crestline dampening system -...

60
Crestline ® Dampening System Installation Instructions Hamada C252 For Presses Originally Equipped With Molleton Dampeners X88-88 01/2001 Rev-A

Upload: others

Post on 20-Mar-2020

10 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Crestline Dampening System - cds.p6y3z3s5.hwcdn.netcds.p6y3z3s5.hwcdn.net/wp-content/uploads/2015/05/Hamada-C252.pdf · with upper control knobs (subject arrow) on OPS and NOPS. Turn

Crestline® Dampening System

Installation Instructions

Hamada C252

For Presses Originally Equipped WithMolleton Dampeners

X88-8801/2001

Rev-A

Page 2: Crestline Dampening System - cds.p6y3z3s5.hwcdn.netcds.p6y3z3s5.hwcdn.net/wp-content/uploads/2015/05/Hamada-C252.pdf · with upper control knobs (subject arrow) on OPS and NOPS. Turn

2

GENERAL INFORMATION

ATTENTIONCRESTLINE®

DAMPENEROWNER!

SAFETYINFORMATION

FOR YOUR SAFETY, DO NOT DISENGAGE OR REMOVE ANYGUARDS FROM THE CRESTLINE® DAMPENER. THE DAMP-ENER CONTAINS SOME INWARD ROTATING ROLLER NIPSTHAT CAN CAUSE INJURY IF LEFT UNGUARDED.

Accel Graphic Systems provides parts and service through itsauthorized distributors and dealers. Therefore, all requests forparts and service should be directed to your local dealer.

The philosophy of Accel Graphic Systems is to continually improveall of its products. Written notices of changes and improvementsare sent to Accel Graphic Systems' Dealers.

If the operating characteristics or the appearance of your productdiffers from those described in this manual, please contact yourlocal Accel Graphic Systems Dealer for updated information andassistance.

Always update your dampener when improvements are madeavailable, especially those related to safety.

YOUR AUTHORIZED CRESTLINE® DEALER IS:

THE SERIAL NUMBER OF YOURCRESTLINE® DAMPENER(S) IS:

Page 3: Crestline Dampening System - cds.p6y3z3s5.hwcdn.netcds.p6y3z3s5.hwcdn.net/wp-content/uploads/2015/05/Hamada-C252.pdf · with upper control knobs (subject arrow) on OPS and NOPS. Turn

3

GENERAL INFORMATION

BASICCONFIGURATION

OF CRESTLINE®

OPS = Operator's Side

NOPS = Non Operator's Side

TERMINOLOGY

TECHNICALASSISTANCE

For technical assistance, please contact:

ACCEL GRAPHIC SYSTEMS11103 Indian TrailDallas, TX 75229PHONE (972) 484-6808FAX (800) 365-6510E-MAIL [email protected] SITE www.accelgraphicsystems.com

Crestline® is covered by U.S. Patents and Patents Pending

Adjustmentsa. Intermediate to Oscillatorb. Metering to Intermediatec. Metering to Pand. Oscillator to Forme. Form to Platef. Form to Auxiliary Rider

Roller DescriptionP = PanM = MeteringI = IntermediateO = OscillatorF = FormA = Auxiliary Rider

Plate Cylinder

PM

I

O

F

c (5mm)b (4mm)

a (4mm)

d (4mm)

e (4mm)

A

f (2.5mm)

Page 4: Crestline Dampening System - cds.p6y3z3s5.hwcdn.netcds.p6y3z3s5.hwcdn.net/wp-content/uploads/2015/05/Hamada-C252.pdf · with upper control knobs (subject arrow) on OPS and NOPS. Turn

4

GENERAL INFORMATION

1. Drill

2. Standard Screwdriver

3. 8 mm Open End

4. 10 mm Open End

5. 13 mm Open End

6. 2.5 mm Allen Wrench

7. 3 mm Allen Wrench

8. 4 mm Allen Wrench

9. 5 mm Allen Wrench

10. 6 mm Allen Wrench

11. 2.5 mm Punch

12. 4 mm Punch

13. Hammer

REQUIRED TOOLS

Page 5: Crestline Dampening System - cds.p6y3z3s5.hwcdn.netcds.p6y3z3s5.hwcdn.net/wp-content/uploads/2015/05/Hamada-C252.pdf · with upper control knobs (subject arrow) on OPS and NOPS. Turn

PRE-INSTALLATION INFORMATION

1. Cut the ties holding the rollers and examine rollers for gouges,scratches, or nicks.

2. Check box and parts board to make sure all pieces are presentand nothing had broken in shipping.

3. Check the dampener for parallel (cutter bed works best). Ifdampener rocks, it needs to be realigned. Loosen tie bar boltsat OPS and align the frames on the flat surface. Retighten bolts.

