpensive and simple implementation using only PI-ProcessBook and PI-DataLink (NO Programming](https://reader033.vdocuments.us/reader033/viewer/2022061413/56649c935503460f9494fde3/html5/thumbnails/21.jpg)
COOLING TOWER DISPLAY
![Page 22: CRITICAL VARIABLES PROGRAM Get plant operating results with an inexpensive and simple implementation using only PI-ProcessBook and PI-DataLink (NO Programming](https://reader033.vdocuments.us/reader033/viewer/2022061413/56649c935503460f9494fde3/html5/thumbnails/22.jpg)
USED DATASETS TODISPLAY LIMITS ON TRENDS
![Page 23: CRITICAL VARIABLES PROGRAM Get plant operating results with an inexpensive and simple implementation using only PI-ProcessBook and PI-DataLink (NO Programming](https://reader033.vdocuments.us/reader033/viewer/2022061413/56649c935503460f9494fde3/html5/thumbnails/23.jpg)
QUALITY CONTROL DISPLAY
![Page 24: CRITICAL VARIABLES PROGRAM Get plant operating results with an inexpensive and simple implementation using only PI-ProcessBook and PI-DataLink (NO Programming](https://reader033.vdocuments.us/reader033/viewer/2022061413/56649c935503460f9494fde3/html5/thumbnails/24.jpg)
SUMMARY OFCRITICAL VARIABLES PROGRAM
• Simple method to maintain key variables on target using basic functionality of PI & Excel
• Can be applied to multiple areas such as production, cooling towers, & quality control
• KEY COMPONENT: COMMUNICATION!– Tool just helps to provide FOCUS on key issues &
problem areas– Once target deviations are identified, operators,
engineers, and supervisors MUST work together to apply solutions (specific communications/training)
![Page 25: CRITICAL VARIABLES PROGRAM Get plant operating results with an inexpensive and simple implementation using only PI-ProcessBook and PI-DataLink (NO Programming](https://reader033.vdocuments.us/reader033/viewer/2022061413/56649c935503460f9494fde3/html5/thumbnails/25.jpg)
QUESTIONS / COMMENTS?
Thank you for your time and interest!