A brief overview of he company and its policy ADDAR Group, was established in 1998 by Dr. Ibrahim bin Salamah, former CEO of SABIC, to provide specialized services to Power, Petrochemical, and Industrial sectors. ADDAR has eight divisions as separate entities to cater to the requirements of different sectors like, Power, Petrochemical, IT, and Industrial. Apart from supplying various equipment and spare parts to the above mentioned market segments Addar found a good opportunity to provide services to its existing clients. For this purpose Country House for Contracting & Operations(CHCO) was established. CHCO has partnered with some of the leading International companies from Europe, USA, and Asia each with its own sphere of expertise and unique wealth of experience in power sector. The main aim of CHCO is to provide quality service and cost effective solutions to its clients. Our efforts are focused on the real needs of our clients and address them to their utmost satisfaction. Any organization is as good as its human resource. This is where CHCO has been very careful in putting the right person in the right position to get the best productivity which translates in to best service for our clients. We have a team of engineers and technicians with a combined experience of over 100 years in the maintenance of Gas / Steam Turbine and its auxiliaries. In recognition of our satisfactory services we enjoy continued patronage and confidence of our clients. This achievement is the combined result of meticulous planning, monitoring, and adapting high standards of safe implementation methods and practices maintaining highest quality, environment, and safety standards. Country House for Contracting & Operations Electro-mechanical Contractors

Upload: lamdung

Post on 11-Apr-2018

215 views

Category:

Documents


1 download

TRANSCRIPT

1

bull

A brief overview of he company and its policy

ADDAR Group was established in 1998 by Dr Ibrahim bin Salamah former CEO of SABIC to provide specialized services to Power Petrochemical and Industrial sectors ADDAR has eight divisions as separate entities to cater to the requirements of different sectors like Power Petrochemical IT and Industrial Apart from supplying various equipment and spare parts to the above mentioned market segments Addar found a good opportunity to provide services to its existing clients For this purpose Country House for Contracting amp Operations(CHCO) was established

CHCO has partnered with some of the leading International companies from Europe USA and Asia each with its own sphere of expertise and unique wealth of experience in power sector

The main aim of CHCO is to provide quality service and cost effective solutions to its clients Our efforts are focused on the real needs of our clients and address them to their utmost satisfaction Any organization is as good as its human resource This is where CHCO has been very careful in putting the right person in the right position to get the best productivity which translates in to best service for our clients

We have a team of engineers and technicians with a combined experience of over 100 years in the maintenance of Gas Steam Turbine and its auxiliaries In recognition of our satisfactory services we enjoy continued patronage and confidence of our clients This achievement is the combined result of meticulous planning monitoring and adapting high standards of safe implementation methods and practices maintaining highest quality environment and safety standards

Country House for Contracting amp Operations Electro-mechanical Contractors

2

Activities

bull Inspection Overhaul Repair Gas Turbine Steam Turbine

bull Inspection Repair Overhaul Gas turbine Exhaust and In-let System

bull Rewinding Repair of Turbine Generators HV MV Electrical Motors

bull Supply and Installation of Expansion Joints of all types

bull Fabrication of Steel Structures

bull Reverse engineering of Linear Bearings Thrust bearings oil seals air seals etc

Our Associates

bull STEG International Services

bull Seiris-SA ndash France Manufacturers of Expansion Joints

bull Edison Electrical Works ndash India Rewinding Services

bull Perfect Chloro System ndash Gas and Electro-chlorination systems

bull PVK EngineersndashIndia Air In-let and Exhaust systems for Gas turbines

bull CMI Energy Belgium ndash Manufacturers of Heat Recovery Steam

Generators

STEG International Services (SIS) is a limited and partly export-based energy Services

Company dedicated to providing a broad range of high quality services covering both the

electricity and gas sectors

STEG International

SIS was created in 2006 Ever since our goals have always been to promote Tunisian

knowledge and know-how in the areas of the energy industry (power generation

transmission and distribution of electricity and gas) with focus features including

bull Offering advice suitable technical support and providing high-quality and

cost-effective service OampM solutions for a variety of applications through the proven

know-how and experience of STEG

3

bull the know-how in several areas of expertise shared with our primary shareholder

STEG and thanks to more than 47 years of experience

bull An international outlook with more than 80 per cent of our turnover coming from

international markets based mainly in Africa and the Middle East

Seiris-SA France

SEIRIS SA was founded in 1978 and is located in Linas a small town in the south of

Paris For the last 25 years SEIRIS is one of the leading manufacturers in Europe which

approved by SEC SABIC and SWCC and has many installation in the Kingdom

Expansion joints are vital components in most industrial plants They are installed as

flexible connections in duct and pipe systems to prevent damage caused by vibrations

temperature pressure or mechanical stress due to movements or vibrations

Fabric expansion joints for low pressure

Metal expansion joints

4

Edison Electrical Works

Edison Electrical Works India is one of the leading service provider for rewinding

and repair of Turbine Generators HV amp MV motors and Transformers It is

approved by Saudi Electricity Co and has carried out many rewinding jobs in

KSA Kuwait Malaysia It has a very wide experience on all generators vis GE

ALSTOM Siemens and others

5

Perfect Chloro System PCS manufacture one of the finest Gas and Electro-

chlorinators in India They have supplied and installed over 500 systems in Asia

and Middle East PCS have complete range of chlorinators and their accessories

6

including the Scrubbers Have installed gas chlorinator with capacity of over 250

kg hr

PVK Engineers

Manufacturers of Air In-let and Exhaust Systems for Gas

Turbines and 3 way 4way valves for Oil and Petrochemical sectors Heavy steel

fabrication Sound attenuation Enclosures for Gas Turbines and other rotating

equipment Supplied and installed many equipment in Iraq Oman and many

African countries apart from South Asia

7

CMI ENERGY is the one of the leading manufacturers of Heat Recovery Steam Generators in the world They are known all over the world for their quality and efficiency CMI has many installations here in Saudi Arabia in some of the major power plants Country House is their service partner here in the Middle East and has executed projects of major overhaul and repair of their Boilers together with CMI here for Saudi Electricity Co Following is one of the references

8

Projects CMI HRSG Boiler inspection amp repair at PP9 Riyadh

9

ELECTRICAL POWER

Generation

Transmission

Distribution

10 Power Generation

10

SIS provides studies operation Maintenance and upkeep of power generation units

including thermal Power Plants Combined -Cycle Power Plants Gas Turbines Hydro-

Power plants Co-generation Diesel Groups Gas Compressors

The following activities are only indicative and not exhaustive

11 SUBIYA Gas Turbine Power Plant in KOWEIT

Construction and Installation of 4 Gas Turbines GE FR 7 Open Cycle Power Plant (4x 75 MW ISO Conditions) The project was divided into Three (3) mains tasks

a- Engineering this involved the complete development of Design Drawings-Quantities-and Materiel Specifications

b- Procurement and Transportation this Task Force was responsible for the complete procurement and transportation of all material required for the construction of the project

c- Construction and installation This included the services provided by SIS as mentioned below

Provided Services

Civil Works Follow up

bull Study plans and electromechanical documents development

bull Designing and identification of required systems equipment cables pipes tools consumables etc

bull Complete Civil Works Drawings Preparation Excavation Foundation Trench

bull Erection of Turbines Generating

11

Sets (GAS Turbines Generators Accessory base Gear boxes Base Frame Alignment

bull Erection of Mechanical Auxiliary Systems

bull Electrical Systems (cable laying Main Switch Gear station service

bull Instrumentation and control panels

bull Erection of Set up Transformers

bull Interconnection with GIS

bull Testing and commissioning

bull Project Hand Over

Site Overview Erection of the Exhaust Stack

PDC Setting Auxiliary Compartment

12 SHOAIBA Steam Turbines Annual Inspection in partnership with Gulf Power International Dabbagh Group (Kingdom of Saudi Arabia)

Provided Services

Steam Turbine Annual Inspection Turbine inspection

bull Pre-Shutdown Activities

bull Unit Shutdown

bull Inspection of Boiler Air ampGas parts

bull Boiler Fuel Firing System

bull Soot-Blowers System

bull ESP System

bull Boiler Water amp Steam System

bull Main Steal System (including Aux steam sys)

bull Analyzers

bull Boiler Feed Water System

bull Main Condensate system

bull Main Turbine amp Condenser stseam side

bull Lub oil amp hydraulic Oil SystemGenerator cooling amp seal Oil System

Inspection of fuel heaters Inspection of the lube oil amp hydraulic pumps of the turbine

12

bull Electrical works

bull Corrective maintenance etc

bull Unit recommissioning and start up

bull Post outage activities (unit performance test vib MeasurementAnnual inspection report preparation and issue)

13 Major Overhaul of GE FR-7 Gas Turbine at Najran Power Plant- in partnership with Gulf Power InternationalDabbagh Group (Kingdom of Saudi Arabia) - Photo Gallery

Services provided Turbine rotor blades inspection TurbineGenerator Control System Mark 5 Troubleshooting

The services provided included

The disassembly removal cleaning visual inspection for erosion corrosion wear cracks damages etc Non Destructive Testing (NDT) inspection alignment checks dimensional checks clearances checks repair servicing maintenance complete partial replacement re-assembly installation alignment adjustment and final quality checks The works performed concerned the below listed and other parts

- Unit Major Inspection including (all Mechanical Electrical Instrumentation and Control Work)

- Unit Hot Gas Path Inspection (all Mechanical Electrical Instrumentation and Control Work)

- NDT of Compressor turbine Generator sections

- Rotor overhaul and Reblading

- Instrument and Controls Maintenance

- Transformers maintenance

- Re-assembly

- Start - up

- Performance test

- Report submittal covering all the areas and aspects of the work done by SIS during the execution the awarded contract

Setting of Turbine bearing compressor rotor inspection

13

14 Strengthening Thermal Generation Plants Capacities injected in the Interconnected Network (IN)

Services provided Measurement of Transformer Ratio

Control and Supervision of Power Generation Plant Extension in Balingueacute (Bamako) in the republic of MALI comprising 4 Diesel Groups 4x11 5 MW ISO Conditions in partnership with IDC (Tunisia)

The services carried out by SIS included

bull Approval of study documents and assembly (accomplished)

bull Factory acceptance test (accomplished)

bull Supervision and control of on-site assembly works (on-going)

bull Site acceptance test and commissioning (once the assembly works will be terminated)

On-load Tape Changer ( OLTC) Transformer Visual Control

14

Test follow up on induced voltage Induced Voltage test on HVMV Transformer

20 Electrical Transmission Network

SISrsquos Scope of activities includes but not limited to the following services

bull Studies of power system transmission network

(system modelling power flow faults analysis) using computer simulation packages

bull Update of the dynamic and static stability studies with the view of evaluating the impact of the new electric power generation and transmission installations

bull Master plans elaboration bull Short-circuits calculation bull Under frequency load shedding calculation bull Development of electrical network protection

schemes including selection of relaysrsquo types and relays coordination

bull Protection setting calculation and configuration

bull Fault analysis in transmission networks using fault recorders and simulation software packages

bull Dimensioning of surge arresters

Washing of energized high voltage insulators

15

bull Commissioning installation and operation of digital control of the HV substations

bull Preparation of technical specifications and evaluation of Bidders

Design and construction of a testing station of insulators in polluted marine industrial and desert region in Oran (Algeria)

16

30 Electrical Distribution Network

South-South Cooperation

We are proud to draw upon our experiences and expertise as a company based in an

African country to help others across Africa

ELECTRICAL DISTRIBUTION

NETWORK

17

RURAL ELECTRIFICATION- CONSTRUCTION WORKS ON A TURN KEY BASIS Pilot Rural Electrification Project based upon single-phase in RWANDA

Services provided Signature of an agreement for cooperation and technical assistance between STEG amp ELECTROGAZ

Metallic Poles delivery

The scope of works included bull Study and Diagnosis of the

existing Rwandan Power

Distribution An inventory of the

existing facilities including

generation transmission and

distribution systems was

established

bull The turnkey design engineering

procurement supply installation

construction commissioning and

start up of a pilot rural

electrification project based upon

single-phase in RWANDA

Sub-station Connection Factory Acceptance Test of AAAC Conductor and twisted cables in presence of Rwandan technicians

Electrcity supply in rwandan remote villages

Energy is an important factor for Socio-Economic Developemnt

18

40 Gas Segment

Services provided Gas Condensate Treatment Unit Pipeline On-Line Welding

SIS services cover the following scope

of activities

bull Study control and supervision of gas

projects erection works

bull Master plans elaboration regarding Gas Transmission and Distributions networks

bull Catholic Protection of gas network bull Gas and condensate treatment units

operation and maintenance related tasks

bull Gas compression stations operation and

maintenance related tasks bull Supervisory and control systems

operation and maintenance bull Gas pipelines network supervision and

remote command bull Pipeline inspection bull Steel pipes and gas delivery station

specification bull Compression stations specification and

supervision of erection works bull Gas and condensate treatment unitsrsquo

implementation commissioning and start-up

Hot Tap Achievement Gas pipeline welding connection

Topographic surveying

19

50 Laboratory-Workshop

Main Activities Rotary Furnace Inspection Surfacing High Precision Castings

General Technics Department GTD was established to perform technical assistance to all power generating units including

bull Thermal Power Plants

bull Combined Cycle Power Plants

bull Gas Turbines

bull Hydraulic Power Plants etc

GTD Mission

bull Acceptance Trial of Equipment

bull High and Mid Voltage Testing (also called dielectric strength test or Hipot Test)

bull Acoustics and Mechanical Vibration

bull Thermodynamics and Hydraulic Activities Management

bull Chemical Analysis amp Controls

bull Metallurgical amp NDT Controls

bull Workshop

NDT Magnetic Testing Turbine Speed Balancing

Analysis of gas dissolved in dielectric liquids of large transformers operation

water lubricant oil dielectric oil and liquid fuel analysis

Dielectric Laboratory Welding Work Shop

Dielectric Laboratory

bull Dielectric oil rigidity

bull Physical and Chimical Characterisics of Dielectric oil

bull Dissolved gas in Dielectric oil

bull Acceptance trials for generators transformers switch-gears

Welding Work Shop

bull Steel plate works

20

bull Heat treatment in furnace or outside

bull Surface reparing by powder spray metallisation

bull Rebabbiting of used bearing

60 Vocational Training ndash Photo Gallery

Services Provided

Practical Hands-On Training Equipment

Practical Hands-On Training electricity amp gas counter

SIS as an energy company

provides the entire scope of training

services including

bull Upgrade of training centers

bull Drawing up and delivery of

training courses

bull Training of trainers

bull Designing and monitoring of

training programs

bull End-user training organization

of seminars hands-on training

on-the-job training and

designing of training manuals

The training provided is relevant

effective structured and

continuously updated This

maintains a high level of technical

skills and procedures in a

constantly changing environment

Practical Hands-On Training works under voltage

Classroom Training on electrical maintenance related to electrical power utilities

21

enabling all staff to keep abreast of

technical innovations and

improvements together with

legislative requirements and

recommended practices

STEG Training Center (CFPK)

Since its inception in 1976 CFPKrsquos aim has been to train newly recruited STEG technicians in Generation Transmission Distribution and Gas sectors and to provide advanced training and retraining for active personnel Since then the Center has constantly expanded and adjusted in order to bull Address STEGrsquos specific requirements in vocational training in all its

sectors technical commercial financial computing management auditing new technologies etc

bull Provides a logical approach as to how to establish and assure a competent workforce by technical vocational training for now and the future

bull Provide appropriate training programs for organizations outside STEG both at national and international levels (in-house training customized courses and lectures)

22

70 Samples of Project Experience

Since 2006 SIS has undertaken many assignments in African countries Middle East and in

Tunisia It is only possible to show a small selection of these in this brochure We are always

happy to provide additional details and examples of our experience on request

71 Accomplished Projects

POWER GENERATION

No Contract Identification Unitne Installed

Capacity(MW) location Start

Date End Date

1 Annual Inspection

5 260 Rabigh SEC Saudi Arabia)

20-12-2005

30-01-2006

2 Annual Inspection 2 260

Rabigh SEC Saudi Arabia)

09-03-2006

22-04-2006

3 Annual Inspection

3 260 Rabigh SEC Saudi Arabia)

19-03-2006

29-04-2006

4 Annual Inspection

1amp4 440 Shoaiba SEC Saoudi Arabia

27-01-2007

01-03-2007

5 Annual Inspection 4 440

Shoaiba SEC Saoudi Arabia

03-03-2007

05-04-2007

6

Annual Inspection Bell seals rings amp nozzle blocks replacement ( turbine overhaul)

4 260 Rabigh SEC Saudi Arabia)

03-01-2008

07-03-2008

7 Annual Inspection 2 260

Rabigh SEC Saudi Arabia)

08-03-2008

15-04-2008

8 Major Overhaul

GT1 27 TihamaSEC Saudi Arabia

20-01-2008

10-02-2008

9

Erection and Supervision of Works 300 MW (ISO Condition) Open Cycle Power Plant Fast Emergency

GTs 1-4

4x75 ISO Conditions

Ministry of Energy

(Electricity and Water)

Sabya Power Plant

State of KOWEIT

2007- 2008

10 Commissioning CPL amp Parallel Resonant Circuit in close cooperation with AREVA

Ethiopie 2007-2008

11

Revamping of obsolete Control and instrumentation system (in close cooperation with SIEMENS)

2 Units Marocco 2008

23

No Contract Identification Unitne Installed Capacity (MW)

location Start Date

12

Commissioning of Control command system Mark VI on GTs Frame 5 (in close cooperation with GESHANAHAN Eng

GTs GE Frame 5

Algeria (Arzew) 2008

13

Grid Interconnection In close cooperation with STUDI for West African Power Pool (WAPP)

225 KV

Electricity grid interconnection

between Burkina Faso and Ghana

2008

14 Pricing Study Senegal 2008

15 Major Inspection GT6

GE-FR7

Najran SEC Saudi Arabia

2008

16 Major Inspection (MI) W501D5

Jazan SEC Saudi Arabia

2009

17 Annual Inspection 2amp3 2x393 Shoaiba SEC Saudi Arabia

2009

24

25

SISrsquoS Experiences in Boilerrsquos Maintenance Work

Power plant location Boiler tech Details ampInspections

Rades A (ST) ST STEAM TURBINE Rades B (ST)

Unit 1 Unit 2 Unit 3 Unit 4

Manufacturer Mitsubishi H I Mitsubishi H I Ansaldo Energia Ansaldo Energia Type amp Model MHI CE RR

type out-door MHI CE RR type outdoor

AE RR type outdoor

AE RR type outdoor

Date of commissioning 1983 1984 1998 1999 MCR (th) 520000 520000 5335 5335

Steam conditions Pressure SHRH(bars) 1685 352 1685 352 1739 1739 Temperature( degC) 543 543 542 542

fuel Natural gas heavy Fuel Ndeg2

Natural gas heavy Fuel Ndeg2

Natural gas heavy Fuel Ndeg2

Natural gas heavy Fuel Ndeg2

Heating area Furnace(msup2) 5105 5105 5360 5360 Reheater (msup2) 3130 3130 1286 1286 Eco (msup2) 2600 2600 1556 1556

Fuel oil Burners type amp No 20 20 Y Ndeg 12 Y Ndeg 12 FDF type amp capacity ( Th) HC 591 HC 591 HC748 HC 748 IDF type amp capacity (Th) HC 640 HC 640 NA NA GRF type amp capacity ( Th) HC 500 HC 500 HC 300 HC 300

RegenAir Preheater Type Ljungstroumlm Ljungstroumlm Ljungstroumlm Ljungstroumlm No amp capacity 2 2 2 2 Heating surface(msup2) 12000 12000 18000 18000

Annual inspection No 20 20 10 10 Starting amp Completion dates

21 Days 21 days 21 days 21 days

Major overhaul No 04 04 01 01 Starting amp Completion dates

1221038843 days 611028854 days 56 days 59 days

Boiler conservation No 20 20 08 08 Boiler Rehabilitation No 0 0 0 0 Boiler Tube Acid cleaning No 01 01 01 01 ILA(Integrity Life Assessment)No 0 0 0 0

26

SISrsquos Experiences in Boilersrsquo Maintenance Work

Power plant location Boiler tech Details ampInspections

Sousse A (ST) Sousse B (CCPP)

Unitne1 Unitne 2 Unitne1 Unitne 2

Manufacturer SGP SGP STEIN INDUSTRY STEIN INDUSTRY Type amp Model Natural circulation Natural circulation Heat Recuperator Heat Recuperator Date of commissioning 1980 1980 1995 1995 MCR (th) 515 515 HP 182 BP 415 HP 182 BP 415 Steam conditions Pressure SHRH (bar) 16038 16038 HP 72 BP 66 HP 72 BP 66

Temperature (degC) 540degC 540degC HP 511 BP 213 HP 511 BP 213 fuel FUELGAZ FUELGAZ Gaz Gaz Heating area Furnace (m2 2080 ) 2080 HP evaporator 25251 LP evaporator 18627

Reheater (m2 1512 ) 1512 HP superheater 9418 LP superheater 2328 Eco (m2 2017 ) 2017 HP economizer 16834 13773 LP economizer 3060

Fuel oil Burners Type ampNo EVT8 EVT8 FDF type amp capacity R62250 7566 m3 R62250 7566 ms 3 s

GRF type amp capacity R62250 721 m3 R62250 721 ms 3 s

Regen Air Preheater

Type No amp capacity 2 220186 Nm3h 2 220186 Nm3h

Heating surface(m2) 2x924 2x924 Annual Inspection

No annually annually annually annually Starting amp completion dates 3 - 4 weeks 3 - 4 weeks 10 days 10 days

Major Overhaul No along with annual inspectioccediln along with annual inspectioccediln

Starting amp completion dates 3 - 4 weeks 3 - 4 weeks

Boiler Conservation No 3 2 Boiler Rehabilitation No Boiler Tube Acid Cleaning No 2 2 ILA (Integrity Life Assessment) No 1

27

SISrsquos Experiences in Boilersrsquo Maintenance Work

Power plant location Boiler tech Details ampInspections Unitne1 (ST) Unitne 2 (ST) Unitne 3 (ST) Unitne 4 (ST)

Manufacturer WALTHER Type amp Model WALTHER FN10 Natural Circulation Date of commissioning 05071965 01111965 22061968 20091968 MCR (th) 112 Steam conditions

Pressure 686 bar Temperature 510 degC

fuel Heavy fuel oil Ndeg2 light fuel oil

Heating area

Furnace (m2 540 m2 ) Reheater (m2 1542 m2 ) Eco (m2 480 m2 )

Fuel oil Burners Type ampNo SONVICO 4 FDF type amp capacity Centrifugal - 27 m3s IDF type amp capacity - - - - GRF type amp capacity - - - -

Regen Air Preheater Type Static LJUNGSTROM No amp capacity 1 1 1 1 Heating surface(m2) 7350 m2 -

Annual Inspection No every year until 1998 every year until

2005 every year until 1998

every year until 2005

Starting amp completion dates - - - -

Major Overhaul No 6 8 5 5 Starting amp completion dates - - - -

Boiler Conservation No - 2 - 2 Boiler Rehabilitation No 4 6 5 5 Boiler Tube Acid Cleaning No 0 0 0 0 ILA (Integrity Life Assessment) No 0 0 0 0

28

SISrsquos Experiences in Boilersrsquo Maintenance Work Power Plant Location

Boiler Tech Details ampInspections

Ghannouch (ST) Unitne1 (ST) Unitne 2

Manufacturer Stein Industrie Stein Industrie Type amp Model Natural circulation Natural circulation Date of commissioning 1972 1972 MCR (th) 120 120 Steam conditions Pressure SHRH (th) 70 bars 70 bars

Temperature 510 degC 510 degC fuel Natural GasHeavy fuel Natural GasHeavy fuel Heating area Furnace (m2 )

Reheater (m2 8880 dmsup3 ) 8880 dmsup3 Eco (m2 2400 dmsup3 ) 2400 dmsup3

Fuel oil Burners Type ampNo PILLARD GRC PILLARD GRC IDF type amp capacity GRF type amp capacity Regen Air Preheater Type Ljunstroumlm Ljunstroumlm

No amp capacity 140msup3h 140msup3h Heating surface(m2) _ _

Annual Inspection No 1 1 Starting amp completion dates 1 week 1 week

Major Overhaul No 15ans 15ans

Starting amp completion dates 2 months 2 months

Boiler Conservation No in case of being extended in case of being extended Boiler Rehabilitation No NO NO Boiler Tube Acid Cleaning No NO NO ILA (Integrity Life Assessment) No NO NO

29

ELECTRICAL TRANSMISSION SYSTEM

Accomplished Projects

bull Tests performed on Numerical relays manufactured by - ABB (Distance protection REL 316 ) - AREVA (Distance protection EPAC MICOMP442 hellip) - ICE (Over current protection NPID 800hellip) - SIEMENS (Distance protection 7SA 511 513 522 611) - REYROLLES (Differential protection DUOBIAS)

bull Test and setting of protective relays and checking the tripping circuits for Generators and

Substations belonging to Zaouia Petroleum Refinery (Libya)

bull Short circuit calculation selectivity study of protective relays by providing solutions for the

existing issues in PEC YEMEN Networks

bull Study and improvement of the existing protective system in close cooperation with Tractebel

Engineering

bull Technical Assistance for Independent Power Producers (IPP) Plant (Carthage Power

Company (CPC) Tunisia) regarding the maintenance and testing of protective relays

related to

- Generators - Main transformers - Auxiliaries - Etc

bull Technical Assistance testing and setting of protective relays at

- Steel ndashworks (Tunisia) - Cement ndashmarker (Tunisia) - Iron industries (Tunisia) - Chemical industries (Tunisia)

bull Commissioning and setting of protective relays at substations (High Medium and Low

voltages)

bull Renovation of the obsolete equipment (relays switchgear hellip)

bull Maintenance of the transmission lines and substations equipment

bull Cost-effective solutions establishment regarding the network issues (droop voltage over

voltage improvement of power factor etc)

30

ELECTRICAL DISTRIBUTION SYSTEM

Rural Electrification- Accomplished Projects

Contract Identification

Contract No 18 Technical Assistance and implementation of a Rural electrification project based upon SWER (Single Wire Earth Return) techniques

Award date 1998 Completion date 1999 Employerrsquos Name JIRAMA (JIRO SY RANO MALAGAS) Address

149 RUE RAINANDRIAMAMPANDRY Antananarivo BP 200 - MADAGASCAR

Main Tasks Performed

bull Training on SWER System bull Data collection needed for SWER System studies and implementation bull Finalization of technical studies and submission of report including

- Technical audit of the pilot project already in place - Technical description of the project - AdviseRecommendations on equipment specifications - Recommendations on possible changes in adjustment and coordination of electrical

protections

Contract Identification

Contract No 19 RWANDA Project (Phase 1) Implementation of a Pilot Rural Electrification Project based on Single-Phase with neutral to ground called MALT System 4000 Subscribers

Award date June 2008 Completion date June 2009

Employerrsquos Name

RECO ( former ELECTROGAZ) -RWANDA

Address BP 537 KIGALI -RWANA

Main Tasks performed

bull Study and Diagnosis of the existing Rwandan Power Distribution An inventory of the existing facilities including generation transmission and distribution systems was established

bull Implementation of a pilot rural electrification project based on MALT System Visit was arranged to some Tunisian rural regions and companies manufacturing electric equipment namely

- Transformers

- Iron poles

- Concrete supports

- Electric cables

- Electronic meters and

- MV and LV line accessories

31

Contract Identification

Contract No 20 Local Electrification study of Tambacounda and Kedougou departments Award date October 2002 Completion date March 2003 Customerrsquos name SENELEC Address ELECTRICAL COMPANY SENEGAL

Main Tasks Performed

bull Data Collection bull Socio-economic survey bull Technical economic and financial analysis bull Electricity market forecast (demand forecast (2003-2015)) bull Estimation of worksrsquo costs regarding medium voltage single-phase and tri-phase lines medium

and low voltage stations low voltage lines diesel micro-stations individual photovoltaic systems bull Technical and economic study related to different methods of supply including the solar as well as

the opportunity of introducing the single-phase system for the rural electrification bull Proposition for the public lighting and the management of photovoltaic systems bull Recommendations for the reinforcement of the existing stations and the existing networks to satisfy

the future demand due to the electrification of the new villages bull Tariff and profitability study bull Set up of the geographical maps and the low voltage electrification plan of the most important

villages (34 villages) bull Recommendations on privatizing power generation energy sector

Contract Identification Contract No 21 - Rural Electrification study of 80 villages in Comoros Isles

- Preparation of Tender Documents for the supply of equipment needed to the construction of 145 km MV lines 100 km LV lines and 80 MVLV stations

- Call for tenders evaluation of Bidders Award date November 2000 Completion date Dec 2002 Customerrsquos name

Ministry of Equipment Department of Energy and Water Resources

Address Moroni Avenue of the Democratic Republic of China

Main Tasks Performed

bull Data collection and visit of the existing electric utilities bull Situation analysis and proposal of electric infrastructure management solutions bull Electricity Demand Estimation and Forecasting bull Electric Calculation (Load Repartition Line Voltage Drop Losses and Voltage Drops

Calculations Short-Circuit Calculations Simulation of the Extension and Reinforcement of the Medium Voltage Networks Power System Stability Analysis Reactive Power Compensation

bull Low Voltage Studies for the Electrification of 80 villages bull RecommendationsSuggestions for the reinforcement of power generation utilities to satisfy

the future demand (by 2010) bull Electricity Tariffing study

- Review of electricity consumption patterns - Cost review - Review of tariff policies - Application and implementation of revised tariff levels

32

Contract Identification Contract Ndeg 22 Establishment and set up of a computerized accounting and budget system

Award date 1992 Completion date 1994 Customerrsquos name SOMELEC Address Nouakchott - MAURITANIA

Main Tasks Performed

bull Analytical accounting bull Bid evaluation bull Cash flow movements management bull Fixed assets management bull Centralizing bookkeeping bull Existing computer application interfaces update bull Transposition of the existing system to the new one bull Operation and maintenance Documents preparation bull Execution of the transposition of the existing system to the new one

Contract Identification Contract

No 23 Electricity sector reform technical assistance in the interim management of the ldquoCompagnie Energie Electrique du Togo ldquo(CEET)

Award date 41997

Completion date 122000

Employerrsquos Name Ministry of Mining Equipment transmission Mail and Telecommunications

Address TOGO

Main Tasks Performed

bull Technical assistance in the interim management of the CEET within the framework of the electricity sectorrsquos liberalization 1) termination of the current CEET management 2) analysis of the existing situation 3) interim management of the CEET prior to its privatization

bull Operation and maintenance of the electrical network for Lomeacute and its surrounding rural areas bull Electricity generation in isolated centers bull Electricity transmission and distribution bull Procurement and maintenance of new diesel production units bull Reduction of energy losses bull Customer management bull Increase in the number of Customers bull Accounting and billing bull Increase in payment recovery bull Call for tenders evaluation of proposals drafting of the technical annexes concerning the contracting

for a new independent operator (concession)

33

72 On-going and Under Bidding (UB) Projects

No Project Description Country

1 Training Center Update (on-going project) Republic of Congo BRAZZAVILLE

2 Master Plan elaboration in close cooperation with STUDI (Tunisia) (on-going project)

Republic of Senegal

3 Implementation of a Rural Electrification Project based on Single-Phase Four-Wires

with Neutral to Ground called MALT System (UB) Republic of Burkina Faso

4 Cost study connections to and extensions of electricity distribution networks

(UB)

Republic of Burkina Faso

5 Works Control and supervision of rural electrification of 33 communities in 4

regions of the Republic of Cameroon (UB) Republic of CAMEROUN

34

JUDICIOUS AND EFFICIENT ENERGY UTILIZATION

IS AT THE FOREFRONT OF OUR MINDS

35

Over the year 2008 STEG International Services (SIS) has widened its scope of activities to

include techno-economic studies and assistance in energy efficiency thereby providing support

to the national energy policy aiming at considering energy auditing energy efficiency energy

saving as a major priority target in Tunisiarsquos future energy strategic plan objectives In this

regard STEG International Services has carried out several projects including but not limited to

the following

80 Energy Efficiency

bull Performing obligatory periodical energy audits for industrial installations as well as energy audits on a consultancy basis

bull Assistance on projects involving energy efficiency bull Studies on energy efficiency of circuits hydraulic and thermal systems bull Upgrading energy management systems of industrial plants

81 Co-generation (Combined Heat and Power (CHP)) Studies

The main tasks performed included

bull Feasibility studies and project implementation assistance ndash RandaTunis

bull Assistance in electric utility restructuring from self power producer (electricity generation

only) to self-producing co-generatorsndash STSBEJATunisia

bull Technical assistance related to STEGrsquos grid connection with Co-generation plants in some

industrial units -SOTIPAPIER STS T-PAP and Carthago-GRE- Tunisia

82 Energy audits and energy efficiency

In any industry the three top operating expenses are often found to be energy (both electrical

and thermal) labour and materials Energy would invariably emerge as a top ranker and thus

energy management function constitutes a strategic area for cost reduction

Energy Audit will help to better understand how energy is used in any industry and in identifying

the areas where waste can occur and where scope for improvement exists In this regard the

Energy Audit would give a positive orientation to the energy cost reduction preventive

maintenance and quality control programs which are vital to production and utility activities Such

36

an audit program will help keep focus on variations which occur in the energy costs availability

and reliability of supply of energy decide on appropriate energy mix identify energy

conservation technologies retrofit for energy conservation equipment etc

Therefore SIS can carry out comprehensive assessment of techno-economic performance of

plants and equipment against the designed performance level or the industry best practice

aiming at optimizing consumption levels along with specific operating control targets

821 Samples of accomplished and on-going Energy Auditing projects

bull Energy Audit of the Liquefied Petroleum Gas (LPG) plant located in Gabegraves (Tunisia) with the assistance of Kvaerner Heurtey in 2001

bull Energy Performance Assessment of Rades and Sousse steam and Combined Cycle Power Plants as well as Bouchemma Menzel Bourguiba Korba Gas Turbines with the assistance of TRACTABEL and EDF in 2002

bull Energy Audit of Sousse Combined Cycle Power Plant with the assistance of CRA2E in 2007-2008

bull Periodic Performance Tests of Carthage Power Company (CPC) combined cycle an Impendent Power Producer (IPP) in Tunisia

37

SIS Future Commitments and Responsibilities

Endowed with a clear vision a sound project management and solid experiences and

know-how acquired by the parent company STEG through its various trades of over 48 years

SIS has put together a team of experts inndashline with its strategic intent- to be positioned as a

competitive and pre-eminent regional energy services company by spreading its expertise and

know-how throughout the African continent Arab countries and the rest of the world working on

a partnership basis with potential consultants andor the utilities of the respective countries

resulting in a keen focus and a strong sense of purpose

As part of its vision SIS management recognizes that it has responsibilities to all of its

stakeholders These include

Shareholders SIS will protect the investments of its shareholders and will provide an acceptable return on

investments through the application of its business principles Customers SIS will aim at optimizing its business activities through winning customers and maintaining

customerrsquos loyalty by offering them high quality services at competitive prices delivering on time

and supporting them with its management expertise

Employees SIS recognizes that its working employees are the key to its success and it nurtures loyalty

teamwork and trust between them SIS will strive to protect support and involve them in the

companyrsquos future to develop their skills and to reward them in line with the corporate values of

SISrsquos organization

Partners Suppliers Contractors and all External Contacts SIS will seek to treat all its partners suppliers contractors and other external stakeholders in a

consistently professional way and to ensure that their needs are fulfilled in every way possible

38

  • 72 On-going and Under Bidding (UB) Projects

2

Activities

bull Inspection Overhaul Repair Gas Turbine Steam Turbine

bull Inspection Repair Overhaul Gas turbine Exhaust and In-let System

bull Rewinding Repair of Turbine Generators HV MV Electrical Motors

bull Supply and Installation of Expansion Joints of all types

bull Fabrication of Steel Structures

bull Reverse engineering of Linear Bearings Thrust bearings oil seals air seals etc

Our Associates

bull STEG International Services

bull Seiris-SA ndash France Manufacturers of Expansion Joints

bull Edison Electrical Works ndash India Rewinding Services

bull Perfect Chloro System ndash Gas and Electro-chlorination systems

bull PVK EngineersndashIndia Air In-let and Exhaust systems for Gas turbines

bull CMI Energy Belgium ndash Manufacturers of Heat Recovery Steam

Generators

STEG International Services (SIS) is a limited and partly export-based energy Services

Company dedicated to providing a broad range of high quality services covering both the

electricity and gas sectors

STEG International

SIS was created in 2006 Ever since our goals have always been to promote Tunisian

knowledge and know-how in the areas of the energy industry (power generation

transmission and distribution of electricity and gas) with focus features including

bull Offering advice suitable technical support and providing high-quality and

cost-effective service OampM solutions for a variety of applications through the proven

know-how and experience of STEG

3

bull the know-how in several areas of expertise shared with our primary shareholder

STEG and thanks to more than 47 years of experience

bull An international outlook with more than 80 per cent of our turnover coming from

international markets based mainly in Africa and the Middle East

Seiris-SA France

SEIRIS SA was founded in 1978 and is located in Linas a small town in the south of

Paris For the last 25 years SEIRIS is one of the leading manufacturers in Europe which

approved by SEC SABIC and SWCC and has many installation in the Kingdom

Expansion joints are vital components in most industrial plants They are installed as

flexible connections in duct and pipe systems to prevent damage caused by vibrations

temperature pressure or mechanical stress due to movements or vibrations

Fabric expansion joints for low pressure

Metal expansion joints

4

Edison Electrical Works

Edison Electrical Works India is one of the leading service provider for rewinding

and repair of Turbine Generators HV amp MV motors and Transformers It is

approved by Saudi Electricity Co and has carried out many rewinding jobs in

KSA Kuwait Malaysia It has a very wide experience on all generators vis GE

ALSTOM Siemens and others

5

Perfect Chloro System PCS manufacture one of the finest Gas and Electro-

chlorinators in India They have supplied and installed over 500 systems in Asia

and Middle East PCS have complete range of chlorinators and their accessories

6

including the Scrubbers Have installed gas chlorinator with capacity of over 250

kg hr

PVK Engineers

Manufacturers of Air In-let and Exhaust Systems for Gas

Turbines and 3 way 4way valves for Oil and Petrochemical sectors Heavy steel

fabrication Sound attenuation Enclosures for Gas Turbines and other rotating

equipment Supplied and installed many equipment in Iraq Oman and many

African countries apart from South Asia

7

CMI ENERGY is the one of the leading manufacturers of Heat Recovery Steam Generators in the world They are known all over the world for their quality and efficiency CMI has many installations here in Saudi Arabia in some of the major power plants Country House is their service partner here in the Middle East and has executed projects of major overhaul and repair of their Boilers together with CMI here for Saudi Electricity Co Following is one of the references

8

Projects CMI HRSG Boiler inspection amp repair at PP9 Riyadh

9

ELECTRICAL POWER

Generation

Transmission

Distribution

10 Power Generation

10

SIS provides studies operation Maintenance and upkeep of power generation units

including thermal Power Plants Combined -Cycle Power Plants Gas Turbines Hydro-

Power plants Co-generation Diesel Groups Gas Compressors

The following activities are only indicative and not exhaustive

11 SUBIYA Gas Turbine Power Plant in KOWEIT

Construction and Installation of 4 Gas Turbines GE FR 7 Open Cycle Power Plant (4x 75 MW ISO Conditions) The project was divided into Three (3) mains tasks

a- Engineering this involved the complete development of Design Drawings-Quantities-and Materiel Specifications

b- Procurement and Transportation this Task Force was responsible for the complete procurement and transportation of all material required for the construction of the project

c- Construction and installation This included the services provided by SIS as mentioned below

Provided Services

Civil Works Follow up

bull Study plans and electromechanical documents development

bull Designing and identification of required systems equipment cables pipes tools consumables etc

bull Complete Civil Works Drawings Preparation Excavation Foundation Trench

bull Erection of Turbines Generating

11

Sets (GAS Turbines Generators Accessory base Gear boxes Base Frame Alignment

bull Erection of Mechanical Auxiliary Systems

bull Electrical Systems (cable laying Main Switch Gear station service

bull Instrumentation and control panels

bull Erection of Set up Transformers

bull Interconnection with GIS

bull Testing and commissioning

bull Project Hand Over

Site Overview Erection of the Exhaust Stack

PDC Setting Auxiliary Compartment

12 SHOAIBA Steam Turbines Annual Inspection in partnership with Gulf Power International Dabbagh Group (Kingdom of Saudi Arabia)

Provided Services

Steam Turbine Annual Inspection Turbine inspection

bull Pre-Shutdown Activities

bull Unit Shutdown

bull Inspection of Boiler Air ampGas parts

bull Boiler Fuel Firing System

bull Soot-Blowers System

bull ESP System

bull Boiler Water amp Steam System

bull Main Steal System (including Aux steam sys)

bull Analyzers

bull Boiler Feed Water System

bull Main Condensate system

bull Main Turbine amp Condenser stseam side

bull Lub oil amp hydraulic Oil SystemGenerator cooling amp seal Oil System

Inspection of fuel heaters Inspection of the lube oil amp hydraulic pumps of the turbine

12

bull Electrical works

bull Corrective maintenance etc

bull Unit recommissioning and start up

bull Post outage activities (unit performance test vib MeasurementAnnual inspection report preparation and issue)

13 Major Overhaul of GE FR-7 Gas Turbine at Najran Power Plant- in partnership with Gulf Power InternationalDabbagh Group (Kingdom of Saudi Arabia) - Photo Gallery

Services provided Turbine rotor blades inspection TurbineGenerator Control System Mark 5 Troubleshooting

The services provided included

The disassembly removal cleaning visual inspection for erosion corrosion wear cracks damages etc Non Destructive Testing (NDT) inspection alignment checks dimensional checks clearances checks repair servicing maintenance complete partial replacement re-assembly installation alignment adjustment and final quality checks The works performed concerned the below listed and other parts

- Unit Major Inspection including (all Mechanical Electrical Instrumentation and Control Work)

- Unit Hot Gas Path Inspection (all Mechanical Electrical Instrumentation and Control Work)

- NDT of Compressor turbine Generator sections

- Rotor overhaul and Reblading

- Instrument and Controls Maintenance

- Transformers maintenance

- Re-assembly

- Start - up

- Performance test

- Report submittal covering all the areas and aspects of the work done by SIS during the execution the awarded contract

Setting of Turbine bearing compressor rotor inspection

13

14 Strengthening Thermal Generation Plants Capacities injected in the Interconnected Network (IN)

Services provided Measurement of Transformer Ratio

Control and Supervision of Power Generation Plant Extension in Balingueacute (Bamako) in the republic of MALI comprising 4 Diesel Groups 4x11 5 MW ISO Conditions in partnership with IDC (Tunisia)

The services carried out by SIS included

bull Approval of study documents and assembly (accomplished)

bull Factory acceptance test (accomplished)

bull Supervision and control of on-site assembly works (on-going)

bull Site acceptance test and commissioning (once the assembly works will be terminated)

On-load Tape Changer ( OLTC) Transformer Visual Control

14

Test follow up on induced voltage Induced Voltage test on HVMV Transformer

20 Electrical Transmission Network

SISrsquos Scope of activities includes but not limited to the following services

bull Studies of power system transmission network

(system modelling power flow faults analysis) using computer simulation packages

bull Update of the dynamic and static stability studies with the view of evaluating the impact of the new electric power generation and transmission installations

bull Master plans elaboration bull Short-circuits calculation bull Under frequency load shedding calculation bull Development of electrical network protection

schemes including selection of relaysrsquo types and relays coordination

bull Protection setting calculation and configuration

bull Fault analysis in transmission networks using fault recorders and simulation software packages

bull Dimensioning of surge arresters

Washing of energized high voltage insulators

15

bull Commissioning installation and operation of digital control of the HV substations

bull Preparation of technical specifications and evaluation of Bidders

Design and construction of a testing station of insulators in polluted marine industrial and desert region in Oran (Algeria)

16

30 Electrical Distribution Network

South-South Cooperation

We are proud to draw upon our experiences and expertise as a company based in an

African country to help others across Africa

ELECTRICAL DISTRIBUTION

NETWORK

17

RURAL ELECTRIFICATION- CONSTRUCTION WORKS ON A TURN KEY BASIS Pilot Rural Electrification Project based upon single-phase in RWANDA

Services provided Signature of an agreement for cooperation and technical assistance between STEG amp ELECTROGAZ

Metallic Poles delivery

The scope of works included bull Study and Diagnosis of the

existing Rwandan Power

Distribution An inventory of the

existing facilities including

generation transmission and

distribution systems was

established

bull The turnkey design engineering

procurement supply installation

construction commissioning and

start up of a pilot rural

electrification project based upon

single-phase in RWANDA

Sub-station Connection Factory Acceptance Test of AAAC Conductor and twisted cables in presence of Rwandan technicians

Electrcity supply in rwandan remote villages

Energy is an important factor for Socio-Economic Developemnt

18

40 Gas Segment

Services provided Gas Condensate Treatment Unit Pipeline On-Line Welding

SIS services cover the following scope

of activities

bull Study control and supervision of gas

projects erection works

bull Master plans elaboration regarding Gas Transmission and Distributions networks

bull Catholic Protection of gas network bull Gas and condensate treatment units

operation and maintenance related tasks

bull Gas compression stations operation and

maintenance related tasks bull Supervisory and control systems

operation and maintenance bull Gas pipelines network supervision and

remote command bull Pipeline inspection bull Steel pipes and gas delivery station

specification bull Compression stations specification and

supervision of erection works bull Gas and condensate treatment unitsrsquo

implementation commissioning and start-up

Hot Tap Achievement Gas pipeline welding connection

Topographic surveying

19

50 Laboratory-Workshop

Main Activities Rotary Furnace Inspection Surfacing High Precision Castings

General Technics Department GTD was established to perform technical assistance to all power generating units including

bull Thermal Power Plants

bull Combined Cycle Power Plants

bull Gas Turbines

bull Hydraulic Power Plants etc

GTD Mission

bull Acceptance Trial of Equipment

bull High and Mid Voltage Testing (also called dielectric strength test or Hipot Test)

bull Acoustics and Mechanical Vibration

bull Thermodynamics and Hydraulic Activities Management

bull Chemical Analysis amp Controls

bull Metallurgical amp NDT Controls

bull Workshop

NDT Magnetic Testing Turbine Speed Balancing

Analysis of gas dissolved in dielectric liquids of large transformers operation

water lubricant oil dielectric oil and liquid fuel analysis

Dielectric Laboratory Welding Work Shop

Dielectric Laboratory

bull Dielectric oil rigidity

bull Physical and Chimical Characterisics of Dielectric oil

bull Dissolved gas in Dielectric oil

bull Acceptance trials for generators transformers switch-gears

Welding Work Shop

bull Steel plate works

20

bull Heat treatment in furnace or outside

bull Surface reparing by powder spray metallisation

bull Rebabbiting of used bearing

60 Vocational Training ndash Photo Gallery

Services Provided

Practical Hands-On Training Equipment

Practical Hands-On Training electricity amp gas counter

SIS as an energy company

provides the entire scope of training

services including

bull Upgrade of training centers

bull Drawing up and delivery of

training courses

bull Training of trainers

bull Designing and monitoring of

training programs

bull End-user training organization

of seminars hands-on training

on-the-job training and

designing of training manuals

The training provided is relevant

effective structured and

continuously updated This

maintains a high level of technical

skills and procedures in a

constantly changing environment

Practical Hands-On Training works under voltage

Classroom Training on electrical maintenance related to electrical power utilities

21

enabling all staff to keep abreast of

technical innovations and

improvements together with

legislative requirements and

recommended practices

STEG Training Center (CFPK)

Since its inception in 1976 CFPKrsquos aim has been to train newly recruited STEG technicians in Generation Transmission Distribution and Gas sectors and to provide advanced training and retraining for active personnel Since then the Center has constantly expanded and adjusted in order to bull Address STEGrsquos specific requirements in vocational training in all its

sectors technical commercial financial computing management auditing new technologies etc

bull Provides a logical approach as to how to establish and assure a competent workforce by technical vocational training for now and the future

bull Provide appropriate training programs for organizations outside STEG both at national and international levels (in-house training customized courses and lectures)

22

70 Samples of Project Experience

Since 2006 SIS has undertaken many assignments in African countries Middle East and in

Tunisia It is only possible to show a small selection of these in this brochure We are always

happy to provide additional details and examples of our experience on request

71 Accomplished Projects

POWER GENERATION

No Contract Identification Unitne Installed

Capacity(MW) location Start

Date End Date

1 Annual Inspection

5 260 Rabigh SEC Saudi Arabia)

20-12-2005

30-01-2006

2 Annual Inspection 2 260

Rabigh SEC Saudi Arabia)

09-03-2006

22-04-2006

3 Annual Inspection

3 260 Rabigh SEC Saudi Arabia)

19-03-2006

29-04-2006

4 Annual Inspection

1amp4 440 Shoaiba SEC Saoudi Arabia

27-01-2007

01-03-2007

5 Annual Inspection 4 440

Shoaiba SEC Saoudi Arabia

03-03-2007

05-04-2007

6

Annual Inspection Bell seals rings amp nozzle blocks replacement ( turbine overhaul)

4 260 Rabigh SEC Saudi Arabia)

03-01-2008

07-03-2008

7 Annual Inspection 2 260

Rabigh SEC Saudi Arabia)

08-03-2008

15-04-2008

8 Major Overhaul

GT1 27 TihamaSEC Saudi Arabia

20-01-2008

10-02-2008

9

Erection and Supervision of Works 300 MW (ISO Condition) Open Cycle Power Plant Fast Emergency

GTs 1-4

4x75 ISO Conditions

Ministry of Energy

(Electricity and Water)

Sabya Power Plant

State of KOWEIT

2007- 2008

10 Commissioning CPL amp Parallel Resonant Circuit in close cooperation with AREVA

Ethiopie 2007-2008

11

Revamping of obsolete Control and instrumentation system (in close cooperation with SIEMENS)

2 Units Marocco 2008

23

No Contract Identification Unitne Installed Capacity (MW)

location Start Date

12

Commissioning of Control command system Mark VI on GTs Frame 5 (in close cooperation with GESHANAHAN Eng

GTs GE Frame 5

Algeria (Arzew) 2008

13

Grid Interconnection In close cooperation with STUDI for West African Power Pool (WAPP)

225 KV

Electricity grid interconnection

between Burkina Faso and Ghana

2008

14 Pricing Study Senegal 2008

15 Major Inspection GT6

GE-FR7

Najran SEC Saudi Arabia

2008

16 Major Inspection (MI) W501D5

Jazan SEC Saudi Arabia

2009

17 Annual Inspection 2amp3 2x393 Shoaiba SEC Saudi Arabia

2009

24

25

SISrsquoS Experiences in Boilerrsquos Maintenance Work

Power plant location Boiler tech Details ampInspections

Rades A (ST) ST STEAM TURBINE Rades B (ST)

Unit 1 Unit 2 Unit 3 Unit 4

Manufacturer Mitsubishi H I Mitsubishi H I Ansaldo Energia Ansaldo Energia Type amp Model MHI CE RR

type out-door MHI CE RR type outdoor

AE RR type outdoor

AE RR type outdoor

Date of commissioning 1983 1984 1998 1999 MCR (th) 520000 520000 5335 5335

Steam conditions Pressure SHRH(bars) 1685 352 1685 352 1739 1739 Temperature( degC) 543 543 542 542

fuel Natural gas heavy Fuel Ndeg2

Natural gas heavy Fuel Ndeg2

Natural gas heavy Fuel Ndeg2

Natural gas heavy Fuel Ndeg2

Heating area Furnace(msup2) 5105 5105 5360 5360 Reheater (msup2) 3130 3130 1286 1286 Eco (msup2) 2600 2600 1556 1556

Fuel oil Burners type amp No 20 20 Y Ndeg 12 Y Ndeg 12 FDF type amp capacity ( Th) HC 591 HC 591 HC748 HC 748 IDF type amp capacity (Th) HC 640 HC 640 NA NA GRF type amp capacity ( Th) HC 500 HC 500 HC 300 HC 300

RegenAir Preheater Type Ljungstroumlm Ljungstroumlm Ljungstroumlm Ljungstroumlm No amp capacity 2 2 2 2 Heating surface(msup2) 12000 12000 18000 18000

Annual inspection No 20 20 10 10 Starting amp Completion dates

21 Days 21 days 21 days 21 days

Major overhaul No 04 04 01 01 Starting amp Completion dates

1221038843 days 611028854 days 56 days 59 days

Boiler conservation No 20 20 08 08 Boiler Rehabilitation No 0 0 0 0 Boiler Tube Acid cleaning No 01 01 01 01 ILA(Integrity Life Assessment)No 0 0 0 0

26

SISrsquos Experiences in Boilersrsquo Maintenance Work

Power plant location Boiler tech Details ampInspections

Sousse A (ST) Sousse B (CCPP)

Unitne1 Unitne 2 Unitne1 Unitne 2

Manufacturer SGP SGP STEIN INDUSTRY STEIN INDUSTRY Type amp Model Natural circulation Natural circulation Heat Recuperator Heat Recuperator Date of commissioning 1980 1980 1995 1995 MCR (th) 515 515 HP 182 BP 415 HP 182 BP 415 Steam conditions Pressure SHRH (bar) 16038 16038 HP 72 BP 66 HP 72 BP 66

Temperature (degC) 540degC 540degC HP 511 BP 213 HP 511 BP 213 fuel FUELGAZ FUELGAZ Gaz Gaz Heating area Furnace (m2 2080 ) 2080 HP evaporator 25251 LP evaporator 18627

Reheater (m2 1512 ) 1512 HP superheater 9418 LP superheater 2328 Eco (m2 2017 ) 2017 HP economizer 16834 13773 LP economizer 3060

Fuel oil Burners Type ampNo EVT8 EVT8 FDF type amp capacity R62250 7566 m3 R62250 7566 ms 3 s

GRF type amp capacity R62250 721 m3 R62250 721 ms 3 s

Regen Air Preheater

Type No amp capacity 2 220186 Nm3h 2 220186 Nm3h

Heating surface(m2) 2x924 2x924 Annual Inspection

No annually annually annually annually Starting amp completion dates 3 - 4 weeks 3 - 4 weeks 10 days 10 days

Major Overhaul No along with annual inspectioccediln along with annual inspectioccediln

Starting amp completion dates 3 - 4 weeks 3 - 4 weeks

Boiler Conservation No 3 2 Boiler Rehabilitation No Boiler Tube Acid Cleaning No 2 2 ILA (Integrity Life Assessment) No 1

27

SISrsquos Experiences in Boilersrsquo Maintenance Work

Power plant location Boiler tech Details ampInspections Unitne1 (ST) Unitne 2 (ST) Unitne 3 (ST) Unitne 4 (ST)

Manufacturer WALTHER Type amp Model WALTHER FN10 Natural Circulation Date of commissioning 05071965 01111965 22061968 20091968 MCR (th) 112 Steam conditions

Pressure 686 bar Temperature 510 degC

fuel Heavy fuel oil Ndeg2 light fuel oil

Heating area

Furnace (m2 540 m2 ) Reheater (m2 1542 m2 ) Eco (m2 480 m2 )

Fuel oil Burners Type ampNo SONVICO 4 FDF type amp capacity Centrifugal - 27 m3s IDF type amp capacity - - - - GRF type amp capacity - - - -

Regen Air Preheater Type Static LJUNGSTROM No amp capacity 1 1 1 1 Heating surface(m2) 7350 m2 -

Annual Inspection No every year until 1998 every year until

2005 every year until 1998

every year until 2005

Starting amp completion dates - - - -

Major Overhaul No 6 8 5 5 Starting amp completion dates - - - -

Boiler Conservation No - 2 - 2 Boiler Rehabilitation No 4 6 5 5 Boiler Tube Acid Cleaning No 0 0 0 0 ILA (Integrity Life Assessment) No 0 0 0 0

28

SISrsquos Experiences in Boilersrsquo Maintenance Work Power Plant Location

Boiler Tech Details ampInspections

Ghannouch (ST) Unitne1 (ST) Unitne 2

Manufacturer Stein Industrie Stein Industrie Type amp Model Natural circulation Natural circulation Date of commissioning 1972 1972 MCR (th) 120 120 Steam conditions Pressure SHRH (th) 70 bars 70 bars

Temperature 510 degC 510 degC fuel Natural GasHeavy fuel Natural GasHeavy fuel Heating area Furnace (m2 )

Reheater (m2 8880 dmsup3 ) 8880 dmsup3 Eco (m2 2400 dmsup3 ) 2400 dmsup3

Fuel oil Burners Type ampNo PILLARD GRC PILLARD GRC IDF type amp capacity GRF type amp capacity Regen Air Preheater Type Ljunstroumlm Ljunstroumlm

No amp capacity 140msup3h 140msup3h Heating surface(m2) _ _

Annual Inspection No 1 1 Starting amp completion dates 1 week 1 week

Major Overhaul No 15ans 15ans

Starting amp completion dates 2 months 2 months

Boiler Conservation No in case of being extended in case of being extended Boiler Rehabilitation No NO NO Boiler Tube Acid Cleaning No NO NO ILA (Integrity Life Assessment) No NO NO

29

ELECTRICAL TRANSMISSION SYSTEM

Accomplished Projects

bull Tests performed on Numerical relays manufactured by - ABB (Distance protection REL 316 ) - AREVA (Distance protection EPAC MICOMP442 hellip) - ICE (Over current protection NPID 800hellip) - SIEMENS (Distance protection 7SA 511 513 522 611) - REYROLLES (Differential protection DUOBIAS)

bull Test and setting of protective relays and checking the tripping circuits for Generators and

Substations belonging to Zaouia Petroleum Refinery (Libya)

bull Short circuit calculation selectivity study of protective relays by providing solutions for the

existing issues in PEC YEMEN Networks

bull Study and improvement of the existing protective system in close cooperation with Tractebel

Engineering

bull Technical Assistance for Independent Power Producers (IPP) Plant (Carthage Power

Company (CPC) Tunisia) regarding the maintenance and testing of protective relays

related to

- Generators - Main transformers - Auxiliaries - Etc

bull Technical Assistance testing and setting of protective relays at

- Steel ndashworks (Tunisia) - Cement ndashmarker (Tunisia) - Iron industries (Tunisia) - Chemical industries (Tunisia)

bull Commissioning and setting of protective relays at substations (High Medium and Low

voltages)

bull Renovation of the obsolete equipment (relays switchgear hellip)

bull Maintenance of the transmission lines and substations equipment

bull Cost-effective solutions establishment regarding the network issues (droop voltage over

voltage improvement of power factor etc)

30

ELECTRICAL DISTRIBUTION SYSTEM

Rural Electrification- Accomplished Projects

Contract Identification

Contract No 18 Technical Assistance and implementation of a Rural electrification project based upon SWER (Single Wire Earth Return) techniques

Award date 1998 Completion date 1999 Employerrsquos Name JIRAMA (JIRO SY RANO MALAGAS) Address

149 RUE RAINANDRIAMAMPANDRY Antananarivo BP 200 - MADAGASCAR

Main Tasks Performed

bull Training on SWER System bull Data collection needed for SWER System studies and implementation bull Finalization of technical studies and submission of report including

- Technical audit of the pilot project already in place - Technical description of the project - AdviseRecommendations on equipment specifications - Recommendations on possible changes in adjustment and coordination of electrical

protections

Contract Identification

Contract No 19 RWANDA Project (Phase 1) Implementation of a Pilot Rural Electrification Project based on Single-Phase with neutral to ground called MALT System 4000 Subscribers

Award date June 2008 Completion date June 2009

Employerrsquos Name

RECO ( former ELECTROGAZ) -RWANDA

Address BP 537 KIGALI -RWANA

Main Tasks performed

bull Study and Diagnosis of the existing Rwandan Power Distribution An inventory of the existing facilities including generation transmission and distribution systems was established

bull Implementation of a pilot rural electrification project based on MALT System Visit was arranged to some Tunisian rural regions and companies manufacturing electric equipment namely

- Transformers

- Iron poles

- Concrete supports

- Electric cables

- Electronic meters and

- MV and LV line accessories

31

Contract Identification

Contract No 20 Local Electrification study of Tambacounda and Kedougou departments Award date October 2002 Completion date March 2003 Customerrsquos name SENELEC Address ELECTRICAL COMPANY SENEGAL

Main Tasks Performed

bull Data Collection bull Socio-economic survey bull Technical economic and financial analysis bull Electricity market forecast (demand forecast (2003-2015)) bull Estimation of worksrsquo costs regarding medium voltage single-phase and tri-phase lines medium

and low voltage stations low voltage lines diesel micro-stations individual photovoltaic systems bull Technical and economic study related to different methods of supply including the solar as well as

the opportunity of introducing the single-phase system for the rural electrification bull Proposition for the public lighting and the management of photovoltaic systems bull Recommendations for the reinforcement of the existing stations and the existing networks to satisfy

the future demand due to the electrification of the new villages bull Tariff and profitability study bull Set up of the geographical maps and the low voltage electrification plan of the most important

villages (34 villages) bull Recommendations on privatizing power generation energy sector

Contract Identification Contract No 21 - Rural Electrification study of 80 villages in Comoros Isles

- Preparation of Tender Documents for the supply of equipment needed to the construction of 145 km MV lines 100 km LV lines and 80 MVLV stations

- Call for tenders evaluation of Bidders Award date November 2000 Completion date Dec 2002 Customerrsquos name

Ministry of Equipment Department of Energy and Water Resources

Address Moroni Avenue of the Democratic Republic of China

Main Tasks Performed

bull Data collection and visit of the existing electric utilities bull Situation analysis and proposal of electric infrastructure management solutions bull Electricity Demand Estimation and Forecasting bull Electric Calculation (Load Repartition Line Voltage Drop Losses and Voltage Drops

Calculations Short-Circuit Calculations Simulation of the Extension and Reinforcement of the Medium Voltage Networks Power System Stability Analysis Reactive Power Compensation

bull Low Voltage Studies for the Electrification of 80 villages bull RecommendationsSuggestions for the reinforcement of power generation utilities to satisfy

the future demand (by 2010) bull Electricity Tariffing study

- Review of electricity consumption patterns - Cost review - Review of tariff policies - Application and implementation of revised tariff levels

32

Contract Identification Contract Ndeg 22 Establishment and set up of a computerized accounting and budget system

Award date 1992 Completion date 1994 Customerrsquos name SOMELEC Address Nouakchott - MAURITANIA

Main Tasks Performed

bull Analytical accounting bull Bid evaluation bull Cash flow movements management bull Fixed assets management bull Centralizing bookkeeping bull Existing computer application interfaces update bull Transposition of the existing system to the new one bull Operation and maintenance Documents preparation bull Execution of the transposition of the existing system to the new one

Contract Identification Contract

No 23 Electricity sector reform technical assistance in the interim management of the ldquoCompagnie Energie Electrique du Togo ldquo(CEET)

Award date 41997

Completion date 122000

Employerrsquos Name Ministry of Mining Equipment transmission Mail and Telecommunications

Address TOGO

Main Tasks Performed

bull Technical assistance in the interim management of the CEET within the framework of the electricity sectorrsquos liberalization 1) termination of the current CEET management 2) analysis of the existing situation 3) interim management of the CEET prior to its privatization

bull Operation and maintenance of the electrical network for Lomeacute and its surrounding rural areas bull Electricity generation in isolated centers bull Electricity transmission and distribution bull Procurement and maintenance of new diesel production units bull Reduction of energy losses bull Customer management bull Increase in the number of Customers bull Accounting and billing bull Increase in payment recovery bull Call for tenders evaluation of proposals drafting of the technical annexes concerning the contracting

for a new independent operator (concession)

33

72 On-going and Under Bidding (UB) Projects

No Project Description Country

1 Training Center Update (on-going project) Republic of Congo BRAZZAVILLE

2 Master Plan elaboration in close cooperation with STUDI (Tunisia) (on-going project)

Republic of Senegal

3 Implementation of a Rural Electrification Project based on Single-Phase Four-Wires

with Neutral to Ground called MALT System (UB) Republic of Burkina Faso

4 Cost study connections to and extensions of electricity distribution networks

(UB)

Republic of Burkina Faso

5 Works Control and supervision of rural electrification of 33 communities in 4

regions of the Republic of Cameroon (UB) Republic of CAMEROUN

34

JUDICIOUS AND EFFICIENT ENERGY UTILIZATION

IS AT THE FOREFRONT OF OUR MINDS

35

Over the year 2008 STEG International Services (SIS) has widened its scope of activities to

include techno-economic studies and assistance in energy efficiency thereby providing support

to the national energy policy aiming at considering energy auditing energy efficiency energy

saving as a major priority target in Tunisiarsquos future energy strategic plan objectives In this

regard STEG International Services has carried out several projects including but not limited to

the following

80 Energy Efficiency

bull Performing obligatory periodical energy audits for industrial installations as well as energy audits on a consultancy basis

bull Assistance on projects involving energy efficiency bull Studies on energy efficiency of circuits hydraulic and thermal systems bull Upgrading energy management systems of industrial plants

81 Co-generation (Combined Heat and Power (CHP)) Studies

The main tasks performed included

bull Feasibility studies and project implementation assistance ndash RandaTunis

bull Assistance in electric utility restructuring from self power producer (electricity generation

only) to self-producing co-generatorsndash STSBEJATunisia

bull Technical assistance related to STEGrsquos grid connection with Co-generation plants in some

industrial units -SOTIPAPIER STS T-PAP and Carthago-GRE- Tunisia

82 Energy audits and energy efficiency

In any industry the three top operating expenses are often found to be energy (both electrical

and thermal) labour and materials Energy would invariably emerge as a top ranker and thus

energy management function constitutes a strategic area for cost reduction

Energy Audit will help to better understand how energy is used in any industry and in identifying

the areas where waste can occur and where scope for improvement exists In this regard the

Energy Audit would give a positive orientation to the energy cost reduction preventive

maintenance and quality control programs which are vital to production and utility activities Such

36

an audit program will help keep focus on variations which occur in the energy costs availability

and reliability of supply of energy decide on appropriate energy mix identify energy

conservation technologies retrofit for energy conservation equipment etc

Therefore SIS can carry out comprehensive assessment of techno-economic performance of

plants and equipment against the designed performance level or the industry best practice

aiming at optimizing consumption levels along with specific operating control targets

821 Samples of accomplished and on-going Energy Auditing projects

bull Energy Audit of the Liquefied Petroleum Gas (LPG) plant located in Gabegraves (Tunisia) with the assistance of Kvaerner Heurtey in 2001

bull Energy Performance Assessment of Rades and Sousse steam and Combined Cycle Power Plants as well as Bouchemma Menzel Bourguiba Korba Gas Turbines with the assistance of TRACTABEL and EDF in 2002

bull Energy Audit of Sousse Combined Cycle Power Plant with the assistance of CRA2E in 2007-2008

bull Periodic Performance Tests of Carthage Power Company (CPC) combined cycle an Impendent Power Producer (IPP) in Tunisia

37

SIS Future Commitments and Responsibilities

Endowed with a clear vision a sound project management and solid experiences and

know-how acquired by the parent company STEG through its various trades of over 48 years

SIS has put together a team of experts inndashline with its strategic intent- to be positioned as a

competitive and pre-eminent regional energy services company by spreading its expertise and

know-how throughout the African continent Arab countries and the rest of the world working on

a partnership basis with potential consultants andor the utilities of the respective countries

resulting in a keen focus and a strong sense of purpose

As part of its vision SIS management recognizes that it has responsibilities to all of its

stakeholders These include

Shareholders SIS will protect the investments of its shareholders and will provide an acceptable return on

investments through the application of its business principles Customers SIS will aim at optimizing its business activities through winning customers and maintaining

customerrsquos loyalty by offering them high quality services at competitive prices delivering on time

and supporting them with its management expertise

Employees SIS recognizes that its working employees are the key to its success and it nurtures loyalty

teamwork and trust between them SIS will strive to protect support and involve them in the

companyrsquos future to develop their skills and to reward them in line with the corporate values of

SISrsquos organization

Partners Suppliers Contractors and all External Contacts SIS will seek to treat all its partners suppliers contractors and other external stakeholders in a

consistently professional way and to ensure that their needs are fulfilled in every way possible

38

  • 72 On-going and Under Bidding (UB) Projects

3

bull the know-how in several areas of expertise shared with our primary shareholder

STEG and thanks to more than 47 years of experience

bull An international outlook with more than 80 per cent of our turnover coming from

international markets based mainly in Africa and the Middle East

Seiris-SA France

SEIRIS SA was founded in 1978 and is located in Linas a small town in the south of

Paris For the last 25 years SEIRIS is one of the leading manufacturers in Europe which

approved by SEC SABIC and SWCC and has many installation in the Kingdom

Expansion joints are vital components in most industrial plants They are installed as

flexible connections in duct and pipe systems to prevent damage caused by vibrations

temperature pressure or mechanical stress due to movements or vibrations

Fabric expansion joints for low pressure

Metal expansion joints

4

Edison Electrical Works

Edison Electrical Works India is one of the leading service provider for rewinding

and repair of Turbine Generators HV amp MV motors and Transformers It is

approved by Saudi Electricity Co and has carried out many rewinding jobs in

KSA Kuwait Malaysia It has a very wide experience on all generators vis GE

ALSTOM Siemens and others

5

Perfect Chloro System PCS manufacture one of the finest Gas and Electro-

chlorinators in India They have supplied and installed over 500 systems in Asia

and Middle East PCS have complete range of chlorinators and their accessories

6

including the Scrubbers Have installed gas chlorinator with capacity of over 250

kg hr

PVK Engineers

Manufacturers of Air In-let and Exhaust Systems for Gas

Turbines and 3 way 4way valves for Oil and Petrochemical sectors Heavy steel

fabrication Sound attenuation Enclosures for Gas Turbines and other rotating

equipment Supplied and installed many equipment in Iraq Oman and many

African countries apart from South Asia

7

CMI ENERGY is the one of the leading manufacturers of Heat Recovery Steam Generators in the world They are known all over the world for their quality and efficiency CMI has many installations here in Saudi Arabia in some of the major power plants Country House is their service partner here in the Middle East and has executed projects of major overhaul and repair of their Boilers together with CMI here for Saudi Electricity Co Following is one of the references

8

Projects CMI HRSG Boiler inspection amp repair at PP9 Riyadh

9

ELECTRICAL POWER

Generation

Transmission

Distribution

10 Power Generation

10

SIS provides studies operation Maintenance and upkeep of power generation units

including thermal Power Plants Combined -Cycle Power Plants Gas Turbines Hydro-

Power plants Co-generation Diesel Groups Gas Compressors

The following activities are only indicative and not exhaustive

11 SUBIYA Gas Turbine Power Plant in KOWEIT

Construction and Installation of 4 Gas Turbines GE FR 7 Open Cycle Power Plant (4x 75 MW ISO Conditions) The project was divided into Three (3) mains tasks

a- Engineering this involved the complete development of Design Drawings-Quantities-and Materiel Specifications

b- Procurement and Transportation this Task Force was responsible for the complete procurement and transportation of all material required for the construction of the project

c- Construction and installation This included the services provided by SIS as mentioned below

Provided Services

Civil Works Follow up

bull Study plans and electromechanical documents development

bull Designing and identification of required systems equipment cables pipes tools consumables etc

bull Complete Civil Works Drawings Preparation Excavation Foundation Trench

bull Erection of Turbines Generating

11

Sets (GAS Turbines Generators Accessory base Gear boxes Base Frame Alignment

bull Erection of Mechanical Auxiliary Systems

bull Electrical Systems (cable laying Main Switch Gear station service

bull Instrumentation and control panels

bull Erection of Set up Transformers

bull Interconnection with GIS

bull Testing and commissioning

bull Project Hand Over

Site Overview Erection of the Exhaust Stack

PDC Setting Auxiliary Compartment

12 SHOAIBA Steam Turbines Annual Inspection in partnership with Gulf Power International Dabbagh Group (Kingdom of Saudi Arabia)

Provided Services

Steam Turbine Annual Inspection Turbine inspection

bull Pre-Shutdown Activities

bull Unit Shutdown

bull Inspection of Boiler Air ampGas parts

bull Boiler Fuel Firing System

bull Soot-Blowers System

bull ESP System

bull Boiler Water amp Steam System

bull Main Steal System (including Aux steam sys)

bull Analyzers

bull Boiler Feed Water System

bull Main Condensate system

bull Main Turbine amp Condenser stseam side

bull Lub oil amp hydraulic Oil SystemGenerator cooling amp seal Oil System

Inspection of fuel heaters Inspection of the lube oil amp hydraulic pumps of the turbine

12

bull Electrical works

bull Corrective maintenance etc

bull Unit recommissioning and start up

bull Post outage activities (unit performance test vib MeasurementAnnual inspection report preparation and issue)

13 Major Overhaul of GE FR-7 Gas Turbine at Najran Power Plant- in partnership with Gulf Power InternationalDabbagh Group (Kingdom of Saudi Arabia) - Photo Gallery

Services provided Turbine rotor blades inspection TurbineGenerator Control System Mark 5 Troubleshooting

The services provided included

The disassembly removal cleaning visual inspection for erosion corrosion wear cracks damages etc Non Destructive Testing (NDT) inspection alignment checks dimensional checks clearances checks repair servicing maintenance complete partial replacement re-assembly installation alignment adjustment and final quality checks The works performed concerned the below listed and other parts

- Unit Major Inspection including (all Mechanical Electrical Instrumentation and Control Work)

- Unit Hot Gas Path Inspection (all Mechanical Electrical Instrumentation and Control Work)

- NDT of Compressor turbine Generator sections

- Rotor overhaul and Reblading

- Instrument and Controls Maintenance

- Transformers maintenance

- Re-assembly

- Start - up

- Performance test

- Report submittal covering all the areas and aspects of the work done by SIS during the execution the awarded contract

Setting of Turbine bearing compressor rotor inspection

13

14 Strengthening Thermal Generation Plants Capacities injected in the Interconnected Network (IN)

Services provided Measurement of Transformer Ratio

Control and Supervision of Power Generation Plant Extension in Balingueacute (Bamako) in the republic of MALI comprising 4 Diesel Groups 4x11 5 MW ISO Conditions in partnership with IDC (Tunisia)

The services carried out by SIS included

bull Approval of study documents and assembly (accomplished)

bull Factory acceptance test (accomplished)

bull Supervision and control of on-site assembly works (on-going)

bull Site acceptance test and commissioning (once the assembly works will be terminated)

On-load Tape Changer ( OLTC) Transformer Visual Control

14

Test follow up on induced voltage Induced Voltage test on HVMV Transformer

20 Electrical Transmission Network

SISrsquos Scope of activities includes but not limited to the following services

bull Studies of power system transmission network

(system modelling power flow faults analysis) using computer simulation packages

bull Update of the dynamic and static stability studies with the view of evaluating the impact of the new electric power generation and transmission installations

bull Master plans elaboration bull Short-circuits calculation bull Under frequency load shedding calculation bull Development of electrical network protection

schemes including selection of relaysrsquo types and relays coordination

bull Protection setting calculation and configuration

bull Fault analysis in transmission networks using fault recorders and simulation software packages

bull Dimensioning of surge arresters

Washing of energized high voltage insulators

15

bull Commissioning installation and operation of digital control of the HV substations

bull Preparation of technical specifications and evaluation of Bidders

Design and construction of a testing station of insulators in polluted marine industrial and desert region in Oran (Algeria)

16

30 Electrical Distribution Network

South-South Cooperation

We are proud to draw upon our experiences and expertise as a company based in an

African country to help others across Africa

ELECTRICAL DISTRIBUTION

NETWORK

17

RURAL ELECTRIFICATION- CONSTRUCTION WORKS ON A TURN KEY BASIS Pilot Rural Electrification Project based upon single-phase in RWANDA

Services provided Signature of an agreement for cooperation and technical assistance between STEG amp ELECTROGAZ

Metallic Poles delivery

The scope of works included bull Study and Diagnosis of the

existing Rwandan Power

Distribution An inventory of the

existing facilities including

generation transmission and

distribution systems was

established

bull The turnkey design engineering

procurement supply installation

construction commissioning and

start up of a pilot rural

electrification project based upon

single-phase in RWANDA

Sub-station Connection Factory Acceptance Test of AAAC Conductor and twisted cables in presence of Rwandan technicians

