Crazylegs Triangle Re:Design Workshop
August 8, 2017
![Page 2: Crazylegs Triangle Re:Design Workshop · Design Crazylegs Plaza (~25,000 ft2) Resilient design Game day vending Pedestrian connections & amenities Innovative stormwater management](https://reader034.vdocuments.us/reader034/viewer/2022052016/602f37a175a78b6058335bcb/html5/thumbnails/2.jpg)
Tonight’s Agenda
Thank you to HotelRED!
1. Project Introduction
2. On-Site Viewing + Visioning Discussion
3. Precedent Imagery + Visual Preferences
![Page 3: Crazylegs Triangle Re:Design Workshop · Design Crazylegs Plaza (~25,000 ft2) Resilient design Game day vending Pedestrian connections & amenities Innovative stormwater management](https://reader034.vdocuments.us/reader034/viewer/2022052016/602f37a175a78b6058335bcb/html5/thumbnails/3.jpg)
Project Team
Ken Saiki Design, Landscape Architecture Ken Saiki, ASLA
Julia Schilling, ASLA
Marcia Yapp, Public Art (mosaics)
Pierce Engineering, Structural Engineering
Urban Assets, Public Engagement Zia Brucaya, AICP
The Village in Wauwatosa
![Page 4: Crazylegs Triangle Re:Design Workshop · Design Crazylegs Plaza (~25,000 ft2) Resilient design Game day vending Pedestrian connections & amenities Innovative stormwater management](https://reader034.vdocuments.us/reader034/viewer/2022052016/602f37a175a78b6058335bcb/html5/thumbnails/4.jpg)
Project Scope
Design Crazylegs Plaza (~25,000 ft2) Resilient design
Game day vending
Pedestrian connections & amenities
Innovative stormwater management
Design Wingra Park Entrance (~105’ frontage) Viewshed to Lake Wingra
New bus shelter
Improve prominence, visibility and accessibility
Seating, innovative stormwater mgmt, and a landscape feature (e.g., rain garden)
Include public art in both locations.
![Page 5: Crazylegs Triangle Re:Design Workshop · Design Crazylegs Plaza (~25,000 ft2) Resilient design Game day vending Pedestrian connections & amenities Innovative stormwater management](https://reader034.vdocuments.us/reader034/viewer/2022052016/602f37a175a78b6058335bcb/html5/thumbnails/5.jpg)
Crazylegs Plaza + Wingra Park Entrance DesignProcess
November:
Final Design Presentation + Project Out
to Bid
Sept. 14:
Design Alternatives Presentation + Workshop
August 8:
Crazylegs Workshop
April 27:
Wingra Entrance Workshop
![Page 6: Crazylegs Triangle Re:Design Workshop · Design Crazylegs Plaza (~25,000 ft2) Resilient design Game day vending Pedestrian connections & amenities Innovative stormwater management](https://reader034.vdocuments.us/reader034/viewer/2022052016/602f37a175a78b6058335bcb/html5/thumbnails/6.jpg)
Monroe Street Reconstruction
Reconstruction will occur from March through November 2018 (nine months)
![Page 7: Crazylegs Triangle Re:Design Workshop · Design Crazylegs Plaza (~25,000 ft2) Resilient design Game day vending Pedestrian connections & amenities Innovative stormwater management](https://reader034.vdocuments.us/reader034/viewer/2022052016/602f37a175a78b6058335bcb/html5/thumbnails/7.jpg)
2016 Community Survey Results
Sidewalk enhancements: Increase the width of
the sidewalk from Wingra Park to Edgewood
College Drive.
Business District Enhancements: “Install seating,
planters, banners, decorative lamp posts, etc.”
Wingra Park Orchard Garden: “Provide green
space, seating and other enhancements to the
orchard garden and ped/bike path entrance.”
Crazy Legs Triangle: Close Crazy Legs Lane and
provide enhancements such as landscaping,
seating and community space.
55%
47%
38%
37%
Top three placemaking projects:
TIE
![Page 8: Crazylegs Triangle Re:Design Workshop · Design Crazylegs Plaza (~25,000 ft2) Resilient design Game day vending Pedestrian connections & amenities Innovative stormwater management](https://reader034.vdocuments.us/reader034/viewer/2022052016/602f37a175a78b6058335bcb/html5/thumbnails/8.jpg)
Site Context
![Page 9: Crazylegs Triangle Re:Design Workshop · Design Crazylegs Plaza (~25,000 ft2) Resilient design Game day vending Pedestrian connections & amenities Innovative stormwater management](https://reader034.vdocuments.us/reader034/viewer/2022052016/602f37a175a78b6058335bcb/html5/thumbnails/9.jpg)
Site Context
Future raised intersection at Harrison.