5

Page 6: Crestline Dampening System - cds.p6y3z3s5.hwcdn.netcds.p6y3z3s5.hwcdn.net/wp-content/uploads/2015/05/Hamada-C252.pdf · with upper control knobs (subject arrow) on OPS and NOPS. Turn

6

Page 7: Crestline Dampening System - cds.p6y3z3s5.hwcdn.netcds.p6y3z3s5.hwcdn.net/wp-content/uploads/2015/05/Hamada-C252.pdf · with upper control knobs (subject arrow) on OPS and NOPS. Turn

7

DISASSEMBLY

1Remove all upper side covers at OPS and NOPS. Removemolleton rollers and water pan from existing dampener.

2

3

On #1 unit, remove cylinder guard, top inker guard, and driptray. Remove mounting block and trip rods. Save for reinstalla-tion. On #2 unit, remove large dampener guard, along withchrome mounting arms. Save hardware and arms for reinstal-lation.

Cut wires to dampener motor. Remove motor and mountingbracket. Secure wires with wire nuts provided.

Page 8: Crestline Dampening System - cds.p6y3z3s5.hwcdn.netcds.p6y3z3s5.hwcdn.net/wp-content/uploads/2015/05/Hamada-C252.pdf · with upper control knobs (subject arrow) on OPS and NOPS. Turn

8

Page 9: Crestline Dampening System - cds.p6y3z3s5.hwcdn.netcds.p6y3z3s5.hwcdn.net/wp-content/uploads/2015/05/Hamada-C252.pdf · with upper control knobs (subject arrow) on OPS and NOPS. Turn

9

DISASSEMBLY

At NOPS, remove block (left subject arrow). Remove gear fromwater fountain roller. Remove NOPS bushings. Remove foun-tain roller.

Disconnect wires from ductor solenoid and remove solenoidassembly.

Remove E-rings from ductor links and remove links. (Photoshows solenoid still in place.)

4

5

6

Page 10: Crestline Dampening System - cds.p6y3z3s5.hwcdn.netcds.p6y3z3s5.hwcdn.net/wp-content/uploads/2015/05/Hamada-C252.pdf · with upper control knobs (subject arrow) on OPS and NOPS. Turn

10

Page 11: Crestline Dampening System - cds.p6y3z3s5.hwcdn.netcds.p6y3z3s5.hwcdn.net/wp-content/uploads/2015/05/Hamada-C252.pdf · with upper control knobs (subject arrow) on OPS and NOPS. Turn

11

DISASSEMBLY

Remove springs from ductor arms. Punch out pins in ductorarms (from non-threaded side.) Loosen set collars on shaft. Pullout shaft through OPS frame. (Pieces will come off end ofshaft.) At OPS and NOPS, remove ductor stop.

Note: pins in ductor arms may be difficult to remove if punch isnot properly aligned.

Remove OPS fountain roller bushings.

At NOPS, remove screws in ink ductor solenoid and let solenoidhang freely. Remove four screws in oscillator drive assemblyand pull assembly out. Save hardware and drive assembly forreinstallation.

7

8

9

Page 12: Crestline Dampening System - cds.p6y3z3s5.hwcdn.netcds.p6y3z3s5.hwcdn.net/wp-content/uploads/2015/05/Hamada-C252.pdf · with upper control knobs (subject arrow) on OPS and NOPS. Turn

12

Page 13: Crestline Dampening System - cds.p6y3z3s5.hwcdn.netcds.p6y3z3s5.hwcdn.net/wp-content/uploads/2015/05/Hamada-C252.pdf · with upper control knobs (subject arrow) on OPS and NOPS. Turn

13

DISASSEMBLY

Remove water oscillator spool by punching out pin. (Photoshows drive assembly still on press.)

