Data centres that use evaporative cooling can cut their energy bills by up to 80% compared to conventional cooling methods! The specifications for the environmental operating conditions of IT equipment used in data centres have recently been revised, opening the way to evaporative cooling in such buildings. Evaporative cooling can provide a highly effective solution, with low installation and running costs, minimal maintenance requirements and quiet operation. This seminar covers: • Revisions to the specifications for the environmental operating conditions of IT equipment in data centres • Options for cooling in a data centre • Implementing evaporative cooling in a data centre.

TRANSCRIPT

Page 1: CPD Presentation   Evaporative cooling in data centres

Evaporative Cooling in Data Centres Colt Technical Seminar

Page 2: CPD Presentation   Evaporative cooling in data centres

I J O’Hea,Colt Founder

A private company founded in 1931

I J O’Hea OBE (1897 - 1984)

2012 Group turnover £151 million

Manufactures in the UK, Holland, Germany, Saudi Arabia, China and

Brazil

A brief history of Colt

Page 3: CPD Presentation   Evaporative cooling in data centres

Current UK Business markets

Smoke Control

Solar Shading

Natural Ventilation

Louvre

Environmental Comfort Control

Data Centre Ventilation

Page 4: CPD Presentation   Evaporative cooling in data centres

Evaporative Cooling in Data Centres

1. Current Trends

2. Current Guidance on Temperature & Humidity in Data Centre

3. Applying Evaporative Cooling

a) The Evaporative Cooling Phenomena

b) Inside an Evaporative Cooler

c) UK Weather Trends

d) Evaporative Cooling Plant Layout

4. Energy Consumption

5. Air Filtration & Hygiene

Covering:

Page 5: CPD Presentation   Evaporative cooling in data centres

Trends

•It is estimated that 1.5% of the total UK energy consumption can be attributed to data centres and within the next 4-6 years it is thought that IT equipment power demand will account for a 10% portion of the 2010 National Grid capacity.

•The data market is estimated to grow by approximately 80% each year which corresponds to a data centre power-growth rate of approximately 20% each year.

•40-60% of the 10 year total-cost-of-operation of a data centre is electrical power.

•A low PUE has, therefore, become the dominant trend and reducing the energy consumption of the cooling system is the most straightforward and immediate way of achieving this.

Evaporative Cooling in Data Centres

Page 6: CPD Presentation   Evaporative cooling in data centres

Trends

Many professional bodies are promoting this ideological change, most notably The Green Grid (Maturity Model), The European Commission (EU Code of Conduct for Data Centres), ASHRAE and BREEAM.

Relative to the more popular, traditional forms of data centre air cooling, evaporative coolers are both inexpensive to buy, run and maintain, and contain no refrigerants or chemicals.

Evaporative Cooling in Data Centres

Page 7: CPD Presentation   Evaporative cooling in data centres

Current Guidance on Temperature & Humidity in Data Centres

The American Society of Heating, Refrigerating and Air-Conditioning Engineers (ASHRAE) publish guidance on air supply conditions within data centre environments. This guidance sets out temperature and humidity bands for the air supply, and is widely considered the benchmark for data centres in the UK.

Before ASHRAE first published this guidance in 2004, there were no supplier-neutral standards for data centre temperature and humidity and typical data centre supply air operating temperatures were 18-20ºC.

Evaporative Cooling in Data Centres

Page 8: CPD Presentation   Evaporative cooling in data centres

Evaporative Cooling in Data Centres

The 2004 ASHRAE guidance defines two operating conditions – ‘recommended’ and ‘allowable’.

These supplier-neutral limits were defined by the IT Equipment Manufacturers who formed the ASHRAE technical committee 9.9 responsible for the standard, and were designed to not void new or legacy IT equipment warranties.

The ‘recommended’ operating condition gives a temperature range of 18-27ºC, an RH of less then 60% and a dew point of 5.5-15ºC. The minimum RH is set by the lower dew point limit.

The ‘allowable’ operating condition gives a temperature range of 15-32ºC, and RH of 20-80% and a maximum dew point of 17ºC. The minimum dew point limit is set by the lower RH limit.

Current Guidance on Temperature & Humidity in Data Centres

Page 9: CPD Presentation   Evaporative cooling in data centres

Evaporative Cooling in Data Centres

Current Guidance on Temperature & Humidity in Data Centres

Allowable

Recommended

Shown on a psychrometric chart…

Page 10: CPD Presentation   Evaporative cooling in data centres

Yet, most data centre operators still choose to operate their data centres at the lower end of this scale, with only a few operating above 20ºC (often in the range of 22-24ºC). A minority of the data centres are operating above 24ºC.

