County Road 26 and County Road 63 Improvement Project May 14 - May 21, 2020

Upload: others

Post on 05-Jul-2020

3 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: County Road 26 and County Road 63 Improvement Project · 2020-05-13 · County Road 26 and County Road 63 PRN PR PROPOSED PROJECT 4 lane expansion of County Road 26 from Hwy 55 to

County Road 26 and County Road 63 Improvement Project

May 14 - May 21, 2020

Page 2: County Road 26 and County Road 63 Improvement Project · 2020-05-13 · County Road 26 and County Road 63 PRN PR PROPOSED PROJECT 4 lane expansion of County Road 26 from Hwy 55 to

County Road 26 and County Road 63 IMPROVEMENT PROJECT

AGENDA

➡Project background

➡Environmental review findings

➡Preliminary construction phasing

➡Schedule

➡Ways you can participate

Page 3: County Road 26 and County Road 63 Improvement Project · 2020-05-13 · County Road 26 and County Road 63 PRN PR PROPOSED PROJECT 4 lane expansion of County Road 26 from Hwy 55 to

County Road 26 and County Road 63 IMPROVEMENT PROJECT

65th Street

65th Street

Amana TrailAmana Trail

26

63

3

Page 4: County Road 26 and County Road 63 Improvement Project · 2020-05-13 · County Road 26 and County Road 63 PRN PR PROPOSED PROJECT 4 lane expansion of County Road 26 from Hwy 55 to

County Road 26 and County Road 63 IMPROVEMENT PROJECT

PROPOSED PROJECT

➡4 lane expansion of County Road 26 from Hwy 55 to Hwy 3

➡Multi-use trails along both side of the roadway, paved shoulders, stormwater infrastructure (i.e. curb and gutter), and a new underpass serving the Mendota Lebanon Greenway

Page 5: County Road 26 and County Road 63 Improvement Project · 2020-05-13 · County Road 26 and County Road 63 PRN PR PROPOSED PROJECT 4 lane expansion of County Road 26 from Hwy 55 to

County Road 26 and County Road 63 IMPROVEMENT PROJECT

PROPOSED PROJECT

➡Construction of a new alignment of County Road 63 from Amana Trail north to 65th Street over to the existing County Road 63 (Argenta Trail)

65th Street

65th Street

Amana TrailAmana Trail

26

63

3

County Road 26County Road 26(Lone Oak Road)(Lone Oak Road)

26

Page 6: County Road 26 and County Road 63 Improvement Project · 2020-05-13 · County Road 26 and County Road 63 PRN PR PROPOSED PROJECT 4 lane expansion of County Road 26 from Hwy 55 to

County Road 26 and County Road 63 IMPROVEMENT PROJECT

PROPOSED PROJECT

➡Access management of driveways and city streets and a new roundabout at the intersection of County Roads 26 and 63

Page 7: County Road 26 and County Road 63 Improvement Project · 2020-05-13 · County Road 26 and County Road 63 PRN PR PROPOSED PROJECT 4 lane expansion of County Road 26 from Hwy 55 to

County Road 26 and County Road 63 IMPROVEMENT PROJECT

WHY IS THIS PROJECT NEEDED?

➡Address safety issues + Site lines, steep slopes, lack of shoulders and turn lanes

+ Intersection at County Road 26 and 63 has more crashes than the statewide average

+ More than half of the crashes along County Road 63 involve vehicles running off the road

➡Improve mobility and operations + Intersection control at major intersections

+ Improve capacity through expansion

+ Access management at minor intersections and driveways

➡Accommodate local residential and commercial development + Future traffic volumes will magnify safety deficiencies without improvements

Page 8: County Road 26 and County Road 63 Improvement Project · 2020-05-13 · County Road 26 and County Road 63 PRN PR PROPOSED PROJECT 4 lane expansion of County Road 26 from Hwy 55 to

County Road 26 and County Road 63 IMPROVEMENT PROJECT

ENVIRONMENTAL ASSESSMENT WORKSHEET (EAW)

➡Mandatory environmental review, per Minnesota Rules, part 4410.4300, subpart 22 B (Highway Projects) for construction of additional travel lanes on an existing road for a length of two or more miles

➡EAW is a document designed to determine if an Environmental Impact Statement (EIS) is required for the proposed project

➡Provides permit information, informs the public about the project, and helps identify ways to protect the environment