Remove tab on inside of press frame that secures oscillatorbushing (not shown). Take off cover plate on oscillator housing.Thread two screws into housing and pull housing out. (Bushingcan not be removed if lift cams are not clear. Use T-wrench frompress to rotate lift arms.) If bushing only comes out part of way,a lift cam is still blocking it, probably inner one.

On #2 unit only: relocate existing tie bar to position shownusing provided hardware.

10

11

12

Page 14: Crestline Dampening System - cds.p6y3z3s5.hwcdn.netcds.p6y3z3s5.hwcdn.net/wp-content/uploads/2015/05/Hamada-C252.pdf · with upper control knobs (subject arrow) on OPS and NOPS. Turn

14

Page 15: Crestline Dampening System - cds.p6y3z3s5.hwcdn.netcds.p6y3z3s5.hwcdn.net/wp-content/uploads/2015/05/Hamada-C252.pdf · with upper control knobs (subject arrow) on OPS and NOPS. Turn

On OPS and NOPS, remove unused oil lines and plug with setscrews provided.

Note: Top photo shows OPS #1 and #2Middle photos show NOPS #1 and #2

Check all remaining oil lines for proper position.

Remove form roller locating studs (bottom photo).

13

15

DISASSEMBLY

14

You are now ready to install Crestline®.

Page 16: Crestline Dampening System - cds.p6y3z3s5.hwcdn.netcds.p6y3z3s5.hwcdn.net/wp-content/uploads/2015/05/Hamada-C252.pdf · with upper control knobs (subject arrow) on OPS and NOPS. Turn

16

Page 17: Crestline Dampening System - cds.p6y3z3s5.hwcdn.netcds.p6y3z3s5.hwcdn.net/wp-content/uploads/2015/05/Hamada-C252.pdf · with upper control knobs (subject arrow) on OPS and NOPS. Turn

17

INSTALLATION

Reinstall water oscillating roller. Follow steps 9 to 11 fromDisassembly section in reverse order.

At OPS and NOPS, insert lift pins. Slide pin through until flangebottoms out on water form hanger. On NOPS, secure withexisting hex bolt. On OPS, secure with existing flat head,slotted bolt.

At OPS and NOPS, install lift arms on previously installed liftpins. Secure with set collar provided. Note: be sure threadedhole on top side of lift arm is pointed toward feeder. (Photoshows arm retained by snap ring.)

3

2

1

Page 18: Crestline Dampening System - cds.p6y3z3s5.hwcdn.netcds.p6y3z3s5.hwcdn.net/wp-content/uploads/2015/05/Hamada-C252.pdf · with upper control knobs (subject arrow) on OPS and NOPS. Turn

18

Page 19: Crestline Dampening System - cds.p6y3z3s5.hwcdn.netcds.p6y3z3s5.hwcdn.net/wp-content/uploads/2015/05/Hamada-C252.pdf · with upper control knobs (subject arrow) on OPS and NOPS. Turn

19

INSTALLATION

At OPS and NOPS, install dampener mounting frames. Retainwith hardware supplied.

Insert dampener into bearing cups. Secure with mounting caps.Note: plastic screw in center of cap is factory set. Do not adjust.

At OPS and NOPS, secure dampener to lift arms using shoul-der bolt provided. To remove any end play, adjust plasticscrews on mounting frames to just touch the dampener frames.Secure with nut.

4

5

6

Page 20: Crestline Dampening System - cds.p6y3z3s5.hwcdn.netcds.p6y3z3s5.hwcdn.net/wp-content/uploads/2015/05/Hamada-C252.pdf · with upper control knobs (subject arrow) on OPS and NOPS. Turn

20

Page 21: Crestline Dampening System - cds.p6y3z3s5.hwcdn.netcds.p6y3z3s5.hwcdn.net/wp-content/uploads/2015/05/Hamada-C252.pdf · with upper control knobs (subject arrow) on OPS and NOPS. Turn

21

INSTALLATION

At NOPS, install water pan valve bracket as shown. Attachvalve assembly to the new brackets using the bolts provided.Note: photo shows #1 unit. Second unit uses longer bolts andspools.

Install water form using original water form shaft. (Photo showsauxiliary rider already installed.)

On guard mounting arms of #2 unit, drill hole in each arm usingprovided template and drill bit. Remount arms and attachbottom part of guard as original. At top, slip spacer between armand guard. Slip bolt from inside guard, through spacer and arm.Secure with provided chrome nut and lock washer. Recheckproper microswitch activation.