XX
![Page 10: Crazylegs Triangle Re:Design Workshop · Design Crazylegs Plaza (~25,000 ft2) Resilient design Game day vending Pedestrian connections & amenities Innovative stormwater management](https://reader034.vdocuments.us/reader034/viewer/2022052016/602f37a175a78b6058335bcb/html5/thumbnails/10.jpg)
![Page 11: Crazylegs Triangle Re:Design Workshop · Design Crazylegs Plaza (~25,000 ft2) Resilient design Game day vending Pedestrian connections & amenities Innovative stormwater management](https://reader034.vdocuments.us/reader034/viewer/2022052016/602f37a175a78b6058335bcb/html5/thumbnails/11.jpg)
Site Context: New Development
![Page 12: Crazylegs Triangle Re:Design Workshop · Design Crazylegs Plaza (~25,000 ft2) Resilient design Game day vending Pedestrian connections & amenities Innovative stormwater management](https://reader034.vdocuments.us/reader034/viewer/2022052016/602f37a175a78b6058335bcb/html5/thumbnails/12.jpg)
Site Context: UW Master Plan
![Page 13: Crazylegs Triangle Re:Design Workshop · Design Crazylegs Plaza (~25,000 ft2) Resilient design Game day vending Pedestrian connections & amenities Innovative stormwater management](https://reader034.vdocuments.us/reader034/viewer/2022052016/602f37a175a78b6058335bcb/html5/thumbnails/13.jpg)
Site Context: Pedestrian & Bicycle Connections
?
![Page 14: Crazylegs Triangle Re:Design Workshop · Design Crazylegs Plaza (~25,000 ft2) Resilient design Game day vending Pedestrian connections & amenities Innovative stormwater management](https://reader034.vdocuments.us/reader034/viewer/2022052016/602f37a175a78b6058335bcb/html5/thumbnails/14.jpg)
Proposed Future Curb Lines
![Page 15: Crazylegs Triangle Re:Design Workshop · Design Crazylegs Plaza (~25,000 ft2) Resilient design Game day vending Pedestrian connections & amenities Innovative stormwater management](https://reader034.vdocuments.us/reader034/viewer/2022052016/602f37a175a78b6058335bcb/html5/thumbnails/15.jpg)
Design Opportunities
Multimodal connections (bus, bike, ped) Better street crossings
Green infrastructure
Decorative plantings
Gathering spaces
Vending spaces
Seating
Public art
Bus stop amenities
Signage (welcome, educational)
![Page 16: Crazylegs Triangle Re:Design Workshop · Design Crazylegs Plaza (~25,000 ft2) Resilient design Game day vending Pedestrian connections & amenities Innovative stormwater management](https://reader034.vdocuments.us/reader034/viewer/2022052016/602f37a175a78b6058335bcb/html5/thumbnails/16.jpg)
Design Opportunities:Public Art
Anchorlily 2, by William Turnbull
Badger
sculpture,
by Harry
Whitehorse
(requires
bronze
casting)
![Page 17: Crazylegs Triangle Re:Design Workshop · Design Crazylegs Plaza (~25,000 ft2) Resilient design Game day vending Pedestrian connections & amenities Innovative stormwater management](https://reader034.vdocuments.us/reader034/viewer/2022052016/602f37a175a78b6058335bcb/html5/thumbnails/17.jpg)
Design Considerations
Existing trees
Bike path signage
Utilities
Game day vending
Viewshed preservation along bike path (10ft each side)
Four-season design (aesthetics, access)
Maintenance & operations (mowing, snow removal)
Wisconsinexploer.blogspot
![Page 18: Crazylegs Triangle Re:Design Workshop · Design Crazylegs Plaza (~25,000 ft2) Resilient design Game day vending Pedestrian connections & amenities Innovative stormwater management](https://reader034.vdocuments.us/reader034/viewer/2022052016/602f37a175a78b6058335bcb/html5/thumbnails/18.jpg)
Example: Five Points Alley, Cincinnati
Photo credits: MKSK, IssueMediaGroup.com,
Soapboxmedia.com, 5chw4r7z (Flickr)
![Page 19: Crazylegs Triangle Re:Design Workshop · Design Crazylegs Plaza (~25,000 ft2) Resilient design Game day vending Pedestrian connections & amenities Innovative stormwater management](https://reader034.vdocuments.us/reader034/viewer/2022052016/602f37a175a78b6058335bcb/html5/thumbnails/19.jpg)
Site Visit
1. Walk to Crazylegs
2. Break into small groups
3. Discuss: What are the current limitations of this site?
How should Crazylegs Plaza feel and function
in the future, and what enhancements would
make it more functional and inviting?
What design themes would you most like to
see expressed? (e.g., athletics, history,
sustainability, etc.)
