Agenda
AECOM Management Services Deltek Insight 2019 Track and Bill Equipment
• Background
• Approach
• Testing
• The Process
• Go Live & Lessons Learned
3
Background
AECOM Management Services Deltek Insight 2019 Track and Bill Equipment
4
Business Need – Background
AECOM Management Services Deltek Insight 2019 Track and Bill Equipment
• Project was put together to move contracts from an Oracle ERP to Deltek
Costpoint
• Management Services was chosen as an effort to work towards a goal of a
standardized delivery of systems (T&E, Costpoint and Cognos)
− Benefit: Savings by standardizing the management of service contracts
− Benefit: Long-term efficiencies
− Benefit: Consolidated systems and support staff
• MS Costpoint houses mostly Government contracts, while the Oracle contracts
were Commercial
• Business line and concepts were fairly new to MS
• Multiple Oracle migrations into Costpoint
− Proven to be efficient and successful
5
Business Need – Equipment Management
AECOM Management Services Deltek Insight 2019 Track and Bill Equipment
• One particular process was identified as a requirement for the migration as it was
critical to the how the organization managed the contracts
• A requirement to track equipment and it’s usage came up as part of various team
meetings
• As various parts of the process were discussed, it was not initially understood
− “Sounds like a service center”
− “Part of an Overhead”
− “Why are we billing ourselves”
• Management of equipment and its usage was new
• Current process was very manual
− Paper were being passed around
− Manually keyed and adjusted into system
− Data was keyed multiple times
6
Business Need – Equipment Requirements
AECOM Management Services Deltek Insight 2019 Track and Bill Equipment
• The main goal was to track equipment from purchase through allocation to the
client projects then billing to the customer
• Requirements were:
− Capture equipment usage through time entry using various units of measure
− Reimburse personal equipment usage to the employee
− Record costs associated with each piece of equipment
− Charge a Service Bill Rate (SBR) to the client project as costs (ex. $6.30)
− Identify equipment as company owned, leased, rented or personal
− Flexible enough to change bill rate based on UOM to provide lowest total
amount to customer (ex. 4 days vs. 1 week)
− Tax Personal equipment reimbursement as necessary
− Analyze over/under for each piece of equipment
7
Business Need – Help Wanted
AECOM Management Services Deltek Insight 2019 Track and Bill Equipment
• Resources were needed to help ensure that we gathered all of the requirements
and to work with the team defining a process
− Tony Bowser joined the team as a consultant to help define and automate this
process as much as possible using the tools available to us
8
Approach
AECOM Management Services Deltek Insight 2019 Track and Bill Equipment
9
Approach – Service Centers
AECOM Management Services Deltek Insight 2019 Track and Bill Equipment
• Multiple discussions lead to using Costpoint to do the natural allocation of costs
that were being collected
• Service Centers provided a good foundation on collecting the costs associated to
each piece of equipment then allocating it out to the direct projects
• Service Centers also allowed us to dictate what to allocate, how and where
− Change in practice – Full allocation of costs vs Service Bill Rate
• One part of the business agreed on using the SC allocation methodology
− Each piece of equipment would require an individual SC
− It would have resulted into over 1,000 SCs
• Question asked: Could we group them? Response: No
− Would not be able to do the proper analysis
• Required too many Service Centers, not a viable option
10
Approach – Projects
AECOM Management Services Deltek Insight 2019 Track and Bill Equipment
• Projects were needed to capture the equipment usage, associated costs, allocate
to client project and bill to the customer
− Very summarized by overall locations that owned the equipment
• Only option is to break down the Projects further for each individual piece of
equipment that needed to be tracked and managed
• Tag number identified as part of the Project structure
• Standard Indirect structure did not fit the needs to identify and track the
equipment
• Management didn’t originally approve of the change to the Indirect structure & org
requirements
− Too much reporting based on the current structure and rules
• After more detailed discussions, Management finally agreed to minimal changes
• Process needed to be defined
11
Approach – Payroll and Costing Information
AECOM Management Services Deltek Insight 2019 Track and Bill Equipment
• Where and how do we capture payroll and costing information for the equipment
• Equipment were tagged and managed through Item Goods in Product Definition
• Repurpose unused fields to record Pay and Cost information
− Manage Goods Costs subtask was the answer
• Ability to identify different units of measure for pay and costing
− Ability to split taxable vs non-taxable for payroll
12
Approach – Payroll and Costing Information
AECOM Management Services Deltek Insight 2019 Track and Bill Equipment
• Repurposed fields were “standardized” for reporting
− Total Unit Costs – Hourly rates
− This-Level Unit Costs – Daily rates
− Labor fields – Non-Taxable Payroll
− Labor Burden fields – Taxable Payroll
− Misc fields – Cost Allocation to Direct Projects
13
Approach – Capturing Usage