7

8

9

Page 22: Crestline Dampening System - cds.p6y3z3s5.hwcdn.netcds.p6y3z3s5.hwcdn.net/wp-content/uploads/2015/05/Hamada-C252.pdf · with upper control knobs (subject arrow) on OPS and NOPS. Turn

22

Page 23: Crestline Dampening System - cds.p6y3z3s5.hwcdn.netcds.p6y3z3s5.hwcdn.net/wp-content/uploads/2015/05/Hamada-C252.pdf · with upper control knobs (subject arrow) on OPS and NOPS. Turn

On #1 unit, mount new guards and hardware using existing liftarms. Recheck microswitch activation.

23

INSTALLATION

10

Page 24: Crestline Dampening System - cds.p6y3z3s5.hwcdn.netcds.p6y3z3s5.hwcdn.net/wp-content/uploads/2015/05/Hamada-C252.pdf · with upper control knobs (subject arrow) on OPS and NOPS. Turn

24

Page 25: Crestline Dampening System - cds.p6y3z3s5.hwcdn.netcds.p6y3z3s5.hwcdn.net/wp-content/uploads/2015/05/Hamada-C252.pdf · with upper control knobs (subject arrow) on OPS and NOPS. Turn

25

FINAL ADJUSTMENTS

Water Form to Plate

Adjust contact pressure of water form against the plate withlower control knobs (subject arrow) on OPS and NOPS. Turnclockwise to decrease pressure; counterclockwise to increase.Stripe should be 5/32" (4 mm).

Water Oscillator to Form

Stop press and let sit for about 10 seconds. Then jog forwardto observe stripe.a) Adjusting Parallel Pressure:

Loosen set screw and turn shaft bracket (eccentric) toadjust parallel pressure. Turn clockwise to increase contactpressure of NOPS; counterclockwise to increase contactpressure of OPS.

b) Adjusting Overall Contact Pressure:Loosen set screw. With screw driver, turn shaft clockwise toincrease contact pressure; counterclockwise to decrease.Stripe should be 5/32" (4mm).

Mount a metal plate to plate cylinder. Dab small amount of inkon dampener form roller. Slowly jog and then run press until inkis evenly distributed on oscillating and form rollers.

1

2

3

Plate Cylinder

PM

I

O

F

(4mm)

A

Plate Cylinder

PM

I

O

F(4mm) A

Page 26: Crestline Dampening System - cds.p6y3z3s5.hwcdn.netcds.p6y3z3s5.hwcdn.net/wp-content/uploads/2015/05/Hamada-C252.pdf · with upper control knobs (subject arrow) on OPS and NOPS. Turn

26

Page 27: Crestline Dampening System - cds.p6y3z3s5.hwcdn.netcds.p6y3z3s5.hwcdn.net/wp-content/uploads/2015/05/Hamada-C252.pdf · with upper control knobs (subject arrow) on OPS and NOPS. Turn

27

FINAL ADJUSTMENTS

Water Oscillator to Intermediate

Run press and turn on Damp Form switch to ink remainingdampener rollers. Open top guard to stop press. Wait about 10seconds, then jog press forward to observe strip on intermedi-ate roller. Stripe should be 5/32" (4mm). Adjustment is madewith upper control knobs (subject arrow) on OPS and NOPS.Turn clockwise to decrease stripe; counterclockwise to in-crease.

Intermediate to Metering

Run press and turn on Damp Form switch. Open top guard tostop press. Wait 10 seconds, then jog press backwards toobserve stripe on metering roller. Stripe should be 1/8" to 5/32"(3.5 - 4 mm). Adjust cap screws (subject arrows) on OPS andNOPS. Turn screws clockwise to increase stripe; counterclock-wise to decrease.

Metering to Pan

Jog the press forward and observe the stripe on the pan roller.It should be 3/16" (4.5 - 5 mm). Turn the knurled metering knobs(subject arrow) clockwise to increase the stripe.

When the proper stripe has been obtained, spin the ratchetgears down until they bottom out on the stud and secure theratchet gear to the knurled knobs with the set screws.

