CP-97: Paving the Road: How AECOM is Using Costpoint to Track and Bill Equipment James D. Mitchell, AECOM Management Services

Upload: others

Post on 26-May-2020

7 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: CP-97: Paving the Road: How AECOM is Using Costpoint to ... · AECOM Management Services Deltek Insight 2019 Track and Bill Equipment •Projects were needed to capture the equipment

CP-97:Paving the Road: How AECOM is Using Costpoint to Track and Bill Equipment

James D. Mitchell, AECOM Management Services

Page 2: CP-97: Paving the Road: How AECOM is Using Costpoint to ... · AECOM Management Services Deltek Insight 2019 Track and Bill Equipment •Projects were needed to capture the equipment

2

Agenda

AECOM Management Services Deltek Insight 2019 Track and Bill Equipment

• Background

• Approach

• Testing

• The Process

• Go Live & Lessons Learned

Page 3: CP-97: Paving the Road: How AECOM is Using Costpoint to ... · AECOM Management Services Deltek Insight 2019 Track and Bill Equipment •Projects were needed to capture the equipment

3

Background

AECOM Management Services Deltek Insight 2019 Track and Bill Equipment

Page 4: CP-97: Paving the Road: How AECOM is Using Costpoint to ... · AECOM Management Services Deltek Insight 2019 Track and Bill Equipment •Projects were needed to capture the equipment

4

Business Need – Background

AECOM Management Services Deltek Insight 2019 Track and Bill Equipment

• Project was put together to move contracts from an Oracle ERP to Deltek

Costpoint

• Management Services was chosen as an effort to work towards a goal of a

standardized delivery of systems (T&E, Costpoint and Cognos)

− Benefit: Savings by standardizing the management of service contracts

− Benefit: Long-term efficiencies

− Benefit: Consolidated systems and support staff

• MS Costpoint houses mostly Government contracts, while the Oracle contracts

were Commercial

• Business line and concepts were fairly new to MS

• Multiple Oracle migrations into Costpoint

− Proven to be efficient and successful

Page 5: CP-97: Paving the Road: How AECOM is Using Costpoint to ... · AECOM Management Services Deltek Insight 2019 Track and Bill Equipment •Projects were needed to capture the equipment

5

Business Need – Equipment Management

AECOM Management Services Deltek Insight 2019 Track and Bill Equipment

• One particular process was identified as a requirement for the migration as it was

critical to the how the organization managed the contracts

• A requirement to track equipment and it’s usage came up as part of various team

meetings

• As various parts of the process were discussed, it was not initially understood

− “Sounds like a service center”

− “Part of an Overhead”

− “Why are we billing ourselves”

• Management of equipment and its usage was new

• Current process was very manual

− Paper were being passed around

− Manually keyed and adjusted into system

− Data was keyed multiple times

Page 6: CP-97: Paving the Road: How AECOM is Using Costpoint to ... · AECOM Management Services Deltek Insight 2019 Track and Bill Equipment •Projects were needed to capture the equipment

6

Business Need – Equipment Requirements

AECOM Management Services Deltek Insight 2019 Track and Bill Equipment

• The main goal was to track equipment from purchase through allocation to the

client projects then billing to the customer

• Requirements were:

− Capture equipment usage through time entry using various units of measure

− Reimburse personal equipment usage to the employee

− Record costs associated with each piece of equipment

− Charge a Service Bill Rate (SBR) to the client project as costs (ex. $6.30)

− Identify equipment as company owned, leased, rented or personal

− Flexible enough to change bill rate based on UOM to provide lowest total

amount to customer (ex. 4 days vs. 1 week)

− Tax Personal equipment reimbursement as necessary

− Analyze over/under for each piece of equipment

Page 7: CP-97: Paving the Road: How AECOM is Using Costpoint to ... · AECOM Management Services Deltek Insight 2019 Track and Bill Equipment •Projects were needed to capture the equipment

7

Business Need – Help Wanted

AECOM Management Services Deltek Insight 2019 Track and Bill Equipment

• Resources were needed to help ensure that we gathered all of the requirements

and to work with the team defining a process

− Tony Bowser joined the team as a consultant to help define and automate this

process as much as possible using the tools available to us

Page 8: CP-97: Paving the Road: How AECOM is Using Costpoint to ... · AECOM Management Services Deltek Insight 2019 Track and Bill Equipment •Projects were needed to capture the equipment