You can find a copy of the complete EAW on the County’s website: www.cr26andcr63improvements.com

Page 9: County Road 26 and County Road 63 Improvement Project · 2020-05-13 · County Road 26 and County Road 63 PRN PR PROPOSED PROJECT 4 lane expansion of County Road 26 from Hwy 55 to

County Road 26 and County Road 63 IMPROVEMENT PROJECT

ENVIRONMENTAL ASSESSMENT WORKSHEET

Land Use

Hazardous Wastes/Contaminated Materials

Historic properties

Water Resources

Fish, Wildlife, and Plant Communities

Transportation

Utilities

Air

Noise

Visual

Geology & Soils

Cumulative potential effects

Cultural Resources

Page 10: County Road 26 and County Road 63 Improvement Project · 2020-05-13 · County Road 26 and County Road 63 PRN PR PROPOSED PROJECT 4 lane expansion of County Road 26 from Hwy 55 to

County Road 26 and County Road 63 IMPROVEMENT PROJECT

WATER RESOURCES

➡Wetlands + Project proposes 3.13 acres of wetland impact

+ Mitigation: County intends to purchase wetland banking credits* at a 2:1 ratio* Minnesota has a wetland banking program, which allows agencies to purchase wetland “credits” to offset (mitigate) authorized wetland impacts

➡DNR Public Waters + Project proposes 0.17 acres of fill within DNR Public Water 19 256W

+ Mitigation: County will narrow boulevard width and install retaining wall to reduce impact, permit application will be submitted to the MN DNR

➡Stormwater + Project proposes a net increase of 23 acres of impervious surface

+ Mitigation: County will implement a stormwater management system that meets State and Local requirements

Page 11: County Road 26 and County Road 63 Improvement Project · 2020-05-13 · County Road 26 and County Road 63 PRN PR PROPOSED PROJECT 4 lane expansion of County Road 26 from Hwy 55 to

County Road 26 and County Road 63 IMPROVEMENT PROJECT

CONTAMINATED RESOURCES/HAZARDOUS WASTE

➡Phase I and Phase II Environmental Site Assessments have been completed to determine the presence and/or extent of soil and groundwater contamination on site

➡According to the Environmental Site Assessment results, no locations of known contaminated properties will be affected by the project

➡A Construction Contingency Plan will be prepared for the handling of unknown contaminated material if encountered

Page 12: County Road 26 and County Road 63 Improvement Project · 2020-05-13 · County Road 26 and County Road 63 PRN PR PROPOSED PROJECT 4 lane expansion of County Road 26 from Hwy 55 to

County Road 26 and County Road 63 IMPROVEMENT PROJECT

FISH, WILDLIFE, AND PLANT COMMUNITIES

➡Northern Long-Eared Bat, Loggerhead Shrike (bird), and Rusty Patched Bumble Bee (insect) are three threatened or endangered species are known to occur in the vicinity of the project

+ Mitigation (Loggerhead Shrike and Northern Long-Eared Bat): County will not remove trees during the critical breeding season (April to July) limiting to potential to harm the species

+ Mitigation (Rusty Patched Bumble Bee): County is coordinating the completion of a Biological Assessment with the MnDOT Wildlife Ecologist and US Fish and Wildlife Service; mitigation measures identified as part of the assessment, if any, will be implemented and may include seeding right of way with native seed mixes and limitations of habitat disturbance

➡The County will adhere to work exclusion dates within DNR Public Waters, if applicable, to protect fish spawning

Page 13: County Road 26 and County Road 63 Improvement Project · 2020-05-13 · County Road 26 and County Road 63 PRN PR PROPOSED PROJECT 4 lane expansion of County Road 26 from Hwy 55 to

County Road 26 and County Road 63 IMPROVEMENT PROJECT

NOISE

➡Three factors must be met for a noise barrier to be considered reasonable: + Noise reduction of at least 7 decibels at a minimum for one receptor

+ Cost effectiveness threshold of $78,500 per individual benefited receptor

+ Benefited receptors vote on whether barrier should be built if above criteria are met

➡Six of the barriers met the first two factors

➡Benefitted properties have been given the opportunity to vote on whether or not the walls are constructed; results of voting are anticipated in the Summer 2020

Page 14: County Road 26 and County Road 63 Improvement Project · 2020-05-13 · County Road 26 and County Road 63 PRN PR PROPOSED PROJECT 4 lane expansion of County Road 26 from Hwy 55 to

County Road 26 and County Road 63 IMPROVEMENT PROJECT

PRELIMINARY CONSTRUCTION PHASING

➡Project constructed in multiple phases over 3 construction seasons

➡Criteria used to determine preliminary phasing includes: + Timing and feasibility to relocate private utilities (i.e. Xcel Energy, CenturyLink, etc.)