4

5

6

Plate Cylinder

PM

I

O

F

(4mm)

A

Plate Cylinder

PM

I

O

F

(3.5 - 4mm)

A

Plate Cylinder

PM

I

O

F

(4.5 - 5mm)

A

Page 28: Crestline Dampening System - cds.p6y3z3s5.hwcdn.netcds.p6y3z3s5.hwcdn.net/wp-content/uploads/2015/05/Hamada-C252.pdf · with upper control knobs (subject arrow) on OPS and NOPS. Turn

28

Page 29: Crestline Dampening System - cds.p6y3z3s5.hwcdn.netcds.p6y3z3s5.hwcdn.net/wp-content/uploads/2015/05/Hamada-C252.pdf · with upper control knobs (subject arrow) on OPS and NOPS. Turn

Auxiliary Rider to Water Form

Install auxiliary water form rider roller into brackets. Secure withspring caps and cap head screws provided.

7

29

FINAL ADJUSTMENTS

Plate Cylinder

PM

I

O

F

(2.5mm)

A

Page 30: Crestline Dampening System - cds.p6y3z3s5.hwcdn.netcds.p6y3z3s5.hwcdn.net/wp-content/uploads/2015/05/Hamada-C252.pdf · with upper control knobs (subject arrow) on OPS and NOPS. Turn

30

A. Make sure all rollers are in place.

B. Spin knurled knobs until the ratchet stops.

C. Mount plate to cylinder. Wipe down all plates before running.Before running metal plates, pre-ink the Crestline® dampenerwith an extremely light coverage of ink by turning the DampForm and Ink Form switches to ON. For Silvermaster orelectrostatic plates, do not engage forms. Dab a small amountof ink on the metering roller to pre-ink dampener.

D. Turn on water pan valve.

NOTE: Accel recommends using the proper fountain solutionfor the plate material being run on the press. A good acid/gumetch should be used with metal plates. Accel offers a productcalled FC (Fountain Concentrate) that we recommend for afountain solution. Contact your Accel dealer for more information.

A. In general, the Crestline® dampener should not have to beadjusted from job to job. The form roller setting should never bechanged unless it has deviated from the factory specification of5/32" (4mm) to the plate.

B. Adjustments to the amount of water fed to the plate are madeby the knurled knobs that apply pressure to the metering roller.The dampener has been set up for minimum water. To increasethe water to the plate, turn the knurled knobs counterclockwise1 or 2 clicks at a time. This opens the gap between the meteringand pan rollers and allows more water to the plate.

C. In general, more water will only be required when going from ametal plate to an electrostatic or Silvermaster-type plate.

START OF DAY

RUNNINGDURING THE DAY

BASIC OPERATION

Page 31: Crestline Dampening System - cds.p6y3z3s5.hwcdn.netcds.p6y3z3s5.hwcdn.net/wp-content/uploads/2015/05/Hamada-C252.pdf · with upper control knobs (subject arrow) on OPS and NOPS. Turn

31

WASH UPSDURING THE DAY

1. Turn off water pan valve and drain excess water from the pan.

2. Mount a metal plate to the press.

3. Turn on the press and squirt a small amount of press wash onthe ink rollers.

4. Set the Damp Form and Ink Form switches to on, dropping thewater form and ink forms to the plate.

5. Use washup attachment as normal. When the press is clean,disengage forms.

6. Remove water pan and clean any solution left in it.

7. Be sure to wipe excess cleanup solution from the ends of thedampener metering and pan rollers.

1. Wash up press. Pay close attention to cleaning the ends of thepan and metering rollers that extend past the form rollers.

2. Spin the knurled knobs up.

END OF THE DAY

CLEANING & MAINTENANCE

Page 32: Crestline Dampening System - cds.p6y3z3s5.hwcdn.netcds.p6y3z3s5.hwcdn.net/wp-content/uploads/2015/05/Hamada-C252.pdf · with upper control knobs (subject arrow) on OPS and NOPS. Turn

32

DEGLAZING THEDAMPENER

Periodic deglazing of water-soluble contaminants will be neces-sary with the Crestline®. Typically, once every 2-3 weeks will besufficient, unless you are running electrostatic plates on a dailybasis whereas deglazing should be performed weekly. A 50/50solution of household ammonia and hot water can be used fordeglazing purposes. Accel recommends avoiding deglazerscontaining pumice or gritty substances. Always follow deglaz-ing with straight water and then roller wash. Accel offers a productcalled COMPOUND X that we recommend for deglazing oursystem. Contact your dealer or Accel for more information.