8

Approach

AECOM Management Services Deltek Insight 2019 Track and Bill Equipment

Page 9: CP-97: Paving the Road: How AECOM is Using Costpoint to ... · AECOM Management Services Deltek Insight 2019 Track and Bill Equipment •Projects were needed to capture the equipment

9

Approach – Service Centers

AECOM Management Services Deltek Insight 2019 Track and Bill Equipment

• Multiple discussions lead to using Costpoint to do the natural allocation of costs

that were being collected

• Service Centers provided a good foundation on collecting the costs associated to

each piece of equipment then allocating it out to the direct projects

• Service Centers also allowed us to dictate what to allocate, how and where

− Change in practice – Full allocation of costs vs Service Bill Rate

• One part of the business agreed on using the SC allocation methodology

− Each piece of equipment would require an individual SC

− It would have resulted into over 1,000 SCs

• Question asked: Could we group them? Response: No

− Would not be able to do the proper analysis

• Required too many Service Centers, not a viable option

Page 10: CP-97: Paving the Road: How AECOM is Using Costpoint to ... · AECOM Management Services Deltek Insight 2019 Track and Bill Equipment •Projects were needed to capture the equipment

10

Approach – Projects

AECOM Management Services Deltek Insight 2019 Track and Bill Equipment

• Projects were needed to capture the equipment usage, associated costs, allocate

to client project and bill to the customer

− Very summarized by overall locations that owned the equipment

• Only option is to break down the Projects further for each individual piece of

equipment that needed to be tracked and managed

• Tag number identified as part of the Project structure

• Standard Indirect structure did not fit the needs to identify and track the

equipment

• Management didn’t originally approve of the change to the Indirect structure & org

requirements

− Too much reporting based on the current structure and rules

• After more detailed discussions, Management finally agreed to minimal changes

• Process needed to be defined

Page 11: CP-97: Paving the Road: How AECOM is Using Costpoint to ... · AECOM Management Services Deltek Insight 2019 Track and Bill Equipment •Projects were needed to capture the equipment

11

Approach – Payroll and Costing Information

AECOM Management Services Deltek Insight 2019 Track and Bill Equipment

• Where and how do we capture payroll and costing information for the equipment

• Equipment were tagged and managed through Item Goods in Product Definition

• Repurpose unused fields to record Pay and Cost information

− Manage Goods Costs subtask was the answer

• Ability to identify different units of measure for pay and costing

− Ability to split taxable vs non-taxable for payroll

Page 12: CP-97: Paving the Road: How AECOM is Using Costpoint to ... · AECOM Management Services Deltek Insight 2019 Track and Bill Equipment •Projects were needed to capture the equipment

12

Approach – Payroll and Costing Information

AECOM Management Services Deltek Insight 2019 Track and Bill Equipment

• Repurposed fields were “standardized” for reporting

− Total Unit Costs – Hourly rates

− This-Level Unit Costs – Daily rates

− Labor fields – Non-Taxable Payroll

− Labor Burden fields – Taxable Payroll

− Misc fields – Cost Allocation to Direct Projects

Page 13: CP-97: Paving the Road: How AECOM is Using Costpoint to ... · AECOM Management Services Deltek Insight 2019 Track and Bill Equipment •Projects were needed to capture the equipment

13

Approach – Capturing Usage

AECOM Management Services Deltek Insight 2019 Track and Bill Equipment

• Unknown how to capture usage of the equipment

• Project Labor Categories were discussed

− Limited characters

− Different structure compared to the Tag Number

− Viewed as labor rather than usage

• Current functionality within Time Collection could capture the Tag Number – UDT

• Ability to record transactions linked to a daily timesheet

• Could be managed in a central location

• Allowed reporting to be used for downstream activities

− Payroll

− Costing

− Billing

Page 14: CP-97: Paving the Road: How AECOM is Using Costpoint to ... · AECOM Management Services Deltek Insight 2019 Track and Bill Equipment •Projects were needed to capture the equipment

14

Approach – Process Flow

AECOM Management Services Deltek Insight 2019 Track and Bill Equipment

Page 15: CP-97: Paving the Road: How AECOM is Using Costpoint to ... · AECOM Management Services Deltek Insight 2019 Track and Bill Equipment •Projects were needed to capture the equipment

15

Approach – Process Flow

AECOM Management Services Deltek Insight 2019 Track and Bill Equipment

Page 16: CP-97: Paving the Road: How AECOM is Using Costpoint to ... · AECOM Management Services Deltek Insight 2019 Track and Bill Equipment •Projects were needed to capture the equipment