+ Detour routes

+ Local access considerations

+ Earthwork

+ Amount of work a Contractor can complete in one year

➡Final construction phasing to be coordinated and determined by project Contractor

Page 15: County Road 26 and County Road 63 Improvement Project · 2020-05-13 · County Road 26 and County Road 63 PRN PR PROPOSED PROJECT 4 lane expansion of County Road 26 from Hwy 55 to

County Road 26 and County Road 63 IMPROVEMENT PROJECT

Construction Activities

➡ CR 63 (E/W)

➡ New local Argenta Trail connection

➡ Tree clearing + Throughout the entire project area

Phase 1 (2021)

NPhase 1

Page 16: County Road 26 and County Road 63 Improvement Project · 2020-05-13 · County Road 26 and County Road 63 PRN PR PROPOSED PROJECT 4 lane expansion of County Road 26 from Hwy 55 to

County Road 26 and County Road 63 IMPROVEMENT PROJECT

Phase 2 & 3Phase 1 Anticipated Detour Route

Phase 1 Work Area

Phase 1

PRELIMINARY DETOUR ROUTES

N

Page 17: County Road 26 and County Road 63 Improvement Project · 2020-05-13 · County Road 26 and County Road 63 PRN PR PROPOSED PROJECT 4 lane expansion of County Road 26 from Hwy 55 to

County Road 26 and County Road 63 IMPROVEMENT PROJECT

Construction Activities

➡ CR 63 (N/W) ➡ 67th Street connection ➡ 72nd Street connection ➡ CR 26/CR 63 roundabout ➡ CR 26 (south half between CR 26/63 roundabout and TH 3)

➡ Utility corridor ➡ Temporary CR 26 connection west of new roundabout

Phase 2 (2022)

NPhase 1

Phase 2

New Roundabout

Page 18: County Road 26 and County Road 63 Improvement Project · 2020-05-13 · County Road 26 and County Road 63 PRN PR PROPOSED PROJECT 4 lane expansion of County Road 26 from Hwy 55 to

County Road 26 and County Road 63 IMPROVEMENT PROJECT

Phase 3 (2023)

N

Construction Activities

➡ CR 26 (north half between CR 26/63 roundabout and TH 3)

➡ CR 26 (west of new roundabout) ➡ All remaining local street connections to CR 26 (i.e. Ames Crossing, Archer Trail, etc.)

Phase 1

Phase 2

Phase 3

Page 19: County Road 26 and County Road 63 Improvement Project · 2020-05-13 · County Road 26 and County Road 63 PRN PR PROPOSED PROJECT 4 lane expansion of County Road 26 from Hwy 55 to

County Road 26 and County Road 63 IMPROVEMENT PROJECT

Phase 2 & 3

Phase 2 Anticipated Detour Route

Phase 2 Work Area

Phase 3 Work Area

Phase 3 Anticipated Detour Route

PRELIMINARY DETOUR ROUTES

N

55

Page 20: County Road 26 and County Road 63 Improvement Project · 2020-05-13 · County Road 26 and County Road 63 PRN PR PROPOSED PROJECT 4 lane expansion of County Road 26 from Hwy 55 to

County Road 26 and County Road 63 IMPROVEMENT PROJECT

NEXT STEPS

➡EAW Comment Period Closes June 3 + Submit your comments on the project website at www.CR26andCR63Improvements.com under the “Online Meeting” tab

➡Findings of Fact Documentation (July 2020)

➡FHWA/MnDOT Environmental Approval (September 2020)

➡Construction (Anticipated 2021 - 2023)

Page 21: County Road 26 and County Road 63 Improvement Project · 2020-05-13 · County Road 26 and County Road 63 PRN PR PROPOSED PROJECT 4 lane expansion of County Road 26 from Hwy 55 to

QUESTIONS?Contact:

John Sass, Project ManagerPhone: 952.891.7130

Email: [email protected]

County Road 26 and County Road 63 IMPROVEMENT PROJECT

For information on upcoming meetings and to sign-up to receive project updates, visit: www.CR26andCR63Improvements.com