A. Place a small amount of grease on the gears once a month.

B. Inject grease into the oscillator grease fitting once a month.

OILING ANDGREASING THE

DAMPENER

CLEANING & MAINTENANCE

Page 33: Crestline Dampening System - cds.p6y3z3s5.hwcdn.netcds.p6y3z3s5.hwcdn.net/wp-content/uploads/2015/05/Hamada-C252.pdf · with upper control knobs (subject arrow) on OPS and NOPS. Turn

33

CRESTLINE®

CLEANING & MAINTENANCE CHART

CLEANING & MAINTENANCE

Wash Rollers

Deglaze Rollers

Metal Plate Users

Silvermaster Plate Users

Electrostatic Plate Users

Grease Gears

Inspect Ball Bearings

Check Roller Pressures

Check Roller Surfaces

Daily Weekly Bi-Weekly Monthly

Page 34: Crestline Dampening System - cds.p6y3z3s5.hwcdn.netcds.p6y3z3s5.hwcdn.net/wp-content/uploads/2015/05/Hamada-C252.pdf · with upper control knobs (subject arrow) on OPS and NOPS. Turn

34

Page 35: Crestline Dampening System - cds.p6y3z3s5.hwcdn.netcds.p6y3z3s5.hwcdn.net/wp-content/uploads/2015/05/Hamada-C252.pdf · with upper control knobs (subject arrow) on OPS and NOPS. Turn

35

Page 36: Crestline Dampening System - cds.p6y3z3s5.hwcdn.netcds.p6y3z3s5.hwcdn.net/wp-content/uploads/2015/05/Hamada-C252.pdf · with upper control knobs (subject arrow) on OPS and NOPS. Turn

36

HAMADA C252

Page 37: Crestline Dampening System - cds.p6y3z3s5.hwcdn.netcds.p6y3z3s5.hwcdn.net/wp-content/uploads/2015/05/Hamada-C252.pdf · with upper control knobs (subject arrow) on OPS and NOPS. Turn

37

Page 38: Crestline Dampening System - cds.p6y3z3s5.hwcdn.netcds.p6y3z3s5.hwcdn.net/wp-content/uploads/2015/05/Hamada-C252.pdf · with upper control knobs (subject arrow) on OPS and NOPS. Turn

38

Page 39: Crestline Dampening System - cds.p6y3z3s5.hwcdn.netcds.p6y3z3s5.hwcdn.net/wp-content/uploads/2015/05/Hamada-C252.pdf · with upper control knobs (subject arrow) on OPS and NOPS. Turn

39

Page 40: Crestline Dampening System - cds.p6y3z3s5.hwcdn.netcds.p6y3z3s5.hwcdn.net/wp-content/uploads/2015/05/Hamada-C252.pdf · with upper control knobs (subject arrow) on OPS and NOPS. Turn

40

Page 41: Crestline Dampening System - cds.p6y3z3s5.hwcdn.netcds.p6y3z3s5.hwcdn.net/wp-content/uploads/2015/05/Hamada-C252.pdf · with upper control knobs (subject arrow) on OPS and NOPS. Turn

41

Page 42: Crestline Dampening System - cds.p6y3z3s5.hwcdn.netcds.p6y3z3s5.hwcdn.net/wp-content/uploads/2015/05/Hamada-C252.pdf · with upper control knobs (subject arrow) on OPS and NOPS. Turn

42

Page 43: Crestline Dampening System - cds.p6y3z3s5.hwcdn.netcds.p6y3z3s5.hwcdn.net/wp-content/uploads/2015/05/Hamada-C252.pdf · with upper control knobs (subject arrow) on OPS and NOPS. Turn

43

Page 44: Crestline Dampening System - cds.p6y3z3s5.hwcdn.netcds.p6y3z3s5.hwcdn.net/wp-content/uploads/2015/05/Hamada-C252.pdf · with upper control knobs (subject arrow) on OPS and NOPS. Turn

44

Page 45: Crestline Dampening System - cds.p6y3z3s5.hwcdn.netcds.p6y3z3s5.hwcdn.net/wp-content/uploads/2015/05/Hamada-C252.pdf · with upper control knobs (subject arrow) on OPS and NOPS. Turn

