coupler design and fabrication tuner design and fabrication

1
This manuscript has been authored by Fermi Research Alliance, LLC under Contract No. DE-AC02- 07CH11359 with the U.S. Department of Energy, Office of Science, Office of High Energy Physics. 1 FERMILAB-POSTER-21-014-TD D. Bice 1 , C. Boffo 1 , S. K. Chandrasekaran 1 , S. Cheban 1 , G. V. Eremeev 1,* , F. Furuta 1 , I. Gonin 1 , C. Grimm 1 , S. Kazakov 1 , T. Khabiboulline 1 , A. Lunin 1 , M. Martinello 1 , J. Ozelis 1 , Y. Pischalnikov 1 , K. Premo 1 , O. Prokofiev 1 , O. Pronitchev 1 , G. Romanov 1 , N. Solyak 1 , A. Sukhanov 1 , G. Wu 1,* , T. Reid 2 , M. Bagre 3 , V. Jain 3 , N. Nigam 3 , A.M. Puntambekar 3 , S. Raghavendra 3 , P. Shrivastava 3 , R. Kumar 4 , P. Bhattacharyya 5 , S. Ghosh 5 , S. Seth 5 , C. Pagani 6,7 , R. Paparella 6 , J. Lewis 7 , P. McIntosh 7 , A. Shabalina 7 , A. Wheelhouse 7 1 Fermi National Accelerator Laboratory, Illinois, USA 2 Argonne National Laboratory, Argonne, IL 60439, USA 3 Raja Ramanna Centre for Advanced Technology, Indore, India 4 Bhabha Atomic Research Center, Trombay, Mumbai, India 5 Variable Energy Cyclotron Centre (VECC), Kolkata, India 6 INFN/LASA, Segrate (MI), Italy 7 Università degli Studi di Milano, Milano, Italy 8 STFC/DL/ASTeC, Daresbury, Warrington, Cheshire, United Kingdom 650 Cavity Fabrication B90 5-cells at FNAL status Instrumentation VTS as jacketed STC test B9A-AES-007 Jacketed No In progress No B9A-AES-008 Jacketed Yes In progress planned B9A-AES-009 Jacketed No In preparation No B9A-AES-010 Jacketed Yes Completed Completed B92 5-cell at FNAL status VTS as bare Jacketing STC test B92D-RRCAT-502 Bare Completed In preparation Planned B92D-RRCAT-504 Bare In progress Planned TBD B92E-RRCAT-506 Bare In preparation Planned TBD B61 5-cell at FNAL status VTS as bare Jacketing STC test B61-EZ-001 Bare In progress Planned at INFN (?) No LB650 proto cavity (B61-EZ-001) received from INFN, Italy HB650 proto cavity (B92D-RRCAT-502) received from RRCAT, India Four bare HB 650 β = 0 . 9 cavities were jacketed after qualification in the vertical test and pressure tested First LB 650 β = 0 . 61 prototype cavity was received from INFN, Italy First three HB 650 β = 0 . 92 prototype cavities received from RRCAT, India Four prototype LB 650 β = 0 . 61 and three prototype HB 650 β = 0 . 92 cavities with jacketing components are in procurement from industry The prototype HB 650 β = 0 . 92 cavity is being jacketed at FNAL Specifications and requirement are in preparation for the procurement of production niobium and cavities Cavity processing B61-EZ-001 EP @ ANL B92D-RRCAT-502 @ FNAL VTS 1.E-03 1.E-02 1.E-01 1.E+00 1.E+01 1.E+02 1.E+03 1.E+04 1.E+10 1.E+11 0 5 10 15 20 25 30 Rad [mR/hr] Q0 Eacc [MV/m] All four bare HB 650 β = 0 . 9 cavities were qualified in the vertical test First HB 650 β = 0 . 92 prototype cavity, received from RRCAT, India, was qualified in the vertical test facility at Fermilab Electropolishing of LB 650 β = 0 . 61 prototype cavity, received from INFN, Italy, showed very uniform removal with modified cathode Processing verification is ongoing with both LB 650 β = 0 . 61 and HB 650 β = 0 . 92 cavities Tuner Design and Fabrication SRF cavity tuner designed to be able to serve three type of 650 MHz cavities β = 0 . 61 , 0 . 9 , and 0 . 92 Double - lever tuner with piezo - actuator installed between main tuner arm and conical flange of dressed cavity, benefiting from using the same highly reliable stepper motor and piezo actuators Incorporated lessons learned from the LCLS - II 1 . 3 GHz tuner Designed with high tuner stiffness to minimize Lornetz Force detuning of the 650 cavities First tuner prototype was installed on b= 0 . 9 dressed cavity and performances of the cavity/tuner system have been evaluated on the warm and cold cavity Tuner’s drawings and details of assembly procedure were shared with the partners Coupler Design and Fabrication 650 MHz power coupler was designed for both β = 0 . 