creating a hub for the futuretransport system: duqm airport • 4 km runway capable of a380 and...
TRANSCRIPT
![Page 1: Creating a Hub for the FutureTransport System: Duqm Airport • 4 KM runway capable of A380 and antonov 225 landings • 500.000 pax/ years terminal • 50.000 tons cargo terminal](https://reader036.vdocuments.us/reader036/viewer/2022081405/5f0cd97b7e708231d4376fed/html5/thumbnails/1.jpg)
Creating a Hub for the Future
![Page 2: Creating a Hub for the FutureTransport System: Duqm Airport • 4 KM runway capable of A380 and antonov 225 landings • 500.000 pax/ years terminal • 50.000 tons cargo terminal](https://reader036.vdocuments.us/reader036/viewer/2022081405/5f0cd97b7e708231d4376fed/html5/thumbnails/2.jpg)
Transport System: Duqm access road
Duqm is (550 km) from Muscat and is accessible by road via:
• Muscat – Salalah highway
• Sinaw –Mahout– Duqm
• The coastal road (Shannah - Mahout) and (Salalah – Duqm)
DUBAI
YEMEN
R 32
R 31
Sur
Masirah
Salalah
Sohar
Duqm
Muscat
IRAN
UAE
KSA
ABU DHABI
Hayma
Al Buraymi
Ras Musandam
Nizwa
Sinaw
![Page 3: Creating a Hub for the FutureTransport System: Duqm Airport • 4 KM runway capable of A380 and antonov 225 landings • 500.000 pax/ years terminal • 50.000 tons cargo terminal](https://reader036.vdocuments.us/reader036/viewer/2022081405/5f0cd97b7e708231d4376fed/html5/thumbnails/3.jpg)
Transport System: Duqm railway connection
• The rail route is part of proposed Inter-GCC railway running from Kuwait to Salalah (and possibly to Yemen)
• provide greater capacity for freight and passenger transport to:
• reduce cost and road freight services
• create faster transfer of goods services between countries in GCC
YEMEN
R 32
R 31
Sur
Ras Musandam
Masirah
Salalah
Nizwa
Duqm
Muscat
IRAN
UAE
KSA
DUBAI
ABU DHABI
Hayma
Sohar Al Buraymi
Phase 1: 900KM Phase 2: 500KM
Start of operation 2016- 2018
![Page 4: Creating a Hub for the FutureTransport System: Duqm Airport • 4 KM runway capable of A380 and antonov 225 landings • 500.000 pax/ years terminal • 50.000 tons cargo terminal](https://reader036.vdocuments.us/reader036/viewer/2022081405/5f0cd97b7e708231d4376fed/html5/thumbnails/4.jpg)
Transport System: Duqm Airport
• 4 KM runway capable of A380 and antonov 225 landings
• 500.000 pax/ years terminal
• 50.000 tons cargo terminal
• Refueling capabilities
• Open today for domestic passenger planes and project cargo planes
![Page 5: Creating a Hub for the FutureTransport System: Duqm Airport • 4 KM runway capable of A380 and antonov 225 landings • 500.000 pax/ years terminal • 50.000 tons cargo terminal](https://reader036.vdocuments.us/reader036/viewer/2022081405/5f0cd97b7e708231d4376fed/html5/thumbnails/5.jpg)
Port of Duqm: Master Plan
5
![Page 6: Creating a Hub for the FutureTransport System: Duqm Airport • 4 KM runway capable of A380 and antonov 225 landings • 500.000 pax/ years terminal • 50.000 tons cargo terminal](https://reader036.vdocuments.us/reader036/viewer/2022081405/5f0cd97b7e708231d4376fed/html5/thumbnails/6.jpg)
Commencement
Duqm 2003
![Page 7: Creating a Hub for the FutureTransport System: Duqm Airport • 4 KM runway capable of A380 and antonov 225 landings • 500.000 pax/ years terminal • 50.000 tons cargo terminal](https://reader036.vdocuments.us/reader036/viewer/2022081405/5f0cd97b7e708231d4376fed/html5/thumbnails/7.jpg)
Details of the Master Plan
Approach Channel
Commercial
Terminals
Phase 1
Royal Navy Berths Harbour
Basin 2
Commercial
Terminals
Phase 2
Liquid Jetties
Dry Dock1: L 410m x W 95m x D -14.2m
Dry Dock 2: L 410m x W 80m x D -14.2m
Oman Dry Dock
In addition to the presented facilities, the port is equipped with MARPOL , water
+ fuel bunkering and domestic waste collection+treatment facilities
Harbour
Basin 1
Area for logistics :
-Warehousing
-Storage
-Services
![Page 8: Creating a Hub for the FutureTransport System: Duqm Airport • 4 KM runway capable of A380 and antonov 225 landings • 500.000 pax/ years terminal • 50.000 tons cargo terminal](https://reader036.vdocuments.us/reader036/viewer/2022081405/5f0cd97b7e708231d4376fed/html5/thumbnails/8.jpg)
Key Figures
• Area:
– Total port boundary: 170 km2
– Land area accommodates: commercial quays, liquid jetties and
1550 ha for logistics (warehousing, storage and services)