45

Page 46: Crestline Dampening System - cds.p6y3z3s5.hwcdn.netcds.p6y3z3s5.hwcdn.net/wp-content/uploads/2015/05/Hamada-C252.pdf · with upper control knobs (subject arrow) on OPS and NOPS. Turn

46

Page 47: Crestline Dampening System - cds.p6y3z3s5.hwcdn.netcds.p6y3z3s5.hwcdn.net/wp-content/uploads/2015/05/Hamada-C252.pdf · with upper control knobs (subject arrow) on OPS and NOPS. Turn

47

Page 48: Crestline Dampening System - cds.p6y3z3s5.hwcdn.netcds.p6y3z3s5.hwcdn.net/wp-content/uploads/2015/05/Hamada-C252.pdf · with upper control knobs (subject arrow) on OPS and NOPS. Turn

48

Page 49: Crestline Dampening System - cds.p6y3z3s5.hwcdn.netcds.p6y3z3s5.hwcdn.net/wp-content/uploads/2015/05/Hamada-C252.pdf · with upper control knobs (subject arrow) on OPS and NOPS. Turn

49

Page 50: Crestline Dampening System - cds.p6y3z3s5.hwcdn.netcds.p6y3z3s5.hwcdn.net/wp-content/uploads/2015/05/Hamada-C252.pdf · with upper control knobs (subject arrow) on OPS and NOPS. Turn

50

Page 51: Crestline Dampening System - cds.p6y3z3s5.hwcdn.netcds.p6y3z3s5.hwcdn.net/wp-content/uploads/2015/05/Hamada-C252.pdf · with upper control knobs (subject arrow) on OPS and NOPS. Turn

51

Page 52: Crestline Dampening System - cds.p6y3z3s5.hwcdn.netcds.p6y3z3s5.hwcdn.net/wp-content/uploads/2015/05/Hamada-C252.pdf · with upper control knobs (subject arrow) on OPS and NOPS. Turn

52

Page 53: Crestline Dampening System - cds.p6y3z3s5.hwcdn.netcds.p6y3z3s5.hwcdn.net/wp-content/uploads/2015/05/Hamada-C252.pdf · with upper control knobs (subject arrow) on OPS and NOPS. Turn

53

Page 54: Crestline Dampening System - cds.p6y3z3s5.hwcdn.netcds.p6y3z3s5.hwcdn.net/wp-content/uploads/2015/05/Hamada-C252.pdf · with upper control knobs (subject arrow) on OPS and NOPS. Turn

54

Page 55: Crestline Dampening System - cds.p6y3z3s5.hwcdn.netcds.p6y3z3s5.hwcdn.net/wp-content/uploads/2015/05/Hamada-C252.pdf · with upper control knobs (subject arrow) on OPS and NOPS. Turn

55

Page 56: Crestline Dampening System - cds.p6y3z3s5.hwcdn.netcds.p6y3z3s5.hwcdn.net/wp-content/uploads/2015/05/Hamada-C252.pdf · with upper control knobs (subject arrow) on OPS and NOPS. Turn

56

Page 57: Crestline Dampening System - cds.p6y3z3s5.hwcdn.netcds.p6y3z3s5.hwcdn.net/wp-content/uploads/2015/05/Hamada-C252.pdf · with upper control knobs (subject arrow) on OPS and NOPS. Turn

57

Page 58: Crestline Dampening System - cds.p6y3z3s5.hwcdn.netcds.p6y3z3s5.hwcdn.net/wp-content/uploads/2015/05/Hamada-C252.pdf · with upper control knobs (subject arrow) on OPS and NOPS. Turn

58

Page 59: Crestline Dampening System - cds.p6y3z3s5.hwcdn.netcds.p6y3z3s5.hwcdn.net/wp-content/uploads/2015/05/Hamada-C252.pdf · with upper control knobs (subject arrow) on OPS and NOPS. Turn
Page 60: Crestline Dampening System - cds.p6y3z3s5.hwcdn.netcds.p6y3z3s5.hwcdn.net/wp-content/uploads/2015/05/Hamada-C252.pdf · with upper control knobs (subject arrow) on OPS and NOPS. Turn

11103 Indian Trail, Dallas, TX 75229 Phone 972-484-6808, Fax 800-365-6510E-mail [email protected], Web Site www.accel-us.com