61 and β = 0 . 92 cavities Coupler consists of two parts : cold vacuum part with flat ceramic window and antenna and warm part with bellows in inner and outer conductors and transition to standard WR 1150 waveguide DC bias up to 5 kV to damp multipactoring activity in the coupler Orientation of the flag at the end of antenna allows to change coupling during coupler - to - cavity installation in the clean room Proposed, built and tested two designs of the 650 MHz power coupler at the prototyping stage : in prototype A stainless steel outer conductor is shielded by copper screen from electromagnetic fields, in prototype B, all stainless - steel tubes and bellows are copper plated, antenna is made of solid copper, polished to reduce thermal radiation Current design is modified version of prototype B coupler, built and successfully tested at full parameters For pre - production β = 0 . 61 and β = 0 . 92 cryomodules Fermilab started the procurement of eight couplers and three cold antenna - window assembly PIP - II partners are planning to start procurement of 650 couplers soon Dressed cavity qualification in STC Commissioned STC for 650 MHz testing: facility (mechanical, instrumentation, vacuum, cryogenic, RF, safety/interlocks), procedures, documentation) Tested and validated 650 MHz coupler and tuner designs Characterized B9A-AES-010 (HB650, 0.9) cavity (max E acc ,Q 0 , FE, MP, LFD, df/dP) Jacketing of the last β = 0.9 cavity β = 0.9 cavity pressure testing B92D-RRCAT-502 bare cavity qualification in VTS 650 coupler, Prototype A 650 coupler, Prototype B Coupler test stand PI’s P-844K075 encapsulated piezo unit Phytron stepper motor 3D model of 650 MHz cavity tuner 650 MHz cavity tuner assembled on HB650 β = 0.9 cavity Fermilab is upgrading its existing accelerator complex to support a world leading neutrino program and future high intensity frontier particle physics experiments . At PIP - II core is the design and construction of a Continuous Wave (CW) superconducting radio frequency (SRF) linear accelerator that would accelerate an average beam current of 2 mA up to 800 MeV . PIP - II beam acceleration occurs mainly in SRF CW linac that will employ five different types of superconducting cavities . Low - beta and high - beta sections of PIP - II linac will use nine low - beta cryomodules with four cavities each and four high - beta cryomodules with six cavities each . These cavities will be produced and qualified in collaboration between Fermilab and the international partners . After qualification of 0 . 9 HB 650 cavities at Fermilab, several pre - production 0 . 92 and 0 . 61 cavities have been and are being fabricated and qualified . We discuss the current status of cavities and subsystem qualification for PIP - II . The high energy section of the SRF CW linac will comprise a section with nine LB 650 cryomodules, hosting four LB 650 dressed cavities each, and a section with four HB 650 cryomodules, hosting six HB 650 dressed cavities each . Fermilab is in the process of the design validation of both types of 650 cavities . Several prototype cavities and other components have been received from the international partners are being processed and tested at Fermilab . At the same time prototype procurement by Fermilab is ongoing along with refinement and finalization of the components requirements to initiate procurements by the partner labs . As a part of validation process, the first Hb 650 β = 0 . 9 cavity has been successfully tested in the recently modified STC horizontal testing bed . TUPAB333

Upload: others

Post on 19-Jan-2022

15 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Coupler Design and Fabrication Tuner Design and Fabrication

This manuscript has been authored by Fermi Research Alliance, LLC under Contract No. DE-AC02-07CH11359 with the U.S. Department of Energy, Office of Science, Office of High Energy Physics.