Electrcity supply in rwandan remote villages

Energy is an important factor for Socio-Economic Developemnt

18

40 Gas Segment

Services provided Gas Condensate Treatment Unit Pipeline On-Line Welding

SIS services cover the following scope

of activities

bull Study control and supervision of gas

projects erection works

bull Master plans elaboration regarding Gas Transmission and Distributions networks

bull Catholic Protection of gas network bull Gas and condensate treatment units

operation and maintenance related tasks

bull Gas compression stations operation and

maintenance related tasks bull Supervisory and control systems

operation and maintenance bull Gas pipelines network supervision and

remote command bull Pipeline inspection bull Steel pipes and gas delivery station

specification bull Compression stations specification and

supervision of erection works bull Gas and condensate treatment unitsrsquo

implementation commissioning and start-up

Hot Tap Achievement Gas pipeline welding connection

Topographic surveying

19

50 Laboratory-Workshop

Main Activities Rotary Furnace Inspection Surfacing High Precision Castings

General Technics Department GTD was established to perform technical assistance to all power generating units including

bull Thermal Power Plants

bull Combined Cycle Power Plants

bull Gas Turbines

bull Hydraulic Power Plants etc

GTD Mission

bull Acceptance Trial of Equipment

bull High and Mid Voltage Testing (also called dielectric strength test or Hipot Test)

bull Acoustics and Mechanical Vibration

bull Thermodynamics and Hydraulic Activities Management

bull Chemical Analysis amp Controls

bull Metallurgical amp NDT Controls

bull Workshop

NDT Magnetic Testing Turbine Speed Balancing

Analysis of gas dissolved in dielectric liquids of large transformers operation

water lubricant oil dielectric oil and liquid fuel analysis

Dielectric Laboratory Welding Work Shop

Dielectric Laboratory

bull Dielectric oil rigidity

bull Physical and Chimical Characterisics of Dielectric oil

bull Dissolved gas in Dielectric oil

bull Acceptance trials for generators transformers switch-gears

Welding Work Shop

bull Steel plate works

20

bull Heat treatment in furnace or outside

bull Surface reparing by powder spray metallisation

bull Rebabbiting of used bearing

60 Vocational Training ndash Photo Gallery

Services Provided

Practical Hands-On Training Equipment

Practical Hands-On Training electricity amp gas counter

SIS as an energy company

provides the entire scope of training

services including

bull Upgrade of training centers

bull Drawing up and delivery of

training courses

bull Training of trainers

bull Designing and monitoring of

training programs

bull End-user training organization

of seminars hands-on training

on-the-job training and

designing of training manuals

The training provided is relevant

effective structured and

continuously updated This

maintains a high level of technical

skills and procedures in a

constantly changing environment

Practical Hands-On Training works under voltage

Classroom Training on electrical maintenance related to electrical power utilities

21

enabling all staff to keep abreast of

technical innovations and

improvements together with

legislative requirements and

recommended practices

STEG Training Center (CFPK)

Since its inception in 1976 CFPKrsquos aim has been to train newly recruited STEG technicians in Generation Transmission Distribution and Gas sectors and to provide advanced training and retraining for active personnel Since then the Center has constantly expanded and adjusted in order to bull Address STEGrsquos specific requirements in vocational training in all its

sectors technical commercial financial computing management auditing new technologies etc

bull Provides a logical approach as to how to establish and assure a competent workforce by technical vocational training for now and the future

bull Provide appropriate training programs for organizations outside STEG both at national and international levels (in-house training customized courses and lectures)

22

70 Samples of Project Experience

Since 2006 SIS has undertaken many assignments in African countries Middle East and in

Tunisia It is only possible to show a small selection of these in this brochure We are always

happy to provide additional details and examples of our experience on request

71 Accomplished Projects

POWER GENERATION

No Contract Identification Unitne Installed

Capacity(MW) location Start

Date End Date

1 Annual Inspection

5 260 Rabigh SEC Saudi Arabia)

20-12-2005

30-01-2006

2 Annual Inspection 2 260

Rabigh SEC Saudi Arabia)

09-03-2006

22-04-2006

3 Annual Inspection

3 260 Rabigh SEC Saudi Arabia)

19-03-2006

29-04-2006

4 Annual Inspection

1amp4 440 Shoaiba SEC Saoudi Arabia

27-01-2007

01-03-2007

5 Annual Inspection 4 440

Shoaiba SEC Saoudi Arabia

03-03-2007

05-04-2007

6

Annual Inspection Bell seals rings amp nozzle blocks replacement ( turbine overhaul)

4 260 Rabigh SEC Saudi Arabia)

03-01-2008

07-03-2008

7 Annual Inspection 2 260

Rabigh SEC Saudi Arabia)

08-03-2008

15-04-2008

8 Major Overhaul

GT1 27 TihamaSEC Saudi Arabia

20-01-2008

10-02-2008

9

Erection and Supervision of Works 300 MW (ISO Condition) Open Cycle Power Plant Fast Emergency

GTs 1-4

4x75 ISO Conditions

Ministry of Energy

(Electricity and Water)

Sabya Power Plant

State of KOWEIT

2007- 2008

10 Commissioning CPL amp Parallel Resonant Circuit in close cooperation with AREVA

Ethiopie 2007-2008

11

Revamping of obsolete Control and instrumentation system (in close cooperation with SIEMENS)

2 Units Marocco 2008

23

No Contract Identification Unitne Installed Capacity (MW)

location Start Date

12

Commissioning of Control command system Mark VI on GTs Frame 5 (in close cooperation with GESHANAHAN Eng

GTs GE Frame 5

Algeria (Arzew) 2008

13

Grid Interconnection In close cooperation with STUDI for West African Power Pool (WAPP)

225 KV

Electricity grid interconnection

between Burkina Faso and Ghana

2008

14 Pricing Study Senegal 2008

15 Major Inspection GT6

GE-FR7

Najran SEC Saudi Arabia

2008

16 Major Inspection (MI) W501D5

Jazan SEC Saudi Arabia

2009

17 Annual Inspection 2amp3 2x393 Shoaiba SEC Saudi Arabia

2009

24

25

SISrsquoS Experiences in Boilerrsquos Maintenance Work

Power plant location Boiler tech Details ampInspections

Rades A (ST) ST STEAM TURBINE Rades B (ST)

Unit 1 Unit 2 Unit 3 Unit 4

Manufacturer Mitsubishi H I Mitsubishi H I Ansaldo Energia Ansaldo Energia Type amp Model MHI CE RR

type out-door MHI CE RR type outdoor

AE RR type outdoor

AE RR type outdoor

Date of commissioning 1983 1984 1998 1999 MCR (th) 520000 520000 5335 5335

Steam conditions Pressure SHRH(bars) 1685 352 1685 352 1739 1739 Temperature( degC) 543 543 542 542

fuel Natural gas heavy Fuel Ndeg2

Natural gas heavy Fuel Ndeg2

Natural gas heavy Fuel Ndeg2

Natural gas heavy Fuel Ndeg2

Heating area Furnace(msup2) 5105 5105 5360 5360 Reheater (msup2) 3130 3130 1286 1286 Eco (msup2) 2600 2600 1556 1556

Fuel oil Burners type amp No 20 20 Y Ndeg 12 Y Ndeg 12 FDF type amp capacity ( Th) HC 591 HC 591 HC748 HC 748 IDF type amp capacity (Th) HC 640 HC 640 NA NA GRF type amp capacity ( Th) HC 500 HC 500 HC 300 HC 300

RegenAir Preheater Type Ljungstroumlm Ljungstroumlm Ljungstroumlm Ljungstroumlm No amp capacity 2 2 2 2 Heating surface(msup2) 12000 12000 18000 18000

Annual inspection No 20 20 10 10 Starting amp Completion dates

21 Days 21 days 21 days 21 days

Major overhaul No 04 04 01 01 Starting amp Completion dates

1221038843 days 611028854 days 56 days 59 days

Boiler conservation No 20 20 08 08 Boiler Rehabilitation No 0 0 0 0 Boiler Tube Acid cleaning No 01 01 01 01 ILA(Integrity Life Assessment)No 0 0 0 0

26

SISrsquos Experiences in Boilersrsquo Maintenance Work

Power plant location Boiler tech Details ampInspections

Sousse A (ST) Sousse B (CCPP)

Unitne1 Unitne 2 Unitne1 Unitne 2

Manufacturer SGP SGP STEIN INDUSTRY STEIN INDUSTRY Type amp Model Natural circulation Natural circulation Heat Recuperator Heat Recuperator Date of commissioning 1980 1980 1995 1995 MCR (th) 515 515 HP 182 BP 415 HP 182 BP 415 Steam conditions Pressure SHRH (bar) 16038 16038 HP 72 BP 66 HP 72 BP 66

Temperature (degC) 540degC 540degC HP 511 BP 213 HP 511 BP 213 fuel FUELGAZ FUELGAZ Gaz Gaz Heating area Furnace (m2 2080 ) 2080 HP evaporator 25251 LP evaporator 18627

Reheater (m2 1512 ) 1512 HP superheater 9418 LP superheater 2328 Eco (m2 2017 ) 2017 HP economizer 16834 13773 LP economizer 3060

Fuel oil Burners Type ampNo EVT8 EVT8 FDF type amp capacity R62250 7566 m3 R62250 7566 ms 3 s

GRF type amp capacity R62250 721 m3 R62250 721 ms 3 s

Regen Air Preheater

Type No amp capacity 2 220186 Nm3h 2 220186 Nm3h

Heating surface(m2) 2x924 2x924 Annual Inspection

No annually annually annually annually Starting amp completion dates 3 - 4 weeks 3 - 4 weeks 10 days 10 days

Major Overhaul No along with annual inspectioccediln along with annual inspectioccediln

Starting amp completion dates 3 - 4 weeks 3 - 4 weeks

Boiler Conservation No 3 2 Boiler Rehabilitation No Boiler Tube Acid Cleaning No 2 2 ILA (Integrity Life Assessment) No 1

27

SISrsquos Experiences in Boilersrsquo Maintenance Work

Power plant location Boiler tech Details ampInspections Unitne1 (ST) Unitne 2 (ST) Unitne 3 (ST) Unitne 4 (ST)

Manufacturer WALTHER Type amp Model WALTHER FN10 Natural Circulation Date of commissioning 05071965 01111965 22061968 20091968 MCR (th) 112 Steam conditions

Pressure 686 bar Temperature 510 degC

fuel Heavy fuel oil Ndeg2 light fuel oil

Heating area

Furnace (m2 540 m2 ) Reheater (m2 1542 m2 ) Eco (m2 480 m2 )

Fuel oil Burners Type ampNo SONVICO 4 FDF type amp capacity Centrifugal - 27 m3s IDF type amp capacity - - - - GRF type amp capacity - - - -

Regen Air Preheater Type Static LJUNGSTROM No amp capacity 1 1 1 1 Heating surface(m2) 7350 m2 -

Annual Inspection No every year until 1998 every year until

2005 every year until 1998

every year until 2005

Starting amp completion dates - - - -

Major Overhaul No 6 8 5 5 Starting amp completion dates - - - -

Boiler Conservation No - 2 - 2 Boiler Rehabilitation No 4 6 5 5 Boiler Tube Acid Cleaning No 0 0 0 0 ILA (Integrity Life Assessment) No 0 0 0 0

28

SISrsquos Experiences in Boilersrsquo Maintenance Work Power Plant Location

Boiler Tech Details ampInspections

Ghannouch (ST) Unitne1 (ST) Unitne 2

Manufacturer Stein Industrie Stein Industrie Type amp Model Natural circulation Natural circulation Date of commissioning 1972 1972 MCR (th) 120 120 Steam conditions Pressure SHRH (th) 70 bars 70 bars

Temperature 510 degC 510 degC fuel Natural GasHeavy fuel Natural GasHeavy fuel Heating area Furnace (m2 )

Reheater (m2 8880 dmsup3 ) 8880 dmsup3 Eco (m2 2400 dmsup3 ) 2400 dmsup3

Fuel oil Burners Type ampNo PILLARD GRC PILLARD GRC IDF type amp capacity GRF type amp capacity Regen Air Preheater Type Ljunstroumlm Ljunstroumlm

No amp capacity 140msup3h 140msup3h Heating surface(m2) _ _

Annual Inspection No 1 1 Starting amp completion dates 1 week 1 week

Major Overhaul No 15ans 15ans

Starting amp completion dates 2 months 2 months

Boiler Conservation No in case of being extended in case of being extended Boiler Rehabilitation No NO NO Boiler Tube Acid Cleaning No NO NO ILA (Integrity Life Assessment) No NO NO

29

ELECTRICAL TRANSMISSION SYSTEM

Accomplished Projects

bull Tests performed on Numerical relays manufactured by - ABB (Distance protection REL 316 ) - AREVA (Distance protection EPAC MICOMP442 hellip) - ICE (Over current protection NPID 800hellip) - SIEMENS (Distance protection 7SA 511 513 522 611) - REYROLLES (Differential protection DUOBIAS)

bull Test and setting of protective relays and checking the tripping circuits for Generators and

Substations belonging to Zaouia Petroleum Refinery (Libya)

bull Short circuit calculation selectivity study of protective relays by providing solutions for the

existing issues in PEC YEMEN Networks

bull Study and improvement of the existing protective system in close cooperation with Tractebel

Engineering

bull Technical Assistance for Independent Power Producers (IPP) Plant (Carthage Power

Company (CPC) Tunisia) regarding the maintenance and testing of protective relays

related to

- Generators - Main transformers - Auxiliaries - Etc

bull Technical Assistance testing and setting of protective relays at

- Steel ndashworks (Tunisia) - Cement ndashmarker (Tunisia) - Iron industries (Tunisia) - Chemical industries (Tunisia)

bull Commissioning and setting of protective relays at substations (High Medium and Low

voltages)

bull Renovation of the obsolete equipment (relays switchgear hellip)

bull Maintenance of the transmission lines and substations equipment

bull Cost-effective solutions establishment regarding the network issues (droop voltage over

voltage improvement of power factor etc)

30

ELECTRICAL DISTRIBUTION SYSTEM

Rural Electrification- Accomplished Projects

Contract Identification

Contract No 18 Technical Assistance and implementation of a Rural electrification project based upon SWER (Single Wire Earth Return) techniques

Award date 1998 Completion date 1999 Employerrsquos Name JIRAMA (JIRO SY RANO MALAGAS) Address

149 RUE RAINANDRIAMAMPANDRY Antananarivo BP 200 - MADAGASCAR

Main Tasks Performed

bull Training on SWER System bull Data collection needed for SWER System studies and implementation bull Finalization of technical studies and submission of report including

- Technical audit of the pilot project already in place - Technical description of the project - AdviseRecommendations on equipment specifications - Recommendations on possible changes in adjustment and coordination of electrical

protections

Contract Identification

Contract No 19 RWANDA Project (Phase 1) Implementation of a Pilot Rural Electrification Project based on Single-Phase with neutral to ground called MALT System 4000 Subscribers

Award date June 2008 Completion date June 2009

Employerrsquos Name

RECO ( former ELECTROGAZ) -RWANDA

Address BP 537 KIGALI -RWANA

Main Tasks performed

bull Study and Diagnosis of the existing Rwandan Power Distribution An inventory of the existing facilities including generation transmission and distribution systems was established

bull Implementation of a pilot rural electrification project based on MALT System Visit was arranged to some Tunisian rural regions and companies manufacturing electric equipment namely

- Transformers

- Iron poles

- Concrete supports

- Electric cables

- Electronic meters and

- MV and LV line accessories

31

Contract Identification

Contract No 20 Local Electrification study of Tambacounda and Kedougou departments Award date October 2002 Completion date March 2003 Customerrsquos name SENELEC Address ELECTRICAL COMPANY SENEGAL

Main Tasks Performed

bull Data Collection bull Socio-economic survey bull Technical economic and financial analysis bull Electricity market forecast (demand forecast (2003-2015)) bull Estimation of worksrsquo costs regarding medium voltage single-phase and tri-phase lines medium

and low voltage stations low voltage lines diesel micro-stations individual photovoltaic systems bull Technical and economic study related to different methods of supply including the solar as well as

the opportunity of introducing the single-phase system for the rural electrification bull Proposition for the public lighting and the management of photovoltaic systems bull Recommendations for the reinforcement of the existing stations and the existing networks to satisfy

the future demand due to the electrification of the new villages bull Tariff and profitability study bull Set up of the geographical maps and the low voltage electrification plan of the most important

villages (34 villages) bull Recommendations on privatizing power generation energy sector

Contract Identification Contract No 21 - Rural Electrification study of 80 villages in Comoros Isles

- Preparation of Tender Documents for the supply of equipment needed to the construction of 145 km MV lines 100 km LV lines and 80 MVLV stations

- Call for tenders evaluation of Bidders Award date November 2000 Completion date Dec 2002 Customerrsquos name

Ministry of Equipment Department of Energy and Water Resources

Address Moroni Avenue of the Democratic Republic of China

Main Tasks Performed

bull Data collection and visit of the existing electric utilities bull Situation analysis and proposal of electric infrastructure management solutions bull Electricity Demand Estimation and Forecasting bull Electric Calculation (Load Repartition Line Voltage Drop Losses and Voltage Drops

Calculations Short-Circuit Calculations Simulation of the Extension and Reinforcement of the Medium Voltage Networks Power System Stability Analysis Reactive Power Compensation

bull Low Voltage Studies for the Electrification of 80 villages bull RecommendationsSuggestions for the reinforcement of power generation utilities to satisfy

the future demand (by 2010) bull Electricity Tariffing study

- Review of electricity consumption patterns - Cost review - Review of tariff policies - Application and implementation of revised tariff levels

32

Contract Identification Contract Ndeg 22 Establishment and set up of a computerized accounting and budget system

Award date 1992 Completion date 1994 Customerrsquos name SOMELEC Address Nouakchott - MAURITANIA

Main Tasks Performed

bull Analytical accounting bull Bid evaluation bull Cash flow movements management bull Fixed assets management bull Centralizing bookkeeping bull Existing computer application interfaces update bull Transposition of the existing system to the new one bull Operation and maintenance Documents preparation bull Execution of the transposition of the existing system to the new one

Contract Identification Contract

No 23 Electricity sector reform technical assistance in the interim management of the ldquoCompagnie Energie Electrique du Togo ldquo(CEET)

Award date 41997

Completion date 122000

Employerrsquos Name Ministry of Mining Equipment transmission Mail and Telecommunications

Address TOGO

Main Tasks Performed

bull Technical assistance in the interim management of the CEET within the framework of the electricity sectorrsquos liberalization 1) termination of the current CEET management 2) analysis of the existing situation 3) interim management of the CEET prior to its privatization

bull Operation and maintenance of the electrical network for Lomeacute and its surrounding rural areas bull Electricity generation in isolated centers bull Electricity transmission and distribution bull Procurement and maintenance of new diesel production units bull Reduction of energy losses bull Customer management bull Increase in the number of Customers bull Accounting and billing bull Increase in payment recovery bull Call for tenders evaluation of proposals drafting of the technical annexes concerning the contracting

for a new independent operator (concession)

33

72 On-going and Under Bidding (UB) Projects

No Project Description Country

1 Training Center Update (on-going project) Republic of Congo BRAZZAVILLE

2 Master Plan elaboration in close cooperation with STUDI (Tunisia) (on-going project)

Republic of Senegal

3 Implementation of a Rural Electrification Project based on Single-Phase Four-Wires

with Neutral to Ground called MALT System (UB) Republic of Burkina Faso

4 Cost study connections to and extensions of electricity distribution networks

(UB)

Republic of Burkina Faso

5 Works Control and supervision of rural electrification of 33 communities in 4

regions of the Republic of Cameroon (UB) Republic of CAMEROUN

34

JUDICIOUS AND EFFICIENT ENERGY UTILIZATION

IS AT THE FOREFRONT OF OUR MINDS

35

Over the year 2008 STEG International Services (SIS) has widened its scope of activities to

include techno-economic studies and assistance in energy efficiency thereby providing support

to the national energy policy aiming at considering energy auditing energy efficiency energy

saving as a major priority target in Tunisiarsquos future energy strategic plan objectives In this

regard STEG International Services has carried out several projects including but not limited to

the following

80 Energy Efficiency

bull Performing obligatory periodical energy audits for industrial installations as well as energy audits on a consultancy basis

bull Assistance on projects involving energy efficiency bull Studies on energy efficiency of circuits hydraulic and thermal systems bull Upgrading energy management systems of industrial plants

81 Co-generation (Combined Heat and Power (CHP)) Studies

The main tasks performed included

bull Feasibility studies and project implementation assistance ndash RandaTunis

bull Assistance in electric utility restructuring from self power producer (electricity generation

only) to self-producing co-generatorsndash STSBEJATunisia

bull Technical assistance related to STEGrsquos grid connection with Co-generation plants in some

industrial units -SOTIPAPIER STS T-PAP and Carthago-GRE- Tunisia

82 Energy audits and energy efficiency

In any industry the three top operating expenses are often found to be energy (both electrical

and thermal) labour and materials Energy would invariably emerge as a top ranker and thus

energy management function constitutes a strategic area for cost reduction

Energy Audit will help to better understand how energy is used in any industry and in identifying

the areas where waste can occur and where scope for improvement exists In this regard the

Energy Audit would give a positive orientation to the energy cost reduction preventive

maintenance and quality control programs which are vital to production and utility activities Such

36

an audit program will help keep focus on variations which occur in the energy costs availability

and reliability of supply of energy decide on appropriate energy mix identify energy

conservation technologies retrofit for energy conservation equipment etc

Therefore SIS can carry out comprehensive assessment of techno-economic performance of

plants and equipment against the designed performance level or the industry best practice

aiming at optimizing consumption levels along with specific operating control targets

821 Samples of accomplished and on-going Energy Auditing projects

bull Energy Audit of the Liquefied Petroleum Gas (LPG) plant located in Gabegraves (Tunisia) with the assistance of Kvaerner Heurtey in 2001

bull Energy Performance Assessment of Rades and Sousse steam and Combined Cycle Power Plants as well as Bouchemma Menzel Bourguiba Korba Gas Turbines with the assistance of TRACTABEL and EDF in 2002

bull Energy Audit of Sousse Combined Cycle Power Plant with the assistance of CRA2E in 2007-2008

bull Periodic Performance Tests of Carthage Power Company (CPC) combined cycle an Impendent Power Producer (IPP) in Tunisia

37

SIS Future Commitments and Responsibilities

Endowed with a clear vision a sound project management and solid experiences and

know-how acquired by the parent company STEG through its various trades of over 48 years

SIS has put together a team of experts inndashline with its strategic intent- to be positioned as a

competitive and pre-eminent regional energy services company by spreading its expertise and

know-how throughout the African continent Arab countries and the rest of the world working on

a partnership basis with potential consultants andor the utilities of the respective countries

resulting in a keen focus and a strong sense of purpose

As part of its vision SIS management recognizes that it has responsibilities to all of its

stakeholders These include

Shareholders SIS will protect the investments of its shareholders and will provide an acceptable return on

investments through the application of its business principles Customers SIS will aim at optimizing its business activities through winning customers and maintaining

customerrsquos loyalty by offering them high quality services at competitive prices delivering on time

and supporting them with its management expertise

Employees SIS recognizes that its working employees are the key to its success and it nurtures loyalty

teamwork and trust between them SIS will strive to protect support and involve them in the

companyrsquos future to develop their skills and to reward them in line with the corporate values of

SISrsquos organization

Partners Suppliers Contractors and all External Contacts SIS will seek to treat all its partners suppliers contractors and other external stakeholders in a

consistently professional way and to ensure that their needs are fulfilled in every way possible

38

  • 72 On-going and Under Bidding (UB) Projects

4

Edison Electrical Works

Edison Electrical Works India is one of the leading service provider for rewinding

and repair of Turbine Generators HV amp MV motors and Transformers It is

approved by Saudi Electricity Co and has carried out many rewinding jobs in

KSA Kuwait Malaysia It has a very wide experience on all generators vis GE

ALSTOM Siemens and others

5

Perfect Chloro System PCS manufacture one of the finest Gas and Electro-

chlorinators in India They have supplied and installed over 500 systems in Asia

and Middle East PCS have complete range of chlorinators and their accessories

6

including the Scrubbers Have installed gas chlorinator with capacity of over 250

kg hr

PVK Engineers

Manufacturers of Air In-let and Exhaust Systems for Gas

Turbines and 3 way 4way valves for Oil and Petrochemical sectors Heavy steel

fabrication Sound attenuation Enclosures for Gas Turbines and other rotating

equipment Supplied and installed many equipment in Iraq Oman and many

African countries apart from South Asia

7

CMI ENERGY is the one of the leading manufacturers of Heat Recovery Steam Generators in the world They are known all over the world for their quality and efficiency CMI has many installations here in Saudi Arabia in some of the major power plants Country House is their service partner here in the Middle East and has executed projects of major overhaul and repair of their Boilers together with CMI here for Saudi Electricity Co Following is one of the references

8

Projects CMI HRSG Boiler inspection amp repair at PP9 Riyadh

9

ELECTRICAL POWER

Generation

Transmission

Distribution

10 Power Generation

10

SIS provides studies operation Maintenance and upkeep of power generation units

including thermal Power Plants Combined -Cycle Power Plants Gas Turbines Hydro-

Power plants Co-generation Diesel Groups Gas Compressors

The following activities are only indicative and not exhaustive

11 SUBIYA Gas Turbine Power Plant in KOWEIT

Construction and Installation of 4 Gas Turbines GE FR 7 Open Cycle Power Plant (4x 75 MW ISO Conditions) The project was divided into Three (3) mains tasks

a- Engineering this involved the complete development of Design Drawings-Quantities-and Materiel Specifications

b- Procurement and Transportation this Task Force was responsible for the complete procurement and transportation of all material required for the construction of the project

c- Construction and installation This included the services provided by SIS as mentioned below

Provided Services

Civil Works Follow up

bull Study plans and electromechanical documents development

bull Designing and identification of required systems equipment cables pipes tools consumables etc

bull Complete Civil Works Drawings Preparation Excavation Foundation Trench

bull Erection of Turbines Generating

11

Sets (GAS Turbines Generators Accessory base Gear boxes Base Frame Alignment

bull Erection of Mechanical Auxiliary Systems

bull Electrical Systems (cable laying Main Switch Gear station service

bull Instrumentation and control panels

bull Erection of Set up Transformers

bull Interconnection with GIS

bull Testing and commissioning

bull Project Hand Over

Site Overview Erection of the Exhaust Stack

PDC Setting Auxiliary Compartment

12 SHOAIBA Steam Turbines Annual Inspection in partnership with Gulf Power International Dabbagh Group (Kingdom of Saudi Arabia)

Provided Services

Steam Turbine Annual Inspection Turbine inspection

bull Pre-Shutdown Activities

bull Unit Shutdown

bull Inspection of Boiler Air ampGas parts

bull Boiler Fuel Firing System

bull Soot-Blowers System

bull ESP System

bull Boiler Water amp Steam System

bull Main Steal System (including Aux steam sys)

bull Analyzers

bull Boiler Feed Water System

bull Main Condensate system

bull Main Turbine amp Condenser stseam side

bull Lub oil amp hydraulic Oil SystemGenerator cooling amp seal Oil System

Inspection of fuel heaters Inspection of the lube oil amp hydraulic pumps of the turbine

12

bull Electrical works

bull Corrective maintenance etc

bull Unit recommissioning and start up

bull Post outage activities (unit performance test vib MeasurementAnnual inspection report preparation and issue)

13 Major Overhaul of GE FR-7 Gas Turbine at Najran Power Plant- in partnership with Gulf Power InternationalDabbagh Group (Kingdom of Saudi Arabia) - Photo Gallery

Services provided Turbine rotor blades inspection TurbineGenerator Control System Mark 5 Troubleshooting

The services provided included

The disassembly removal cleaning visual inspection for erosion corrosion wear cracks damages etc Non Destructive Testing (NDT) inspection alignment checks dimensional checks clearances checks repair servicing maintenance complete partial replacement re-assembly installation alignment adjustment and final quality checks The works performed concerned the below listed and other parts

- Unit Major Inspection including (all Mechanical Electrical Instrumentation and Control Work)

- Unit Hot Gas Path Inspection (all Mechanical Electrical Instrumentation and Control Work)

- NDT of Compressor turbine Generator sections

- Rotor overhaul and Reblading

- Instrument and Controls Maintenance

- Transformers maintenance

- Re-assembly

- Start - up

- Performance test

- Report submittal covering all the areas and aspects of the work done by SIS during the execution the awarded contract

Setting of Turbine bearing compressor rotor inspection

13

14 Strengthening Thermal Generation Plants Capacities injected in the Interconnected Network (IN)

Services provided Measurement of Transformer Ratio

Control and Supervision of Power Generation Plant Extension in Balingueacute (Bamako) in the republic of MALI comprising 4 Diesel Groups 4x11 5 MW ISO Conditions in partnership with IDC (Tunisia)

The services carried out by SIS included

bull Approval of study documents and assembly (accomplished)

bull Factory acceptance test (accomplished)

bull Supervision and control of on-site assembly works (on-going)

bull Site acceptance test and commissioning (once the assembly works will be terminated)

On-load Tape Changer ( OLTC) Transformer Visual Control

14

Test follow up on induced voltage Induced Voltage test on HVMV Transformer

20 Electrical Transmission Network

SISrsquos Scope of activities includes but not limited to the following services

bull Studies of power system transmission network

(system modelling power flow faults analysis) using computer simulation packages

bull Update of the dynamic and static stability studies with the view of evaluating the impact of the new electric power generation and transmission installations

bull Master plans elaboration bull Short-circuits calculation bull Under frequency load shedding calculation bull Development of electrical network protection

schemes including selection of relaysrsquo types and relays coordination

bull Protection setting calculation and configuration

bull Fault analysis in transmission networks using fault recorders and simulation software packages

bull Dimensioning of surge arresters

Washing of energized high voltage insulators

15

bull Commissioning installation and operation of digital control of the HV substations

bull Preparation of technical specifications and evaluation of Bidders

Design and construction of a testing station of insulators in polluted marine industrial and desert region in Oran (Algeria)

16

30 Electrical Distribution Network

South-South Cooperation

We are proud to draw upon our experiences and expertise as a company based in an

African country to help others across Africa

ELECTRICAL DISTRIBUTION

NETWORK

17

RURAL ELECTRIFICATION- CONSTRUCTION WORKS ON A TURN KEY BASIS Pilot Rural Electrification Project based upon single-phase in RWANDA

Services provided Signature of an agreement for cooperation and technical assistance between STEG amp ELECTROGAZ

Metallic Poles delivery

The scope of works included bull Study and Diagnosis of the

existing Rwandan Power

Distribution An inventory of the

existing facilities including

generation transmission and

distribution systems was

established

bull The turnkey design engineering

procurement supply installation

construction commissioning and

start up of a pilot rural

electrification project based upon

single-phase in RWANDA

Sub-station Connection Factory Acceptance Test of AAAC Conductor and twisted cables in presence of Rwandan technicians

Electrcity supply in rwandan remote villages

Energy is an important factor for Socio-Economic Developemnt

18

40 Gas Segment

Services provided Gas Condensate Treatment Unit Pipeline On-Line Welding

SIS services cover the following scope

of activities

bull Study control and supervision of gas

projects erection works

bull Master plans elaboration regarding Gas Transmission and Distributions networks

bull Catholic Protection of gas network bull Gas and condensate treatment units

operation and maintenance related tasks

bull Gas compression stations operation and

maintenance related tasks bull Supervisory and control systems

operation and maintenance bull Gas pipelines network supervision and

remote command bull Pipeline inspection bull Steel pipes and gas delivery station

specification bull Compression stations specification and

supervision of erection works bull Gas and condensate treatment unitsrsquo

implementation commissioning and start-up

Hot Tap Achievement Gas pipeline welding connection

Topographic surveying

19

50 Laboratory-Workshop

Main Activities Rotary Furnace Inspection Surfacing High Precision Castings

General Technics Department GTD was established to perform technical assistance to all power generating units including

bull Thermal Power Plants

bull Combined Cycle Power Plants

bull Gas Turbines

bull Hydraulic Power Plants etc

GTD Mission

bull Acceptance Trial of Equipment

bull High and Mid Voltage Testing (also called dielectric strength test or Hipot Test)

bull Acoustics and Mechanical Vibration

bull Thermodynamics and Hydraulic Activities Management

bull Chemical Analysis amp Controls

bull Metallurgical amp NDT Controls

bull Workshop

NDT Magnetic Testing Turbine Speed Balancing

Analysis of gas dissolved in dielectric liquids of large transformers operation

water lubricant oil dielectric oil and liquid fuel analysis

Dielectric Laboratory Welding Work Shop

Dielectric Laboratory

bull Dielectric oil rigidity

bull Physical and Chimical Characterisics of Dielectric oil

bull Dissolved gas in Dielectric oil

bull Acceptance trials for generators transformers switch-gears

Welding Work Shop

bull Steel plate works

20

bull Heat treatment in furnace or outside

bull Surface reparing by powder spray metallisation

bull Rebabbiting of used bearing

60 Vocational Training ndash Photo Gallery

Services Provided

Practical Hands-On Training Equipment

Practical Hands-On Training electricity amp gas counter

SIS as an energy company

provides the entire scope of training

services including

bull Upgrade of training centers

bull Drawing up and delivery of

training courses

bull Training of trainers

bull Designing and monitoring of

training programs

bull End-user training organization

of seminars hands-on training

on-the-job training and

designing of training manuals

The training provided is relevant

effective structured and

continuously updated This

maintains a high level of technical

skills and procedures in a

constantly changing environment

Practical Hands-On Training works under voltage

Classroom Training on electrical maintenance related to electrical power utilities

21

enabling all staff to keep abreast of

technical innovations and

improvements together with

legislative requirements and

recommended practices

STEG Training Center (CFPK)

Since its inception in 1976 CFPKrsquos aim has been to train newly recruited STEG technicians in Generation Transmission Distribution and Gas sectors and to provide advanced training and retraining for active personnel Since then the Center has constantly expanded and adjusted in order to bull Address STEGrsquos specific requirements in vocational training in all its

sectors technical commercial financial computing management auditing new technologies etc

bull Provides a logical approach as to how to establish and assure a competent workforce by technical vocational training for now and the future

bull Provide appropriate training programs for organizations outside STEG both at national and international levels (in-house training customized courses and lectures)

22

70 Samples of Project Experience

Since 2006 SIS has undertaken many assignments in African countries Middle East and in

Tunisia It is only possible to show a small selection of these in this brochure We are always

happy to provide additional details and examples of our experience on request

71 Accomplished Projects

POWER GENERATION

No Contract Identification Unitne Installed

Capacity(MW) location Start

Date End Date

1 Annual Inspection

5 260 Rabigh SEC Saudi Arabia)

20-12-2005

30-01-2006

2 Annual Inspection 2 260

Rabigh SEC Saudi Arabia)

09-03-2006

22-04-2006

3 Annual Inspection

3 260 Rabigh SEC Saudi Arabia)

19-03-2006

29-04-2006

4 Annual Inspection

1amp4 440 Shoaiba SEC Saoudi Arabia

27-01-2007

01-03-2007

5 Annual Inspection 4 440

Shoaiba SEC Saoudi Arabia

03-03-2007

05-04-2007

6

Annual Inspection Bell seals rings amp nozzle blocks replacement ( turbine overhaul)

4 260 Rabigh SEC Saudi Arabia)

03-01-2008

07-03-2008

7 Annual Inspection 2 260

Rabigh SEC Saudi Arabia)

08-03-2008

15-04-2008

8 Major Overhaul

GT1 27 TihamaSEC Saudi Arabia

20-01-2008

10-02-2008

9

Erection and Supervision of Works 300 MW (ISO Condition) Open Cycle Power Plant Fast Emergency

GTs 1-4

4x75 ISO Conditions

Ministry of Energy

(Electricity and Water)

Sabya Power Plant

State of KOWEIT

2007- 2008

10 Commissioning CPL amp Parallel Resonant Circuit in close cooperation with AREVA

Ethiopie 2007-2008

11

Revamping of obsolete Control and instrumentation system (in close cooperation with SIEMENS)

2 Units Marocco 2008

23

No Contract Identification Unitne Installed Capacity (MW)

location Start Date

12

Commissioning of Control command system Mark VI on GTs Frame 5 (in close cooperation with GESHANAHAN Eng

GTs GE Frame 5

Algeria (Arzew) 2008

13

Grid Interconnection In close cooperation with STUDI for West African Power Pool (WAPP)

225 KV

Electricity grid interconnection

between Burkina Faso and Ghana

2008

14 Pricing Study Senegal 2008

15 Major Inspection GT6

GE-FR7

Najran SEC Saudi Arabia

2008

16 Major Inspection (MI) W501D5

Jazan SEC Saudi Arabia

2009

17 Annual Inspection 2amp3 2x393 Shoaiba SEC Saudi Arabia

2009

24

25

SISrsquoS Experiences in Boilerrsquos Maintenance Work

Power plant location Boiler tech Details ampInspections

Rades A (ST) ST STEAM TURBINE Rades B (ST)

Unit 1 Unit 2 Unit 3 Unit 4

Manufacturer Mitsubishi H I Mitsubishi H I Ansaldo Energia Ansaldo Energia Type amp Model MHI CE RR

type out-door MHI CE RR type outdoor

AE RR type outdoor

AE RR type outdoor

Date of commissioning 1983 1984 1998 1999 MCR (th) 520000 520000 5335 5335

Steam conditions Pressure SHRH(bars) 1685 352 1685 352 1739 1739 Temperature( degC) 543 543 542 542

fuel Natural gas heavy Fuel Ndeg2

Natural gas heavy Fuel Ndeg2

Natural gas heavy Fuel Ndeg2

Natural gas heavy Fuel Ndeg2

Heating area Furnace(msup2) 5105 5105 5360 5360 Reheater (msup2) 3130 3130 1286 1286 Eco (msup2) 2600 2600 1556 1556

Fuel oil Burners type amp No 20 20 Y Ndeg 12 Y Ndeg 12 FDF type amp capacity ( Th) HC 591 HC 591 HC748 HC 748 IDF type amp capacity (Th) HC 640 HC 640 NA NA GRF type amp capacity ( Th) HC 500 HC 500 HC 300 HC 300

RegenAir Preheater Type Ljungstroumlm Ljungstroumlm Ljungstroumlm Ljungstroumlm No amp capacity 2 2 2 2 Heating surface(msup2) 12000 12000 18000 18000

Annual inspection No 20 20 10 10 Starting amp Completion dates

21 Days 21 days 21 days 21 days

Major overhaul No 04 04 01 01 Starting amp Completion dates

1221038843 days 611028854 days 56 days 59 days

Boiler conservation No 20 20 08 08 Boiler Rehabilitation No 0 0 0 0 Boiler Tube Acid cleaning No 01 01 01 01 ILA(Integrity Life Assessment)No 0 0 0 0

26

SISrsquos Experiences in Boilersrsquo Maintenance Work

Power plant location Boiler tech Details ampInspections

Sousse A (ST) Sousse B (CCPP)

Unitne1 Unitne 2 Unitne1 Unitne 2

Manufacturer SGP SGP STEIN INDUSTRY STEIN INDUSTRY Type amp Model Natural circulation Natural circulation Heat Recuperator Heat Recuperator Date of commissioning 1980 1980 1995 1995 MCR (th) 515 515 HP 182 BP 415 HP 182 BP 415 Steam conditions Pressure SHRH (bar) 16038 16038 HP 72 BP 66 HP 72 BP 66

Temperature (degC) 540degC 540degC HP 511 BP 213 HP 511 BP 213 fuel FUELGAZ FUELGAZ Gaz Gaz Heating area Furnace (m2 2080 ) 2080 HP evaporator 25251 LP evaporator 18627

Reheater (m2 1512 ) 1512 HP superheater 9418 LP superheater 2328 Eco (m2 2017 ) 2017 HP economizer 16834 13773 LP economizer 3060

Fuel oil Burners Type ampNo EVT8 EVT8 FDF type amp capacity R62250 7566 m3 R62250 7566 ms 3 s

GRF type amp capacity R62250 721 m3 R62250 721 ms 3 s

Regen Air Preheater

Type No amp capacity 2 220186 Nm3h 2 220186 Nm3h

Heating surface(m2) 2x924 2x924 Annual Inspection

No annually annually annually annually Starting amp completion dates 3 - 4 weeks 3 - 4 weeks 10 days 10 days

Major Overhaul No along with annual inspectioccediln along with annual inspectioccediln

Starting amp completion dates 3 - 4 weeks 3 - 4 weeks

Boiler Conservation No 3 2 Boiler Rehabilitation No Boiler Tube Acid Cleaning No 2 2 ILA (Integrity Life Assessment) No 1

27

SISrsquos Experiences in Boilersrsquo Maintenance Work

Power plant location Boiler tech Details ampInspections Unitne1 (ST) Unitne 2 (ST) Unitne 3 (ST) Unitne 4 (ST)

Manufacturer WALTHER Type amp Model WALTHER FN10 Natural Circulation Date of commissioning 05071965 01111965 22061968 20091968 MCR (th) 112 Steam conditions

Pressure 686 bar Temperature 510 degC

fuel Heavy fuel oil Ndeg2 light fuel oil

Heating area

Furnace (m2 540 m2 ) Reheater (m2 1542 m2 ) Eco (m2 480 m2 )

Fuel oil Burners Type ampNo SONVICO 4 FDF type amp capacity Centrifugal - 27 m3s IDF type amp capacity - - - - GRF type amp capacity - - - -

Regen Air Preheater Type Static LJUNGSTROM No amp capacity 1 1 1 1 Heating surface(m2) 7350 m2 -

Annual Inspection No every year until 1998 every year until

2005 every year until 1998

every year until 2005

Starting amp completion dates - - - -

Major Overhaul No 6 8 5 5 Starting amp completion dates - - - -

Boiler Conservation No - 2 - 2 Boiler Rehabilitation No 4 6 5 5 Boiler Tube Acid Cleaning No 0 0 0 0 ILA (Integrity Life Assessment) No 0 0 0 0

28

SISrsquos Experiences in Boilersrsquo Maintenance Work Power Plant Location

Boiler Tech Details ampInspections

Ghannouch (ST) Unitne1 (ST) Unitne 2

Manufacturer Stein Industrie Stein Industrie Type amp Model Natural circulation Natural circulation Date of commissioning 1972 1972 MCR (th) 120 120 Steam conditions Pressure SHRH (th) 70 bars 70 bars

Temperature 510 degC 510 degC fuel Natural GasHeavy fuel Natural GasHeavy fuel Heating area Furnace (m2 )

Reheater (m2 8880 dmsup3 ) 8880 dmsup3 Eco (m2 2400 dmsup3 ) 2400 dmsup3

Fuel oil Burners Type ampNo PILLARD GRC PILLARD GRC IDF type amp capacity GRF type amp capacity Regen Air Preheater Type Ljunstroumlm Ljunstroumlm

No amp capacity 140msup3h 140msup3h Heating surface(m2) _ _

Annual Inspection No 1 1 Starting amp completion dates 1 week 1 week

Major Overhaul No 15ans 15ans

Starting amp completion dates 2 months 2 months

Boiler Conservation No in case of being extended in case of being extended Boiler Rehabilitation No NO NO Boiler Tube Acid Cleaning No NO NO ILA (Integrity Life Assessment) No NO NO

29

ELECTRICAL TRANSMISSION SYSTEM

Accomplished Projects

bull Tests performed on Numerical relays manufactured by - ABB (Distance protection REL 316 ) - AREVA (Distance protection EPAC MICOMP442 hellip) - ICE (Over current protection NPID 800hellip) - SIEMENS (Distance protection 7SA 511 513 522 611) - REYROLLES (Differential protection DUOBIAS)

bull Test and setting of protective relays and checking the tripping circuits for Generators and

Substations belonging to Zaouia Petroleum Refinery (Libya)

bull Short circuit calculation selectivity study of protective relays by providing solutions for the

existing issues in PEC YEMEN Networks

bull Study and improvement of the existing protective system in close cooperation with Tractebel

Engineering

bull Technical Assistance for Independent Power Producers (IPP) Plant (Carthage Power

Company (CPC) Tunisia) regarding the maintenance and testing of protective relays

related to

- Generators - Main transformers - Auxiliaries - Etc

bull Technical Assistance testing and setting of protective relays at

- Steel ndashworks (Tunisia) - Cement ndashmarker (Tunisia) - Iron industries (Tunisia) - Chemical industries (Tunisia)

bull Commissioning and setting of protective relays at substations (High Medium and Low

voltages)

bull Renovation of the obsolete equipment (relays switchgear hellip)

bull Maintenance of the transmission lines and substations equipment

bull Cost-effective solutions establishment regarding the network issues (droop voltage over

voltage improvement of power factor etc)

30

ELECTRICAL DISTRIBUTION SYSTEM

Rural Electrification- Accomplished Projects

Contract Identification

Contract No 18 Technical Assistance and implementation of a Rural electrification project based upon SWER (Single Wire Earth Return) techniques

Award date 1998 Completion date 1999 Employerrsquos Name JIRAMA (JIRO SY RANO MALAGAS) Address

149 RUE RAINANDRIAMAMPANDRY Antananarivo BP 200 - MADAGASCAR

Main Tasks Performed

bull Training on SWER System bull Data collection needed for SWER System studies and implementation bull Finalization of technical studies and submission of report including

- Technical audit of the pilot project already in place - Technical description of the project - AdviseRecommendations on equipment specifications - Recommendations on possible changes in adjustment and coordination of electrical

protections

Contract Identification

Contract No 19 RWANDA Project (Phase 1) Implementation of a Pilot Rural Electrification Project based on Single-Phase with neutral to ground called MALT System 4000 Subscribers

Award date June 2008 Completion date June 2009

Employerrsquos Name

RECO ( former ELECTROGAZ) -RWANDA

Address BP 537 KIGALI -RWANA

Main Tasks performed

bull Study and Diagnosis of the existing Rwandan Power Distribution An inventory of the existing facilities including generation transmission and distribution systems was established

bull Implementation of a pilot rural electrification project based on MALT System Visit was arranged to some Tunisian rural regions and companies manufacturing electric equipment namely

- Transformers

- Iron poles

- Concrete supports

- Electric cables

- Electronic meters and

- MV and LV line accessories

31

Contract Identification

Contract No 20 Local Electrification study of Tambacounda and Kedougou departments Award date October 2002 Completion date March 2003 Customerrsquos name SENELEC Address ELECTRICAL COMPANY SENEGAL

Main Tasks Performed

bull Data Collection bull Socio-economic survey bull Technical economic and financial analysis bull Electricity market forecast (demand forecast (2003-2015)) bull Estimation of worksrsquo costs regarding medium voltage single-phase and tri-phase lines medium

and low voltage stations low voltage lines diesel micro-stations individual photovoltaic systems bull Technical and economic study related to different methods of supply including the solar as well as

the opportunity of introducing the single-phase system for the rural electrification bull Proposition for the public lighting and the management of photovoltaic systems bull Recommendations for the reinforcement of the existing stations and the existing networks to satisfy

the future demand due to the electrification of the new villages bull Tariff and profitability study bull Set up of the geographical maps and the low voltage electrification plan of the most important

villages (34 villages) bull Recommendations on privatizing power generation energy sector

Contract Identification Contract No 21 - Rural Electrification study of 80 villages in Comoros Isles

- Preparation of Tender Documents for the supply of equipment needed to the construction of 145 km MV lines 100 km LV lines and 80 MVLV stations

- Call for tenders evaluation of Bidders Award date November 2000 Completion date Dec 2002 Customerrsquos name

Ministry of Equipment Department of Energy and Water Resources

Address Moroni Avenue of the Democratic Republic of China

Main Tasks Performed

bull Data collection and visit of the existing electric utilities bull Situation analysis and proposal of electric infrastructure management solutions bull Electricity Demand Estimation and Forecasting bull Electric Calculation (Load Repartition Line Voltage Drop Losses and Voltage Drops

Calculations Short-Circuit Calculations Simulation of the Extension and Reinforcement of the Medium Voltage Networks Power System Stability Analysis Reactive Power Compensation

bull Low Voltage Studies for the Electrification of 80 villages bull RecommendationsSuggestions for the reinforcement of power generation utilities to satisfy

the future demand (by 2010) bull Electricity Tariffing study

- Review of electricity consumption patterns - Cost review - Review of tariff policies - Application and implementation of revised tariff levels

32

Contract Identification Contract Ndeg 22 Establishment and set up of a computerized accounting and budget system

Award date 1992 Completion date 1994 Customerrsquos name SOMELEC Address Nouakchott - MAURITANIA

Main Tasks Performed

bull Analytical accounting bull Bid evaluation bull Cash flow movements management bull Fixed assets management bull Centralizing bookkeeping bull Existing computer application interfaces update bull Transposition of the existing system to the new one bull Operation and maintenance Documents preparation bull Execution of the transposition of the existing system to the new one

Contract Identification Contract

No 23 Electricity sector reform technical assistance in the interim management of the ldquoCompagnie Energie Electrique du Togo ldquo(CEET)

Award date 41997

Completion date 122000

Employerrsquos Name Ministry of Mining Equipment transmission Mail and Telecommunications

Address TOGO

Main Tasks Performed

bull Technical assistance in the interim management of the CEET within the framework of the electricity sectorrsquos liberalization 1) termination of the current CEET management 2) analysis of the existing situation 3) interim management of the CEET prior to its privatization

bull Operation and maintenance of the electrical network for Lomeacute and its surrounding rural areas bull Electricity generation in isolated centers bull Electricity transmission and distribution bull Procurement and maintenance of new diesel production units bull Reduction of energy losses bull Customer management bull Increase in the number of Customers bull Accounting and billing bull Increase in payment recovery bull Call for tenders evaluation of proposals drafting of the technical annexes concerning the contracting

for a new independent operator (concession)

33

72 On-going and Under Bidding (UB) Projects

No Project Description Country

1 Training Center Update (on-going project) Republic of Congo BRAZZAVILLE

2 Master Plan elaboration in close cooperation with STUDI (Tunisia) (on-going project)

Republic of Senegal

3 Implementation of a Rural Electrification Project based on Single-Phase Four-Wires

with Neutral to Ground called MALT System (UB) Republic of Burkina Faso

4 Cost study connections to and extensions of electricity distribution networks

(UB)

Republic of Burkina Faso

5 Works Control and supervision of rural electrification of 33 communities in 4

regions of the Republic of Cameroon (UB) Republic of CAMEROUN

34

JUDICIOUS AND EFFICIENT ENERGY UTILIZATION

IS AT THE FOREFRONT OF OUR MINDS

35

Over the year 2008 STEG International Services (SIS) has widened its scope of activities to

include techno-economic studies and assistance in energy efficiency thereby providing support

to the national energy policy aiming at considering energy auditing energy efficiency energy

saving as a major priority target in Tunisiarsquos future energy strategic plan objectives In this

regard STEG International Services has carried out several projects including but not limited to

the following

80 Energy Efficiency

bull Performing obligatory periodical energy audits for industrial installations as well as energy audits on a consultancy basis

bull Assistance on projects involving energy efficiency bull Studies on energy efficiency of circuits hydraulic and thermal systems bull Upgrading energy management systems of industrial plants

81 Co-generation (Combined Heat and Power (CHP)) Studies

The main tasks performed included

bull Feasibility studies and project implementation assistance ndash RandaTunis

bull Assistance in electric utility restructuring from self power producer (electricity generation

only) to self-producing co-generatorsndash STSBEJATunisia

bull Technical assistance related to STEGrsquos grid connection with Co-generation plants in some

industrial units -SOTIPAPIER STS T-PAP and Carthago-GRE- Tunisia

82 Energy audits and energy efficiency

In any industry the three top operating expenses are often found to be energy (both electrical

and thermal) labour and materials Energy would invariably emerge as a top ranker and thus

energy management function constitutes a strategic area for cost reduction

Energy Audit will help to better understand how energy is used in any industry and in identifying

the areas where waste can occur and where scope for improvement exists In this regard the

Energy Audit would give a positive orientation to the energy cost reduction preventive

maintenance and quality control programs which are vital to production and utility activities Such

36

an audit program will help keep focus on variations which occur in the energy costs availability

and reliability of supply of energy decide on appropriate energy mix identify energy

conservation technologies retrofit for energy conservation equipment etc

Therefore SIS can carry out comprehensive assessment of techno-economic performance of

plants and equipment against the designed performance level or the industry best practice

aiming at optimizing consumption levels along with specific operating control targets

821 Samples of accomplished and on-going Energy Auditing projects

bull Energy Audit of the Liquefied Petroleum Gas (LPG) plant located in Gabegraves (Tunisia) with the assistance of Kvaerner Heurtey in 2001

bull Energy Performance Assessment of Rades and Sousse steam and Combined Cycle Power Plants as well as Bouchemma Menzel Bourguiba Korba Gas Turbines with the assistance of TRACTABEL and EDF in 2002

bull Energy Audit of Sousse Combined Cycle Power Plant with the assistance of CRA2E in 2007-2008

bull Periodic Performance Tests of Carthage Power Company (CPC) combined cycle an Impendent Power Producer (IPP) in Tunisia

37

SIS Future Commitments and Responsibilities

Endowed with a clear vision a sound project management and solid experiences and

know-how acquired by the parent company STEG through its various trades of over 48 years

SIS has put together a team of experts inndashline with its strategic intent- to be positioned as a

competitive and pre-eminent regional energy services company by spreading its expertise and

know-how throughout the African continent Arab countries and the rest of the world working on

a partnership basis with potential consultants andor the utilities of the respective countries

resulting in a keen focus and a strong sense of purpose

As part of its vision SIS management recognizes that it has responsibilities to all of its

stakeholders These include

Shareholders SIS will protect the investments of its shareholders and will provide an acceptable return on

investments through the application of its business principles Customers SIS will aim at optimizing its business activities through winning customers and maintaining

customerrsquos loyalty by offering them high quality services at competitive prices delivering on time

and supporting them with its management expertise

Employees SIS recognizes that its working employees are the key to its success and it nurtures loyalty

teamwork and trust between them SIS will strive to protect support and involve them in the

companyrsquos future to develop their skills and to reward them in line with the corporate values of

SISrsquos organization

Partners Suppliers Contractors and all External Contacts SIS will seek to treat all its partners suppliers contractors and other external stakeholders in a

consistently professional way and to ensure that their needs are fulfilled in every way possible

38

  • 72 On-going and Under Bidding (UB) Projects

5

Perfect Chloro System PCS manufacture one of the finest Gas and Electro-

chlorinators in India They have supplied and installed over 500 systems in Asia

and Middle East PCS have complete range of chlorinators and their accessories

6

including the Scrubbers Have installed gas chlorinator with capacity of over 250

kg hr

PVK Engineers

Manufacturers of Air In-let and Exhaust Systems for Gas

Turbines and 3 way 4way valves for Oil and Petrochemical sectors Heavy steel

fabrication Sound attenuation Enclosures for Gas Turbines and other rotating

equipment Supplied and installed many equipment in Iraq Oman and many

African countries apart from South Asia

7

CMI ENERGY is the one of the leading manufacturers of Heat Recovery Steam Generators in the world They are known all over the world for their quality and efficiency CMI has many installations here in Saudi Arabia in some of the major power plants Country House is their service partner here in the Middle East and has executed projects of major overhaul and repair of their Boilers together with CMI here for Saudi Electricity Co Following is one of the references

8

Projects CMI HRSG Boiler inspection amp repair at PP9 Riyadh

9

ELECTRICAL POWER

Generation

Transmission

Distribution

10 Power Generation

10

SIS provides studies operation Maintenance and upkeep of power generation units

including thermal Power Plants Combined -Cycle Power Plants Gas Turbines Hydro-

Power plants Co-generation Diesel Groups Gas Compressors

The following activities are only indicative and not exhaustive

11 SUBIYA Gas Turbine Power Plant in KOWEIT

Construction and Installation of 4 Gas Turbines GE FR 7 Open Cycle Power Plant (4x 75 MW ISO Conditions) The project was divided into Three (3) mains tasks

a- Engineering this involved the complete development of Design Drawings-Quantities-and Materiel Specifications

b- Procurement and Transportation this Task Force was responsible for the complete procurement and transportation of all material required for the construction of the project

c- Construction and installation This included the services provided by SIS as mentioned below

Provided Services

Civil Works Follow up

bull Study plans and electromechanical documents development

bull Designing and identification of required systems equipment cables pipes tools consumables etc

bull Complete Civil Works Drawings Preparation Excavation Foundation Trench

bull Erection of Turbines Generating

11

Sets (GAS Turbines Generators Accessory base Gear boxes Base Frame Alignment

bull Erection of Mechanical Auxiliary Systems

bull Electrical Systems (cable laying Main Switch Gear station service

bull Instrumentation and control panels

bull Erection of Set up Transformers

bull Interconnection with GIS

bull Testing and commissioning

bull Project Hand Over

Site Overview Erection of the Exhaust Stack

PDC Setting Auxiliary Compartment

12 SHOAIBA Steam Turbines Annual Inspection in partnership with Gulf Power International Dabbagh Group (Kingdom of Saudi Arabia)

Provided Services

Steam Turbine Annual Inspection Turbine inspection

bull Pre-Shutdown Activities

bull Unit Shutdown

bull Inspection of Boiler Air ampGas parts

bull Boiler Fuel Firing System

bull Soot-Blowers System

bull ESP System

bull Boiler Water amp Steam System

bull Main Steal System (including Aux steam sys)

bull Analyzers

bull Boiler Feed Water System

bull Main Condensate system

bull Main Turbine amp Condenser stseam side

bull Lub oil amp hydraulic Oil SystemGenerator cooling amp seal Oil System

Inspection of fuel heaters Inspection of the lube oil amp hydraulic pumps of the turbine

12

bull Electrical works

bull Corrective maintenance etc

bull Unit recommissioning and start up

bull Post outage activities (unit performance test vib MeasurementAnnual inspection report preparation and issue)

13 Major Overhaul of GE FR-7 Gas Turbine at Najran Power Plant- in partnership with Gulf Power InternationalDabbagh Group (Kingdom of Saudi Arabia) - Photo Gallery

Services provided Turbine rotor blades inspection TurbineGenerator Control System Mark 5 Troubleshooting

The services provided included

The disassembly removal cleaning visual inspection for erosion corrosion wear cracks damages etc Non Destructive Testing (NDT) inspection alignment checks dimensional checks clearances checks repair servicing maintenance complete partial replacement re-assembly installation alignment adjustment and final quality checks The works performed concerned the below listed and other parts

- Unit Major Inspection including (all Mechanical Electrical Instrumentation and Control Work)

- Unit Hot Gas Path Inspection (all Mechanical Electrical Instrumentation and Control Work)

- NDT of Compressor turbine Generator sections

- Rotor overhaul and Reblading

- Instrument and Controls Maintenance

- Transformers maintenance

- Re-assembly

- Start - up

- Performance test

- Report submittal covering all the areas and aspects of the work done by SIS during the execution the awarded contract

Setting of Turbine bearing compressor rotor inspection

13

14 Strengthening Thermal Generation Plants Capacities injected in the Interconnected Network (IN)

Services provided Measurement of Transformer Ratio

Control and Supervision of Power Generation Plant Extension in Balingueacute (Bamako) in the republic of MALI comprising 4 Diesel Groups 4x11 5 MW ISO Conditions in partnership with IDC (Tunisia)

The services carried out by SIS included

bull Approval of study documents and assembly (accomplished)

bull Factory acceptance test (accomplished)

bull Supervision and control of on-site assembly works (on-going)

bull Site acceptance test and commissioning (once the assembly works will be terminated)

On-load Tape Changer ( OLTC) Transformer Visual Control

14

Test follow up on induced voltage Induced Voltage test on HVMV Transformer

20 Electrical Transmission Network

SISrsquos Scope of activities includes but not limited to the following services

bull Studies of power system transmission network

(system modelling power flow faults analysis) using computer simulation packages

bull Update of the dynamic and static stability studies with the view of evaluating the impact of the new electric power generation and transmission installations

bull Master plans elaboration bull Short-circuits calculation bull Under frequency load shedding calculation bull Development of electrical network protection

schemes including selection of relaysrsquo types and relays coordination

bull Protection setting calculation and configuration

bull Fault analysis in transmission networks using fault recorders and simulation software packages

bull Dimensioning of surge arresters

Washing of energized high voltage insulators

15

bull Commissioning installation and operation of digital control of the HV substations

bull Preparation of technical specifications and evaluation of Bidders

Design and construction of a testing station of insulators in polluted marine industrial and desert region in Oran (Algeria)

16

30 Electrical Distribution Network

South-South Cooperation

We are proud to draw upon our experiences and expertise as a company based in an

African country to help others across Africa

ELECTRICAL DISTRIBUTION

NETWORK

17

RURAL ELECTRIFICATION- CONSTRUCTION WORKS ON A TURN KEY BASIS Pilot Rural Electrification Project based upon single-phase in RWANDA

Services provided Signature of an agreement for cooperation and technical assistance between STEG amp ELECTROGAZ

Metallic Poles delivery

The scope of works included bull Study and Diagnosis of the

existing Rwandan Power

Distribution An inventory of the

existing facilities including

generation transmission and

distribution systems was

established

bull The turnkey design engineering

procurement supply installation

construction commissioning and

start up of a pilot rural

electrification project based upon

single-phase in RWANDA

Sub-station Connection Factory Acceptance Test of AAAC Conductor and twisted cables in presence of Rwandan technicians

Electrcity supply in rwandan remote villages

Energy is an important factor for Socio-Economic Developemnt

18

40 Gas Segment

Services provided Gas Condensate Treatment Unit Pipeline On-Line Welding

SIS services cover the following scope

of activities

bull Study control and supervision of gas

projects erection works

bull Master plans elaboration regarding Gas Transmission and Distributions networks

bull Catholic Protection of gas network bull Gas and condensate treatment units

operation and maintenance related tasks

bull Gas compression stations operation and

maintenance related tasks bull Supervisory and control systems

operation and maintenance bull Gas pipelines network supervision and

remote command bull Pipeline inspection bull Steel pipes and gas delivery station

specification bull Compression stations specification and

supervision of erection works bull Gas and condensate treatment unitsrsquo

implementation commissioning and start-up

Hot Tap Achievement Gas pipeline welding connection

Topographic surveying

19

50 Laboratory-Workshop

Main Activities Rotary Furnace Inspection Surfacing High Precision Castings

General Technics Department GTD was established to perform technical assistance to all power generating units including

bull Thermal Power Plants

bull Combined Cycle Power Plants

bull Gas Turbines

bull Hydraulic Power Plants etc

GTD Mission

bull Acceptance Trial of Equipment

bull High and Mid Voltage Testing (also called dielectric strength test or Hipot Test)

bull Acoustics and Mechanical Vibration

bull Thermodynamics and Hydraulic Activities Management

bull Chemical Analysis amp Controls

bull Metallurgical amp NDT Controls

bull Workshop

NDT Magnetic Testing Turbine Speed Balancing

Analysis of gas dissolved in dielectric liquids of large transformers operation

water lubricant oil dielectric oil and liquid fuel analysis

Dielectric Laboratory Welding Work Shop

Dielectric Laboratory

bull Dielectric oil rigidity

bull Physical and Chimical Characterisics of Dielectric oil

bull Dissolved gas in Dielectric oil

bull Acceptance trials for generators transformers switch-gears

Welding Work Shop

bull Steel plate works

20

bull Heat treatment in furnace or outside

bull Surface reparing by powder spray metallisation

bull Rebabbiting of used bearing

60 Vocational Training ndash Photo Gallery

Services Provided

Practical Hands-On Training Equipment

Practical Hands-On Training electricity amp gas counter

SIS as an energy company

provides the entire scope of training

services including

bull Upgrade of training centers

bull Drawing up and delivery of

training courses

bull Training of trainers

bull Designing and monitoring of

training programs

bull End-user training organization

of seminars hands-on training

on-the-job training and

designing of training manuals

The training provided is relevant

effective structured and

continuously updated This

maintains a high level of technical

skills and procedures in a

constantly changing environment

Practical Hands-On Training works under voltage

Classroom Training on electrical maintenance related to electrical power utilities

21

enabling all staff to keep abreast of

technical innovations and

improvements together with

legislative requirements and

recommended practices

STEG Training Center (CFPK)

Since its inception in 1976 CFPKrsquos aim has been to train newly recruited STEG technicians in Generation Transmission Distribution and Gas sectors and to provide advanced training and retraining for active personnel Since then the Center has constantly expanded and adjusted in order to bull Address STEGrsquos specific requirements in vocational training in all its

sectors technical commercial financial computing management auditing new technologies etc

bull Provides a logical approach as to how to establish and assure a competent workforce by technical vocational training for now and the future

bull Provide appropriate training programs for organizations outside STEG both at national and international levels (in-house training customized courses and lectures)

22

70 Samples of Project Experience

Since 2006 SIS has undertaken many assignments in African countries Middle East and in

Tunisia It is only possible to show a small selection of these in this brochure We are always

happy to provide additional details and examples of our experience on request

71 Accomplished Projects

POWER GENERATION

No Contract Identification Unitne Installed

Capacity(MW) location Start

Date End Date

1 Annual Inspection

5 260 Rabigh SEC Saudi Arabia)

20-12-2005

30-01-2006

2 Annual Inspection 2 260

Rabigh SEC Saudi Arabia)

09-03-2006

22-04-2006

3 Annual Inspection

3 260 Rabigh SEC Saudi Arabia)

19-03-2006

29-04-2006

4 Annual Inspection

1amp4 440 Shoaiba SEC Saoudi Arabia

27-01-2007

01-03-2007

5 Annual Inspection 4 440

Shoaiba SEC Saoudi Arabia

03-03-2007

05-04-2007

6

Annual Inspection Bell seals rings amp nozzle blocks replacement ( turbine overhaul)

4 260 Rabigh SEC Saudi Arabia)

03-01-2008

07-03-2008

7 Annual Inspection 2 260

Rabigh SEC Saudi Arabia)

08-03-2008

15-04-2008

8 Major Overhaul

GT1 27 TihamaSEC Saudi Arabia

20-01-2008

10-02-2008

9

Erection and Supervision of Works 300 MW (ISO Condition) Open Cycle Power Plant Fast Emergency

GTs 1-4

4x75 ISO Conditions

Ministry of Energy

(Electricity and Water)

Sabya Power Plant

State of KOWEIT

2007- 2008

10 Commissioning CPL amp Parallel Resonant Circuit in close cooperation with AREVA

Ethiopie 2007-2008

11

Revamping of obsolete Control and instrumentation system (in close cooperation with SIEMENS)

2 Units Marocco 2008

23

No Contract Identification Unitne Installed Capacity (MW)

location Start Date

12

Commissioning of Control command system Mark VI on GTs Frame 5 (in close cooperation with GESHANAHAN Eng

GTs GE Frame 5

Algeria (Arzew) 2008

13

Grid Interconnection In close cooperation with STUDI for West African Power Pool (WAPP)

225 KV

Electricity grid interconnection

between Burkina Faso and Ghana

2008

14 Pricing Study Senegal 2008

15 Major Inspection GT6

GE-FR7

Najran SEC Saudi Arabia

2008

16 Major Inspection (MI) W501D5

Jazan SEC Saudi Arabia

2009

17 Annual Inspection 2amp3 2x393 Shoaiba SEC Saudi Arabia

2009

24

25

SISrsquoS Experiences in Boilerrsquos Maintenance Work

Power plant location Boiler tech Details ampInspections

Rades A (ST) ST STEAM TURBINE Rades B (ST)

Unit 1 Unit 2 Unit 3 Unit 4

Manufacturer Mitsubishi H I Mitsubishi H I Ansaldo Energia Ansaldo Energia Type amp Model MHI CE RR

type out-door MHI CE RR type outdoor

AE RR type outdoor

AE RR type outdoor

Date of commissioning 1983 1984 1998 1999 MCR (th) 520000 520000 5335 5335

Steam conditions Pressure SHRH(bars) 1685 352 1685 352 1739 1739 Temperature( degC) 543 543 542 542

fuel Natural gas heavy Fuel Ndeg2

Natural gas heavy Fuel Ndeg2

Natural gas heavy Fuel Ndeg2

Natural gas heavy Fuel Ndeg2

Heating area Furnace(msup2) 5105 5105 5360 5360 Reheater (msup2) 3130 3130 1286 1286 Eco (msup2) 2600 2600 1556 1556

Fuel oil Burners type amp No 20 20 Y Ndeg 12 Y Ndeg 12 FDF type amp capacity ( Th) HC 591 HC 591 HC748 HC 748 IDF type amp capacity (Th) HC 640 HC 640 NA NA GRF type amp capacity ( Th) HC 500 HC 500 HC 300 HC 300

RegenAir Preheater Type Ljungstroumlm Ljungstroumlm Ljungstroumlm Ljungstroumlm No amp capacity 2 2 2 2 Heating surface(msup2) 12000 12000 18000 18000

Annual inspection No 20 20 10 10 Starting amp Completion dates

21 Days 21 days 21 days 21 days

Major overhaul No 04 04 01 01 Starting amp Completion dates

1221038843 days 611028854 days 56 days 59 days

Boiler conservation No 20 20 08 08 Boiler Rehabilitation No 0 0 0 0 Boiler Tube Acid cleaning No 01 01 01 01 ILA(Integrity Life Assessment)No 0 0 0 0

26

SISrsquos Experiences in Boilersrsquo Maintenance Work

Power plant location Boiler tech Details ampInspections

Sousse A (ST) Sousse B (CCPP)

Unitne1 Unitne 2 Unitne1 Unitne 2

Manufacturer SGP SGP STEIN INDUSTRY STEIN INDUSTRY Type amp Model Natural circulation Natural circulation Heat Recuperator Heat Recuperator Date of commissioning 1980 1980 1995 1995 MCR (th) 515 515 HP 182 BP 415 HP 182 BP 415 Steam conditions Pressure SHRH (bar) 16038 16038 HP 72 BP 66 HP 72 BP 66

Temperature (degC) 540degC 540degC HP 511 BP 213 HP 511 BP 213 fuel FUELGAZ FUELGAZ Gaz Gaz Heating area Furnace (m2 2080 ) 2080 HP evaporator 25251 LP evaporator 18627

Reheater (m2 1512 ) 1512 HP superheater 9418 LP superheater 2328 Eco (m2 2017 ) 2017 HP economizer 16834 13773 LP economizer 3060

Fuel oil Burners Type ampNo EVT8 EVT8 FDF type amp capacity R62250 7566 m3 R62250 7566 ms 3 s

GRF type amp capacity R62250 721 m3 R62250 721 ms 3 s

Regen Air Preheater

Type No amp capacity 2 220186 Nm3h 2 220186 Nm3h

Heating surface(m2) 2x924 2x924 Annual Inspection

No annually annually annually annually Starting amp completion dates 3 - 4 weeks 3 - 4 weeks 10 days 10 days

Major Overhaul No along with annual inspectioccediln along with annual inspectioccediln

Starting amp completion dates 3 - 4 weeks 3 - 4 weeks

Boiler Conservation No 3 2 Boiler Rehabilitation No Boiler Tube Acid Cleaning No 2 2 ILA (Integrity Life Assessment) No 1

27

SISrsquos Experiences in Boilersrsquo Maintenance Work

Power plant location Boiler tech Details ampInspections Unitne1 (ST) Unitne 2 (ST) Unitne 3 (ST) Unitne 4 (ST)

Manufacturer WALTHER Type amp Model WALTHER FN10 Natural Circulation Date of commissioning 05071965 01111965 22061968 20091968 MCR (th) 112 Steam conditions

Pressure 686 bar Temperature 510 degC

fuel Heavy fuel oil Ndeg2 light fuel oil

Heating area

Furnace (m2 540 m2 ) Reheater (m2 1542 m2 ) Eco (m2 480 m2 )

Fuel oil Burners Type ampNo SONVICO 4 FDF type amp capacity Centrifugal - 27 m3s IDF type amp capacity - - - - GRF type amp capacity - - - -

Regen Air Preheater Type Static LJUNGSTROM No amp capacity 1 1 1 1 Heating surface(m2) 7350 m2 -

Annual Inspection No every year until 1998 every year until

2005 every year until 1998

every year until 2005

Starting amp completion dates - - - -

Major Overhaul No 6 8 5 5 Starting amp completion dates - - - -

Boiler Conservation No - 2 - 2 Boiler Rehabilitation No 4 6 5 5 Boiler Tube Acid Cleaning No 0 0 0 0 ILA (Integrity Life Assessment) No 0 0 0 0

28

SISrsquos Experiences in Boilersrsquo Maintenance Work Power Plant Location

Boiler Tech Details ampInspections

Ghannouch (ST) Unitne1 (ST) Unitne 2

Manufacturer Stein Industrie Stein Industrie Type amp Model Natural circulation Natural circulation Date of commissioning 1972 1972 MCR (th) 120 120 Steam conditions Pressure SHRH (th) 70 bars 70 bars

Temperature 510 degC 510 degC fuel Natural GasHeavy fuel Natural GasHeavy fuel Heating area Furnace (m2 )

Reheater (m2 8880 dmsup3 ) 8880 dmsup3 Eco (m2 2400 dmsup3 ) 2400 dmsup3

Fuel oil Burners Type ampNo PILLARD GRC PILLARD GRC IDF type amp capacity GRF type amp capacity Regen Air Preheater Type Ljunstroumlm Ljunstroumlm

No amp capacity 140msup3h 140msup3h Heating surface(m2) _ _

Annual Inspection No 1 1 Starting amp completion dates 1 week 1 week

Major Overhaul No 15ans 15ans

Starting amp completion dates 2 months 2 months

Boiler Conservation No in case of being extended in case of being extended Boiler Rehabilitation No NO NO Boiler Tube Acid Cleaning No NO NO ILA (Integrity Life Assessment) No NO NO

29

ELECTRICAL TRANSMISSION SYSTEM

Accomplished Projects

bull Tests performed on Numerical relays manufactured by - ABB (Distance protection REL 316 ) - AREVA (Distance protection EPAC MICOMP442 hellip) - ICE (Over current protection NPID 800hellip) - SIEMENS (Distance protection 7SA 511 513 522 611) - REYROLLES (Differential protection DUOBIAS)

bull Test and setting of protective relays and checking the tripping circuits for Generators and

Substations belonging to Zaouia Petroleum Refinery (Libya)

bull Short circuit calculation selectivity study of protective relays by providing solutions for the

existing issues in PEC YEMEN Networks

bull Study and improvement of the existing protective system in close cooperation with Tractebel

Engineering

bull Technical Assistance for Independent Power Producers (IPP) Plant (Carthage Power

Company (CPC) Tunisia) regarding the maintenance and testing of protective relays

related to

- Generators - Main transformers - Auxiliaries - Etc

bull Technical Assistance testing and setting of protective relays at

- Steel ndashworks (Tunisia) - Cement ndashmarker (Tunisia) - Iron industries (Tunisia) - Chemical industries (Tunisia)

bull Commissioning and setting of protective relays at substations (High Medium and Low

voltages)

bull Renovation of the obsolete equipment (relays switchgear hellip)

bull Maintenance of the transmission lines and substations equipment

bull Cost-effective solutions establishment regarding the network issues (droop voltage over

voltage improvement of power factor etc)

30

ELECTRICAL DISTRIBUTION SYSTEM

Rural Electrification- Accomplished Projects

Contract Identification

Contract No 18 Technical Assistance and implementation of a Rural electrification project based upon SWER (Single Wire Earth Return) techniques

Award date 1998 Completion date 1999 Employerrsquos Name JIRAMA (JIRO SY RANO MALAGAS) Address

149 RUE RAINANDRIAMAMPANDRY Antananarivo BP 200 - MADAGASCAR

Main Tasks Performed

bull Training on SWER System bull Data collection needed for SWER System studies and implementation bull Finalization of technical studies and submission of report including

