TABLE OF CONTENT
No.ItemsPage
1.0Introduction4
2.0Purpose4
3.0Scope4
4.0Reference4
5.0Definitions5
1.0 PURPOSE
The purpose of this Inspection and Test Plan is to define the quality assurance and quality control requirements for the KR1 WWTP 1B. This plan identifies the minimum inspection and test requirements. Level of inspection and test to be utilized and verified in accordance with the acceptability of materials or equipments based on scope of the contract.
2.0 DEFINITIONS
OWNER shall mean Petronas Penapisan ( T ) Sdn. Bhd. and includes its representatives, successors and permitted assigns.
CONTRACTOR shall mean the Rekayasa Industri Malaysia Sdn. Bhd. includes its representatives, subcontractors, vendors, suppliers, successors and permitted assigns.
3.0
PROJECT TITLE AND PLANT LOCATIONProject Title
: KR1 WWTP 1B
Location of the Plant in : KERTEH, TERENGGANU,MALAYSIA.
4.0
REFERENCES
Project Quality Plan PTS 33.64.10.10Electrical Engineering Guidelines
PTS 33.64.10.11Electrical Network Monitoring & Control System Application
PTS 33.64.10.12Electrical Supply and Generation Design and Operation
PTS 33.66.05.31Electrical Machines-cage Induction Types
PTS 33.66.05.33Electrical Variable Speed Drive System
PTS 33.67.01.31Low-Voltage Switchgear and Control Gear Assemblies
(Amendments/Supplements to IEC 439-1)
5.0
ABBREVIATIONS
5.1 I Inspect
Mandatory examination of work after completion of activities as indicated by the symbol I on the approved Shop Inspection and Test Plan. Verify acceptance to the acceptance to the specification, industry code and manufacturers requirements. Can be visual /dimensional inspection or test.
5.2 W Witness
A point, that required to be witnessed by the QC inspector or designated representative on the process of production or installation activity. In the event this Inspector representative is not present at the time of inspection or examination, the inspection and examination may proceed without designated witnesses.
5.3 (W) Random Witness
A point, that required to be random witnessed by the QC inspector or designated representative on the process of productivity or installation activity.
In the event inspector or representative is not present at the time of inspection and examination, the inspection or examination may proceed without designated witness.
5.4 H Hold Point
A point, that mandatory requirement has to be inspected or examined, before further the work can be performed. The Hold Point shall not be by-passed without QC inspectors or designated representatives concurrence.
5.5 R Review
Review and evaluation of reports, procedures, qualifications and verify conformance to specified requirements.
EMBED Word.Picture.8