Evaporative Cooling in Data Centres

Current Guidance on Temperature & Humidity in Data Centres

ASHRAE are presently trying to encourage more companies to take advantage of the recommended and allowable envelopes – by demonstrating through examples and case studies that this higher temperature and humidity envelopes do not cause a higher risk of IT equipment failure.

A recent ASHRAE journal article, for example, found that high humidity is rarely an issue in most data centres and concluded that "it is difficult to make a case for actively controlling humidity in data centres." Typically, the temperature of IT equipment is significantly higher than that of the air supply dew-point, and furthermore most IT equipment is rated for operation up to 80% RH.

Page 11: CPD Presentation   Evaporative cooling in data centres

A direct-air evaporative cooling system takes advantage of these wider operating parameters – to provide air at desirable conditions, whilst offering significant cost savings over traditional cooling methods

This is a direct-air system

The evaporative cooling system described herein is a ‘direct-air’ system, meaning that outside air is conditioned and delivered directly into the data centre environment.

Evaporative Cooling in Data Centres

Applying Evaporative Cooling

Page 12: CPD Presentation   Evaporative cooling in data centres

Evaporative Cooling in Data Centres

Applying Evaporative Cooling – Outline Principle

CRAC Unit

Evaporative Cooling & Air Handling Process

Page 13: CPD Presentation   Evaporative cooling in data centres

Evaporative Cooling in Data Centres

Applying Evaporative Cooling - The Evaporative Cooling Phenomena

Dry warm air is passed across a wetted desorption medium, the water evaporates from the media and is absorbed by the air. The energy needed for evaporation is taken from the air, whereupon the cooling takes place. After the humidification the latent energy content is higher, the sensible energy content is lower and therefore, the temperature of the air is lower.

Or in simpler terms, effectively pass warm ‘dry’ air across a wetted media, thereby exchanging energy and reducing internal air temperature.

Page 14: CPD Presentation   Evaporative cooling in data centres

Evaporative Cooling in Data Centres

Applying Evaporative Cooling - The Evaporative Cooling Phenomena

Sensible

Latent Latent

Sensible

38ºC / 30% RH

25ºC / 50 % RH

25ºC / 90% RH

18.5ºC / 90% RH

Page 15: CPD Presentation   Evaporative cooling in data centres

Evaporative Cooling in Data Centres

Applying Evaporative Cooling

Fan

Desorption medium

Filtration

Controls

Water pump

Sump

Page 16: CPD Presentation   Evaporative cooling in data centres

UK Weather Patterns

Evaporative Cooling in Data Centres

Occurances of Temperature Vs. Humidity

0

20

40

60

80

100

120

-10 -5 0 5 10 15 20 25 30

Temperature (deg.C)

Hu

mid

ity

(Rel

.%)

Havant

Page 17: CPD Presentation   Evaporative cooling in data centres

Within the UK, for a large portion of the year, the external ambient temperatures fall within the ASHRAE limits, allowing free-cooling to take place. That is to say, outside air is delivered directly into the data centre, bypassing the evaporative cooler.

During periods of warmer weather, where ambient temperatures exceed the ASHRAE limits, the air is cooled by the evaporative cooler - The UK’s temperate climate is well suited to evaporative cooling, as during spells of warm weather, humidity is generally lower. Therefore, during warmer weather, the potential for cooling is greater.

However, owing to the nature of the evaporative cooling principle, conditioned air leaving the cooler is of a high humidity (up to 90% relative humidity), which is in excess of the maximum humidity levels set out in the ASHRAE guide.

Evaporative Cooling in Data Centres

Applying Evaporative Cooling

Page 18: CPD Presentation   Evaporative cooling in data centres

For that reason, before the air is ultimately provided to the data centre, it needs to be carefully pre-conditioned so that both the temperature and humidity are within desirable limits.

This is achieved by mixing the conditioned humid air from the cooler with lower-humidity outside ambient air, which increases the temperature and reduces the relative humidity, and therefore creating air at desirable conditions.

During periods of cooler weather, where outside ambient temperatures are below the ASHRAE limits, the waste heat exhausted by the IT equipment is recycled back into the supply air system and mixed with external ambient air to raise its temperature.