- Technical audit of the pilot project already in place - Technical description of the project - AdviseRecommendations on equipment specifications - Recommendations on possible changes in adjustment and coordination of electrical

protections

Contract Identification

Contract No 19 RWANDA Project (Phase 1) Implementation of a Pilot Rural Electrification Project based on Single-Phase with neutral to ground called MALT System 4000 Subscribers

Award date June 2008 Completion date June 2009

Employerrsquos Name

RECO ( former ELECTROGAZ) -RWANDA

Address BP 537 KIGALI -RWANA

Main Tasks performed

bull Study and Diagnosis of the existing Rwandan Power Distribution An inventory of the existing facilities including generation transmission and distribution systems was established

bull Implementation of a pilot rural electrification project based on MALT System Visit was arranged to some Tunisian rural regions and companies manufacturing electric equipment namely

- Transformers

- Iron poles

- Concrete supports

- Electric cables

- Electronic meters and

- MV and LV line accessories

31

Contract Identification

Contract No 20 Local Electrification study of Tambacounda and Kedougou departments Award date October 2002 Completion date March 2003 Customerrsquos name SENELEC Address ELECTRICAL COMPANY SENEGAL

Main Tasks Performed

bull Data Collection bull Socio-economic survey bull Technical economic and financial analysis bull Electricity market forecast (demand forecast (2003-2015)) bull Estimation of worksrsquo costs regarding medium voltage single-phase and tri-phase lines medium

and low voltage stations low voltage lines diesel micro-stations individual photovoltaic systems bull Technical and economic study related to different methods of supply including the solar as well as

the opportunity of introducing the single-phase system for the rural electrification bull Proposition for the public lighting and the management of photovoltaic systems bull Recommendations for the reinforcement of the existing stations and the existing networks to satisfy

the future demand due to the electrification of the new villages bull Tariff and profitability study bull Set up of the geographical maps and the low voltage electrification plan of the most important

villages (34 villages) bull Recommendations on privatizing power generation energy sector

Contract Identification Contract No 21 - Rural Electrification study of 80 villages in Comoros Isles

- Preparation of Tender Documents for the supply of equipment needed to the construction of 145 km MV lines 100 km LV lines and 80 MVLV stations

- Call for tenders evaluation of Bidders Award date November 2000 Completion date Dec 2002 Customerrsquos name

Ministry of Equipment Department of Energy and Water Resources

Address Moroni Avenue of the Democratic Republic of China

Main Tasks Performed

bull Data collection and visit of the existing electric utilities bull Situation analysis and proposal of electric infrastructure management solutions bull Electricity Demand Estimation and Forecasting bull Electric Calculation (Load Repartition Line Voltage Drop Losses and Voltage Drops

Calculations Short-Circuit Calculations Simulation of the Extension and Reinforcement of the Medium Voltage Networks Power System Stability Analysis Reactive Power Compensation

bull Low Voltage Studies for the Electrification of 80 villages bull RecommendationsSuggestions for the reinforcement of power generation utilities to satisfy

the future demand (by 2010) bull Electricity Tariffing study

- Review of electricity consumption patterns - Cost review - Review of tariff policies - Application and implementation of revised tariff levels

32

Contract Identification Contract Ndeg 22 Establishment and set up of a computerized accounting and budget system

Award date 1992 Completion date 1994 Customerrsquos name SOMELEC Address Nouakchott - MAURITANIA

Main Tasks Performed

bull Analytical accounting bull Bid evaluation bull Cash flow movements management bull Fixed assets management bull Centralizing bookkeeping bull Existing computer application interfaces update bull Transposition of the existing system to the new one bull Operation and maintenance Documents preparation bull Execution of the transposition of the existing system to the new one

Contract Identification Contract

No 23 Electricity sector reform technical assistance in the interim management of the ldquoCompagnie Energie Electrique du Togo ldquo(CEET)

Award date 41997

Completion date 122000

Employerrsquos Name Ministry of Mining Equipment transmission Mail and Telecommunications

Address TOGO

Main Tasks Performed

bull Technical assistance in the interim management of the CEET within the framework of the electricity sectorrsquos liberalization 1) termination of the current CEET management 2) analysis of the existing situation 3) interim management of the CEET prior to its privatization

bull Operation and maintenance of the electrical network for Lomeacute and its surrounding rural areas bull Electricity generation in isolated centers bull Electricity transmission and distribution bull Procurement and maintenance of new diesel production units bull Reduction of energy losses bull Customer management bull Increase in the number of Customers bull Accounting and billing bull Increase in payment recovery bull Call for tenders evaluation of proposals drafting of the technical annexes concerning the contracting

for a new independent operator (concession)

33

72 On-going and Under Bidding (UB) Projects

No Project Description Country

1 Training Center Update (on-going project) Republic of Congo BRAZZAVILLE

2 Master Plan elaboration in close cooperation with STUDI (Tunisia) (on-going project)

Republic of Senegal

3 Implementation of a Rural Electrification Project based on Single-Phase Four-Wires

with Neutral to Ground called MALT System (UB) Republic of Burkina Faso

4 Cost study connections to and extensions of electricity distribution networks

(UB)

Republic of Burkina Faso

5 Works Control and supervision of rural electrification of 33 communities in 4

regions of the Republic of Cameroon (UB) Republic of CAMEROUN

34

JUDICIOUS AND EFFICIENT ENERGY UTILIZATION

IS AT THE FOREFRONT OF OUR MINDS

35

Over the year 2008 STEG International Services (SIS) has widened its scope of activities to

include techno-economic studies and assistance in energy efficiency thereby providing support

to the national energy policy aiming at considering energy auditing energy efficiency energy

saving as a major priority target in Tunisiarsquos future energy strategic plan objectives In this

regard STEG International Services has carried out several projects including but not limited to

the following

80 Energy Efficiency

bull Performing obligatory periodical energy audits for industrial installations as well as energy audits on a consultancy basis

bull Assistance on projects involving energy efficiency bull Studies on energy efficiency of circuits hydraulic and thermal systems bull Upgrading energy management systems of industrial plants

81 Co-generation (Combined Heat and Power (CHP)) Studies

The main tasks performed included

bull Feasibility studies and project implementation assistance ndash RandaTunis

bull Assistance in electric utility restructuring from self power producer (electricity generation

only) to self-producing co-generatorsndash STSBEJATunisia

bull Technical assistance related to STEGrsquos grid connection with Co-generation plants in some

industrial units -SOTIPAPIER STS T-PAP and Carthago-GRE- Tunisia

82 Energy audits and energy efficiency

In any industry the three top operating expenses are often found to be energy (both electrical

and thermal) labour and materials Energy would invariably emerge as a top ranker and thus

energy management function constitutes a strategic area for cost reduction

Energy Audit will help to better understand how energy is used in any industry and in identifying

the areas where waste can occur and where scope for improvement exists In this regard the

Energy Audit would give a positive orientation to the energy cost reduction preventive

maintenance and quality control programs which are vital to production and utility activities Such

36

an audit program will help keep focus on variations which occur in the energy costs availability

and reliability of supply of energy decide on appropriate energy mix identify energy

conservation technologies retrofit for energy conservation equipment etc

Therefore SIS can carry out comprehensive assessment of techno-economic performance of

plants and equipment against the designed performance level or the industry best practice

aiming at optimizing consumption levels along with specific operating control targets

821 Samples of accomplished and on-going Energy Auditing projects

bull Energy Audit of the Liquefied Petroleum Gas (LPG) plant located in Gabegraves (Tunisia) with the assistance of Kvaerner Heurtey in 2001

bull Energy Performance Assessment of Rades and Sousse steam and Combined Cycle Power Plants as well as Bouchemma Menzel Bourguiba Korba Gas Turbines with the assistance of TRACTABEL and EDF in 2002

bull Energy Audit of Sousse Combined Cycle Power Plant with the assistance of CRA2E in 2007-2008

bull Periodic Performance Tests of Carthage Power Company (CPC) combined cycle an Impendent Power Producer (IPP) in Tunisia

37

SIS Future Commitments and Responsibilities

Endowed with a clear vision a sound project management and solid experiences and

know-how acquired by the parent company STEG through its various trades of over 48 years

SIS has put together a team of experts inndashline with its strategic intent- to be positioned as a

competitive and pre-eminent regional energy services company by spreading its expertise and

know-how throughout the African continent Arab countries and the rest of the world working on

a partnership basis with potential consultants andor the utilities of the respective countries

resulting in a keen focus and a strong sense of purpose

As part of its vision SIS management recognizes that it has responsibilities to all of its

stakeholders These include

Shareholders SIS will protect the investments of its shareholders and will provide an acceptable return on

investments through the application of its business principles Customers SIS will aim at optimizing its business activities through winning customers and maintaining

customerrsquos loyalty by offering them high quality services at competitive prices delivering on time

and supporting them with its management expertise

Employees SIS recognizes that its working employees are the key to its success and it nurtures loyalty

teamwork and trust between them SIS will strive to protect support and involve them in the

companyrsquos future to develop their skills and to reward them in line with the corporate values of

SISrsquos organization

Partners Suppliers Contractors and all External Contacts SIS will seek to treat all its partners suppliers contractors and other external stakeholders in a

consistently professional way and to ensure that their needs are fulfilled in every way possible

38

  • 72 On-going and Under Bidding (UB) Projects

6

including the Scrubbers Have installed gas chlorinator with capacity of over 250

kg hr

PVK Engineers

Manufacturers of Air In-let and Exhaust Systems for Gas

Turbines and 3 way 4way valves for Oil and Petrochemical sectors Heavy steel

fabrication Sound attenuation Enclosures for Gas Turbines and other rotating

equipment Supplied and installed many equipment in Iraq Oman and many

African countries apart from South Asia

7

CMI ENERGY is the one of the leading manufacturers of Heat Recovery Steam Generators in the world They are known all over the world for their quality and efficiency CMI has many installations here in Saudi Arabia in some of the major power plants Country House is their service partner here in the Middle East and has executed projects of major overhaul and repair of their Boilers together with CMI here for Saudi Electricity Co Following is one of the references

8

Projects CMI HRSG Boiler inspection amp repair at PP9 Riyadh

9

ELECTRICAL POWER

Generation

Transmission

Distribution

10 Power Generation

10

SIS provides studies operation Maintenance and upkeep of power generation units

including thermal Power Plants Combined -Cycle Power Plants Gas Turbines Hydro-

Power plants Co-generation Diesel Groups Gas Compressors

The following activities are only indicative and not exhaustive

11 SUBIYA Gas Turbine Power Plant in KOWEIT

Construction and Installation of 4 Gas Turbines GE FR 7 Open Cycle Power Plant (4x 75 MW ISO Conditions) The project was divided into Three (3) mains tasks

a- Engineering this involved the complete development of Design Drawings-Quantities-and Materiel Specifications

b- Procurement and Transportation this Task Force was responsible for the complete procurement and transportation of all material required for the construction of the project

c- Construction and installation This included the services provided by SIS as mentioned below

Provided Services

Civil Works Follow up

bull Study plans and electromechanical documents development

bull Designing and identification of required systems equipment cables pipes tools consumables etc

bull Complete Civil Works Drawings Preparation Excavation Foundation Trench

bull Erection of Turbines Generating

11

Sets (GAS Turbines Generators Accessory base Gear boxes Base Frame Alignment

bull Erection of Mechanical Auxiliary Systems

bull Electrical Systems (cable laying Main Switch Gear station service

bull Instrumentation and control panels

bull Erection of Set up Transformers

bull Interconnection with GIS

bull Testing and commissioning

bull Project Hand Over

Site Overview Erection of the Exhaust Stack

PDC Setting Auxiliary Compartment

12 SHOAIBA Steam Turbines Annual Inspection in partnership with Gulf Power International Dabbagh Group (Kingdom of Saudi Arabia)

Provided Services

Steam Turbine Annual Inspection Turbine inspection

bull Pre-Shutdown Activities

bull Unit Shutdown

bull Inspection of Boiler Air ampGas parts

bull Boiler Fuel Firing System

bull Soot-Blowers System

bull ESP System

bull Boiler Water amp Steam System

bull Main Steal System (including Aux steam sys)

bull Analyzers

bull Boiler Feed Water System

bull Main Condensate system

bull Main Turbine amp Condenser stseam side

bull Lub oil amp hydraulic Oil SystemGenerator cooling amp seal Oil System

Inspection of fuel heaters Inspection of the lube oil amp hydraulic pumps of the turbine

12

bull Electrical works

bull Corrective maintenance etc

bull Unit recommissioning and start up

bull Post outage activities (unit performance test vib MeasurementAnnual inspection report preparation and issue)

13 Major Overhaul of GE FR-7 Gas Turbine at Najran Power Plant- in partnership with Gulf Power InternationalDabbagh Group (Kingdom of Saudi Arabia) - Photo Gallery

Services provided Turbine rotor blades inspection TurbineGenerator Control System Mark 5 Troubleshooting

The services provided included

The disassembly removal cleaning visual inspection for erosion corrosion wear cracks damages etc Non Destructive Testing (NDT) inspection alignment checks dimensional checks clearances checks repair servicing maintenance complete partial replacement re-assembly installation alignment adjustment and final quality checks The works performed concerned the below listed and other parts

- Unit Major Inspection including (all Mechanical Electrical Instrumentation and Control Work)

- Unit Hot Gas Path Inspection (all Mechanical Electrical Instrumentation and Control Work)

- NDT of Compressor turbine Generator sections

- Rotor overhaul and Reblading

- Instrument and Controls Maintenance

- Transformers maintenance

- Re-assembly

- Start - up

- Performance test

- Report submittal covering all the areas and aspects of the work done by SIS during the execution the awarded contract

Setting of Turbine bearing compressor rotor inspection

13

14 Strengthening Thermal Generation Plants Capacities injected in the Interconnected Network (IN)

Services provided Measurement of Transformer Ratio

Control and Supervision of Power Generation Plant Extension in Balingueacute (Bamako) in the republic of MALI comprising 4 Diesel Groups 4x11 5 MW ISO Conditions in partnership with IDC (Tunisia)

The services carried out by SIS included

bull Approval of study documents and assembly (accomplished)

bull Factory acceptance test (accomplished)

bull Supervision and control of on-site assembly works (on-going)

bull Site acceptance test and commissioning (once the assembly works will be terminated)

On-load Tape Changer ( OLTC) Transformer Visual Control

14

Test follow up on induced voltage Induced Voltage test on HVMV Transformer

20 Electrical Transmission Network

SISrsquos Scope of activities includes but not limited to the following services

bull Studies of power system transmission network

(system modelling power flow faults analysis) using computer simulation packages

bull Update of the dynamic and static stability studies with the view of evaluating the impact of the new electric power generation and transmission installations

bull Master plans elaboration bull Short-circuits calculation bull Under frequency load shedding calculation bull Development of electrical network protection

schemes including selection of relaysrsquo types and relays coordination

bull Protection setting calculation and configuration

bull Fault analysis in transmission networks using fault recorders and simulation software packages

bull Dimensioning of surge arresters

Washing of energized high voltage insulators

15

bull Commissioning installation and operation of digital control of the HV substations

bull Preparation of technical specifications and evaluation of Bidders

Design and construction of a testing station of insulators in polluted marine industrial and desert region in Oran (Algeria)

16

30 Electrical Distribution Network

South-South Cooperation

We are proud to draw upon our experiences and expertise as a company based in an

African country to help others across Africa

ELECTRICAL DISTRIBUTION

NETWORK

17

RURAL ELECTRIFICATION- CONSTRUCTION WORKS ON A TURN KEY BASIS Pilot Rural Electrification Project based upon single-phase in RWANDA

Services provided Signature of an agreement for cooperation and technical assistance between STEG amp ELECTROGAZ

Metallic Poles delivery

The scope of works included bull Study and Diagnosis of the

existing Rwandan Power

Distribution An inventory of the

existing facilities including

generation transmission and

distribution systems was

established

bull The turnkey design engineering

procurement supply installation

construction commissioning and

start up of a pilot rural

electrification project based upon

single-phase in RWANDA

Sub-station Connection Factory Acceptance Test of AAAC Conductor and twisted cables in presence of Rwandan technicians

Electrcity supply in rwandan remote villages

Energy is an important factor for Socio-Economic Developemnt

18

40 Gas Segment

Services provided Gas Condensate Treatment Unit Pipeline On-Line Welding

SIS services cover the following scope

of activities

bull Study control and supervision of gas

projects erection works

bull Master plans elaboration regarding Gas Transmission and Distributions networks

bull Catholic Protection of gas network bull Gas and condensate treatment units

operation and maintenance related tasks

bull Gas compression stations operation and

maintenance related tasks bull Supervisory and control systems

operation and maintenance bull Gas pipelines network supervision and

remote command bull Pipeline inspection bull Steel pipes and gas delivery station

specification bull Compression stations specification and

supervision of erection works bull Gas and condensate treatment unitsrsquo

implementation commissioning and start-up

Hot Tap Achievement Gas pipeline welding connection

Topographic surveying

19

50 Laboratory-Workshop

Main Activities Rotary Furnace Inspection Surfacing High Precision Castings

General Technics Department GTD was established to perform technical assistance to all power generating units including

bull Thermal Power Plants

bull Combined Cycle Power Plants

bull Gas Turbines

bull Hydraulic Power Plants etc

GTD Mission

bull Acceptance Trial of Equipment

bull High and Mid Voltage Testing (also called dielectric strength test or Hipot Test)

bull Acoustics and Mechanical Vibration

bull Thermodynamics and Hydraulic Activities Management

bull Chemical Analysis amp Controls

bull Metallurgical amp NDT Controls

bull Workshop

NDT Magnetic Testing Turbine Speed Balancing

Analysis of gas dissolved in dielectric liquids of large transformers operation

water lubricant oil dielectric oil and liquid fuel analysis

Dielectric Laboratory Welding Work Shop

Dielectric Laboratory

bull Dielectric oil rigidity

bull Physical and Chimical Characterisics of Dielectric oil

bull Dissolved gas in Dielectric oil

bull Acceptance trials for generators transformers switch-gears

Welding Work Shop

bull Steel plate works

20

bull Heat treatment in furnace or outside

bull Surface reparing by powder spray metallisation

bull Rebabbiting of used bearing

60 Vocational Training ndash Photo Gallery

Services Provided

Practical Hands-On Training Equipment

Practical Hands-On Training electricity amp gas counter

SIS as an energy company

provides the entire scope of training

services including

bull Upgrade of training centers

bull Drawing up and delivery of

training courses

bull Training of trainers

bull Designing and monitoring of

training programs

bull End-user training organization

of seminars hands-on training

on-the-job training and

designing of training manuals

The training provided is relevant

effective structured and

continuously updated This

maintains a high level of technical

skills and procedures in a

constantly changing environment

Practical Hands-On Training works under voltage

Classroom Training on electrical maintenance related to electrical power utilities

21

enabling all staff to keep abreast of

technical innovations and

improvements together with

legislative requirements and

recommended practices

STEG Training Center (CFPK)

Since its inception in 1976 CFPKrsquos aim has been to train newly recruited STEG technicians in Generation Transmission Distribution and Gas sectors and to provide advanced training and retraining for active personnel Since then the Center has constantly expanded and adjusted in order to bull Address STEGrsquos specific requirements in vocational training in all its

sectors technical commercial financial computing management auditing new technologies etc

bull Provides a logical approach as to how to establish and assure a competent workforce by technical vocational training for now and the future

bull Provide appropriate training programs for organizations outside STEG both at national and international levels (in-house training customized courses and lectures)

22

70 Samples of Project Experience

Since 2006 SIS has undertaken many assignments in African countries Middle East and in

Tunisia It is only possible to show a small selection of these in this brochure We are always

happy to provide additional details and examples of our experience on request

71 Accomplished Projects

POWER GENERATION

No Contract Identification Unitne Installed

Capacity(MW) location Start

Date End Date

1 Annual Inspection

5 260 Rabigh SEC Saudi Arabia)

20-12-2005

30-01-2006

2 Annual Inspection 2 260

Rabigh SEC Saudi Arabia)

09-03-2006

22-04-2006

3 Annual Inspection

3 260 Rabigh SEC Saudi Arabia)

19-03-2006

29-04-2006

4 Annual Inspection

1amp4 440 Shoaiba SEC Saoudi Arabia

27-01-2007

01-03-2007

5 Annual Inspection 4 440

Shoaiba SEC Saoudi Arabia

03-03-2007

05-04-2007

6

Annual Inspection Bell seals rings amp nozzle blocks replacement ( turbine overhaul)

4 260 Rabigh SEC Saudi Arabia)

03-01-2008

07-03-2008

7 Annual Inspection 2 260

Rabigh SEC Saudi Arabia)

08-03-2008

15-04-2008

8 Major Overhaul

GT1 27 TihamaSEC Saudi Arabia

20-01-2008

10-02-2008

9

Erection and Supervision of Works 300 MW (ISO Condition) Open Cycle Power Plant Fast Emergency

GTs 1-4

4x75 ISO Conditions

Ministry of Energy

(Electricity and Water)

Sabya Power Plant

State of KOWEIT

2007- 2008

10 Commissioning CPL amp Parallel Resonant Circuit in close cooperation with AREVA

Ethiopie 2007-2008

11

Revamping of obsolete Control and instrumentation system (in close cooperation with SIEMENS)

2 Units Marocco 2008

23

No Contract Identification Unitne Installed Capacity (MW)

location Start Date

12

Commissioning of Control command system Mark VI on GTs Frame 5 (in close cooperation with GESHANAHAN Eng

GTs GE Frame 5

Algeria (Arzew) 2008

13

Grid Interconnection In close cooperation with STUDI for West African Power Pool (WAPP)

225 KV

Electricity grid interconnection

between Burkina Faso and Ghana

2008

14 Pricing Study Senegal 2008

15 Major Inspection GT6

GE-FR7

Najran SEC Saudi Arabia

2008

16 Major Inspection (MI) W501D5

Jazan SEC Saudi Arabia

2009

17 Annual Inspection 2amp3 2x393 Shoaiba SEC Saudi Arabia

2009

24

25

SISrsquoS Experiences in Boilerrsquos Maintenance Work

Power plant location Boiler tech Details ampInspections

Rades A (ST) ST STEAM TURBINE Rades B (ST)

Unit 1 Unit 2 Unit 3 Unit 4

Manufacturer Mitsubishi H I Mitsubishi H I Ansaldo Energia Ansaldo Energia Type amp Model MHI CE RR

type out-door MHI CE RR type outdoor

AE RR type outdoor

AE RR type outdoor

Date of commissioning 1983 1984 1998 1999 MCR (th) 520000 520000 5335 5335

Steam conditions Pressure SHRH(bars) 1685 352 1685 352 1739 1739 Temperature( degC) 543 543 542 542

fuel Natural gas heavy Fuel Ndeg2

Natural gas heavy Fuel Ndeg2

Natural gas heavy Fuel Ndeg2

Natural gas heavy Fuel Ndeg2

Heating area Furnace(msup2) 5105 5105 5360 5360 Reheater (msup2) 3130 3130 1286 1286 Eco (msup2) 2600 2600 1556 1556

Fuel oil Burners type amp No 20 20 Y Ndeg 12 Y Ndeg 12 FDF type amp capacity ( Th) HC 591 HC 591 HC748 HC 748 IDF type amp capacity (Th) HC 640 HC 640 NA NA GRF type amp capacity ( Th) HC 500 HC 500 HC 300 HC 300

RegenAir Preheater Type Ljungstroumlm Ljungstroumlm Ljungstroumlm Ljungstroumlm No amp capacity 2 2 2 2 Heating surface(msup2) 12000 12000 18000 18000

Annual inspection No 20 20 10 10 Starting amp Completion dates

21 Days 21 days 21 days 21 days

Major overhaul No 04 04 01 01 Starting amp Completion dates

1221038843 days 611028854 days 56 days 59 days

Boiler conservation No 20 20 08 08 Boiler Rehabilitation No 0 0 0 0 Boiler Tube Acid cleaning No 01 01 01 01 ILA(Integrity Life Assessment)No 0 0 0 0

26

SISrsquos Experiences in Boilersrsquo Maintenance Work

Power plant location Boiler tech Details ampInspections

Sousse A (ST) Sousse B (CCPP)

Unitne1 Unitne 2 Unitne1 Unitne 2

Manufacturer SGP SGP STEIN INDUSTRY STEIN INDUSTRY Type amp Model Natural circulation Natural circulation Heat Recuperator Heat Recuperator Date of commissioning 1980 1980 1995 1995 MCR (th) 515 515 HP 182 BP 415 HP 182 BP 415 Steam conditions Pressure SHRH (bar) 16038 16038 HP 72 BP 66 HP 72 BP 66

Temperature (degC) 540degC 540degC HP 511 BP 213 HP 511 BP 213 fuel FUELGAZ FUELGAZ Gaz Gaz Heating area Furnace (m2 2080 ) 2080 HP evaporator 25251 LP evaporator 18627

Reheater (m2 1512 ) 1512 HP superheater 9418 LP superheater 2328 Eco (m2 2017 ) 2017 HP economizer 16834 13773 LP economizer 3060

Fuel oil Burners Type ampNo EVT8 EVT8 FDF type amp capacity R62250 7566 m3 R62250 7566 ms 3 s

GRF type amp capacity R62250 721 m3 R62250 721 ms 3 s

Regen Air Preheater

Type No amp capacity 2 220186 Nm3h 2 220186 Nm3h

Heating surface(m2) 2x924 2x924 Annual Inspection

No annually annually annually annually Starting amp completion dates 3 - 4 weeks 3 - 4 weeks 10 days 10 days

Major Overhaul No along with annual inspectioccediln along with annual inspectioccediln

Starting amp completion dates 3 - 4 weeks 3 - 4 weeks

Boiler Conservation No 3 2 Boiler Rehabilitation No Boiler Tube Acid Cleaning No 2 2 ILA (Integrity Life Assessment) No 1

27

SISrsquos Experiences in Boilersrsquo Maintenance Work

Power plant location Boiler tech Details ampInspections Unitne1 (ST) Unitne 2 (ST) Unitne 3 (ST) Unitne 4 (ST)

Manufacturer WALTHER Type amp Model WALTHER FN10 Natural Circulation Date of commissioning 05071965 01111965 22061968 20091968 MCR (th) 112 Steam conditions

Pressure 686 bar Temperature 510 degC

fuel Heavy fuel oil Ndeg2 light fuel oil

Heating area

Furnace (m2 540 m2 ) Reheater (m2 1542 m2 ) Eco (m2 480 m2 )

Fuel oil Burners Type ampNo SONVICO 4 FDF type amp capacity Centrifugal - 27 m3s IDF type amp capacity - - - - GRF type amp capacity - - - -

Regen Air Preheater Type Static LJUNGSTROM No amp capacity 1 1 1 1 Heating surface(m2) 7350 m2 -

Annual Inspection No every year until 1998 every year until

2005 every year until 1998

every year until 2005

Starting amp completion dates - - - -

Major Overhaul No 6 8 5 5 Starting amp completion dates - - - -

Boiler Conservation No - 2 - 2 Boiler Rehabilitation No 4 6 5 5 Boiler Tube Acid Cleaning No 0 0 0 0 ILA (Integrity Life Assessment) No 0 0 0 0

28

SISrsquos Experiences in Boilersrsquo Maintenance Work Power Plant Location

Boiler Tech Details ampInspections

Ghannouch (ST) Unitne1 (ST) Unitne 2

Manufacturer Stein Industrie Stein Industrie Type amp Model Natural circulation Natural circulation Date of commissioning 1972 1972 MCR (th) 120 120 Steam conditions Pressure SHRH (th) 70 bars 70 bars

Temperature 510 degC 510 degC fuel Natural GasHeavy fuel Natural GasHeavy fuel Heating area Furnace (m2 )

Reheater (m2 8880 dmsup3 ) 8880 dmsup3 Eco (m2 2400 dmsup3 ) 2400 dmsup3

Fuel oil Burners Type ampNo PILLARD GRC PILLARD GRC IDF type amp capacity GRF type amp capacity Regen Air Preheater Type Ljunstroumlm Ljunstroumlm

No amp capacity 140msup3h 140msup3h Heating surface(m2) _ _

Annual Inspection No 1 1 Starting amp completion dates 1 week 1 week

Major Overhaul No 15ans 15ans

Starting amp completion dates 2 months 2 months

Boiler Conservation No in case of being extended in case of being extended Boiler Rehabilitation No NO NO Boiler Tube Acid Cleaning No NO NO ILA (Integrity Life Assessment) No NO NO

29

ELECTRICAL TRANSMISSION SYSTEM

Accomplished Projects

bull Tests performed on Numerical relays manufactured by - ABB (Distance protection REL 316 ) - AREVA (Distance protection EPAC MICOMP442 hellip) - ICE (Over current protection NPID 800hellip) - SIEMENS (Distance protection 7SA 511 513 522 611) - REYROLLES (Differential protection DUOBIAS)

bull Test and setting of protective relays and checking the tripping circuits for Generators and

Substations belonging to Zaouia Petroleum Refinery (Libya)

bull Short circuit calculation selectivity study of protective relays by providing solutions for the

existing issues in PEC YEMEN Networks

bull Study and improvement of the existing protective system in close cooperation with Tractebel

Engineering

bull Technical Assistance for Independent Power Producers (IPP) Plant (Carthage Power

Company (CPC) Tunisia) regarding the maintenance and testing of protective relays

related to

- Generators - Main transformers - Auxiliaries - Etc

bull Technical Assistance testing and setting of protective relays at

- Steel ndashworks (Tunisia) - Cement ndashmarker (Tunisia) - Iron industries (Tunisia) - Chemical industries (Tunisia)

bull Commissioning and setting of protective relays at substations (High Medium and Low

voltages)

bull Renovation of the obsolete equipment (relays switchgear hellip)

bull Maintenance of the transmission lines and substations equipment

bull Cost-effective solutions establishment regarding the network issues (droop voltage over

voltage improvement of power factor etc)

30

ELECTRICAL DISTRIBUTION SYSTEM

Rural Electrification- Accomplished Projects

Contract Identification

Contract No 18 Technical Assistance and implementation of a Rural electrification project based upon SWER (Single Wire Earth Return) techniques

Award date 1998 Completion date 1999 Employerrsquos Name JIRAMA (JIRO SY RANO MALAGAS) Address

149 RUE RAINANDRIAMAMPANDRY Antananarivo BP 200 - MADAGASCAR

Main Tasks Performed

bull Training on SWER System bull Data collection needed for SWER System studies and implementation bull Finalization of technical studies and submission of report including

- Technical audit of the pilot project already in place - Technical description of the project - AdviseRecommendations on equipment specifications - Recommendations on possible changes in adjustment and coordination of electrical

protections

Contract Identification

Contract No 19 RWANDA Project (Phase 1) Implementation of a Pilot Rural Electrification Project based on Single-Phase with neutral to ground called MALT System 4000 Subscribers

Award date June 2008 Completion date June 2009

Employerrsquos Name

RECO ( former ELECTROGAZ) -RWANDA

Address BP 537 KIGALI -RWANA

Main Tasks performed

bull Study and Diagnosis of the existing Rwandan Power Distribution An inventory of the existing facilities including generation transmission and distribution systems was established

bull Implementation of a pilot rural electrification project based on MALT System Visit was arranged to some Tunisian rural regions and companies manufacturing electric equipment namely

- Transformers

- Iron poles

- Concrete supports

- Electric cables

- Electronic meters and

- MV and LV line accessories

31

Contract Identification

Contract No 20 Local Electrification study of Tambacounda and Kedougou departments Award date October 2002 Completion date March 2003 Customerrsquos name SENELEC Address ELECTRICAL COMPANY SENEGAL

Main Tasks Performed

bull Data Collection bull Socio-economic survey bull Technical economic and financial analysis bull Electricity market forecast (demand forecast (2003-2015)) bull Estimation of worksrsquo costs regarding medium voltage single-phase and tri-phase lines medium

and low voltage stations low voltage lines diesel micro-stations individual photovoltaic systems bull Technical and economic study related to different methods of supply including the solar as well as

the opportunity of introducing the single-phase system for the rural electrification bull Proposition for the public lighting and the management of photovoltaic systems bull Recommendations for the reinforcement of the existing stations and the existing networks to satisfy

the future demand due to the electrification of the new villages bull Tariff and profitability study bull Set up of the geographical maps and the low voltage electrification plan of the most important

villages (34 villages) bull Recommendations on privatizing power generation energy sector

Contract Identification Contract No 21 - Rural Electrification study of 80 villages in Comoros Isles

- Preparation of Tender Documents for the supply of equipment needed to the construction of 145 km MV lines 100 km LV lines and 80 MVLV stations

- Call for tenders evaluation of Bidders Award date November 2000 Completion date Dec 2002 Customerrsquos name

Ministry of Equipment Department of Energy and Water Resources

Address Moroni Avenue of the Democratic Republic of China

Main Tasks Performed

bull Data collection and visit of the existing electric utilities bull Situation analysis and proposal of electric infrastructure management solutions bull Electricity Demand Estimation and Forecasting bull Electric Calculation (Load Repartition Line Voltage Drop Losses and Voltage Drops

Calculations Short-Circuit Calculations Simulation of the Extension and Reinforcement of the Medium Voltage Networks Power System Stability Analysis Reactive Power Compensation

bull Low Voltage Studies for the Electrification of 80 villages bull RecommendationsSuggestions for the reinforcement of power generation utilities to satisfy

the future demand (by 2010) bull Electricity Tariffing study

- Review of electricity consumption patterns - Cost review - Review of tariff policies - Application and implementation of revised tariff levels

32

Contract Identification Contract Ndeg 22 Establishment and set up of a computerized accounting and budget system

Award date 1992 Completion date 1994 Customerrsquos name SOMELEC Address Nouakchott - MAURITANIA

Main Tasks Performed

bull Analytical accounting bull Bid evaluation bull Cash flow movements management bull Fixed assets management bull Centralizing bookkeeping bull Existing computer application interfaces update bull Transposition of the existing system to the new one bull Operation and maintenance Documents preparation bull Execution of the transposition of the existing system to the new one

Contract Identification Contract

No 23 Electricity sector reform technical assistance in the interim management of the ldquoCompagnie Energie Electrique du Togo ldquo(CEET)

Award date 41997

Completion date 122000

Employerrsquos Name Ministry of Mining Equipment transmission Mail and Telecommunications

Address TOGO

Main Tasks Performed

bull Technical assistance in the interim management of the CEET within the framework of the electricity sectorrsquos liberalization 1) termination of the current CEET management 2) analysis of the existing situation 3) interim management of the CEET prior to its privatization

bull Operation and maintenance of the electrical network for Lomeacute and its surrounding rural areas bull Electricity generation in isolated centers bull Electricity transmission and distribution bull Procurement and maintenance of new diesel production units bull Reduction of energy losses bull Customer management bull Increase in the number of Customers bull Accounting and billing bull Increase in payment recovery bull Call for tenders evaluation of proposals drafting of the technical annexes concerning the contracting

for a new independent operator (concession)

33

72 On-going and Under Bidding (UB) Projects

No Project Description Country

1 Training Center Update (on-going project) Republic of Congo BRAZZAVILLE

2 Master Plan elaboration in close cooperation with STUDI (Tunisia) (on-going project)

Republic of Senegal

3 Implementation of a Rural Electrification Project based on Single-Phase Four-Wires

with Neutral to Ground called MALT System (UB) Republic of Burkina Faso

4 Cost study connections to and extensions of electricity distribution networks

(UB)

Republic of Burkina Faso

5 Works Control and supervision of rural electrification of 33 communities in 4

regions of the Republic of Cameroon (UB) Republic of CAMEROUN

34

JUDICIOUS AND EFFICIENT ENERGY UTILIZATION

IS AT THE FOREFRONT OF OUR MINDS

35

Over the year 2008 STEG International Services (SIS) has widened its scope of activities to

include techno-economic studies and assistance in energy efficiency thereby providing support

to the national energy policy aiming at considering energy auditing energy efficiency energy

saving as a major priority target in Tunisiarsquos future energy strategic plan objectives In this

regard STEG International Services has carried out several projects including but not limited to

the following

80 Energy Efficiency

bull Performing obligatory periodical energy audits for industrial installations as well as energy audits on a consultancy basis

bull Assistance on projects involving energy efficiency bull Studies on energy efficiency of circuits hydraulic and thermal systems bull Upgrading energy management systems of industrial plants

81 Co-generation (Combined Heat and Power (CHP)) Studies

The main tasks performed included

bull Feasibility studies and project implementation assistance ndash RandaTunis

bull Assistance in electric utility restructuring from self power producer (electricity generation

only) to self-producing co-generatorsndash STSBEJATunisia

bull Technical assistance related to STEGrsquos grid connection with Co-generation plants in some

industrial units -SOTIPAPIER STS T-PAP and Carthago-GRE- Tunisia

82 Energy audits and energy efficiency

In any industry the three top operating expenses are often found to be energy (both electrical

and thermal) labour and materials Energy would invariably emerge as a top ranker and thus

energy management function constitutes a strategic area for cost reduction

Energy Audit will help to better understand how energy is used in any industry and in identifying

the areas where waste can occur and where scope for improvement exists In this regard the

Energy Audit would give a positive orientation to the energy cost reduction preventive

maintenance and quality control programs which are vital to production and utility activities Such

36

an audit program will help keep focus on variations which occur in the energy costs availability

and reliability of supply of energy decide on appropriate energy mix identify energy

conservation technologies retrofit for energy conservation equipment etc

Therefore SIS can carry out comprehensive assessment of techno-economic performance of

plants and equipment against the designed performance level or the industry best practice

aiming at optimizing consumption levels along with specific operating control targets

821 Samples of accomplished and on-going Energy Auditing projects

bull Energy Audit of the Liquefied Petroleum Gas (LPG) plant located in Gabegraves (Tunisia) with the assistance of Kvaerner Heurtey in 2001

bull Energy Performance Assessment of Rades and Sousse steam and Combined Cycle Power Plants as well as Bouchemma Menzel Bourguiba Korba Gas Turbines with the assistance of TRACTABEL and EDF in 2002

bull Energy Audit of Sousse Combined Cycle Power Plant with the assistance of CRA2E in 2007-2008

bull Periodic Performance Tests of Carthage Power Company (CPC) combined cycle an Impendent Power Producer (IPP) in Tunisia

37

SIS Future Commitments and Responsibilities

Endowed with a clear vision a sound project management and solid experiences and

know-how acquired by the parent company STEG through its various trades of over 48 years

SIS has put together a team of experts inndashline with its strategic intent- to be positioned as a

competitive and pre-eminent regional energy services company by spreading its expertise and

know-how throughout the African continent Arab countries and the rest of the world working on

a partnership basis with potential consultants andor the utilities of the respective countries

resulting in a keen focus and a strong sense of purpose

As part of its vision SIS management recognizes that it has responsibilities to all of its

stakeholders These include

Shareholders SIS will protect the investments of its shareholders and will provide an acceptable return on

investments through the application of its business principles Customers SIS will aim at optimizing its business activities through winning customers and maintaining

customerrsquos loyalty by offering them high quality services at competitive prices delivering on time

and supporting them with its management expertise

Employees SIS recognizes that its working employees are the key to its success and it nurtures loyalty

teamwork and trust between them SIS will strive to protect support and involve them in the

companyrsquos future to develop their skills and to reward them in line with the corporate values of

SISrsquos organization

Partners Suppliers Contractors and all External Contacts SIS will seek to treat all its partners suppliers contractors and other external stakeholders in a

consistently professional way and to ensure that their needs are fulfilled in every way possible

38

  • 72 On-going and Under Bidding (UB) Projects

7

CMI ENERGY is the one of the leading manufacturers of Heat Recovery Steam Generators in the world They are known all over the world for their quality and efficiency CMI has many installations here in Saudi Arabia in some of the major power plants Country House is their service partner here in the Middle East and has executed projects of major overhaul and repair of their Boilers together with CMI here for Saudi Electricity Co Following is one of the references

8

Projects CMI HRSG Boiler inspection amp repair at PP9 Riyadh

9

ELECTRICAL POWER

Generation

Transmission

Distribution

10 Power Generation

10

SIS provides studies operation Maintenance and upkeep of power generation units

including thermal Power Plants Combined -Cycle Power Plants Gas Turbines Hydro-

Power plants Co-generation Diesel Groups Gas Compressors

The following activities are only indicative and not exhaustive

11 SUBIYA Gas Turbine Power Plant in KOWEIT

Construction and Installation of 4 Gas Turbines GE FR 7 Open Cycle Power Plant (4x 75 MW ISO Conditions) The project was divided into Three (3) mains tasks

a- Engineering this involved the complete development of Design Drawings-Quantities-and Materiel Specifications

b- Procurement and Transportation this Task Force was responsible for the complete procurement and transportation of all material required for the construction of the project

c- Construction and installation This included the services provided by SIS as mentioned below

Provided Services

Civil Works Follow up

bull Study plans and electromechanical documents development

bull Designing and identification of required systems equipment cables pipes tools consumables etc

bull Complete Civil Works Drawings Preparation Excavation Foundation Trench

bull Erection of Turbines Generating

11

Sets (GAS Turbines Generators Accessory base Gear boxes Base Frame Alignment

bull Erection of Mechanical Auxiliary Systems

bull Electrical Systems (cable laying Main Switch Gear station service

bull Instrumentation and control panels

bull Erection of Set up Transformers

bull Interconnection with GIS

bull Testing and commissioning

bull Project Hand Over

Site Overview Erection of the Exhaust Stack

PDC Setting Auxiliary Compartment

12 SHOAIBA Steam Turbines Annual Inspection in partnership with Gulf Power International Dabbagh Group (Kingdom of Saudi Arabia)

Provided Services

Steam Turbine Annual Inspection Turbine inspection

bull Pre-Shutdown Activities

bull Unit Shutdown

bull Inspection of Boiler Air ampGas parts

bull Boiler Fuel Firing System

bull Soot-Blowers System

bull ESP System

bull Boiler Water amp Steam System

bull Main Steal System (including Aux steam sys)

bull Analyzers

bull Boiler Feed Water System

bull Main Condensate system

bull Main Turbine amp Condenser stseam side

bull Lub oil amp hydraulic Oil SystemGenerator cooling amp seal Oil System

Inspection of fuel heaters Inspection of the lube oil amp hydraulic pumps of the turbine

12

bull Electrical works

bull Corrective maintenance etc

bull Unit recommissioning and start up

bull Post outage activities (unit performance test vib MeasurementAnnual inspection report preparation and issue)

13 Major Overhaul of GE FR-7 Gas Turbine at Najran Power Plant- in partnership with Gulf Power InternationalDabbagh Group (Kingdom of Saudi Arabia) - Photo Gallery

Services provided Turbine rotor blades inspection TurbineGenerator Control System Mark 5 Troubleshooting

The services provided included

The disassembly removal cleaning visual inspection for erosion corrosion wear cracks damages etc Non Destructive Testing (NDT) inspection alignment checks dimensional checks clearances checks repair servicing maintenance complete partial replacement re-assembly installation alignment adjustment and final quality checks The works performed concerned the below listed and other parts

- Unit Major Inspection including (all Mechanical Electrical Instrumentation and Control Work)

- Unit Hot Gas Path Inspection (all Mechanical Electrical Instrumentation and Control Work)

- NDT of Compressor turbine Generator sections

- Rotor overhaul and Reblading

- Instrument and Controls Maintenance

- Transformers maintenance

- Re-assembly

- Start - up

- Performance test

- Report submittal covering all the areas and aspects of the work done by SIS during the execution the awarded contract

Setting of Turbine bearing compressor rotor inspection

13

14 Strengthening Thermal Generation Plants Capacities injected in the Interconnected Network (IN)

Services provided Measurement of Transformer Ratio

Control and Supervision of Power Generation Plant Extension in Balingueacute (Bamako) in the republic of MALI comprising 4 Diesel Groups 4x11 5 MW ISO Conditions in partnership with IDC (Tunisia)

The services carried out by SIS included

bull Approval of study documents and assembly (accomplished)

bull Factory acceptance test (accomplished)

bull Supervision and control of on-site assembly works (on-going)

bull Site acceptance test and commissioning (once the assembly works will be terminated)

On-load Tape Changer ( OLTC) Transformer Visual Control

14

Test follow up on induced voltage Induced Voltage test on HVMV Transformer

20 Electrical Transmission Network

SISrsquos Scope of activities includes but not limited to the following services

bull Studies of power system transmission network

(system modelling power flow faults analysis) using computer simulation packages

bull Update of the dynamic and static stability studies with the view of evaluating the impact of the new electric power generation and transmission installations

bull Master plans elaboration bull Short-circuits calculation bull Under frequency load shedding calculation bull Development of electrical network protection

schemes including selection of relaysrsquo types and relays coordination

bull Protection setting calculation and configuration

bull Fault analysis in transmission networks using fault recorders and simulation software packages

bull Dimensioning of surge arresters

Washing of energized high voltage insulators

15

bull Commissioning installation and operation of digital control of the HV substations

bull Preparation of technical specifications and evaluation of Bidders

Design and construction of a testing station of insulators in polluted marine industrial and desert region in Oran (Algeria)

16

30 Electrical Distribution Network

South-South Cooperation

We are proud to draw upon our experiences and expertise as a company based in an

African country to help others across Africa

ELECTRICAL DISTRIBUTION

NETWORK

17

RURAL ELECTRIFICATION- CONSTRUCTION WORKS ON A TURN KEY BASIS Pilot Rural Electrification Project based upon single-phase in RWANDA

Services provided Signature of an agreement for cooperation and technical assistance between STEG amp ELECTROGAZ

Metallic Poles delivery

The scope of works included bull Study and Diagnosis of the

existing Rwandan Power

Distribution An inventory of the

existing facilities including

generation transmission and

distribution systems was

established

bull The turnkey design engineering

procurement supply installation

construction commissioning and

start up of a pilot rural

electrification project based upon

single-phase in RWANDA

Sub-station Connection Factory Acceptance Test of AAAC Conductor and twisted cables in presence of Rwandan technicians

Electrcity supply in rwandan remote villages

Energy is an important factor for Socio-Economic Developemnt

18

40 Gas Segment

Services provided Gas Condensate Treatment Unit Pipeline On-Line Welding

SIS services cover the following scope

of activities

bull Study control and supervision of gas

projects erection works

bull Master plans elaboration regarding Gas Transmission and Distributions networks

bull Catholic Protection of gas network bull Gas and condensate treatment units

operation and maintenance related tasks

bull Gas compression stations operation and

maintenance related tasks bull Supervisory and control systems

operation and maintenance bull Gas pipelines network supervision and

remote command bull Pipeline inspection bull Steel pipes and gas delivery station

specification bull Compression stations specification and

supervision of erection works bull Gas and condensate treatment unitsrsquo

implementation commissioning and start-up

Hot Tap Achievement Gas pipeline welding connection

Topographic surveying

19

50 Laboratory-Workshop

Main Activities Rotary Furnace Inspection Surfacing High Precision Castings

General Technics Department GTD was established to perform technical assistance to all power generating units including

bull Thermal Power Plants

bull Combined Cycle Power Plants

bull Gas Turbines

bull Hydraulic Power Plants etc

GTD Mission

bull Acceptance Trial of Equipment

bull High and Mid Voltage Testing (also called dielectric strength test or Hipot Test)

bull Acoustics and Mechanical Vibration

bull Thermodynamics and Hydraulic Activities Management

bull Chemical Analysis amp Controls

bull Metallurgical amp NDT Controls

bull Workshop

NDT Magnetic Testing Turbine Speed Balancing

Analysis of gas dissolved in dielectric liquids of large transformers operation

water lubricant oil dielectric oil and liquid fuel analysis

Dielectric Laboratory Welding Work Shop

Dielectric Laboratory

bull Dielectric oil rigidity

bull Physical and Chimical Characterisics of Dielectric oil

bull Dissolved gas in Dielectric oil

bull Acceptance trials for generators transformers switch-gears

Welding Work Shop

bull Steel plate works

20

bull Heat treatment in furnace or outside

bull Surface reparing by powder spray metallisation

bull Rebabbiting of used bearing

60 Vocational Training ndash Photo Gallery

Services Provided

Practical Hands-On Training Equipment

Practical Hands-On Training electricity amp gas counter

SIS as an energy company

provides the entire scope of training

services including

bull Upgrade of training centers

bull Drawing up and delivery of

training courses

bull Training of trainers

bull Designing and monitoring of

training programs

bull End-user training organization

of seminars hands-on training

on-the-job training and

designing of training manuals

The training provided is relevant

effective structured and

continuously updated This

maintains a high level of technical

skills and procedures in a

constantly changing environment

Practical Hands-On Training works under voltage

Classroom Training on electrical maintenance related to electrical power utilities

21

enabling all staff to keep abreast of

technical innovations and

improvements together with

legislative requirements and

recommended practices

STEG Training Center (CFPK)

Since its inception in 1976 CFPKrsquos aim has been to train newly recruited STEG technicians in Generation Transmission Distribution and Gas sectors and to provide advanced training and retraining for active personnel Since then the Center has constantly expanded and adjusted in order to bull Address STEGrsquos specific requirements in vocational training in all its

sectors technical commercial financial computing management auditing new technologies etc

bull Provides a logical approach as to how to establish and assure a competent workforce by technical vocational training for now and the future

bull Provide appropriate training programs for organizations outside STEG both at national and international levels (in-house training customized courses and lectures)

22

70 Samples of Project Experience

Since 2006 SIS has undertaken many assignments in African countries Middle East and in

Tunisia It is only possible to show a small selection of these in this brochure We are always

happy to provide additional details and examples of our experience on request

71 Accomplished Projects

POWER GENERATION

No Contract Identification Unitne Installed

Capacity(MW) location Start

Date End Date

1 Annual Inspection

5 260 Rabigh SEC Saudi Arabia)

20-12-2005

30-01-2006

2 Annual Inspection 2 260

Rabigh SEC Saudi Arabia)

09-03-2006

22-04-2006

3 Annual Inspection

3 260 Rabigh SEC Saudi Arabia)

19-03-2006

29-04-2006

4 Annual Inspection

1amp4 440 Shoaiba SEC Saoudi Arabia

27-01-2007

01-03-2007

5 Annual Inspection 4 440

Shoaiba SEC Saoudi Arabia

03-03-2007

05-04-2007

6

Annual Inspection Bell seals rings amp nozzle blocks replacement ( turbine overhaul)

4 260 Rabigh SEC Saudi Arabia)

03-01-2008

07-03-2008

7 Annual Inspection 2 260

Rabigh SEC Saudi Arabia)

08-03-2008

15-04-2008

8 Major Overhaul

GT1 27 TihamaSEC Saudi Arabia

20-01-2008

10-02-2008

9

Erection and Supervision of Works 300 MW (ISO Condition) Open Cycle Power Plant Fast Emergency

GTs 1-4

4x75 ISO Conditions

Ministry of Energy

(Electricity and Water)

Sabya Power Plant

State of KOWEIT

2007- 2008

10 Commissioning CPL amp Parallel Resonant Circuit in close cooperation with AREVA

Ethiopie 2007-2008

11

Revamping of obsolete Control and instrumentation system (in close cooperation with SIEMENS)

2 Units Marocco 2008

23

No Contract Identification Unitne Installed Capacity (MW)

location Start Date

12

Commissioning of Control command system Mark VI on GTs Frame 5 (in close cooperation with GESHANAHAN Eng

GTs GE Frame 5

Algeria (Arzew) 2008

13

Grid Interconnection In close cooperation with STUDI for West African Power Pool (WAPP)

225 KV

Electricity grid interconnection

between Burkina Faso and Ghana

2008

14 Pricing Study Senegal 2008

15 Major Inspection GT6

GE-FR7

Najran SEC Saudi Arabia

2008

16 Major Inspection (MI) W501D5

Jazan SEC Saudi Arabia

2009

17 Annual Inspection 2amp3 2x393 Shoaiba SEC Saudi Arabia

2009

24

25

SISrsquoS Experiences in Boilerrsquos Maintenance Work

Power plant location Boiler tech Details ampInspections

Rades A (ST) ST STEAM TURBINE Rades B (ST)

Unit 1 Unit 2 Unit 3 Unit 4

Manufacturer Mitsubishi H I Mitsubishi H I Ansaldo Energia Ansaldo Energia Type amp Model MHI CE RR

type out-door MHI CE RR type outdoor

AE RR type outdoor

AE RR type outdoor

Date of commissioning 1983 1984 1998 1999 MCR (th) 520000 520000 5335 5335

Steam conditions Pressure SHRH(bars) 1685 352 1685 352 1739 1739 Temperature( degC) 543 543 542 542

fuel Natural gas heavy Fuel Ndeg2

Natural gas heavy Fuel Ndeg2

Natural gas heavy Fuel Ndeg2

Natural gas heavy Fuel Ndeg2

Heating area Furnace(msup2) 5105 5105 5360 5360 Reheater (msup2) 3130 3130 1286 1286 Eco (msup2) 2600 2600 1556 1556

Fuel oil Burners type amp No 20 20 Y Ndeg 12 Y Ndeg 12 FDF type amp capacity ( Th) HC 591 HC 591 HC748 HC 748 IDF type amp capacity (Th) HC 640 HC 640 NA NA GRF type amp capacity ( Th) HC 500 HC 500 HC 300 HC 300

RegenAir Preheater Type Ljungstroumlm Ljungstroumlm Ljungstroumlm Ljungstroumlm No amp capacity 2 2 2 2 Heating surface(msup2) 12000 12000 18000 18000

Annual inspection No 20 20 10 10 Starting amp Completion dates

21 Days 21 days 21 days 21 days

Major overhaul No 04 04 01 01 Starting amp Completion dates

1221038843 days 611028854 days 56 days 59 days

Boiler conservation No 20 20 08 08 Boiler Rehabilitation No 0 0 0 0 Boiler Tube Acid cleaning No 01 01 01 01 ILA(Integrity Life Assessment)No 0 0 0 0

26

SISrsquos Experiences in Boilersrsquo Maintenance Work

Power plant location Boiler tech Details ampInspections

Sousse A (ST) Sousse B (CCPP)

Unitne1 Unitne 2 Unitne1 Unitne 2

Manufacturer SGP SGP STEIN INDUSTRY STEIN INDUSTRY Type amp Model Natural circulation Natural circulation Heat Recuperator Heat Recuperator Date of commissioning 1980 1980 1995 1995 MCR (th) 515 515 HP 182 BP 415 HP 182 BP 415 Steam conditions Pressure SHRH (bar) 16038 16038 HP 72 BP 66 HP 72 BP 66

Temperature (degC) 540degC 540degC HP 511 BP 213 HP 511 BP 213 fuel FUELGAZ FUELGAZ Gaz Gaz Heating area Furnace (m2 2080 ) 2080 HP evaporator 25251 LP evaporator 18627

Reheater (m2 1512 ) 1512 HP superheater 9418 LP superheater 2328 Eco (m2 2017 ) 2017 HP economizer 16834 13773 LP economizer 3060

Fuel oil Burners Type ampNo EVT8 EVT8 FDF type amp capacity R62250 7566 m3 R62250 7566 ms 3 s

GRF type amp capacity R62250 721 m3 R62250 721 ms 3 s

Regen Air Preheater

Type No amp capacity 2 220186 Nm3h 2 220186 Nm3h

Heating surface(m2) 2x924 2x924 Annual Inspection

No annually annually annually annually Starting amp completion dates 3 - 4 weeks 3 - 4 weeks 10 days 10 days

Major Overhaul No along with annual inspectioccediln along with annual inspectioccediln

Starting amp completion dates 3 - 4 weeks 3 - 4 weeks

Boiler Conservation No 3 2 Boiler Rehabilitation No Boiler Tube Acid Cleaning No 2 2 ILA (Integrity Life Assessment) No 1

27

SISrsquos Experiences in Boilersrsquo Maintenance Work

Power plant location Boiler tech Details ampInspections Unitne1 (ST) Unitne 2 (ST) Unitne 3 (ST) Unitne 4 (ST)

Manufacturer WALTHER Type amp Model WALTHER FN10 Natural Circulation Date of commissioning 05071965 01111965 22061968 20091968 MCR (th) 112 Steam conditions

Pressure 686 bar Temperature 510 degC

fuel Heavy fuel oil Ndeg2 light fuel oil

Heating area

Furnace (m2 540 m2 ) Reheater (m2 1542 m2 ) Eco (m2 480 m2 )

Fuel oil Burners Type ampNo SONVICO 4 FDF type amp capacity Centrifugal - 27 m3s IDF type amp capacity - - - - GRF type amp capacity - - - -

Regen Air Preheater Type Static LJUNGSTROM No amp capacity 1 1 1 1 Heating surface(m2) 7350 m2 -

Annual Inspection No every year until 1998 every year until

2005 every year until 1998

every year until 2005

Starting amp completion dates - - - -

Major Overhaul No 6 8 5 5 Starting amp completion dates - - - -

Boiler Conservation No - 2 - 2 Boiler Rehabilitation No 4 6 5 5 Boiler Tube Acid Cleaning No 0 0 0 0 ILA (Integrity Life Assessment) No 0 0 0 0

28

SISrsquos Experiences in Boilersrsquo Maintenance Work Power Plant Location

Boiler Tech Details ampInspections

Ghannouch (ST) Unitne1 (ST) Unitne 2

Manufacturer Stein Industrie Stein Industrie Type amp Model Natural circulation Natural circulation Date of commissioning 1972 1972 MCR (th) 120 120 Steam conditions Pressure SHRH (th) 70 bars 70 bars

Temperature 510 degC 510 degC fuel Natural GasHeavy fuel Natural GasHeavy fuel Heating area Furnace (m2 )

Reheater (m2 8880 dmsup3 ) 8880 dmsup3 Eco (m2 2400 dmsup3 ) 2400 dmsup3

Fuel oil Burners Type ampNo PILLARD GRC PILLARD GRC IDF type amp capacity GRF type amp capacity Regen Air Preheater Type Ljunstroumlm Ljunstroumlm

No amp capacity 140msup3h 140msup3h Heating surface(m2) _ _

Annual Inspection No 1 1 Starting amp completion dates 1 week 1 week

Major Overhaul No 15ans 15ans

Starting amp completion dates 2 months 2 months

Boiler Conservation No in case of being extended in case of being extended Boiler Rehabilitation No NO NO Boiler Tube Acid Cleaning No NO NO ILA (Integrity Life Assessment) No NO NO

29

ELECTRICAL TRANSMISSION SYSTEM

Accomplished Projects

bull Tests performed on Numerical relays manufactured by - ABB (Distance protection REL 316 ) - AREVA (Distance protection EPAC MICOMP442 hellip) - ICE (Over current protection NPID 800hellip) - SIEMENS (Distance protection 7SA 511 513 522 611) - REYROLLES (Differential protection DUOBIAS)

bull Test and setting of protective relays and checking the tripping circuits for Generators and

Substations belonging to Zaouia Petroleum Refinery (Libya)

bull Short circuit calculation selectivity study of protective relays by providing solutions for the

existing issues in PEC YEMEN Networks

bull Study and improvement of the existing protective system in close cooperation with Tractebel

Engineering

bull Technical Assistance for Independent Power Producers (IPP) Plant (Carthage Power

Company (CPC) Tunisia) regarding the maintenance and testing of protective relays

related to

- Generators - Main transformers - Auxiliaries - Etc

bull Technical Assistance testing and setting of protective relays at

- Steel ndashworks (Tunisia) - Cement ndashmarker (Tunisia) - Iron industries (Tunisia) - Chemical industries (Tunisia)

bull Commissioning and setting of protective relays at substations (High Medium and Low

voltages)

bull Renovation of the obsolete equipment (relays switchgear hellip)

bull Maintenance of the transmission lines and substations equipment

bull Cost-effective solutions establishment regarding the network issues (droop voltage over

voltage improvement of power factor etc)

30

ELECTRICAL DISTRIBUTION SYSTEM

Rural Electrification- Accomplished Projects

Contract Identification

Contract No 18 Technical Assistance and implementation of a Rural electrification project based upon SWER (Single Wire Earth Return) techniques

Award date 1998 Completion date 1999 Employerrsquos Name JIRAMA (JIRO SY RANO MALAGAS) Address

149 RUE RAINANDRIAMAMPANDRY Antananarivo BP 200 - MADAGASCAR

Main Tasks Performed

bull Training on SWER System bull Data collection needed for SWER System studies and implementation bull Finalization of technical studies and submission of report including

- Technical audit of the pilot project already in place - Technical description of the project - AdviseRecommendations on equipment specifications - Recommendations on possible changes in adjustment and coordination of electrical

protections

Contract Identification

Contract No 19 RWANDA Project (Phase 1) Implementation of a Pilot Rural Electrification Project based on Single-Phase with neutral to ground called MALT System 4000 Subscribers

Award date June 2008 Completion date June 2009

Employerrsquos Name

RECO ( former ELECTROGAZ) -RWANDA

Address BP 537 KIGALI -RWANA

Main Tasks performed

bull Study and Diagnosis of the existing Rwandan Power Distribution An inventory of the existing facilities including generation transmission and distribution systems was established

bull Implementation of a pilot rural electrification project based on MALT System Visit was arranged to some Tunisian rural regions and companies manufacturing electric equipment namely

- Transformers

- Iron poles

- Concrete supports

- Electric cables

- Electronic meters and

- MV and LV line accessories

31

Contract Identification

Contract No 20 Local Electrification study of Tambacounda and Kedougou departments Award date October 2002 Completion date March 2003 Customerrsquos name SENELEC Address ELECTRICAL COMPANY SENEGAL

Main Tasks Performed

bull Data Collection bull Socio-economic survey bull Technical economic and financial analysis bull Electricity market forecast (demand forecast (2003-2015)) bull Estimation of worksrsquo costs regarding medium voltage single-phase and tri-phase lines medium

and low voltage stations low voltage lines diesel micro-stations individual photovoltaic systems bull Technical and economic study related to different methods of supply including the solar as well as

the opportunity of introducing the single-phase system for the rural electrification bull Proposition for the public lighting and the management of photovoltaic systems bull Recommendations for the reinforcement of the existing stations and the existing networks to satisfy

the future demand due to the electrification of the new villages bull Tariff and profitability study bull Set up of the geographical maps and the low voltage electrification plan of the most important

villages (34 villages) bull Recommendations on privatizing power generation energy sector

Contract Identification Contract No 21 - Rural Electrification study of 80 villages in Comoros Isles

- Preparation of Tender Documents for the supply of equipment needed to the construction of 145 km MV lines 100 km LV lines and 80 MVLV stations

- Call for tenders evaluation of Bidders Award date November 2000 Completion date Dec 2002 Customerrsquos name

Ministry of Equipment Department of Energy and Water Resources

Address Moroni Avenue of the Democratic Republic of China

Main Tasks Performed

bull Data collection and visit of the existing electric utilities bull Situation analysis and proposal of electric infrastructure management solutions bull Electricity Demand Estimation and Forecasting bull Electric Calculation (Load Repartition Line Voltage Drop Losses and Voltage Drops

Calculations Short-Circuit Calculations Simulation of the Extension and Reinforcement of the Medium Voltage Networks Power System Stability Analysis Reactive Power Compensation

bull Low Voltage Studies for the Electrification of 80 villages bull RecommendationsSuggestions for the reinforcement of power generation utilities to satisfy

the future demand (by 2010) bull Electricity Tariffing study

- Review of electricity consumption patterns - Cost review - Review of tariff policies - Application and implementation of revised tariff levels

32

Contract Identification Contract Ndeg 22 Establishment and set up of a computerized accounting and budget system

Award date 1992 Completion date 1994 Customerrsquos name SOMELEC Address Nouakchott - MAURITANIA

Main Tasks Performed

bull Analytical accounting bull Bid evaluation bull Cash flow movements management bull Fixed assets management bull Centralizing bookkeeping bull Existing computer application interfaces update bull Transposition of the existing system to the new one bull Operation and maintenance Documents preparation bull Execution of the transposition of the existing system to the new one

Contract Identification Contract

No 23 Electricity sector reform technical assistance in the interim management of the ldquoCompagnie Energie Electrique du Togo ldquo(CEET)

Award date 41997

Completion date 122000

Employerrsquos Name Ministry of Mining Equipment transmission Mail and Telecommunications

Address TOGO

Main Tasks Performed

bull Technical assistance in the interim management of the CEET within the framework of the electricity sectorrsquos liberalization 1) termination of the current CEET management 2) analysis of the existing situation 3) interim management of the CEET prior to its privatization

bull Operation and maintenance of the electrical network for Lomeacute and its surrounding rural areas bull Electricity generation in isolated centers bull Electricity transmission and distribution bull Procurement and maintenance of new diesel production units bull Reduction of energy losses bull Customer management bull Increase in the number of Customers bull Accounting and billing bull Increase in payment recovery bull Call for tenders evaluation of proposals drafting of the technical annexes concerning the contracting

for a new independent operator (concession)

33

72 On-going and Under Bidding (UB) Projects

No Project Description Country

1 Training Center Update (on-going project) Republic of Congo BRAZZAVILLE

2 Master Plan elaboration in close cooperation with STUDI (Tunisia) (on-going project)

Republic of Senegal

3 Implementation of a Rural Electrification Project based on Single-Phase Four-Wires

with Neutral to Ground called MALT System (UB) Republic of Burkina Faso

4 Cost study connections to and extensions of electricity distribution networks

(UB)

Republic of Burkina Faso

5 Works Control and supervision of rural electrification of 33 communities in 4

regions of the Republic of Cameroon (UB) Republic of CAMEROUN

34

JUDICIOUS AND EFFICIENT ENERGY UTILIZATION

IS AT THE FOREFRONT OF OUR MINDS

35

Over the year 2008 STEG International Services (SIS) has widened its scope of activities to

include techno-economic studies and assistance in energy efficiency thereby providing support

to the national energy policy aiming at considering energy auditing energy efficiency energy

saving as a major priority target in Tunisiarsquos future energy strategic plan objectives In this

regard STEG International Services has carried out several projects including but not limited to

the following

80 Energy Efficiency

bull Performing obligatory periodical energy audits for industrial installations as well as energy audits on a consultancy basis

bull Assistance on projects involving energy efficiency bull Studies on energy efficiency of circuits hydraulic and thermal systems bull Upgrading energy management systems of industrial plants

81 Co-generation (Combined Heat and Power (CHP)) Studies

The main tasks performed included

bull Feasibility studies and project implementation assistance ndash RandaTunis

bull Assistance in electric utility restructuring from self power producer (electricity generation

only) to self-producing co-generatorsndash STSBEJATunisia

bull Technical assistance related to STEGrsquos grid connection with Co-generation plants in some

industrial units -SOTIPAPIER STS T-PAP and Carthago-GRE- Tunisia

82 Energy audits and energy efficiency

In any industry the three top operating expenses are often found to be energy (both electrical

and thermal) labour and materials Energy would invariably emerge as a top ranker and thus

energy management function constitutes a strategic area for cost reduction

Energy Audit will help to better understand how energy is used in any industry and in identifying

the areas where waste can occur and where scope for improvement exists In this regard the

Energy Audit would give a positive orientation to the energy cost reduction preventive

maintenance and quality control programs which are vital to production and utility activities Such

36

an audit program will help keep focus on variations which occur in the energy costs availability

and reliability of supply of energy decide on appropriate energy mix identify energy

conservation technologies retrofit for energy conservation equipment etc

Therefore SIS can carry out comprehensive assessment of techno-economic performance of

plants and equipment against the designed performance level or the industry best practice

aiming at optimizing consumption levels along with specific operating control targets

821 Samples of accomplished and on-going Energy Auditing projects

bull Energy Audit of the Liquefied Petroleum Gas (LPG) plant located in Gabegraves (Tunisia) with the assistance of Kvaerner Heurtey in 2001

bull Energy Performance Assessment of Rades and Sousse steam and Combined Cycle Power Plants as well as Bouchemma Menzel Bourguiba Korba Gas Turbines with the assistance of TRACTABEL and EDF in 2002

bull Energy Audit of Sousse Combined Cycle Power Plant with the assistance of CRA2E in 2007-2008

bull Periodic Performance Tests of Carthage Power Company (CPC) combined cycle an Impendent Power Producer (IPP) in Tunisia

37

SIS Future Commitments and Responsibilities

Endowed with a clear vision a sound project management and solid experiences and

know-how acquired by the parent company STEG through its various trades of over 48 years

SIS has put together a team of experts inndashline with its strategic intent- to be positioned as a

competitive and pre-eminent regional energy services company by spreading its expertise and

know-how throughout the African continent Arab countries and the rest of the world working on

a partnership basis with potential consultants andor the utilities of the respective countries

resulting in a keen focus and a strong sense of purpose

As part of its vision SIS management recognizes that it has responsibilities to all of its

stakeholders These include

Shareholders SIS will protect the investments of its shareholders and will provide an acceptable return on

investments through the application of its business principles Customers SIS will aim at optimizing its business activities through winning customers and maintaining

customerrsquos loyalty by offering them high quality services at competitive prices delivering on time

and supporting them with its management expertise

Employees SIS recognizes that its working employees are the key to its success and it nurtures loyalty

teamwork and trust between them SIS will strive to protect support and involve them in the

companyrsquos future to develop their skills and to reward them in line with the corporate values of

SISrsquos organization

Partners Suppliers Contractors and all External Contacts SIS will seek to treat all its partners suppliers contractors and other external stakeholders in a

consistently professional way and to ensure that their needs are fulfilled in every way possible

38

  • 72 On-going and Under Bidding (UB) Projects

8

Projects CMI HRSG Boiler inspection amp repair at PP9 Riyadh

9

ELECTRICAL POWER

Generation

Transmission

Distribution

10 Power Generation

10

SIS provides studies operation Maintenance and upkeep of power generation units

including thermal Power Plants Combined -Cycle Power Plants Gas Turbines Hydro-

Power plants Co-generation Diesel Groups Gas Compressors

The following activities are only indicative and not exhaustive

11 SUBIYA Gas Turbine Power Plant in KOWEIT

Construction and Installation of 4 Gas Turbines GE FR 7 Open Cycle Power Plant (4x 75 MW ISO Conditions) The project was divided into Three (3) mains tasks

a- Engineering this involved the complete development of Design Drawings-Quantities-and Materiel Specifications

b- Procurement and Transportation this Task Force was responsible for the complete procurement and transportation of all material required for the construction of the project

c- Construction and installation This included the services provided by SIS as mentioned below

Provided Services

Civil Works Follow up

bull Study plans and electromechanical documents development

bull Designing and identification of required systems equipment cables pipes tools consumables etc

bull Complete Civil Works Drawings Preparation Excavation Foundation Trench

bull Erection of Turbines Generating

11

Sets (GAS Turbines Generators Accessory base Gear boxes Base Frame Alignment

bull Erection of Mechanical Auxiliary Systems

bull Electrical Systems (cable laying Main Switch Gear station service

bull Instrumentation and control panels

bull Erection of Set up Transformers

bull Interconnection with GIS

bull Testing and commissioning

bull Project Hand Over

Site Overview Erection of the Exhaust Stack

PDC Setting Auxiliary Compartment

12 SHOAIBA Steam Turbines Annual Inspection in partnership with Gulf Power International Dabbagh Group (Kingdom of Saudi Arabia)

Provided Services

Steam Turbine Annual Inspection Turbine inspection

bull Pre-Shutdown Activities

bull Unit Shutdown

bull Inspection of Boiler Air ampGas parts

bull Boiler Fuel Firing System

bull Soot-Blowers System

bull ESP System

bull Boiler Water amp Steam System

bull Main Steal System (including Aux steam sys)

bull Analyzers

bull Boiler Feed Water System

bull Main Condensate system

bull Main Turbine amp Condenser stseam side

bull Lub oil amp hydraulic Oil SystemGenerator cooling amp seal Oil System

Inspection of fuel heaters Inspection of the lube oil amp hydraulic pumps of the turbine

12

bull Electrical works

bull Corrective maintenance etc

bull Unit recommissioning and start up

bull Post outage activities (unit performance test vib MeasurementAnnual inspection report preparation and issue)

13 Major Overhaul of GE FR-7 Gas Turbine at Najran Power Plant- in partnership with Gulf Power InternationalDabbagh Group (Kingdom of Saudi Arabia) - Photo Gallery

Services provided Turbine rotor blades inspection TurbineGenerator Control System Mark 5 Troubleshooting

The services provided included

The disassembly removal cleaning visual inspection for erosion corrosion wear cracks damages etc Non Destructive Testing (NDT) inspection alignment checks dimensional checks clearances checks repair servicing maintenance complete partial replacement re-assembly installation alignment adjustment and final quality checks The works performed concerned the below listed and other parts

- Unit Major Inspection including (all Mechanical Electrical Instrumentation and Control Work)

- Unit Hot Gas Path Inspection (all Mechanical Electrical Instrumentation and Control Work)

- NDT of Compressor turbine Generator sections

- Rotor overhaul and Reblading

- Instrument and Controls Maintenance

- Transformers maintenance

- Re-assembly

- Start - up

- Performance test

- Report submittal covering all the areas and aspects of the work done by SIS during the execution the awarded contract

Setting of Turbine bearing compressor rotor inspection

13

14 Strengthening Thermal Generation Plants Capacities injected in the Interconnected Network (IN)

Services provided Measurement of Transformer Ratio

Control and Supervision of Power Generation Plant Extension in Balingueacute (Bamako) in the republic of MALI comprising 4 Diesel Groups 4x11 5 MW ISO Conditions in partnership with IDC (Tunisia)

The services carried out by SIS included

bull Approval of study documents and assembly (accomplished)

bull Factory acceptance test (accomplished)

bull Supervision and control of on-site assembly works (on-going)

bull Site acceptance test and commissioning (once the assembly works will be terminated)

On-load Tape Changer ( OLTC) Transformer Visual Control

14

Test follow up on induced voltage Induced Voltage test on HVMV Transformer

20 Electrical Transmission Network

SISrsquos Scope of activities includes but not limited to the following services

bull Studies of power system transmission network

(system modelling power flow faults analysis) using computer simulation packages

bull Update of the dynamic and static stability studies with the view of evaluating the impact of the new electric power generation and transmission installations

bull Master plans elaboration bull Short-circuits calculation bull Under frequency load shedding calculation bull Development of electrical network protection

schemes including selection of relaysrsquo types and relays coordination

bull Protection setting calculation and configuration

bull Fault analysis in transmission networks using fault recorders and simulation software packages

bull Dimensioning of surge arresters

Washing of energized high voltage insulators

15

bull Commissioning installation and operation of digital control of the HV substations

bull Preparation of technical specifications and evaluation of Bidders

Design and construction of a testing station of insulators in polluted marine industrial and desert region in Oran (Algeria)

16

30 Electrical Distribution Network

South-South Cooperation

We are proud to draw upon our experiences and expertise as a company based in an

African country to help others across Africa

ELECTRICAL DISTRIBUTION

NETWORK

17

RURAL ELECTRIFICATION- CONSTRUCTION WORKS ON A TURN KEY BASIS Pilot Rural Electrification Project based upon single-phase in RWANDA

Services provided Signature of an agreement for cooperation and technical assistance between STEG amp ELECTROGAZ

Metallic Poles delivery

The scope of works included bull Study and Diagnosis of the

existing Rwandan Power

Distribution An inventory of the

existing facilities including

generation transmission and

distribution systems was

established

bull The turnkey design engineering

procurement supply installation

construction commissioning and

start up of a pilot rural

electrification project based upon

single-phase in RWANDA

Sub-station Connection Factory Acceptance Test of AAAC Conductor and twisted cables in presence of Rwandan technicians