16

Approach – Process Flow

AECOM Management Services Deltek Insight 2019 Track and Bill Equipment

Page 17: CP-97: Paving the Road: How AECOM is Using Costpoint to ... · AECOM Management Services Deltek Insight 2019 Track and Bill Equipment •Projects were needed to capture the equipment

17

Testing

AECOM Management Services Deltek Insight 2019 Track and Bill Equipment

Page 18: CP-97: Paving the Road: How AECOM is Using Costpoint to ... · AECOM Management Services Deltek Insight 2019 Track and Bill Equipment •Projects were needed to capture the equipment

18

Testing

AECOM Management Services Deltek Insight 2019 Track and Bill Equipment

• Needed to gather all of the “active” equipment,

which were not centralized

• Standardize the tagging system while staying

similar to the current

• User Defined Fields were created to track/link

information

− Link Item Good to Asset ID, if applicable

− Assign Over/Under Project tracking the equipment

costs

• Finalize the CLIN Units setup with different rates for

a single piece of equipment and link them to

individual Projects

• Crosswalks created to map old IDs to new IDs

Page 19: CP-97: Paving the Road: How AECOM is Using Costpoint to ... · AECOM Management Services Deltek Insight 2019 Track and Bill Equipment •Projects were needed to capture the equipment

19

Testing

AECOM Management Services Deltek Insight 2019 Track and Bill Equipment

• Pulling a form together identifying all of the information needed to setup Item

• Struggled to get the system ready for testing (not related to the process)

• Running through small batches to better define the process

• Ensured reporting capabilities worked as intended and could support the process

Page 20: CP-97: Paving the Road: How AECOM is Using Costpoint to ... · AECOM Management Services Deltek Insight 2019 Track and Bill Equipment •Projects were needed to capture the equipment

20

The Process

AECOM Management Services Deltek Insight 2019 Track and Bill Equipment

Page 21: CP-97: Paving the Road: How AECOM is Using Costpoint to ... · AECOM Management Services Deltek Insight 2019 Track and Bill Equipment •Projects were needed to capture the equipment

21

The Process

AECOM Management Services Deltek Insight 2019 Track and Bill Equipment

• Overall process required 3 main components that needed to be set up

− Product Definition (Item Goods)

− Time Collection

− Billing

• As a 4th component, Fixed Assets was only required during certain situations but

was not required to process equipment usage through the system

• From the point the piece of equipment was brought in, a number of steps, forms

and departments were required to fully set up the equipment transactions

• Process started with identifying the piece of equipment for use on a project

− Company Owned

− Lease/Rental

− Personal

• Three Cognos Reports were created to support the processing

Page 22: CP-97: Paving the Road: How AECOM is Using Costpoint to ... · AECOM Management Services Deltek Insight 2019 Track and Bill Equipment •Projects were needed to capture the equipment

22

The Process – Step 1: Initial Setup (Personal Equipment)

AECOM Management Services Deltek Insight 2019 Track and Bill Equipment

• Employees are allowed to use selected personal equipment on the job if approved

• Agreements are drawn up with the employee defining the rate of pay for the use of

each personal equipment

• These amounts must be included on the Equipment Usage Form as part of the

Equipment setup in Product Definition

Project Terms & Conditions

Per Diem

Frequency

Amount $

Housing

Transportation

Rig Pay (only applicable to welders) $21/hr

Truck Pay $70/day with fuel card

Weld Skills Assessment

Weld Skills Assessment Location

(Location to include physical address: District

Office or Client Site or Other Training site)

Weld Skills Assessment Requirements

Page 23: CP-97: Paving the Road: How AECOM is Using Costpoint to ... · AECOM Management Services Deltek Insight 2019 Track and Bill Equipment •Projects were needed to capture the equipment

23

The Process – Step 1: Initial Setup

AECOM Management Services Deltek Insight 2019 Track and Bill Equipment

• Specific Forms are required for the initial

requests to set up the Equipment

• Equipment Usage Form* submitted to

Equipment Manager

− Identifies the Equipment and charging

elements

• Fixed Asset form submitted to Fixed Asset

Manager, as appropriate

• Indirect Project Setup form submitted to

Accounting

− Over/Under Project setup to capture the

costs associated with the equipment

* Form is still being modified

Page 24: CP-97: Paving the Road: How AECOM is Using Costpoint to ... · AECOM Management Services Deltek Insight 2019 Track and Bill Equipment •Projects were needed to capture the equipment