• Breakwaters:
– Lee breakwater: 4.5 km
– Main breakwater: 4.1 km
• Water depths: to allow safe reception of vessels with capacity up to 150 000 DWT
– Approach channel: -19m
– Commercial berths Phase 1: -18m
• Commercial Terminals Phase 1 (2.325km of berths, 80 ha. area): under construction
– Multi-Purpose terminal : 0.8 Mt (425 m of berth)
– Container terminals : 3.5 M TEU (1 600 m of berth)
– Dry bulk terminal : 5.0 Mt (300 m of berth)
• Liquid Jetties: design works start in 2013
• Commercial Terminals Phase 2 (10km of berths) to be defined later
![Page 9: Creating a Hub for the FutureTransport System: Duqm Airport • 4 KM runway capable of A380 and antonov 225 landings • 500.000 pax/ years terminal • 50.000 tons cargo terminal](https://reader036.vdocuments.us/reader036/viewer/2022081405/5f0cd97b7e708231d4376fed/html5/thumbnails/9.jpg)
•Dry bulk terminal
•300 m of berth ( 5 Mt/y)
•Container terminal
1600m of berth (3.5 MEU/y)
•Multi-Purpose terminal
•300 + 125 m of berth (0.8 Mt/y)
•Port Operations Area ( traffic
control tower, tugboats, port
emergency building…)
Details Commercial Quays
Phase 1
Terminal 2
= Container handling
Terminal 1
= Multi Purpose
Terminal 4
= Dry Bulk
Port Operations
Area
Terminal 3
= Container handling
![Page 10: Creating a Hub for the FutureTransport System: Duqm Airport • 4 KM runway capable of A380 and antonov 225 landings • 500.000 pax/ years terminal • 50.000 tons cargo terminal](https://reader036.vdocuments.us/reader036/viewer/2022081405/5f0cd97b7e708231d4376fed/html5/thumbnails/10.jpg)
Government Berths: Buildings & Infrastructure
ROYAL OMANI
POLICE
IP3
![Page 11: Creating a Hub for the FutureTransport System: Duqm Airport • 4 KM runway capable of A380 and antonov 225 landings • 500.000 pax/ years terminal • 50.000 tons cargo terminal](https://reader036.vdocuments.us/reader036/viewer/2022081405/5f0cd97b7e708231d4376fed/html5/thumbnails/11.jpg)
Finger Pier & Early Operations
• PDC Working Offices & Control Room
• Finger Pier for Operational Vessels & Fueling
• Pipelines for Cement & Fuel Loading/Unloading
![Page 12: Creating a Hub for the FutureTransport System: Duqm Airport • 4 KM runway capable of A380 and antonov 225 landings • 500.000 pax/ years terminal • 50.000 tons cargo terminal](https://reader036.vdocuments.us/reader036/viewer/2022081405/5f0cd97b7e708231d4376fed/html5/thumbnails/12.jpg)
Potential Market for
Multi-Purpose / Project Cargo
in the Port of Duqm
![Page 13: Creating a Hub for the FutureTransport System: Duqm Airport • 4 KM runway capable of A380 and antonov 225 landings • 500.000 pax/ years terminal • 50.000 tons cargo terminal](https://reader036.vdocuments.us/reader036/viewer/2022081405/5f0cd97b7e708231d4376fed/html5/thumbnails/13.jpg)
Central Location in Oman
• Close to the (new) oil and gas
concessions, inland and
offshore
• Direct road access between
Duqm and the oil fields and
free of bridges and tunnels
• Today there is no longer
acceptance of (oversized)
project cargo going to Oman
through UAE’s main ports
Muscat
Salalah
Sohar
Hayma Duqm
300KM 250KM
200KM
150KM
100KM
![Page 14: Creating a Hub for the FutureTransport System: Duqm Airport • 4 KM runway capable of A380 and antonov 225 landings • 500.000 pax/ years terminal • 50.000 tons cargo terminal](https://reader036.vdocuments.us/reader036/viewer/2022081405/5f0cd97b7e708231d4376fed/html5/thumbnails/14.jpg)
First Project Cargo, April 2012
![Page 15: Creating a Hub for the FutureTransport System: Duqm Airport • 4 KM runway capable of A380 and antonov 225 landings • 500.000 pax/ years terminal • 50.000 tons cargo terminal](https://reader036.vdocuments.us/reader036/viewer/2022081405/5f0cd97b7e708231d4376fed/html5/thumbnails/15.jpg)
Potential Market for
the container terminals
in the Port of Duqm
![Page 16: Creating a Hub for the FutureTransport System: Duqm Airport • 4 KM runway capable of A380 and antonov 225 landings • 500.000 pax/ years terminal • 50.000 tons cargo terminal](https://reader036.vdocuments.us/reader036/viewer/2022081405/5f0cd97b7e708231d4376fed/html5/thumbnails/16.jpg)
On the Main Shipping Route
• Duqm is strategically located:
on the main international trading route between Asia and Europe.