Electrcity supply in rwandan remote villages

Energy is an important factor for Socio-Economic Developemnt

18

40 Gas Segment

Services provided Gas Condensate Treatment Unit Pipeline On-Line Welding

SIS services cover the following scope

of activities

bull Study control and supervision of gas

projects erection works

bull Master plans elaboration regarding Gas Transmission and Distributions networks

bull Catholic Protection of gas network bull Gas and condensate treatment units

operation and maintenance related tasks

bull Gas compression stations operation and

maintenance related tasks bull Supervisory and control systems

operation and maintenance bull Gas pipelines network supervision and

remote command bull Pipeline inspection bull Steel pipes and gas delivery station

specification bull Compression stations specification and

supervision of erection works bull Gas and condensate treatment unitsrsquo

implementation commissioning and start-up

Hot Tap Achievement Gas pipeline welding connection

Topographic surveying

19

50 Laboratory-Workshop

Main Activities Rotary Furnace Inspection Surfacing High Precision Castings

General Technics Department GTD was established to perform technical assistance to all power generating units including

bull Thermal Power Plants

bull Combined Cycle Power Plants

bull Gas Turbines

bull Hydraulic Power Plants etc

GTD Mission

bull Acceptance Trial of Equipment

bull High and Mid Voltage Testing (also called dielectric strength test or Hipot Test)

bull Acoustics and Mechanical Vibration

bull Thermodynamics and Hydraulic Activities Management

bull Chemical Analysis amp Controls

bull Metallurgical amp NDT Controls

bull Workshop

NDT Magnetic Testing Turbine Speed Balancing

Analysis of gas dissolved in dielectric liquids of large transformers operation

water lubricant oil dielectric oil and liquid fuel analysis

Dielectric Laboratory Welding Work Shop

Dielectric Laboratory

bull Dielectric oil rigidity

bull Physical and Chimical Characterisics of Dielectric oil

bull Dissolved gas in Dielectric oil

bull Acceptance trials for generators transformers switch-gears

Welding Work Shop

bull Steel plate works

20

bull Heat treatment in furnace or outside

bull Surface reparing by powder spray metallisation

bull Rebabbiting of used bearing

60 Vocational Training ndash Photo Gallery

Services Provided

Practical Hands-On Training Equipment

Practical Hands-On Training electricity amp gas counter

SIS as an energy company

provides the entire scope of training

services including

bull Upgrade of training centers

bull Drawing up and delivery of

training courses

bull Training of trainers

bull Designing and monitoring of

training programs

bull End-user training organization

of seminars hands-on training

on-the-job training and

designing of training manuals

The training provided is relevant

effective structured and

continuously updated This

maintains a high level of technical

skills and procedures in a

constantly changing environment

Practical Hands-On Training works under voltage

Classroom Training on electrical maintenance related to electrical power utilities

21

enabling all staff to keep abreast of

technical innovations and

improvements together with

legislative requirements and

recommended practices

STEG Training Center (CFPK)

Since its inception in 1976 CFPKrsquos aim has been to train newly recruited STEG technicians in Generation Transmission Distribution and Gas sectors and to provide advanced training and retraining for active personnel Since then the Center has constantly expanded and adjusted in order to bull Address STEGrsquos specific requirements in vocational training in all its

sectors technical commercial financial computing management auditing new technologies etc

bull Provides a logical approach as to how to establish and assure a competent workforce by technical vocational training for now and the future

bull Provide appropriate training programs for organizations outside STEG both at national and international levels (in-house training customized courses and lectures)

22

70 Samples of Project Experience

Since 2006 SIS has undertaken many assignments in African countries Middle East and in

Tunisia It is only possible to show a small selection of these in this brochure We are always

happy to provide additional details and examples of our experience on request

71 Accomplished Projects

POWER GENERATION

No Contract Identification Unitne Installed

Capacity(MW) location Start

Date End Date

1 Annual Inspection

5 260 Rabigh SEC Saudi Arabia)

20-12-2005

30-01-2006

2 Annual Inspection 2 260

Rabigh SEC Saudi Arabia)

09-03-2006

22-04-2006

3 Annual Inspection

3 260 Rabigh SEC Saudi Arabia)

19-03-2006

29-04-2006

4 Annual Inspection

1amp4 440 Shoaiba SEC Saoudi Arabia

27-01-2007

01-03-2007

5 Annual Inspection 4 440

Shoaiba SEC Saoudi Arabia

03-03-2007

05-04-2007

6

Annual Inspection Bell seals rings amp nozzle blocks replacement ( turbine overhaul)

4 260 Rabigh SEC Saudi Arabia)

03-01-2008

07-03-2008

7 Annual Inspection 2 260

Rabigh SEC Saudi Arabia)

08-03-2008

15-04-2008

8 Major Overhaul

GT1 27 TihamaSEC Saudi Arabia

20-01-2008

10-02-2008

9

Erection and Supervision of Works 300 MW (ISO Condition) Open Cycle Power Plant Fast Emergency

GTs 1-4

4x75 ISO Conditions

Ministry of Energy

(Electricity and Water)

Sabya Power Plant

State of KOWEIT

2007- 2008

10 Commissioning CPL amp Parallel Resonant Circuit in close cooperation with AREVA

Ethiopie 2007-2008

11

Revamping of obsolete Control and instrumentation system (in close cooperation with SIEMENS)

2 Units Marocco 2008

23

No Contract Identification Unitne Installed Capacity (MW)

location Start Date

12

Commissioning of Control command system Mark VI on GTs Frame 5 (in close cooperation with GESHANAHAN Eng

GTs GE Frame 5

Algeria (Arzew) 2008

13

Grid Interconnection In close cooperation with STUDI for West African Power Pool (WAPP)

225 KV

Electricity grid interconnection

between Burkina Faso and Ghana

2008

14 Pricing Study Senegal 2008

15 Major Inspection GT6

GE-FR7

Najran SEC Saudi Arabia

2008

16 Major Inspection (MI) W501D5

Jazan SEC Saudi Arabia

2009

17 Annual Inspection 2amp3 2x393 Shoaiba SEC Saudi Arabia

2009

24

25

SISrsquoS Experiences in Boilerrsquos Maintenance Work

Power plant location Boiler tech Details ampInspections

Rades A (ST) ST STEAM TURBINE Rades B (ST)

Unit 1 Unit 2 Unit 3 Unit 4

Manufacturer Mitsubishi H I Mitsubishi H I Ansaldo Energia Ansaldo Energia Type amp Model MHI CE RR

type out-door MHI CE RR type outdoor

AE RR type outdoor

AE RR type outdoor

Date of commissioning 1983 1984 1998 1999 MCR (th) 520000 520000 5335 5335

Steam conditions Pressure SHRH(bars) 1685 352 1685 352 1739 1739 Temperature( degC) 543 543 542 542

fuel Natural gas heavy Fuel Ndeg2

Natural gas heavy Fuel Ndeg2

Natural gas heavy Fuel Ndeg2

Natural gas heavy Fuel Ndeg2

Heating area Furnace(msup2) 5105 5105 5360 5360 Reheater (msup2) 3130 3130 1286 1286 Eco (msup2) 2600 2600 1556 1556

Fuel oil Burners type amp No 20 20 Y Ndeg 12 Y Ndeg 12 FDF type amp capacity ( Th) HC 591 HC 591 HC748 HC 748 IDF type amp capacity (Th) HC 640 HC 640 NA NA GRF type amp capacity ( Th) HC 500 HC 500 HC 300 HC 300

RegenAir Preheater Type Ljungstroumlm Ljungstroumlm Ljungstroumlm Ljungstroumlm No amp capacity 2 2 2 2 Heating surface(msup2) 12000 12000 18000 18000

Annual inspection No 20 20 10 10 Starting amp Completion dates

21 Days 21 days 21 days 21 days

Major overhaul No 04 04 01 01 Starting amp Completion dates

1221038843 days 611028854 days 56 days 59 days

Boiler conservation No 20 20 08 08 Boiler Rehabilitation No 0 0 0 0 Boiler Tube Acid cleaning No 01 01 01 01 ILA(Integrity Life Assessment)No 0 0 0 0

26

SISrsquos Experiences in Boilersrsquo Maintenance Work

Power plant location Boiler tech Details ampInspections

Sousse A (ST) Sousse B (CCPP)

Unitne1 Unitne 2 Unitne1 Unitne 2

Manufacturer SGP SGP STEIN INDUSTRY STEIN INDUSTRY Type amp Model Natural circulation Natural circulation Heat Recuperator Heat Recuperator Date of commissioning 1980 1980 1995 1995 MCR (th) 515 515 HP 182 BP 415 HP 182 BP 415 Steam conditions Pressure SHRH (bar) 16038 16038 HP 72 BP 66 HP 72 BP 66

Temperature (degC) 540degC 540degC HP 511 BP 213 HP 511 BP 213 fuel FUELGAZ FUELGAZ Gaz Gaz Heating area Furnace (m2 2080 ) 2080 HP evaporator 25251 LP evaporator 18627

Reheater (m2 1512 ) 1512 HP superheater 9418 LP superheater 2328 Eco (m2 2017 ) 2017 HP economizer 16834 13773 LP economizer 3060

Fuel oil Burners Type ampNo EVT8 EVT8 FDF type amp capacity R62250 7566 m3 R62250 7566 ms 3 s

GRF type amp capacity R62250 721 m3 R62250 721 ms 3 s

Regen Air Preheater

Type No amp capacity 2 220186 Nm3h 2 220186 Nm3h

Heating surface(m2) 2x924 2x924 Annual Inspection

No annually annually annually annually Starting amp completion dates 3 - 4 weeks 3 - 4 weeks 10 days 10 days

Major Overhaul No along with annual inspectioccediln along with annual inspectioccediln

Starting amp completion dates 3 - 4 weeks 3 - 4 weeks

Boiler Conservation No 3 2 Boiler Rehabilitation No Boiler Tube Acid Cleaning No 2 2 ILA (Integrity Life Assessment) No 1

27

SISrsquos Experiences in Boilersrsquo Maintenance Work

Power plant location Boiler tech Details ampInspections Unitne1 (ST) Unitne 2 (ST) Unitne 3 (ST) Unitne 4 (ST)

Manufacturer WALTHER Type amp Model WALTHER FN10 Natural Circulation Date of commissioning 05071965 01111965 22061968 20091968 MCR (th) 112 Steam conditions

Pressure 686 bar Temperature 510 degC

fuel Heavy fuel oil Ndeg2 light fuel oil

Heating area

Furnace (m2 540 m2 ) Reheater (m2 1542 m2 ) Eco (m2 480 m2 )

Fuel oil Burners Type ampNo SONVICO 4 FDF type amp capacity Centrifugal - 27 m3s IDF type amp capacity - - - - GRF type amp capacity - - - -

Regen Air Preheater Type Static LJUNGSTROM No amp capacity 1 1 1 1 Heating surface(m2) 7350 m2 -

Annual Inspection No every year until 1998 every year until

2005 every year until 1998

every year until 2005

Starting amp completion dates - - - -

Major Overhaul No 6 8 5 5 Starting amp completion dates - - - -

Boiler Conservation No - 2 - 2 Boiler Rehabilitation No 4 6 5 5 Boiler Tube Acid Cleaning No 0 0 0 0 ILA (Integrity Life Assessment) No 0 0 0 0

28

SISrsquos Experiences in Boilersrsquo Maintenance Work Power Plant Location

Boiler Tech Details ampInspections

Ghannouch (ST) Unitne1 (ST) Unitne 2

Manufacturer Stein Industrie Stein Industrie Type amp Model Natural circulation Natural circulation Date of commissioning 1972 1972 MCR (th) 120 120 Steam conditions Pressure SHRH (th) 70 bars 70 bars

Temperature 510 degC 510 degC fuel Natural GasHeavy fuel Natural GasHeavy fuel Heating area Furnace (m2 )

Reheater (m2 8880 dmsup3 ) 8880 dmsup3 Eco (m2 2400 dmsup3 ) 2400 dmsup3

Fuel oil Burners Type ampNo PILLARD GRC PILLARD GRC IDF type amp capacity GRF type amp capacity Regen Air Preheater Type Ljunstroumlm Ljunstroumlm

No amp capacity 140msup3h 140msup3h Heating surface(m2) _ _

Annual Inspection No 1 1 Starting amp completion dates 1 week 1 week

Major Overhaul No 15ans 15ans

Starting amp completion dates 2 months 2 months

Boiler Conservation No in case of being extended in case of being extended Boiler Rehabilitation No NO NO Boiler Tube Acid Cleaning No NO NO ILA (Integrity Life Assessment) No NO NO

29

ELECTRICAL TRANSMISSION SYSTEM

Accomplished Projects

bull Tests performed on Numerical relays manufactured by - ABB (Distance protection REL 316 ) - AREVA (Distance protection EPAC MICOMP442 hellip) - ICE (Over current protection NPID 800hellip) - SIEMENS (Distance protection 7SA 511 513 522 611) - REYROLLES (Differential protection DUOBIAS)

bull Test and setting of protective relays and checking the tripping circuits for Generators and

Substations belonging to Zaouia Petroleum Refinery (Libya)

bull Short circuit calculation selectivity study of protective relays by providing solutions for the

existing issues in PEC YEMEN Networks

bull Study and improvement of the existing protective system in close cooperation with Tractebel

Engineering

bull Technical Assistance for Independent Power Producers (IPP) Plant (Carthage Power

Company (CPC) Tunisia) regarding the maintenance and testing of protective relays

related to

- Generators - Main transformers - Auxiliaries - Etc

bull Technical Assistance testing and setting of protective relays at

- Steel ndashworks (Tunisia) - Cement ndashmarker (Tunisia) - Iron industries (Tunisia) - Chemical industries (Tunisia)

bull Commissioning and setting of protective relays at substations (High Medium and Low

voltages)

bull Renovation of the obsolete equipment (relays switchgear hellip)

bull Maintenance of the transmission lines and substations equipment

bull Cost-effective solutions establishment regarding the network issues (droop voltage over

voltage improvement of power factor etc)

30

ELECTRICAL DISTRIBUTION SYSTEM

Rural Electrification- Accomplished Projects

Contract Identification

Contract No 18 Technical Assistance and implementation of a Rural electrification project based upon SWER (Single Wire Earth Return) techniques

Award date 1998 Completion date 1999 Employerrsquos Name JIRAMA (JIRO SY RANO MALAGAS) Address

149 RUE RAINANDRIAMAMPANDRY Antananarivo BP 200 - MADAGASCAR

Main Tasks Performed

bull Training on SWER System bull Data collection needed for SWER System studies and implementation bull Finalization of technical studies and submission of report including

- Technical audit of the pilot project already in place - Technical description of the project - AdviseRecommendations on equipment specifications - Recommendations on possible changes in adjustment and coordination of electrical

protections

Contract Identification

Contract No 19 RWANDA Project (Phase 1) Implementation of a Pilot Rural Electrification Project based on Single-Phase with neutral to ground called MALT System 4000 Subscribers

Award date June 2008 Completion date June 2009

Employerrsquos Name

RECO ( former ELECTROGAZ) -RWANDA

Address BP 537 KIGALI -RWANA

Main Tasks performed

bull Study and Diagnosis of the existing Rwandan Power Distribution An inventory of the existing facilities including generation transmission and distribution systems was established

bull Implementation of a pilot rural electrification project based on MALT System Visit was arranged to some Tunisian rural regions and companies manufacturing electric equipment namely

- Transformers

- Iron poles

- Concrete supports

- Electric cables

- Electronic meters and

- MV and LV line accessories

31

Contract Identification

Contract No 20 Local Electrification study of Tambacounda and Kedougou departments Award date October 2002 Completion date March 2003 Customerrsquos name SENELEC Address ELECTRICAL COMPANY SENEGAL

Main Tasks Performed

bull Data Collection bull Socio-economic survey bull Technical economic and financial analysis bull Electricity market forecast (demand forecast (2003-2015)) bull Estimation of worksrsquo costs regarding medium voltage single-phase and tri-phase lines medium

and low voltage stations low voltage lines diesel micro-stations individual photovoltaic systems bull Technical and economic study related to different methods of supply including the solar as well as

the opportunity of introducing the single-phase system for the rural electrification bull Proposition for the public lighting and the management of photovoltaic systems bull Recommendations for the reinforcement of the existing stations and the existing networks to satisfy

the future demand due to the electrification of the new villages bull Tariff and profitability study bull Set up of the geographical maps and the low voltage electrification plan of the most important

villages (34 villages) bull Recommendations on privatizing power generation energy sector

Contract Identification Contract No 21 - Rural Electrification study of 80 villages in Comoros Isles

- Preparation of Tender Documents for the supply of equipment needed to the construction of 145 km MV lines 100 km LV lines and 80 MVLV stations

- Call for tenders evaluation of Bidders Award date November 2000 Completion date Dec 2002 Customerrsquos name

Ministry of Equipment Department of Energy and Water Resources

Address Moroni Avenue of the Democratic Republic of China

Main Tasks Performed

bull Data collection and visit of the existing electric utilities bull Situation analysis and proposal of electric infrastructure management solutions bull Electricity Demand Estimation and Forecasting bull Electric Calculation (Load Repartition Line Voltage Drop Losses and Voltage Drops

Calculations Short-Circuit Calculations Simulation of the Extension and Reinforcement of the Medium Voltage Networks Power System Stability Analysis Reactive Power Compensation

bull Low Voltage Studies for the Electrification of 80 villages bull RecommendationsSuggestions for the reinforcement of power generation utilities to satisfy

the future demand (by 2010) bull Electricity Tariffing study

- Review of electricity consumption patterns - Cost review - Review of tariff policies - Application and implementation of revised tariff levels

32

Contract Identification Contract Ndeg 22 Establishment and set up of a computerized accounting and budget system

Award date 1992 Completion date 1994 Customerrsquos name SOMELEC Address Nouakchott - MAURITANIA

Main Tasks Performed

bull Analytical accounting bull Bid evaluation bull Cash flow movements management bull Fixed assets management bull Centralizing bookkeeping bull Existing computer application interfaces update bull Transposition of the existing system to the new one bull Operation and maintenance Documents preparation bull Execution of the transposition of the existing system to the new one

Contract Identification Contract

No 23 Electricity sector reform technical assistance in the interim management of the ldquoCompagnie Energie Electrique du Togo ldquo(CEET)

Award date 41997

Completion date 122000

Employerrsquos Name Ministry of Mining Equipment transmission Mail and Telecommunications

Address TOGO

Main Tasks Performed

bull Technical assistance in the interim management of the CEET within the framework of the electricity sectorrsquos liberalization 1) termination of the current CEET management 2) analysis of the existing situation 3) interim management of the CEET prior to its privatization

bull Operation and maintenance of the electrical network for Lomeacute and its surrounding rural areas bull Electricity generation in isolated centers bull Electricity transmission and distribution bull Procurement and maintenance of new diesel production units bull Reduction of energy losses bull Customer management bull Increase in the number of Customers bull Accounting and billing bull Increase in payment recovery bull Call for tenders evaluation of proposals drafting of the technical annexes concerning the contracting

for a new independent operator (concession)

33

72 On-going and Under Bidding (UB) Projects

No Project Description Country

1 Training Center Update (on-going project) Republic of Congo BRAZZAVILLE

2 Master Plan elaboration in close cooperation with STUDI (Tunisia) (on-going project)

Republic of Senegal

3 Implementation of a Rural Electrification Project based on Single-Phase Four-Wires

with Neutral to Ground called MALT System (UB) Republic of Burkina Faso

4 Cost study connections to and extensions of electricity distribution networks

(UB)

Republic of Burkina Faso

5 Works Control and supervision of rural electrification of 33 communities in 4

regions of the Republic of Cameroon (UB) Republic of CAMEROUN

34

JUDICIOUS AND EFFICIENT ENERGY UTILIZATION

IS AT THE FOREFRONT OF OUR MINDS

35

Over the year 2008 STEG International Services (SIS) has widened its scope of activities to

include techno-economic studies and assistance in energy efficiency thereby providing support

to the national energy policy aiming at considering energy auditing energy efficiency energy

saving as a major priority target in Tunisiarsquos future energy strategic plan objectives In this

regard STEG International Services has carried out several projects including but not limited to

the following

80 Energy Efficiency

bull Performing obligatory periodical energy audits for industrial installations as well as energy audits on a consultancy basis

bull Assistance on projects involving energy efficiency bull Studies on energy efficiency of circuits hydraulic and thermal systems bull Upgrading energy management systems of industrial plants

81 Co-generation (Combined Heat and Power (CHP)) Studies

The main tasks performed included

bull Feasibility studies and project implementation assistance ndash RandaTunis

bull Assistance in electric utility restructuring from self power producer (electricity generation

only) to self-producing co-generatorsndash STSBEJATunisia

bull Technical assistance related to STEGrsquos grid connection with Co-generation plants in some

industrial units -SOTIPAPIER STS T-PAP and Carthago-GRE- Tunisia

82 Energy audits and energy efficiency

In any industry the three top operating expenses are often found to be energy (both electrical

and thermal) labour and materials Energy would invariably emerge as a top ranker and thus

energy management function constitutes a strategic area for cost reduction

Energy Audit will help to better understand how energy is used in any industry and in identifying

the areas where waste can occur and where scope for improvement exists In this regard the

Energy Audit would give a positive orientation to the energy cost reduction preventive

maintenance and quality control programs which are vital to production and utility activities Such

36

an audit program will help keep focus on variations which occur in the energy costs availability

and reliability of supply of energy decide on appropriate energy mix identify energy

conservation technologies retrofit for energy conservation equipment etc

Therefore SIS can carry out comprehensive assessment of techno-economic performance of

plants and equipment against the designed performance level or the industry best practice

aiming at optimizing consumption levels along with specific operating control targets

821 Samples of accomplished and on-going Energy Auditing projects

bull Energy Audit of the Liquefied Petroleum Gas (LPG) plant located in Gabegraves (Tunisia) with the assistance of Kvaerner Heurtey in 2001

bull Energy Performance Assessment of Rades and Sousse steam and Combined Cycle Power Plants as well as Bouchemma Menzel Bourguiba Korba Gas Turbines with the assistance of TRACTABEL and EDF in 2002

bull Energy Audit of Sousse Combined Cycle Power Plant with the assistance of CRA2E in 2007-2008

bull Periodic Performance Tests of Carthage Power Company (CPC) combined cycle an Impendent Power Producer (IPP) in Tunisia

37

SIS Future Commitments and Responsibilities

Endowed with a clear vision a sound project management and solid experiences and

know-how acquired by the parent company STEG through its various trades of over 48 years

SIS has put together a team of experts inndashline with its strategic intent- to be positioned as a

competitive and pre-eminent regional energy services company by spreading its expertise and

know-how throughout the African continent Arab countries and the rest of the world working on

a partnership basis with potential consultants andor the utilities of the respective countries

resulting in a keen focus and a strong sense of purpose

As part of its vision SIS management recognizes that it has responsibilities to all of its

stakeholders These include

Shareholders SIS will protect the investments of its shareholders and will provide an acceptable return on

investments through the application of its business principles Customers SIS will aim at optimizing its business activities through winning customers and maintaining

customerrsquos loyalty by offering them high quality services at competitive prices delivering on time

and supporting them with its management expertise

Employees SIS recognizes that its working employees are the key to its success and it nurtures loyalty

teamwork and trust between them SIS will strive to protect support and involve them in the

companyrsquos future to develop their skills and to reward them in line with the corporate values of

SISrsquos organization

Partners Suppliers Contractors and all External Contacts SIS will seek to treat all its partners suppliers contractors and other external stakeholders in a

consistently professional way and to ensure that their needs are fulfilled in every way possible

38

  • 72 On-going and Under Bidding (UB) Projects

9

ELECTRICAL POWER

Generation

Transmission

Distribution

10 Power Generation

10

SIS provides studies operation Maintenance and upkeep of power generation units

including thermal Power Plants Combined -Cycle Power Plants Gas Turbines Hydro-

Power plants Co-generation Diesel Groups Gas Compressors

The following activities are only indicative and not exhaustive

11 SUBIYA Gas Turbine Power Plant in KOWEIT

Construction and Installation of 4 Gas Turbines GE FR 7 Open Cycle Power Plant (4x 75 MW ISO Conditions) The project was divided into Three (3) mains tasks

a- Engineering this involved the complete development of Design Drawings-Quantities-and Materiel Specifications

b- Procurement and Transportation this Task Force was responsible for the complete procurement and transportation of all material required for the construction of the project

c- Construction and installation This included the services provided by SIS as mentioned below

Provided Services

Civil Works Follow up

bull Study plans and electromechanical documents development

bull Designing and identification of required systems equipment cables pipes tools consumables etc

bull Complete Civil Works Drawings Preparation Excavation Foundation Trench

bull Erection of Turbines Generating

11

Sets (GAS Turbines Generators Accessory base Gear boxes Base Frame Alignment

bull Erection of Mechanical Auxiliary Systems

bull Electrical Systems (cable laying Main Switch Gear station service

bull Instrumentation and control panels

bull Erection of Set up Transformers

bull Interconnection with GIS

bull Testing and commissioning

bull Project Hand Over

Site Overview Erection of the Exhaust Stack

PDC Setting Auxiliary Compartment

12 SHOAIBA Steam Turbines Annual Inspection in partnership with Gulf Power International Dabbagh Group (Kingdom of Saudi Arabia)

Provided Services

Steam Turbine Annual Inspection Turbine inspection

bull Pre-Shutdown Activities

bull Unit Shutdown

bull Inspection of Boiler Air ampGas parts

bull Boiler Fuel Firing System

bull Soot-Blowers System

bull ESP System

bull Boiler Water amp Steam System

bull Main Steal System (including Aux steam sys)

bull Analyzers

bull Boiler Feed Water System

bull Main Condensate system

bull Main Turbine amp Condenser stseam side

bull Lub oil amp hydraulic Oil SystemGenerator cooling amp seal Oil System

Inspection of fuel heaters Inspection of the lube oil amp hydraulic pumps of the turbine

12

bull Electrical works

bull Corrective maintenance etc

bull Unit recommissioning and start up

bull Post outage activities (unit performance test vib MeasurementAnnual inspection report preparation and issue)

13 Major Overhaul of GE FR-7 Gas Turbine at Najran Power Plant- in partnership with Gulf Power InternationalDabbagh Group (Kingdom of Saudi Arabia) - Photo Gallery

Services provided Turbine rotor blades inspection TurbineGenerator Control System Mark 5 Troubleshooting

The services provided included

The disassembly removal cleaning visual inspection for erosion corrosion wear cracks damages etc Non Destructive Testing (NDT) inspection alignment checks dimensional checks clearances checks repair servicing maintenance complete partial replacement re-assembly installation alignment adjustment and final quality checks The works performed concerned the below listed and other parts

- Unit Major Inspection including (all Mechanical Electrical Instrumentation and Control Work)

- Unit Hot Gas Path Inspection (all Mechanical Electrical Instrumentation and Control Work)

- NDT of Compressor turbine Generator sections

- Rotor overhaul and Reblading

- Instrument and Controls Maintenance

- Transformers maintenance

- Re-assembly

- Start - up

- Performance test

- Report submittal covering all the areas and aspects of the work done by SIS during the execution the awarded contract

Setting of Turbine bearing compressor rotor inspection

13

14 Strengthening Thermal Generation Plants Capacities injected in the Interconnected Network (IN)

Services provided Measurement of Transformer Ratio

Control and Supervision of Power Generation Plant Extension in Balingueacute (Bamako) in the republic of MALI comprising 4 Diesel Groups 4x11 5 MW ISO Conditions in partnership with IDC (Tunisia)

The services carried out by SIS included

bull Approval of study documents and assembly (accomplished)

bull Factory acceptance test (accomplished)

bull Supervision and control of on-site assembly works (on-going)

bull Site acceptance test and commissioning (once the assembly works will be terminated)

On-load Tape Changer ( OLTC) Transformer Visual Control

14

Test follow up on induced voltage Induced Voltage test on HVMV Transformer

20 Electrical Transmission Network

SISrsquos Scope of activities includes but not limited to the following services

bull Studies of power system transmission network

(system modelling power flow faults analysis) using computer simulation packages

bull Update of the dynamic and static stability studies with the view of evaluating the impact of the new electric power generation and transmission installations

bull Master plans elaboration bull Short-circuits calculation bull Under frequency load shedding calculation bull Development of electrical network protection

schemes including selection of relaysrsquo types and relays coordination

bull Protection setting calculation and configuration

bull Fault analysis in transmission networks using fault recorders and simulation software packages

bull Dimensioning of surge arresters

Washing of energized high voltage insulators

15

bull Commissioning installation and operation of digital control of the HV substations

bull Preparation of technical specifications and evaluation of Bidders

Design and construction of a testing station of insulators in polluted marine industrial and desert region in Oran (Algeria)

16

30 Electrical Distribution Network

South-South Cooperation

We are proud to draw upon our experiences and expertise as a company based in an

African country to help others across Africa

ELECTRICAL DISTRIBUTION

NETWORK

17

RURAL ELECTRIFICATION- CONSTRUCTION WORKS ON A TURN KEY BASIS Pilot Rural Electrification Project based upon single-phase in RWANDA

Services provided Signature of an agreement for cooperation and technical assistance between STEG amp ELECTROGAZ

Metallic Poles delivery

The scope of works included bull Study and Diagnosis of the

existing Rwandan Power

Distribution An inventory of the

existing facilities including

generation transmission and

distribution systems was

established

bull The turnkey design engineering

procurement supply installation

construction commissioning and

start up of a pilot rural

electrification project based upon

single-phase in RWANDA

Sub-station Connection Factory Acceptance Test of AAAC Conductor and twisted cables in presence of Rwandan technicians

Electrcity supply in rwandan remote villages

Energy is an important factor for Socio-Economic Developemnt

18

40 Gas Segment

Services provided Gas Condensate Treatment Unit Pipeline On-Line Welding

SIS services cover the following scope

of activities

bull Study control and supervision of gas

projects erection works

bull Master plans elaboration regarding Gas Transmission and Distributions networks

bull Catholic Protection of gas network bull Gas and condensate treatment units

operation and maintenance related tasks

bull Gas compression stations operation and

maintenance related tasks bull Supervisory and control systems

operation and maintenance bull Gas pipelines network supervision and

remote command bull Pipeline inspection bull Steel pipes and gas delivery station

specification bull Compression stations specification and

supervision of erection works bull Gas and condensate treatment unitsrsquo

implementation commissioning and start-up

Hot Tap Achievement Gas pipeline welding connection

Topographic surveying

19

50 Laboratory-Workshop

Main Activities Rotary Furnace Inspection Surfacing High Precision Castings

General Technics Department GTD was established to perform technical assistance to all power generating units including

bull Thermal Power Plants

bull Combined Cycle Power Plants

bull Gas Turbines

bull Hydraulic Power Plants etc

GTD Mission

bull Acceptance Trial of Equipment

bull High and Mid Voltage Testing (also called dielectric strength test or Hipot Test)

bull Acoustics and Mechanical Vibration

bull Thermodynamics and Hydraulic Activities Management

bull Chemical Analysis amp Controls

bull Metallurgical amp NDT Controls

bull Workshop

NDT Magnetic Testing Turbine Speed Balancing

Analysis of gas dissolved in dielectric liquids of large transformers operation

water lubricant oil dielectric oil and liquid fuel analysis

Dielectric Laboratory Welding Work Shop

Dielectric Laboratory

bull Dielectric oil rigidity

bull Physical and Chimical Characterisics of Dielectric oil

bull Dissolved gas in Dielectric oil

bull Acceptance trials for generators transformers switch-gears

Welding Work Shop

bull Steel plate works

20

bull Heat treatment in furnace or outside

bull Surface reparing by powder spray metallisation

bull Rebabbiting of used bearing

60 Vocational Training ndash Photo Gallery

Services Provided

Practical Hands-On Training Equipment

Practical Hands-On Training electricity amp gas counter

SIS as an energy company

provides the entire scope of training

services including

bull Upgrade of training centers

bull Drawing up and delivery of

training courses

bull Training of trainers

bull Designing and monitoring of

training programs

bull End-user training organization

of seminars hands-on training

on-the-job training and

designing of training manuals

The training provided is relevant

effective structured and

continuously updated This

maintains a high level of technical

skills and procedures in a

constantly changing environment

Practical Hands-On Training works under voltage

Classroom Training on electrical maintenance related to electrical power utilities

21

enabling all staff to keep abreast of

technical innovations and

improvements together with

legislative requirements and

recommended practices

STEG Training Center (CFPK)

Since its inception in 1976 CFPKrsquos aim has been to train newly recruited STEG technicians in Generation Transmission Distribution and Gas sectors and to provide advanced training and retraining for active personnel Since then the Center has constantly expanded and adjusted in order to bull Address STEGrsquos specific requirements in vocational training in all its

sectors technical commercial financial computing management auditing new technologies etc

bull Provides a logical approach as to how to establish and assure a competent workforce by technical vocational training for now and the future

bull Provide appropriate training programs for organizations outside STEG both at national and international levels (in-house training customized courses and lectures)

22

70 Samples of Project Experience

Since 2006 SIS has undertaken many assignments in African countries Middle East and in

Tunisia It is only possible to show a small selection of these in this brochure We are always

happy to provide additional details and examples of our experience on request

71 Accomplished Projects

POWER GENERATION

No Contract Identification Unitne Installed

Capacity(MW) location Start

Date End Date

1 Annual Inspection

5 260 Rabigh SEC Saudi Arabia)

20-12-2005

30-01-2006

2 Annual Inspection 2 260

Rabigh SEC Saudi Arabia)

09-03-2006

22-04-2006

3 Annual Inspection

3 260 Rabigh SEC Saudi Arabia)

19-03-2006

29-04-2006

4 Annual Inspection

1amp4 440 Shoaiba SEC Saoudi Arabia

27-01-2007

01-03-2007

5 Annual Inspection 4 440

Shoaiba SEC Saoudi Arabia

03-03-2007

05-04-2007

6

Annual Inspection Bell seals rings amp nozzle blocks replacement ( turbine overhaul)

4 260 Rabigh SEC Saudi Arabia)

03-01-2008

07-03-2008

7 Annual Inspection 2 260

Rabigh SEC Saudi Arabia)

08-03-2008

15-04-2008

8 Major Overhaul

GT1 27 TihamaSEC Saudi Arabia

20-01-2008

10-02-2008

9

Erection and Supervision of Works 300 MW (ISO Condition) Open Cycle Power Plant Fast Emergency

GTs 1-4

4x75 ISO Conditions

Ministry of Energy

(Electricity and Water)

Sabya Power Plant

State of KOWEIT

2007- 2008

10 Commissioning CPL amp Parallel Resonant Circuit in close cooperation with AREVA

Ethiopie 2007-2008

11

Revamping of obsolete Control and instrumentation system (in close cooperation with SIEMENS)

2 Units Marocco 2008

23

No Contract Identification Unitne Installed Capacity (MW)

location Start Date

12

Commissioning of Control command system Mark VI on GTs Frame 5 (in close cooperation with GESHANAHAN Eng

GTs GE Frame 5

Algeria (Arzew) 2008

13

Grid Interconnection In close cooperation with STUDI for West African Power Pool (WAPP)

225 KV

Electricity grid interconnection

between Burkina Faso and Ghana

2008

14 Pricing Study Senegal 2008

15 Major Inspection GT6

GE-FR7

Najran SEC Saudi Arabia

2008

16 Major Inspection (MI) W501D5

Jazan SEC Saudi Arabia

2009

17 Annual Inspection 2amp3 2x393 Shoaiba SEC Saudi Arabia

2009

24

25

SISrsquoS Experiences in Boilerrsquos Maintenance Work

Power plant location Boiler tech Details ampInspections

Rades A (ST) ST STEAM TURBINE Rades B (ST)

Unit 1 Unit 2 Unit 3 Unit 4

Manufacturer Mitsubishi H I Mitsubishi H I Ansaldo Energia Ansaldo Energia Type amp Model MHI CE RR

type out-door MHI CE RR type outdoor

AE RR type outdoor

AE RR type outdoor

Date of commissioning 1983 1984 1998 1999 MCR (th) 520000 520000 5335 5335

Steam conditions Pressure SHRH(bars) 1685 352 1685 352 1739 1739 Temperature( degC) 543 543 542 542

fuel Natural gas heavy Fuel Ndeg2

Natural gas heavy Fuel Ndeg2

Natural gas heavy Fuel Ndeg2

Natural gas heavy Fuel Ndeg2

Heating area Furnace(msup2) 5105 5105 5360 5360 Reheater (msup2) 3130 3130 1286 1286 Eco (msup2) 2600 2600 1556 1556

Fuel oil Burners type amp No 20 20 Y Ndeg 12 Y Ndeg 12 FDF type amp capacity ( Th) HC 591 HC 591 HC748 HC 748 IDF type amp capacity (Th) HC 640 HC 640 NA NA GRF type amp capacity ( Th) HC 500 HC 500 HC 300 HC 300

RegenAir Preheater Type Ljungstroumlm Ljungstroumlm Ljungstroumlm Ljungstroumlm No amp capacity 2 2 2 2 Heating surface(msup2) 12000 12000 18000 18000

Annual inspection No 20 20 10 10 Starting amp Completion dates

21 Days 21 days 21 days 21 days

Major overhaul No 04 04 01 01 Starting amp Completion dates

1221038843 days 611028854 days 56 days 59 days

Boiler conservation No 20 20 08 08 Boiler Rehabilitation No 0 0 0 0 Boiler Tube Acid cleaning No 01 01 01 01 ILA(Integrity Life Assessment)No 0 0 0 0

26

SISrsquos Experiences in Boilersrsquo Maintenance Work

Power plant location Boiler tech Details ampInspections

Sousse A (ST) Sousse B (CCPP)

Unitne1 Unitne 2 Unitne1 Unitne 2

Manufacturer SGP SGP STEIN INDUSTRY STEIN INDUSTRY Type amp Model Natural circulation Natural circulation Heat Recuperator Heat Recuperator Date of commissioning 1980 1980 1995 1995 MCR (th) 515 515 HP 182 BP 415 HP 182 BP 415 Steam conditions Pressure SHRH (bar) 16038 16038 HP 72 BP 66 HP 72 BP 66

Temperature (degC) 540degC 540degC HP 511 BP 213 HP 511 BP 213 fuel FUELGAZ FUELGAZ Gaz Gaz Heating area Furnace (m2 2080 ) 2080 HP evaporator 25251 LP evaporator 18627

Reheater (m2 1512 ) 1512 HP superheater 9418 LP superheater 2328 Eco (m2 2017 ) 2017 HP economizer 16834 13773 LP economizer 3060

Fuel oil Burners Type ampNo EVT8 EVT8 FDF type amp capacity R62250 7566 m3 R62250 7566 ms 3 s

GRF type amp capacity R62250 721 m3 R62250 721 ms 3 s

Regen Air Preheater

Type No amp capacity 2 220186 Nm3h 2 220186 Nm3h

Heating surface(m2) 2x924 2x924 Annual Inspection

No annually annually annually annually Starting amp completion dates 3 - 4 weeks 3 - 4 weeks 10 days 10 days

Major Overhaul No along with annual inspectioccediln along with annual inspectioccediln

Starting amp completion dates 3 - 4 weeks 3 - 4 weeks

Boiler Conservation No 3 2 Boiler Rehabilitation No Boiler Tube Acid Cleaning No 2 2 ILA (Integrity Life Assessment) No 1

27

SISrsquos Experiences in Boilersrsquo Maintenance Work

Power plant location Boiler tech Details ampInspections Unitne1 (ST) Unitne 2 (ST) Unitne 3 (ST) Unitne 4 (ST)

Manufacturer WALTHER Type amp Model WALTHER FN10 Natural Circulation Date of commissioning 05071965 01111965 22061968 20091968 MCR (th) 112 Steam conditions

Pressure 686 bar Temperature 510 degC

fuel Heavy fuel oil Ndeg2 light fuel oil

Heating area

Furnace (m2 540 m2 ) Reheater (m2 1542 m2 ) Eco (m2 480 m2 )

Fuel oil Burners Type ampNo SONVICO 4 FDF type amp capacity Centrifugal - 27 m3s IDF type amp capacity - - - - GRF type amp capacity - - - -

Regen Air Preheater Type Static LJUNGSTROM No amp capacity 1 1 1 1 Heating surface(m2) 7350 m2 -

Annual Inspection No every year until 1998 every year until

2005 every year until 1998

every year until 2005

Starting amp completion dates - - - -

Major Overhaul No 6 8 5 5 Starting amp completion dates - - - -

Boiler Conservation No - 2 - 2 Boiler Rehabilitation No 4 6 5 5 Boiler Tube Acid Cleaning No 0 0 0 0 ILA (Integrity Life Assessment) No 0 0 0 0

28

SISrsquos Experiences in Boilersrsquo Maintenance Work Power Plant Location

Boiler Tech Details ampInspections

Ghannouch (ST) Unitne1 (ST) Unitne 2

Manufacturer Stein Industrie Stein Industrie Type amp Model Natural circulation Natural circulation Date of commissioning 1972 1972 MCR (th) 120 120 Steam conditions Pressure SHRH (th) 70 bars 70 bars

Temperature 510 degC 510 degC fuel Natural GasHeavy fuel Natural GasHeavy fuel Heating area Furnace (m2 )

Reheater (m2 8880 dmsup3 ) 8880 dmsup3 Eco (m2 2400 dmsup3 ) 2400 dmsup3

Fuel oil Burners Type ampNo PILLARD GRC PILLARD GRC IDF type amp capacity GRF type amp capacity Regen Air Preheater Type Ljunstroumlm Ljunstroumlm

No amp capacity 140msup3h 140msup3h Heating surface(m2) _ _

Annual Inspection No 1 1 Starting amp completion dates 1 week 1 week

Major Overhaul No 15ans 15ans

Starting amp completion dates 2 months 2 months

Boiler Conservation No in case of being extended in case of being extended Boiler Rehabilitation No NO NO Boiler Tube Acid Cleaning No NO NO ILA (Integrity Life Assessment) No NO NO

29

ELECTRICAL TRANSMISSION SYSTEM

Accomplished Projects

bull Tests performed on Numerical relays manufactured by - ABB (Distance protection REL 316 ) - AREVA (Distance protection EPAC MICOMP442 hellip) - ICE (Over current protection NPID 800hellip) - SIEMENS (Distance protection 7SA 511 513 522 611) - REYROLLES (Differential protection DUOBIAS)

bull Test and setting of protective relays and checking the tripping circuits for Generators and

Substations belonging to Zaouia Petroleum Refinery (Libya)

bull Short circuit calculation selectivity study of protective relays by providing solutions for the

existing issues in PEC YEMEN Networks

bull Study and improvement of the existing protective system in close cooperation with Tractebel

Engineering

bull Technical Assistance for Independent Power Producers (IPP) Plant (Carthage Power

Company (CPC) Tunisia) regarding the maintenance and testing of protective relays

related to

- Generators - Main transformers - Auxiliaries - Etc

bull Technical Assistance testing and setting of protective relays at

- Steel ndashworks (Tunisia) - Cement ndashmarker (Tunisia) - Iron industries (Tunisia) - Chemical industries (Tunisia)

bull Commissioning and setting of protective relays at substations (High Medium and Low

voltages)

bull Renovation of the obsolete equipment (relays switchgear hellip)

bull Maintenance of the transmission lines and substations equipment

bull Cost-effective solutions establishment regarding the network issues (droop voltage over

voltage improvement of power factor etc)

30

ELECTRICAL DISTRIBUTION SYSTEM

Rural Electrification- Accomplished Projects

Contract Identification

Contract No 18 Technical Assistance and implementation of a Rural electrification project based upon SWER (Single Wire Earth Return) techniques

Award date 1998 Completion date 1999 Employerrsquos Name JIRAMA (JIRO SY RANO MALAGAS) Address

149 RUE RAINANDRIAMAMPANDRY Antananarivo BP 200 - MADAGASCAR

Main Tasks Performed

bull Training on SWER System bull Data collection needed for SWER System studies and implementation bull Finalization of technical studies and submission of report including

- Technical audit of the pilot project already in place - Technical description of the project - AdviseRecommendations on equipment specifications - Recommendations on possible changes in adjustment and coordination of electrical

protections

Contract Identification

Contract No 19 RWANDA Project (Phase 1) Implementation of a Pilot Rural Electrification Project based on Single-Phase with neutral to ground called MALT System 4000 Subscribers

Award date June 2008 Completion date June 2009

Employerrsquos Name

RECO ( former ELECTROGAZ) -RWANDA

Address BP 537 KIGALI -RWANA

Main Tasks performed

bull Study and Diagnosis of the existing Rwandan Power Distribution An inventory of the existing facilities including generation transmission and distribution systems was established

bull Implementation of a pilot rural electrification project based on MALT System Visit was arranged to some Tunisian rural regions and companies manufacturing electric equipment namely

- Transformers

- Iron poles

- Concrete supports

- Electric cables

- Electronic meters and

- MV and LV line accessories

31

Contract Identification

Contract No 20 Local Electrification study of Tambacounda and Kedougou departments Award date October 2002 Completion date March 2003 Customerrsquos name SENELEC Address ELECTRICAL COMPANY SENEGAL

Main Tasks Performed

bull Data Collection bull Socio-economic survey bull Technical economic and financial analysis bull Electricity market forecast (demand forecast (2003-2015)) bull Estimation of worksrsquo costs regarding medium voltage single-phase and tri-phase lines medium

and low voltage stations low voltage lines diesel micro-stations individual photovoltaic systems bull Technical and economic study related to different methods of supply including the solar as well as

the opportunity of introducing the single-phase system for the rural electrification bull Proposition for the public lighting and the management of photovoltaic systems bull Recommendations for the reinforcement of the existing stations and the existing networks to satisfy

the future demand due to the electrification of the new villages bull Tariff and profitability study bull Set up of the geographical maps and the low voltage electrification plan of the most important

villages (34 villages) bull Recommendations on privatizing power generation energy sector

Contract Identification Contract No 21 - Rural Electrification study of 80 villages in Comoros Isles

- Preparation of Tender Documents for the supply of equipment needed to the construction of 145 km MV lines 100 km LV lines and 80 MVLV stations

- Call for tenders evaluation of Bidders Award date November 2000 Completion date Dec 2002 Customerrsquos name

Ministry of Equipment Department of Energy and Water Resources

Address Moroni Avenue of the Democratic Republic of China

Main Tasks Performed

bull Data collection and visit of the existing electric utilities bull Situation analysis and proposal of electric infrastructure management solutions bull Electricity Demand Estimation and Forecasting bull Electric Calculation (Load Repartition Line Voltage Drop Losses and Voltage Drops

Calculations Short-Circuit Calculations Simulation of the Extension and Reinforcement of the Medium Voltage Networks Power System Stability Analysis Reactive Power Compensation

bull Low Voltage Studies for the Electrification of 80 villages bull RecommendationsSuggestions for the reinforcement of power generation utilities to satisfy

the future demand (by 2010) bull Electricity Tariffing study

- Review of electricity consumption patterns - Cost review - Review of tariff policies - Application and implementation of revised tariff levels

32

Contract Identification Contract Ndeg 22 Establishment and set up of a computerized accounting and budget system

Award date 1992 Completion date 1994 Customerrsquos name SOMELEC Address Nouakchott - MAURITANIA

Main Tasks Performed

bull Analytical accounting bull Bid evaluation bull Cash flow movements management bull Fixed assets management bull Centralizing bookkeeping bull Existing computer application interfaces update bull Transposition of the existing system to the new one bull Operation and maintenance Documents preparation bull Execution of the transposition of the existing system to the new one

Contract Identification Contract

No 23 Electricity sector reform technical assistance in the interim management of the ldquoCompagnie Energie Electrique du Togo ldquo(CEET)

Award date 41997

Completion date 122000

Employerrsquos Name Ministry of Mining Equipment transmission Mail and Telecommunications

Address TOGO

Main Tasks Performed

bull Technical assistance in the interim management of the CEET within the framework of the electricity sectorrsquos liberalization 1) termination of the current CEET management 2) analysis of the existing situation 3) interim management of the CEET prior to its privatization

bull Operation and maintenance of the electrical network for Lomeacute and its surrounding rural areas bull Electricity generation in isolated centers bull Electricity transmission and distribution bull Procurement and maintenance of new diesel production units bull Reduction of energy losses bull Customer management bull Increase in the number of Customers bull Accounting and billing bull Increase in payment recovery bull Call for tenders evaluation of proposals drafting of the technical annexes concerning the contracting

for a new independent operator (concession)

33

72 On-going and Under Bidding (UB) Projects

No Project Description Country

1 Training Center Update (on-going project) Republic of Congo BRAZZAVILLE

2 Master Plan elaboration in close cooperation with STUDI (Tunisia) (on-going project)

Republic of Senegal

3 Implementation of a Rural Electrification Project based on Single-Phase Four-Wires

with Neutral to Ground called MALT System (UB) Republic of Burkina Faso

4 Cost study connections to and extensions of electricity distribution networks

(UB)

Republic of Burkina Faso

5 Works Control and supervision of rural electrification of 33 communities in 4

regions of the Republic of Cameroon (UB) Republic of CAMEROUN

34

JUDICIOUS AND EFFICIENT ENERGY UTILIZATION

IS AT THE FOREFRONT OF OUR MINDS

35

Over the year 2008 STEG International Services (SIS) has widened its scope of activities to

include techno-economic studies and assistance in energy efficiency thereby providing support

to the national energy policy aiming at considering energy auditing energy efficiency energy

saving as a major priority target in Tunisiarsquos future energy strategic plan objectives In this

regard STEG International Services has carried out several projects including but not limited to

the following

80 Energy Efficiency

bull Performing obligatory periodical energy audits for industrial installations as well as energy audits on a consultancy basis

bull Assistance on projects involving energy efficiency bull Studies on energy efficiency of circuits hydraulic and thermal systems bull Upgrading energy management systems of industrial plants

81 Co-generation (Combined Heat and Power (CHP)) Studies

The main tasks performed included

bull Feasibility studies and project implementation assistance ndash RandaTunis

bull Assistance in electric utility restructuring from self power producer (electricity generation

only) to self-producing co-generatorsndash STSBEJATunisia

bull Technical assistance related to STEGrsquos grid connection with Co-generation plants in some

industrial units -SOTIPAPIER STS T-PAP and Carthago-GRE- Tunisia

82 Energy audits and energy efficiency

In any industry the three top operating expenses are often found to be energy (both electrical

and thermal) labour and materials Energy would invariably emerge as a top ranker and thus

energy management function constitutes a strategic area for cost reduction

Energy Audit will help to better understand how energy is used in any industry and in identifying

the areas where waste can occur and where scope for improvement exists In this regard the

Energy Audit would give a positive orientation to the energy cost reduction preventive

maintenance and quality control programs which are vital to production and utility activities Such

36

an audit program will help keep focus on variations which occur in the energy costs availability

and reliability of supply of energy decide on appropriate energy mix identify energy

conservation technologies retrofit for energy conservation equipment etc

Therefore SIS can carry out comprehensive assessment of techno-economic performance of

plants and equipment against the designed performance level or the industry best practice

aiming at optimizing consumption levels along with specific operating control targets

821 Samples of accomplished and on-going Energy Auditing projects

bull Energy Audit of the Liquefied Petroleum Gas (LPG) plant located in Gabegraves (Tunisia) with the assistance of Kvaerner Heurtey in 2001

bull Energy Performance Assessment of Rades and Sousse steam and Combined Cycle Power Plants as well as Bouchemma Menzel Bourguiba Korba Gas Turbines with the assistance of TRACTABEL and EDF in 2002

bull Energy Audit of Sousse Combined Cycle Power Plant with the assistance of CRA2E in 2007-2008

bull Periodic Performance Tests of Carthage Power Company (CPC) combined cycle an Impendent Power Producer (IPP) in Tunisia

37

SIS Future Commitments and Responsibilities

Endowed with a clear vision a sound project management and solid experiences and

know-how acquired by the parent company STEG through its various trades of over 48 years

SIS has put together a team of experts inndashline with its strategic intent- to be positioned as a

competitive and pre-eminent regional energy services company by spreading its expertise and

know-how throughout the African continent Arab countries and the rest of the world working on

a partnership basis with potential consultants andor the utilities of the respective countries

resulting in a keen focus and a strong sense of purpose

As part of its vision SIS management recognizes that it has responsibilities to all of its

stakeholders These include

Shareholders SIS will protect the investments of its shareholders and will provide an acceptable return on

investments through the application of its business principles Customers SIS will aim at optimizing its business activities through winning customers and maintaining

customerrsquos loyalty by offering them high quality services at competitive prices delivering on time

and supporting them with its management expertise

Employees SIS recognizes that its working employees are the key to its success and it nurtures loyalty

teamwork and trust between them SIS will strive to protect support and involve them in the

companyrsquos future to develop their skills and to reward them in line with the corporate values of

SISrsquos organization

Partners Suppliers Contractors and all External Contacts SIS will seek to treat all its partners suppliers contractors and other external stakeholders in a

consistently professional way and to ensure that their needs are fulfilled in every way possible

38

  • 72 On-going and Under Bidding (UB) Projects

10

SIS provides studies operation Maintenance and upkeep of power generation units

including thermal Power Plants Combined -Cycle Power Plants Gas Turbines Hydro-

Power plants Co-generation Diesel Groups Gas Compressors

The following activities are only indicative and not exhaustive

11 SUBIYA Gas Turbine Power Plant in KOWEIT

Construction and Installation of 4 Gas Turbines GE FR 7 Open Cycle Power Plant (4x 75 MW ISO Conditions) The project was divided into Three (3) mains tasks

a- Engineering this involved the complete development of Design Drawings-Quantities-and Materiel Specifications

b- Procurement and Transportation this Task Force was responsible for the complete procurement and transportation of all material required for the construction of the project

c- Construction and installation This included the services provided by SIS as mentioned below

Provided Services

Civil Works Follow up

bull Study plans and electromechanical documents development

bull Designing and identification of required systems equipment cables pipes tools consumables etc

bull Complete Civil Works Drawings Preparation Excavation Foundation Trench

bull Erection of Turbines Generating

11

Sets (GAS Turbines Generators Accessory base Gear boxes Base Frame Alignment

bull Erection of Mechanical Auxiliary Systems

bull Electrical Systems (cable laying Main Switch Gear station service

bull Instrumentation and control panels

bull Erection of Set up Transformers

bull Interconnection with GIS

bull Testing and commissioning

bull Project Hand Over

Site Overview Erection of the Exhaust Stack

PDC Setting Auxiliary Compartment

12 SHOAIBA Steam Turbines Annual Inspection in partnership with Gulf Power International Dabbagh Group (Kingdom of Saudi Arabia)

Provided Services

Steam Turbine Annual Inspection Turbine inspection

bull Pre-Shutdown Activities

bull Unit Shutdown

bull Inspection of Boiler Air ampGas parts

bull Boiler Fuel Firing System

bull Soot-Blowers System

bull ESP System

bull Boiler Water amp Steam System

bull Main Steal System (including Aux steam sys)

bull Analyzers

bull Boiler Feed Water System

bull Main Condensate system

bull Main Turbine amp Condenser stseam side

bull Lub oil amp hydraulic Oil SystemGenerator cooling amp seal Oil System

Inspection of fuel heaters Inspection of the lube oil amp hydraulic pumps of the turbine

12

bull Electrical works

bull Corrective maintenance etc

bull Unit recommissioning and start up

bull Post outage activities (unit performance test vib MeasurementAnnual inspection report preparation and issue)

13 Major Overhaul of GE FR-7 Gas Turbine at Najran Power Plant- in partnership with Gulf Power InternationalDabbagh Group (Kingdom of Saudi Arabia) - Photo Gallery

Services provided Turbine rotor blades inspection TurbineGenerator Control System Mark 5 Troubleshooting

The services provided included

The disassembly removal cleaning visual inspection for erosion corrosion wear cracks damages etc Non Destructive Testing (NDT) inspection alignment checks dimensional checks clearances checks repair servicing maintenance complete partial replacement re-assembly installation alignment adjustment and final quality checks The works performed concerned the below listed and other parts

- Unit Major Inspection including (all Mechanical Electrical Instrumentation and Control Work)

- Unit Hot Gas Path Inspection (all Mechanical Electrical Instrumentation and Control Work)

- NDT of Compressor turbine Generator sections

- Rotor overhaul and Reblading

- Instrument and Controls Maintenance

- Transformers maintenance

- Re-assembly

- Start - up

- Performance test

- Report submittal covering all the areas and aspects of the work done by SIS during the execution the awarded contract

Setting of Turbine bearing compressor rotor inspection

13

14 Strengthening Thermal Generation Plants Capacities injected in the Interconnected Network (IN)

Services provided Measurement of Transformer Ratio

Control and Supervision of Power Generation Plant Extension in Balingueacute (Bamako) in the republic of MALI comprising 4 Diesel Groups 4x11 5 MW ISO Conditions in partnership with IDC (Tunisia)

The services carried out by SIS included

bull Approval of study documents and assembly (accomplished)

bull Factory acceptance test (accomplished)

bull Supervision and control of on-site assembly works (on-going)

bull Site acceptance test and commissioning (once the assembly works will be terminated)

On-load Tape Changer ( OLTC) Transformer Visual Control

14

Test follow up on induced voltage Induced Voltage test on HVMV Transformer

20 Electrical Transmission Network

SISrsquos Scope of activities includes but not limited to the following services

bull Studies of power system transmission network

(system modelling power flow faults analysis) using computer simulation packages

bull Update of the dynamic and static stability studies with the view of evaluating the impact of the new electric power generation and transmission installations

bull Master plans elaboration bull Short-circuits calculation bull Under frequency load shedding calculation bull Development of electrical network protection

schemes including selection of relaysrsquo types and relays coordination

bull Protection setting calculation and configuration

bull Fault analysis in transmission networks using fault recorders and simulation software packages

bull Dimensioning of surge arresters

Washing of energized high voltage insulators

15

bull Commissioning installation and operation of digital control of the HV substations

bull Preparation of technical specifications and evaluation of Bidders

Design and construction of a testing station of insulators in polluted marine industrial and desert region in Oran (Algeria)

16

30 Electrical Distribution Network

South-South Cooperation

We are proud to draw upon our experiences and expertise as a company based in an

African country to help others across Africa

ELECTRICAL DISTRIBUTION

NETWORK

17

RURAL ELECTRIFICATION- CONSTRUCTION WORKS ON A TURN KEY BASIS Pilot Rural Electrification Project based upon single-phase in RWANDA

Services provided Signature of an agreement for cooperation and technical assistance between STEG amp ELECTROGAZ

Metallic Poles delivery

The scope of works included bull Study and Diagnosis of the

existing Rwandan Power

Distribution An inventory of the

existing facilities including

generation transmission and

distribution systems was

established

bull The turnkey design engineering

procurement supply installation

construction commissioning and

start up of a pilot rural

electrification project based upon

single-phase in RWANDA

Sub-station Connection Factory Acceptance Test of AAAC Conductor and twisted cables in presence of Rwandan technicians

Electrcity supply in rwandan remote villages

Energy is an important factor for Socio-Economic Developemnt

18

40 Gas Segment

Services provided Gas Condensate Treatment Unit Pipeline On-Line Welding

SIS services cover the following scope

of activities

bull Study control and supervision of gas

projects erection works

bull Master plans elaboration regarding Gas Transmission and Distributions networks

bull Catholic Protection of gas network bull Gas and condensate treatment units

operation and maintenance related tasks

bull Gas compression stations operation and

maintenance related tasks bull Supervisory and control systems

operation and maintenance bull Gas pipelines network supervision and

remote command bull Pipeline inspection bull Steel pipes and gas delivery station

specification bull Compression stations specification and

supervision of erection works bull Gas and condensate treatment unitsrsquo

implementation commissioning and start-up

Hot Tap Achievement Gas pipeline welding connection

Topographic surveying

19

50 Laboratory-Workshop

Main Activities Rotary Furnace Inspection Surfacing High Precision Castings

General Technics Department GTD was established to perform technical assistance to all power generating units including

bull Thermal Power Plants

bull Combined Cycle Power Plants

bull Gas Turbines

bull Hydraulic Power Plants etc

GTD Mission

bull Acceptance Trial of Equipment

bull High and Mid Voltage Testing (also called dielectric strength test or Hipot Test)

bull Acoustics and Mechanical Vibration

bull Thermodynamics and Hydraulic Activities Management

bull Chemical Analysis amp Controls

bull Metallurgical amp NDT Controls

bull Workshop

NDT Magnetic Testing Turbine Speed Balancing

Analysis of gas dissolved in dielectric liquids of large transformers operation

water lubricant oil dielectric oil and liquid fuel analysis

Dielectric Laboratory Welding Work Shop

Dielectric Laboratory

bull Dielectric oil rigidity

bull Physical and Chimical Characterisics of Dielectric oil

bull Dissolved gas in Dielectric oil

bull Acceptance trials for generators transformers switch-gears

Welding Work Shop

bull Steel plate works

20

bull Heat treatment in furnace or outside

bull Surface reparing by powder spray metallisation

bull Rebabbiting of used bearing

60 Vocational Training ndash Photo Gallery

Services Provided

Practical Hands-On Training Equipment

Practical Hands-On Training electricity amp gas counter

SIS as an energy company

provides the entire scope of training

services including

bull Upgrade of training centers

bull Drawing up and delivery of

training courses

bull Training of trainers

bull Designing and monitoring of

training programs

bull End-user training organization

of seminars hands-on training

on-the-job training and

designing of training manuals

The training provided is relevant

effective structured and

continuously updated This

maintains a high level of technical

skills and procedures in a

constantly changing environment

Practical Hands-On Training works under voltage

Classroom Training on electrical maintenance related to electrical power utilities

21

enabling all staff to keep abreast of

technical innovations and

improvements together with

legislative requirements and

recommended practices

STEG Training Center (CFPK)

Since its inception in 1976 CFPKrsquos aim has been to train newly recruited STEG technicians in Generation Transmission Distribution and Gas sectors and to provide advanced training and retraining for active personnel Since then the Center has constantly expanded and adjusted in order to bull Address STEGrsquos specific requirements in vocational training in all its

sectors technical commercial financial computing management auditing new technologies etc

bull Provides a logical approach as to how to establish and assure a competent workforce by technical vocational training for now and the future

bull Provide appropriate training programs for organizations outside STEG both at national and international levels (in-house training customized courses and lectures)

22

70 Samples of Project Experience

Since 2006 SIS has undertaken many assignments in African countries Middle East and in

Tunisia It is only possible to show a small selection of these in this brochure We are always

happy to provide additional details and examples of our experience on request

71 Accomplished Projects

POWER GENERATION

No Contract Identification Unitne Installed

Capacity(MW) location Start

Date End Date

1 Annual Inspection

5 260 Rabigh SEC Saudi Arabia)

20-12-2005

30-01-2006

2 Annual Inspection 2 260

Rabigh SEC Saudi Arabia)

09-03-2006

22-04-2006

3 Annual Inspection

3 260 Rabigh SEC Saudi Arabia)

19-03-2006

29-04-2006

4 Annual Inspection

1amp4 440 Shoaiba SEC Saoudi Arabia

27-01-2007

01-03-2007

5 Annual Inspection 4 440

Shoaiba SEC Saoudi Arabia

03-03-2007

05-04-2007

6

Annual Inspection Bell seals rings amp nozzle blocks replacement ( turbine overhaul)

4 260 Rabigh SEC Saudi Arabia)

03-01-2008

07-03-2008

7 Annual Inspection 2 260

Rabigh SEC Saudi Arabia)

08-03-2008

15-04-2008

8 Major Overhaul

GT1 27 TihamaSEC Saudi Arabia

20-01-2008

10-02-2008

9

Erection and Supervision of Works 300 MW (ISO Condition) Open Cycle Power Plant Fast Emergency

GTs 1-4

4x75 ISO Conditions

Ministry of Energy

(Electricity and Water)

Sabya Power Plant

State of KOWEIT

2007- 2008

10 Commissioning CPL amp Parallel Resonant Circuit in close cooperation with AREVA

Ethiopie 2007-2008

11

Revamping of obsolete Control and instrumentation system (in close cooperation with SIEMENS)

2 Units Marocco 2008

23

No Contract Identification Unitne Installed Capacity (MW)

location Start Date

12

Commissioning of Control command system Mark VI on GTs Frame 5 (in close cooperation with GESHANAHAN Eng

GTs GE Frame 5

Algeria (Arzew) 2008

13

Grid Interconnection In close cooperation with STUDI for West African Power Pool (WAPP)

225 KV

Electricity grid interconnection

between Burkina Faso and Ghana

2008

14 Pricing Study Senegal 2008

15 Major Inspection GT6

GE-FR7

Najran SEC Saudi Arabia

2008

16 Major Inspection (MI) W501D5

Jazan SEC Saudi Arabia

2009

17 Annual Inspection 2amp3 2x393 Shoaiba SEC Saudi Arabia

2009

24

25

SISrsquoS Experiences in Boilerrsquos Maintenance Work

Power plant location Boiler tech Details ampInspections

Rades A (ST) ST STEAM TURBINE Rades B (ST)

Unit 1 Unit 2 Unit 3 Unit 4

Manufacturer Mitsubishi H I Mitsubishi H I Ansaldo Energia Ansaldo Energia Type amp Model MHI CE RR

type out-door MHI CE RR type outdoor

AE RR type outdoor

AE RR type outdoor

Date of commissioning 1983 1984 1998 1999 MCR (th) 520000 520000 5335 5335

Steam conditions Pressure SHRH(bars) 1685 352 1685 352 1739 1739 Temperature( degC) 543 543 542 542

fuel Natural gas heavy Fuel Ndeg2

Natural gas heavy Fuel Ndeg2

Natural gas heavy Fuel Ndeg2

Natural gas heavy Fuel Ndeg2

Heating area Furnace(msup2) 5105 5105 5360 5360 Reheater (msup2) 3130 3130 1286 1286 Eco (msup2) 2600 2600 1556 1556

Fuel oil Burners type amp No 20 20 Y Ndeg 12 Y Ndeg 12 FDF type amp capacity ( Th) HC 591 HC 591 HC748 HC 748 IDF type amp capacity (Th) HC 640 HC 640 NA NA GRF type amp capacity ( Th) HC 500 HC 500 HC 300 HC 300

RegenAir Preheater Type Ljungstroumlm Ljungstroumlm Ljungstroumlm Ljungstroumlm No amp capacity 2 2 2 2 Heating surface(msup2) 12000 12000 18000 18000

Annual inspection No 20 20 10 10 Starting amp Completion dates

21 Days 21 days 21 days 21 days

Major overhaul No 04 04 01 01 Starting amp Completion dates

1221038843 days 611028854 days 56 days 59 days

Boiler conservation No 20 20 08 08 Boiler Rehabilitation No 0 0 0 0 Boiler Tube Acid cleaning No 01 01 01 01 ILA(Integrity Life Assessment)No 0 0 0 0

26

SISrsquos Experiences in Boilersrsquo Maintenance Work

Power plant location Boiler tech Details ampInspections

Sousse A (ST) Sousse B (CCPP)

Unitne1 Unitne 2 Unitne1 Unitne 2

Manufacturer SGP SGP STEIN INDUSTRY STEIN INDUSTRY Type amp Model Natural circulation Natural circulation Heat Recuperator Heat Recuperator Date of commissioning 1980 1980 1995 1995 MCR (th) 515 515 HP 182 BP 415 HP 182 BP 415 Steam conditions Pressure SHRH (bar) 16038 16038 HP 72 BP 66 HP 72 BP 66

Temperature (degC) 540degC 540degC HP 511 BP 213 HP 511 BP 213 fuel FUELGAZ FUELGAZ Gaz Gaz Heating area Furnace (m2 2080 ) 2080 HP evaporator 25251 LP evaporator 18627

Reheater (m2 1512 ) 1512 HP superheater 9418 LP superheater 2328 Eco (m2 2017 ) 2017 HP economizer 16834 13773 LP economizer 3060

Fuel oil Burners Type ampNo EVT8 EVT8 FDF type amp capacity R62250 7566 m3 R62250 7566 ms 3 s

GRF type amp capacity R62250 721 m3 R62250 721 ms 3 s

Regen Air Preheater

Type No amp capacity 2 220186 Nm3h 2 220186 Nm3h

Heating surface(m2) 2x924 2x924 Annual Inspection

No annually annually annually annually Starting amp completion dates 3 - 4 weeks 3 - 4 weeks 10 days 10 days

Major Overhaul No along with annual inspectioccediln along with annual inspectioccediln

Starting amp completion dates 3 - 4 weeks 3 - 4 weeks

Boiler Conservation No 3 2 Boiler Rehabilitation No Boiler Tube Acid Cleaning No 2 2 ILA (Integrity Life Assessment) No 1

27

SISrsquos Experiences in Boilersrsquo Maintenance Work

Power plant location Boiler tech Details ampInspections Unitne1 (ST) Unitne 2 (ST) Unitne 3 (ST) Unitne 4 (ST)

Manufacturer WALTHER Type amp Model WALTHER FN10 Natural Circulation Date of commissioning 05071965 01111965 22061968 20091968 MCR (th) 112 Steam conditions

Pressure 686 bar Temperature 510 degC

fuel Heavy fuel oil Ndeg2 light fuel oil

Heating area

Furnace (m2 540 m2 ) Reheater (m2 1542 m2 ) Eco (m2 480 m2 )

Fuel oil Burners Type ampNo SONVICO 4 FDF type amp capacity Centrifugal - 27 m3s IDF type amp capacity - - - - GRF type amp capacity - - - -

Regen Air Preheater Type Static LJUNGSTROM No amp capacity 1 1 1 1 Heating surface(m2) 7350 m2 -

Annual Inspection No every year until 1998 every year until

2005 every year until 1998

every year until 2005

Starting amp completion dates - - - -

Major Overhaul No 6 8 5 5 Starting amp completion dates - - - -

Boiler Conservation No - 2 - 2 Boiler Rehabilitation No 4 6 5 5 Boiler Tube Acid Cleaning No 0 0 0 0 ILA (Integrity Life Assessment) No 0 0 0 0

28

SISrsquos Experiences in Boilersrsquo Maintenance Work Power Plant Location

Boiler Tech Details ampInspections

Ghannouch (ST) Unitne1 (ST) Unitne 2

Manufacturer Stein Industrie Stein Industrie Type amp Model Natural circulation Natural circulation Date of commissioning 1972 1972 MCR (th) 120 120 Steam conditions Pressure SHRH (th) 70 bars 70 bars

Temperature 510 degC 510 degC fuel Natural GasHeavy fuel Natural GasHeavy fuel Heating area Furnace (m2 )

Reheater (m2 8880 dmsup3 ) 8880 dmsup3 Eco (m2 2400 dmsup3 ) 2400 dmsup3

Fuel oil Burners Type ampNo PILLARD GRC PILLARD GRC IDF type amp capacity GRF type amp capacity Regen Air Preheater Type Ljunstroumlm Ljunstroumlm

No amp capacity 140msup3h 140msup3h Heating surface(m2) _ _

Annual Inspection No 1 1 Starting amp completion dates 1 week 1 week

Major Overhaul No 15ans 15ans

Starting amp completion dates 2 months 2 months

Boiler Conservation No in case of being extended in case of being extended Boiler Rehabilitation No NO NO Boiler Tube Acid Cleaning No NO NO ILA (Integrity Life Assessment) No NO NO

29

ELECTRICAL TRANSMISSION SYSTEM

Accomplished Projects

bull Tests performed on Numerical relays manufactured by - ABB (Distance protection REL 316 ) - AREVA (Distance protection EPAC MICOMP442 hellip) - ICE (Over current protection NPID 800hellip) - SIEMENS (Distance protection 7SA 511 513 522 611) - REYROLLES (Differential protection DUOBIAS)

bull Test and setting of protective relays and checking the tripping circuits for Generators and

Substations belonging to Zaouia Petroleum Refinery (Libya)

bull Short circuit calculation selectivity study of protective relays by providing solutions for the

existing issues in PEC YEMEN Networks

bull Study and improvement of the existing protective system in close cooperation with Tractebel

Engineering

bull Technical Assistance for Independent Power Producers (IPP) Plant (Carthage Power

Company (CPC) Tunisia) regarding the maintenance and testing of protective relays

related to

- Generators - Main transformers - Auxiliaries - Etc

bull Technical Assistance testing and setting of protective relays at

- Steel ndashworks (Tunisia) - Cement ndashmarker (Tunisia) - Iron industries (Tunisia) - Chemical industries (Tunisia)

bull Commissioning and setting of protective relays at substations (High Medium and Low

voltages)

bull Renovation of the obsolete equipment (relays switchgear hellip)

bull Maintenance of the transmission lines and substations equipment

bull Cost-effective solutions establishment regarding the network issues (droop voltage over

voltage improvement of power factor etc)

30

ELECTRICAL DISTRIBUTION SYSTEM

Rural Electrification- Accomplished Projects

Contract Identification

Contract No 18 Technical Assistance and implementation of a Rural electrification project based upon SWER (Single Wire Earth Return) techniques

Award date 1998 Completion date 1999 Employerrsquos Name JIRAMA (JIRO SY RANO MALAGAS) Address

149 RUE RAINANDRIAMAMPANDRY Antananarivo BP 200 - MADAGASCAR

Main Tasks Performed

bull Training on SWER System bull Data collection needed for SWER System studies and implementation bull Finalization of technical studies and submission of report including

- Technical audit of the pilot project already in place - Technical description of the project - AdviseRecommendations on equipment specifications - Recommendations on possible changes in adjustment and coordination of electrical

protections

Contract Identification

Contract No 19 RWANDA Project (Phase 1) Implementation of a Pilot Rural Electrification Project based on Single-Phase with neutral to ground called MALT System 4000 Subscribers

Award date June 2008 Completion date June 2009

Employerrsquos Name

RECO ( former ELECTROGAZ) -RWANDA

Address BP 537 KIGALI -RWANA

Main Tasks performed

bull Study and Diagnosis of the existing Rwandan Power Distribution An inventory of the existing facilities including generation transmission and distribution systems was established

bull Implementation of a pilot rural electrification project based on MALT System Visit was arranged to some Tunisian rural regions and companies manufacturing electric equipment namely

- Transformers

- Iron poles

- Concrete supports

- Electric cables

- Electronic meters and

- MV and LV line accessories

31

Contract Identification

Contract No 20 Local Electrification study of Tambacounda and Kedougou departments Award date October 2002 Completion date March 2003 Customerrsquos name SENELEC Address ELECTRICAL COMPANY SENEGAL

Main Tasks Performed

bull Data Collection bull Socio-economic survey bull Technical economic and financial analysis bull Electricity market forecast (demand forecast (2003-2015)) bull Estimation of worksrsquo costs regarding medium voltage single-phase and tri-phase lines medium

and low voltage stations low voltage lines diesel micro-stations individual photovoltaic systems bull Technical and economic study related to different methods of supply including the solar as well as

the opportunity of introducing the single-phase system for the rural electrification bull Proposition for the public lighting and the management of photovoltaic systems bull Recommendations for the reinforcement of the existing stations and the existing networks to satisfy

the future demand due to the electrification of the new villages bull Tariff and profitability study bull Set up of the geographical maps and the low voltage electrification plan of the most important

villages (34 villages) bull Recommendations on privatizing power generation energy sector

Contract Identification Contract No 21 - Rural Electrification study of 80 villages in Comoros Isles

- Preparation of Tender Documents for the supply of equipment needed to the construction of 145 km MV lines 100 km LV lines and 80 MVLV stations

- Call for tenders evaluation of Bidders Award date November 2000 Completion date Dec 2002 Customerrsquos name

Ministry of Equipment Department of Energy and Water Resources

Address Moroni Avenue of the Democratic Republic of China

Main Tasks Performed

bull Data collection and visit of the existing electric utilities bull Situation analysis and proposal of electric infrastructure management solutions bull Electricity Demand Estimation and Forecasting bull Electric Calculation (Load Repartition Line Voltage Drop Losses and Voltage Drops

Calculations Short-Circuit Calculations Simulation of the Extension and Reinforcement of the Medium Voltage Networks Power System Stability Analysis Reactive Power Compensation

bull Low Voltage Studies for the Electrification of 80 villages bull RecommendationsSuggestions for the reinforcement of power generation utilities to satisfy

the future demand (by 2010) bull Electricity Tariffing study

- Review of electricity consumption patterns - Cost review - Review of tariff policies - Application and implementation of revised tariff levels

32

Contract Identification Contract Ndeg 22 Establishment and set up of a computerized accounting and budget system

Award date 1992 Completion date 1994 Customerrsquos name SOMELEC Address Nouakchott - MAURITANIA

Main Tasks Performed

bull Analytical accounting bull Bid evaluation bull Cash flow movements management bull Fixed assets management bull Centralizing bookkeeping bull Existing computer application interfaces update bull Transposition of the existing system to the new one bull Operation and maintenance Documents preparation bull Execution of the transposition of the existing system to the new one

Contract Identification Contract

No 23 Electricity sector reform technical assistance in the interim management of the ldquoCompagnie Energie Electrique du Togo ldquo(CEET)