24

The Process – Step 1: Product Definition Goods

AECOM Management Services Deltek Insight 2019 Track and Bill Equipment

Example: AECOM Owned Equipment

Page 25: CP-97: Paving the Road: How AECOM is Using Costpoint to ... · AECOM Management Services Deltek Insight 2019 Track and Bill Equipment •Projects were needed to capture the equipment

25

The Process – Step 1: Product Definition Goods

AECOM Management Services Deltek Insight 2019 Track and Bill Equipment

Example: Personal Equipment

Page 26: CP-97: Paving the Road: How AECOM is Using Costpoint to ... · AECOM Management Services Deltek Insight 2019 Track and Bill Equipment •Projects were needed to capture the equipment

26

The Process – Step 2: Usage & Billing Setup

AECOM Management Services Deltek Insight 2019 Track and Bill Equipment

• Forms forwarded for Time and Billing set up

• Completed Equipment Usage Form forwarded to the Labor team

− Usage could not be recorded until the Item was set up in Time Collection

− Item manually added to the UDT table (centrally controlled)

Page 27: CP-97: Paving the Road: How AECOM is Using Costpoint to ... · AECOM Management Services Deltek Insight 2019 Track and Bill Equipment •Projects were needed to capture the equipment

27

The Process – Step 2: Usage & Billing Setup

AECOM Management Services Deltek Insight 2019 Track and Bill Equipment

• Equipment Usage From and applicable rate schedule is sent to the Billing team

− Notifies the team that a new piece of equipment needed to be set up as a

Billable Item then added to CLIN Units Usage

− While the Equipment Usage Form identifies the item, the rate schedule

identifies the unit of measure and rate at which the equipment can be billed out

− If the equipment requires multiple units of measure, additional CLINs are set up

to accommodate the different rates for the individual item

Page 28: CP-97: Paving the Road: How AECOM is Using Costpoint to ... · AECOM Management Services Deltek Insight 2019 Track and Bill Equipment •Projects were needed to capture the equipment

28

The Process – Step 3: Recording Equipment Usage

AECOM Management Services Deltek Insight 2019 Track and Bill Equipment

• Employees record equipment usage on their timesheet

• Separate field for each Equipment (UDT/Item ID) used on every TS row

• Pay Type was used to specify unit of measure (ex. EQH, EQD, EQP, etc.)

• For Personal (EQP) Equipment, two records were required

− Record the use of personal equipment (EQP) for payroll (ex. 1 day) charged to the

Over/Under Project

− Record actual usage time of equipment (EQH) for costing/billing (ex. 8 hours) charged to

the Direct Project

• Equipment information is not passed on to Costpoint however the usage information was in

addition to the standard “labor” data

− An Amount is not applied when Equipment TS rows are imported into Costpoint

Page 29: CP-97: Paving the Road: How AECOM is Using Costpoint to ... · AECOM Management Services Deltek Insight 2019 Track and Bill Equipment •Projects were needed to capture the equipment

29

The Process – Step 4: Employee Payment

AECOM Management Services Deltek Insight 2019 Track and Bill Equipment

• For Personal Equipment that is being used on the job, the Employee is

reimbursed based on an agreed amount made with the Project

• An additional step is required once the usage transaction is imported into

Costpoint

• Using Cognos, a report was developed to capture the necessary information from

Time Collection and Product Definition

• The report created a Labor preprocessor file to be loaded into Costpoint Labor

− Time Collection populated the Equipment, Unit of Measure and Dates

− Product Definition populated the agreed upon Payroll amounts for each

personal equipment

− When applicable, the report would take the payroll amounts and create two

records, one as taxable and another as non-taxable along with their appropriate

Pay Types

Page 30: CP-97: Paving the Road: How AECOM is Using Costpoint to ... · AECOM Management Services Deltek Insight 2019 Track and Bill Equipment •Projects were needed to capture the equipment

30

The Process – Step 5: Equipment Costing

AECOM Management Services Deltek Insight 2019 Track and Bill Equipment

• Two types of costs

− Depreciation, maintenance, repairs or other costs associated to the equipment

charged to the Over/Under Project

− Costs applied to the Direct Projects for the use of the equipment

• Costs associated to the equipment are charged to the Over/Under Project through

“natural” methods (ex. FA, APV, LD, etc.)

