crew transfer walk to work+ transfer cargo · walk to work get 20 % more work done each shift crew...

1
WALK TO WORK + Safe and efficient offshore logistics without waiting on weather No need for platform cranes Many fixed facility cranes needed Offshore cranes are unreliable: more mainte- nance than operational hours Savings of € 100.000 per crane per year on maintenance and certification alone No need for helicopters Expensive and unreliable: 1 out of 5 flights is more than an hour late No need for a helideck, saving € 100.000 per platform/y Helicopters have limited capacity No need for jack up barges High mobilization- and day rates Hard to maneuver and dependent on water depth and soil conditions Risk of punch through BM-Gangway motion compensated people transfer Effective time on platform Travel & Waiting Helicopter transfer Travel & Waiting Walk to work Get 20 % more work done each shift 15% waiting on the weather 75% waiting on the weather BM-T40 motion compensated lifting Save 63 % on project costs Vessel with BM-T40 (H s < 3.0 m) Jack up barge (H s < 1.5 m) Vessel w.o. BM-Systems (H s < 0.75 m) 4 days actual vessel hire 6 days actual vessel hire 12 days actual vessel hire 3 day job 3 day job 3 day job 50% waiting on the weather Benefits of Walk to Work + Increase workability three times 100 % 80 % 60 % 40 % 20 % 0 % D N O S A J J M A M F J Vessel with motion compensation (H s = max 3.0 m) 85 % Jack up barge (H s = max 1.5 m) 50 % Vessel w.o. motion compensation (H s = max 0.75 m) 25 % 9.5 hr 11.5 hr Typical day rate Typical mobilization costs Total costs per job Savings with Barge Master W2W + vessel with BM-T40 65.000 65.000 325.000 Jack up barge 80.000 400.000 880.000 12.210.000 63 % 60.000 60.000 780.000 10.010.000 58 % Vessel w.o. BM-T40 • No swinging loads while lifting • Safer travelling than by helicopter, boat landing or conventional basket • Low risk operations Safety • Less loss of production thanks to fast project execution • One crane on vessel versus many platform cranes • Ability to work 24/7, also at night Efficiency • Fast and predictable construction and maintenance periods • Workability of 300+ days a year on the North Sea • Improved ability to perform unplanned maintenance at any time Reliability (22 jobs/year) Contact us if you want to explore the added value of Walk to Work+ for your project +31 (0) 10 409 00 60 [email protected]

Upload: others

Post on 03-Aug-2020

5 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: CREW TRANSFER WALK TO WORK+ TRANSFER CARGO · Walk to work Get 20 % more work done each shift CREW TRANSFER CARGO TRANSFER 15% waiting on the weather 75% waiting on the weather BM-T40

WALK TO WORK+ Safe and efficient offshore logistics without waiting on weather

No need for platform cranes

Many fixed facility cranes needed

Offshore cranes areunreliable: more mainte-

nance than operational hours

Savings of € 100.000 per crane per year on maintenance

and certification alone

No need for helicopters

Expensive and unreliable:1 out of 5 flights is more

than an hour late

No need for a helideck, saving

€ 100.000 per platform/y

Helicopters havelimited capacity

No need for jack up barges

High mobilization- and day rates

Hard to maneuver and dependent on water depth and soil conditions

Risk of punch through

BM-Gangway motion compensated people transfer

Effective timeon platform

Travel & Waiting

Helicopter transfer

Travel & Waiting

Walk to work

Get 20 % more work done each shift

CREWTRANSFER

CARGOTRANSFER

15% waiting on the weather

75% waiting on the weather

BM-T40 motion compensated lifting

Save 63 % on project costs

Vessel with BM-T40 (Hs < 3.0 m)

Jack up barge (Hs < 1.5 m)

Vessel w.o. BM-Systems (Hs < 0.75 m)

4 days actual vessel hire

6 days actual vessel hire

12 days actual vessel hire

3 day job

3 day job

3 day job 50% waiting on the weather

Benefits of Walk to Work+

Increase workability three times

100 %

80 %

60 %

40 %

20 %

0 %

DNOSAJJMAMFJ

Vessel with motion compensation(Hs = max 3.0 m)

85 %

Jack up barge(Hs = max 1.5 m)

50 %

Vesselw.o. motion

compensation(Hs = max 0.75 m)

25 %

9.5 hr 11.5 hr

Typical day rateTypical mobilization costs

Total costs per job

Savings with Barge Master

W2W+ vessel with BM-T40

65.00065.000

325.000

€€€

Jack up barge

80.000400.000880.000

12.210.000

63 %

€€€

60.00060.000

780.000

10.010.000

58 %

€€€

Vessel w.o. BM-T40

• No swinging loads while lifting

• Safer travelling than by helicopter, boat landing or conventional basket

• Low risk operations

Safety• Less loss of production thanks

to fast project execution• One crane on vessel versus

many platform cranes• Ability to work 24/7, also at

night

Efficiency• Fast and predictable construction

and maintenance periods• Workability of 300+ days a year on

the North Sea• Improved ability to perform

unplanned maintenance at any time

Reliability

(22 jobs/year)

Contact us if you want to explore the added value of Walk to Work+ for your project +31 (0) 10 409 00 60 [email protected]