AECOM Management Services Deltek Insight 2019 Track and Bill Equipment
• Unknown how to capture usage of the equipment
• Project Labor Categories were discussed
− Limited characters
− Different structure compared to the Tag Number
− Viewed as labor rather than usage
• Current functionality within Time Collection could capture the Tag Number – UDT
• Ability to record transactions linked to a daily timesheet
• Could be managed in a central location
• Allowed reporting to be used for downstream activities
− Payroll
− Costing
− Billing
14
Approach – Process Flow
AECOM Management Services Deltek Insight 2019 Track and Bill Equipment
15
Approach – Process Flow
AECOM Management Services Deltek Insight 2019 Track and Bill Equipment
16
Approach – Process Flow
AECOM Management Services Deltek Insight 2019 Track and Bill Equipment
17
Testing
AECOM Management Services Deltek Insight 2019 Track and Bill Equipment
18
Testing
AECOM Management Services Deltek Insight 2019 Track and Bill Equipment
• Needed to gather all of the “active” equipment,
which were not centralized
• Standardize the tagging system while staying
similar to the current
• User Defined Fields were created to track/link
information
− Link Item Good to Asset ID, if applicable
− Assign Over/Under Project tracking the equipment
costs
• Finalize the CLIN Units setup with different rates for
a single piece of equipment and link them to
individual Projects
• Crosswalks created to map old IDs to new IDs
19
Testing
AECOM Management Services Deltek Insight 2019 Track and Bill Equipment
• Pulling a form together identifying all of the information needed to setup Item
• Struggled to get the system ready for testing (not related to the process)
• Running through small batches to better define the process
• Ensured reporting capabilities worked as intended and could support the process
20
The Process
AECOM Management Services Deltek Insight 2019 Track and Bill Equipment
21
The Process
AECOM Management Services Deltek Insight 2019 Track and Bill Equipment
• Overall process required 3 main components that needed to be set up
− Product Definition (Item Goods)
− Time Collection
− Billing
• As a 4th component, Fixed Assets was only required during certain situations but
was not required to process equipment usage through the system
• From the point the piece of equipment was brought in, a number of steps, forms
and departments were required to fully set up the equipment transactions
• Process started with identifying the piece of equipment for use on a project
− Company Owned
− Lease/Rental
− Personal
• Three Cognos Reports were created to support the processing
22
The Process – Step 1: Initial Setup (Personal Equipment)
AECOM Management Services Deltek Insight 2019 Track and Bill Equipment
• Employees are allowed to use selected personal equipment on the job if approved
• Agreements are drawn up with the employee defining the rate of pay for the use of
each personal equipment
• These amounts must be included on the Equipment Usage Form as part of the
Equipment setup in Product Definition
Project Terms & Conditions
Per Diem
Frequency
Amount $
Housing
Transportation
Rig Pay (only applicable to welders) $21/hr
Truck Pay $70/day with fuel card
Weld Skills Assessment
Weld Skills Assessment Location
(Location to include physical address: District
Office or Client Site or Other Training site)
Weld Skills Assessment Requirements
23
The Process – Step 1: Initial Setup
AECOM Management Services Deltek Insight 2019 Track and Bill Equipment
• Specific Forms are required for the initial
requests to set up the Equipment
• Equipment Usage Form* submitted to
Equipment Manager
− Identifies the Equipment and charging
elements
• Fixed Asset form submitted to Fixed Asset
Manager, as appropriate
• Indirect Project Setup form submitted to
Accounting
− Over/Under Project setup to capture the
costs associated with the equipment
* Form is still being modified
24
The Process – Step 1: Product Definition Goods
AECOM Management Services Deltek Insight 2019 Track and Bill Equipment
Example: AECOM Owned Equipment
25
The Process – Step 1: Product Definition Goods
AECOM Management Services Deltek Insight 2019 Track and Bill Equipment
Example: Personal Equipment
26
The Process – Step 2: Usage & Billing Setup
AECOM Management Services Deltek Insight 2019 Track and Bill Equipment
• Forms forwarded for Time and Billing set up
• Completed Equipment Usage Form forwarded to the Labor team
− Usage could not be recorded until the Item was set up in Time Collection
− Item manually added to the UDT table (centrally controlled)
27
The Process – Step 2: Usage & Billing Setup
AECOM Management Services Deltek Insight 2019 Track and Bill Equipment
• Equipment Usage From and applicable rate schedule is sent to the Billing team
− Notifies the team that a new piece of equipment needed to be set up as a
Billable Item then added to CLIN Units Usage
− While the Equipment Usage Form identifies the item, the rate schedule
identifies the unit of measure and rate at which the equipment can be billed out
− If the equipment requires multiple units of measure, additional CLINs are set up
to accommodate the different rates for the individual item
28
The Process – Step 3: Recording Equipment Usage
AECOM Management Services Deltek Insight 2019 Track and Bill Equipment
• Employees record equipment usage on their timesheet
• Separate field for each Equipment (UDT/Item ID) used on every TS row
• Pay Type was used to specify unit of measure (ex. EQH, EQD, EQP, etc.)