Award date 41997

Completion date 122000

Employerrsquos Name Ministry of Mining Equipment transmission Mail and Telecommunications

Address TOGO

Main Tasks Performed

bull Technical assistance in the interim management of the CEET within the framework of the electricity sectorrsquos liberalization 1) termination of the current CEET management 2) analysis of the existing situation 3) interim management of the CEET prior to its privatization

bull Operation and maintenance of the electrical network for Lomeacute and its surrounding rural areas bull Electricity generation in isolated centers bull Electricity transmission and distribution bull Procurement and maintenance of new diesel production units bull Reduction of energy losses bull Customer management bull Increase in the number of Customers bull Accounting and billing bull Increase in payment recovery bull Call for tenders evaluation of proposals drafting of the technical annexes concerning the contracting

for a new independent operator (concession)

33

72 On-going and Under Bidding (UB) Projects

No Project Description Country

1 Training Center Update (on-going project) Republic of Congo BRAZZAVILLE

2 Master Plan elaboration in close cooperation with STUDI (Tunisia) (on-going project)

Republic of Senegal

3 Implementation of a Rural Electrification Project based on Single-Phase Four-Wires

with Neutral to Ground called MALT System (UB) Republic of Burkina Faso

4 Cost study connections to and extensions of electricity distribution networks

(UB)

Republic of Burkina Faso

5 Works Control and supervision of rural electrification of 33 communities in 4

regions of the Republic of Cameroon (UB) Republic of CAMEROUN

34

JUDICIOUS AND EFFICIENT ENERGY UTILIZATION

IS AT THE FOREFRONT OF OUR MINDS

35

Over the year 2008 STEG International Services (SIS) has widened its scope of activities to

include techno-economic studies and assistance in energy efficiency thereby providing support

to the national energy policy aiming at considering energy auditing energy efficiency energy

saving as a major priority target in Tunisiarsquos future energy strategic plan objectives In this

regard STEG International Services has carried out several projects including but not limited to

the following

80 Energy Efficiency

bull Performing obligatory periodical energy audits for industrial installations as well as energy audits on a consultancy basis

bull Assistance on projects involving energy efficiency bull Studies on energy efficiency of circuits hydraulic and thermal systems bull Upgrading energy management systems of industrial plants

81 Co-generation (Combined Heat and Power (CHP)) Studies

The main tasks performed included

bull Feasibility studies and project implementation assistance ndash RandaTunis

bull Assistance in electric utility restructuring from self power producer (electricity generation

only) to self-producing co-generatorsndash STSBEJATunisia

bull Technical assistance related to STEGrsquos grid connection with Co-generation plants in some

industrial units -SOTIPAPIER STS T-PAP and Carthago-GRE- Tunisia

82 Energy audits and energy efficiency

In any industry the three top operating expenses are often found to be energy (both electrical

and thermal) labour and materials Energy would invariably emerge as a top ranker and thus

energy management function constitutes a strategic area for cost reduction

Energy Audit will help to better understand how energy is used in any industry and in identifying

the areas where waste can occur and where scope for improvement exists In this regard the

Energy Audit would give a positive orientation to the energy cost reduction preventive

maintenance and quality control programs which are vital to production and utility activities Such

36

an audit program will help keep focus on variations which occur in the energy costs availability

and reliability of supply of energy decide on appropriate energy mix identify energy

conservation technologies retrofit for energy conservation equipment etc

Therefore SIS can carry out comprehensive assessment of techno-economic performance of

plants and equipment against the designed performance level or the industry best practice

aiming at optimizing consumption levels along with specific operating control targets

821 Samples of accomplished and on-going Energy Auditing projects

bull Energy Audit of the Liquefied Petroleum Gas (LPG) plant located in Gabegraves (Tunisia) with the assistance of Kvaerner Heurtey in 2001

bull Energy Performance Assessment of Rades and Sousse steam and Combined Cycle Power Plants as well as Bouchemma Menzel Bourguiba Korba Gas Turbines with the assistance of TRACTABEL and EDF in 2002

bull Energy Audit of Sousse Combined Cycle Power Plant with the assistance of CRA2E in 2007-2008

bull Periodic Performance Tests of Carthage Power Company (CPC) combined cycle an Impendent Power Producer (IPP) in Tunisia

37

SIS Future Commitments and Responsibilities

Endowed with a clear vision a sound project management and solid experiences and

know-how acquired by the parent company STEG through its various trades of over 48 years

SIS has put together a team of experts inndashline with its strategic intent- to be positioned as a

competitive and pre-eminent regional energy services company by spreading its expertise and

know-how throughout the African continent Arab countries and the rest of the world working on

a partnership basis with potential consultants andor the utilities of the respective countries

resulting in a keen focus and a strong sense of purpose

As part of its vision SIS management recognizes that it has responsibilities to all of its

stakeholders These include

Shareholders SIS will protect the investments of its shareholders and will provide an acceptable return on

investments through the application of its business principles Customers SIS will aim at optimizing its business activities through winning customers and maintaining

customerrsquos loyalty by offering them high quality services at competitive prices delivering on time

and supporting them with its management expertise

Employees SIS recognizes that its working employees are the key to its success and it nurtures loyalty

teamwork and trust between them SIS will strive to protect support and involve them in the

companyrsquos future to develop their skills and to reward them in line with the corporate values of

SISrsquos organization

Partners Suppliers Contractors and all External Contacts SIS will seek to treat all its partners suppliers contractors and other external stakeholders in a

consistently professional way and to ensure that their needs are fulfilled in every way possible

38

  • 72 On-going and Under Bidding (UB) Projects

11

Sets (GAS Turbines Generators Accessory base Gear boxes Base Frame Alignment

bull Erection of Mechanical Auxiliary Systems

bull Electrical Systems (cable laying Main Switch Gear station service

bull Instrumentation and control panels

bull Erection of Set up Transformers

bull Interconnection with GIS

bull Testing and commissioning

bull Project Hand Over

Site Overview Erection of the Exhaust Stack

PDC Setting Auxiliary Compartment

12 SHOAIBA Steam Turbines Annual Inspection in partnership with Gulf Power International Dabbagh Group (Kingdom of Saudi Arabia)

Provided Services

Steam Turbine Annual Inspection Turbine inspection

bull Pre-Shutdown Activities

bull Unit Shutdown

bull Inspection of Boiler Air ampGas parts

bull Boiler Fuel Firing System

bull Soot-Blowers System

bull ESP System

bull Boiler Water amp Steam System

bull Main Steal System (including Aux steam sys)

bull Analyzers

bull Boiler Feed Water System

bull Main Condensate system

bull Main Turbine amp Condenser stseam side

bull Lub oil amp hydraulic Oil SystemGenerator cooling amp seal Oil System

Inspection of fuel heaters Inspection of the lube oil amp hydraulic pumps of the turbine

12

bull Electrical works

bull Corrective maintenance etc

bull Unit recommissioning and start up

bull Post outage activities (unit performance test vib MeasurementAnnual inspection report preparation and issue)

13 Major Overhaul of GE FR-7 Gas Turbine at Najran Power Plant- in partnership with Gulf Power InternationalDabbagh Group (Kingdom of Saudi Arabia) - Photo Gallery

Services provided Turbine rotor blades inspection TurbineGenerator Control System Mark 5 Troubleshooting

The services provided included

The disassembly removal cleaning visual inspection for erosion corrosion wear cracks damages etc Non Destructive Testing (NDT) inspection alignment checks dimensional checks clearances checks repair servicing maintenance complete partial replacement re-assembly installation alignment adjustment and final quality checks The works performed concerned the below listed and other parts

- Unit Major Inspection including (all Mechanical Electrical Instrumentation and Control Work)

- Unit Hot Gas Path Inspection (all Mechanical Electrical Instrumentation and Control Work)

- NDT of Compressor turbine Generator sections

- Rotor overhaul and Reblading

- Instrument and Controls Maintenance

- Transformers maintenance

- Re-assembly

- Start - up

- Performance test

- Report submittal covering all the areas and aspects of the work done by SIS during the execution the awarded contract

Setting of Turbine bearing compressor rotor inspection

13

14 Strengthening Thermal Generation Plants Capacities injected in the Interconnected Network (IN)

Services provided Measurement of Transformer Ratio

Control and Supervision of Power Generation Plant Extension in Balingueacute (Bamako) in the republic of MALI comprising 4 Diesel Groups 4x11 5 MW ISO Conditions in partnership with IDC (Tunisia)

The services carried out by SIS included

bull Approval of study documents and assembly (accomplished)

bull Factory acceptance test (accomplished)

bull Supervision and control of on-site assembly works (on-going)

bull Site acceptance test and commissioning (once the assembly works will be terminated)

On-load Tape Changer ( OLTC) Transformer Visual Control

14

Test follow up on induced voltage Induced Voltage test on HVMV Transformer

20 Electrical Transmission Network

SISrsquos Scope of activities includes but not limited to the following services

bull Studies of power system transmission network

(system modelling power flow faults analysis) using computer simulation packages

bull Update of the dynamic and static stability studies with the view of evaluating the impact of the new electric power generation and transmission installations

bull Master plans elaboration bull Short-circuits calculation bull Under frequency load shedding calculation bull Development of electrical network protection

schemes including selection of relaysrsquo types and relays coordination

bull Protection setting calculation and configuration

bull Fault analysis in transmission networks using fault recorders and simulation software packages

bull Dimensioning of surge arresters

Washing of energized high voltage insulators

15

bull Commissioning installation and operation of digital control of the HV substations

bull Preparation of technical specifications and evaluation of Bidders

Design and construction of a testing station of insulators in polluted marine industrial and desert region in Oran (Algeria)

16

30 Electrical Distribution Network

South-South Cooperation

We are proud to draw upon our experiences and expertise as a company based in an

African country to help others across Africa

ELECTRICAL DISTRIBUTION

NETWORK

17

RURAL ELECTRIFICATION- CONSTRUCTION WORKS ON A TURN KEY BASIS Pilot Rural Electrification Project based upon single-phase in RWANDA

Services provided Signature of an agreement for cooperation and technical assistance between STEG amp ELECTROGAZ

Metallic Poles delivery

The scope of works included bull Study and Diagnosis of the

existing Rwandan Power

Distribution An inventory of the

existing facilities including

generation transmission and

distribution systems was

established

bull The turnkey design engineering

procurement supply installation

construction commissioning and

start up of a pilot rural

electrification project based upon

single-phase in RWANDA

Sub-station Connection Factory Acceptance Test of AAAC Conductor and twisted cables in presence of Rwandan technicians

Electrcity supply in rwandan remote villages

Energy is an important factor for Socio-Economic Developemnt

18

40 Gas Segment

Services provided Gas Condensate Treatment Unit Pipeline On-Line Welding

SIS services cover the following scope

of activities

bull Study control and supervision of gas

projects erection works

bull Master plans elaboration regarding Gas Transmission and Distributions networks

bull Catholic Protection of gas network bull Gas and condensate treatment units

operation and maintenance related tasks

bull Gas compression stations operation and

maintenance related tasks bull Supervisory and control systems

operation and maintenance bull Gas pipelines network supervision and

remote command bull Pipeline inspection bull Steel pipes and gas delivery station

specification bull Compression stations specification and

supervision of erection works bull Gas and condensate treatment unitsrsquo

implementation commissioning and start-up

Hot Tap Achievement Gas pipeline welding connection

Topographic surveying

19

50 Laboratory-Workshop

Main Activities Rotary Furnace Inspection Surfacing High Precision Castings

General Technics Department GTD was established to perform technical assistance to all power generating units including

bull Thermal Power Plants

bull Combined Cycle Power Plants

bull Gas Turbines

bull Hydraulic Power Plants etc

GTD Mission

bull Acceptance Trial of Equipment

bull High and Mid Voltage Testing (also called dielectric strength test or Hipot Test)

bull Acoustics and Mechanical Vibration

bull Thermodynamics and Hydraulic Activities Management

bull Chemical Analysis amp Controls

bull Metallurgical amp NDT Controls

bull Workshop

NDT Magnetic Testing Turbine Speed Balancing

Analysis of gas dissolved in dielectric liquids of large transformers operation

water lubricant oil dielectric oil and liquid fuel analysis

Dielectric Laboratory Welding Work Shop

Dielectric Laboratory

bull Dielectric oil rigidity

bull Physical and Chimical Characterisics of Dielectric oil

bull Dissolved gas in Dielectric oil

bull Acceptance trials for generators transformers switch-gears

Welding Work Shop

bull Steel plate works

20

bull Heat treatment in furnace or outside

bull Surface reparing by powder spray metallisation

bull Rebabbiting of used bearing

60 Vocational Training ndash Photo Gallery

Services Provided

Practical Hands-On Training Equipment

Practical Hands-On Training electricity amp gas counter

SIS as an energy company

provides the entire scope of training

services including

bull Upgrade of training centers

bull Drawing up and delivery of

training courses

bull Training of trainers

bull Designing and monitoring of

training programs

bull End-user training organization

of seminars hands-on training

on-the-job training and

designing of training manuals

The training provided is relevant

effective structured and

continuously updated This

maintains a high level of technical

skills and procedures in a

constantly changing environment

Practical Hands-On Training works under voltage

Classroom Training on electrical maintenance related to electrical power utilities

21

enabling all staff to keep abreast of

technical innovations and

improvements together with

legislative requirements and

recommended practices

STEG Training Center (CFPK)

Since its inception in 1976 CFPKrsquos aim has been to train newly recruited STEG technicians in Generation Transmission Distribution and Gas sectors and to provide advanced training and retraining for active personnel Since then the Center has constantly expanded and adjusted in order to bull Address STEGrsquos specific requirements in vocational training in all its

sectors technical commercial financial computing management auditing new technologies etc

bull Provides a logical approach as to how to establish and assure a competent workforce by technical vocational training for now and the future

bull Provide appropriate training programs for organizations outside STEG both at national and international levels (in-house training customized courses and lectures)

22

70 Samples of Project Experience

Since 2006 SIS has undertaken many assignments in African countries Middle East and in

Tunisia It is only possible to show a small selection of these in this brochure We are always

happy to provide additional details and examples of our experience on request

71 Accomplished Projects

POWER GENERATION

No Contract Identification Unitne Installed

Capacity(MW) location Start

Date End Date

1 Annual Inspection

5 260 Rabigh SEC Saudi Arabia)

20-12-2005

30-01-2006

2 Annual Inspection 2 260

Rabigh SEC Saudi Arabia)

09-03-2006

22-04-2006

3 Annual Inspection

3 260 Rabigh SEC Saudi Arabia)

19-03-2006

29-04-2006

4 Annual Inspection

1amp4 440 Shoaiba SEC Saoudi Arabia

27-01-2007

01-03-2007

5 Annual Inspection 4 440

Shoaiba SEC Saoudi Arabia

03-03-2007

05-04-2007

6

Annual Inspection Bell seals rings amp nozzle blocks replacement ( turbine overhaul)

4 260 Rabigh SEC Saudi Arabia)

03-01-2008

07-03-2008

7 Annual Inspection 2 260

Rabigh SEC Saudi Arabia)

08-03-2008

15-04-2008

8 Major Overhaul

GT1 27 TihamaSEC Saudi Arabia

20-01-2008

10-02-2008

9

Erection and Supervision of Works 300 MW (ISO Condition) Open Cycle Power Plant Fast Emergency

GTs 1-4

4x75 ISO Conditions

Ministry of Energy

(Electricity and Water)

Sabya Power Plant

State of KOWEIT

2007- 2008

10 Commissioning CPL amp Parallel Resonant Circuit in close cooperation with AREVA

Ethiopie 2007-2008

11

Revamping of obsolete Control and instrumentation system (in close cooperation with SIEMENS)

2 Units Marocco 2008

23

No Contract Identification Unitne Installed Capacity (MW)

location Start Date

12

Commissioning of Control command system Mark VI on GTs Frame 5 (in close cooperation with GESHANAHAN Eng

GTs GE Frame 5

Algeria (Arzew) 2008

13

Grid Interconnection In close cooperation with STUDI for West African Power Pool (WAPP)

225 KV

Electricity grid interconnection

between Burkina Faso and Ghana

2008

14 Pricing Study Senegal 2008

15 Major Inspection GT6

GE-FR7

Najran SEC Saudi Arabia

2008

16 Major Inspection (MI) W501D5

Jazan SEC Saudi Arabia

2009

17 Annual Inspection 2amp3 2x393 Shoaiba SEC Saudi Arabia

2009

24

25

SISrsquoS Experiences in Boilerrsquos Maintenance Work

Power plant location Boiler tech Details ampInspections

Rades A (ST) ST STEAM TURBINE Rades B (ST)

Unit 1 Unit 2 Unit 3 Unit 4

Manufacturer Mitsubishi H I Mitsubishi H I Ansaldo Energia Ansaldo Energia Type amp Model MHI CE RR

type out-door MHI CE RR type outdoor

AE RR type outdoor

AE RR type outdoor

Date of commissioning 1983 1984 1998 1999 MCR (th) 520000 520000 5335 5335

Steam conditions Pressure SHRH(bars) 1685 352 1685 352 1739 1739 Temperature( degC) 543 543 542 542

fuel Natural gas heavy Fuel Ndeg2

Natural gas heavy Fuel Ndeg2

Natural gas heavy Fuel Ndeg2

Natural gas heavy Fuel Ndeg2

Heating area Furnace(msup2) 5105 5105 5360 5360 Reheater (msup2) 3130 3130 1286 1286 Eco (msup2) 2600 2600 1556 1556

Fuel oil Burners type amp No 20 20 Y Ndeg 12 Y Ndeg 12 FDF type amp capacity ( Th) HC 591 HC 591 HC748 HC 748 IDF type amp capacity (Th) HC 640 HC 640 NA NA GRF type amp capacity ( Th) HC 500 HC 500 HC 300 HC 300

RegenAir Preheater Type Ljungstroumlm Ljungstroumlm Ljungstroumlm Ljungstroumlm No amp capacity 2 2 2 2 Heating surface(msup2) 12000 12000 18000 18000

Annual inspection No 20 20 10 10 Starting amp Completion dates

21 Days 21 days 21 days 21 days

Major overhaul No 04 04 01 01 Starting amp Completion dates

1221038843 days 611028854 days 56 days 59 days

Boiler conservation No 20 20 08 08 Boiler Rehabilitation No 0 0 0 0 Boiler Tube Acid cleaning No 01 01 01 01 ILA(Integrity Life Assessment)No 0 0 0 0

26

SISrsquos Experiences in Boilersrsquo Maintenance Work

Power plant location Boiler tech Details ampInspections

Sousse A (ST) Sousse B (CCPP)

Unitne1 Unitne 2 Unitne1 Unitne 2

Manufacturer SGP SGP STEIN INDUSTRY STEIN INDUSTRY Type amp Model Natural circulation Natural circulation Heat Recuperator Heat Recuperator Date of commissioning 1980 1980 1995 1995 MCR (th) 515 515 HP 182 BP 415 HP 182 BP 415 Steam conditions Pressure SHRH (bar) 16038 16038 HP 72 BP 66 HP 72 BP 66

Temperature (degC) 540degC 540degC HP 511 BP 213 HP 511 BP 213 fuel FUELGAZ FUELGAZ Gaz Gaz Heating area Furnace (m2 2080 ) 2080 HP evaporator 25251 LP evaporator 18627

Reheater (m2 1512 ) 1512 HP superheater 9418 LP superheater 2328 Eco (m2 2017 ) 2017 HP economizer 16834 13773 LP economizer 3060

Fuel oil Burners Type ampNo EVT8 EVT8 FDF type amp capacity R62250 7566 m3 R62250 7566 ms 3 s

GRF type amp capacity R62250 721 m3 R62250 721 ms 3 s

Regen Air Preheater

Type No amp capacity 2 220186 Nm3h 2 220186 Nm3h

Heating surface(m2) 2x924 2x924 Annual Inspection

No annually annually annually annually Starting amp completion dates 3 - 4 weeks 3 - 4 weeks 10 days 10 days

Major Overhaul No along with annual inspectioccediln along with annual inspectioccediln

Starting amp completion dates 3 - 4 weeks 3 - 4 weeks

Boiler Conservation No 3 2 Boiler Rehabilitation No Boiler Tube Acid Cleaning No 2 2 ILA (Integrity Life Assessment) No 1

27

SISrsquos Experiences in Boilersrsquo Maintenance Work

Power plant location Boiler tech Details ampInspections Unitne1 (ST) Unitne 2 (ST) Unitne 3 (ST) Unitne 4 (ST)

Manufacturer WALTHER Type amp Model WALTHER FN10 Natural Circulation Date of commissioning 05071965 01111965 22061968 20091968 MCR (th) 112 Steam conditions

Pressure 686 bar Temperature 510 degC

fuel Heavy fuel oil Ndeg2 light fuel oil

Heating area

Furnace (m2 540 m2 ) Reheater (m2 1542 m2 ) Eco (m2 480 m2 )

Fuel oil Burners Type ampNo SONVICO 4 FDF type amp capacity Centrifugal - 27 m3s IDF type amp capacity - - - - GRF type amp capacity - - - -

Regen Air Preheater Type Static LJUNGSTROM No amp capacity 1 1 1 1 Heating surface(m2) 7350 m2 -

Annual Inspection No every year until 1998 every year until

2005 every year until 1998

every year until 2005

Starting amp completion dates - - - -

Major Overhaul No 6 8 5 5 Starting amp completion dates - - - -

Boiler Conservation No - 2 - 2 Boiler Rehabilitation No 4 6 5 5 Boiler Tube Acid Cleaning No 0 0 0 0 ILA (Integrity Life Assessment) No 0 0 0 0

28

SISrsquos Experiences in Boilersrsquo Maintenance Work Power Plant Location

Boiler Tech Details ampInspections

Ghannouch (ST) Unitne1 (ST) Unitne 2

Manufacturer Stein Industrie Stein Industrie Type amp Model Natural circulation Natural circulation Date of commissioning 1972 1972 MCR (th) 120 120 Steam conditions Pressure SHRH (th) 70 bars 70 bars

Temperature 510 degC 510 degC fuel Natural GasHeavy fuel Natural GasHeavy fuel Heating area Furnace (m2 )

Reheater (m2 8880 dmsup3 ) 8880 dmsup3 Eco (m2 2400 dmsup3 ) 2400 dmsup3

Fuel oil Burners Type ampNo PILLARD GRC PILLARD GRC IDF type amp capacity GRF type amp capacity Regen Air Preheater Type Ljunstroumlm Ljunstroumlm

No amp capacity 140msup3h 140msup3h Heating surface(m2) _ _

Annual Inspection No 1 1 Starting amp completion dates 1 week 1 week

Major Overhaul No 15ans 15ans

Starting amp completion dates 2 months 2 months

Boiler Conservation No in case of being extended in case of being extended Boiler Rehabilitation No NO NO Boiler Tube Acid Cleaning No NO NO ILA (Integrity Life Assessment) No NO NO

29

ELECTRICAL TRANSMISSION SYSTEM

Accomplished Projects

bull Tests performed on Numerical relays manufactured by - ABB (Distance protection REL 316 ) - AREVA (Distance protection EPAC MICOMP442 hellip) - ICE (Over current protection NPID 800hellip) - SIEMENS (Distance protection 7SA 511 513 522 611) - REYROLLES (Differential protection DUOBIAS)

bull Test and setting of protective relays and checking the tripping circuits for Generators and

Substations belonging to Zaouia Petroleum Refinery (Libya)

bull Short circuit calculation selectivity study of protective relays by providing solutions for the

existing issues in PEC YEMEN Networks

bull Study and improvement of the existing protective system in close cooperation with Tractebel

Engineering

bull Technical Assistance for Independent Power Producers (IPP) Plant (Carthage Power

Company (CPC) Tunisia) regarding the maintenance and testing of protective relays

related to

- Generators - Main transformers - Auxiliaries - Etc

bull Technical Assistance testing and setting of protective relays at

- Steel ndashworks (Tunisia) - Cement ndashmarker (Tunisia) - Iron industries (Tunisia) - Chemical industries (Tunisia)

bull Commissioning and setting of protective relays at substations (High Medium and Low

voltages)

bull Renovation of the obsolete equipment (relays switchgear hellip)

bull Maintenance of the transmission lines and substations equipment

bull Cost-effective solutions establishment regarding the network issues (droop voltage over

voltage improvement of power factor etc)

30

ELECTRICAL DISTRIBUTION SYSTEM

Rural Electrification- Accomplished Projects

Contract Identification

Contract No 18 Technical Assistance and implementation of a Rural electrification project based upon SWER (Single Wire Earth Return) techniques

Award date 1998 Completion date 1999 Employerrsquos Name JIRAMA (JIRO SY RANO MALAGAS) Address

149 RUE RAINANDRIAMAMPANDRY Antananarivo BP 200 - MADAGASCAR

Main Tasks Performed

bull Training on SWER System bull Data collection needed for SWER System studies and implementation bull Finalization of technical studies and submission of report including

- Technical audit of the pilot project already in place - Technical description of the project - AdviseRecommendations on equipment specifications - Recommendations on possible changes in adjustment and coordination of electrical

protections

Contract Identification

Contract No 19 RWANDA Project (Phase 1) Implementation of a Pilot Rural Electrification Project based on Single-Phase with neutral to ground called MALT System 4000 Subscribers

Award date June 2008 Completion date June 2009

Employerrsquos Name

RECO ( former ELECTROGAZ) -RWANDA

Address BP 537 KIGALI -RWANA

Main Tasks performed

bull Study and Diagnosis of the existing Rwandan Power Distribution An inventory of the existing facilities including generation transmission and distribution systems was established

bull Implementation of a pilot rural electrification project based on MALT System Visit was arranged to some Tunisian rural regions and companies manufacturing electric equipment namely

- Transformers

- Iron poles

- Concrete supports

- Electric cables

- Electronic meters and

- MV and LV line accessories

31

Contract Identification

Contract No 20 Local Electrification study of Tambacounda and Kedougou departments Award date October 2002 Completion date March 2003 Customerrsquos name SENELEC Address ELECTRICAL COMPANY SENEGAL

Main Tasks Performed

bull Data Collection bull Socio-economic survey bull Technical economic and financial analysis bull Electricity market forecast (demand forecast (2003-2015)) bull Estimation of worksrsquo costs regarding medium voltage single-phase and tri-phase lines medium

and low voltage stations low voltage lines diesel micro-stations individual photovoltaic systems bull Technical and economic study related to different methods of supply including the solar as well as

the opportunity of introducing the single-phase system for the rural electrification bull Proposition for the public lighting and the management of photovoltaic systems bull Recommendations for the reinforcement of the existing stations and the existing networks to satisfy

the future demand due to the electrification of the new villages bull Tariff and profitability study bull Set up of the geographical maps and the low voltage electrification plan of the most important

villages (34 villages) bull Recommendations on privatizing power generation energy sector

Contract Identification Contract No 21 - Rural Electrification study of 80 villages in Comoros Isles

- Preparation of Tender Documents for the supply of equipment needed to the construction of 145 km MV lines 100 km LV lines and 80 MVLV stations

- Call for tenders evaluation of Bidders Award date November 2000 Completion date Dec 2002 Customerrsquos name

Ministry of Equipment Department of Energy and Water Resources

Address Moroni Avenue of the Democratic Republic of China

Main Tasks Performed

bull Data collection and visit of the existing electric utilities bull Situation analysis and proposal of electric infrastructure management solutions bull Electricity Demand Estimation and Forecasting bull Electric Calculation (Load Repartition Line Voltage Drop Losses and Voltage Drops

Calculations Short-Circuit Calculations Simulation of the Extension and Reinforcement of the Medium Voltage Networks Power System Stability Analysis Reactive Power Compensation

bull Low Voltage Studies for the Electrification of 80 villages bull RecommendationsSuggestions for the reinforcement of power generation utilities to satisfy

the future demand (by 2010) bull Electricity Tariffing study

- Review of electricity consumption patterns - Cost review - Review of tariff policies - Application and implementation of revised tariff levels

32

Contract Identification Contract Ndeg 22 Establishment and set up of a computerized accounting and budget system

Award date 1992 Completion date 1994 Customerrsquos name SOMELEC Address Nouakchott - MAURITANIA

Main Tasks Performed

bull Analytical accounting bull Bid evaluation bull Cash flow movements management bull Fixed assets management bull Centralizing bookkeeping bull Existing computer application interfaces update bull Transposition of the existing system to the new one bull Operation and maintenance Documents preparation bull Execution of the transposition of the existing system to the new one

Contract Identification Contract

No 23 Electricity sector reform technical assistance in the interim management of the ldquoCompagnie Energie Electrique du Togo ldquo(CEET)

Award date 41997

Completion date 122000

Employerrsquos Name Ministry of Mining Equipment transmission Mail and Telecommunications

Address TOGO

Main Tasks Performed

bull Technical assistance in the interim management of the CEET within the framework of the electricity sectorrsquos liberalization 1) termination of the current CEET management 2) analysis of the existing situation 3) interim management of the CEET prior to its privatization

bull Operation and maintenance of the electrical network for Lomeacute and its surrounding rural areas bull Electricity generation in isolated centers bull Electricity transmission and distribution bull Procurement and maintenance of new diesel production units bull Reduction of energy losses bull Customer management bull Increase in the number of Customers bull Accounting and billing bull Increase in payment recovery bull Call for tenders evaluation of proposals drafting of the technical annexes concerning the contracting

for a new independent operator (concession)

33

72 On-going and Under Bidding (UB) Projects

No Project Description Country

1 Training Center Update (on-going project) Republic of Congo BRAZZAVILLE

2 Master Plan elaboration in close cooperation with STUDI (Tunisia) (on-going project)

Republic of Senegal

3 Implementation of a Rural Electrification Project based on Single-Phase Four-Wires

with Neutral to Ground called MALT System (UB) Republic of Burkina Faso

4 Cost study connections to and extensions of electricity distribution networks

(UB)

Republic of Burkina Faso

5 Works Control and supervision of rural electrification of 33 communities in 4

regions of the Republic of Cameroon (UB) Republic of CAMEROUN

34

JUDICIOUS AND EFFICIENT ENERGY UTILIZATION

IS AT THE FOREFRONT OF OUR MINDS

35

Over the year 2008 STEG International Services (SIS) has widened its scope of activities to

include techno-economic studies and assistance in energy efficiency thereby providing support

to the national energy policy aiming at considering energy auditing energy efficiency energy

saving as a major priority target in Tunisiarsquos future energy strategic plan objectives In this

regard STEG International Services has carried out several projects including but not limited to

the following

80 Energy Efficiency

bull Performing obligatory periodical energy audits for industrial installations as well as energy audits on a consultancy basis

bull Assistance on projects involving energy efficiency bull Studies on energy efficiency of circuits hydraulic and thermal systems bull Upgrading energy management systems of industrial plants

81 Co-generation (Combined Heat and Power (CHP)) Studies

The main tasks performed included

bull Feasibility studies and project implementation assistance ndash RandaTunis

bull Assistance in electric utility restructuring from self power producer (electricity generation

only) to self-producing co-generatorsndash STSBEJATunisia

bull Technical assistance related to STEGrsquos grid connection with Co-generation plants in some

industrial units -SOTIPAPIER STS T-PAP and Carthago-GRE- Tunisia

82 Energy audits and energy efficiency

In any industry the three top operating expenses are often found to be energy (both electrical

and thermal) labour and materials Energy would invariably emerge as a top ranker and thus

energy management function constitutes a strategic area for cost reduction

Energy Audit will help to better understand how energy is used in any industry and in identifying

the areas where waste can occur and where scope for improvement exists In this regard the

Energy Audit would give a positive orientation to the energy cost reduction preventive

maintenance and quality control programs which are vital to production and utility activities Such

36

an audit program will help keep focus on variations which occur in the energy costs availability

and reliability of supply of energy decide on appropriate energy mix identify energy

conservation technologies retrofit for energy conservation equipment etc

Therefore SIS can carry out comprehensive assessment of techno-economic performance of

plants and equipment against the designed performance level or the industry best practice

aiming at optimizing consumption levels along with specific operating control targets

821 Samples of accomplished and on-going Energy Auditing projects

bull Energy Audit of the Liquefied Petroleum Gas (LPG) plant located in Gabegraves (Tunisia) with the assistance of Kvaerner Heurtey in 2001

bull Energy Performance Assessment of Rades and Sousse steam and Combined Cycle Power Plants as well as Bouchemma Menzel Bourguiba Korba Gas Turbines with the assistance of TRACTABEL and EDF in 2002

bull Energy Audit of Sousse Combined Cycle Power Plant with the assistance of CRA2E in 2007-2008

bull Periodic Performance Tests of Carthage Power Company (CPC) combined cycle an Impendent Power Producer (IPP) in Tunisia

37

SIS Future Commitments and Responsibilities

Endowed with a clear vision a sound project management and solid experiences and

know-how acquired by the parent company STEG through its various trades of over 48 years

SIS has put together a team of experts inndashline with its strategic intent- to be positioned as a

competitive and pre-eminent regional energy services company by spreading its expertise and

know-how throughout the African continent Arab countries and the rest of the world working on

a partnership basis with potential consultants andor the utilities of the respective countries

resulting in a keen focus and a strong sense of purpose

As part of its vision SIS management recognizes that it has responsibilities to all of its

stakeholders These include

Shareholders SIS will protect the investments of its shareholders and will provide an acceptable return on

investments through the application of its business principles Customers SIS will aim at optimizing its business activities through winning customers and maintaining

customerrsquos loyalty by offering them high quality services at competitive prices delivering on time

and supporting them with its management expertise

Employees SIS recognizes that its working employees are the key to its success and it nurtures loyalty

teamwork and trust between them SIS will strive to protect support and involve them in the

companyrsquos future to develop their skills and to reward them in line with the corporate values of

SISrsquos organization

Partners Suppliers Contractors and all External Contacts SIS will seek to treat all its partners suppliers contractors and other external stakeholders in a

consistently professional way and to ensure that their needs are fulfilled in every way possible

38

  • 72 On-going and Under Bidding (UB) Projects

12

bull Electrical works

bull Corrective maintenance etc

bull Unit recommissioning and start up

bull Post outage activities (unit performance test vib MeasurementAnnual inspection report preparation and issue)

13 Major Overhaul of GE FR-7 Gas Turbine at Najran Power Plant- in partnership with Gulf Power InternationalDabbagh Group (Kingdom of Saudi Arabia) - Photo Gallery

Services provided Turbine rotor blades inspection TurbineGenerator Control System Mark 5 Troubleshooting

The services provided included

The disassembly removal cleaning visual inspection for erosion corrosion wear cracks damages etc Non Destructive Testing (NDT) inspection alignment checks dimensional checks clearances checks repair servicing maintenance complete partial replacement re-assembly installation alignment adjustment and final quality checks The works performed concerned the below listed and other parts

- Unit Major Inspection including (all Mechanical Electrical Instrumentation and Control Work)

- Unit Hot Gas Path Inspection (all Mechanical Electrical Instrumentation and Control Work)

- NDT of Compressor turbine Generator sections

- Rotor overhaul and Reblading

- Instrument and Controls Maintenance

- Transformers maintenance

- Re-assembly

- Start - up

- Performance test

- Report submittal covering all the areas and aspects of the work done by SIS during the execution the awarded contract

Setting of Turbine bearing compressor rotor inspection

13

14 Strengthening Thermal Generation Plants Capacities injected in the Interconnected Network (IN)

Services provided Measurement of Transformer Ratio

Control and Supervision of Power Generation Plant Extension in Balingueacute (Bamako) in the republic of MALI comprising 4 Diesel Groups 4x11 5 MW ISO Conditions in partnership with IDC (Tunisia)

The services carried out by SIS included

bull Approval of study documents and assembly (accomplished)

bull Factory acceptance test (accomplished)

bull Supervision and control of on-site assembly works (on-going)

bull Site acceptance test and commissioning (once the assembly works will be terminated)

On-load Tape Changer ( OLTC) Transformer Visual Control

14

Test follow up on induced voltage Induced Voltage test on HVMV Transformer

20 Electrical Transmission Network

SISrsquos Scope of activities includes but not limited to the following services

bull Studies of power system transmission network

(system modelling power flow faults analysis) using computer simulation packages

bull Update of the dynamic and static stability studies with the view of evaluating the impact of the new electric power generation and transmission installations

bull Master plans elaboration bull Short-circuits calculation bull Under frequency load shedding calculation bull Development of electrical network protection

schemes including selection of relaysrsquo types and relays coordination

bull Protection setting calculation and configuration

bull Fault analysis in transmission networks using fault recorders and simulation software packages

bull Dimensioning of surge arresters

Washing of energized high voltage insulators

15

bull Commissioning installation and operation of digital control of the HV substations

bull Preparation of technical specifications and evaluation of Bidders

Design and construction of a testing station of insulators in polluted marine industrial and desert region in Oran (Algeria)

16

30 Electrical Distribution Network

South-South Cooperation

We are proud to draw upon our experiences and expertise as a company based in an

African country to help others across Africa

ELECTRICAL DISTRIBUTION

NETWORK

17

RURAL ELECTRIFICATION- CONSTRUCTION WORKS ON A TURN KEY BASIS Pilot Rural Electrification Project based upon single-phase in RWANDA

Services provided Signature of an agreement for cooperation and technical assistance between STEG amp ELECTROGAZ

Metallic Poles delivery

The scope of works included bull Study and Diagnosis of the

existing Rwandan Power

Distribution An inventory of the

existing facilities including

generation transmission and

distribution systems was

established

bull The turnkey design engineering

procurement supply installation

construction commissioning and

start up of a pilot rural

electrification project based upon

single-phase in RWANDA

Sub-station Connection Factory Acceptance Test of AAAC Conductor and twisted cables in presence of Rwandan technicians

Electrcity supply in rwandan remote villages

Energy is an important factor for Socio-Economic Developemnt

18

40 Gas Segment

Services provided Gas Condensate Treatment Unit Pipeline On-Line Welding

SIS services cover the following scope

of activities

bull Study control and supervision of gas

projects erection works

bull Master plans elaboration regarding Gas Transmission and Distributions networks

bull Catholic Protection of gas network bull Gas and condensate treatment units

operation and maintenance related tasks

bull Gas compression stations operation and

maintenance related tasks bull Supervisory and control systems

operation and maintenance bull Gas pipelines network supervision and

remote command bull Pipeline inspection bull Steel pipes and gas delivery station

specification bull Compression stations specification and

supervision of erection works bull Gas and condensate treatment unitsrsquo

implementation commissioning and start-up

Hot Tap Achievement Gas pipeline welding connection

Topographic surveying

19

50 Laboratory-Workshop

Main Activities Rotary Furnace Inspection Surfacing High Precision Castings

General Technics Department GTD was established to perform technical assistance to all power generating units including

bull Thermal Power Plants

bull Combined Cycle Power Plants

bull Gas Turbines

bull Hydraulic Power Plants etc

GTD Mission

bull Acceptance Trial of Equipment

bull High and Mid Voltage Testing (also called dielectric strength test or Hipot Test)

bull Acoustics and Mechanical Vibration

bull Thermodynamics and Hydraulic Activities Management

bull Chemical Analysis amp Controls

bull Metallurgical amp NDT Controls

bull Workshop

NDT Magnetic Testing Turbine Speed Balancing

Analysis of gas dissolved in dielectric liquids of large transformers operation

water lubricant oil dielectric oil and liquid fuel analysis

Dielectric Laboratory Welding Work Shop

Dielectric Laboratory

bull Dielectric oil rigidity

bull Physical and Chimical Characterisics of Dielectric oil

bull Dissolved gas in Dielectric oil

bull Acceptance trials for generators transformers switch-gears

Welding Work Shop

bull Steel plate works

20

bull Heat treatment in furnace or outside

bull Surface reparing by powder spray metallisation

bull Rebabbiting of used bearing

60 Vocational Training ndash Photo Gallery

Services Provided

Practical Hands-On Training Equipment

Practical Hands-On Training electricity amp gas counter

SIS as an energy company

provides the entire scope of training

services including

bull Upgrade of training centers

bull Drawing up and delivery of

training courses

bull Training of trainers

bull Designing and monitoring of

training programs

bull End-user training organization

of seminars hands-on training

on-the-job training and

designing of training manuals

The training provided is relevant

effective structured and

continuously updated This

maintains a high level of technical

skills and procedures in a

constantly changing environment

Practical Hands-On Training works under voltage

Classroom Training on electrical maintenance related to electrical power utilities

21

enabling all staff to keep abreast of

technical innovations and

improvements together with

legislative requirements and

recommended practices

STEG Training Center (CFPK)

Since its inception in 1976 CFPKrsquos aim has been to train newly recruited STEG technicians in Generation Transmission Distribution and Gas sectors and to provide advanced training and retraining for active personnel Since then the Center has constantly expanded and adjusted in order to bull Address STEGrsquos specific requirements in vocational training in all its

sectors technical commercial financial computing management auditing new technologies etc

bull Provides a logical approach as to how to establish and assure a competent workforce by technical vocational training for now and the future

bull Provide appropriate training programs for organizations outside STEG both at national and international levels (in-house training customized courses and lectures)

22

70 Samples of Project Experience

Since 2006 SIS has undertaken many assignments in African countries Middle East and in

Tunisia It is only possible to show a small selection of these in this brochure We are always

happy to provide additional details and examples of our experience on request

71 Accomplished Projects

POWER GENERATION

No Contract Identification Unitne Installed

Capacity(MW) location Start

Date End Date

1 Annual Inspection

5 260 Rabigh SEC Saudi Arabia)

20-12-2005

30-01-2006

2 Annual Inspection 2 260

Rabigh SEC Saudi Arabia)

09-03-2006

22-04-2006

3 Annual Inspection

3 260 Rabigh SEC Saudi Arabia)

19-03-2006

29-04-2006

4 Annual Inspection

1amp4 440 Shoaiba SEC Saoudi Arabia

27-01-2007

01-03-2007

5 Annual Inspection 4 440

Shoaiba SEC Saoudi Arabia

03-03-2007

05-04-2007

6

Annual Inspection Bell seals rings amp nozzle blocks replacement ( turbine overhaul)

4 260 Rabigh SEC Saudi Arabia)

03-01-2008

07-03-2008

7 Annual Inspection 2 260

Rabigh SEC Saudi Arabia)

08-03-2008

15-04-2008

8 Major Overhaul

GT1 27 TihamaSEC Saudi Arabia

20-01-2008

10-02-2008

9

Erection and Supervision of Works 300 MW (ISO Condition) Open Cycle Power Plant Fast Emergency

GTs 1-4

4x75 ISO Conditions

Ministry of Energy

(Electricity and Water)

Sabya Power Plant

State of KOWEIT

2007- 2008

10 Commissioning CPL amp Parallel Resonant Circuit in close cooperation with AREVA

Ethiopie 2007-2008

11

Revamping of obsolete Control and instrumentation system (in close cooperation with SIEMENS)

2 Units Marocco 2008

23

No Contract Identification Unitne Installed Capacity (MW)

location Start Date

12

Commissioning of Control command system Mark VI on GTs Frame 5 (in close cooperation with GESHANAHAN Eng

GTs GE Frame 5

Algeria (Arzew) 2008

13

Grid Interconnection In close cooperation with STUDI for West African Power Pool (WAPP)

225 KV

Electricity grid interconnection

between Burkina Faso and Ghana

2008

14 Pricing Study Senegal 2008

15 Major Inspection GT6

GE-FR7

Najran SEC Saudi Arabia

2008

16 Major Inspection (MI) W501D5

Jazan SEC Saudi Arabia

2009

17 Annual Inspection 2amp3 2x393 Shoaiba SEC Saudi Arabia

2009

24

25

SISrsquoS Experiences in Boilerrsquos Maintenance Work

Power plant location Boiler tech Details ampInspections

Rades A (ST) ST STEAM TURBINE Rades B (ST)

Unit 1 Unit 2 Unit 3 Unit 4

Manufacturer Mitsubishi H I Mitsubishi H I Ansaldo Energia Ansaldo Energia Type amp Model MHI CE RR

type out-door MHI CE RR type outdoor

AE RR type outdoor

AE RR type outdoor

Date of commissioning 1983 1984 1998 1999 MCR (th) 520000 520000 5335 5335

Steam conditions Pressure SHRH(bars) 1685 352 1685 352 1739 1739 Temperature( degC) 543 543 542 542

fuel Natural gas heavy Fuel Ndeg2

Natural gas heavy Fuel Ndeg2

Natural gas heavy Fuel Ndeg2

Natural gas heavy Fuel Ndeg2

Heating area Furnace(msup2) 5105 5105 5360 5360 Reheater (msup2) 3130 3130 1286 1286 Eco (msup2) 2600 2600 1556 1556

Fuel oil Burners type amp No 20 20 Y Ndeg 12 Y Ndeg 12 FDF type amp capacity ( Th) HC 591 HC 591 HC748 HC 748 IDF type amp capacity (Th) HC 640 HC 640 NA NA GRF type amp capacity ( Th) HC 500 HC 500 HC 300 HC 300

RegenAir Preheater Type Ljungstroumlm Ljungstroumlm Ljungstroumlm Ljungstroumlm No amp capacity 2 2 2 2 Heating surface(msup2) 12000 12000 18000 18000

Annual inspection No 20 20 10 10 Starting amp Completion dates

21 Days 21 days 21 days 21 days

Major overhaul No 04 04 01 01 Starting amp Completion dates

1221038843 days 611028854 days 56 days 59 days

Boiler conservation No 20 20 08 08 Boiler Rehabilitation No 0 0 0 0 Boiler Tube Acid cleaning No 01 01 01 01 ILA(Integrity Life Assessment)No 0 0 0 0

26

SISrsquos Experiences in Boilersrsquo Maintenance Work

Power plant location Boiler tech Details ampInspections

Sousse A (ST) Sousse B (CCPP)

Unitne1 Unitne 2 Unitne1 Unitne 2

Manufacturer SGP SGP STEIN INDUSTRY STEIN INDUSTRY Type amp Model Natural circulation Natural circulation Heat Recuperator Heat Recuperator Date of commissioning 1980 1980 1995 1995 MCR (th) 515 515 HP 182 BP 415 HP 182 BP 415 Steam conditions Pressure SHRH (bar) 16038 16038 HP 72 BP 66 HP 72 BP 66

Temperature (degC) 540degC 540degC HP 511 BP 213 HP 511 BP 213 fuel FUELGAZ FUELGAZ Gaz Gaz Heating area Furnace (m2 2080 ) 2080 HP evaporator 25251 LP evaporator 18627

Reheater (m2 1512 ) 1512 HP superheater 9418 LP superheater 2328 Eco (m2 2017 ) 2017 HP economizer 16834 13773 LP economizer 3060

Fuel oil Burners Type ampNo EVT8 EVT8 FDF type amp capacity R62250 7566 m3 R62250 7566 ms 3 s

GRF type amp capacity R62250 721 m3 R62250 721 ms 3 s

Regen Air Preheater

Type No amp capacity 2 220186 Nm3h 2 220186 Nm3h

Heating surface(m2) 2x924 2x924 Annual Inspection

No annually annually annually annually Starting amp completion dates 3 - 4 weeks 3 - 4 weeks 10 days 10 days

Major Overhaul No along with annual inspectioccediln along with annual inspectioccediln

Starting amp completion dates 3 - 4 weeks 3 - 4 weeks

Boiler Conservation No 3 2 Boiler Rehabilitation No Boiler Tube Acid Cleaning No 2 2 ILA (Integrity Life Assessment) No 1

27

SISrsquos Experiences in Boilersrsquo Maintenance Work

Power plant location Boiler tech Details ampInspections Unitne1 (ST) Unitne 2 (ST) Unitne 3 (ST) Unitne 4 (ST)

Manufacturer WALTHER Type amp Model WALTHER FN10 Natural Circulation Date of commissioning 05071965 01111965 22061968 20091968 MCR (th) 112 Steam conditions

Pressure 686 bar Temperature 510 degC

fuel Heavy fuel oil Ndeg2 light fuel oil

Heating area

Furnace (m2 540 m2 ) Reheater (m2 1542 m2 ) Eco (m2 480 m2 )

Fuel oil Burners Type ampNo SONVICO 4 FDF type amp capacity Centrifugal - 27 m3s IDF type amp capacity - - - - GRF type amp capacity - - - -

Regen Air Preheater Type Static LJUNGSTROM No amp capacity 1 1 1 1 Heating surface(m2) 7350 m2 -

Annual Inspection No every year until 1998 every year until

2005 every year until 1998

every year until 2005

Starting amp completion dates - - - -

Major Overhaul No 6 8 5 5 Starting amp completion dates - - - -

Boiler Conservation No - 2 - 2 Boiler Rehabilitation No 4 6 5 5 Boiler Tube Acid Cleaning No 0 0 0 0 ILA (Integrity Life Assessment) No 0 0 0 0

28

SISrsquos Experiences in Boilersrsquo Maintenance Work Power Plant Location

Boiler Tech Details ampInspections

Ghannouch (ST) Unitne1 (ST) Unitne 2

Manufacturer Stein Industrie Stein Industrie Type amp Model Natural circulation Natural circulation Date of commissioning 1972 1972 MCR (th) 120 120 Steam conditions Pressure SHRH (th) 70 bars 70 bars

Temperature 510 degC 510 degC fuel Natural GasHeavy fuel Natural GasHeavy fuel Heating area Furnace (m2 )

Reheater (m2 8880 dmsup3 ) 8880 dmsup3 Eco (m2 2400 dmsup3 ) 2400 dmsup3

Fuel oil Burners Type ampNo PILLARD GRC PILLARD GRC IDF type amp capacity GRF type amp capacity Regen Air Preheater Type Ljunstroumlm Ljunstroumlm

No amp capacity 140msup3h 140msup3h Heating surface(m2) _ _

Annual Inspection No 1 1 Starting amp completion dates 1 week 1 week

Major Overhaul No 15ans 15ans

Starting amp completion dates 2 months 2 months

Boiler Conservation No in case of being extended in case of being extended Boiler Rehabilitation No NO NO Boiler Tube Acid Cleaning No NO NO ILA (Integrity Life Assessment) No NO NO

29

ELECTRICAL TRANSMISSION SYSTEM

Accomplished Projects

bull Tests performed on Numerical relays manufactured by - ABB (Distance protection REL 316 ) - AREVA (Distance protection EPAC MICOMP442 hellip) - ICE (Over current protection NPID 800hellip) - SIEMENS (Distance protection 7SA 511 513 522 611) - REYROLLES (Differential protection DUOBIAS)

bull Test and setting of protective relays and checking the tripping circuits for Generators and

Substations belonging to Zaouia Petroleum Refinery (Libya)

bull Short circuit calculation selectivity study of protective relays by providing solutions for the

existing issues in PEC YEMEN Networks

bull Study and improvement of the existing protective system in close cooperation with Tractebel

Engineering

bull Technical Assistance for Independent Power Producers (IPP) Plant (Carthage Power

Company (CPC) Tunisia) regarding the maintenance and testing of protective relays

related to

- Generators - Main transformers - Auxiliaries - Etc

bull Technical Assistance testing and setting of protective relays at

- Steel ndashworks (Tunisia) - Cement ndashmarker (Tunisia) - Iron industries (Tunisia) - Chemical industries (Tunisia)

bull Commissioning and setting of protective relays at substations (High Medium and Low

voltages)

bull Renovation of the obsolete equipment (relays switchgear hellip)

bull Maintenance of the transmission lines and substations equipment

bull Cost-effective solutions establishment regarding the network issues (droop voltage over

voltage improvement of power factor etc)

30

ELECTRICAL DISTRIBUTION SYSTEM

Rural Electrification- Accomplished Projects

Contract Identification

Contract No 18 Technical Assistance and implementation of a Rural electrification project based upon SWER (Single Wire Earth Return) techniques

Award date 1998 Completion date 1999 Employerrsquos Name JIRAMA (JIRO SY RANO MALAGAS) Address

149 RUE RAINANDRIAMAMPANDRY Antananarivo BP 200 - MADAGASCAR

Main Tasks Performed

bull Training on SWER System bull Data collection needed for SWER System studies and implementation bull Finalization of technical studies and submission of report including

- Technical audit of the pilot project already in place - Technical description of the project - AdviseRecommendations on equipment specifications - Recommendations on possible changes in adjustment and coordination of electrical

protections

Contract Identification

Contract No 19 RWANDA Project (Phase 1) Implementation of a Pilot Rural Electrification Project based on Single-Phase with neutral to ground called MALT System 4000 Subscribers

Award date June 2008 Completion date June 2009

Employerrsquos Name

RECO ( former ELECTROGAZ) -RWANDA

Address BP 537 KIGALI -RWANA

Main Tasks performed

bull Study and Diagnosis of the existing Rwandan Power Distribution An inventory of the existing facilities including generation transmission and distribution systems was established

bull Implementation of a pilot rural electrification project based on MALT System Visit was arranged to some Tunisian rural regions and companies manufacturing electric equipment namely

- Transformers

- Iron poles

- Concrete supports

- Electric cables

- Electronic meters and

- MV and LV line accessories

31

Contract Identification

Contract No 20 Local Electrification study of Tambacounda and Kedougou departments Award date October 2002 Completion date March 2003 Customerrsquos name SENELEC Address ELECTRICAL COMPANY SENEGAL

Main Tasks Performed

bull Data Collection bull Socio-economic survey bull Technical economic and financial analysis bull Electricity market forecast (demand forecast (2003-2015)) bull Estimation of worksrsquo costs regarding medium voltage single-phase and tri-phase lines medium

and low voltage stations low voltage lines diesel micro-stations individual photovoltaic systems bull Technical and economic study related to different methods of supply including the solar as well as

the opportunity of introducing the single-phase system for the rural electrification bull Proposition for the public lighting and the management of photovoltaic systems bull Recommendations for the reinforcement of the existing stations and the existing networks to satisfy

the future demand due to the electrification of the new villages bull Tariff and profitability study bull Set up of the geographical maps and the low voltage electrification plan of the most important

villages (34 villages) bull Recommendations on privatizing power generation energy sector

Contract Identification Contract No 21 - Rural Electrification study of 80 villages in Comoros Isles

- Preparation of Tender Documents for the supply of equipment needed to the construction of 145 km MV lines 100 km LV lines and 80 MVLV stations

- Call for tenders evaluation of Bidders Award date November 2000 Completion date Dec 2002 Customerrsquos name

Ministry of Equipment Department of Energy and Water Resources

Address Moroni Avenue of the Democratic Republic of China

Main Tasks Performed

bull Data collection and visit of the existing electric utilities bull Situation analysis and proposal of electric infrastructure management solutions bull Electricity Demand Estimation and Forecasting bull Electric Calculation (Load Repartition Line Voltage Drop Losses and Voltage Drops

Calculations Short-Circuit Calculations Simulation of the Extension and Reinforcement of the Medium Voltage Networks Power System Stability Analysis Reactive Power Compensation

bull Low Voltage Studies for the Electrification of 80 villages bull RecommendationsSuggestions for the reinforcement of power generation utilities to satisfy

the future demand (by 2010) bull Electricity Tariffing study

- Review of electricity consumption patterns - Cost review - Review of tariff policies - Application and implementation of revised tariff levels

32

Contract Identification Contract Ndeg 22 Establishment and set up of a computerized accounting and budget system

Award date 1992 Completion date 1994 Customerrsquos name SOMELEC Address Nouakchott - MAURITANIA

Main Tasks Performed

bull Analytical accounting bull Bid evaluation bull Cash flow movements management bull Fixed assets management bull Centralizing bookkeeping bull Existing computer application interfaces update bull Transposition of the existing system to the new one bull Operation and maintenance Documents preparation bull Execution of the transposition of the existing system to the new one

Contract Identification Contract

No 23 Electricity sector reform technical assistance in the interim management of the ldquoCompagnie Energie Electrique du Togo ldquo(CEET)

Award date 41997

Completion date 122000

Employerrsquos Name Ministry of Mining Equipment transmission Mail and Telecommunications

Address TOGO

Main Tasks Performed

bull Technical assistance in the interim management of the CEET within the framework of the electricity sectorrsquos liberalization 1) termination of the current CEET management 2) analysis of the existing situation 3) interim management of the CEET prior to its privatization

bull Operation and maintenance of the electrical network for Lomeacute and its surrounding rural areas bull Electricity generation in isolated centers bull Electricity transmission and distribution bull Procurement and maintenance of new diesel production units bull Reduction of energy losses bull Customer management bull Increase in the number of Customers bull Accounting and billing bull Increase in payment recovery bull Call for tenders evaluation of proposals drafting of the technical annexes concerning the contracting

for a new independent operator (concession)

33

72 On-going and Under Bidding (UB) Projects

No Project Description Country

1 Training Center Update (on-going project) Republic of Congo BRAZZAVILLE

2 Master Plan elaboration in close cooperation with STUDI (Tunisia) (on-going project)

Republic of Senegal

3 Implementation of a Rural Electrification Project based on Single-Phase Four-Wires

with Neutral to Ground called MALT System (UB) Republic of Burkina Faso

4 Cost study connections to and extensions of electricity distribution networks

(UB)

Republic of Burkina Faso

5 Works Control and supervision of rural electrification of 33 communities in 4

regions of the Republic of Cameroon (UB) Republic of CAMEROUN

34

JUDICIOUS AND EFFICIENT ENERGY UTILIZATION

IS AT THE FOREFRONT OF OUR MINDS

35

Over the year 2008 STEG International Services (SIS) has widened its scope of activities to

include techno-economic studies and assistance in energy efficiency thereby providing support

to the national energy policy aiming at considering energy auditing energy efficiency energy

saving as a major priority target in Tunisiarsquos future energy strategic plan objectives In this

regard STEG International Services has carried out several projects including but not limited to

the following

80 Energy Efficiency

bull Performing obligatory periodical energy audits for industrial installations as well as energy audits on a consultancy basis

bull Assistance on projects involving energy efficiency bull Studies on energy efficiency of circuits hydraulic and thermal systems bull Upgrading energy management systems of industrial plants

81 Co-generation (Combined Heat and Power (CHP)) Studies

The main tasks performed included

bull Feasibility studies and project implementation assistance ndash RandaTunis

bull Assistance in electric utility restructuring from self power producer (electricity generation

only) to self-producing co-generatorsndash STSBEJATunisia

bull Technical assistance related to STEGrsquos grid connection with Co-generation plants in some

industrial units -SOTIPAPIER STS T-PAP and Carthago-GRE- Tunisia

82 Energy audits and energy efficiency

In any industry the three top operating expenses are often found to be energy (both electrical

and thermal) labour and materials Energy would invariably emerge as a top ranker and thus

energy management function constitutes a strategic area for cost reduction

Energy Audit will help to better understand how energy is used in any industry and in identifying

the areas where waste can occur and where scope for improvement exists In this regard the

Energy Audit would give a positive orientation to the energy cost reduction preventive

maintenance and quality control programs which are vital to production and utility activities Such

36

an audit program will help keep focus on variations which occur in the energy costs availability

and reliability of supply of energy decide on appropriate energy mix identify energy

conservation technologies retrofit for energy conservation equipment etc

Therefore SIS can carry out comprehensive assessment of techno-economic performance of

plants and equipment against the designed performance level or the industry best practice

aiming at optimizing consumption levels along with specific operating control targets

821 Samples of accomplished and on-going Energy Auditing projects

bull Energy Audit of the Liquefied Petroleum Gas (LPG) plant located in Gabegraves (Tunisia) with the assistance of Kvaerner Heurtey in 2001

bull Energy Performance Assessment of Rades and Sousse steam and Combined Cycle Power Plants as well as Bouchemma Menzel Bourguiba Korba Gas Turbines with the assistance of TRACTABEL and EDF in 2002

bull Energy Audit of Sousse Combined Cycle Power Plant with the assistance of CRA2E in 2007-2008

bull Periodic Performance Tests of Carthage Power Company (CPC) combined cycle an Impendent Power Producer (IPP) in Tunisia

37

SIS Future Commitments and Responsibilities

Endowed with a clear vision a sound project management and solid experiences and

know-how acquired by the parent company STEG through its various trades of over 48 years

SIS has put together a team of experts inndashline with its strategic intent- to be positioned as a

competitive and pre-eminent regional energy services company by spreading its expertise and

know-how throughout the African continent Arab countries and the rest of the world working on

a partnership basis with potential consultants andor the utilities of the respective countries

resulting in a keen focus and a strong sense of purpose

As part of its vision SIS management recognizes that it has responsibilities to all of its

stakeholders These include

Shareholders SIS will protect the investments of its shareholders and will provide an acceptable return on

investments through the application of its business principles Customers SIS will aim at optimizing its business activities through winning customers and maintaining

customerrsquos loyalty by offering them high quality services at competitive prices delivering on time

and supporting them with its management expertise

Employees SIS recognizes that its working employees are the key to its success and it nurtures loyalty

teamwork and trust between them SIS will strive to protect support and involve them in the

companyrsquos future to develop their skills and to reward them in line with the corporate values of

SISrsquos organization

Partners Suppliers Contractors and all External Contacts SIS will seek to treat all its partners suppliers contractors and other external stakeholders in a

consistently professional way and to ensure that their needs are fulfilled in every way possible

38

  • 72 On-going and Under Bidding (UB) Projects

13

14 Strengthening Thermal Generation Plants Capacities injected in the Interconnected Network (IN)

Services provided Measurement of Transformer Ratio

Control and Supervision of Power Generation Plant Extension in Balingueacute (Bamako) in the republic of MALI comprising 4 Diesel Groups 4x11 5 MW ISO Conditions in partnership with IDC (Tunisia)

The services carried out by SIS included

bull Approval of study documents and assembly (accomplished)

bull Factory acceptance test (accomplished)

bull Supervision and control of on-site assembly works (on-going)

bull Site acceptance test and commissioning (once the assembly works will be terminated)

On-load Tape Changer ( OLTC) Transformer Visual Control

14

Test follow up on induced voltage Induced Voltage test on HVMV Transformer

20 Electrical Transmission Network

SISrsquos Scope of activities includes but not limited to the following services

bull Studies of power system transmission network

(system modelling power flow faults analysis) using computer simulation packages

bull Update of the dynamic and static stability studies with the view of evaluating the impact of the new electric power generation and transmission installations

bull Master plans elaboration bull Short-circuits calculation bull Under frequency load shedding calculation bull Development of electrical network protection

schemes including selection of relaysrsquo types and relays coordination

bull Protection setting calculation and configuration

bull Fault analysis in transmission networks using fault recorders and simulation software packages

bull Dimensioning of surge arresters

Washing of energized high voltage insulators

15

bull Commissioning installation and operation of digital control of the HV substations

bull Preparation of technical specifications and evaluation of Bidders

Design and construction of a testing station of insulators in polluted marine industrial and desert region in Oran (Algeria)

16

30 Electrical Distribution Network

South-South Cooperation

We are proud to draw upon our experiences and expertise as a company based in an

African country to help others across Africa

ELECTRICAL DISTRIBUTION

NETWORK

17

RURAL ELECTRIFICATION- CONSTRUCTION WORKS ON A TURN KEY BASIS Pilot Rural Electrification Project based upon single-phase in RWANDA

Services provided Signature of an agreement for cooperation and technical assistance between STEG amp ELECTROGAZ

Metallic Poles delivery

The scope of works included bull Study and Diagnosis of the

existing Rwandan Power

Distribution An inventory of the

existing facilities including

generation transmission and

distribution systems was

established

bull The turnkey design engineering

procurement supply installation

construction commissioning and

start up of a pilot rural

electrification project based upon

single-phase in RWANDA

Sub-station Connection Factory Acceptance Test of AAAC Conductor and twisted cables in presence of Rwandan technicians

Electrcity supply in rwandan remote villages

Energy is an important factor for Socio-Economic Developemnt

18

40 Gas Segment

Services provided Gas Condensate Treatment Unit Pipeline On-Line Welding

SIS services cover the following scope

of activities

bull Study control and supervision of gas

projects erection works

bull Master plans elaboration regarding Gas Transmission and Distributions networks

bull Catholic Protection of gas network bull Gas and condensate treatment units

operation and maintenance related tasks

bull Gas compression stations operation and

maintenance related tasks bull Supervisory and control systems

operation and maintenance bull Gas pipelines network supervision and

remote command bull Pipeline inspection bull Steel pipes and gas delivery station

specification bull Compression stations specification and

supervision of erection works bull Gas and condensate treatment unitsrsquo

implementation commissioning and start-up

Hot Tap Achievement Gas pipeline welding connection

Topographic surveying

19

50 Laboratory-Workshop

Main Activities Rotary Furnace Inspection Surfacing High Precision Castings

General Technics Department GTD was established to perform technical assistance to all power generating units including

bull Thermal Power Plants

bull Combined Cycle Power Plants

bull Gas Turbines

bull Hydraulic Power Plants etc

GTD Mission

bull Acceptance Trial of Equipment

bull High and Mid Voltage Testing (also called dielectric strength test or Hipot Test)

bull Acoustics and Mechanical Vibration

bull Thermodynamics and Hydraulic Activities Management

bull Chemical Analysis amp Controls

bull Metallurgical amp NDT Controls

bull Workshop

NDT Magnetic Testing Turbine Speed Balancing

Analysis of gas dissolved in dielectric liquids of large transformers operation

water lubricant oil dielectric oil and liquid fuel analysis

Dielectric Laboratory Welding Work Shop

Dielectric Laboratory

bull Dielectric oil rigidity

bull Physical and Chimical Characterisics of Dielectric oil

bull Dissolved gas in Dielectric oil

bull Acceptance trials for generators transformers switch-gears

Welding Work Shop

bull Steel plate works

20

bull Heat treatment in furnace or outside

bull Surface reparing by powder spray metallisation

bull Rebabbiting of used bearing

60 Vocational Training ndash Photo Gallery

Services Provided

Practical Hands-On Training Equipment

Practical Hands-On Training electricity amp gas counter

SIS as an energy company

provides the entire scope of training

services including

bull Upgrade of training centers

bull Drawing up and delivery of

training courses

bull Training of trainers

bull Designing and monitoring of

training programs

bull End-user training organization

of seminars hands-on training

on-the-job training and

designing of training manuals

The training provided is relevant

effective structured and

continuously updated This

maintains a high level of technical

skills and procedures in a

constantly changing environment

Practical Hands-On Training works under voltage

Classroom Training on electrical maintenance related to electrical power utilities

21

enabling all staff to keep abreast of

technical innovations and

improvements together with

legislative requirements and

recommended practices

STEG Training Center (CFPK)

Since its inception in 1976 CFPKrsquos aim has been to train newly recruited STEG technicians in Generation Transmission Distribution and Gas sectors and to provide advanced training and retraining for active personnel Since then the Center has constantly expanded and adjusted in order to bull Address STEGrsquos specific requirements in vocational training in all its

sectors technical commercial financial computing management auditing new technologies etc

bull Provides a logical approach as to how to establish and assure a competent workforce by technical vocational training for now and the future

bull Provide appropriate training programs for organizations outside STEG both at national and international levels (in-house training customized courses and lectures)

22

70 Samples of Project Experience

Since 2006 SIS has undertaken many assignments in African countries Middle East and in

Tunisia It is only possible to show a small selection of these in this brochure We are always

happy to provide additional details and examples of our experience on request

71 Accomplished Projects

POWER GENERATION

No Contract Identification Unitne Installed

Capacity(MW) location Start

Date End Date

1 Annual Inspection

5 260 Rabigh SEC Saudi Arabia)

20-12-2005

30-01-2006

2 Annual Inspection 2 260

Rabigh SEC Saudi Arabia)

09-03-2006

22-04-2006

3 Annual Inspection

3 260 Rabigh SEC Saudi Arabia)

19-03-2006

29-04-2006

4 Annual Inspection

1amp4 440 Shoaiba SEC Saoudi Arabia

27-01-2007

01-03-2007

5 Annual Inspection 4 440

Shoaiba SEC Saoudi Arabia

03-03-2007

05-04-2007

6

Annual Inspection Bell seals rings amp nozzle blocks replacement ( turbine overhaul)

4 260 Rabigh SEC Saudi Arabia)

03-01-2008

07-03-2008

7 Annual Inspection 2 260

Rabigh SEC Saudi Arabia)

08-03-2008

15-04-2008

8 Major Overhaul

GT1 27 TihamaSEC Saudi Arabia

20-01-2008

10-02-2008

9

Erection and Supervision of Works 300 MW (ISO Condition) Open Cycle Power Plant Fast Emergency

GTs 1-4

4x75 ISO Conditions

Ministry of Energy

(Electricity and Water)

Sabya Power Plant

State of KOWEIT

2007- 2008

10 Commissioning CPL amp Parallel Resonant Circuit in close cooperation with AREVA

Ethiopie 2007-2008

11

Revamping of obsolete Control and instrumentation system (in close cooperation with SIEMENS)

2 Units Marocco 2008

23

No Contract Identification Unitne Installed Capacity (MW)

location Start Date

12

Commissioning of Control command system Mark VI on GTs Frame 5 (in close cooperation with GESHANAHAN Eng

GTs GE Frame 5

Algeria (Arzew) 2008

13

Grid Interconnection In close cooperation with STUDI for West African Power Pool (WAPP)

225 KV

Electricity grid interconnection

between Burkina Faso and Ghana

2008

14 Pricing Study Senegal 2008

15 Major Inspection GT6

GE-FR7

Najran SEC Saudi Arabia

2008

16 Major Inspection (MI) W501D5

Jazan SEC Saudi Arabia

2009

17 Annual Inspection 2amp3 2x393 Shoaiba SEC Saudi Arabia

2009

24

25

SISrsquoS Experiences in Boilerrsquos Maintenance Work

Power plant location Boiler tech Details ampInspections

Rades A (ST) ST STEAM TURBINE Rades B (ST)

Unit 1 Unit 2 Unit 3 Unit 4

Manufacturer Mitsubishi H I Mitsubishi H I Ansaldo Energia Ansaldo Energia Type amp Model MHI CE RR

type out-door MHI CE RR type outdoor

AE RR type outdoor

AE RR type outdoor

Date of commissioning 1983 1984 1998 1999 MCR (th) 520000 520000 5335 5335

Steam conditions Pressure SHRH(bars) 1685 352 1685 352 1739 1739 Temperature( degC) 543 543 542 542

fuel Natural gas heavy Fuel Ndeg2

Natural gas heavy Fuel Ndeg2

Natural gas heavy Fuel Ndeg2

Natural gas heavy Fuel Ndeg2

Heating area Furnace(msup2) 5105 5105 5360 5360 Reheater (msup2) 3130 3130 1286 1286 Eco (msup2) 2600 2600 1556 1556

Fuel oil Burners type amp No 20 20 Y Ndeg 12 Y Ndeg 12 FDF type amp capacity ( Th) HC 591 HC 591 HC748 HC 748 IDF type amp capacity (Th) HC 640 HC 640 NA NA GRF type amp capacity ( Th) HC 500 HC 500 HC 300 HC 300

RegenAir Preheater Type Ljungstroumlm Ljungstroumlm Ljungstroumlm Ljungstroumlm No amp capacity 2 2 2 2 Heating surface(msup2) 12000 12000 18000 18000

Annual inspection No 20 20 10 10 Starting amp Completion dates

21 Days 21 days 21 days 21 days

Major overhaul No 04 04 01 01 Starting amp Completion dates

1221038843 days 611028854 days 56 days 59 days

Boiler conservation No 20 20 08 08 Boiler Rehabilitation No 0 0 0 0 Boiler Tube Acid cleaning No 01 01 01 01 ILA(Integrity Life Assessment)No 0 0 0 0

26

SISrsquos Experiences in Boilersrsquo Maintenance Work

Power plant location Boiler tech Details ampInspections

Sousse A (ST) Sousse B (CCPP)

Unitne1 Unitne 2 Unitne1 Unitne 2

Manufacturer SGP SGP STEIN INDUSTRY STEIN INDUSTRY Type amp Model Natural circulation Natural circulation Heat Recuperator Heat Recuperator Date of commissioning 1980 1980 1995 1995 MCR (th) 515 515 HP 182 BP 415 HP 182 BP 415 Steam conditions Pressure SHRH (bar) 16038 16038 HP 72 BP 66 HP 72 BP 66

Temperature (degC) 540degC 540degC HP 511 BP 213 HP 511 BP 213 fuel FUELGAZ FUELGAZ Gaz Gaz Heating area Furnace (m2 2080 ) 2080 HP evaporator 25251 LP evaporator 18627

Reheater (m2 1512 ) 1512 HP superheater 9418 LP superheater 2328 Eco (m2 2017 ) 2017 HP economizer 16834 13773 LP economizer 3060

Fuel oil Burners Type ampNo EVT8 EVT8 FDF type amp capacity R62250 7566 m3 R62250 7566 ms 3 s

GRF type amp capacity R62250 721 m3 R62250 721 ms 3 s

Regen Air Preheater

Type No amp capacity 2 220186 Nm3h 2 220186 Nm3h

Heating surface(m2) 2x924 2x924 Annual Inspection

No annually annually annually annually Starting amp completion dates 3 - 4 weeks 3 - 4 weeks 10 days 10 days

Major Overhaul No along with annual inspectioccediln along with annual inspectioccediln

Starting amp completion dates 3 - 4 weeks 3 - 4 weeks

Boiler Conservation No 3 2 Boiler Rehabilitation No Boiler Tube Acid Cleaning No 2 2 ILA (Integrity Life Assessment) No 1

27

SISrsquos Experiences in Boilersrsquo Maintenance Work

Power plant location Boiler tech Details ampInspections Unitne1 (ST) Unitne 2 (ST) Unitne 3 (ST) Unitne 4 (ST)

Manufacturer WALTHER Type amp Model WALTHER FN10 Natural Circulation Date of commissioning 05071965 01111965 22061968 20091968 MCR (th) 112 Steam conditions

Pressure 686 bar Temperature 510 degC

fuel Heavy fuel oil Ndeg2 light fuel oil

Heating area

Furnace (m2 540 m2 ) Reheater (m2 1542 m2 ) Eco (m2 480 m2 )

Fuel oil Burners Type ampNo SONVICO 4 FDF type amp capacity Centrifugal - 27 m3s IDF type amp capacity - - - - GRF type amp capacity - - - -

Regen Air Preheater Type Static LJUNGSTROM No amp capacity 1 1 1 1 Heating surface(m2) 7350 m2 -

Annual Inspection No every year until 1998 every year until

2005 every year until 1998

every year until 2005

Starting amp completion dates - - - -

Major Overhaul No 6 8 5 5 Starting amp completion dates - - - -

Boiler Conservation No - 2 - 2 Boiler Rehabilitation No 4 6 5 5 Boiler Tube Acid Cleaning No 0 0 0 0 ILA (Integrity Life Assessment) No 0 0 0 0

28

SISrsquos Experiences in Boilersrsquo Maintenance Work Power Plant Location

Boiler Tech Details ampInspections

Ghannouch (ST) Unitne1 (ST) Unitne 2

Manufacturer Stein Industrie Stein Industrie Type amp Model Natural circulation Natural circulation Date of commissioning 1972 1972 MCR (th) 120 120 Steam conditions Pressure SHRH (th) 70 bars 70 bars

Temperature 510 degC 510 degC fuel Natural GasHeavy fuel Natural GasHeavy fuel Heating area Furnace (m2 )

Reheater (m2 8880 dmsup3 ) 8880 dmsup3 Eco (m2 2400 dmsup3 ) 2400 dmsup3

Fuel oil Burners Type ampNo PILLARD GRC PILLARD GRC IDF type amp capacity GRF type amp capacity Regen Air Preheater Type Ljunstroumlm Ljunstroumlm

No amp capacity 140msup3h 140msup3h Heating surface(m2) _ _

Annual Inspection No 1 1 Starting amp completion dates 1 week 1 week

Major Overhaul No 15ans 15ans

Starting amp completion dates 2 months 2 months

Boiler Conservation No in case of being extended in case of being extended Boiler Rehabilitation No NO NO Boiler Tube Acid Cleaning No NO NO ILA (Integrity Life Assessment) No NO NO

29

ELECTRICAL TRANSMISSION SYSTEM

Accomplished Projects

bull Tests performed on Numerical relays manufactured by - ABB (Distance protection REL 316 ) - AREVA (Distance protection EPAC MICOMP442 hellip) - ICE (Over current protection NPID 800hellip) - SIEMENS (Distance protection 7SA 511 513 522 611) - REYROLLES (Differential protection DUOBIAS)

bull Test and setting of protective relays and checking the tripping circuits for Generators and