![Page 20: Crazylegs Triangle Re:Design Workshop · Design Crazylegs Plaza (~25,000 ft2) Resilient design Game day vending Pedestrian connections & amenities Innovative stormwater management](https://reader034.vdocuments.us/reader034/viewer/2022052016/602f37a175a78b6058335bcb/html5/thumbnails/20.jpg)
Precedent Imagery
![Page 21: Crazylegs Triangle Re:Design Workshop · Design Crazylegs Plaza (~25,000 ft2) Resilient design Game day vending Pedestrian connections & amenities Innovative stormwater management](https://reader034.vdocuments.us/reader034/viewer/2022052016/602f37a175a78b6058335bcb/html5/thumbnails/21.jpg)
Green Infrastructure
![Page 22: Crazylegs Triangle Re:Design Workshop · Design Crazylegs Plaza (~25,000 ft2) Resilient design Game day vending Pedestrian connections & amenities Innovative stormwater management](https://reader034.vdocuments.us/reader034/viewer/2022052016/602f37a175a78b6058335bcb/html5/thumbnails/22.jpg)
Mosaic
![Page 23: Crazylegs Triangle Re:Design Workshop · Design Crazylegs Plaza (~25,000 ft2) Resilient design Game day vending Pedestrian connections & amenities Innovative stormwater management](https://reader034.vdocuments.us/reader034/viewer/2022052016/602f37a175a78b6058335bcb/html5/thumbnails/23.jpg)
Seating
![Page 24: Crazylegs Triangle Re:Design Workshop · Design Crazylegs Plaza (~25,000 ft2) Resilient design Game day vending Pedestrian connections & amenities Innovative stormwater management](https://reader034.vdocuments.us/reader034/viewer/2022052016/602f37a175a78b6058335bcb/html5/thumbnails/24.jpg)
Shelters & Bus Stops
![Page 25: Crazylegs Triangle Re:Design Workshop · Design Crazylegs Plaza (~25,000 ft2) Resilient design Game day vending Pedestrian connections & amenities Innovative stormwater management](https://reader034.vdocuments.us/reader034/viewer/2022052016/602f37a175a78b6058335bcb/html5/thumbnails/25.jpg)
Design ThemesVisual Preference “Survey”
![Page 26: Crazylegs Triangle Re:Design Workshop · Design Crazylegs Plaza (~25,000 ft2) Resilient design Game day vending Pedestrian connections & amenities Innovative stormwater management](https://reader034.vdocuments.us/reader034/viewer/2022052016/602f37a175a78b6058335bcb/html5/thumbnails/26.jpg)
Traditional Urban Park
![Page 27: Crazylegs Triangle Re:Design Workshop · Design Crazylegs Plaza (~25,000 ft2) Resilient design Game day vending Pedestrian connections & amenities Innovative stormwater management](https://reader034.vdocuments.us/reader034/viewer/2022052016/602f37a175a78b6058335bcb/html5/thumbnails/27.jpg)
Eclectic
![Page 28: Crazylegs Triangle Re:Design Workshop · Design Crazylegs Plaza (~25,000 ft2) Resilient design Game day vending Pedestrian connections & amenities Innovative stormwater management](https://reader034.vdocuments.us/reader034/viewer/2022052016/602f37a175a78b6058335bcb/html5/thumbnails/28.jpg)
Industrial
![Page 29: Crazylegs Triangle Re:Design Workshop · Design Crazylegs Plaza (~25,000 ft2) Resilient design Game day vending Pedestrian connections & amenities Innovative stormwater management](https://reader034.vdocuments.us/reader034/viewer/2022052016/602f37a175a78b6058335bcb/html5/thumbnails/29.jpg)
Modern
![Page 30: Crazylegs Triangle Re:Design Workshop · Design Crazylegs Plaza (~25,000 ft2) Resilient design Game day vending Pedestrian connections & amenities Innovative stormwater management](https://reader034.vdocuments.us/reader034/viewer/2022052016/602f37a175a78b6058335bcb/html5/thumbnails/30.jpg)
TakeawaysWhat one concept or idea have you heard today that
most inspires or excites you?
![Page 31: Crazylegs Triangle Re:Design Workshop · Design Crazylegs Plaza (~25,000 ft2) Resilient design Game day vending Pedestrian connections & amenities Innovative stormwater management](https://reader034.vdocuments.us/reader034/viewer/2022052016/602f37a175a78b6058335bcb/html5/thumbnails/31.jpg)
Next Steps
![Page 32: Crazylegs Triangle Re:Design Workshop · Design Crazylegs Plaza (~25,000 ft2) Resilient design Game day vending Pedestrian connections & amenities Innovative stormwater management](https://reader034.vdocuments.us/reader034/viewer/2022052016/602f37a175a78b6058335bcb/html5/thumbnails/32.jpg)
Key Dates
September 14 Design Alternatives Presentation + Workshop
6:00-7:30PM, Wingra School
October 9th Plans submitted to City
November Final Design Presentation, date TBD
Monroe Street reconstruction, Crazylegs Plaza and Wingra Park entrance out to bid.
![Page 33: Crazylegs Triangle Re:Design Workshop · Design Crazylegs Plaza (~25,000 ft2) Resilient design Game day vending Pedestrian connections & amenities Innovative stormwater management](https://reader034.vdocuments.us/reader034/viewer/2022052016/602f37a175a78b6058335bcb/html5/thumbnails/33.jpg)
For More Information:
1. All meeting materials are posted online atCity of Madison Engineering: www.cityofmadison.com/engineering/projects/monroe-street
Subscribe to email updates.
View survey results, presentations and notes.
2. Alder Eskrich, District 13: www.cityofmadison.com/council/district13/
Subscribe to email updates.
Share comments.