cover page

10
PROJECT TRACKING INFORMATION SYSTEM FOR IMO STATE GOVERNMENT BY ARIWODO KINGSLEY 2013/HND/CST/60616 A PROJECT SUBMITTED TO THE DEPARTMENT OF COMPUTER SCIENCE TECHNOLOGY SCHOOL OF SCIENCE TECHNOLOGY (SST), IMO STATE POLYTECHNIC UMUAGWO OHAJI IN PARTIAL FULFILMENT OF THE REQUUIREMENT FOR THE AWARD OF

Upload: ugostan

Post on 11-Feb-2016

212 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Cover Page

PROJECT TRACKING INFORMATION SYSTEM FOR IMO STATE GOVERNMENT

BY

ARIWODO KINGSLEY

2013/HND/CST/60616

A PROJECT SUBMITTED TO THE

DEPARTMENT OF COMPUTER SCIENCE TECHNOLOGY

SCHOOL OF SCIENCE TECHNOLOGY (SST),

IMO STATE POLYTECHNIC UMUAGWO OHAJI

IN PARTIAL FULFILMENT OF THE REQUUIREMENT FOR THE AWARD OF

HIGHER NATIONAL DIPLOMA (HND) IN COMPUTER SCIENCE

AUGUST, 2015.

Page 2: Cover Page

DEDICATION

To God Almighty who gave me the enablement to make this a success.

And to my beloved parents Mr. and Mrs. Ariwodo who supported me both financially and spiritually.

Page 3: Cover Page

ACKNOWLEDMENT

I am most grateful to the Almighty God for his enabling grace and the inspiration that made this work to be brought into fruition.

I am highly indebted to my supervisor Mr. Anyiam Chukwuma who supported me with his numerous advices during this project work.

I appreciate and acknowledge with immense thanks to the understanding, care and support shown by my God throughout the period I was writing this project.

My gratitude also goes to my friends who motivated me greatly in their numerous teachings towards this topic.

To my uncle Mr. Godwin Ejiogu, on your fatherly advice and financially support can never be forgotten.

I equally express unreserved thanks to my God for his care and advice during the making of this work.

Page 4: Cover Page

ABSTRACT

Fig.1

We all are aware of errors and losses of funds and man-power arising from non-continuity of project ranging from one administration to another. This primarily comes or results from the deficiency associated with manual storage and processing of project information in project tracking information in the state, therefore this computer base project tracking information system of government projects all over the state from development stage to completion stage keeps awarded projects and information secured as it ensures adequate information security, time saving, easy storage and retrieval mechanism.

Fig.2

And the program was tracked on:

A little more about this program is it is a visual basic program, and it was used track the main profile information of all workers in imo state government. This was reloaded 25th august 2015.

Page 5: Cover Page

TABLE OF CONTENTS

Page ……………………………………………………………………………………..…..i

Certification……………………………………………………………………………….ii

Dedication…………………………………………………………………………………iii

Acknowledgment……………….…………………………………………………….iv

Abstract……………………………………………………………………………..……...v

Table of Content…………………………………………………………..……………vi

CHAPTER ONE

0.1 Background of the study………………………………………………………1-2

1.1 Statement of problem……………………………………………….……………2-3

1.2 Objective of study……………………………………………………..…………..3-4

1.3 Scope of study …………………………………………………………….…………..4

1.4 Significance of study ………………………………………………………………4

1.5 Limitation ……………………………………………………………..……………5-6

1.6 Definition of terms……………………………………………………..…………6-9

CHAPTER TWO

2.0 Introduction to literature review.

2.1 Computer application in project tracking information

Page 6: Cover Page

System……………………………..………………………………………..……………….10

2.2 Computer database in project tracking information

System…………………………………………………………………………..………….....11

2.3 Manual filling office document………………………….………………12-13

2.4 Electronic project tracking filling…………………………………………13-18

CHAPTER THREE

3.0 Methodology and analysis……………………………………………….19

3.1 Methodology………………………………………………………….……20-22

3.2 Problem and weakness of the present system………………...22-23

3.3 Description of new system…………………………………..…..…23-24

3.4 Data flow diagram of the present system……………….……..25

3.5 Proposed high level model of new system……………….………26

3.6 Organogram of Imo State Government ………………...…………..27

3.6.1 Data flow diagram of the present system……………………………28

CHAPTER FOUR

4.0 Design and Implementation……………………………………..……….29

4.0 Objective of the new system ………………………………….……29-30

4.1 Data base specification project……………………………..…..30-31

Page 7: Cover Page

4.2.1 Company monitoring database (MBB)……………………..………31-32

4.3 Input and output design …………………………………….………………32

4.3.0 Input and out design…………………………………………..……………33

4.3.1 Edith project…………………………………………………………………..34-37

4.4.0 Program Run time procedure……………………………………………38

4.4.1 Proposed high level model main menu of the system 39

4.5.0 Program module specification………………………………..…………39

4.6.0 Program module flow chart and new project………….…………40

4.6.1 Edith existing project……………………………………………….…………41

4.6.2 Delete existing project …………………………………………..…………42

4.6.3 Dataflow diagram of the new system……………………………43-46

4.7.0 The program interface……………………………………………………Add.

CHAPTER FIVE

5.0 Summary…………………………………………..…………………………….51

5.1 Conclusion………………………………………..…………………………51-52

5.2 Recommendation……………………………………………………………52

5.3 References……………………………..……………………………………53-54

Page 8: Cover Page