Substations belonging to Zaouia Petroleum Refinery (Libya)

bull Short circuit calculation selectivity study of protective relays by providing solutions for the

existing issues in PEC YEMEN Networks

bull Study and improvement of the existing protective system in close cooperation with Tractebel

Engineering

bull Technical Assistance for Independent Power Producers (IPP) Plant (Carthage Power

Company (CPC) Tunisia) regarding the maintenance and testing of protective relays

related to

- Generators - Main transformers - Auxiliaries - Etc

bull Technical Assistance testing and setting of protective relays at

- Steel ndashworks (Tunisia) - Cement ndashmarker (Tunisia) - Iron industries (Tunisia) - Chemical industries (Tunisia)

bull Commissioning and setting of protective relays at substations (High Medium and Low

voltages)

bull Renovation of the obsolete equipment (relays switchgear hellip)

bull Maintenance of the transmission lines and substations equipment

bull Cost-effective solutions establishment regarding the network issues (droop voltage over

voltage improvement of power factor etc)

30

ELECTRICAL DISTRIBUTION SYSTEM

Rural Electrification- Accomplished Projects

Contract Identification

Contract No 18 Technical Assistance and implementation of a Rural electrification project based upon SWER (Single Wire Earth Return) techniques

Award date 1998 Completion date 1999 Employerrsquos Name JIRAMA (JIRO SY RANO MALAGAS) Address

149 RUE RAINANDRIAMAMPANDRY Antananarivo BP 200 - MADAGASCAR

Main Tasks Performed

bull Training on SWER System bull Data collection needed for SWER System studies and implementation bull Finalization of technical studies and submission of report including

- Technical audit of the pilot project already in place - Technical description of the project - AdviseRecommendations on equipment specifications - Recommendations on possible changes in adjustment and coordination of electrical

protections

Contract Identification

Contract No 19 RWANDA Project (Phase 1) Implementation of a Pilot Rural Electrification Project based on Single-Phase with neutral to ground called MALT System 4000 Subscribers

Award date June 2008 Completion date June 2009

Employerrsquos Name

RECO ( former ELECTROGAZ) -RWANDA

Address BP 537 KIGALI -RWANA

Main Tasks performed

bull Study and Diagnosis of the existing Rwandan Power Distribution An inventory of the existing facilities including generation transmission and distribution systems was established

bull Implementation of a pilot rural electrification project based on MALT System Visit was arranged to some Tunisian rural regions and companies manufacturing electric equipment namely

- Transformers

- Iron poles

- Concrete supports

- Electric cables

- Electronic meters and

- MV and LV line accessories

31

Contract Identification

Contract No 20 Local Electrification study of Tambacounda and Kedougou departments Award date October 2002 Completion date March 2003 Customerrsquos name SENELEC Address ELECTRICAL COMPANY SENEGAL

Main Tasks Performed

bull Data Collection bull Socio-economic survey bull Technical economic and financial analysis bull Electricity market forecast (demand forecast (2003-2015)) bull Estimation of worksrsquo costs regarding medium voltage single-phase and tri-phase lines medium

and low voltage stations low voltage lines diesel micro-stations individual photovoltaic systems bull Technical and economic study related to different methods of supply including the solar as well as

the opportunity of introducing the single-phase system for the rural electrification bull Proposition for the public lighting and the management of photovoltaic systems bull Recommendations for the reinforcement of the existing stations and the existing networks to satisfy

the future demand due to the electrification of the new villages bull Tariff and profitability study bull Set up of the geographical maps and the low voltage electrification plan of the most important

villages (34 villages) bull Recommendations on privatizing power generation energy sector

Contract Identification Contract No 21 - Rural Electrification study of 80 villages in Comoros Isles

- Preparation of Tender Documents for the supply of equipment needed to the construction of 145 km MV lines 100 km LV lines and 80 MVLV stations

- Call for tenders evaluation of Bidders Award date November 2000 Completion date Dec 2002 Customerrsquos name

Ministry of Equipment Department of Energy and Water Resources

Address Moroni Avenue of the Democratic Republic of China

Main Tasks Performed

bull Data collection and visit of the existing electric utilities bull Situation analysis and proposal of electric infrastructure management solutions bull Electricity Demand Estimation and Forecasting bull Electric Calculation (Load Repartition Line Voltage Drop Losses and Voltage Drops

Calculations Short-Circuit Calculations Simulation of the Extension and Reinforcement of the Medium Voltage Networks Power System Stability Analysis Reactive Power Compensation

bull Low Voltage Studies for the Electrification of 80 villages bull RecommendationsSuggestions for the reinforcement of power generation utilities to satisfy

the future demand (by 2010) bull Electricity Tariffing study

- Review of electricity consumption patterns - Cost review - Review of tariff policies - Application and implementation of revised tariff levels

32

Contract Identification Contract Ndeg 22 Establishment and set up of a computerized accounting and budget system

Award date 1992 Completion date 1994 Customerrsquos name SOMELEC Address Nouakchott - MAURITANIA

Main Tasks Performed

bull Analytical accounting bull Bid evaluation bull Cash flow movements management bull Fixed assets management bull Centralizing bookkeeping bull Existing computer application interfaces update bull Transposition of the existing system to the new one bull Operation and maintenance Documents preparation bull Execution of the transposition of the existing system to the new one

Contract Identification Contract

No 23 Electricity sector reform technical assistance in the interim management of the ldquoCompagnie Energie Electrique du Togo ldquo(CEET)

Award date 41997

Completion date 122000

Employerrsquos Name Ministry of Mining Equipment transmission Mail and Telecommunications

Address TOGO

Main Tasks Performed

bull Technical assistance in the interim management of the CEET within the framework of the electricity sectorrsquos liberalization 1) termination of the current CEET management 2) analysis of the existing situation 3) interim management of the CEET prior to its privatization

bull Operation and maintenance of the electrical network for Lomeacute and its surrounding rural areas bull Electricity generation in isolated centers bull Electricity transmission and distribution bull Procurement and maintenance of new diesel production units bull Reduction of energy losses bull Customer management bull Increase in the number of Customers bull Accounting and billing bull Increase in payment recovery bull Call for tenders evaluation of proposals drafting of the technical annexes concerning the contracting

for a new independent operator (concession)

33

72 On-going and Under Bidding (UB) Projects

No Project Description Country

1 Training Center Update (on-going project) Republic of Congo BRAZZAVILLE

2 Master Plan elaboration in close cooperation with STUDI (Tunisia) (on-going project)

Republic of Senegal

3 Implementation of a Rural Electrification Project based on Single-Phase Four-Wires

with Neutral to Ground called MALT System (UB) Republic of Burkina Faso

4 Cost study connections to and extensions of electricity distribution networks

(UB)

Republic of Burkina Faso

5 Works Control and supervision of rural electrification of 33 communities in 4

regions of the Republic of Cameroon (UB) Republic of CAMEROUN

34

JUDICIOUS AND EFFICIENT ENERGY UTILIZATION

IS AT THE FOREFRONT OF OUR MINDS

35

Over the year 2008 STEG International Services (SIS) has widened its scope of activities to

include techno-economic studies and assistance in energy efficiency thereby providing support

to the national energy policy aiming at considering energy auditing energy efficiency energy

saving as a major priority target in Tunisiarsquos future energy strategic plan objectives In this

regard STEG International Services has carried out several projects including but not limited to

the following

80 Energy Efficiency

bull Performing obligatory periodical energy audits for industrial installations as well as energy audits on a consultancy basis

bull Assistance on projects involving energy efficiency bull Studies on energy efficiency of circuits hydraulic and thermal systems bull Upgrading energy management systems of industrial plants

81 Co-generation (Combined Heat and Power (CHP)) Studies

The main tasks performed included

bull Feasibility studies and project implementation assistance ndash RandaTunis

bull Assistance in electric utility restructuring from self power producer (electricity generation

only) to self-producing co-generatorsndash STSBEJATunisia

bull Technical assistance related to STEGrsquos grid connection with Co-generation plants in some

industrial units -SOTIPAPIER STS T-PAP and Carthago-GRE- Tunisia

82 Energy audits and energy efficiency

In any industry the three top operating expenses are often found to be energy (both electrical

and thermal) labour and materials Energy would invariably emerge as a top ranker and thus

energy management function constitutes a strategic area for cost reduction

Energy Audit will help to better understand how energy is used in any industry and in identifying

the areas where waste can occur and where scope for improvement exists In this regard the

Energy Audit would give a positive orientation to the energy cost reduction preventive

maintenance and quality control programs which are vital to production and utility activities Such

36

an audit program will help keep focus on variations which occur in the energy costs availability

and reliability of supply of energy decide on appropriate energy mix identify energy

conservation technologies retrofit for energy conservation equipment etc

Therefore SIS can carry out comprehensive assessment of techno-economic performance of

plants and equipment against the designed performance level or the industry best practice

aiming at optimizing consumption levels along with specific operating control targets

821 Samples of accomplished and on-going Energy Auditing projects

bull Energy Audit of the Liquefied Petroleum Gas (LPG) plant located in Gabegraves (Tunisia) with the assistance of Kvaerner Heurtey in 2001

bull Energy Performance Assessment of Rades and Sousse steam and Combined Cycle Power Plants as well as Bouchemma Menzel Bourguiba Korba Gas Turbines with the assistance of TRACTABEL and EDF in 2002

bull Energy Audit of Sousse Combined Cycle Power Plant with the assistance of CRA2E in 2007-2008

bull Periodic Performance Tests of Carthage Power Company (CPC) combined cycle an Impendent Power Producer (IPP) in Tunisia

37

SIS Future Commitments and Responsibilities

Endowed with a clear vision a sound project management and solid experiences and

know-how acquired by the parent company STEG through its various trades of over 48 years

SIS has put together a team of experts inndashline with its strategic intent- to be positioned as a

competitive and pre-eminent regional energy services company by spreading its expertise and

know-how throughout the African continent Arab countries and the rest of the world working on

a partnership basis with potential consultants andor the utilities of the respective countries

resulting in a keen focus and a strong sense of purpose

As part of its vision SIS management recognizes that it has responsibilities to all of its

stakeholders These include

Shareholders SIS will protect the investments of its shareholders and will provide an acceptable return on

investments through the application of its business principles Customers SIS will aim at optimizing its business activities through winning customers and maintaining

customerrsquos loyalty by offering them high quality services at competitive prices delivering on time

and supporting them with its management expertise

Employees SIS recognizes that its working employees are the key to its success and it nurtures loyalty

teamwork and trust between them SIS will strive to protect support and involve them in the

companyrsquos future to develop their skills and to reward them in line with the corporate values of

SISrsquos organization

Partners Suppliers Contractors and all External Contacts SIS will seek to treat all its partners suppliers contractors and other external stakeholders in a

consistently professional way and to ensure that their needs are fulfilled in every way possible

38

  • 72 On-going and Under Bidding (UB) Projects

14

Test follow up on induced voltage Induced Voltage test on HVMV Transformer

20 Electrical Transmission Network

SISrsquos Scope of activities includes but not limited to the following services

bull Studies of power system transmission network

(system modelling power flow faults analysis) using computer simulation packages

bull Update of the dynamic and static stability studies with the view of evaluating the impact of the new electric power generation and transmission installations

bull Master plans elaboration bull Short-circuits calculation bull Under frequency load shedding calculation bull Development of electrical network protection

schemes including selection of relaysrsquo types and relays coordination

bull Protection setting calculation and configuration

bull Fault analysis in transmission networks using fault recorders and simulation software packages

bull Dimensioning of surge arresters

Washing of energized high voltage insulators

15

bull Commissioning installation and operation of digital control of the HV substations

bull Preparation of technical specifications and evaluation of Bidders

Design and construction of a testing station of insulators in polluted marine industrial and desert region in Oran (Algeria)

16

30 Electrical Distribution Network

South-South Cooperation

We are proud to draw upon our experiences and expertise as a company based in an

African country to help others across Africa

ELECTRICAL DISTRIBUTION

NETWORK

17

RURAL ELECTRIFICATION- CONSTRUCTION WORKS ON A TURN KEY BASIS Pilot Rural Electrification Project based upon single-phase in RWANDA

Services provided Signature of an agreement for cooperation and technical assistance between STEG amp ELECTROGAZ

Metallic Poles delivery

The scope of works included bull Study and Diagnosis of the

existing Rwandan Power

Distribution An inventory of the

existing facilities including

generation transmission and

distribution systems was

established

bull The turnkey design engineering

procurement supply installation

construction commissioning and

start up of a pilot rural

electrification project based upon

single-phase in RWANDA

Sub-station Connection Factory Acceptance Test of AAAC Conductor and twisted cables in presence of Rwandan technicians

Electrcity supply in rwandan remote villages

Energy is an important factor for Socio-Economic Developemnt

18

40 Gas Segment

Services provided Gas Condensate Treatment Unit Pipeline On-Line Welding

SIS services cover the following scope

of activities

bull Study control and supervision of gas

projects erection works

bull Master plans elaboration regarding Gas Transmission and Distributions networks

bull Catholic Protection of gas network bull Gas and condensate treatment units

operation and maintenance related tasks

bull Gas compression stations operation and

maintenance related tasks bull Supervisory and control systems

operation and maintenance bull Gas pipelines network supervision and

remote command bull Pipeline inspection bull Steel pipes and gas delivery station

specification bull Compression stations specification and

supervision of erection works bull Gas and condensate treatment unitsrsquo

implementation commissioning and start-up

Hot Tap Achievement Gas pipeline welding connection

Topographic surveying

19

50 Laboratory-Workshop

Main Activities Rotary Furnace Inspection Surfacing High Precision Castings

General Technics Department GTD was established to perform technical assistance to all power generating units including

bull Thermal Power Plants

bull Combined Cycle Power Plants

bull Gas Turbines

bull Hydraulic Power Plants etc

GTD Mission

bull Acceptance Trial of Equipment

bull High and Mid Voltage Testing (also called dielectric strength test or Hipot Test)

bull Acoustics and Mechanical Vibration

bull Thermodynamics and Hydraulic Activities Management

bull Chemical Analysis amp Controls

bull Metallurgical amp NDT Controls

bull Workshop

NDT Magnetic Testing Turbine Speed Balancing

Analysis of gas dissolved in dielectric liquids of large transformers operation

water lubricant oil dielectric oil and liquid fuel analysis

Dielectric Laboratory Welding Work Shop

Dielectric Laboratory

bull Dielectric oil rigidity

bull Physical and Chimical Characterisics of Dielectric oil

bull Dissolved gas in Dielectric oil

bull Acceptance trials for generators transformers switch-gears

Welding Work Shop

bull Steel plate works

20

bull Heat treatment in furnace or outside

bull Surface reparing by powder spray metallisation

bull Rebabbiting of used bearing

60 Vocational Training ndash Photo Gallery

Services Provided

Practical Hands-On Training Equipment

Practical Hands-On Training electricity amp gas counter

SIS as an energy company

provides the entire scope of training

services including

bull Upgrade of training centers

bull Drawing up and delivery of

training courses

bull Training of trainers

bull Designing and monitoring of

training programs

bull End-user training organization

of seminars hands-on training

on-the-job training and

designing of training manuals

The training provided is relevant

effective structured and

continuously updated This

maintains a high level of technical

skills and procedures in a

constantly changing environment

Practical Hands-On Training works under voltage

Classroom Training on electrical maintenance related to electrical power utilities

21

enabling all staff to keep abreast of

technical innovations and

improvements together with

legislative requirements and

recommended practices

STEG Training Center (CFPK)

Since its inception in 1976 CFPKrsquos aim has been to train newly recruited STEG technicians in Generation Transmission Distribution and Gas sectors and to provide advanced training and retraining for active personnel Since then the Center has constantly expanded and adjusted in order to bull Address STEGrsquos specific requirements in vocational training in all its

sectors technical commercial financial computing management auditing new technologies etc

bull Provides a logical approach as to how to establish and assure a competent workforce by technical vocational training for now and the future

bull Provide appropriate training programs for organizations outside STEG both at national and international levels (in-house training customized courses and lectures)

22

70 Samples of Project Experience

Since 2006 SIS has undertaken many assignments in African countries Middle East and in

Tunisia It is only possible to show a small selection of these in this brochure We are always

happy to provide additional details and examples of our experience on request

71 Accomplished Projects

POWER GENERATION

No Contract Identification Unitne Installed

Capacity(MW) location Start

Date End Date

1 Annual Inspection

5 260 Rabigh SEC Saudi Arabia)

20-12-2005

30-01-2006

2 Annual Inspection 2 260

Rabigh SEC Saudi Arabia)

09-03-2006

22-04-2006

3 Annual Inspection

3 260 Rabigh SEC Saudi Arabia)

19-03-2006

29-04-2006

4 Annual Inspection

1amp4 440 Shoaiba SEC Saoudi Arabia

27-01-2007

01-03-2007

5 Annual Inspection 4 440

Shoaiba SEC Saoudi Arabia

03-03-2007

05-04-2007

6

Annual Inspection Bell seals rings amp nozzle blocks replacement ( turbine overhaul)

4 260 Rabigh SEC Saudi Arabia)

03-01-2008

07-03-2008

7 Annual Inspection 2 260

Rabigh SEC Saudi Arabia)

08-03-2008

15-04-2008

8 Major Overhaul

GT1 27 TihamaSEC Saudi Arabia

20-01-2008

10-02-2008

9

Erection and Supervision of Works 300 MW (ISO Condition) Open Cycle Power Plant Fast Emergency

GTs 1-4

4x75 ISO Conditions

Ministry of Energy

(Electricity and Water)

Sabya Power Plant

State of KOWEIT

2007- 2008

10 Commissioning CPL amp Parallel Resonant Circuit in close cooperation with AREVA

Ethiopie 2007-2008

11

Revamping of obsolete Control and instrumentation system (in close cooperation with SIEMENS)

2 Units Marocco 2008

23

No Contract Identification Unitne Installed Capacity (MW)

location Start Date

12

Commissioning of Control command system Mark VI on GTs Frame 5 (in close cooperation with GESHANAHAN Eng

GTs GE Frame 5

Algeria (Arzew) 2008

13

Grid Interconnection In close cooperation with STUDI for West African Power Pool (WAPP)

225 KV

Electricity grid interconnection

between Burkina Faso and Ghana

2008

14 Pricing Study Senegal 2008

15 Major Inspection GT6

GE-FR7

Najran SEC Saudi Arabia

2008

16 Major Inspection (MI) W501D5

Jazan SEC Saudi Arabia

2009

17 Annual Inspection 2amp3 2x393 Shoaiba SEC Saudi Arabia

2009

24

25

SISrsquoS Experiences in Boilerrsquos Maintenance Work

Power plant location Boiler tech Details ampInspections

Rades A (ST) ST STEAM TURBINE Rades B (ST)

Unit 1 Unit 2 Unit 3 Unit 4

Manufacturer Mitsubishi H I Mitsubishi H I Ansaldo Energia Ansaldo Energia Type amp Model MHI CE RR

type out-door MHI CE RR type outdoor

AE RR type outdoor

AE RR type outdoor

Date of commissioning 1983 1984 1998 1999 MCR (th) 520000 520000 5335 5335

Steam conditions Pressure SHRH(bars) 1685 352 1685 352 1739 1739 Temperature( degC) 543 543 542 542

fuel Natural gas heavy Fuel Ndeg2

Natural gas heavy Fuel Ndeg2

Natural gas heavy Fuel Ndeg2

Natural gas heavy Fuel Ndeg2

Heating area Furnace(msup2) 5105 5105 5360 5360 Reheater (msup2) 3130 3130 1286 1286 Eco (msup2) 2600 2600 1556 1556

Fuel oil Burners type amp No 20 20 Y Ndeg 12 Y Ndeg 12 FDF type amp capacity ( Th) HC 591 HC 591 HC748 HC 748 IDF type amp capacity (Th) HC 640 HC 640 NA NA GRF type amp capacity ( Th) HC 500 HC 500 HC 300 HC 300

RegenAir Preheater Type Ljungstroumlm Ljungstroumlm Ljungstroumlm Ljungstroumlm No amp capacity 2 2 2 2 Heating surface(msup2) 12000 12000 18000 18000

Annual inspection No 20 20 10 10 Starting amp Completion dates

21 Days 21 days 21 days 21 days

Major overhaul No 04 04 01 01 Starting amp Completion dates

1221038843 days 611028854 days 56 days 59 days

Boiler conservation No 20 20 08 08 Boiler Rehabilitation No 0 0 0 0 Boiler Tube Acid cleaning No 01 01 01 01 ILA(Integrity Life Assessment)No 0 0 0 0

26

SISrsquos Experiences in Boilersrsquo Maintenance Work

Power plant location Boiler tech Details ampInspections

Sousse A (ST) Sousse B (CCPP)

Unitne1 Unitne 2 Unitne1 Unitne 2

Manufacturer SGP SGP STEIN INDUSTRY STEIN INDUSTRY Type amp Model Natural circulation Natural circulation Heat Recuperator Heat Recuperator Date of commissioning 1980 1980 1995 1995 MCR (th) 515 515 HP 182 BP 415 HP 182 BP 415 Steam conditions Pressure SHRH (bar) 16038 16038 HP 72 BP 66 HP 72 BP 66

Temperature (degC) 540degC 540degC HP 511 BP 213 HP 511 BP 213 fuel FUELGAZ FUELGAZ Gaz Gaz Heating area Furnace (m2 2080 ) 2080 HP evaporator 25251 LP evaporator 18627

Reheater (m2 1512 ) 1512 HP superheater 9418 LP superheater 2328 Eco (m2 2017 ) 2017 HP economizer 16834 13773 LP economizer 3060

Fuel oil Burners Type ampNo EVT8 EVT8 FDF type amp capacity R62250 7566 m3 R62250 7566 ms 3 s

GRF type amp capacity R62250 721 m3 R62250 721 ms 3 s

Regen Air Preheater

Type No amp capacity 2 220186 Nm3h 2 220186 Nm3h

Heating surface(m2) 2x924 2x924 Annual Inspection

No annually annually annually annually Starting amp completion dates 3 - 4 weeks 3 - 4 weeks 10 days 10 days

Major Overhaul No along with annual inspectioccediln along with annual inspectioccediln

Starting amp completion dates 3 - 4 weeks 3 - 4 weeks

Boiler Conservation No 3 2 Boiler Rehabilitation No Boiler Tube Acid Cleaning No 2 2 ILA (Integrity Life Assessment) No 1

27

SISrsquos Experiences in Boilersrsquo Maintenance Work

Power plant location Boiler tech Details ampInspections Unitne1 (ST) Unitne 2 (ST) Unitne 3 (ST) Unitne 4 (ST)

Manufacturer WALTHER Type amp Model WALTHER FN10 Natural Circulation Date of commissioning 05071965 01111965 22061968 20091968 MCR (th) 112 Steam conditions

Pressure 686 bar Temperature 510 degC

fuel Heavy fuel oil Ndeg2 light fuel oil

Heating area

Furnace (m2 540 m2 ) Reheater (m2 1542 m2 ) Eco (m2 480 m2 )

Fuel oil Burners Type ampNo SONVICO 4 FDF type amp capacity Centrifugal - 27 m3s IDF type amp capacity - - - - GRF type amp capacity - - - -

Regen Air Preheater Type Static LJUNGSTROM No amp capacity 1 1 1 1 Heating surface(m2) 7350 m2 -

Annual Inspection No every year until 1998 every year until

2005 every year until 1998

every year until 2005

Starting amp completion dates - - - -

Major Overhaul No 6 8 5 5 Starting amp completion dates - - - -

Boiler Conservation No - 2 - 2 Boiler Rehabilitation No 4 6 5 5 Boiler Tube Acid Cleaning No 0 0 0 0 ILA (Integrity Life Assessment) No 0 0 0 0

28

SISrsquos Experiences in Boilersrsquo Maintenance Work Power Plant Location

Boiler Tech Details ampInspections

Ghannouch (ST) Unitne1 (ST) Unitne 2

Manufacturer Stein Industrie Stein Industrie Type amp Model Natural circulation Natural circulation Date of commissioning 1972 1972 MCR (th) 120 120 Steam conditions Pressure SHRH (th) 70 bars 70 bars

Temperature 510 degC 510 degC fuel Natural GasHeavy fuel Natural GasHeavy fuel Heating area Furnace (m2 )

Reheater (m2 8880 dmsup3 ) 8880 dmsup3 Eco (m2 2400 dmsup3 ) 2400 dmsup3

Fuel oil Burners Type ampNo PILLARD GRC PILLARD GRC IDF type amp capacity GRF type amp capacity Regen Air Preheater Type Ljunstroumlm Ljunstroumlm

No amp capacity 140msup3h 140msup3h Heating surface(m2) _ _

Annual Inspection No 1 1 Starting amp completion dates 1 week 1 week

Major Overhaul No 15ans 15ans

Starting amp completion dates 2 months 2 months

Boiler Conservation No in case of being extended in case of being extended Boiler Rehabilitation No NO NO Boiler Tube Acid Cleaning No NO NO ILA (Integrity Life Assessment) No NO NO

29

ELECTRICAL TRANSMISSION SYSTEM

Accomplished Projects

bull Tests performed on Numerical relays manufactured by - ABB (Distance protection REL 316 ) - AREVA (Distance protection EPAC MICOMP442 hellip) - ICE (Over current protection NPID 800hellip) - SIEMENS (Distance protection 7SA 511 513 522 611) - REYROLLES (Differential protection DUOBIAS)

bull Test and setting of protective relays and checking the tripping circuits for Generators and

Substations belonging to Zaouia Petroleum Refinery (Libya)

bull Short circuit calculation selectivity study of protective relays by providing solutions for the

existing issues in PEC YEMEN Networks

bull Study and improvement of the existing protective system in close cooperation with Tractebel

Engineering

bull Technical Assistance for Independent Power Producers (IPP) Plant (Carthage Power

Company (CPC) Tunisia) regarding the maintenance and testing of protective relays

related to

- Generators - Main transformers - Auxiliaries - Etc

bull Technical Assistance testing and setting of protective relays at

- Steel ndashworks (Tunisia) - Cement ndashmarker (Tunisia) - Iron industries (Tunisia) - Chemical industries (Tunisia)

bull Commissioning and setting of protective relays at substations (High Medium and Low

voltages)

bull Renovation of the obsolete equipment (relays switchgear hellip)

bull Maintenance of the transmission lines and substations equipment

bull Cost-effective solutions establishment regarding the network issues (droop voltage over

voltage improvement of power factor etc)

30

ELECTRICAL DISTRIBUTION SYSTEM

Rural Electrification- Accomplished Projects

Contract Identification

Contract No 18 Technical Assistance and implementation of a Rural electrification project based upon SWER (Single Wire Earth Return) techniques

Award date 1998 Completion date 1999 Employerrsquos Name JIRAMA (JIRO SY RANO MALAGAS) Address

149 RUE RAINANDRIAMAMPANDRY Antananarivo BP 200 - MADAGASCAR

Main Tasks Performed

bull Training on SWER System bull Data collection needed for SWER System studies and implementation bull Finalization of technical studies and submission of report including

- Technical audit of the pilot project already in place - Technical description of the project - AdviseRecommendations on equipment specifications - Recommendations on possible changes in adjustment and coordination of electrical

protections

Contract Identification

Contract No 19 RWANDA Project (Phase 1) Implementation of a Pilot Rural Electrification Project based on Single-Phase with neutral to ground called MALT System 4000 Subscribers

Award date June 2008 Completion date June 2009

Employerrsquos Name

RECO ( former ELECTROGAZ) -RWANDA

Address BP 537 KIGALI -RWANA

Main Tasks performed

bull Study and Diagnosis of the existing Rwandan Power Distribution An inventory of the existing facilities including generation transmission and distribution systems was established

bull Implementation of a pilot rural electrification project based on MALT System Visit was arranged to some Tunisian rural regions and companies manufacturing electric equipment namely

- Transformers

- Iron poles

- Concrete supports

- Electric cables

- Electronic meters and

- MV and LV line accessories

31

Contract Identification

Contract No 20 Local Electrification study of Tambacounda and Kedougou departments Award date October 2002 Completion date March 2003 Customerrsquos name SENELEC Address ELECTRICAL COMPANY SENEGAL

Main Tasks Performed

bull Data Collection bull Socio-economic survey bull Technical economic and financial analysis bull Electricity market forecast (demand forecast (2003-2015)) bull Estimation of worksrsquo costs regarding medium voltage single-phase and tri-phase lines medium

and low voltage stations low voltage lines diesel micro-stations individual photovoltaic systems bull Technical and economic study related to different methods of supply including the solar as well as

the opportunity of introducing the single-phase system for the rural electrification bull Proposition for the public lighting and the management of photovoltaic systems bull Recommendations for the reinforcement of the existing stations and the existing networks to satisfy

the future demand due to the electrification of the new villages bull Tariff and profitability study bull Set up of the geographical maps and the low voltage electrification plan of the most important

villages (34 villages) bull Recommendations on privatizing power generation energy sector

Contract Identification Contract No 21 - Rural Electrification study of 80 villages in Comoros Isles

- Preparation of Tender Documents for the supply of equipment needed to the construction of 145 km MV lines 100 km LV lines and 80 MVLV stations

- Call for tenders evaluation of Bidders Award date November 2000 Completion date Dec 2002 Customerrsquos name

Ministry of Equipment Department of Energy and Water Resources

Address Moroni Avenue of the Democratic Republic of China

Main Tasks Performed

bull Data collection and visit of the existing electric utilities bull Situation analysis and proposal of electric infrastructure management solutions bull Electricity Demand Estimation and Forecasting bull Electric Calculation (Load Repartition Line Voltage Drop Losses and Voltage Drops

Calculations Short-Circuit Calculations Simulation of the Extension and Reinforcement of the Medium Voltage Networks Power System Stability Analysis Reactive Power Compensation

bull Low Voltage Studies for the Electrification of 80 villages bull RecommendationsSuggestions for the reinforcement of power generation utilities to satisfy

the future demand (by 2010) bull Electricity Tariffing study

- Review of electricity consumption patterns - Cost review - Review of tariff policies - Application and implementation of revised tariff levels

32

Contract Identification Contract Ndeg 22 Establishment and set up of a computerized accounting and budget system

Award date 1992 Completion date 1994 Customerrsquos name SOMELEC Address Nouakchott - MAURITANIA

Main Tasks Performed

bull Analytical accounting bull Bid evaluation bull Cash flow movements management bull Fixed assets management bull Centralizing bookkeeping bull Existing computer application interfaces update bull Transposition of the existing system to the new one bull Operation and maintenance Documents preparation bull Execution of the transposition of the existing system to the new one

Contract Identification Contract

No 23 Electricity sector reform technical assistance in the interim management of the ldquoCompagnie Energie Electrique du Togo ldquo(CEET)

Award date 41997

Completion date 122000

Employerrsquos Name Ministry of Mining Equipment transmission Mail and Telecommunications

Address TOGO

Main Tasks Performed

bull Technical assistance in the interim management of the CEET within the framework of the electricity sectorrsquos liberalization 1) termination of the current CEET management 2) analysis of the existing situation 3) interim management of the CEET prior to its privatization

bull Operation and maintenance of the electrical network for Lomeacute and its surrounding rural areas bull Electricity generation in isolated centers bull Electricity transmission and distribution bull Procurement and maintenance of new diesel production units bull Reduction of energy losses bull Customer management bull Increase in the number of Customers bull Accounting and billing bull Increase in payment recovery bull Call for tenders evaluation of proposals drafting of the technical annexes concerning the contracting

for a new independent operator (concession)

33

72 On-going and Under Bidding (UB) Projects

No Project Description Country

1 Training Center Update (on-going project) Republic of Congo BRAZZAVILLE

2 Master Plan elaboration in close cooperation with STUDI (Tunisia) (on-going project)

Republic of Senegal

3 Implementation of a Rural Electrification Project based on Single-Phase Four-Wires

with Neutral to Ground called MALT System (UB) Republic of Burkina Faso

4 Cost study connections to and extensions of electricity distribution networks

(UB)

Republic of Burkina Faso

5 Works Control and supervision of rural electrification of 33 communities in 4

regions of the Republic of Cameroon (UB) Republic of CAMEROUN

34

JUDICIOUS AND EFFICIENT ENERGY UTILIZATION

IS AT THE FOREFRONT OF OUR MINDS

35

Over the year 2008 STEG International Services (SIS) has widened its scope of activities to

include techno-economic studies and assistance in energy efficiency thereby providing support

to the national energy policy aiming at considering energy auditing energy efficiency energy

saving as a major priority target in Tunisiarsquos future energy strategic plan objectives In this

regard STEG International Services has carried out several projects including but not limited to

the following

80 Energy Efficiency

bull Performing obligatory periodical energy audits for industrial installations as well as energy audits on a consultancy basis

bull Assistance on projects involving energy efficiency bull Studies on energy efficiency of circuits hydraulic and thermal systems bull Upgrading energy management systems of industrial plants

81 Co-generation (Combined Heat and Power (CHP)) Studies

The main tasks performed included

bull Feasibility studies and project implementation assistance ndash RandaTunis

bull Assistance in electric utility restructuring from self power producer (electricity generation

only) to self-producing co-generatorsndash STSBEJATunisia

bull Technical assistance related to STEGrsquos grid connection with Co-generation plants in some

industrial units -SOTIPAPIER STS T-PAP and Carthago-GRE- Tunisia

82 Energy audits and energy efficiency

In any industry the three top operating expenses are often found to be energy (both electrical

and thermal) labour and materials Energy would invariably emerge as a top ranker and thus

energy management function constitutes a strategic area for cost reduction

Energy Audit will help to better understand how energy is used in any industry and in identifying

the areas where waste can occur and where scope for improvement exists In this regard the

Energy Audit would give a positive orientation to the energy cost reduction preventive

maintenance and quality control programs which are vital to production and utility activities Such

36

an audit program will help keep focus on variations which occur in the energy costs availability

and reliability of supply of energy decide on appropriate energy mix identify energy

conservation technologies retrofit for energy conservation equipment etc

Therefore SIS can carry out comprehensive assessment of techno-economic performance of

plants and equipment against the designed performance level or the industry best practice

aiming at optimizing consumption levels along with specific operating control targets

821 Samples of accomplished and on-going Energy Auditing projects

bull Energy Audit of the Liquefied Petroleum Gas (LPG) plant located in Gabegraves (Tunisia) with the assistance of Kvaerner Heurtey in 2001

bull Energy Performance Assessment of Rades and Sousse steam and Combined Cycle Power Plants as well as Bouchemma Menzel Bourguiba Korba Gas Turbines with the assistance of TRACTABEL and EDF in 2002

bull Energy Audit of Sousse Combined Cycle Power Plant with the assistance of CRA2E in 2007-2008

bull Periodic Performance Tests of Carthage Power Company (CPC) combined cycle an Impendent Power Producer (IPP) in Tunisia

37

SIS Future Commitments and Responsibilities

Endowed with a clear vision a sound project management and solid experiences and

know-how acquired by the parent company STEG through its various trades of over 48 years

SIS has put together a team of experts inndashline with its strategic intent- to be positioned as a

competitive and pre-eminent regional energy services company by spreading its expertise and

know-how throughout the African continent Arab countries and the rest of the world working on

a partnership basis with potential consultants andor the utilities of the respective countries

resulting in a keen focus and a strong sense of purpose

As part of its vision SIS management recognizes that it has responsibilities to all of its

stakeholders These include

Shareholders SIS will protect the investments of its shareholders and will provide an acceptable return on

investments through the application of its business principles Customers SIS will aim at optimizing its business activities through winning customers and maintaining

customerrsquos loyalty by offering them high quality services at competitive prices delivering on time

and supporting them with its management expertise

Employees SIS recognizes that its working employees are the key to its success and it nurtures loyalty

teamwork and trust between them SIS will strive to protect support and involve them in the

companyrsquos future to develop their skills and to reward them in line with the corporate values of

SISrsquos organization

Partners Suppliers Contractors and all External Contacts SIS will seek to treat all its partners suppliers contractors and other external stakeholders in a

consistently professional way and to ensure that their needs are fulfilled in every way possible

38

  • 72 On-going and Under Bidding (UB) Projects

15

bull Commissioning installation and operation of digital control of the HV substations

bull Preparation of technical specifications and evaluation of Bidders

Design and construction of a testing station of insulators in polluted marine industrial and desert region in Oran (Algeria)

16

30 Electrical Distribution Network

South-South Cooperation

We are proud to draw upon our experiences and expertise as a company based in an

African country to help others across Africa

ELECTRICAL DISTRIBUTION

NETWORK

17

RURAL ELECTRIFICATION- CONSTRUCTION WORKS ON A TURN KEY BASIS Pilot Rural Electrification Project based upon single-phase in RWANDA

Services provided Signature of an agreement for cooperation and technical assistance between STEG amp ELECTROGAZ

Metallic Poles delivery

The scope of works included bull Study and Diagnosis of the

existing Rwandan Power

Distribution An inventory of the

existing facilities including

generation transmission and

distribution systems was

established

bull The turnkey design engineering

procurement supply installation

construction commissioning and

start up of a pilot rural

electrification project based upon

single-phase in RWANDA

Sub-station Connection Factory Acceptance Test of AAAC Conductor and twisted cables in presence of Rwandan technicians

Electrcity supply in rwandan remote villages

Energy is an important factor for Socio-Economic Developemnt

18

40 Gas Segment

Services provided Gas Condensate Treatment Unit Pipeline On-Line Welding

SIS services cover the following scope

of activities

bull Study control and supervision of gas

projects erection works

bull Master plans elaboration regarding Gas Transmission and Distributions networks

bull Catholic Protection of gas network bull Gas and condensate treatment units

operation and maintenance related tasks

bull Gas compression stations operation and

maintenance related tasks bull Supervisory and control systems

operation and maintenance bull Gas pipelines network supervision and

remote command bull Pipeline inspection bull Steel pipes and gas delivery station

specification bull Compression stations specification and

supervision of erection works bull Gas and condensate treatment unitsrsquo

implementation commissioning and start-up

Hot Tap Achievement Gas pipeline welding connection

Topographic surveying

19

50 Laboratory-Workshop

Main Activities Rotary Furnace Inspection Surfacing High Precision Castings

General Technics Department GTD was established to perform technical assistance to all power generating units including

bull Thermal Power Plants

bull Combined Cycle Power Plants

bull Gas Turbines

bull Hydraulic Power Plants etc

GTD Mission

bull Acceptance Trial of Equipment

bull High and Mid Voltage Testing (also called dielectric strength test or Hipot Test)

bull Acoustics and Mechanical Vibration

bull Thermodynamics and Hydraulic Activities Management

bull Chemical Analysis amp Controls

bull Metallurgical amp NDT Controls

bull Workshop

NDT Magnetic Testing Turbine Speed Balancing

Analysis of gas dissolved in dielectric liquids of large transformers operation

water lubricant oil dielectric oil and liquid fuel analysis

Dielectric Laboratory Welding Work Shop

Dielectric Laboratory

bull Dielectric oil rigidity

bull Physical and Chimical Characterisics of Dielectric oil

bull Dissolved gas in Dielectric oil

bull Acceptance trials for generators transformers switch-gears

Welding Work Shop

bull Steel plate works

20

bull Heat treatment in furnace or outside

bull Surface reparing by powder spray metallisation

bull Rebabbiting of used bearing

60 Vocational Training ndash Photo Gallery

Services Provided

Practical Hands-On Training Equipment

Practical Hands-On Training electricity amp gas counter

SIS as an energy company

provides the entire scope of training

services including

bull Upgrade of training centers

bull Drawing up and delivery of

training courses

bull Training of trainers

bull Designing and monitoring of

training programs

bull End-user training organization

of seminars hands-on training

on-the-job training and

designing of training manuals

The training provided is relevant

effective structured and

continuously updated This

maintains a high level of technical

skills and procedures in a

constantly changing environment

Practical Hands-On Training works under voltage

Classroom Training on electrical maintenance related to electrical power utilities

21

enabling all staff to keep abreast of

technical innovations and

improvements together with

legislative requirements and

recommended practices

STEG Training Center (CFPK)

Since its inception in 1976 CFPKrsquos aim has been to train newly recruited STEG technicians in Generation Transmission Distribution and Gas sectors and to provide advanced training and retraining for active personnel Since then the Center has constantly expanded and adjusted in order to bull Address STEGrsquos specific requirements in vocational training in all its

sectors technical commercial financial computing management auditing new technologies etc

bull Provides a logical approach as to how to establish and assure a competent workforce by technical vocational training for now and the future

bull Provide appropriate training programs for organizations outside STEG both at national and international levels (in-house training customized courses and lectures)

22

70 Samples of Project Experience

Since 2006 SIS has undertaken many assignments in African countries Middle East and in

Tunisia It is only possible to show a small selection of these in this brochure We are always

happy to provide additional details and examples of our experience on request

71 Accomplished Projects

POWER GENERATION

No Contract Identification Unitne Installed

Capacity(MW) location Start

Date End Date

1 Annual Inspection

5 260 Rabigh SEC Saudi Arabia)

20-12-2005

30-01-2006

2 Annual Inspection 2 260

Rabigh SEC Saudi Arabia)

09-03-2006

22-04-2006

3 Annual Inspection

3 260 Rabigh SEC Saudi Arabia)

19-03-2006

29-04-2006

4 Annual Inspection

1amp4 440 Shoaiba SEC Saoudi Arabia

27-01-2007

01-03-2007

5 Annual Inspection 4 440

Shoaiba SEC Saoudi Arabia

03-03-2007

05-04-2007

6

Annual Inspection Bell seals rings amp nozzle blocks replacement ( turbine overhaul)

4 260 Rabigh SEC Saudi Arabia)

03-01-2008

07-03-2008

7 Annual Inspection 2 260

Rabigh SEC Saudi Arabia)

08-03-2008

15-04-2008

8 Major Overhaul

GT1 27 TihamaSEC Saudi Arabia

20-01-2008

10-02-2008

9

Erection and Supervision of Works 300 MW (ISO Condition) Open Cycle Power Plant Fast Emergency

GTs 1-4

4x75 ISO Conditions

Ministry of Energy

(Electricity and Water)

Sabya Power Plant

State of KOWEIT

2007- 2008

10 Commissioning CPL amp Parallel Resonant Circuit in close cooperation with AREVA

Ethiopie 2007-2008

11

Revamping of obsolete Control and instrumentation system (in close cooperation with SIEMENS)

2 Units Marocco 2008

23

No Contract Identification Unitne Installed Capacity (MW)

location Start Date

12

Commissioning of Control command system Mark VI on GTs Frame 5 (in close cooperation with GESHANAHAN Eng

GTs GE Frame 5

Algeria (Arzew) 2008

13

Grid Interconnection In close cooperation with STUDI for West African Power Pool (WAPP)

225 KV

Electricity grid interconnection

between Burkina Faso and Ghana

2008

14 Pricing Study Senegal 2008

15 Major Inspection GT6

GE-FR7

Najran SEC Saudi Arabia

2008

16 Major Inspection (MI) W501D5

Jazan SEC Saudi Arabia

2009

17 Annual Inspection 2amp3 2x393 Shoaiba SEC Saudi Arabia

2009

24

25

SISrsquoS Experiences in Boilerrsquos Maintenance Work

Power plant location Boiler tech Details ampInspections

Rades A (ST) ST STEAM TURBINE Rades B (ST)

Unit 1 Unit 2 Unit 3 Unit 4

Manufacturer Mitsubishi H I Mitsubishi H I Ansaldo Energia Ansaldo Energia Type amp Model MHI CE RR

type out-door MHI CE RR type outdoor

AE RR type outdoor

AE RR type outdoor

Date of commissioning 1983 1984 1998 1999 MCR (th) 520000 520000 5335 5335

Steam conditions Pressure SHRH(bars) 1685 352 1685 352 1739 1739 Temperature( degC) 543 543 542 542

fuel Natural gas heavy Fuel Ndeg2

Natural gas heavy Fuel Ndeg2

Natural gas heavy Fuel Ndeg2

Natural gas heavy Fuel Ndeg2

Heating area Furnace(msup2) 5105 5105 5360 5360 Reheater (msup2) 3130 3130 1286 1286 Eco (msup2) 2600 2600 1556 1556

Fuel oil Burners type amp No 20 20 Y Ndeg 12 Y Ndeg 12 FDF type amp capacity ( Th) HC 591 HC 591 HC748 HC 748 IDF type amp capacity (Th) HC 640 HC 640 NA NA GRF type amp capacity ( Th) HC 500 HC 500 HC 300 HC 300

RegenAir Preheater Type Ljungstroumlm Ljungstroumlm Ljungstroumlm Ljungstroumlm No amp capacity 2 2 2 2 Heating surface(msup2) 12000 12000 18000 18000

Annual inspection No 20 20 10 10 Starting amp Completion dates

21 Days 21 days 21 days 21 days

Major overhaul No 04 04 01 01 Starting amp Completion dates

1221038843 days 611028854 days 56 days 59 days

Boiler conservation No 20 20 08 08 Boiler Rehabilitation No 0 0 0 0 Boiler Tube Acid cleaning No 01 01 01 01 ILA(Integrity Life Assessment)No 0 0 0 0

26

SISrsquos Experiences in Boilersrsquo Maintenance Work

Power plant location Boiler tech Details ampInspections

Sousse A (ST) Sousse B (CCPP)

Unitne1 Unitne 2 Unitne1 Unitne 2

Manufacturer SGP SGP STEIN INDUSTRY STEIN INDUSTRY Type amp Model Natural circulation Natural circulation Heat Recuperator Heat Recuperator Date of commissioning 1980 1980 1995 1995 MCR (th) 515 515 HP 182 BP 415 HP 182 BP 415 Steam conditions Pressure SHRH (bar) 16038 16038 HP 72 BP 66 HP 72 BP 66

Temperature (degC) 540degC 540degC HP 511 BP 213 HP 511 BP 213 fuel FUELGAZ FUELGAZ Gaz Gaz Heating area Furnace (m2 2080 ) 2080 HP evaporator 25251 LP evaporator 18627

Reheater (m2 1512 ) 1512 HP superheater 9418 LP superheater 2328 Eco (m2 2017 ) 2017 HP economizer 16834 13773 LP economizer 3060

Fuel oil Burners Type ampNo EVT8 EVT8 FDF type amp capacity R62250 7566 m3 R62250 7566 ms 3 s

GRF type amp capacity R62250 721 m3 R62250 721 ms 3 s

Regen Air Preheater

Type No amp capacity 2 220186 Nm3h 2 220186 Nm3h

Heating surface(m2) 2x924 2x924 Annual Inspection

No annually annually annually annually Starting amp completion dates 3 - 4 weeks 3 - 4 weeks 10 days 10 days

Major Overhaul No along with annual inspectioccediln along with annual inspectioccediln

Starting amp completion dates 3 - 4 weeks 3 - 4 weeks

Boiler Conservation No 3 2 Boiler Rehabilitation No Boiler Tube Acid Cleaning No 2 2 ILA (Integrity Life Assessment) No 1

27

SISrsquos Experiences in Boilersrsquo Maintenance Work

Power plant location Boiler tech Details ampInspections Unitne1 (ST) Unitne 2 (ST) Unitne 3 (ST) Unitne 4 (ST)

Manufacturer WALTHER Type amp Model WALTHER FN10 Natural Circulation Date of commissioning 05071965 01111965 22061968 20091968 MCR (th) 112 Steam conditions

Pressure 686 bar Temperature 510 degC

fuel Heavy fuel oil Ndeg2 light fuel oil

Heating area

Furnace (m2 540 m2 ) Reheater (m2 1542 m2 ) Eco (m2 480 m2 )

Fuel oil Burners Type ampNo SONVICO 4 FDF type amp capacity Centrifugal - 27 m3s IDF type amp capacity - - - - GRF type amp capacity - - - -

Regen Air Preheater Type Static LJUNGSTROM No amp capacity 1 1 1 1 Heating surface(m2) 7350 m2 -

Annual Inspection No every year until 1998 every year until

2005 every year until 1998

every year until 2005

Starting amp completion dates - - - -

Major Overhaul No 6 8 5 5 Starting amp completion dates - - - -

Boiler Conservation No - 2 - 2 Boiler Rehabilitation No 4 6 5 5 Boiler Tube Acid Cleaning No 0 0 0 0 ILA (Integrity Life Assessment) No 0 0 0 0

28

SISrsquos Experiences in Boilersrsquo Maintenance Work Power Plant Location

Boiler Tech Details ampInspections

Ghannouch (ST) Unitne1 (ST) Unitne 2

Manufacturer Stein Industrie Stein Industrie Type amp Model Natural circulation Natural circulation Date of commissioning 1972 1972 MCR (th) 120 120 Steam conditions Pressure SHRH (th) 70 bars 70 bars

Temperature 510 degC 510 degC fuel Natural GasHeavy fuel Natural GasHeavy fuel Heating area Furnace (m2 )

Reheater (m2 8880 dmsup3 ) 8880 dmsup3 Eco (m2 2400 dmsup3 ) 2400 dmsup3

Fuel oil Burners Type ampNo PILLARD GRC PILLARD GRC IDF type amp capacity GRF type amp capacity Regen Air Preheater Type Ljunstroumlm Ljunstroumlm

No amp capacity 140msup3h 140msup3h Heating surface(m2) _ _

Annual Inspection No 1 1 Starting amp completion dates 1 week 1 week

Major Overhaul No 15ans 15ans

Starting amp completion dates 2 months 2 months

Boiler Conservation No in case of being extended in case of being extended Boiler Rehabilitation No NO NO Boiler Tube Acid Cleaning No NO NO ILA (Integrity Life Assessment) No NO NO

29

ELECTRICAL TRANSMISSION SYSTEM

Accomplished Projects

bull Tests performed on Numerical relays manufactured by - ABB (Distance protection REL 316 ) - AREVA (Distance protection EPAC MICOMP442 hellip) - ICE (Over current protection NPID 800hellip) - SIEMENS (Distance protection 7SA 511 513 522 611) - REYROLLES (Differential protection DUOBIAS)

bull Test and setting of protective relays and checking the tripping circuits for Generators and

Substations belonging to Zaouia Petroleum Refinery (Libya)

bull Short circuit calculation selectivity study of protective relays by providing solutions for the

existing issues in PEC YEMEN Networks

bull Study and improvement of the existing protective system in close cooperation with Tractebel

Engineering

bull Technical Assistance for Independent Power Producers (IPP) Plant (Carthage Power

Company (CPC) Tunisia) regarding the maintenance and testing of protective relays

related to

- Generators - Main transformers - Auxiliaries - Etc

bull Technical Assistance testing and setting of protective relays at

- Steel ndashworks (Tunisia) - Cement ndashmarker (Tunisia) - Iron industries (Tunisia) - Chemical industries (Tunisia)

bull Commissioning and setting of protective relays at substations (High Medium and Low

voltages)

bull Renovation of the obsolete equipment (relays switchgear hellip)

bull Maintenance of the transmission lines and substations equipment

bull Cost-effective solutions establishment regarding the network issues (droop voltage over

voltage improvement of power factor etc)

30

ELECTRICAL DISTRIBUTION SYSTEM

Rural Electrification- Accomplished Projects

Contract Identification

Contract No 18 Technical Assistance and implementation of a Rural electrification project based upon SWER (Single Wire Earth Return) techniques

Award date 1998 Completion date 1999 Employerrsquos Name JIRAMA (JIRO SY RANO MALAGAS) Address

149 RUE RAINANDRIAMAMPANDRY Antananarivo BP 200 - MADAGASCAR

Main Tasks Performed

bull Training on SWER System bull Data collection needed for SWER System studies and implementation bull Finalization of technical studies and submission of report including

- Technical audit of the pilot project already in place - Technical description of the project - AdviseRecommendations on equipment specifications - Recommendations on possible changes in adjustment and coordination of electrical

protections

Contract Identification

Contract No 19 RWANDA Project (Phase 1) Implementation of a Pilot Rural Electrification Project based on Single-Phase with neutral to ground called MALT System 4000 Subscribers

Award date June 2008 Completion date June 2009

Employerrsquos Name

RECO ( former ELECTROGAZ) -RWANDA

Address BP 537 KIGALI -RWANA

Main Tasks performed

bull Study and Diagnosis of the existing Rwandan Power Distribution An inventory of the existing facilities including generation transmission and distribution systems was established

bull Implementation of a pilot rural electrification project based on MALT System Visit was arranged to some Tunisian rural regions and companies manufacturing electric equipment namely

- Transformers

- Iron poles

- Concrete supports

- Electric cables

- Electronic meters and

- MV and LV line accessories

31

Contract Identification

Contract No 20 Local Electrification study of Tambacounda and Kedougou departments Award date October 2002 Completion date March 2003 Customerrsquos name SENELEC Address ELECTRICAL COMPANY SENEGAL

Main Tasks Performed

bull Data Collection bull Socio-economic survey bull Technical economic and financial analysis bull Electricity market forecast (demand forecast (2003-2015)) bull Estimation of worksrsquo costs regarding medium voltage single-phase and tri-phase lines medium

and low voltage stations low voltage lines diesel micro-stations individual photovoltaic systems bull Technical and economic study related to different methods of supply including the solar as well as

the opportunity of introducing the single-phase system for the rural electrification bull Proposition for the public lighting and the management of photovoltaic systems bull Recommendations for the reinforcement of the existing stations and the existing networks to satisfy

the future demand due to the electrification of the new villages bull Tariff and profitability study bull Set up of the geographical maps and the low voltage electrification plan of the most important

villages (34 villages) bull Recommendations on privatizing power generation energy sector

Contract Identification Contract No 21 - Rural Electrification study of 80 villages in Comoros Isles

- Preparation of Tender Documents for the supply of equipment needed to the construction of 145 km MV lines 100 km LV lines and 80 MVLV stations

- Call for tenders evaluation of Bidders Award date November 2000 Completion date Dec 2002 Customerrsquos name

Ministry of Equipment Department of Energy and Water Resources

Address Moroni Avenue of the Democratic Republic of China

Main Tasks Performed

bull Data collection and visit of the existing electric utilities bull Situation analysis and proposal of electric infrastructure management solutions bull Electricity Demand Estimation and Forecasting bull Electric Calculation (Load Repartition Line Voltage Drop Losses and Voltage Drops

Calculations Short-Circuit Calculations Simulation of the Extension and Reinforcement of the Medium Voltage Networks Power System Stability Analysis Reactive Power Compensation

bull Low Voltage Studies for the Electrification of 80 villages bull RecommendationsSuggestions for the reinforcement of power generation utilities to satisfy

the future demand (by 2010) bull Electricity Tariffing study

- Review of electricity consumption patterns - Cost review - Review of tariff policies - Application and implementation of revised tariff levels

32

Contract Identification Contract Ndeg 22 Establishment and set up of a computerized accounting and budget system

Award date 1992 Completion date 1994 Customerrsquos name SOMELEC Address Nouakchott - MAURITANIA

Main Tasks Performed

bull Analytical accounting bull Bid evaluation bull Cash flow movements management bull Fixed assets management bull Centralizing bookkeeping bull Existing computer application interfaces update bull Transposition of the existing system to the new one bull Operation and maintenance Documents preparation bull Execution of the transposition of the existing system to the new one

Contract Identification Contract

No 23 Electricity sector reform technical assistance in the interim management of the ldquoCompagnie Energie Electrique du Togo ldquo(CEET)

Award date 41997

Completion date 122000

Employerrsquos Name Ministry of Mining Equipment transmission Mail and Telecommunications

Address TOGO

Main Tasks Performed

bull Technical assistance in the interim management of the CEET within the framework of the electricity sectorrsquos liberalization 1) termination of the current CEET management 2) analysis of the existing situation 3) interim management of the CEET prior to its privatization

bull Operation and maintenance of the electrical network for Lomeacute and its surrounding rural areas bull Electricity generation in isolated centers bull Electricity transmission and distribution bull Procurement and maintenance of new diesel production units bull Reduction of energy losses bull Customer management bull Increase in the number of Customers bull Accounting and billing bull Increase in payment recovery bull Call for tenders evaluation of proposals drafting of the technical annexes concerning the contracting

for a new independent operator (concession)

33

72 On-going and Under Bidding (UB) Projects

No Project Description Country

1 Training Center Update (on-going project) Republic of Congo BRAZZAVILLE

2 Master Plan elaboration in close cooperation with STUDI (Tunisia) (on-going project)

Republic of Senegal

3 Implementation of a Rural Electrification Project based on Single-Phase Four-Wires

with Neutral to Ground called MALT System (UB) Republic of Burkina Faso

4 Cost study connections to and extensions of electricity distribution networks

(UB)

Republic of Burkina Faso

5 Works Control and supervision of rural electrification of 33 communities in 4

regions of the Republic of Cameroon (UB) Republic of CAMEROUN

34

JUDICIOUS AND EFFICIENT ENERGY UTILIZATION

IS AT THE FOREFRONT OF OUR MINDS

35

Over the year 2008 STEG International Services (SIS) has widened its scope of activities to

include techno-economic studies and assistance in energy efficiency thereby providing support

to the national energy policy aiming at considering energy auditing energy efficiency energy

saving as a major priority target in Tunisiarsquos future energy strategic plan objectives In this

regard STEG International Services has carried out several projects including but not limited to

the following

80 Energy Efficiency

bull Performing obligatory periodical energy audits for industrial installations as well as energy audits on a consultancy basis

bull Assistance on projects involving energy efficiency bull Studies on energy efficiency of circuits hydraulic and thermal systems bull Upgrading energy management systems of industrial plants

81 Co-generation (Combined Heat and Power (CHP)) Studies

The main tasks performed included

bull Feasibility studies and project implementation assistance ndash RandaTunis

bull Assistance in electric utility restructuring from self power producer (electricity generation

only) to self-producing co-generatorsndash STSBEJATunisia

bull Technical assistance related to STEGrsquos grid connection with Co-generation plants in some

industrial units -SOTIPAPIER STS T-PAP and Carthago-GRE- Tunisia

82 Energy audits and energy efficiency

In any industry the three top operating expenses are often found to be energy (both electrical

and thermal) labour and materials Energy would invariably emerge as a top ranker and thus

energy management function constitutes a strategic area for cost reduction

Energy Audit will help to better understand how energy is used in any industry and in identifying

the areas where waste can occur and where scope for improvement exists In this regard the

Energy Audit would give a positive orientation to the energy cost reduction preventive

maintenance and quality control programs which are vital to production and utility activities Such

36

an audit program will help keep focus on variations which occur in the energy costs availability

and reliability of supply of energy decide on appropriate energy mix identify energy

conservation technologies retrofit for energy conservation equipment etc

Therefore SIS can carry out comprehensive assessment of techno-economic performance of

plants and equipment against the designed performance level or the industry best practice

aiming at optimizing consumption levels along with specific operating control targets

821 Samples of accomplished and on-going Energy Auditing projects

bull Energy Audit of the Liquefied Petroleum Gas (LPG) plant located in Gabegraves (Tunisia) with the assistance of Kvaerner Heurtey in 2001

bull Energy Performance Assessment of Rades and Sousse steam and Combined Cycle Power Plants as well as Bouchemma Menzel Bourguiba Korba Gas Turbines with the assistance of TRACTABEL and EDF in 2002

bull Energy Audit of Sousse Combined Cycle Power Plant with the assistance of CRA2E in 2007-2008

bull Periodic Performance Tests of Carthage Power Company (CPC) combined cycle an Impendent Power Producer (IPP) in Tunisia

37

SIS Future Commitments and Responsibilities

Endowed with a clear vision a sound project management and solid experiences and

know-how acquired by the parent company STEG through its various trades of over 48 years

SIS has put together a team of experts inndashline with its strategic intent- to be positioned as a

competitive and pre-eminent regional energy services company by spreading its expertise and

know-how throughout the African continent Arab countries and the rest of the world working on

a partnership basis with potential consultants andor the utilities of the respective countries

resulting in a keen focus and a strong sense of purpose

As part of its vision SIS management recognizes that it has responsibilities to all of its

stakeholders These include

Shareholders SIS will protect the investments of its shareholders and will provide an acceptable return on

investments through the application of its business principles Customers SIS will aim at optimizing its business activities through winning customers and maintaining

customerrsquos loyalty by offering them high quality services at competitive prices delivering on time

and supporting them with its management expertise

Employees SIS recognizes that its working employees are the key to its success and it nurtures loyalty

teamwork and trust between them SIS will strive to protect support and involve them in the

companyrsquos future to develop their skills and to reward them in line with the corporate values of

SISrsquos organization

Partners Suppliers Contractors and all External Contacts SIS will seek to treat all its partners suppliers contractors and other external stakeholders in a

consistently professional way and to ensure that their needs are fulfilled in every way possible

38

  • 72 On-going and Under Bidding (UB) Projects

16

30 Electrical Distribution Network

South-South Cooperation

We are proud to draw upon our experiences and expertise as a company based in an

African country to help others across Africa

ELECTRICAL DISTRIBUTION

NETWORK

17

RURAL ELECTRIFICATION- CONSTRUCTION WORKS ON A TURN KEY BASIS Pilot Rural Electrification Project based upon single-phase in RWANDA

Services provided Signature of an agreement for cooperation and technical assistance between STEG amp ELECTROGAZ

Metallic Poles delivery

The scope of works included bull Study and Diagnosis of the

existing Rwandan Power

Distribution An inventory of the

existing facilities including

generation transmission and

distribution systems was

established

bull The turnkey design engineering

procurement supply installation

construction commissioning and

start up of a pilot rural

electrification project based upon

single-phase in RWANDA

Sub-station Connection Factory Acceptance Test of AAAC Conductor and twisted cables in presence of Rwandan technicians

Electrcity supply in rwandan remote villages

Energy is an important factor for Socio-Economic Developemnt

18

40 Gas Segment

Services provided Gas Condensate Treatment Unit Pipeline On-Line Welding

SIS services cover the following scope

of activities

bull Study control and supervision of gas

projects erection works

bull Master plans elaboration regarding Gas Transmission and Distributions networks

bull Catholic Protection of gas network bull Gas and condensate treatment units

operation and maintenance related tasks

bull Gas compression stations operation and

maintenance related tasks bull Supervisory and control systems

operation and maintenance bull Gas pipelines network supervision and

remote command bull Pipeline inspection bull Steel pipes and gas delivery station

specification bull Compression stations specification and

supervision of erection works bull Gas and condensate treatment unitsrsquo

implementation commissioning and start-up

Hot Tap Achievement Gas pipeline welding connection

Topographic surveying

19

50 Laboratory-Workshop

Main Activities Rotary Furnace Inspection Surfacing High Precision Castings

General Technics Department GTD was established to perform technical assistance to all power generating units including

bull Thermal Power Plants

bull Combined Cycle Power Plants

bull Gas Turbines

bull Hydraulic Power Plants etc

GTD Mission

bull Acceptance Trial of Equipment

bull High and Mid Voltage Testing (also called dielectric strength test or Hipot Test)

bull Acoustics and Mechanical Vibration

bull Thermodynamics and Hydraulic Activities Management

bull Chemical Analysis amp Controls

bull Metallurgical amp NDT Controls

bull Workshop

NDT Magnetic Testing Turbine Speed Balancing

Analysis of gas dissolved in dielectric liquids of large transformers operation

water lubricant oil dielectric oil and liquid fuel analysis

Dielectric Laboratory Welding Work Shop

Dielectric Laboratory

bull Dielectric oil rigidity

bull Physical and Chimical Characterisics of Dielectric oil

bull Dissolved gas in Dielectric oil

bull Acceptance trials for generators transformers switch-gears

Welding Work Shop

bull Steel plate works

20

bull Heat treatment in furnace or outside

bull Surface reparing by powder spray metallisation

bull Rebabbiting of used bearing

60 Vocational Training ndash Photo Gallery

Services Provided

Practical Hands-On Training Equipment

Practical Hands-On Training electricity amp gas counter

SIS as an energy company

provides the entire scope of training

services including

bull Upgrade of training centers

bull Drawing up and delivery of

training courses

bull Training of trainers

bull Designing and monitoring of

training programs

bull End-user training organization

of seminars hands-on training

on-the-job training and

designing of training manuals

The training provided is relevant

effective structured and

continuously updated This

maintains a high level of technical

skills and procedures in a

constantly changing environment

Practical Hands-On Training works under voltage

Classroom Training on electrical maintenance related to electrical power utilities

21

enabling all staff to keep abreast of

technical innovations and

improvements together with

legislative requirements and

recommended practices

STEG Training Center (CFPK)

Since its inception in 1976 CFPKrsquos aim has been to train newly recruited STEG technicians in Generation Transmission Distribution and Gas sectors and to provide advanced training and retraining for active personnel Since then the Center has constantly expanded and adjusted in order to bull Address STEGrsquos specific requirements in vocational training in all its

sectors technical commercial financial computing management auditing new technologies etc

bull Provides a logical approach as to how to establish and assure a competent workforce by technical vocational training for now and the future

bull Provide appropriate training programs for organizations outside STEG both at national and international levels (in-house training customized courses and lectures)

22

70 Samples of Project Experience

Since 2006 SIS has undertaken many assignments in African countries Middle East and in

Tunisia It is only possible to show a small selection of these in this brochure We are always

happy to provide additional details and examples of our experience on request

71 Accomplished Projects

POWER GENERATION

No Contract Identification Unitne Installed

Capacity(MW) location Start

Date End Date

1 Annual Inspection

5 260 Rabigh SEC Saudi Arabia)

20-12-2005

30-01-2006

2 Annual Inspection 2 260

Rabigh SEC Saudi Arabia)

09-03-2006

22-04-2006

3 Annual Inspection

3 260 Rabigh SEC Saudi Arabia)

19-03-2006

29-04-2006

4 Annual Inspection

1amp4 440 Shoaiba SEC Saoudi Arabia

27-01-2007

01-03-2007

5 Annual Inspection 4 440

Shoaiba SEC Saoudi Arabia

03-03-2007

05-04-2007

6

Annual Inspection Bell seals rings amp nozzle blocks replacement ( turbine overhaul)

4 260 Rabigh SEC Saudi Arabia)

03-01-2008

07-03-2008

7 Annual Inspection 2 260

Rabigh SEC Saudi Arabia)

08-03-2008

15-04-2008

8 Major Overhaul

GT1 27 TihamaSEC Saudi Arabia

20-01-2008

10-02-2008

9

Erection and Supervision of Works 300 MW (ISO Condition) Open Cycle Power Plant Fast Emergency

GTs 1-4

4x75 ISO Conditions

Ministry of Energy

(Electricity and Water)

Sabya Power Plant

State of KOWEIT

2007- 2008

10 Commissioning CPL amp Parallel Resonant Circuit in close cooperation with AREVA

Ethiopie 2007-2008

11

Revamping of obsolete Control and instrumentation system (in close cooperation with SIEMENS)

2 Units Marocco 2008

23

No Contract Identification Unitne Installed Capacity (MW)

location Start Date

12

Commissioning of Control command system Mark VI on GTs Frame 5 (in close cooperation with GESHANAHAN Eng

GTs GE Frame 5

Algeria (Arzew) 2008

13

Grid Interconnection In close cooperation with STUDI for West African Power Pool (WAPP)

225 KV

Electricity grid interconnection

between Burkina Faso and Ghana

2008

14 Pricing Study Senegal 2008

15 Major Inspection GT6

GE-FR7

Najran SEC Saudi Arabia

2008

16 Major Inspection (MI) W501D5

Jazan SEC Saudi Arabia

2009

17 Annual Inspection 2amp3 2x393 Shoaiba SEC Saudi Arabia

2009

24

25

SISrsquoS Experiences in Boilerrsquos Maintenance Work

Power plant location Boiler tech Details ampInspections

Rades A (ST) ST STEAM TURBINE Rades B (ST)

Unit 1 Unit 2 Unit 3 Unit 4

Manufacturer Mitsubishi H I Mitsubishi H I Ansaldo Energia Ansaldo Energia Type amp Model MHI CE RR

type out-door MHI CE RR type outdoor

AE RR type outdoor

AE RR type outdoor

Date of commissioning 1983 1984 1998 1999 MCR (th) 520000 520000 5335 5335

Steam conditions Pressure SHRH(bars) 1685 352 1685 352 1739 1739 Temperature( degC) 543 543 542 542

fuel Natural gas heavy Fuel Ndeg2

Natural gas heavy Fuel Ndeg2

Natural gas heavy Fuel Ndeg2

Natural gas heavy Fuel Ndeg2

Heating area Furnace(msup2) 5105 5105 5360 5360 Reheater (msup2) 3130 3130 1286 1286 Eco (msup2) 2600 2600 1556 1556

Fuel oil Burners type amp No 20 20 Y Ndeg 12 Y Ndeg 12 FDF type amp capacity ( Th) HC 591 HC 591 HC748 HC 748 IDF type amp capacity (Th) HC 640 HC 640 NA NA GRF type amp capacity ( Th) HC 500 HC 500 HC 300 HC 300

RegenAir Preheater Type Ljungstroumlm Ljungstroumlm Ljungstroumlm Ljungstroumlm No amp capacity 2 2 2 2 Heating surface(msup2) 12000 12000 18000 18000

Annual inspection No 20 20 10 10 Starting amp Completion dates

21 Days 21 days 21 days 21 days

Major overhaul No 04 04 01 01 Starting amp Completion dates

1221038843 days 611028854 days 56 days 59 days

Boiler conservation No 20 20 08 08 Boiler Rehabilitation No 0 0 0 0 Boiler Tube Acid cleaning No 01 01 01 01 ILA(Integrity Life Assessment)No 0 0 0 0

26

SISrsquos Experiences in Boilersrsquo Maintenance Work

Power plant location Boiler tech Details ampInspections

Sousse A (ST) Sousse B (CCPP)

Unitne1 Unitne 2 Unitne1 Unitne 2

Manufacturer SGP SGP STEIN INDUSTRY STEIN INDUSTRY Type amp Model Natural circulation Natural circulation Heat Recuperator Heat Recuperator Date of commissioning 1980 1980 1995 1995 MCR (th) 515 515 HP 182 BP 415 HP 182 BP 415 Steam conditions Pressure SHRH (bar) 16038 16038 HP 72 BP 66 HP 72 BP 66

Temperature (degC) 540degC 540degC HP 511 BP 213 HP 511 BP 213 fuel FUELGAZ FUELGAZ Gaz Gaz Heating area Furnace (m2 2080 ) 2080 HP evaporator 25251 LP evaporator 18627

Reheater (m2 1512 ) 1512 HP superheater 9418 LP superheater 2328 Eco (m2 2017 ) 2017 HP economizer 16834 13773 LP economizer 3060

Fuel oil Burners Type ampNo EVT8 EVT8 FDF type amp capacity R62250 7566 m3 R62250 7566 ms 3 s

GRF type amp capacity R62250 721 m3 R62250 721 ms 3 s

Regen Air Preheater

Type No amp capacity 2 220186 Nm3h 2 220186 Nm3h

Heating surface(m2) 2x924 2x924 Annual Inspection

No annually annually annually annually Starting amp completion dates 3 - 4 weeks 3 - 4 weeks 10 days 10 days

Major Overhaul No along with annual inspectioccediln along with annual inspectioccediln

Starting amp completion dates 3 - 4 weeks 3 - 4 weeks

Boiler Conservation No 3 2 Boiler Rehabilitation No Boiler Tube Acid Cleaning No 2 2 ILA (Integrity Life Assessment) No 1

27

SISrsquos Experiences in Boilersrsquo Maintenance Work

Power plant location Boiler tech Details ampInspections Unitne1 (ST) Unitne 2 (ST) Unitne 3 (ST) Unitne 4 (ST)

Manufacturer WALTHER Type amp Model WALTHER FN10 Natural Circulation Date of commissioning 05071965 01111965 22061968 20091968 MCR (th) 112 Steam conditions

Pressure 686 bar Temperature 510 degC

fuel Heavy fuel oil Ndeg2 light fuel oil

Heating area

Furnace (m2 540 m2 ) Reheater (m2 1542 m2 ) Eco (m2 480 m2 )

Fuel oil Burners Type ampNo SONVICO 4 FDF type amp capacity Centrifugal - 27 m3s IDF type amp capacity - - - - GRF type amp capacity - - - -

Regen Air Preheater Type Static LJUNGSTROM No amp capacity 1 1 1 1 Heating surface(m2) 7350 m2 -

Annual Inspection No every year until 1998 every year until

2005 every year until 1998

every year until 2005

Starting amp completion dates - - - -

Major Overhaul No 6 8 5 5 Starting amp completion dates - - - -

Boiler Conservation No - 2 - 2 Boiler Rehabilitation No 4 6 5 5 Boiler Tube Acid Cleaning No 0 0 0 0 ILA (Integrity Life Assessment) No 0 0 0 0

28

SISrsquos Experiences in Boilersrsquo Maintenance Work Power Plant Location

Boiler Tech Details ampInspections

Ghannouch (ST) Unitne1 (ST) Unitne 2

Manufacturer Stein Industrie Stein Industrie Type amp Model Natural circulation Natural circulation Date of commissioning 1972 1972 MCR (th) 120 120 Steam conditions Pressure SHRH (th) 70 bars 70 bars

Temperature 510 degC 510 degC fuel Natural GasHeavy fuel Natural GasHeavy fuel Heating area Furnace (m2 )

Reheater (m2 8880 dmsup3 ) 8880 dmsup3 Eco (m2 2400 dmsup3 ) 2400 dmsup3

Fuel oil Burners Type ampNo PILLARD GRC PILLARD GRC IDF type amp capacity GRF type amp capacity Regen Air Preheater Type Ljunstroumlm Ljunstroumlm

No amp capacity 140msup3h 140msup3h Heating surface(m2) _ _

Annual Inspection No 1 1 Starting amp completion dates 1 week 1 week

Major Overhaul No 15ans 15ans

Starting amp completion dates 2 months 2 months

Boiler Conservation No in case of being extended in case of being extended Boiler Rehabilitation No NO NO Boiler Tube Acid Cleaning No NO NO ILA (Integrity Life Assessment) No NO NO

29

ELECTRICAL TRANSMISSION SYSTEM

Accomplished Projects

bull Tests performed on Numerical relays manufactured by - ABB (Distance protection REL 316 ) - AREVA (Distance protection EPAC MICOMP442 hellip) - ICE (Over current protection NPID 800hellip) - SIEMENS (Distance protection 7SA 511 513 522 611) - REYROLLES (Differential protection DUOBIAS)

bull Test and setting of protective relays and checking the tripping circuits for Generators and

Substations belonging to Zaouia Petroleum Refinery (Libya)

bull Short circuit calculation selectivity study of protective relays by providing solutions for the

existing issues in PEC YEMEN Networks

bull Study and improvement of the existing protective system in close cooperation with Tractebel

Engineering

bull Technical Assistance for Independent Power Producers (IPP) Plant (Carthage Power

Company (CPC) Tunisia) regarding the maintenance and testing of protective relays

related to

- Generators - Main transformers - Auxiliaries - Etc

bull Technical Assistance testing and setting of protective relays at

- Steel ndashworks (Tunisia) - Cement ndashmarker (Tunisia) - Iron industries (Tunisia) - Chemical industries (Tunisia)

bull Commissioning and setting of protective relays at substations (High Medium and Low

voltages)

bull Renovation of the obsolete equipment (relays switchgear hellip)

bull Maintenance of the transmission lines and substations equipment

bull Cost-effective solutions establishment regarding the network issues (droop voltage over

voltage improvement of power factor etc)

30

ELECTRICAL DISTRIBUTION SYSTEM

Rural Electrification- Accomplished Projects

Contract Identification

Contract No 18 Technical Assistance and implementation of a Rural electrification project based upon SWER (Single Wire Earth Return) techniques

Award date 1998 Completion date 1999 Employerrsquos Name JIRAMA (JIRO SY RANO MALAGAS) Address

149 RUE RAINANDRIAMAMPANDRY Antananarivo BP 200 - MADAGASCAR

Main Tasks Performed

bull Training on SWER System bull Data collection needed for SWER System studies and implementation bull Finalization of technical studies and submission of report including

- Technical audit of the pilot project already in place - Technical description of the project - AdviseRecommendations on equipment specifications - Recommendations on possible changes in adjustment and coordination of electrical

protections

Contract Identification

Contract No 19 RWANDA Project (Phase 1) Implementation of a Pilot Rural Electrification Project based on Single-Phase with neutral to ground called MALT System 4000 Subscribers