• Costs due to the usage of the equipment are charged to the Direct Project via an

Adjusting Journal Entry using a Cognos report pulling information from Time

Collection and Product Definition

• The report created an AJE preprocessor file to be loaded as a Journal Entry

− Time Collection populated the Equipment, Project, Unit of Measure and Dates

− Product Definition populated the cost amounts associated to the Equipment

− Over/Under Project that the Equipment was assigned to (Credit entry)

Page 31: CP-97: Paving the Road: How AECOM is Using Costpoint to ... · AECOM Management Services Deltek Insight 2019 Track and Bill Equipment •Projects were needed to capture the equipment

31

The Process – Step 6: Equipment Billing

AECOM Management Services Deltek Insight 2019 Track and Bill Equipment

• Usage has been recorded on the TS and the costs applied to the usage has been

charged to the Direct Project using an Unallowable Account in the PAG

• Using Cognos, a report was developed to capture the necessary information from

Time Collection

• The report created an Units preprocessor file to be loaded as a Units Usage Entry

− Time Collection populated the Equipment, Project, UOM (Pay Type), Dates and

miscellaneous Employee Information (ID & Name)

− Using the data gathered from TC, the report positioned and translated the

information to be read in the Units Import

− CLIN was defined by the UOM (ex. EQH – Hours, EQD – Days, etc.)

• In some cases, the data would need to be adjusted based on the contract needs

before it was loaded into Costpoint

• The final import file would be loaded and processed through to the Invoice

Page 32: CP-97: Paving the Road: How AECOM is Using Costpoint to ... · AECOM Management Services Deltek Insight 2019 Track and Bill Equipment •Projects were needed to capture the equipment

32

Go Live & Lessons Learned

AECOM Management Services Deltek Insight 2019 Track and Bill Equipment

Page 33: CP-97: Paving the Road: How AECOM is Using Costpoint to ... · AECOM Management Services Deltek Insight 2019 Track and Bill Equipment •Projects were needed to capture the equipment

33

Go Live – Communication & Training

AECOM Management Services Deltek Insight 2019 Track and Bill Equipment

• Full process was still being defined and tested

• Employees/Timesheet Coordinators needed to understand how to enter the

information into Time Collection

• Labor Team needed to know what to look for and how to correct, if necessary

− Personal Equipment reimbursement

− Process to get the data entered or corrected

• Accounting Team needed to understand what to look for and an appropriate

amount for the AJE

− Identify if all usage was captured in the report

− Personal Equipment was reimbursed but identify if both lines were entered

• Billing team needed to reconcile what was being charged on the Timesheet to

what was being billed

• Communication and Training was required multiple times and to the larger group

Page 34: CP-97: Paving the Road: How AECOM is Using Costpoint to ... · AECOM Management Services Deltek Insight 2019 Track and Bill Equipment •Projects were needed to capture the equipment

34

Lessons Learned

AECOM Management Services Deltek Insight 2019 Track and Bill Equipment

• The original process was very manual and required many hours to complete

• It did not allow for a “clean” method of analysis or tracking

• In some cases, the over/under process wasn’t working and the information got

lost requiring an incredible amount of work to “unwind” it

• The new process allowed the equipment to be tracked and managed better

• Allowed the appropriate analysis to be done to better understand the true value of

the equipment being used

− Lease/Rent vs. Buy

− Personal vs. Lease/Rent

• Better communication and training

− Basic understanding of entry point by Employee/Timesheet Coordinator

− Full understanding of the process was very limited to a small group

Page 35: CP-97: Paving the Road: How AECOM is Using Costpoint to ... · AECOM Management Services Deltek Insight 2019 Track and Bill Equipment •Projects were needed to capture the equipment

35

Lessons Learned

AECOM Management Services Deltek Insight 2019 Track and Bill Equipment

• Full process was still being defined and tested after phase 1 go live

• Responsibilities were not fully defined

• Identifying the best communication paths to ensure full coordination between

teams (ex. Procurement, Fixed Assets, Equipment, Accounting, Projects, etc.)

• How do we not get “lost” or lose a step in the process

• Reconciliation to ensure information (cost/billing) isn’t being duplicated or missed

• Involving all of the right people at the right times

• Dedicated time to map and test the process fully with the larger team

− Understand what worked and what didn’t

− Define the training needs better

− Communicate based on audience

• Using Extensibility in Production Definition for the Pay/Cost Amounts

Page 36: CP-97: Paving the Road: How AECOM is Using Costpoint to ... · AECOM Management Services Deltek Insight 2019 Track and Bill Equipment •Projects were needed to capture the equipment

36

Contact Information

AECOM Management Services Deltek Insight 2019 Track and Bill Equipment

James D. Mitchell

[email protected]