1

FERMILAB-POSTER-21-014-TD

D. Bice1, C. Boffo1, S. K. Chandrasekaran1, S. Cheban1, G. V. Eremeev1,*, F. Furuta1, I. Gonin1, C. Grimm1, S. Kazakov1, T. Khabiboulline1, A. Lunin1, M. Martinello1, J. Ozelis1, Y.Pischalnikov1, K. Premo1, O. Prokofiev1, O. Pronitchev1, G. Romanov1, N. Solyak1, A. Sukhanov1, G. Wu1,*, T. Reid2, M. Bagre3, V. Jain3, N. Nigam3, A.M. Puntambekar3, S. Raghavendra3, P.Shrivastava3, R. Kumar4, P. Bhattacharyya5, S. Ghosh5, S. Seth5, C. Pagani6,7, R. Paparella6, J. Lewis7, P. McIntosh7, A. Shabalina7, A. Wheelhouse7

1Fermi National Accelerator Laboratory, Illinois, USA2Argonne National Laboratory, Argonne, IL 60439, USA

3Raja Ramanna Centre for Advanced Technology, Indore, India4Bhabha Atomic Research Center, Trombay, Mumbai, India

5Variable Energy Cyclotron Centre (VECC), Kolkata, India6INFN/LASA, Segrate (MI), Italy

7Università degli Studi di Milano, Milano, Italy8STFC/DL/ASTeC, Daresbury, Warrington, Cheshire, United Kingdom

650 Cavity Fabrication

B90 5-cells at FNAL status Instrumentation VTS as jacketed STC testB9A-AES-007 Jacketed No In progress NoB9A-AES-008 Jacketed Yes In progress plannedB9A-AES-009 Jacketed No In preparation NoB9A-AES-010 Jacketed Yes Completed Completed

B92 5-cell at FNAL status VTS as bare Jacketing STC testB92D-RRCAT-502 Bare Completed In preparation PlannedB92D-RRCAT-504 Bare In progress Planned TBDB92E-RRCAT-506 Bare In preparation Planned TBD

B61 5-cell at FNAL status VTS as bare Jacketing STC testB61-EZ-001 Bare In progress Planned at INFN (?) No

LB650 proto cavity (B61-EZ-001) received from INFN, Italy

HB650 proto cavity (B92D-RRCAT-502) received from RRCAT, India

✓ Four bare HB650 β = 0.9 cavities

were jacketed after qualification in

the vertical test and pressure

tested

✓ First LB650 β = 0.61 prototype

cavity was received from INFN, Italy

✓ First three HB650 β = 0.92

prototype cavities received from

RRCAT, India

✓ Four prototype LB650 β = 0.61 and

three prototype HB650 β = 0.92

cavities with jacketing components

are in procurement from industry

✓ The prototype HB650 β = 0.92

cavity is being jacketed at FNAL

✓ Specifications and requirement are

in preparation for the procurement

of production niobium and cavities

Cavity processing

B61-EZ-001 EP @ ANL

B92D-RRCAT-502 @ FNAL VTS

1.E-03

1.E-02

1.E-01

1.E+00

1.E+01

1.E+02

1.E+03

1.E+04

1.E+10

1.E+11

0 5 10 15 20 25 30

Rad

[m

R/h

r]

Q0

Eacc [MV/m]