Award date June 2008 Completion date June 2009

Employerrsquos Name

RECO ( former ELECTROGAZ) -RWANDA

Address BP 537 KIGALI -RWANA

Main Tasks performed

bull Study and Diagnosis of the existing Rwandan Power Distribution An inventory of the existing facilities including generation transmission and distribution systems was established

bull Implementation of a pilot rural electrification project based on MALT System Visit was arranged to some Tunisian rural regions and companies manufacturing electric equipment namely

- Transformers

- Iron poles

- Concrete supports

- Electric cables

- Electronic meters and

- MV and LV line accessories

31

Contract Identification

Contract No 20 Local Electrification study of Tambacounda and Kedougou departments Award date October 2002 Completion date March 2003 Customerrsquos name SENELEC Address ELECTRICAL COMPANY SENEGAL

Main Tasks Performed

bull Data Collection bull Socio-economic survey bull Technical economic and financial analysis bull Electricity market forecast (demand forecast (2003-2015)) bull Estimation of worksrsquo costs regarding medium voltage single-phase and tri-phase lines medium

and low voltage stations low voltage lines diesel micro-stations individual photovoltaic systems bull Technical and economic study related to different methods of supply including the solar as well as

the opportunity of introducing the single-phase system for the rural electrification bull Proposition for the public lighting and the management of photovoltaic systems bull Recommendations for the reinforcement of the existing stations and the existing networks to satisfy

the future demand due to the electrification of the new villages bull Tariff and profitability study bull Set up of the geographical maps and the low voltage electrification plan of the most important

villages (34 villages) bull Recommendations on privatizing power generation energy sector

Contract Identification Contract No 21 - Rural Electrification study of 80 villages in Comoros Isles

- Preparation of Tender Documents for the supply of equipment needed to the construction of 145 km MV lines 100 km LV lines and 80 MVLV stations

- Call for tenders evaluation of Bidders Award date November 2000 Completion date Dec 2002 Customerrsquos name

Ministry of Equipment Department of Energy and Water Resources

Address Moroni Avenue of the Democratic Republic of China

Main Tasks Performed

bull Data collection and visit of the existing electric utilities bull Situation analysis and proposal of electric infrastructure management solutions bull Electricity Demand Estimation and Forecasting bull Electric Calculation (Load Repartition Line Voltage Drop Losses and Voltage Drops

Calculations Short-Circuit Calculations Simulation of the Extension and Reinforcement of the Medium Voltage Networks Power System Stability Analysis Reactive Power Compensation

bull Low Voltage Studies for the Electrification of 80 villages bull RecommendationsSuggestions for the reinforcement of power generation utilities to satisfy

the future demand (by 2010) bull Electricity Tariffing study

- Review of electricity consumption patterns - Cost review - Review of tariff policies - Application and implementation of revised tariff levels

32

Contract Identification Contract Ndeg 22 Establishment and set up of a computerized accounting and budget system

Award date 1992 Completion date 1994 Customerrsquos name SOMELEC Address Nouakchott - MAURITANIA

Main Tasks Performed

bull Analytical accounting bull Bid evaluation bull Cash flow movements management bull Fixed assets management bull Centralizing bookkeeping bull Existing computer application interfaces update bull Transposition of the existing system to the new one bull Operation and maintenance Documents preparation bull Execution of the transposition of the existing system to the new one

Contract Identification Contract

No 23 Electricity sector reform technical assistance in the interim management of the ldquoCompagnie Energie Electrique du Togo ldquo(CEET)

Award date 41997

Completion date 122000

Employerrsquos Name Ministry of Mining Equipment transmission Mail and Telecommunications

Address TOGO

Main Tasks Performed

bull Technical assistance in the interim management of the CEET within the framework of the electricity sectorrsquos liberalization 1) termination of the current CEET management 2) analysis of the existing situation 3) interim management of the CEET prior to its privatization

bull Operation and maintenance of the electrical network for Lomeacute and its surrounding rural areas bull Electricity generation in isolated centers bull Electricity transmission and distribution bull Procurement and maintenance of new diesel production units bull Reduction of energy losses bull Customer management bull Increase in the number of Customers bull Accounting and billing bull Increase in payment recovery bull Call for tenders evaluation of proposals drafting of the technical annexes concerning the contracting

for a new independent operator (concession)

33

72 On-going and Under Bidding (UB) Projects

No Project Description Country

1 Training Center Update (on-going project) Republic of Congo BRAZZAVILLE

2 Master Plan elaboration in close cooperation with STUDI (Tunisia) (on-going project)

Republic of Senegal

3 Implementation of a Rural Electrification Project based on Single-Phase Four-Wires

with Neutral to Ground called MALT System (UB) Republic of Burkina Faso

4 Cost study connections to and extensions of electricity distribution networks

(UB)

Republic of Burkina Faso

5 Works Control and supervision of rural electrification of 33 communities in 4

regions of the Republic of Cameroon (UB) Republic of CAMEROUN

34

JUDICIOUS AND EFFICIENT ENERGY UTILIZATION

IS AT THE FOREFRONT OF OUR MINDS

35

Over the year 2008 STEG International Services (SIS) has widened its scope of activities to

include techno-economic studies and assistance in energy efficiency thereby providing support

to the national energy policy aiming at considering energy auditing energy efficiency energy

saving as a major priority target in Tunisiarsquos future energy strategic plan objectives In this

regard STEG International Services has carried out several projects including but not limited to

the following

80 Energy Efficiency

bull Performing obligatory periodical energy audits for industrial installations as well as energy audits on a consultancy basis

bull Assistance on projects involving energy efficiency bull Studies on energy efficiency of circuits hydraulic and thermal systems bull Upgrading energy management systems of industrial plants

81 Co-generation (Combined Heat and Power (CHP)) Studies

The main tasks performed included

bull Feasibility studies and project implementation assistance ndash RandaTunis

bull Assistance in electric utility restructuring from self power producer (electricity generation

only) to self-producing co-generatorsndash STSBEJATunisia

bull Technical assistance related to STEGrsquos grid connection with Co-generation plants in some

industrial units -SOTIPAPIER STS T-PAP and Carthago-GRE- Tunisia

82 Energy audits and energy efficiency

In any industry the three top operating expenses are often found to be energy (both electrical

and thermal) labour and materials Energy would invariably emerge as a top ranker and thus

energy management function constitutes a strategic area for cost reduction

Energy Audit will help to better understand how energy is used in any industry and in identifying

the areas where waste can occur and where scope for improvement exists In this regard the

Energy Audit would give a positive orientation to the energy cost reduction preventive

maintenance and quality control programs which are vital to production and utility activities Such

36

an audit program will help keep focus on variations which occur in the energy costs availability

and reliability of supply of energy decide on appropriate energy mix identify energy

conservation technologies retrofit for energy conservation equipment etc

Therefore SIS can carry out comprehensive assessment of techno-economic performance of

plants and equipment against the designed performance level or the industry best practice

aiming at optimizing consumption levels along with specific operating control targets

821 Samples of accomplished and on-going Energy Auditing projects

bull Energy Audit of the Liquefied Petroleum Gas (LPG) plant located in Gabegraves (Tunisia) with the assistance of Kvaerner Heurtey in 2001

bull Energy Performance Assessment of Rades and Sousse steam and Combined Cycle Power Plants as well as Bouchemma Menzel Bourguiba Korba Gas Turbines with the assistance of TRACTABEL and EDF in 2002

bull Energy Audit of Sousse Combined Cycle Power Plant with the assistance of CRA2E in 2007-2008

bull Periodic Performance Tests of Carthage Power Company (CPC) combined cycle an Impendent Power Producer (IPP) in Tunisia

37

SIS Future Commitments and Responsibilities

Endowed with a clear vision a sound project management and solid experiences and

know-how acquired by the parent company STEG through its various trades of over 48 years

SIS has put together a team of experts inndashline with its strategic intent- to be positioned as a

competitive and pre-eminent regional energy services company by spreading its expertise and

know-how throughout the African continent Arab countries and the rest of the world working on

a partnership basis with potential consultants andor the utilities of the respective countries

resulting in a keen focus and a strong sense of purpose

As part of its vision SIS management recognizes that it has responsibilities to all of its

stakeholders These include

Shareholders SIS will protect the investments of its shareholders and will provide an acceptable return on

investments through the application of its business principles Customers SIS will aim at optimizing its business activities through winning customers and maintaining

customerrsquos loyalty by offering them high quality services at competitive prices delivering on time

and supporting them with its management expertise

Employees SIS recognizes that its working employees are the key to its success and it nurtures loyalty

teamwork and trust between them SIS will strive to protect support and involve them in the

companyrsquos future to develop their skills and to reward them in line with the corporate values of

SISrsquos organization

Partners Suppliers Contractors and all External Contacts SIS will seek to treat all its partners suppliers contractors and other external stakeholders in a

consistently professional way and to ensure that their needs are fulfilled in every way possible

38

  • 72 On-going and Under Bidding (UB) Projects

17

RURAL ELECTRIFICATION- CONSTRUCTION WORKS ON A TURN KEY BASIS Pilot Rural Electrification Project based upon single-phase in RWANDA

Services provided Signature of an agreement for cooperation and technical assistance between STEG amp ELECTROGAZ

Metallic Poles delivery

The scope of works included bull Study and Diagnosis of the

existing Rwandan Power

Distribution An inventory of the

existing facilities including

generation transmission and

distribution systems was

established

bull The turnkey design engineering

procurement supply installation

construction commissioning and

start up of a pilot rural

electrification project based upon

single-phase in RWANDA

Sub-station Connection Factory Acceptance Test of AAAC Conductor and twisted cables in presence of Rwandan technicians

Electrcity supply in rwandan remote villages

Energy is an important factor for Socio-Economic Developemnt

18

40 Gas Segment

Services provided Gas Condensate Treatment Unit Pipeline On-Line Welding

SIS services cover the following scope

of activities

bull Study control and supervision of gas

projects erection works

bull Master plans elaboration regarding Gas Transmission and Distributions networks

bull Catholic Protection of gas network bull Gas and condensate treatment units

operation and maintenance related tasks

bull Gas compression stations operation and

maintenance related tasks bull Supervisory and control systems

operation and maintenance bull Gas pipelines network supervision and

remote command bull Pipeline inspection bull Steel pipes and gas delivery station

specification bull Compression stations specification and

supervision of erection works bull Gas and condensate treatment unitsrsquo

implementation commissioning and start-up

Hot Tap Achievement Gas pipeline welding connection

Topographic surveying

19

50 Laboratory-Workshop

Main Activities Rotary Furnace Inspection Surfacing High Precision Castings

General Technics Department GTD was established to perform technical assistance to all power generating units including

bull Thermal Power Plants

bull Combined Cycle Power Plants

bull Gas Turbines

bull Hydraulic Power Plants etc

GTD Mission

bull Acceptance Trial of Equipment

bull High and Mid Voltage Testing (also called dielectric strength test or Hipot Test)

bull Acoustics and Mechanical Vibration

bull Thermodynamics and Hydraulic Activities Management

bull Chemical Analysis amp Controls

bull Metallurgical amp NDT Controls

bull Workshop

NDT Magnetic Testing Turbine Speed Balancing

Analysis of gas dissolved in dielectric liquids of large transformers operation

water lubricant oil dielectric oil and liquid fuel analysis

Dielectric Laboratory Welding Work Shop

Dielectric Laboratory

bull Dielectric oil rigidity

bull Physical and Chimical Characterisics of Dielectric oil

bull Dissolved gas in Dielectric oil

bull Acceptance trials for generators transformers switch-gears

Welding Work Shop

bull Steel plate works

20

bull Heat treatment in furnace or outside

bull Surface reparing by powder spray metallisation

bull Rebabbiting of used bearing

60 Vocational Training ndash Photo Gallery

Services Provided

Practical Hands-On Training Equipment

Practical Hands-On Training electricity amp gas counter

SIS as an energy company

provides the entire scope of training

services including

bull Upgrade of training centers

bull Drawing up and delivery of

training courses

bull Training of trainers

bull Designing and monitoring of

training programs

bull End-user training organization

of seminars hands-on training

on-the-job training and

designing of training manuals

The training provided is relevant

effective structured and

continuously updated This

maintains a high level of technical

skills and procedures in a

constantly changing environment

Practical Hands-On Training works under voltage

Classroom Training on electrical maintenance related to electrical power utilities

21

enabling all staff to keep abreast of

technical innovations and

improvements together with

legislative requirements and

recommended practices

STEG Training Center (CFPK)

Since its inception in 1976 CFPKrsquos aim has been to train newly recruited STEG technicians in Generation Transmission Distribution and Gas sectors and to provide advanced training and retraining for active personnel Since then the Center has constantly expanded and adjusted in order to bull Address STEGrsquos specific requirements in vocational training in all its

sectors technical commercial financial computing management auditing new technologies etc

bull Provides a logical approach as to how to establish and assure a competent workforce by technical vocational training for now and the future

bull Provide appropriate training programs for organizations outside STEG both at national and international levels (in-house training customized courses and lectures)

22

70 Samples of Project Experience

Since 2006 SIS has undertaken many assignments in African countries Middle East and in

Tunisia It is only possible to show a small selection of these in this brochure We are always

happy to provide additional details and examples of our experience on request

71 Accomplished Projects

POWER GENERATION

No Contract Identification Unitne Installed

Capacity(MW) location Start

Date End Date

1 Annual Inspection

5 260 Rabigh SEC Saudi Arabia)

20-12-2005

30-01-2006

2 Annual Inspection 2 260

Rabigh SEC Saudi Arabia)

09-03-2006

22-04-2006

3 Annual Inspection

3 260 Rabigh SEC Saudi Arabia)

19-03-2006

29-04-2006

4 Annual Inspection

1amp4 440 Shoaiba SEC Saoudi Arabia

27-01-2007

01-03-2007

5 Annual Inspection 4 440

Shoaiba SEC Saoudi Arabia

03-03-2007

05-04-2007

6

Annual Inspection Bell seals rings amp nozzle blocks replacement ( turbine overhaul)

4 260 Rabigh SEC Saudi Arabia)

03-01-2008

07-03-2008

7 Annual Inspection 2 260

Rabigh SEC Saudi Arabia)

08-03-2008

15-04-2008

8 Major Overhaul

GT1 27 TihamaSEC Saudi Arabia

20-01-2008

10-02-2008

9

Erection and Supervision of Works 300 MW (ISO Condition) Open Cycle Power Plant Fast Emergency

GTs 1-4

4x75 ISO Conditions

Ministry of Energy

(Electricity and Water)

Sabya Power Plant

State of KOWEIT

2007- 2008

10 Commissioning CPL amp Parallel Resonant Circuit in close cooperation with AREVA

Ethiopie 2007-2008

11

Revamping of obsolete Control and instrumentation system (in close cooperation with SIEMENS)

2 Units Marocco 2008

23

No Contract Identification Unitne Installed Capacity (MW)

location Start Date

12

Commissioning of Control command system Mark VI on GTs Frame 5 (in close cooperation with GESHANAHAN Eng

GTs GE Frame 5

Algeria (Arzew) 2008

13

Grid Interconnection In close cooperation with STUDI for West African Power Pool (WAPP)

225 KV

Electricity grid interconnection

between Burkina Faso and Ghana

2008

14 Pricing Study Senegal 2008

15 Major Inspection GT6

GE-FR7

Najran SEC Saudi Arabia

2008

16 Major Inspection (MI) W501D5

Jazan SEC Saudi Arabia

2009

17 Annual Inspection 2amp3 2x393 Shoaiba SEC Saudi Arabia

2009

24

25

SISrsquoS Experiences in Boilerrsquos Maintenance Work

Power plant location Boiler tech Details ampInspections

Rades A (ST) ST STEAM TURBINE Rades B (ST)

Unit 1 Unit 2 Unit 3 Unit 4

Manufacturer Mitsubishi H I Mitsubishi H I Ansaldo Energia Ansaldo Energia Type amp Model MHI CE RR

type out-door MHI CE RR type outdoor

AE RR type outdoor

AE RR type outdoor

Date of commissioning 1983 1984 1998 1999 MCR (th) 520000 520000 5335 5335

Steam conditions Pressure SHRH(bars) 1685 352 1685 352 1739 1739 Temperature( degC) 543 543 542 542

fuel Natural gas heavy Fuel Ndeg2

Natural gas heavy Fuel Ndeg2

Natural gas heavy Fuel Ndeg2

Natural gas heavy Fuel Ndeg2

Heating area Furnace(msup2) 5105 5105 5360 5360 Reheater (msup2) 3130 3130 1286 1286 Eco (msup2) 2600 2600 1556 1556

Fuel oil Burners type amp No 20 20 Y Ndeg 12 Y Ndeg 12 FDF type amp capacity ( Th) HC 591 HC 591 HC748 HC 748 IDF type amp capacity (Th) HC 640 HC 640 NA NA GRF type amp capacity ( Th) HC 500 HC 500 HC 300 HC 300

RegenAir Preheater Type Ljungstroumlm Ljungstroumlm Ljungstroumlm Ljungstroumlm No amp capacity 2 2 2 2 Heating surface(msup2) 12000 12000 18000 18000

Annual inspection No 20 20 10 10 Starting amp Completion dates

21 Days 21 days 21 days 21 days

Major overhaul No 04 04 01 01 Starting amp Completion dates

1221038843 days 611028854 days 56 days 59 days

Boiler conservation No 20 20 08 08 Boiler Rehabilitation No 0 0 0 0 Boiler Tube Acid cleaning No 01 01 01 01 ILA(Integrity Life Assessment)No 0 0 0 0

26

SISrsquos Experiences in Boilersrsquo Maintenance Work

Power plant location Boiler tech Details ampInspections

Sousse A (ST) Sousse B (CCPP)

Unitne1 Unitne 2 Unitne1 Unitne 2

Manufacturer SGP SGP STEIN INDUSTRY STEIN INDUSTRY Type amp Model Natural circulation Natural circulation Heat Recuperator Heat Recuperator Date of commissioning 1980 1980 1995 1995 MCR (th) 515 515 HP 182 BP 415 HP 182 BP 415 Steam conditions Pressure SHRH (bar) 16038 16038 HP 72 BP 66 HP 72 BP 66

Temperature (degC) 540degC 540degC HP 511 BP 213 HP 511 BP 213 fuel FUELGAZ FUELGAZ Gaz Gaz Heating area Furnace (m2 2080 ) 2080 HP evaporator 25251 LP evaporator 18627

Reheater (m2 1512 ) 1512 HP superheater 9418 LP superheater 2328 Eco (m2 2017 ) 2017 HP economizer 16834 13773 LP economizer 3060

Fuel oil Burners Type ampNo EVT8 EVT8 FDF type amp capacity R62250 7566 m3 R62250 7566 ms 3 s

GRF type amp capacity R62250 721 m3 R62250 721 ms 3 s

Regen Air Preheater

Type No amp capacity 2 220186 Nm3h 2 220186 Nm3h

Heating surface(m2) 2x924 2x924 Annual Inspection

No annually annually annually annually Starting amp completion dates 3 - 4 weeks 3 - 4 weeks 10 days 10 days

Major Overhaul No along with annual inspectioccediln along with annual inspectioccediln

Starting amp completion dates 3 - 4 weeks 3 - 4 weeks

Boiler Conservation No 3 2 Boiler Rehabilitation No Boiler Tube Acid Cleaning No 2 2 ILA (Integrity Life Assessment) No 1

27

SISrsquos Experiences in Boilersrsquo Maintenance Work

Power plant location Boiler tech Details ampInspections Unitne1 (ST) Unitne 2 (ST) Unitne 3 (ST) Unitne 4 (ST)

Manufacturer WALTHER Type amp Model WALTHER FN10 Natural Circulation Date of commissioning 05071965 01111965 22061968 20091968 MCR (th) 112 Steam conditions

Pressure 686 bar Temperature 510 degC

fuel Heavy fuel oil Ndeg2 light fuel oil

Heating area

Furnace (m2 540 m2 ) Reheater (m2 1542 m2 ) Eco (m2 480 m2 )

Fuel oil Burners Type ampNo SONVICO 4 FDF type amp capacity Centrifugal - 27 m3s IDF type amp capacity - - - - GRF type amp capacity - - - -

Regen Air Preheater Type Static LJUNGSTROM No amp capacity 1 1 1 1 Heating surface(m2) 7350 m2 -

Annual Inspection No every year until 1998 every year until

2005 every year until 1998

every year until 2005

Starting amp completion dates - - - -

Major Overhaul No 6 8 5 5 Starting amp completion dates - - - -

Boiler Conservation No - 2 - 2 Boiler Rehabilitation No 4 6 5 5 Boiler Tube Acid Cleaning No 0 0 0 0 ILA (Integrity Life Assessment) No 0 0 0 0

28

SISrsquos Experiences in Boilersrsquo Maintenance Work Power Plant Location

Boiler Tech Details ampInspections

Ghannouch (ST) Unitne1 (ST) Unitne 2

Manufacturer Stein Industrie Stein Industrie Type amp Model Natural circulation Natural circulation Date of commissioning 1972 1972 MCR (th) 120 120 Steam conditions Pressure SHRH (th) 70 bars 70 bars

Temperature 510 degC 510 degC fuel Natural GasHeavy fuel Natural GasHeavy fuel Heating area Furnace (m2 )

Reheater (m2 8880 dmsup3 ) 8880 dmsup3 Eco (m2 2400 dmsup3 ) 2400 dmsup3

Fuel oil Burners Type ampNo PILLARD GRC PILLARD GRC IDF type amp capacity GRF type amp capacity Regen Air Preheater Type Ljunstroumlm Ljunstroumlm

No amp capacity 140msup3h 140msup3h Heating surface(m2) _ _

Annual Inspection No 1 1 Starting amp completion dates 1 week 1 week

Major Overhaul No 15ans 15ans

Starting amp completion dates 2 months 2 months

Boiler Conservation No in case of being extended in case of being extended Boiler Rehabilitation No NO NO Boiler Tube Acid Cleaning No NO NO ILA (Integrity Life Assessment) No NO NO

29

ELECTRICAL TRANSMISSION SYSTEM

Accomplished Projects

bull Tests performed on Numerical relays manufactured by - ABB (Distance protection REL 316 ) - AREVA (Distance protection EPAC MICOMP442 hellip) - ICE (Over current protection NPID 800hellip) - SIEMENS (Distance protection 7SA 511 513 522 611) - REYROLLES (Differential protection DUOBIAS)

bull Test and setting of protective relays and checking the tripping circuits for Generators and

Substations belonging to Zaouia Petroleum Refinery (Libya)

bull Short circuit calculation selectivity study of protective relays by providing solutions for the

existing issues in PEC YEMEN Networks

bull Study and improvement of the existing protective system in close cooperation with Tractebel

Engineering

bull Technical Assistance for Independent Power Producers (IPP) Plant (Carthage Power

Company (CPC) Tunisia) regarding the maintenance and testing of protective relays

related to

- Generators - Main transformers - Auxiliaries - Etc

bull Technical Assistance testing and setting of protective relays at

- Steel ndashworks (Tunisia) - Cement ndashmarker (Tunisia) - Iron industries (Tunisia) - Chemical industries (Tunisia)

bull Commissioning and setting of protective relays at substations (High Medium and Low

voltages)

bull Renovation of the obsolete equipment (relays switchgear hellip)

bull Maintenance of the transmission lines and substations equipment

bull Cost-effective solutions establishment regarding the network issues (droop voltage over

voltage improvement of power factor etc)

30

ELECTRICAL DISTRIBUTION SYSTEM

Rural Electrification- Accomplished Projects

Contract Identification

Contract No 18 Technical Assistance and implementation of a Rural electrification project based upon SWER (Single Wire Earth Return) techniques

Award date 1998 Completion date 1999 Employerrsquos Name JIRAMA (JIRO SY RANO MALAGAS) Address

149 RUE RAINANDRIAMAMPANDRY Antananarivo BP 200 - MADAGASCAR

Main Tasks Performed

bull Training on SWER System bull Data collection needed for SWER System studies and implementation bull Finalization of technical studies and submission of report including

- Technical audit of the pilot project already in place - Technical description of the project - AdviseRecommendations on equipment specifications - Recommendations on possible changes in adjustment and coordination of electrical

protections

Contract Identification

Contract No 19 RWANDA Project (Phase 1) Implementation of a Pilot Rural Electrification Project based on Single-Phase with neutral to ground called MALT System 4000 Subscribers

Award date June 2008 Completion date June 2009

Employerrsquos Name

RECO ( former ELECTROGAZ) -RWANDA

Address BP 537 KIGALI -RWANA

Main Tasks performed

bull Study and Diagnosis of the existing Rwandan Power Distribution An inventory of the existing facilities including generation transmission and distribution systems was established

bull Implementation of a pilot rural electrification project based on MALT System Visit was arranged to some Tunisian rural regions and companies manufacturing electric equipment namely

- Transformers

- Iron poles

- Concrete supports

- Electric cables

- Electronic meters and

- MV and LV line accessories

31

Contract Identification

Contract No 20 Local Electrification study of Tambacounda and Kedougou departments Award date October 2002 Completion date March 2003 Customerrsquos name SENELEC Address ELECTRICAL COMPANY SENEGAL

Main Tasks Performed

bull Data Collection bull Socio-economic survey bull Technical economic and financial analysis bull Electricity market forecast (demand forecast (2003-2015)) bull Estimation of worksrsquo costs regarding medium voltage single-phase and tri-phase lines medium

and low voltage stations low voltage lines diesel micro-stations individual photovoltaic systems bull Technical and economic study related to different methods of supply including the solar as well as

the opportunity of introducing the single-phase system for the rural electrification bull Proposition for the public lighting and the management of photovoltaic systems bull Recommendations for the reinforcement of the existing stations and the existing networks to satisfy

the future demand due to the electrification of the new villages bull Tariff and profitability study bull Set up of the geographical maps and the low voltage electrification plan of the most important

villages (34 villages) bull Recommendations on privatizing power generation energy sector

Contract Identification Contract No 21 - Rural Electrification study of 80 villages in Comoros Isles

- Preparation of Tender Documents for the supply of equipment needed to the construction of 145 km MV lines 100 km LV lines and 80 MVLV stations

- Call for tenders evaluation of Bidders Award date November 2000 Completion date Dec 2002 Customerrsquos name

Ministry of Equipment Department of Energy and Water Resources

Address Moroni Avenue of the Democratic Republic of China

Main Tasks Performed

bull Data collection and visit of the existing electric utilities bull Situation analysis and proposal of electric infrastructure management solutions bull Electricity Demand Estimation and Forecasting bull Electric Calculation (Load Repartition Line Voltage Drop Losses and Voltage Drops

Calculations Short-Circuit Calculations Simulation of the Extension and Reinforcement of the Medium Voltage Networks Power System Stability Analysis Reactive Power Compensation

bull Low Voltage Studies for the Electrification of 80 villages bull RecommendationsSuggestions for the reinforcement of power generation utilities to satisfy

the future demand (by 2010) bull Electricity Tariffing study

- Review of electricity consumption patterns - Cost review - Review of tariff policies - Application and implementation of revised tariff levels

32

Contract Identification Contract Ndeg 22 Establishment and set up of a computerized accounting and budget system

Award date 1992 Completion date 1994 Customerrsquos name SOMELEC Address Nouakchott - MAURITANIA

Main Tasks Performed

bull Analytical accounting bull Bid evaluation bull Cash flow movements management bull Fixed assets management bull Centralizing bookkeeping bull Existing computer application interfaces update bull Transposition of the existing system to the new one bull Operation and maintenance Documents preparation bull Execution of the transposition of the existing system to the new one

Contract Identification Contract

No 23 Electricity sector reform technical assistance in the interim management of the ldquoCompagnie Energie Electrique du Togo ldquo(CEET)

Award date 41997

Completion date 122000

Employerrsquos Name Ministry of Mining Equipment transmission Mail and Telecommunications

Address TOGO

Main Tasks Performed

bull Technical assistance in the interim management of the CEET within the framework of the electricity sectorrsquos liberalization 1) termination of the current CEET management 2) analysis of the existing situation 3) interim management of the CEET prior to its privatization

bull Operation and maintenance of the electrical network for Lomeacute and its surrounding rural areas bull Electricity generation in isolated centers bull Electricity transmission and distribution bull Procurement and maintenance of new diesel production units bull Reduction of energy losses bull Customer management bull Increase in the number of Customers bull Accounting and billing bull Increase in payment recovery bull Call for tenders evaluation of proposals drafting of the technical annexes concerning the contracting

for a new independent operator (concession)

33

72 On-going and Under Bidding (UB) Projects

No Project Description Country

1 Training Center Update (on-going project) Republic of Congo BRAZZAVILLE

2 Master Plan elaboration in close cooperation with STUDI (Tunisia) (on-going project)

Republic of Senegal

3 Implementation of a Rural Electrification Project based on Single-Phase Four-Wires

with Neutral to Ground called MALT System (UB) Republic of Burkina Faso

4 Cost study connections to and extensions of electricity distribution networks

(UB)

Republic of Burkina Faso

5 Works Control and supervision of rural electrification of 33 communities in 4

regions of the Republic of Cameroon (UB) Republic of CAMEROUN

34

JUDICIOUS AND EFFICIENT ENERGY UTILIZATION

IS AT THE FOREFRONT OF OUR MINDS

35

Over the year 2008 STEG International Services (SIS) has widened its scope of activities to

include techno-economic studies and assistance in energy efficiency thereby providing support

to the national energy policy aiming at considering energy auditing energy efficiency energy

saving as a major priority target in Tunisiarsquos future energy strategic plan objectives In this

regard STEG International Services has carried out several projects including but not limited to

the following

80 Energy Efficiency

bull Performing obligatory periodical energy audits for industrial installations as well as energy audits on a consultancy basis

bull Assistance on projects involving energy efficiency bull Studies on energy efficiency of circuits hydraulic and thermal systems bull Upgrading energy management systems of industrial plants

81 Co-generation (Combined Heat and Power (CHP)) Studies

The main tasks performed included

bull Feasibility studies and project implementation assistance ndash RandaTunis

bull Assistance in electric utility restructuring from self power producer (electricity generation

only) to self-producing co-generatorsndash STSBEJATunisia

bull Technical assistance related to STEGrsquos grid connection with Co-generation plants in some

industrial units -SOTIPAPIER STS T-PAP and Carthago-GRE- Tunisia

82 Energy audits and energy efficiency

In any industry the three top operating expenses are often found to be energy (both electrical

and thermal) labour and materials Energy would invariably emerge as a top ranker and thus

energy management function constitutes a strategic area for cost reduction

Energy Audit will help to better understand how energy is used in any industry and in identifying

the areas where waste can occur and where scope for improvement exists In this regard the

Energy Audit would give a positive orientation to the energy cost reduction preventive

maintenance and quality control programs which are vital to production and utility activities Such

36

an audit program will help keep focus on variations which occur in the energy costs availability

and reliability of supply of energy decide on appropriate energy mix identify energy

conservation technologies retrofit for energy conservation equipment etc

Therefore SIS can carry out comprehensive assessment of techno-economic performance of

plants and equipment against the designed performance level or the industry best practice

aiming at optimizing consumption levels along with specific operating control targets

821 Samples of accomplished and on-going Energy Auditing projects

bull Energy Audit of the Liquefied Petroleum Gas (LPG) plant located in Gabegraves (Tunisia) with the assistance of Kvaerner Heurtey in 2001

bull Energy Performance Assessment of Rades and Sousse steam and Combined Cycle Power Plants as well as Bouchemma Menzel Bourguiba Korba Gas Turbines with the assistance of TRACTABEL and EDF in 2002

bull Energy Audit of Sousse Combined Cycle Power Plant with the assistance of CRA2E in 2007-2008

bull Periodic Performance Tests of Carthage Power Company (CPC) combined cycle an Impendent Power Producer (IPP) in Tunisia

37

SIS Future Commitments and Responsibilities

Endowed with a clear vision a sound project management and solid experiences and

know-how acquired by the parent company STEG through its various trades of over 48 years

SIS has put together a team of experts inndashline with its strategic intent- to be positioned as a

competitive and pre-eminent regional energy services company by spreading its expertise and

know-how throughout the African continent Arab countries and the rest of the world working on

a partnership basis with potential consultants andor the utilities of the respective countries

resulting in a keen focus and a strong sense of purpose

As part of its vision SIS management recognizes that it has responsibilities to all of its

stakeholders These include

Shareholders SIS will protect the investments of its shareholders and will provide an acceptable return on

investments through the application of its business principles Customers SIS will aim at optimizing its business activities through winning customers and maintaining

customerrsquos loyalty by offering them high quality services at competitive prices delivering on time

and supporting them with its management expertise

Employees SIS recognizes that its working employees are the key to its success and it nurtures loyalty

teamwork and trust between them SIS will strive to protect support and involve them in the

companyrsquos future to develop their skills and to reward them in line with the corporate values of

SISrsquos organization

Partners Suppliers Contractors and all External Contacts SIS will seek to treat all its partners suppliers contractors and other external stakeholders in a

consistently professional way and to ensure that their needs are fulfilled in every way possible

38

  • 72 On-going and Under Bidding (UB) Projects

18

40 Gas Segment

Services provided Gas Condensate Treatment Unit Pipeline On-Line Welding

SIS services cover the following scope

of activities

bull Study control and supervision of gas

projects erection works

bull Master plans elaboration regarding Gas Transmission and Distributions networks

bull Catholic Protection of gas network bull Gas and condensate treatment units

operation and maintenance related tasks

bull Gas compression stations operation and

maintenance related tasks bull Supervisory and control systems

operation and maintenance bull Gas pipelines network supervision and

remote command bull Pipeline inspection bull Steel pipes and gas delivery station

specification bull Compression stations specification and

supervision of erection works bull Gas and condensate treatment unitsrsquo

implementation commissioning and start-up

Hot Tap Achievement Gas pipeline welding connection

Topographic surveying

19

50 Laboratory-Workshop

Main Activities Rotary Furnace Inspection Surfacing High Precision Castings

General Technics Department GTD was established to perform technical assistance to all power generating units including

bull Thermal Power Plants

bull Combined Cycle Power Plants

bull Gas Turbines

bull Hydraulic Power Plants etc

GTD Mission

bull Acceptance Trial of Equipment

bull High and Mid Voltage Testing (also called dielectric strength test or Hipot Test)

bull Acoustics and Mechanical Vibration

bull Thermodynamics and Hydraulic Activities Management

bull Chemical Analysis amp Controls

bull Metallurgical amp NDT Controls

bull Workshop

NDT Magnetic Testing Turbine Speed Balancing

Analysis of gas dissolved in dielectric liquids of large transformers operation

water lubricant oil dielectric oil and liquid fuel analysis

Dielectric Laboratory Welding Work Shop

Dielectric Laboratory

bull Dielectric oil rigidity

bull Physical and Chimical Characterisics of Dielectric oil

bull Dissolved gas in Dielectric oil

bull Acceptance trials for generators transformers switch-gears

Welding Work Shop

bull Steel plate works

20

bull Heat treatment in furnace or outside

bull Surface reparing by powder spray metallisation

bull Rebabbiting of used bearing

60 Vocational Training ndash Photo Gallery

Services Provided

Practical Hands-On Training Equipment

Practical Hands-On Training electricity amp gas counter

SIS as an energy company

provides the entire scope of training

services including

bull Upgrade of training centers

bull Drawing up and delivery of

training courses

bull Training of trainers

bull Designing and monitoring of

training programs

bull End-user training organization

of seminars hands-on training

on-the-job training and

designing of training manuals

The training provided is relevant

effective structured and

continuously updated This

maintains a high level of technical

skills and procedures in a

constantly changing environment

Practical Hands-On Training works under voltage

Classroom Training on electrical maintenance related to electrical power utilities

21

enabling all staff to keep abreast of

technical innovations and

improvements together with

legislative requirements and

recommended practices

STEG Training Center (CFPK)

Since its inception in 1976 CFPKrsquos aim has been to train newly recruited STEG technicians in Generation Transmission Distribution and Gas sectors and to provide advanced training and retraining for active personnel Since then the Center has constantly expanded and adjusted in order to bull Address STEGrsquos specific requirements in vocational training in all its

sectors technical commercial financial computing management auditing new technologies etc

bull Provides a logical approach as to how to establish and assure a competent workforce by technical vocational training for now and the future

bull Provide appropriate training programs for organizations outside STEG both at national and international levels (in-house training customized courses and lectures)

22

70 Samples of Project Experience

Since 2006 SIS has undertaken many assignments in African countries Middle East and in

Tunisia It is only possible to show a small selection of these in this brochure We are always

happy to provide additional details and examples of our experience on request

71 Accomplished Projects

POWER GENERATION

No Contract Identification Unitne Installed

Capacity(MW) location Start

Date End Date

1 Annual Inspection

5 260 Rabigh SEC Saudi Arabia)

20-12-2005

30-01-2006

2 Annual Inspection 2 260

Rabigh SEC Saudi Arabia)

09-03-2006

22-04-2006

3 Annual Inspection

3 260 Rabigh SEC Saudi Arabia)

19-03-2006

29-04-2006

4 Annual Inspection

1amp4 440 Shoaiba SEC Saoudi Arabia

27-01-2007

01-03-2007

5 Annual Inspection 4 440

Shoaiba SEC Saoudi Arabia

03-03-2007

05-04-2007

6

Annual Inspection Bell seals rings amp nozzle blocks replacement ( turbine overhaul)

4 260 Rabigh SEC Saudi Arabia)

03-01-2008

07-03-2008

7 Annual Inspection 2 260

Rabigh SEC Saudi Arabia)

08-03-2008

15-04-2008

8 Major Overhaul

GT1 27 TihamaSEC Saudi Arabia

20-01-2008

10-02-2008

9

Erection and Supervision of Works 300 MW (ISO Condition) Open Cycle Power Plant Fast Emergency

GTs 1-4

4x75 ISO Conditions

Ministry of Energy

(Electricity and Water)

Sabya Power Plant

State of KOWEIT

2007- 2008

10 Commissioning CPL amp Parallel Resonant Circuit in close cooperation with AREVA

Ethiopie 2007-2008

11

Revamping of obsolete Control and instrumentation system (in close cooperation with SIEMENS)

2 Units Marocco 2008

23

No Contract Identification Unitne Installed Capacity (MW)

location Start Date

12

Commissioning of Control command system Mark VI on GTs Frame 5 (in close cooperation with GESHANAHAN Eng

GTs GE Frame 5

Algeria (Arzew) 2008

13

Grid Interconnection In close cooperation with STUDI for West African Power Pool (WAPP)

225 KV

Electricity grid interconnection

between Burkina Faso and Ghana

2008

14 Pricing Study Senegal 2008

15 Major Inspection GT6

GE-FR7

Najran SEC Saudi Arabia

2008

16 Major Inspection (MI) W501D5

Jazan SEC Saudi Arabia

2009

17 Annual Inspection 2amp3 2x393 Shoaiba SEC Saudi Arabia

2009

24

25

SISrsquoS Experiences in Boilerrsquos Maintenance Work

Power plant location Boiler tech Details ampInspections

Rades A (ST) ST STEAM TURBINE Rades B (ST)

Unit 1 Unit 2 Unit 3 Unit 4

Manufacturer Mitsubishi H I Mitsubishi H I Ansaldo Energia Ansaldo Energia Type amp Model MHI CE RR

type out-door MHI CE RR type outdoor

AE RR type outdoor

AE RR type outdoor

Date of commissioning 1983 1984 1998 1999 MCR (th) 520000 520000 5335 5335

Steam conditions Pressure SHRH(bars) 1685 352 1685 352 1739 1739 Temperature( degC) 543 543 542 542

fuel Natural gas heavy Fuel Ndeg2

Natural gas heavy Fuel Ndeg2

Natural gas heavy Fuel Ndeg2

Natural gas heavy Fuel Ndeg2

Heating area Furnace(msup2) 5105 5105 5360 5360 Reheater (msup2) 3130 3130 1286 1286 Eco (msup2) 2600 2600 1556 1556

Fuel oil Burners type amp No 20 20 Y Ndeg 12 Y Ndeg 12 FDF type amp capacity ( Th) HC 591 HC 591 HC748 HC 748 IDF type amp capacity (Th) HC 640 HC 640 NA NA GRF type amp capacity ( Th) HC 500 HC 500 HC 300 HC 300

RegenAir Preheater Type Ljungstroumlm Ljungstroumlm Ljungstroumlm Ljungstroumlm No amp capacity 2 2 2 2 Heating surface(msup2) 12000 12000 18000 18000

Annual inspection No 20 20 10 10 Starting amp Completion dates

21 Days 21 days 21 days 21 days

Major overhaul No 04 04 01 01 Starting amp Completion dates

1221038843 days 611028854 days 56 days 59 days

Boiler conservation No 20 20 08 08 Boiler Rehabilitation No 0 0 0 0 Boiler Tube Acid cleaning No 01 01 01 01 ILA(Integrity Life Assessment)No 0 0 0 0

26

SISrsquos Experiences in Boilersrsquo Maintenance Work

Power plant location Boiler tech Details ampInspections

Sousse A (ST) Sousse B (CCPP)

Unitne1 Unitne 2 Unitne1 Unitne 2

Manufacturer SGP SGP STEIN INDUSTRY STEIN INDUSTRY Type amp Model Natural circulation Natural circulation Heat Recuperator Heat Recuperator Date of commissioning 1980 1980 1995 1995 MCR (th) 515 515 HP 182 BP 415 HP 182 BP 415 Steam conditions Pressure SHRH (bar) 16038 16038 HP 72 BP 66 HP 72 BP 66

Temperature (degC) 540degC 540degC HP 511 BP 213 HP 511 BP 213 fuel FUELGAZ FUELGAZ Gaz Gaz Heating area Furnace (m2 2080 ) 2080 HP evaporator 25251 LP evaporator 18627

Reheater (m2 1512 ) 1512 HP superheater 9418 LP superheater 2328 Eco (m2 2017 ) 2017 HP economizer 16834 13773 LP economizer 3060

Fuel oil Burners Type ampNo EVT8 EVT8 FDF type amp capacity R62250 7566 m3 R62250 7566 ms 3 s

GRF type amp capacity R62250 721 m3 R62250 721 ms 3 s

Regen Air Preheater

Type No amp capacity 2 220186 Nm3h 2 220186 Nm3h

Heating surface(m2) 2x924 2x924 Annual Inspection

No annually annually annually annually Starting amp completion dates 3 - 4 weeks 3 - 4 weeks 10 days 10 days

Major Overhaul No along with annual inspectioccediln along with annual inspectioccediln

Starting amp completion dates 3 - 4 weeks 3 - 4 weeks

Boiler Conservation No 3 2 Boiler Rehabilitation No Boiler Tube Acid Cleaning No 2 2 ILA (Integrity Life Assessment) No 1

27

SISrsquos Experiences in Boilersrsquo Maintenance Work

Power plant location Boiler tech Details ampInspections Unitne1 (ST) Unitne 2 (ST) Unitne 3 (ST) Unitne 4 (ST)

Manufacturer WALTHER Type amp Model WALTHER FN10 Natural Circulation Date of commissioning 05071965 01111965 22061968 20091968 MCR (th) 112 Steam conditions

Pressure 686 bar Temperature 510 degC

fuel Heavy fuel oil Ndeg2 light fuel oil

Heating area

Furnace (m2 540 m2 ) Reheater (m2 1542 m2 ) Eco (m2 480 m2 )

Fuel oil Burners Type ampNo SONVICO 4 FDF type amp capacity Centrifugal - 27 m3s IDF type amp capacity - - - - GRF type amp capacity - - - -

Regen Air Preheater Type Static LJUNGSTROM No amp capacity 1 1 1 1 Heating surface(m2) 7350 m2 -

Annual Inspection No every year until 1998 every year until

2005 every year until 1998

every year until 2005

Starting amp completion dates - - - -

Major Overhaul No 6 8 5 5 Starting amp completion dates - - - -

Boiler Conservation No - 2 - 2 Boiler Rehabilitation No 4 6 5 5 Boiler Tube Acid Cleaning No 0 0 0 0 ILA (Integrity Life Assessment) No 0 0 0 0

28

SISrsquos Experiences in Boilersrsquo Maintenance Work Power Plant Location

Boiler Tech Details ampInspections

Ghannouch (ST) Unitne1 (ST) Unitne 2

Manufacturer Stein Industrie Stein Industrie Type amp Model Natural circulation Natural circulation Date of commissioning 1972 1972 MCR (th) 120 120 Steam conditions Pressure SHRH (th) 70 bars 70 bars

Temperature 510 degC 510 degC fuel Natural GasHeavy fuel Natural GasHeavy fuel Heating area Furnace (m2 )

Reheater (m2 8880 dmsup3 ) 8880 dmsup3 Eco (m2 2400 dmsup3 ) 2400 dmsup3

Fuel oil Burners Type ampNo PILLARD GRC PILLARD GRC IDF type amp capacity GRF type amp capacity Regen Air Preheater Type Ljunstroumlm Ljunstroumlm

No amp capacity 140msup3h 140msup3h Heating surface(m2) _ _

Annual Inspection No 1 1 Starting amp completion dates 1 week 1 week

Major Overhaul No 15ans 15ans

Starting amp completion dates 2 months 2 months

Boiler Conservation No in case of being extended in case of being extended Boiler Rehabilitation No NO NO Boiler Tube Acid Cleaning No NO NO ILA (Integrity Life Assessment) No NO NO

29

ELECTRICAL TRANSMISSION SYSTEM

Accomplished Projects

bull Tests performed on Numerical relays manufactured by - ABB (Distance protection REL 316 ) - AREVA (Distance protection EPAC MICOMP442 hellip) - ICE (Over current protection NPID 800hellip) - SIEMENS (Distance protection 7SA 511 513 522 611) - REYROLLES (Differential protection DUOBIAS)

bull Test and setting of protective relays and checking the tripping circuits for Generators and

Substations belonging to Zaouia Petroleum Refinery (Libya)

bull Short circuit calculation selectivity study of protective relays by providing solutions for the

existing issues in PEC YEMEN Networks

bull Study and improvement of the existing protective system in close cooperation with Tractebel

Engineering

bull Technical Assistance for Independent Power Producers (IPP) Plant (Carthage Power

Company (CPC) Tunisia) regarding the maintenance and testing of protective relays

related to

- Generators - Main transformers - Auxiliaries - Etc

bull Technical Assistance testing and setting of protective relays at

- Steel ndashworks (Tunisia) - Cement ndashmarker (Tunisia) - Iron industries (Tunisia) - Chemical industries (Tunisia)

bull Commissioning and setting of protective relays at substations (High Medium and Low

voltages)

bull Renovation of the obsolete equipment (relays switchgear hellip)

bull Maintenance of the transmission lines and substations equipment

bull Cost-effective solutions establishment regarding the network issues (droop voltage over

voltage improvement of power factor etc)

30

ELECTRICAL DISTRIBUTION SYSTEM

Rural Electrification- Accomplished Projects

Contract Identification

Contract No 18 Technical Assistance and implementation of a Rural electrification project based upon SWER (Single Wire Earth Return) techniques

Award date 1998 Completion date 1999 Employerrsquos Name JIRAMA (JIRO SY RANO MALAGAS) Address

149 RUE RAINANDRIAMAMPANDRY Antananarivo BP 200 - MADAGASCAR

Main Tasks Performed

bull Training on SWER System bull Data collection needed for SWER System studies and implementation bull Finalization of technical studies and submission of report including

- Technical audit of the pilot project already in place - Technical description of the project - AdviseRecommendations on equipment specifications - Recommendations on possible changes in adjustment and coordination of electrical

protections

Contract Identification

Contract No 19 RWANDA Project (Phase 1) Implementation of a Pilot Rural Electrification Project based on Single-Phase with neutral to ground called MALT System 4000 Subscribers

Award date June 2008 Completion date June 2009

Employerrsquos Name

RECO ( former ELECTROGAZ) -RWANDA

Address BP 537 KIGALI -RWANA

Main Tasks performed

bull Study and Diagnosis of the existing Rwandan Power Distribution An inventory of the existing facilities including generation transmission and distribution systems was established

bull Implementation of a pilot rural electrification project based on MALT System Visit was arranged to some Tunisian rural regions and companies manufacturing electric equipment namely

- Transformers

- Iron poles

- Concrete supports

- Electric cables

- Electronic meters and

- MV and LV line accessories

31

Contract Identification

Contract No 20 Local Electrification study of Tambacounda and Kedougou departments Award date October 2002 Completion date March 2003 Customerrsquos name SENELEC Address ELECTRICAL COMPANY SENEGAL

Main Tasks Performed

bull Data Collection bull Socio-economic survey bull Technical economic and financial analysis bull Electricity market forecast (demand forecast (2003-2015)) bull Estimation of worksrsquo costs regarding medium voltage single-phase and tri-phase lines medium

and low voltage stations low voltage lines diesel micro-stations individual photovoltaic systems bull Technical and economic study related to different methods of supply including the solar as well as

the opportunity of introducing the single-phase system for the rural electrification bull Proposition for the public lighting and the management of photovoltaic systems bull Recommendations for the reinforcement of the existing stations and the existing networks to satisfy

the future demand due to the electrification of the new villages bull Tariff and profitability study bull Set up of the geographical maps and the low voltage electrification plan of the most important

villages (34 villages) bull Recommendations on privatizing power generation energy sector

Contract Identification Contract No 21 - Rural Electrification study of 80 villages in Comoros Isles

- Preparation of Tender Documents for the supply of equipment needed to the construction of 145 km MV lines 100 km LV lines and 80 MVLV stations

- Call for tenders evaluation of Bidders Award date November 2000 Completion date Dec 2002 Customerrsquos name

Ministry of Equipment Department of Energy and Water Resources

Address Moroni Avenue of the Democratic Republic of China

Main Tasks Performed

bull Data collection and visit of the existing electric utilities bull Situation analysis and proposal of electric infrastructure management solutions bull Electricity Demand Estimation and Forecasting bull Electric Calculation (Load Repartition Line Voltage Drop Losses and Voltage Drops

Calculations Short-Circuit Calculations Simulation of the Extension and Reinforcement of the Medium Voltage Networks Power System Stability Analysis Reactive Power Compensation

bull Low Voltage Studies for the Electrification of 80 villages bull RecommendationsSuggestions for the reinforcement of power generation utilities to satisfy

the future demand (by 2010) bull Electricity Tariffing study

- Review of electricity consumption patterns - Cost review - Review of tariff policies - Application and implementation of revised tariff levels

32

Contract Identification Contract Ndeg 22 Establishment and set up of a computerized accounting and budget system

Award date 1992 Completion date 1994 Customerrsquos name SOMELEC Address Nouakchott - MAURITANIA

Main Tasks Performed

bull Analytical accounting bull Bid evaluation bull Cash flow movements management bull Fixed assets management bull Centralizing bookkeeping bull Existing computer application interfaces update bull Transposition of the existing system to the new one bull Operation and maintenance Documents preparation bull Execution of the transposition of the existing system to the new one

Contract Identification Contract

No 23 Electricity sector reform technical assistance in the interim management of the ldquoCompagnie Energie Electrique du Togo ldquo(CEET)

Award date 41997

Completion date 122000

Employerrsquos Name Ministry of Mining Equipment transmission Mail and Telecommunications

Address TOGO

Main Tasks Performed

bull Technical assistance in the interim management of the CEET within the framework of the electricity sectorrsquos liberalization 1) termination of the current CEET management 2) analysis of the existing situation 3) interim management of the CEET prior to its privatization

bull Operation and maintenance of the electrical network for Lomeacute and its surrounding rural areas bull Electricity generation in isolated centers bull Electricity transmission and distribution bull Procurement and maintenance of new diesel production units bull Reduction of energy losses bull Customer management bull Increase in the number of Customers bull Accounting and billing bull Increase in payment recovery bull Call for tenders evaluation of proposals drafting of the technical annexes concerning the contracting

for a new independent operator (concession)

33

72 On-going and Under Bidding (UB) Projects

No Project Description Country

1 Training Center Update (on-going project) Republic of Congo BRAZZAVILLE

2 Master Plan elaboration in close cooperation with STUDI (Tunisia) (on-going project)

Republic of Senegal

3 Implementation of a Rural Electrification Project based on Single-Phase Four-Wires

with Neutral to Ground called MALT System (UB) Republic of Burkina Faso

4 Cost study connections to and extensions of electricity distribution networks

(UB)

Republic of Burkina Faso

5 Works Control and supervision of rural electrification of 33 communities in 4

regions of the Republic of Cameroon (UB) Republic of CAMEROUN

34

JUDICIOUS AND EFFICIENT ENERGY UTILIZATION

IS AT THE FOREFRONT OF OUR MINDS

35

Over the year 2008 STEG International Services (SIS) has widened its scope of activities to

include techno-economic studies and assistance in energy efficiency thereby providing support

to the national energy policy aiming at considering energy auditing energy efficiency energy

saving as a major priority target in Tunisiarsquos future energy strategic plan objectives In this

regard STEG International Services has carried out several projects including but not limited to

the following

80 Energy Efficiency

bull Performing obligatory periodical energy audits for industrial installations as well as energy audits on a consultancy basis

bull Assistance on projects involving energy efficiency bull Studies on energy efficiency of circuits hydraulic and thermal systems bull Upgrading energy management systems of industrial plants

81 Co-generation (Combined Heat and Power (CHP)) Studies

The main tasks performed included

bull Feasibility studies and project implementation assistance ndash RandaTunis

bull Assistance in electric utility restructuring from self power producer (electricity generation

only) to self-producing co-generatorsndash STSBEJATunisia

bull Technical assistance related to STEGrsquos grid connection with Co-generation plants in some

industrial units -SOTIPAPIER STS T-PAP and Carthago-GRE- Tunisia

82 Energy audits and energy efficiency

In any industry the three top operating expenses are often found to be energy (both electrical

and thermal) labour and materials Energy would invariably emerge as a top ranker and thus

energy management function constitutes a strategic area for cost reduction

Energy Audit will help to better understand how energy is used in any industry and in identifying

the areas where waste can occur and where scope for improvement exists In this regard the

Energy Audit would give a positive orientation to the energy cost reduction preventive

maintenance and quality control programs which are vital to production and utility activities Such

36

an audit program will help keep focus on variations which occur in the energy costs availability

and reliability of supply of energy decide on appropriate energy mix identify energy

conservation technologies retrofit for energy conservation equipment etc

Therefore SIS can carry out comprehensive assessment of techno-economic performance of

plants and equipment against the designed performance level or the industry best practice

aiming at optimizing consumption levels along with specific operating control targets

821 Samples of accomplished and on-going Energy Auditing projects

bull Energy Audit of the Liquefied Petroleum Gas (LPG) plant located in Gabegraves (Tunisia) with the assistance of Kvaerner Heurtey in 2001

bull Energy Performance Assessment of Rades and Sousse steam and Combined Cycle Power Plants as well as Bouchemma Menzel Bourguiba Korba Gas Turbines with the assistance of TRACTABEL and EDF in 2002

bull Energy Audit of Sousse Combined Cycle Power Plant with the assistance of CRA2E in 2007-2008

bull Periodic Performance Tests of Carthage Power Company (CPC) combined cycle an Impendent Power Producer (IPP) in Tunisia

37

SIS Future Commitments and Responsibilities

Endowed with a clear vision a sound project management and solid experiences and

know-how acquired by the parent company STEG through its various trades of over 48 years

SIS has put together a team of experts inndashline with its strategic intent- to be positioned as a

competitive and pre-eminent regional energy services company by spreading its expertise and

know-how throughout the African continent Arab countries and the rest of the world working on

a partnership basis with potential consultants andor the utilities of the respective countries

resulting in a keen focus and a strong sense of purpose

As part of its vision SIS management recognizes that it has responsibilities to all of its

stakeholders These include

Shareholders SIS will protect the investments of its shareholders and will provide an acceptable return on

investments through the application of its business principles Customers SIS will aim at optimizing its business activities through winning customers and maintaining

customerrsquos loyalty by offering them high quality services at competitive prices delivering on time

and supporting them with its management expertise

Employees SIS recognizes that its working employees are the key to its success and it nurtures loyalty

teamwork and trust between them SIS will strive to protect support and involve them in the

companyrsquos future to develop their skills and to reward them in line with the corporate values of

SISrsquos organization

Partners Suppliers Contractors and all External Contacts SIS will seek to treat all its partners suppliers contractors and other external stakeholders in a

consistently professional way and to ensure that their needs are fulfilled in every way possible

38

  • 72 On-going and Under Bidding (UB) Projects

19

50 Laboratory-Workshop

Main Activities Rotary Furnace Inspection Surfacing High Precision Castings

General Technics Department GTD was established to perform technical assistance to all power generating units including

bull Thermal Power Plants

bull Combined Cycle Power Plants

bull Gas Turbines

bull Hydraulic Power Plants etc

GTD Mission

bull Acceptance Trial of Equipment

bull High and Mid Voltage Testing (also called dielectric strength test or Hipot Test)

bull Acoustics and Mechanical Vibration

bull Thermodynamics and Hydraulic Activities Management

bull Chemical Analysis amp Controls

bull Metallurgical amp NDT Controls

bull Workshop

NDT Magnetic Testing Turbine Speed Balancing

Analysis of gas dissolved in dielectric liquids of large transformers operation

water lubricant oil dielectric oil and liquid fuel analysis

Dielectric Laboratory Welding Work Shop

Dielectric Laboratory

bull Dielectric oil rigidity

bull Physical and Chimical Characterisics of Dielectric oil

bull Dissolved gas in Dielectric oil

bull Acceptance trials for generators transformers switch-gears

Welding Work Shop

bull Steel plate works

20

bull Heat treatment in furnace or outside

bull Surface reparing by powder spray metallisation

bull Rebabbiting of used bearing

60 Vocational Training ndash Photo Gallery

Services Provided

Practical Hands-On Training Equipment

Practical Hands-On Training electricity amp gas counter

SIS as an energy company

provides the entire scope of training

services including

bull Upgrade of training centers

bull Drawing up and delivery of

training courses

bull Training of trainers

bull Designing and monitoring of

training programs

bull End-user training organization

of seminars hands-on training

on-the-job training and

designing of training manuals

The training provided is relevant

effective structured and

continuously updated This

maintains a high level of technical

skills and procedures in a

constantly changing environment

Practical Hands-On Training works under voltage

Classroom Training on electrical maintenance related to electrical power utilities

21

enabling all staff to keep abreast of

technical innovations and

improvements together with

legislative requirements and

recommended practices

STEG Training Center (CFPK)

Since its inception in 1976 CFPKrsquos aim has been to train newly recruited STEG technicians in Generation Transmission Distribution and Gas sectors and to provide advanced training and retraining for active personnel Since then the Center has constantly expanded and adjusted in order to bull Address STEGrsquos specific requirements in vocational training in all its

sectors technical commercial financial computing management auditing new technologies etc

bull Provides a logical approach as to how to establish and assure a competent workforce by technical vocational training for now and the future

bull Provide appropriate training programs for organizations outside STEG both at national and international levels (in-house training customized courses and lectures)

22

70 Samples of Project Experience

Since 2006 SIS has undertaken many assignments in African countries Middle East and in

Tunisia It is only possible to show a small selection of these in this brochure We are always

happy to provide additional details and examples of our experience on request

71 Accomplished Projects

POWER GENERATION

No Contract Identification Unitne Installed

Capacity(MW) location Start

Date End Date

1 Annual Inspection

5 260 Rabigh SEC Saudi Arabia)

20-12-2005

30-01-2006

2 Annual Inspection 2 260

Rabigh SEC Saudi Arabia)

09-03-2006

22-04-2006

3 Annual Inspection

3 260 Rabigh SEC Saudi Arabia)

19-03-2006

29-04-2006

4 Annual Inspection

1amp4 440 Shoaiba SEC Saoudi Arabia

27-01-2007

01-03-2007

5 Annual Inspection 4 440

Shoaiba SEC Saoudi Arabia

03-03-2007

05-04-2007

6

Annual Inspection Bell seals rings amp nozzle blocks replacement ( turbine overhaul)

4 260 Rabigh SEC Saudi Arabia)

03-01-2008

07-03-2008

7 Annual Inspection 2 260

Rabigh SEC Saudi Arabia)

08-03-2008

15-04-2008

8 Major Overhaul

GT1 27 TihamaSEC Saudi Arabia

20-01-2008

10-02-2008

9

Erection and Supervision of Works 300 MW (ISO Condition) Open Cycle Power Plant Fast Emergency

GTs 1-4

4x75 ISO Conditions

Ministry of Energy

(Electricity and Water)

Sabya Power Plant

State of KOWEIT

2007- 2008

10 Commissioning CPL amp Parallel Resonant Circuit in close cooperation with AREVA

Ethiopie 2007-2008

11

Revamping of obsolete Control and instrumentation system (in close cooperation with SIEMENS)

2 Units Marocco 2008

23

No Contract Identification Unitne Installed Capacity (MW)

location Start Date

12

Commissioning of Control command system Mark VI on GTs Frame 5 (in close cooperation with GESHANAHAN Eng

GTs GE Frame 5

Algeria (Arzew) 2008

13

Grid Interconnection In close cooperation with STUDI for West African Power Pool (WAPP)

225 KV

Electricity grid interconnection

between Burkina Faso and Ghana

2008

14 Pricing Study Senegal 2008

15 Major Inspection GT6

GE-FR7

Najran SEC Saudi Arabia

2008

16 Major Inspection (MI) W501D5

Jazan SEC Saudi Arabia

2009

17 Annual Inspection 2amp3 2x393 Shoaiba SEC Saudi Arabia

2009

24

25

SISrsquoS Experiences in Boilerrsquos Maintenance Work

Power plant location Boiler tech Details ampInspections

Rades A (ST) ST STEAM TURBINE Rades B (ST)

Unit 1 Unit 2 Unit 3 Unit 4

Manufacturer Mitsubishi H I Mitsubishi H I Ansaldo Energia Ansaldo Energia Type amp Model MHI CE RR

type out-door MHI CE RR type outdoor

AE RR type outdoor

AE RR type outdoor

Date of commissioning 1983 1984 1998 1999 MCR (th) 520000 520000 5335 5335

Steam conditions Pressure SHRH(bars) 1685 352 1685 352 1739 1739 Temperature( degC) 543 543 542 542

fuel Natural gas heavy Fuel Ndeg2

Natural gas heavy Fuel Ndeg2

Natural gas heavy Fuel Ndeg2

Natural gas heavy Fuel Ndeg2

Heating area Furnace(msup2) 5105 5105 5360 5360 Reheater (msup2) 3130 3130 1286 1286 Eco (msup2) 2600 2600 1556 1556

Fuel oil Burners type amp No 20 20 Y Ndeg 12 Y Ndeg 12 FDF type amp capacity ( Th) HC 591 HC 591 HC748 HC 748 IDF type amp capacity (Th) HC 640 HC 640 NA NA GRF type amp capacity ( Th) HC 500 HC 500 HC 300 HC 300

RegenAir Preheater Type Ljungstroumlm Ljungstroumlm Ljungstroumlm Ljungstroumlm No amp capacity 2 2 2 2 Heating surface(msup2) 12000 12000 18000 18000

Annual inspection No 20 20 10 10 Starting amp Completion dates

21 Days 21 days 21 days 21 days

Major overhaul No 04 04 01 01 Starting amp Completion dates

1221038843 days 611028854 days 56 days 59 days

Boiler conservation No 20 20 08 08 Boiler Rehabilitation No 0 0 0 0 Boiler Tube Acid cleaning No 01 01 01 01 ILA(Integrity Life Assessment)No 0 0 0 0

26

SISrsquos Experiences in Boilersrsquo Maintenance Work

Power plant location Boiler tech Details ampInspections

Sousse A (ST) Sousse B (CCPP)

Unitne1 Unitne 2 Unitne1 Unitne 2

Manufacturer SGP SGP STEIN INDUSTRY STEIN INDUSTRY Type amp Model Natural circulation Natural circulation Heat Recuperator Heat Recuperator Date of commissioning 1980 1980 1995 1995 MCR (th) 515 515 HP 182 BP 415 HP 182 BP 415 Steam conditions Pressure SHRH (bar) 16038 16038 HP 72 BP 66 HP 72 BP 66

Temperature (degC) 540degC 540degC HP 511 BP 213 HP 511 BP 213 fuel FUELGAZ FUELGAZ Gaz Gaz Heating area Furnace (m2 2080 ) 2080 HP evaporator 25251 LP evaporator 18627

Reheater (m2 1512 ) 1512 HP superheater 9418 LP superheater 2328 Eco (m2 2017 ) 2017 HP economizer 16834 13773 LP economizer 3060

Fuel oil Burners Type ampNo EVT8 EVT8 FDF type amp capacity R62250 7566 m3 R62250 7566 ms 3 s

GRF type amp capacity R62250 721 m3 R62250 721 ms 3 s

Regen Air Preheater

Type No amp capacity 2 220186 Nm3h 2 220186 Nm3h

Heating surface(m2) 2x924 2x924 Annual Inspection

No annually annually annually annually Starting amp completion dates 3 - 4 weeks 3 - 4 weeks 10 days 10 days

Major Overhaul No along with annual inspectioccediln along with annual inspectioccediln

Starting amp completion dates 3 - 4 weeks 3 - 4 weeks

Boiler Conservation No 3 2 Boiler Rehabilitation No Boiler Tube Acid Cleaning No 2 2 ILA (Integrity Life Assessment) No 1

27

SISrsquos Experiences in Boilersrsquo Maintenance Work

Power plant location Boiler tech Details ampInspections Unitne1 (ST) Unitne 2 (ST) Unitne 3 (ST) Unitne 4 (ST)

Manufacturer WALTHER Type amp Model WALTHER FN10 Natural Circulation Date of commissioning 05071965 01111965 22061968 20091968 MCR (th) 112 Steam conditions

Pressure 686 bar Temperature 510 degC

fuel Heavy fuel oil Ndeg2 light fuel oil

Heating area

Furnace (m2 540 m2 ) Reheater (m2 1542 m2 ) Eco (m2 480 m2 )

Fuel oil Burners Type ampNo SONVICO 4 FDF type amp capacity Centrifugal - 27 m3s IDF type amp capacity - - - - GRF type amp capacity - - - -

Regen Air Preheater Type Static LJUNGSTROM No amp capacity 1 1 1 1 Heating surface(m2) 7350 m2 -

Annual Inspection No every year until 1998 every year until

2005 every year until 1998

every year until 2005

Starting amp completion dates - - - -

Major Overhaul No 6 8 5 5 Starting amp completion dates - - - -

Boiler Conservation No - 2 - 2 Boiler Rehabilitation No 4 6 5 5 Boiler Tube Acid Cleaning No 0 0 0 0 ILA (Integrity Life Assessment) No 0 0 0 0

28

SISrsquos Experiences in Boilersrsquo Maintenance Work Power Plant Location

Boiler Tech Details ampInspections

Ghannouch (ST) Unitne1 (ST) Unitne 2

Manufacturer Stein Industrie Stein Industrie Type amp Model Natural circulation Natural circulation Date of commissioning 1972 1972 MCR (th) 120 120 Steam conditions Pressure SHRH (th) 70 bars 70 bars

Temperature 510 degC 510 degC fuel Natural GasHeavy fuel Natural GasHeavy fuel Heating area Furnace (m2 )

Reheater (m2 8880 dmsup3 ) 8880 dmsup3 Eco (m2 2400 dmsup3 ) 2400 dmsup3

Fuel oil Burners Type ampNo PILLARD GRC PILLARD GRC IDF type amp capacity GRF type amp capacity Regen Air Preheater Type Ljunstroumlm Ljunstroumlm

No amp capacity 140msup3h 140msup3h Heating surface(m2) _ _

Annual Inspection No 1 1 Starting amp completion dates 1 week 1 week

Major Overhaul No 15ans 15ans

Starting amp completion dates 2 months 2 months

Boiler Conservation No in case of being extended in case of being extended Boiler Rehabilitation No NO NO Boiler Tube Acid Cleaning No NO NO ILA (Integrity Life Assessment) No NO NO

29

ELECTRICAL TRANSMISSION SYSTEM

Accomplished Projects

bull Tests performed on Numerical relays manufactured by - ABB (Distance protection REL 316 ) - AREVA (Distance protection EPAC MICOMP442 hellip) - ICE (Over current protection NPID 800hellip) - SIEMENS (Distance protection 7SA 511 513 522 611) - REYROLLES (Differential protection DUOBIAS)

bull Test and setting of protective relays and checking the tripping circuits for Generators and

Substations belonging to Zaouia Petroleum Refinery (Libya)

bull Short circuit calculation selectivity study of protective relays by providing solutions for the

existing issues in PEC YEMEN Networks

bull Study and improvement of the existing protective system in close cooperation with Tractebel

Engineering

bull Technical Assistance for Independent Power Producers (IPP) Plant (Carthage Power

Company (CPC) Tunisia) regarding the maintenance and testing of protective relays

related to

- Generators - Main transformers - Auxiliaries - Etc

bull Technical Assistance testing and setting of protective relays at

- Steel ndashworks (Tunisia) - Cement ndashmarker (Tunisia) - Iron industries (Tunisia) - Chemical industries (Tunisia)

bull Commissioning and setting of protective relays at substations (High Medium and Low

voltages)

bull Renovation of the obsolete equipment (relays switchgear hellip)

bull Maintenance of the transmission lines and substations equipment

bull Cost-effective solutions establishment regarding the network issues (droop voltage over

voltage improvement of power factor etc)

30

ELECTRICAL DISTRIBUTION SYSTEM

Rural Electrification- Accomplished Projects

Contract Identification

Contract No 18 Technical Assistance and implementation of a Rural electrification project based upon SWER (Single Wire Earth Return) techniques

Award date 1998 Completion date 1999 Employerrsquos Name JIRAMA (JIRO SY RANO MALAGAS) Address

149 RUE RAINANDRIAMAMPANDRY Antananarivo BP 200 - MADAGASCAR

Main Tasks Performed

bull Training on SWER System bull Data collection needed for SWER System studies and implementation bull Finalization of technical studies and submission of report including

- Technical audit of the pilot project already in place - Technical description of the project - AdviseRecommendations on equipment specifications - Recommendations on possible changes in adjustment and coordination of electrical

protections

Contract Identification

Contract No 19 RWANDA Project (Phase 1) Implementation of a Pilot Rural Electrification Project based on Single-Phase with neutral to ground called MALT System 4000 Subscribers

Award date June 2008 Completion date June 2009

Employerrsquos Name

RECO ( former ELECTROGAZ) -RWANDA

Address BP 537 KIGALI -RWANA

Main Tasks performed

bull Study and Diagnosis of the existing Rwandan Power Distribution An inventory of the existing facilities including generation transmission and distribution systems was established

bull Implementation of a pilot rural electrification project based on MALT System Visit was arranged to some Tunisian rural regions and companies manufacturing electric equipment namely

- Transformers

- Iron poles

- Concrete supports

- Electric cables

- Electronic meters and

- MV and LV line accessories

31

Contract Identification

Contract No 20 Local Electrification study of Tambacounda and Kedougou departments Award date October 2002 Completion date March 2003 Customerrsquos name SENELEC Address ELECTRICAL COMPANY SENEGAL

Main Tasks Performed

bull Data Collection bull Socio-economic survey bull Technical economic and financial analysis bull Electricity market forecast (demand forecast (2003-2015)) bull Estimation of worksrsquo costs regarding medium voltage single-phase and tri-phase lines medium

and low voltage stations low voltage lines diesel micro-stations individual photovoltaic systems bull Technical and economic study related to different methods of supply including the solar as well as

the opportunity of introducing the single-phase system for the rural electrification bull Proposition for the public lighting and the management of photovoltaic systems bull Recommendations for the reinforcement of the existing stations and the existing networks to satisfy

the future demand due to the electrification of the new villages bull Tariff and profitability study bull Set up of the geographical maps and the low voltage electrification plan of the most important

villages (34 villages) bull Recommendations on privatizing power generation energy sector

Contract Identification Contract No 21 - Rural Electrification study of 80 villages in Comoros Isles

- Preparation of Tender Documents for the supply of equipment needed to the construction of 145 km MV lines 100 km LV lines and 80 MVLV stations

- Call for tenders evaluation of Bidders Award date November 2000 Completion date Dec 2002 Customerrsquos name

Ministry of Equipment Department of Energy and Water Resources

Address Moroni Avenue of the Democratic Republic of China

Main Tasks Performed

bull Data collection and visit of the existing electric utilities bull Situation analysis and proposal of electric infrastructure management solutions bull Electricity Demand Estimation and Forecasting bull Electric Calculation (Load Repartition Line Voltage Drop Losses and Voltage Drops

Calculations Short-Circuit Calculations Simulation of the Extension and Reinforcement of the Medium Voltage Networks Power System Stability Analysis Reactive Power Compensation

bull Low Voltage Studies for the Electrification of 80 villages bull RecommendationsSuggestions for the reinforcement of power generation utilities to satisfy

the future demand (by 2010) bull Electricity Tariffing study

- Review of electricity consumption patterns - Cost review - Review of tariff policies - Application and implementation of revised tariff levels

32

Contract Identification Contract Ndeg 22 Establishment and set up of a computerized accounting and budget system

Award date 1992 Completion date 1994 Customerrsquos name SOMELEC Address Nouakchott - MAURITANIA

Main Tasks Performed

bull Analytical accounting bull Bid evaluation bull Cash flow movements management bull Fixed assets management bull Centralizing bookkeeping bull Existing computer application interfaces update bull Transposition of the existing system to the new one bull Operation and maintenance Documents preparation bull Execution of the transposition of the existing system to the new one

Contract Identification Contract

No 23 Electricity sector reform technical assistance in the interim management of the ldquoCompagnie Energie Electrique du Togo ldquo(CEET)

Award date 41997

Completion date 122000

Employerrsquos Name Ministry of Mining Equipment transmission Mail and Telecommunications

Address TOGO

Main Tasks Performed

bull Technical assistance in the interim management of the CEET within the framework of the electricity sectorrsquos liberalization 1) termination of the current CEET management 2) analysis of the existing situation 3) interim management of the CEET prior to its privatization

bull Operation and maintenance of the electrical network for Lomeacute and its surrounding rural areas bull Electricity generation in isolated centers bull Electricity transmission and distribution bull Procurement and maintenance of new diesel production units bull Reduction of energy losses bull Customer management bull Increase in the number of Customers bull Accounting and billing bull Increase in payment recovery bull Call for tenders evaluation of proposals drafting of the technical annexes concerning the contracting

for a new independent operator (concession)

33

72 On-going and Under Bidding (UB) Projects

No Project Description Country

1 Training Center Update (on-going project) Republic of Congo BRAZZAVILLE

2 Master Plan elaboration in close cooperation with STUDI (Tunisia) (on-going project)

Republic of Senegal

3 Implementation of a Rural Electrification Project based on Single-Phase Four-Wires

with Neutral to Ground called MALT System (UB) Republic of Burkina Faso

4 Cost study connections to and extensions of electricity distribution networks

(UB)

Republic of Burkina Faso

5 Works Control and supervision of rural electrification of 33 communities in 4

regions of the Republic of Cameroon (UB) Republic of CAMEROUN

34

JUDICIOUS AND EFFICIENT ENERGY UTILIZATION

IS AT THE FOREFRONT OF OUR MINDS

35

Over the year 2008 STEG International Services (SIS) has widened its scope of activities to

include techno-economic studies and assistance in energy efficiency thereby providing support

to the national energy policy aiming at considering energy auditing energy efficiency energy

saving as a major priority target in Tunisiarsquos future energy strategic plan objectives In this

regard STEG International Services has carried out several projects including but not limited to

the following

80 Energy Efficiency

bull Performing obligatory periodical energy audits for industrial installations as well as energy audits on a consultancy basis

bull Assistance on projects involving energy efficiency bull Studies on energy efficiency of circuits hydraulic and thermal systems bull Upgrading energy management systems of industrial plants