• For Personal (EQP) Equipment, two records were required
− Record the use of personal equipment (EQP) for payroll (ex. 1 day) charged to the
Over/Under Project
− Record actual usage time of equipment (EQH) for costing/billing (ex. 8 hours) charged to
the Direct Project
• Equipment information is not passed on to Costpoint however the usage information was in
addition to the standard “labor” data
− An Amount is not applied when Equipment TS rows are imported into Costpoint
29
The Process – Step 4: Employee Payment
AECOM Management Services Deltek Insight 2019 Track and Bill Equipment
• For Personal Equipment that is being used on the job, the Employee is
reimbursed based on an agreed amount made with the Project
• An additional step is required once the usage transaction is imported into
Costpoint
• Using Cognos, a report was developed to capture the necessary information from
Time Collection and Product Definition
• The report created a Labor preprocessor file to be loaded into Costpoint Labor
− Time Collection populated the Equipment, Unit of Measure and Dates
− Product Definition populated the agreed upon Payroll amounts for each
personal equipment
− When applicable, the report would take the payroll amounts and create two
records, one as taxable and another as non-taxable along with their appropriate
Pay Types
30
The Process – Step 5: Equipment Costing
AECOM Management Services Deltek Insight 2019 Track and Bill Equipment
• Two types of costs
− Depreciation, maintenance, repairs or other costs associated to the equipment
charged to the Over/Under Project
− Costs applied to the Direct Projects for the use of the equipment
• Costs associated to the equipment are charged to the Over/Under Project through
“natural” methods (ex. FA, APV, LD, etc.)
• Costs due to the usage of the equipment are charged to the Direct Project via an
Adjusting Journal Entry using a Cognos report pulling information from Time
Collection and Product Definition
• The report created an AJE preprocessor file to be loaded as a Journal Entry
− Time Collection populated the Equipment, Project, Unit of Measure and Dates
− Product Definition populated the cost amounts associated to the Equipment
− Over/Under Project that the Equipment was assigned to (Credit entry)
31
The Process – Step 6: Equipment Billing
AECOM Management Services Deltek Insight 2019 Track and Bill Equipment
• Usage has been recorded on the TS and the costs applied to the usage has been
charged to the Direct Project using an Unallowable Account in the PAG
• Using Cognos, a report was developed to capture the necessary information from
Time Collection
• The report created an Units preprocessor file to be loaded as a Units Usage Entry
− Time Collection populated the Equipment, Project, UOM (Pay Type), Dates and
miscellaneous Employee Information (ID & Name)
− Using the data gathered from TC, the report positioned and translated the
information to be read in the Units Import
− CLIN was defined by the UOM (ex. EQH – Hours, EQD – Days, etc.)
• In some cases, the data would need to be adjusted based on the contract needs
before it was loaded into Costpoint
• The final import file would be loaded and processed through to the Invoice
32
Go Live & Lessons Learned
AECOM Management Services Deltek Insight 2019 Track and Bill Equipment
33
Go Live – Communication & Training
AECOM Management Services Deltek Insight 2019 Track and Bill Equipment
• Full process was still being defined and tested
• Employees/Timesheet Coordinators needed to understand how to enter the
information into Time Collection
• Labor Team needed to know what to look for and how to correct, if necessary
− Personal Equipment reimbursement
− Process to get the data entered or corrected
• Accounting Team needed to understand what to look for and an appropriate
amount for the AJE
− Identify if all usage was captured in the report
− Personal Equipment was reimbursed but identify if both lines were entered
• Billing team needed to reconcile what was being charged on the Timesheet to
what was being billed
• Communication and Training was required multiple times and to the larger group
34
Lessons Learned
AECOM Management Services Deltek Insight 2019 Track and Bill Equipment
• The original process was very manual and required many hours to complete
• It did not allow for a “clean” method of analysis or tracking
• In some cases, the over/under process wasn’t working and the information got
lost requiring an incredible amount of work to “unwind” it
• The new process allowed the equipment to be tracked and managed better
• Allowed the appropriate analysis to be done to better understand the true value of
the equipment being used
− Lease/Rent vs. Buy
− Personal vs. Lease/Rent
• Better communication and training
− Basic understanding of entry point by Employee/Timesheet Coordinator
− Full understanding of the process was very limited to a small group
35
Lessons Learned
AECOM Management Services Deltek Insight 2019 Track and Bill Equipment
• Full process was still being defined and tested after phase 1 go live
• Responsibilities were not fully defined
• Identifying the best communication paths to ensure full coordination between
teams (ex. Procurement, Fixed Assets, Equipment, Accounting, Projects, etc.)
• How do we not get “lost” or lose a step in the process
• Reconciliation to ensure information (cost/billing) isn’t being duplicated or missed
• Involving all of the right people at the right times
• Dedicated time to map and test the process fully with the larger team
− Understand what worked and what didn’t
− Define the training needs better
− Communicate based on audience
• Using Extensibility in Production Definition for the Pay/Cost Amounts
36
Contact Information
AECOM Management Services Deltek Insight 2019 Track and Bill Equipment
James D. Mitchell