✓All four bare HB650 β = 0.9 cavities were qualified in the vertical test

✓ First HB650 β = 0.92 prototype cavity, received from RRCAT, India, was

qualified in the vertical test facility at Fermilab

✓ Electropolishing of LB650 β = 0.61 prototype cavity, received from INFN, Italy,

showed very uniform removal with modified cathode

✓Processing verification is ongoing with both LB650 β = 0.61 and HB650 β =

0.92 cavities

Tuner Design and Fabrication

✓ SRF cavity tuner designed to be able to

serve three type of 650MHz cavities β =

0.61, 0.9, and 0.92

✓Double-lever tuner with piezo-actuator

installed between main tuner arm and

conical flange of dressed cavity,

benefiting from using the same highly

reliable stepper motor and piezo

actuators

✓ Incorporated lessons learned from the

LCLS-II 1.3 GHz tuner

✓Designed with high tuner stiffness to

minimize Lornetz Force detuning of the

650 cavities

✓ First tuner prototype was installed on

b=0.9 dressed cavity and performances

of the cavity/tuner system have been

evaluated on the warm and cold cavity

✓ Tuner’s drawings and details of

assembly procedure were shared with

the partners

Coupler Design and Fabrication✓ 650 MHz power coupler was designed for both β = 0.61 andβ = 0.92 cavities

✓Coupler consists of two parts: cold vacuum part with flatceramic window and antenna and warm part with bellows ininner and outer conductors and transition to standardWR1150 waveguide

✓DC bias up to 5kV to damp multipactoring activity in thecoupler

✓Orientation of the flag at the end of antenna allows tochange coupling during coupler-to-cavity installation in theclean room

✓Proposed, built and tested two designs of the 650 MHzpower coupler at the prototyping stage: in prototype Astainless steel outer conductor is shielded by copper screenfrom electromagnetic fields, in prototype B, all stainless-steeltubes and bellows are copper plated, antenna is made ofsolid copper, polished to reduce thermal radiation

✓Current design is modified version of prototype B coupler,built and successfully tested at full parameters

✓ For pre-production β = 0.61 and β = 0.92 cryomodulesFermilab started the procurement of eight couplers andthree cold antenna-window assembly

✓PIP-II partners are planning to start procurement of 650couplers soon

Dressed cavity qualification in STC✓ Commissioned STC for 650 MHz testing:

facility (mechanical, instrumentation,vacuum, cryogenic, RF,safety/interlocks), procedures,documentation)

✓ Tested and validated 650 MHz couplerand tuner designs

✓ Characterized B9A-AES-010 (HB650, 0.9)cavity (max Eacc, Q0, FE, MP, LFD, df/dP)

Jacketing of the last β = 0.9 cavityβ = 0.9 cavity pressure testing

B92D-RRCAT-502 bare cavity qualification in VTS

650 coupler, Prototype A

650 coupler, Prototype B

Coupler test stand

PI’s P-844K075 encapsulated

piezo unit

Phytron stepper motor3D model of 650 MHz cavity tuner

650 MHz cavity tuner assembled on HB650 β = 0.9 cavity

Fermilab is upgrading its existing accelerator complex to support a world leading neutrino program

and future high intensity frontier particle physics experiments. At PIP-II core is the design and construction of a

Continuous Wave (CW) superconducting radio frequency (SRF) linear accelerator that would accelerate an average

beam current of 2 mA up to 800 MeV. PIP-II beam acceleration occurs mainly in SRF CW linac that will employ

five different types of superconducting cavities.

Low-beta and high-beta sections of PIP-II linac will use nine low-beta cryomodules with four cavities

each and four high-beta cryomodules with six cavities each. These cavities will be produced and qualified in

collaboration between Fermilab and the international partners. After qualification of 0.9 HB650 cavities at

Fermilab, several pre-production 0.92 and 0.61 cavities have been and are being fabricated and qualified. We

discuss the current status of cavities and subsystem qualification for PIP-II.

The high energy section of the SRF CW linac will comprise a section with nine LB650 cryomodules, hosting four LB650 dressed cavities each, and a section withfour HB650 cryomodules, hosting six HB650 dressed cavities each. Fermilab is in the process of the design validation of both types of 650 cavities. Several prototype cavitiesand other components have been received from the international partners are being processed and tested at Fermilab. At the same time prototype procurement byFermilab is ongoing along with refinement and finalization of the components requirements to initiate procurements by the partner labs. As a part of validation process, thefirst Hb650 β = 0.9 cavity has been successfully tested in the recently modified STC horizontal testing bed.

TUPAB333