![Page 17: Creating a Hub for the FutureTransport System: Duqm Airport • 4 KM runway capable of A380 and antonov 225 landings • 500.000 pax/ years terminal • 50.000 tons cargo terminal](https://reader036.vdocuments.us/reader036/viewer/2022081405/5f0cd97b7e708231d4376fed/html5/thumbnails/17.jpg)
Connection To The Growing Markets
India Ocean Rim
Mid-East
ISC
East Africa
Red Sea Port Traffic
24.1 Mn -12%
Port Traffic
11.2 Mn -10%
Total Tanshipment
Market
37 Mn TEU – 11% average
growth
Port Traffic
1.9 Mn -7%
Mid-East
ISC East
Africa
The pyramid
shows each
region’s total
and gateway
traffic in Million
TEU and growth
rate over last 9
years
(2000-09)
![Page 18: Creating a Hub for the FutureTransport System: Duqm Airport • 4 KM runway capable of A380 and antonov 225 landings • 500.000 pax/ years terminal • 50.000 tons cargo terminal](https://reader036.vdocuments.us/reader036/viewer/2022081405/5f0cd97b7e708231d4376fed/html5/thumbnails/18.jpg)
Potential Market for the Dry Bulk terminal in the Port of Duqm
![Page 19: Creating a Hub for the FutureTransport System: Duqm Airport • 4 KM runway capable of A380 and antonov 225 landings • 500.000 pax/ years terminal • 50.000 tons cargo terminal](https://reader036.vdocuments.us/reader036/viewer/2022081405/5f0cd97b7e708231d4376fed/html5/thumbnails/19.jpg)
Logistic Support for Minerals Industry
• The region is very rich in minerals:
Limestone
Silica Sand
Dolomite
Solar Salt
Basalt
Laterite
![Page 20: Creating a Hub for the FutureTransport System: Duqm Airport • 4 KM runway capable of A380 and antonov 225 landings • 500.000 pax/ years terminal • 50.000 tons cargo terminal](https://reader036.vdocuments.us/reader036/viewer/2022081405/5f0cd97b7e708231d4376fed/html5/thumbnails/20.jpg)
• The region is very rich in minerals:
Gypsum
Kaolin
Granite
Gabbro
Attapulgite
Logistic Support for Minerals Industry
![Page 21: Creating a Hub for the FutureTransport System: Duqm Airport • 4 KM runway capable of A380 and antonov 225 landings • 500.000 pax/ years terminal • 50.000 tons cargo terminal](https://reader036.vdocuments.us/reader036/viewer/2022081405/5f0cd97b7e708231d4376fed/html5/thumbnails/21.jpg)
Comparison with Iconic Structures
Rock required for the port
construction: 18.0 million
tonnes
The mass of the Pyramid of Giza
in Egypt
Steel required for the port
construction: 35,000 tonnes
The metal structure of the Eiffel Tower in
France
Concrete required for the
port construction:
1.8 million tonnes
The concrete used to
construct the Burj Khalifa in
Dubai
3 times 5 times 2.5 times 65 times
Total quantity of the channel
& basin dredging:
71 million cubic metres
The volume of the new
Wembley Stadium in
United Kingdom
![Page 22: Creating a Hub for the FutureTransport System: Duqm Airport • 4 KM runway capable of A380 and antonov 225 landings • 500.000 pax/ years terminal • 50.000 tons cargo terminal](https://reader036.vdocuments.us/reader036/viewer/2022081405/5f0cd97b7e708231d4376fed/html5/thumbnails/22.jpg)
Thank you