Evaporative Cooling in Data Centres

Applying Evaporative Cooling

Page 19: CPD Presentation   Evaporative cooling in data centres

Evaporative Cooling in Data Centres

Applying Evaporative Cooling

From the data centre

To the data centre

Evaporative Cooler

Final Discharge

Ambient Air Intake

Mixing Channel

Control Dampers

Page 20: CPD Presentation   Evaporative cooling in data centres

Evaporative Cooling in Data Centres

Applying Evaporative Cooling

From the data centre

To the data centre

Cold Day

Page 21: CPD Presentation   Evaporative cooling in data centres

Evaporative Cooling in Data Centres

Applying Evaporative Cooling

From the data centre

To the data centre

Cooler Day

Page 22: CPD Presentation   Evaporative cooling in data centres

Evaporative Cooling in Data Centres

Applying Evaporative Cooling

From the data centre

To the data centre

Warm Day

Page 23: CPD Presentation   Evaporative cooling in data centres

This whole cause and effect process is automated by a sophisticated controls system.

Using that methodology, for most of the UK, we are able to provide air to the data centre within the ASHRAE acceptable limits for over 99% of the year.

This ability to provide high volumes of cool air, within the limits of the ASHRAE guidance, and at a significantly cheaper rate than the traditional cooling techniques, means that Evaporative Cooling has significant potential within the Data Centre Market

Evaporative Cooling in Data Centres

Applying Evaporative Cooling

Page 24: CPD Presentation   Evaporative cooling in data centres

Evaporative Cooling in Data Centres

Page 25: CPD Presentation   Evaporative cooling in data centres

It its simplest form, PUE is an energy ratio of the Total Data Centre Input Power over the IT Power Load.

The PUE for the cooling can be itemised separately (described as a ‘partial PUE’). For example, a data centre with a 50kW IT load that requires 25kW of power to cool has a partial cooling PUE of 1.5 – commensurate with well designed traditional cooling systems.

A direct-air evaporative cooling system can have a PUE of less than 1.1, meaning for a 50kW IT load, the power consumption of the Evaporative Cooling system is less than 5kW

Evaporative Cooling in Data Centres

PUE & Energy Consumption

kW

kWkWPUE

50

550)1.1(

Page 26: CPD Presentation   Evaporative cooling in data centres

The lower the PUE, the lower the energy consumption of the data centre.

A Colt direct-air evaporative cooling system has a partial cooling PUE of approx. 1.08.

Consider a 1MW IT Load. That’s a potential saving of over £400,000 annually in electricity costs when compared to a traditional cooling system with a PUE of around 1.5.

Evaporative Cooling – 80kW to cool 1000kW IT equipment. 80kW x 8760hrs/yr = 700,800kWhrs x 0.12p/kWhr = £84,096

Traditional Cooling – 500kW to cool 1000kW IT equipment. 500kW x 8760hrs/yr = 4,380,000kWhrs x 0.12p/kWhr = £525,600

£441,504 saving annually using Evaporative Cooling.

Evaporative Cooling in Data Centres

PUE & Energy Consumption

Page 27: CPD Presentation   Evaporative cooling in data centres

Evaporative Cooling in Data Centres

Applying Evaporative Cooling - CFD

Typical section through hot & colt aisle of a data centre

IT equipment in racks draws in cold air and exhausts hot air. This can

be several megawatts of heat!

Supply air – cold aisle Exhaust air – hot aisle

Page 28: CPD Presentation   Evaporative cooling in data centres

The desorption medium built in the Evaporative Cooler has a cleaning effect, as dust and pollen adhere to wet surfaces. However, the desorption medium does not have a classifiable filter effect.

ASHRAE recommend a minimum of MERV 8, which is equivalent to the UK G4 specification filter

Optional air filters to filter class G4, M5 or F7 in accordance with EN 779:2012 for higher standards of air purity.

A filter switch monitors the pressure difference and when dirty sends a message to the remote control or the BMS.

Evaporative Cooling in Data Centres

Air Filters

Page 29: CPD Presentation   Evaporative cooling in data centres

Smart design of the Colt Coolstream, operation with drinking water, monitoring of the circulating water and periodic drying times ensure proper hygiene, making a disinfection of the water unnecessary.

The Colt Coolstream Evaporative Cooler is the only unit of its type certified according to VDI 6022 - "Hygiene requirements for ventilationand air-conditioning equipment"

Evaporative Cooling in Data Centres

Hygiene

Page 30: CPD Presentation   Evaporative cooling in data centres

The End