81 Co-generation (Combined Heat and Power (CHP)) Studies

The main tasks performed included

bull Feasibility studies and project implementation assistance ndash RandaTunis

bull Assistance in electric utility restructuring from self power producer (electricity generation

only) to self-producing co-generatorsndash STSBEJATunisia

bull Technical assistance related to STEGrsquos grid connection with Co-generation plants in some

industrial units -SOTIPAPIER STS T-PAP and Carthago-GRE- Tunisia

82 Energy audits and energy efficiency

In any industry the three top operating expenses are often found to be energy (both electrical

and thermal) labour and materials Energy would invariably emerge as a top ranker and thus

energy management function constitutes a strategic area for cost reduction

Energy Audit will help to better understand how energy is used in any industry and in identifying

the areas where waste can occur and where scope for improvement exists In this regard the

Energy Audit would give a positive orientation to the energy cost reduction preventive

maintenance and quality control programs which are vital to production and utility activities Such

36

an audit program will help keep focus on variations which occur in the energy costs availability

and reliability of supply of energy decide on appropriate energy mix identify energy

conservation technologies retrofit for energy conservation equipment etc

Therefore SIS can carry out comprehensive assessment of techno-economic performance of

plants and equipment against the designed performance level or the industry best practice

aiming at optimizing consumption levels along with specific operating control targets

821 Samples of accomplished and on-going Energy Auditing projects

bull Energy Audit of the Liquefied Petroleum Gas (LPG) plant located in Gabegraves (Tunisia) with the assistance of Kvaerner Heurtey in 2001

bull Energy Performance Assessment of Rades and Sousse steam and Combined Cycle Power Plants as well as Bouchemma Menzel Bourguiba Korba Gas Turbines with the assistance of TRACTABEL and EDF in 2002

bull Energy Audit of Sousse Combined Cycle Power Plant with the assistance of CRA2E in 2007-2008

bull Periodic Performance Tests of Carthage Power Company (CPC) combined cycle an Impendent Power Producer (IPP) in Tunisia

37

SIS Future Commitments and Responsibilities

Endowed with a clear vision a sound project management and solid experiences and

know-how acquired by the parent company STEG through its various trades of over 48 years

SIS has put together a team of experts inndashline with its strategic intent- to be positioned as a

competitive and pre-eminent regional energy services company by spreading its expertise and

know-how throughout the African continent Arab countries and the rest of the world working on

a partnership basis with potential consultants andor the utilities of the respective countries

resulting in a keen focus and a strong sense of purpose

As part of its vision SIS management recognizes that it has responsibilities to all of its

stakeholders These include

Shareholders SIS will protect the investments of its shareholders and will provide an acceptable return on

investments through the application of its business principles Customers SIS will aim at optimizing its business activities through winning customers and maintaining

customerrsquos loyalty by offering them high quality services at competitive prices delivering on time

and supporting them with its management expertise

Employees SIS recognizes that its working employees are the key to its success and it nurtures loyalty

teamwork and trust between them SIS will strive to protect support and involve them in the

companyrsquos future to develop their skills and to reward them in line with the corporate values of

SISrsquos organization

Partners Suppliers Contractors and all External Contacts SIS will seek to treat all its partners suppliers contractors and other external stakeholders in a

consistently professional way and to ensure that their needs are fulfilled in every way possible

38

  • 72 On-going and Under Bidding (UB) Projects

20

bull Heat treatment in furnace or outside

bull Surface reparing by powder spray metallisation

bull Rebabbiting of used bearing

60 Vocational Training ndash Photo Gallery

Services Provided

Practical Hands-On Training Equipment

Practical Hands-On Training electricity amp gas counter

SIS as an energy company

provides the entire scope of training

services including

bull Upgrade of training centers

bull Drawing up and delivery of

training courses

bull Training of trainers

bull Designing and monitoring of

training programs

bull End-user training organization

of seminars hands-on training

on-the-job training and

designing of training manuals

The training provided is relevant

effective structured and

continuously updated This

maintains a high level of technical

skills and procedures in a

constantly changing environment

Practical Hands-On Training works under voltage

Classroom Training on electrical maintenance related to electrical power utilities

21

enabling all staff to keep abreast of

technical innovations and

improvements together with

legislative requirements and

recommended practices

STEG Training Center (CFPK)

Since its inception in 1976 CFPKrsquos aim has been to train newly recruited STEG technicians in Generation Transmission Distribution and Gas sectors and to provide advanced training and retraining for active personnel Since then the Center has constantly expanded and adjusted in order to bull Address STEGrsquos specific requirements in vocational training in all its

sectors technical commercial financial computing management auditing new technologies etc

bull Provides a logical approach as to how to establish and assure a competent workforce by technical vocational training for now and the future

bull Provide appropriate training programs for organizations outside STEG both at national and international levels (in-house training customized courses and lectures)

22

70 Samples of Project Experience

Since 2006 SIS has undertaken many assignments in African countries Middle East and in

Tunisia It is only possible to show a small selection of these in this brochure We are always

happy to provide additional details and examples of our experience on request

71 Accomplished Projects

POWER GENERATION

No Contract Identification Unitne Installed

Capacity(MW) location Start

Date End Date

1 Annual Inspection

5 260 Rabigh SEC Saudi Arabia)

20-12-2005

30-01-2006

2 Annual Inspection 2 260

Rabigh SEC Saudi Arabia)

09-03-2006

22-04-2006

3 Annual Inspection

3 260 Rabigh SEC Saudi Arabia)

19-03-2006

29-04-2006

4 Annual Inspection

1amp4 440 Shoaiba SEC Saoudi Arabia

27-01-2007

01-03-2007

5 Annual Inspection 4 440

Shoaiba SEC Saoudi Arabia

03-03-2007

05-04-2007

6

Annual Inspection Bell seals rings amp nozzle blocks replacement ( turbine overhaul)

4 260 Rabigh SEC Saudi Arabia)

03-01-2008

07-03-2008

7 Annual Inspection 2 260

Rabigh SEC Saudi Arabia)

08-03-2008

15-04-2008

8 Major Overhaul

GT1 27 TihamaSEC Saudi Arabia

20-01-2008

10-02-2008

9

Erection and Supervision of Works 300 MW (ISO Condition) Open Cycle Power Plant Fast Emergency

GTs 1-4

4x75 ISO Conditions

Ministry of Energy

(Electricity and Water)

Sabya Power Plant

State of KOWEIT

2007- 2008

10 Commissioning CPL amp Parallel Resonant Circuit in close cooperation with AREVA

Ethiopie 2007-2008

11

Revamping of obsolete Control and instrumentation system (in close cooperation with SIEMENS)

2 Units Marocco 2008

23

No Contract Identification Unitne Installed Capacity (MW)

location Start Date

12

Commissioning of Control command system Mark VI on GTs Frame 5 (in close cooperation with GESHANAHAN Eng

GTs GE Frame 5

Algeria (Arzew) 2008

13

Grid Interconnection In close cooperation with STUDI for West African Power Pool (WAPP)

225 KV

Electricity grid interconnection

between Burkina Faso and Ghana

2008

14 Pricing Study Senegal 2008

15 Major Inspection GT6

GE-FR7

Najran SEC Saudi Arabia

2008

16 Major Inspection (MI) W501D5

Jazan SEC Saudi Arabia

2009

17 Annual Inspection 2amp3 2x393 Shoaiba SEC Saudi Arabia

2009

24

25

SISrsquoS Experiences in Boilerrsquos Maintenance Work

Power plant location Boiler tech Details ampInspections

Rades A (ST) ST STEAM TURBINE Rades B (ST)

Unit 1 Unit 2 Unit 3 Unit 4

Manufacturer Mitsubishi H I Mitsubishi H I Ansaldo Energia Ansaldo Energia Type amp Model MHI CE RR

type out-door MHI CE RR type outdoor

AE RR type outdoor

AE RR type outdoor

Date of commissioning 1983 1984 1998 1999 MCR (th) 520000 520000 5335 5335

Steam conditions Pressure SHRH(bars) 1685 352 1685 352 1739 1739 Temperature( degC) 543 543 542 542

fuel Natural gas heavy Fuel Ndeg2

Natural gas heavy Fuel Ndeg2

Natural gas heavy Fuel Ndeg2

Natural gas heavy Fuel Ndeg2

Heating area Furnace(msup2) 5105 5105 5360 5360 Reheater (msup2) 3130 3130 1286 1286 Eco (msup2) 2600 2600 1556 1556

Fuel oil Burners type amp No 20 20 Y Ndeg 12 Y Ndeg 12 FDF type amp capacity ( Th) HC 591 HC 591 HC748 HC 748 IDF type amp capacity (Th) HC 640 HC 640 NA NA GRF type amp capacity ( Th) HC 500 HC 500 HC 300 HC 300

RegenAir Preheater Type Ljungstroumlm Ljungstroumlm Ljungstroumlm Ljungstroumlm No amp capacity 2 2 2 2 Heating surface(msup2) 12000 12000 18000 18000

Annual inspection No 20 20 10 10 Starting amp Completion dates

21 Days 21 days 21 days 21 days

Major overhaul No 04 04 01 01 Starting amp Completion dates

1221038843 days 611028854 days 56 days 59 days

Boiler conservation No 20 20 08 08 Boiler Rehabilitation No 0 0 0 0 Boiler Tube Acid cleaning No 01 01 01 01 ILA(Integrity Life Assessment)No 0 0 0 0

26

SISrsquos Experiences in Boilersrsquo Maintenance Work

Power plant location Boiler tech Details ampInspections

Sousse A (ST) Sousse B (CCPP)

Unitne1 Unitne 2 Unitne1 Unitne 2

Manufacturer SGP SGP STEIN INDUSTRY STEIN INDUSTRY Type amp Model Natural circulation Natural circulation Heat Recuperator Heat Recuperator Date of commissioning 1980 1980 1995 1995 MCR (th) 515 515 HP 182 BP 415 HP 182 BP 415 Steam conditions Pressure SHRH (bar) 16038 16038 HP 72 BP 66 HP 72 BP 66

Temperature (degC) 540degC 540degC HP 511 BP 213 HP 511 BP 213 fuel FUELGAZ FUELGAZ Gaz Gaz Heating area Furnace (m2 2080 ) 2080 HP evaporator 25251 LP evaporator 18627

Reheater (m2 1512 ) 1512 HP superheater 9418 LP superheater 2328 Eco (m2 2017 ) 2017 HP economizer 16834 13773 LP economizer 3060

Fuel oil Burners Type ampNo EVT8 EVT8 FDF type amp capacity R62250 7566 m3 R62250 7566 ms 3 s

GRF type amp capacity R62250 721 m3 R62250 721 ms 3 s

Regen Air Preheater

Type No amp capacity 2 220186 Nm3h 2 220186 Nm3h

Heating surface(m2) 2x924 2x924 Annual Inspection

No annually annually annually annually Starting amp completion dates 3 - 4 weeks 3 - 4 weeks 10 days 10 days

Major Overhaul No along with annual inspectioccediln along with annual inspectioccediln

Starting amp completion dates 3 - 4 weeks 3 - 4 weeks

Boiler Conservation No 3 2 Boiler Rehabilitation No Boiler Tube Acid Cleaning No 2 2 ILA (Integrity Life Assessment) No 1

27

SISrsquos Experiences in Boilersrsquo Maintenance Work

Power plant location Boiler tech Details ampInspections Unitne1 (ST) Unitne 2 (ST) Unitne 3 (ST) Unitne 4 (ST)

Manufacturer WALTHER Type amp Model WALTHER FN10 Natural Circulation Date of commissioning 05071965 01111965 22061968 20091968 MCR (th) 112 Steam conditions

Pressure 686 bar Temperature 510 degC

fuel Heavy fuel oil Ndeg2 light fuel oil

Heating area

Furnace (m2 540 m2 ) Reheater (m2 1542 m2 ) Eco (m2 480 m2 )

Fuel oil Burners Type ampNo SONVICO 4 FDF type amp capacity Centrifugal - 27 m3s IDF type amp capacity - - - - GRF type amp capacity - - - -

Regen Air Preheater Type Static LJUNGSTROM No amp capacity 1 1 1 1 Heating surface(m2) 7350 m2 -

Annual Inspection No every year until 1998 every year until

2005 every year until 1998

every year until 2005

Starting amp completion dates - - - -

Major Overhaul No 6 8 5 5 Starting amp completion dates - - - -

Boiler Conservation No - 2 - 2 Boiler Rehabilitation No 4 6 5 5 Boiler Tube Acid Cleaning No 0 0 0 0 ILA (Integrity Life Assessment) No 0 0 0 0

28

SISrsquos Experiences in Boilersrsquo Maintenance Work Power Plant Location

Boiler Tech Details ampInspections

Ghannouch (ST) Unitne1 (ST) Unitne 2

Manufacturer Stein Industrie Stein Industrie Type amp Model Natural circulation Natural circulation Date of commissioning 1972 1972 MCR (th) 120 120 Steam conditions Pressure SHRH (th) 70 bars 70 bars

Temperature 510 degC 510 degC fuel Natural GasHeavy fuel Natural GasHeavy fuel Heating area Furnace (m2 )

Reheater (m2 8880 dmsup3 ) 8880 dmsup3 Eco (m2 2400 dmsup3 ) 2400 dmsup3

Fuel oil Burners Type ampNo PILLARD GRC PILLARD GRC IDF type amp capacity GRF type amp capacity Regen Air Preheater Type Ljunstroumlm Ljunstroumlm

No amp capacity 140msup3h 140msup3h Heating surface(m2) _ _

Annual Inspection No 1 1 Starting amp completion dates 1 week 1 week

Major Overhaul No 15ans 15ans

Starting amp completion dates 2 months 2 months

Boiler Conservation No in case of being extended in case of being extended Boiler Rehabilitation No NO NO Boiler Tube Acid Cleaning No NO NO ILA (Integrity Life Assessment) No NO NO

29

ELECTRICAL TRANSMISSION SYSTEM

Accomplished Projects

bull Tests performed on Numerical relays manufactured by - ABB (Distance protection REL 316 ) - AREVA (Distance protection EPAC MICOMP442 hellip) - ICE (Over current protection NPID 800hellip) - SIEMENS (Distance protection 7SA 511 513 522 611) - REYROLLES (Differential protection DUOBIAS)

bull Test and setting of protective relays and checking the tripping circuits for Generators and

Substations belonging to Zaouia Petroleum Refinery (Libya)

bull Short circuit calculation selectivity study of protective relays by providing solutions for the

existing issues in PEC YEMEN Networks

bull Study and improvement of the existing protective system in close cooperation with Tractebel

Engineering

bull Technical Assistance for Independent Power Producers (IPP) Plant (Carthage Power

Company (CPC) Tunisia) regarding the maintenance and testing of protective relays

related to

- Generators - Main transformers - Auxiliaries - Etc

bull Technical Assistance testing and setting of protective relays at

- Steel ndashworks (Tunisia) - Cement ndashmarker (Tunisia) - Iron industries (Tunisia) - Chemical industries (Tunisia)

bull Commissioning and setting of protective relays at substations (High Medium and Low

voltages)

bull Renovation of the obsolete equipment (relays switchgear hellip)

bull Maintenance of the transmission lines and substations equipment

bull Cost-effective solutions establishment regarding the network issues (droop voltage over

voltage improvement of power factor etc)

30

ELECTRICAL DISTRIBUTION SYSTEM

Rural Electrification- Accomplished Projects

Contract Identification

Contract No 18 Technical Assistance and implementation of a Rural electrification project based upon SWER (Single Wire Earth Return) techniques

Award date 1998 Completion date 1999 Employerrsquos Name JIRAMA (JIRO SY RANO MALAGAS) Address

149 RUE RAINANDRIAMAMPANDRY Antananarivo BP 200 - MADAGASCAR

Main Tasks Performed

bull Training on SWER System bull Data collection needed for SWER System studies and implementation bull Finalization of technical studies and submission of report including

- Technical audit of the pilot project already in place - Technical description of the project - AdviseRecommendations on equipment specifications - Recommendations on possible changes in adjustment and coordination of electrical

protections

Contract Identification

Contract No 19 RWANDA Project (Phase 1) Implementation of a Pilot Rural Electrification Project based on Single-Phase with neutral to ground called MALT System 4000 Subscribers

Award date June 2008 Completion date June 2009

Employerrsquos Name

RECO ( former ELECTROGAZ) -RWANDA

Address BP 537 KIGALI -RWANA

Main Tasks performed

bull Study and Diagnosis of the existing Rwandan Power Distribution An inventory of the existing facilities including generation transmission and distribution systems was established

bull Implementation of a pilot rural electrification project based on MALT System Visit was arranged to some Tunisian rural regions and companies manufacturing electric equipment namely

- Transformers

- Iron poles

- Concrete supports

- Electric cables

- Electronic meters and

- MV and LV line accessories

31

Contract Identification

Contract No 20 Local Electrification study of Tambacounda and Kedougou departments Award date October 2002 Completion date March 2003 Customerrsquos name SENELEC Address ELECTRICAL COMPANY SENEGAL

Main Tasks Performed

bull Data Collection bull Socio-economic survey bull Technical economic and financial analysis bull Electricity market forecast (demand forecast (2003-2015)) bull Estimation of worksrsquo costs regarding medium voltage single-phase and tri-phase lines medium

and low voltage stations low voltage lines diesel micro-stations individual photovoltaic systems bull Technical and economic study related to different methods of supply including the solar as well as

the opportunity of introducing the single-phase system for the rural electrification bull Proposition for the public lighting and the management of photovoltaic systems bull Recommendations for the reinforcement of the existing stations and the existing networks to satisfy

the future demand due to the electrification of the new villages bull Tariff and profitability study bull Set up of the geographical maps and the low voltage electrification plan of the most important

villages (34 villages) bull Recommendations on privatizing power generation energy sector

Contract Identification Contract No 21 - Rural Electrification study of 80 villages in Comoros Isles

- Preparation of Tender Documents for the supply of equipment needed to the construction of 145 km MV lines 100 km LV lines and 80 MVLV stations

- Call for tenders evaluation of Bidders Award date November 2000 Completion date Dec 2002 Customerrsquos name

Ministry of Equipment Department of Energy and Water Resources

Address Moroni Avenue of the Democratic Republic of China

Main Tasks Performed

bull Data collection and visit of the existing electric utilities bull Situation analysis and proposal of electric infrastructure management solutions bull Electricity Demand Estimation and Forecasting bull Electric Calculation (Load Repartition Line Voltage Drop Losses and Voltage Drops

Calculations Short-Circuit Calculations Simulation of the Extension and Reinforcement of the Medium Voltage Networks Power System Stability Analysis Reactive Power Compensation

bull Low Voltage Studies for the Electrification of 80 villages bull RecommendationsSuggestions for the reinforcement of power generation utilities to satisfy

the future demand (by 2010) bull Electricity Tariffing study

- Review of electricity consumption patterns - Cost review - Review of tariff policies - Application and implementation of revised tariff levels

32

Contract Identification Contract Ndeg 22 Establishment and set up of a computerized accounting and budget system

Award date 1992 Completion date 1994 Customerrsquos name SOMELEC Address Nouakchott - MAURITANIA

Main Tasks Performed

bull Analytical accounting bull Bid evaluation bull Cash flow movements management bull Fixed assets management bull Centralizing bookkeeping bull Existing computer application interfaces update bull Transposition of the existing system to the new one bull Operation and maintenance Documents preparation bull Execution of the transposition of the existing system to the new one

Contract Identification Contract

No 23 Electricity sector reform technical assistance in the interim management of the ldquoCompagnie Energie Electrique du Togo ldquo(CEET)

Award date 41997

Completion date 122000

Employerrsquos Name Ministry of Mining Equipment transmission Mail and Telecommunications

Address TOGO

Main Tasks Performed

bull Technical assistance in the interim management of the CEET within the framework of the electricity sectorrsquos liberalization 1) termination of the current CEET management 2) analysis of the existing situation 3) interim management of the CEET prior to its privatization

bull Operation and maintenance of the electrical network for Lomeacute and its surrounding rural areas bull Electricity generation in isolated centers bull Electricity transmission and distribution bull Procurement and maintenance of new diesel production units bull Reduction of energy losses bull Customer management bull Increase in the number of Customers bull Accounting and billing bull Increase in payment recovery bull Call for tenders evaluation of proposals drafting of the technical annexes concerning the contracting

for a new independent operator (concession)

33

72 On-going and Under Bidding (UB) Projects

No Project Description Country

1 Training Center Update (on-going project) Republic of Congo BRAZZAVILLE

2 Master Plan elaboration in close cooperation with STUDI (Tunisia) (on-going project)

Republic of Senegal

3 Implementation of a Rural Electrification Project based on Single-Phase Four-Wires

with Neutral to Ground called MALT System (UB) Republic of Burkina Faso

4 Cost study connections to and extensions of electricity distribution networks

(UB)

Republic of Burkina Faso

5 Works Control and supervision of rural electrification of 33 communities in 4

regions of the Republic of Cameroon (UB) Republic of CAMEROUN

34

JUDICIOUS AND EFFICIENT ENERGY UTILIZATION

IS AT THE FOREFRONT OF OUR MINDS

35

Over the year 2008 STEG International Services (SIS) has widened its scope of activities to

include techno-economic studies and assistance in energy efficiency thereby providing support

to the national energy policy aiming at considering energy auditing energy efficiency energy

saving as a major priority target in Tunisiarsquos future energy strategic plan objectives In this

regard STEG International Services has carried out several projects including but not limited to

the following

80 Energy Efficiency

bull Performing obligatory periodical energy audits for industrial installations as well as energy audits on a consultancy basis

bull Assistance on projects involving energy efficiency bull Studies on energy efficiency of circuits hydraulic and thermal systems bull Upgrading energy management systems of industrial plants

81 Co-generation (Combined Heat and Power (CHP)) Studies

The main tasks performed included

bull Feasibility studies and project implementation assistance ndash RandaTunis

bull Assistance in electric utility restructuring from self power producer (electricity generation

only) to self-producing co-generatorsndash STSBEJATunisia

bull Technical assistance related to STEGrsquos grid connection with Co-generation plants in some

industrial units -SOTIPAPIER STS T-PAP and Carthago-GRE- Tunisia

82 Energy audits and energy efficiency

In any industry the three top operating expenses are often found to be energy (both electrical

and thermal) labour and materials Energy would invariably emerge as a top ranker and thus

energy management function constitutes a strategic area for cost reduction

Energy Audit will help to better understand how energy is used in any industry and in identifying

the areas where waste can occur and where scope for improvement exists In this regard the

Energy Audit would give a positive orientation to the energy cost reduction preventive

maintenance and quality control programs which are vital to production and utility activities Such

36

an audit program will help keep focus on variations which occur in the energy costs availability

and reliability of supply of energy decide on appropriate energy mix identify energy

conservation technologies retrofit for energy conservation equipment etc

Therefore SIS can carry out comprehensive assessment of techno-economic performance of

plants and equipment against the designed performance level or the industry best practice

aiming at optimizing consumption levels along with specific operating control targets

821 Samples of accomplished and on-going Energy Auditing projects

bull Energy Audit of the Liquefied Petroleum Gas (LPG) plant located in Gabegraves (Tunisia) with the assistance of Kvaerner Heurtey in 2001

bull Energy Performance Assessment of Rades and Sousse steam and Combined Cycle Power Plants as well as Bouchemma Menzel Bourguiba Korba Gas Turbines with the assistance of TRACTABEL and EDF in 2002

bull Energy Audit of Sousse Combined Cycle Power Plant with the assistance of CRA2E in 2007-2008

bull Periodic Performance Tests of Carthage Power Company (CPC) combined cycle an Impendent Power Producer (IPP) in Tunisia

37

SIS Future Commitments and Responsibilities

Endowed with a clear vision a sound project management and solid experiences and

know-how acquired by the parent company STEG through its various trades of over 48 years

SIS has put together a team of experts inndashline with its strategic intent- to be positioned as a

competitive and pre-eminent regional energy services company by spreading its expertise and

know-how throughout the African continent Arab countries and the rest of the world working on

a partnership basis with potential consultants andor the utilities of the respective countries

resulting in a keen focus and a strong sense of purpose

As part of its vision SIS management recognizes that it has responsibilities to all of its

stakeholders These include

Shareholders SIS will protect the investments of its shareholders and will provide an acceptable return on

investments through the application of its business principles Customers SIS will aim at optimizing its business activities through winning customers and maintaining

customerrsquos loyalty by offering them high quality services at competitive prices delivering on time

and supporting them with its management expertise

Employees SIS recognizes that its working employees are the key to its success and it nurtures loyalty

teamwork and trust between them SIS will strive to protect support and involve them in the

companyrsquos future to develop their skills and to reward them in line with the corporate values of

SISrsquos organization

Partners Suppliers Contractors and all External Contacts SIS will seek to treat all its partners suppliers contractors and other external stakeholders in a

consistently professional way and to ensure that their needs are fulfilled in every way possible

38

  • 72 On-going and Under Bidding (UB) Projects

21

enabling all staff to keep abreast of

technical innovations and

improvements together with

legislative requirements and

recommended practices

STEG Training Center (CFPK)

Since its inception in 1976 CFPKrsquos aim has been to train newly recruited STEG technicians in Generation Transmission Distribution and Gas sectors and to provide advanced training and retraining for active personnel Since then the Center has constantly expanded and adjusted in order to bull Address STEGrsquos specific requirements in vocational training in all its

sectors technical commercial financial computing management auditing new technologies etc

bull Provides a logical approach as to how to establish and assure a competent workforce by technical vocational training for now and the future

bull Provide appropriate training programs for organizations outside STEG both at national and international levels (in-house training customized courses and lectures)

22

70 Samples of Project Experience

Since 2006 SIS has undertaken many assignments in African countries Middle East and in

Tunisia It is only possible to show a small selection of these in this brochure We are always

happy to provide additional details and examples of our experience on request

71 Accomplished Projects

POWER GENERATION

No Contract Identification Unitne Installed

Capacity(MW) location Start

Date End Date

1 Annual Inspection

5 260 Rabigh SEC Saudi Arabia)

20-12-2005

30-01-2006

2 Annual Inspection 2 260

Rabigh SEC Saudi Arabia)

09-03-2006

22-04-2006

3 Annual Inspection

3 260 Rabigh SEC Saudi Arabia)

19-03-2006

29-04-2006

4 Annual Inspection

1amp4 440 Shoaiba SEC Saoudi Arabia

27-01-2007

01-03-2007

5 Annual Inspection 4 440

Shoaiba SEC Saoudi Arabia

03-03-2007

05-04-2007

6

Annual Inspection Bell seals rings amp nozzle blocks replacement ( turbine overhaul)

4 260 Rabigh SEC Saudi Arabia)

03-01-2008

07-03-2008

7 Annual Inspection 2 260

Rabigh SEC Saudi Arabia)

08-03-2008

15-04-2008

8 Major Overhaul

GT1 27 TihamaSEC Saudi Arabia

20-01-2008

10-02-2008

9

Erection and Supervision of Works 300 MW (ISO Condition) Open Cycle Power Plant Fast Emergency

GTs 1-4

4x75 ISO Conditions

Ministry of Energy

(Electricity and Water)

Sabya Power Plant

State of KOWEIT

2007- 2008

10 Commissioning CPL amp Parallel Resonant Circuit in close cooperation with AREVA

Ethiopie 2007-2008

11

Revamping of obsolete Control and instrumentation system (in close cooperation with SIEMENS)

2 Units Marocco 2008

23

No Contract Identification Unitne Installed Capacity (MW)

location Start Date

12

Commissioning of Control command system Mark VI on GTs Frame 5 (in close cooperation with GESHANAHAN Eng

GTs GE Frame 5

Algeria (Arzew) 2008

13

Grid Interconnection In close cooperation with STUDI for West African Power Pool (WAPP)

225 KV

Electricity grid interconnection

between Burkina Faso and Ghana

2008

14 Pricing Study Senegal 2008

15 Major Inspection GT6

GE-FR7

Najran SEC Saudi Arabia

2008

16 Major Inspection (MI) W501D5

Jazan SEC Saudi Arabia

2009

17 Annual Inspection 2amp3 2x393 Shoaiba SEC Saudi Arabia

2009

24

25

SISrsquoS Experiences in Boilerrsquos Maintenance Work

Power plant location Boiler tech Details ampInspections

Rades A (ST) ST STEAM TURBINE Rades B (ST)

Unit 1 Unit 2 Unit 3 Unit 4

Manufacturer Mitsubishi H I Mitsubishi H I Ansaldo Energia Ansaldo Energia Type amp Model MHI CE RR

type out-door MHI CE RR type outdoor

AE RR type outdoor

AE RR type outdoor

Date of commissioning 1983 1984 1998 1999 MCR (th) 520000 520000 5335 5335

Steam conditions Pressure SHRH(bars) 1685 352 1685 352 1739 1739 Temperature( degC) 543 543 542 542

fuel Natural gas heavy Fuel Ndeg2

Natural gas heavy Fuel Ndeg2

Natural gas heavy Fuel Ndeg2

Natural gas heavy Fuel Ndeg2

Heating area Furnace(msup2) 5105 5105 5360 5360 Reheater (msup2) 3130 3130 1286 1286 Eco (msup2) 2600 2600 1556 1556

Fuel oil Burners type amp No 20 20 Y Ndeg 12 Y Ndeg 12 FDF type amp capacity ( Th) HC 591 HC 591 HC748 HC 748 IDF type amp capacity (Th) HC 640 HC 640 NA NA GRF type amp capacity ( Th) HC 500 HC 500 HC 300 HC 300

RegenAir Preheater Type Ljungstroumlm Ljungstroumlm Ljungstroumlm Ljungstroumlm No amp capacity 2 2 2 2 Heating surface(msup2) 12000 12000 18000 18000

Annual inspection No 20 20 10 10 Starting amp Completion dates

21 Days 21 days 21 days 21 days

Major overhaul No 04 04 01 01 Starting amp Completion dates

1221038843 days 611028854 days 56 days 59 days

Boiler conservation No 20 20 08 08 Boiler Rehabilitation No 0 0 0 0 Boiler Tube Acid cleaning No 01 01 01 01 ILA(Integrity Life Assessment)No 0 0 0 0

26

SISrsquos Experiences in Boilersrsquo Maintenance Work

Power plant location Boiler tech Details ampInspections

Sousse A (ST) Sousse B (CCPP)

Unitne1 Unitne 2 Unitne1 Unitne 2

Manufacturer SGP SGP STEIN INDUSTRY STEIN INDUSTRY Type amp Model Natural circulation Natural circulation Heat Recuperator Heat Recuperator Date of commissioning 1980 1980 1995 1995 MCR (th) 515 515 HP 182 BP 415 HP 182 BP 415 Steam conditions Pressure SHRH (bar) 16038 16038 HP 72 BP 66 HP 72 BP 66

Temperature (degC) 540degC 540degC HP 511 BP 213 HP 511 BP 213 fuel FUELGAZ FUELGAZ Gaz Gaz Heating area Furnace (m2 2080 ) 2080 HP evaporator 25251 LP evaporator 18627

Reheater (m2 1512 ) 1512 HP superheater 9418 LP superheater 2328 Eco (m2 2017 ) 2017 HP economizer 16834 13773 LP economizer 3060

Fuel oil Burners Type ampNo EVT8 EVT8 FDF type amp capacity R62250 7566 m3 R62250 7566 ms 3 s

GRF type amp capacity R62250 721 m3 R62250 721 ms 3 s

Regen Air Preheater

Type No amp capacity 2 220186 Nm3h 2 220186 Nm3h

Heating surface(m2) 2x924 2x924 Annual Inspection

No annually annually annually annually Starting amp completion dates 3 - 4 weeks 3 - 4 weeks 10 days 10 days

Major Overhaul No along with annual inspectioccediln along with annual inspectioccediln

Starting amp completion dates 3 - 4 weeks 3 - 4 weeks

Boiler Conservation No 3 2 Boiler Rehabilitation No Boiler Tube Acid Cleaning No 2 2 ILA (Integrity Life Assessment) No 1

27

SISrsquos Experiences in Boilersrsquo Maintenance Work

Power plant location Boiler tech Details ampInspections Unitne1 (ST) Unitne 2 (ST) Unitne 3 (ST) Unitne 4 (ST)

Manufacturer WALTHER Type amp Model WALTHER FN10 Natural Circulation Date of commissioning 05071965 01111965 22061968 20091968 MCR (th) 112 Steam conditions

Pressure 686 bar Temperature 510 degC

fuel Heavy fuel oil Ndeg2 light fuel oil

Heating area

Furnace (m2 540 m2 ) Reheater (m2 1542 m2 ) Eco (m2 480 m2 )

Fuel oil Burners Type ampNo SONVICO 4 FDF type amp capacity Centrifugal - 27 m3s IDF type amp capacity - - - - GRF type amp capacity - - - -

Regen Air Preheater Type Static LJUNGSTROM No amp capacity 1 1 1 1 Heating surface(m2) 7350 m2 -

Annual Inspection No every year until 1998 every year until

2005 every year until 1998

every year until 2005

Starting amp completion dates - - - -

Major Overhaul No 6 8 5 5 Starting amp completion dates - - - -

Boiler Conservation No - 2 - 2 Boiler Rehabilitation No 4 6 5 5 Boiler Tube Acid Cleaning No 0 0 0 0 ILA (Integrity Life Assessment) No 0 0 0 0

28

SISrsquos Experiences in Boilersrsquo Maintenance Work Power Plant Location

Boiler Tech Details ampInspections

Ghannouch (ST) Unitne1 (ST) Unitne 2

Manufacturer Stein Industrie Stein Industrie Type amp Model Natural circulation Natural circulation Date of commissioning 1972 1972 MCR (th) 120 120 Steam conditions Pressure SHRH (th) 70 bars 70 bars

Temperature 510 degC 510 degC fuel Natural GasHeavy fuel Natural GasHeavy fuel Heating area Furnace (m2 )

Reheater (m2 8880 dmsup3 ) 8880 dmsup3 Eco (m2 2400 dmsup3 ) 2400 dmsup3

Fuel oil Burners Type ampNo PILLARD GRC PILLARD GRC IDF type amp capacity GRF type amp capacity Regen Air Preheater Type Ljunstroumlm Ljunstroumlm

No amp capacity 140msup3h 140msup3h Heating surface(m2) _ _

Annual Inspection No 1 1 Starting amp completion dates 1 week 1 week

Major Overhaul No 15ans 15ans

Starting amp completion dates 2 months 2 months

Boiler Conservation No in case of being extended in case of being extended Boiler Rehabilitation No NO NO Boiler Tube Acid Cleaning No NO NO ILA (Integrity Life Assessment) No NO NO

29

ELECTRICAL TRANSMISSION SYSTEM

Accomplished Projects

bull Tests performed on Numerical relays manufactured by - ABB (Distance protection REL 316 ) - AREVA (Distance protection EPAC MICOMP442 hellip) - ICE (Over current protection NPID 800hellip) - SIEMENS (Distance protection 7SA 511 513 522 611) - REYROLLES (Differential protection DUOBIAS)

bull Test and setting of protective relays and checking the tripping circuits for Generators and

Substations belonging to Zaouia Petroleum Refinery (Libya)

bull Short circuit calculation selectivity study of protective relays by providing solutions for the

existing issues in PEC YEMEN Networks

bull Study and improvement of the existing protective system in close cooperation with Tractebel

Engineering

bull Technical Assistance for Independent Power Producers (IPP) Plant (Carthage Power

Company (CPC) Tunisia) regarding the maintenance and testing of protective relays

related to

- Generators - Main transformers - Auxiliaries - Etc

bull Technical Assistance testing and setting of protective relays at

- Steel ndashworks (Tunisia) - Cement ndashmarker (Tunisia) - Iron industries (Tunisia) - Chemical industries (Tunisia)

bull Commissioning and setting of protective relays at substations (High Medium and Low

voltages)

bull Renovation of the obsolete equipment (relays switchgear hellip)

bull Maintenance of the transmission lines and substations equipment

bull Cost-effective solutions establishment regarding the network issues (droop voltage over

voltage improvement of power factor etc)

30

ELECTRICAL DISTRIBUTION SYSTEM

Rural Electrification- Accomplished Projects

Contract Identification

Contract No 18 Technical Assistance and implementation of a Rural electrification project based upon SWER (Single Wire Earth Return) techniques

Award date 1998 Completion date 1999 Employerrsquos Name JIRAMA (JIRO SY RANO MALAGAS) Address

149 RUE RAINANDRIAMAMPANDRY Antananarivo BP 200 - MADAGASCAR

Main Tasks Performed

bull Training on SWER System bull Data collection needed for SWER System studies and implementation bull Finalization of technical studies and submission of report including

- Technical audit of the pilot project already in place - Technical description of the project - AdviseRecommendations on equipment specifications - Recommendations on possible changes in adjustment and coordination of electrical

protections

Contract Identification

Contract No 19 RWANDA Project (Phase 1) Implementation of a Pilot Rural Electrification Project based on Single-Phase with neutral to ground called MALT System 4000 Subscribers

Award date June 2008 Completion date June 2009

Employerrsquos Name

RECO ( former ELECTROGAZ) -RWANDA

Address BP 537 KIGALI -RWANA

Main Tasks performed

bull Study and Diagnosis of the existing Rwandan Power Distribution An inventory of the existing facilities including generation transmission and distribution systems was established

bull Implementation of a pilot rural electrification project based on MALT System Visit was arranged to some Tunisian rural regions and companies manufacturing electric equipment namely

- Transformers

- Iron poles

- Concrete supports

- Electric cables

- Electronic meters and

- MV and LV line accessories

31

Contract Identification

Contract No 20 Local Electrification study of Tambacounda and Kedougou departments Award date October 2002 Completion date March 2003 Customerrsquos name SENELEC Address ELECTRICAL COMPANY SENEGAL

Main Tasks Performed

bull Data Collection bull Socio-economic survey bull Technical economic and financial analysis bull Electricity market forecast (demand forecast (2003-2015)) bull Estimation of worksrsquo costs regarding medium voltage single-phase and tri-phase lines medium

and low voltage stations low voltage lines diesel micro-stations individual photovoltaic systems bull Technical and economic study related to different methods of supply including the solar as well as

the opportunity of introducing the single-phase system for the rural electrification bull Proposition for the public lighting and the management of photovoltaic systems bull Recommendations for the reinforcement of the existing stations and the existing networks to satisfy

the future demand due to the electrification of the new villages bull Tariff and profitability study bull Set up of the geographical maps and the low voltage electrification plan of the most important

villages (34 villages) bull Recommendations on privatizing power generation energy sector

Contract Identification Contract No 21 - Rural Electrification study of 80 villages in Comoros Isles

- Preparation of Tender Documents for the supply of equipment needed to the construction of 145 km MV lines 100 km LV lines and 80 MVLV stations

- Call for tenders evaluation of Bidders Award date November 2000 Completion date Dec 2002 Customerrsquos name

Ministry of Equipment Department of Energy and Water Resources

Address Moroni Avenue of the Democratic Republic of China

Main Tasks Performed

bull Data collection and visit of the existing electric utilities bull Situation analysis and proposal of electric infrastructure management solutions bull Electricity Demand Estimation and Forecasting bull Electric Calculation (Load Repartition Line Voltage Drop Losses and Voltage Drops

Calculations Short-Circuit Calculations Simulation of the Extension and Reinforcement of the Medium Voltage Networks Power System Stability Analysis Reactive Power Compensation

bull Low Voltage Studies for the Electrification of 80 villages bull RecommendationsSuggestions for the reinforcement of power generation utilities to satisfy

the future demand (by 2010) bull Electricity Tariffing study

- Review of electricity consumption patterns - Cost review - Review of tariff policies - Application and implementation of revised tariff levels

32

Contract Identification Contract Ndeg 22 Establishment and set up of a computerized accounting and budget system

Award date 1992 Completion date 1994 Customerrsquos name SOMELEC Address Nouakchott - MAURITANIA

Main Tasks Performed

bull Analytical accounting bull Bid evaluation bull Cash flow movements management bull Fixed assets management bull Centralizing bookkeeping bull Existing computer application interfaces update bull Transposition of the existing system to the new one bull Operation and maintenance Documents preparation bull Execution of the transposition of the existing system to the new one

Contract Identification Contract

No 23 Electricity sector reform technical assistance in the interim management of the ldquoCompagnie Energie Electrique du Togo ldquo(CEET)

Award date 41997

Completion date 122000

Employerrsquos Name Ministry of Mining Equipment transmission Mail and Telecommunications

Address TOGO

Main Tasks Performed

bull Technical assistance in the interim management of the CEET within the framework of the electricity sectorrsquos liberalization 1) termination of the current CEET management 2) analysis of the existing situation 3) interim management of the CEET prior to its privatization

bull Operation and maintenance of the electrical network for Lomeacute and its surrounding rural areas bull Electricity generation in isolated centers bull Electricity transmission and distribution bull Procurement and maintenance of new diesel production units bull Reduction of energy losses bull Customer management bull Increase in the number of Customers bull Accounting and billing bull Increase in payment recovery bull Call for tenders evaluation of proposals drafting of the technical annexes concerning the contracting

for a new independent operator (concession)

33

72 On-going and Under Bidding (UB) Projects

No Project Description Country

1 Training Center Update (on-going project) Republic of Congo BRAZZAVILLE

2 Master Plan elaboration in close cooperation with STUDI (Tunisia) (on-going project)

Republic of Senegal

3 Implementation of a Rural Electrification Project based on Single-Phase Four-Wires

with Neutral to Ground called MALT System (UB) Republic of Burkina Faso

4 Cost study connections to and extensions of electricity distribution networks

(UB)

Republic of Burkina Faso

5 Works Control and supervision of rural electrification of 33 communities in 4

regions of the Republic of Cameroon (UB) Republic of CAMEROUN

34

JUDICIOUS AND EFFICIENT ENERGY UTILIZATION

IS AT THE FOREFRONT OF OUR MINDS

35

Over the year 2008 STEG International Services (SIS) has widened its scope of activities to

include techno-economic studies and assistance in energy efficiency thereby providing support

to the national energy policy aiming at considering energy auditing energy efficiency energy

saving as a major priority target in Tunisiarsquos future energy strategic plan objectives In this

regard STEG International Services has carried out several projects including but not limited to

the following

80 Energy Efficiency

bull Performing obligatory periodical energy audits for industrial installations as well as energy audits on a consultancy basis

bull Assistance on projects involving energy efficiency bull Studies on energy efficiency of circuits hydraulic and thermal systems bull Upgrading energy management systems of industrial plants

81 Co-generation (Combined Heat and Power (CHP)) Studies

The main tasks performed included

bull Feasibility studies and project implementation assistance ndash RandaTunis

bull Assistance in electric utility restructuring from self power producer (electricity generation

only) to self-producing co-generatorsndash STSBEJATunisia

bull Technical assistance related to STEGrsquos grid connection with Co-generation plants in some

industrial units -SOTIPAPIER STS T-PAP and Carthago-GRE- Tunisia

82 Energy audits and energy efficiency

In any industry the three top operating expenses are often found to be energy (both electrical

and thermal) labour and materials Energy would invariably emerge as a top ranker and thus

energy management function constitutes a strategic area for cost reduction

Energy Audit will help to better understand how energy is used in any industry and in identifying

the areas where waste can occur and where scope for improvement exists In this regard the

Energy Audit would give a positive orientation to the energy cost reduction preventive

maintenance and quality control programs which are vital to production and utility activities Such

36

an audit program will help keep focus on variations which occur in the energy costs availability

and reliability of supply of energy decide on appropriate energy mix identify energy

conservation technologies retrofit for energy conservation equipment etc

Therefore SIS can carry out comprehensive assessment of techno-economic performance of

plants and equipment against the designed performance level or the industry best practice

aiming at optimizing consumption levels along with specific operating control targets

821 Samples of accomplished and on-going Energy Auditing projects

bull Energy Audit of the Liquefied Petroleum Gas (LPG) plant located in Gabegraves (Tunisia) with the assistance of Kvaerner Heurtey in 2001

bull Energy Performance Assessment of Rades and Sousse steam and Combined Cycle Power Plants as well as Bouchemma Menzel Bourguiba Korba Gas Turbines with the assistance of TRACTABEL and EDF in 2002

bull Energy Audit of Sousse Combined Cycle Power Plant with the assistance of CRA2E in 2007-2008

bull Periodic Performance Tests of Carthage Power Company (CPC) combined cycle an Impendent Power Producer (IPP) in Tunisia

37

SIS Future Commitments and Responsibilities

Endowed with a clear vision a sound project management and solid experiences and

know-how acquired by the parent company STEG through its various trades of over 48 years

SIS has put together a team of experts inndashline with its strategic intent- to be positioned as a

competitive and pre-eminent regional energy services company by spreading its expertise and

know-how throughout the African continent Arab countries and the rest of the world working on

a partnership basis with potential consultants andor the utilities of the respective countries

resulting in a keen focus and a strong sense of purpose

As part of its vision SIS management recognizes that it has responsibilities to all of its

stakeholders These include

Shareholders SIS will protect the investments of its shareholders and will provide an acceptable return on

investments through the application of its business principles Customers SIS will aim at optimizing its business activities through winning customers and maintaining

customerrsquos loyalty by offering them high quality services at competitive prices delivering on time

and supporting them with its management expertise

Employees SIS recognizes that its working employees are the key to its success and it nurtures loyalty

teamwork and trust between them SIS will strive to protect support and involve them in the

companyrsquos future to develop their skills and to reward them in line with the corporate values of

SISrsquos organization

Partners Suppliers Contractors and all External Contacts SIS will seek to treat all its partners suppliers contractors and other external stakeholders in a

consistently professional way and to ensure that their needs are fulfilled in every way possible

38

  • 72 On-going and Under Bidding (UB) Projects

22

70 Samples of Project Experience

Since 2006 SIS has undertaken many assignments in African countries Middle East and in

Tunisia It is only possible to show a small selection of these in this brochure We are always

happy to provide additional details and examples of our experience on request

71 Accomplished Projects

POWER GENERATION

No Contract Identification Unitne Installed

Capacity(MW) location Start

Date End Date

1 Annual Inspection

5 260 Rabigh SEC Saudi Arabia)

20-12-2005

30-01-2006

2 Annual Inspection 2 260

Rabigh SEC Saudi Arabia)

09-03-2006

22-04-2006

3 Annual Inspection

3 260 Rabigh SEC Saudi Arabia)

19-03-2006

29-04-2006

4 Annual Inspection

1amp4 440 Shoaiba SEC Saoudi Arabia

27-01-2007

01-03-2007

5 Annual Inspection 4 440

Shoaiba SEC Saoudi Arabia

03-03-2007

05-04-2007

6

Annual Inspection Bell seals rings amp nozzle blocks replacement ( turbine overhaul)

4 260 Rabigh SEC Saudi Arabia)

03-01-2008

07-03-2008

7 Annual Inspection 2 260

Rabigh SEC Saudi Arabia)

08-03-2008

15-04-2008

8 Major Overhaul

GT1 27 TihamaSEC Saudi Arabia

20-01-2008

10-02-2008

9

Erection and Supervision of Works 300 MW (ISO Condition) Open Cycle Power Plant Fast Emergency

GTs 1-4

4x75 ISO Conditions

Ministry of Energy

(Electricity and Water)

Sabya Power Plant

State of KOWEIT

2007- 2008

10 Commissioning CPL amp Parallel Resonant Circuit in close cooperation with AREVA

Ethiopie 2007-2008

11

Revamping of obsolete Control and instrumentation system (in close cooperation with SIEMENS)

2 Units Marocco 2008

23

No Contract Identification Unitne Installed Capacity (MW)

location Start Date

12

Commissioning of Control command system Mark VI on GTs Frame 5 (in close cooperation with GESHANAHAN Eng

GTs GE Frame 5

Algeria (Arzew) 2008

13

Grid Interconnection In close cooperation with STUDI for West African Power Pool (WAPP)

225 KV

Electricity grid interconnection

between Burkina Faso and Ghana

2008

14 Pricing Study Senegal 2008

15 Major Inspection GT6

GE-FR7

Najran SEC Saudi Arabia

2008

16 Major Inspection (MI) W501D5

Jazan SEC Saudi Arabia

2009

17 Annual Inspection 2amp3 2x393 Shoaiba SEC Saudi Arabia

2009

24

25

SISrsquoS Experiences in Boilerrsquos Maintenance Work

Power plant location Boiler tech Details ampInspections

Rades A (ST) ST STEAM TURBINE Rades B (ST)

Unit 1 Unit 2 Unit 3 Unit 4

Manufacturer Mitsubishi H I Mitsubishi H I Ansaldo Energia Ansaldo Energia Type amp Model MHI CE RR

type out-door MHI CE RR type outdoor

AE RR type outdoor

AE RR type outdoor

Date of commissioning 1983 1984 1998 1999 MCR (th) 520000 520000 5335 5335

Steam conditions Pressure SHRH(bars) 1685 352 1685 352 1739 1739 Temperature( degC) 543 543 542 542

fuel Natural gas heavy Fuel Ndeg2

Natural gas heavy Fuel Ndeg2

Natural gas heavy Fuel Ndeg2

Natural gas heavy Fuel Ndeg2

Heating area Furnace(msup2) 5105 5105 5360 5360 Reheater (msup2) 3130 3130 1286 1286 Eco (msup2) 2600 2600 1556 1556

Fuel oil Burners type amp No 20 20 Y Ndeg 12 Y Ndeg 12 FDF type amp capacity ( Th) HC 591 HC 591 HC748 HC 748 IDF type amp capacity (Th) HC 640 HC 640 NA NA GRF type amp capacity ( Th) HC 500 HC 500 HC 300 HC 300

RegenAir Preheater Type Ljungstroumlm Ljungstroumlm Ljungstroumlm Ljungstroumlm No amp capacity 2 2 2 2 Heating surface(msup2) 12000 12000 18000 18000

Annual inspection No 20 20 10 10 Starting amp Completion dates

21 Days 21 days 21 days 21 days

Major overhaul No 04 04 01 01 Starting amp Completion dates

1221038843 days 611028854 days 56 days 59 days

Boiler conservation No 20 20 08 08 Boiler Rehabilitation No 0 0 0 0 Boiler Tube Acid cleaning No 01 01 01 01 ILA(Integrity Life Assessment)No 0 0 0 0

26

SISrsquos Experiences in Boilersrsquo Maintenance Work

Power plant location Boiler tech Details ampInspections

Sousse A (ST) Sousse B (CCPP)

Unitne1 Unitne 2 Unitne1 Unitne 2

Manufacturer SGP SGP STEIN INDUSTRY STEIN INDUSTRY Type amp Model Natural circulation Natural circulation Heat Recuperator Heat Recuperator Date of commissioning 1980 1980 1995 1995 MCR (th) 515 515 HP 182 BP 415 HP 182 BP 415 Steam conditions Pressure SHRH (bar) 16038 16038 HP 72 BP 66 HP 72 BP 66

Temperature (degC) 540degC 540degC HP 511 BP 213 HP 511 BP 213 fuel FUELGAZ FUELGAZ Gaz Gaz Heating area Furnace (m2 2080 ) 2080 HP evaporator 25251 LP evaporator 18627

Reheater (m2 1512 ) 1512 HP superheater 9418 LP superheater 2328 Eco (m2 2017 ) 2017 HP economizer 16834 13773 LP economizer 3060

Fuel oil Burners Type ampNo EVT8 EVT8 FDF type amp capacity R62250 7566 m3 R62250 7566 ms 3 s

GRF type amp capacity R62250 721 m3 R62250 721 ms 3 s

Regen Air Preheater

Type No amp capacity 2 220186 Nm3h 2 220186 Nm3h

Heating surface(m2) 2x924 2x924 Annual Inspection

No annually annually annually annually Starting amp completion dates 3 - 4 weeks 3 - 4 weeks 10 days 10 days

Major Overhaul No along with annual inspectioccediln along with annual inspectioccediln

Starting amp completion dates 3 - 4 weeks 3 - 4 weeks

Boiler Conservation No 3 2 Boiler Rehabilitation No Boiler Tube Acid Cleaning No 2 2 ILA (Integrity Life Assessment) No 1

27

SISrsquos Experiences in Boilersrsquo Maintenance Work

Power plant location Boiler tech Details ampInspections Unitne1 (ST) Unitne 2 (ST) Unitne 3 (ST) Unitne 4 (ST)

Manufacturer WALTHER Type amp Model WALTHER FN10 Natural Circulation Date of commissioning 05071965 01111965 22061968 20091968 MCR (th) 112 Steam conditions

Pressure 686 bar Temperature 510 degC

fuel Heavy fuel oil Ndeg2 light fuel oil

Heating area

Furnace (m2 540 m2 ) Reheater (m2 1542 m2 ) Eco (m2 480 m2 )

Fuel oil Burners Type ampNo SONVICO 4 FDF type amp capacity Centrifugal - 27 m3s IDF type amp capacity - - - - GRF type amp capacity - - - -

Regen Air Preheater Type Static LJUNGSTROM No amp capacity 1 1 1 1 Heating surface(m2) 7350 m2 -

Annual Inspection No every year until 1998 every year until

2005 every year until 1998

every year until 2005

Starting amp completion dates - - - -

Major Overhaul No 6 8 5 5 Starting amp completion dates - - - -

Boiler Conservation No - 2 - 2 Boiler Rehabilitation No 4 6 5 5 Boiler Tube Acid Cleaning No 0 0 0 0 ILA (Integrity Life Assessment) No 0 0 0 0

28

SISrsquos Experiences in Boilersrsquo Maintenance Work Power Plant Location

Boiler Tech Details ampInspections

Ghannouch (ST) Unitne1 (ST) Unitne 2

Manufacturer Stein Industrie Stein Industrie Type amp Model Natural circulation Natural circulation Date of commissioning 1972 1972 MCR (th) 120 120 Steam conditions Pressure SHRH (th) 70 bars 70 bars

Temperature 510 degC 510 degC fuel Natural GasHeavy fuel Natural GasHeavy fuel Heating area Furnace (m2 )

Reheater (m2 8880 dmsup3 ) 8880 dmsup3 Eco (m2 2400 dmsup3 ) 2400 dmsup3

Fuel oil Burners Type ampNo PILLARD GRC PILLARD GRC IDF type amp capacity GRF type amp capacity Regen Air Preheater Type Ljunstroumlm Ljunstroumlm

No amp capacity 140msup3h 140msup3h Heating surface(m2) _ _

Annual Inspection No 1 1 Starting amp completion dates 1 week 1 week

Major Overhaul No 15ans 15ans

Starting amp completion dates 2 months 2 months

Boiler Conservation No in case of being extended in case of being extended Boiler Rehabilitation No NO NO Boiler Tube Acid Cleaning No NO NO ILA (Integrity Life Assessment) No NO NO

29

ELECTRICAL TRANSMISSION SYSTEM

Accomplished Projects

bull Tests performed on Numerical relays manufactured by - ABB (Distance protection REL 316 ) - AREVA (Distance protection EPAC MICOMP442 hellip) - ICE (Over current protection NPID 800hellip) - SIEMENS (Distance protection 7SA 511 513 522 611) - REYROLLES (Differential protection DUOBIAS)

bull Test and setting of protective relays and checking the tripping circuits for Generators and

Substations belonging to Zaouia Petroleum Refinery (Libya)

bull Short circuit calculation selectivity study of protective relays by providing solutions for the

existing issues in PEC YEMEN Networks

bull Study and improvement of the existing protective system in close cooperation with Tractebel

Engineering

bull Technical Assistance for Independent Power Producers (IPP) Plant (Carthage Power

Company (CPC) Tunisia) regarding the maintenance and testing of protective relays

related to

- Generators - Main transformers - Auxiliaries - Etc

bull Technical Assistance testing and setting of protective relays at

- Steel ndashworks (Tunisia) - Cement ndashmarker (Tunisia) - Iron industries (Tunisia) - Chemical industries (Tunisia)

bull Commissioning and setting of protective relays at substations (High Medium and Low

voltages)

bull Renovation of the obsolete equipment (relays switchgear hellip)

bull Maintenance of the transmission lines and substations equipment

bull Cost-effective solutions establishment regarding the network issues (droop voltage over

voltage improvement of power factor etc)

30

ELECTRICAL DISTRIBUTION SYSTEM

Rural Electrification- Accomplished Projects

Contract Identification

Contract No 18 Technical Assistance and implementation of a Rural electrification project based upon SWER (Single Wire Earth Return) techniques

Award date 1998 Completion date 1999 Employerrsquos Name JIRAMA (JIRO SY RANO MALAGAS) Address

149 RUE RAINANDRIAMAMPANDRY Antananarivo BP 200 - MADAGASCAR

Main Tasks Performed

bull Training on SWER System bull Data collection needed for SWER System studies and implementation bull Finalization of technical studies and submission of report including

- Technical audit of the pilot project already in place - Technical description of the project - AdviseRecommendations on equipment specifications - Recommendations on possible changes in adjustment and coordination of electrical

protections

Contract Identification

Contract No 19 RWANDA Project (Phase 1) Implementation of a Pilot Rural Electrification Project based on Single-Phase with neutral to ground called MALT System 4000 Subscribers

Award date June 2008 Completion date June 2009

Employerrsquos Name

RECO ( former ELECTROGAZ) -RWANDA

Address BP 537 KIGALI -RWANA

Main Tasks performed

bull Study and Diagnosis of the existing Rwandan Power Distribution An inventory of the existing facilities including generation transmission and distribution systems was established

bull Implementation of a pilot rural electrification project based on MALT System Visit was arranged to some Tunisian rural regions and companies manufacturing electric equipment namely

- Transformers

- Iron poles

- Concrete supports

- Electric cables

- Electronic meters and

- MV and LV line accessories

31

Contract Identification

Contract No 20 Local Electrification study of Tambacounda and Kedougou departments Award date October 2002 Completion date March 2003 Customerrsquos name SENELEC Address ELECTRICAL COMPANY SENEGAL

Main Tasks Performed

bull Data Collection bull Socio-economic survey bull Technical economic and financial analysis bull Electricity market forecast (demand forecast (2003-2015)) bull Estimation of worksrsquo costs regarding medium voltage single-phase and tri-phase lines medium

and low voltage stations low voltage lines diesel micro-stations individual photovoltaic systems bull Technical and economic study related to different methods of supply including the solar as well as

the opportunity of introducing the single-phase system for the rural electrification bull Proposition for the public lighting and the management of photovoltaic systems bull Recommendations for the reinforcement of the existing stations and the existing networks to satisfy

the future demand due to the electrification of the new villages bull Tariff and profitability study bull Set up of the geographical maps and the low voltage electrification plan of the most important

villages (34 villages) bull Recommendations on privatizing power generation energy sector

Contract Identification Contract No 21 - Rural Electrification study of 80 villages in Comoros Isles

- Preparation of Tender Documents for the supply of equipment needed to the construction of 145 km MV lines 100 km LV lines and 80 MVLV stations

- Call for tenders evaluation of Bidders Award date November 2000 Completion date Dec 2002 Customerrsquos name

Ministry of Equipment Department of Energy and Water Resources

Address Moroni Avenue of the Democratic Republic of China

Main Tasks Performed

bull Data collection and visit of the existing electric utilities bull Situation analysis and proposal of electric infrastructure management solutions bull Electricity Demand Estimation and Forecasting bull Electric Calculation (Load Repartition Line Voltage Drop Losses and Voltage Drops

Calculations Short-Circuit Calculations Simulation of the Extension and Reinforcement of the Medium Voltage Networks Power System Stability Analysis Reactive Power Compensation

bull Low Voltage Studies for the Electrification of 80 villages bull RecommendationsSuggestions for the reinforcement of power generation utilities to satisfy

the future demand (by 2010) bull Electricity Tariffing study

- Review of electricity consumption patterns - Cost review - Review of tariff policies - Application and implementation of revised tariff levels

32

Contract Identification Contract Ndeg 22 Establishment and set up of a computerized accounting and budget system

Award date 1992 Completion date 1994 Customerrsquos name SOMELEC Address Nouakchott - MAURITANIA

Main Tasks Performed

bull Analytical accounting bull Bid evaluation bull Cash flow movements management bull Fixed assets management bull Centralizing bookkeeping bull Existing computer application interfaces update bull Transposition of the existing system to the new one bull Operation and maintenance Documents preparation bull Execution of the transposition of the existing system to the new one

Contract Identification Contract

No 23 Electricity sector reform technical assistance in the interim management of the ldquoCompagnie Energie Electrique du Togo ldquo(CEET)

Award date 41997

Completion date 122000

Employerrsquos Name Ministry of Mining Equipment transmission Mail and Telecommunications

Address TOGO

Main Tasks Performed

bull Technical assistance in the interim management of the CEET within the framework of the electricity sectorrsquos liberalization 1) termination of the current CEET management 2) analysis of the existing situation 3) interim management of the CEET prior to its privatization

bull Operation and maintenance of the electrical network for Lomeacute and its surrounding rural areas bull Electricity generation in isolated centers bull Electricity transmission and distribution bull Procurement and maintenance of new diesel production units bull Reduction of energy losses bull Customer management bull Increase in the number of Customers bull Accounting and billing bull Increase in payment recovery bull Call for tenders evaluation of proposals drafting of the technical annexes concerning the contracting

for a new independent operator (concession)

33

72 On-going and Under Bidding (UB) Projects

No Project Description Country

1 Training Center Update (on-going project) Republic of Congo BRAZZAVILLE

2 Master Plan elaboration in close cooperation with STUDI (Tunisia) (on-going project)

Republic of Senegal

3 Implementation of a Rural Electrification Project based on Single-Phase Four-Wires

with Neutral to Ground called MALT System (UB) Republic of Burkina Faso

4 Cost study connections to and extensions of electricity distribution networks

(UB)

Republic of Burkina Faso

5 Works Control and supervision of rural electrification of 33 communities in 4

regions of the Republic of Cameroon (UB) Republic of CAMEROUN

34

JUDICIOUS AND EFFICIENT ENERGY UTILIZATION

IS AT THE FOREFRONT OF OUR MINDS

35

Over the year 2008 STEG International Services (SIS) has widened its scope of activities to

include techno-economic studies and assistance in energy efficiency thereby providing support

to the national energy policy aiming at considering energy auditing energy efficiency energy

saving as a major priority target in Tunisiarsquos future energy strategic plan objectives In this

regard STEG International Services has carried out several projects including but not limited to

the following

80 Energy Efficiency

bull Performing obligatory periodical energy audits for industrial installations as well as energy audits on a consultancy basis

bull Assistance on projects involving energy efficiency bull Studies on energy efficiency of circuits hydraulic and thermal systems bull Upgrading energy management systems of industrial plants

81 Co-generation (Combined Heat and Power (CHP)) Studies

The main tasks performed included

bull Feasibility studies and project implementation assistance ndash RandaTunis

bull Assistance in electric utility restructuring from self power producer (electricity generation

only) to self-producing co-generatorsndash STSBEJATunisia

bull Technical assistance related to STEGrsquos grid connection with Co-generation plants in some

industrial units -SOTIPAPIER STS T-PAP and Carthago-GRE- Tunisia

82 Energy audits and energy efficiency

In any industry the three top operating expenses are often found to be energy (both electrical

and thermal) labour and materials Energy would invariably emerge as a top ranker and thus

energy management function constitutes a strategic area for cost reduction

Energy Audit will help to better understand how energy is used in any industry and in identifying

the areas where waste can occur and where scope for improvement exists In this regard the

Energy Audit would give a positive orientation to the energy cost reduction preventive

maintenance and quality control programs which are vital to production and utility activities Such

36

an audit program will help keep focus on variations which occur in the energy costs availability

and reliability of supply of energy decide on appropriate energy mix identify energy

conservation technologies retrofit for energy conservation equipment etc

Therefore SIS can carry out comprehensive assessment of techno-economic performance of

plants and equipment against the designed performance level or the industry best practice

aiming at optimizing consumption levels along with specific operating control targets

821 Samples of accomplished and on-going Energy Auditing projects

bull Energy Audit of the Liquefied Petroleum Gas (LPG) plant located in Gabegraves (Tunisia) with the assistance of Kvaerner Heurtey in 2001

bull Energy Performance Assessment of Rades and Sousse steam and Combined Cycle Power Plants as well as Bouchemma Menzel Bourguiba Korba Gas Turbines with the assistance of TRACTABEL and EDF in 2002

bull Energy Audit of Sousse Combined Cycle Power Plant with the assistance of CRA2E in 2007-2008

bull Periodic Performance Tests of Carthage Power Company (CPC) combined cycle an Impendent Power Producer (IPP) in Tunisia

37

SIS Future Commitments and Responsibilities

Endowed with a clear vision a sound project management and solid experiences and

know-how acquired by the parent company STEG through its various trades of over 48 years

SIS has put together a team of experts inndashline with its strategic intent- to be positioned as a

competitive and pre-eminent regional energy services company by spreading its expertise and

know-how throughout the African continent Arab countries and the rest of the world working on

a partnership basis with potential consultants andor the utilities of the respective countries

resulting in a keen focus and a strong sense of purpose

As part of its vision SIS management recognizes that it has responsibilities to all of its

stakeholders These include

Shareholders SIS will protect the investments of its shareholders and will provide an acceptable return on

investments through the application of its business principles Customers SIS will aim at optimizing its business activities through winning customers and maintaining

customerrsquos loyalty by offering them high quality services at competitive prices delivering on time

and supporting them with its management expertise

Employees SIS recognizes that its working employees are the key to its success and it nurtures loyalty

teamwork and trust between them SIS will strive to protect support and involve them in the

companyrsquos future to develop their skills and to reward them in line with the corporate values of

SISrsquos organization

Partners Suppliers Contractors and all External Contacts SIS will seek to treat all its partners suppliers contractors and other external stakeholders in a

consistently professional way and to ensure that their needs are fulfilled in every way possible

38

  • 72 On-going and Under Bidding (UB) Projects

23

No Contract Identification Unitne Installed Capacity (MW)

location Start Date

12

Commissioning of Control command system Mark VI on GTs Frame 5 (in close cooperation with GESHANAHAN Eng

GTs GE Frame 5

Algeria (Arzew) 2008

13

Grid Interconnection In close cooperation with STUDI for West African Power Pool (WAPP)

225 KV

Electricity grid interconnection

between Burkina Faso and Ghana

2008

14 Pricing Study Senegal 2008

15 Major Inspection GT6

GE-FR7

Najran SEC Saudi Arabia

2008

16 Major Inspection (MI) W501D5

Jazan SEC Saudi Arabia

2009

17 Annual Inspection 2amp3 2x393 Shoaiba SEC Saudi Arabia

2009

24

25

SISrsquoS Experiences in Boilerrsquos Maintenance Work

Power plant location Boiler tech Details ampInspections

Rades A (ST) ST STEAM TURBINE Rades B (ST)

Unit 1 Unit 2 Unit 3 Unit 4

Manufacturer Mitsubishi H I Mitsubishi H I Ansaldo Energia Ansaldo Energia Type amp Model MHI CE RR

type out-door MHI CE RR type outdoor

AE RR type outdoor

AE RR type outdoor

Date of commissioning 1983 1984 1998 1999 MCR (th) 520000 520000 5335 5335

Steam conditions Pressure SHRH(bars) 1685 352 1685 352 1739 1739 Temperature( degC) 543 543 542 542

fuel Natural gas heavy Fuel Ndeg2

Natural gas heavy Fuel Ndeg2

Natural gas heavy Fuel Ndeg2

Natural gas heavy Fuel Ndeg2

Heating area Furnace(msup2) 5105 5105 5360 5360 Reheater (msup2) 3130 3130 1286 1286 Eco (msup2) 2600 2600 1556 1556

Fuel oil Burners type amp No 20 20 Y Ndeg 12 Y Ndeg 12 FDF type amp capacity ( Th) HC 591 HC 591 HC748 HC 748 IDF type amp capacity (Th) HC 640 HC 640 NA NA GRF type amp capacity ( Th) HC 500 HC 500 HC 300 HC 300

RegenAir Preheater Type Ljungstroumlm Ljungstroumlm Ljungstroumlm Ljungstroumlm No amp capacity 2 2 2 2 Heating surface(msup2) 12000 12000 18000 18000

Annual inspection No 20 20 10 10 Starting amp Completion dates

21 Days 21 days 21 days 21 days

Major overhaul No 04 04 01 01 Starting amp Completion dates

1221038843 days 611028854 days 56 days 59 days

Boiler conservation No 20 20 08 08 Boiler Rehabilitation No 0 0 0 0 Boiler Tube Acid cleaning No 01 01 01 01 ILA(Integrity Life Assessment)No 0 0 0 0

26

SISrsquos Experiences in Boilersrsquo Maintenance Work

Power plant location Boiler tech Details ampInspections

Sousse A (ST) Sousse B (CCPP)

Unitne1 Unitne 2 Unitne1 Unitne 2

Manufacturer SGP SGP STEIN INDUSTRY STEIN INDUSTRY Type amp Model Natural circulation Natural circulation Heat Recuperator Heat Recuperator Date of commissioning 1980 1980 1995 1995 MCR (th) 515 515 HP 182 BP 415 HP 182 BP 415 Steam conditions Pressure SHRH (bar) 16038 16038 HP 72 BP 66 HP 72 BP 66

Temperature (degC) 540degC 540degC HP 511 BP 213 HP 511 BP 213 fuel FUELGAZ FUELGAZ Gaz Gaz Heating area Furnace (m2 2080 ) 2080 HP evaporator 25251 LP evaporator 18627

Reheater (m2 1512 ) 1512 HP superheater 9418 LP superheater 2328 Eco (m2 2017 ) 2017 HP economizer 16834 13773 LP economizer 3060

Fuel oil Burners Type ampNo EVT8 EVT8 FDF type amp capacity R62250 7566 m3 R62250 7566 ms 3 s

GRF type amp capacity R62250 721 m3 R62250 721 ms 3 s

Regen Air Preheater

Type No amp capacity 2 220186 Nm3h 2 220186 Nm3h

Heating surface(m2) 2x924 2x924 Annual Inspection

No annually annually annually annually Starting amp completion dates 3 - 4 weeks 3 - 4 weeks 10 days 10 days

Major Overhaul No along with annual inspectioccediln along with annual inspectioccediln

Starting amp completion dates 3 - 4 weeks 3 - 4 weeks

Boiler Conservation No 3 2 Boiler Rehabilitation No Boiler Tube Acid Cleaning No 2 2 ILA (Integrity Life Assessment) No 1

27

SISrsquos Experiences in Boilersrsquo Maintenance Work

Power plant location Boiler tech Details ampInspections Unitne1 (ST) Unitne 2 (ST) Unitne 3 (ST) Unitne 4 (ST)

Manufacturer WALTHER Type amp Model WALTHER FN10 Natural Circulation Date of commissioning 05071965 01111965 22061968 20091968 MCR (th) 112 Steam conditions

Pressure 686 bar Temperature 510 degC

fuel Heavy fuel oil Ndeg2 light fuel oil

Heating area

Furnace (m2 540 m2 ) Reheater (m2 1542 m2 ) Eco (m2 480 m2 )

Fuel oil Burners Type ampNo SONVICO 4 FDF type amp capacity Centrifugal - 27 m3s IDF type amp capacity - - - - GRF type amp capacity - - - -

Regen Air Preheater Type Static LJUNGSTROM No amp capacity 1 1 1 1 Heating surface(m2) 7350 m2 -

Annual Inspection No every year until 1998 every year until

2005 every year until 1998

every year until 2005

Starting amp completion dates - - - -

Major Overhaul No 6 8 5 5 Starting amp completion dates - - - -

Boiler Conservation No - 2 - 2 Boiler Rehabilitation No 4 6 5 5 Boiler Tube Acid Cleaning No 0 0 0 0 ILA (Integrity Life Assessment) No 0 0 0 0

28

SISrsquos Experiences in Boilersrsquo Maintenance Work Power Plant Location

Boiler Tech Details ampInspections

Ghannouch (ST) Unitne1 (ST) Unitne 2

Manufacturer Stein Industrie Stein Industrie Type amp Model Natural circulation Natural circulation Date of commissioning 1972 1972 MCR (th) 120 120 Steam conditions Pressure SHRH (th) 70 bars 70 bars

Temperature 510 degC 510 degC fuel Natural GasHeavy fuel Natural GasHeavy fuel Heating area Furnace (m2 )

Reheater (m2 8880 dmsup3 ) 8880 dmsup3 Eco (m2 2400 dmsup3 ) 2400 dmsup3

Fuel oil Burners Type ampNo PILLARD GRC PILLARD GRC IDF type amp capacity GRF type amp capacity Regen Air Preheater Type Ljunstroumlm Ljunstroumlm

No amp capacity 140msup3h 140msup3h Heating surface(m2) _ _

Annual Inspection No 1 1 Starting amp completion dates 1 week 1 week

Major Overhaul No 15ans 15ans

Starting amp completion dates 2 months 2 months

Boiler Conservation No in case of being extended in case of being extended Boiler Rehabilitation No NO NO Boiler Tube Acid Cleaning No NO NO ILA (Integrity Life Assessment) No NO NO

29

ELECTRICAL TRANSMISSION SYSTEM

Accomplished Projects

bull Tests performed on Numerical relays manufactured by - ABB (Distance protection REL 316 ) - AREVA (Distance protection EPAC MICOMP442 hellip) - ICE (Over current protection NPID 800hellip) - SIEMENS (Distance protection 7SA 511 513 522 611) - REYROLLES (Differential protection DUOBIAS)

bull Test and setting of protective relays and checking the tripping circuits for Generators and

Substations belonging to Zaouia Petroleum Refinery (Libya)

bull Short circuit calculation selectivity study of protective relays by providing solutions for the

existing issues in PEC YEMEN Networks

bull Study and improvement of the existing protective system in close cooperation with Tractebel

Engineering

bull Technical Assistance for Independent Power Producers (IPP) Plant (Carthage Power

Company (CPC) Tunisia) regarding the maintenance and testing of protective relays

related to

- Generators - Main transformers - Auxiliaries - Etc

bull Technical Assistance testing and setting of protective relays at

- Steel ndashworks (Tunisia) - Cement ndashmarker (Tunisia) - Iron industries (Tunisia) - Chemical industries (Tunisia)

bull Commissioning and setting of protective relays at substations (High Medium and Low

voltages)

bull Renovation of the obsolete equipment (relays switchgear hellip)

bull Maintenance of the transmission lines and substations equipment

bull Cost-effective solutions establishment regarding the network issues (droop voltage over

voltage improvement of power factor etc)

30

ELECTRICAL DISTRIBUTION SYSTEM

Rural Electrification- Accomplished Projects

Contract Identification

Contract No 18 Technical Assistance and implementation of a Rural electrification project based upon SWER (Single Wire Earth Return) techniques

Award date 1998 Completion date 1999 Employerrsquos Name JIRAMA (JIRO SY RANO MALAGAS) Address

149 RUE RAINANDRIAMAMPANDRY Antananarivo BP 200 - MADAGASCAR

Main Tasks Performed

bull Training on SWER System bull Data collection needed for SWER System studies and implementation bull Finalization of technical studies and submission of report including

- Technical audit of the pilot project already in place - Technical description of the project - AdviseRecommendations on equipment specifications - Recommendations on possible changes in adjustment and coordination of electrical

protections

Contract Identification

Contract No 19 RWANDA Project (Phase 1) Implementation of a Pilot Rural Electrification Project based on Single-Phase with neutral to ground called MALT System 4000 Subscribers

Award date June 2008 Completion date June 2009

Employerrsquos Name

RECO ( former ELECTROGAZ) -RWANDA

Address BP 537 KIGALI -RWANA

Main Tasks performed

bull Study and Diagnosis of the existing Rwandan Power Distribution An inventory of the existing facilities including generation transmission and distribution systems was established

bull Implementation of a pilot rural electrification project based on MALT System Visit was arranged to some Tunisian rural regions and companies manufacturing electric equipment namely

- Transformers

- Iron poles

- Concrete supports

- Electric cables

- Electronic meters and

- MV and LV line accessories

31

Contract Identification

Contract No 20 Local Electrification study of Tambacounda and Kedougou departments Award date October 2002 Completion date March 2003 Customerrsquos name SENELEC Address ELECTRICAL COMPANY SENEGAL

Main Tasks Performed

bull Data Collection bull Socio-economic survey bull Technical economic and financial analysis bull Electricity market forecast (demand forecast (2003-2015)) bull Estimation of worksrsquo costs regarding medium voltage single-phase and tri-phase lines medium

and low voltage stations low voltage lines diesel micro-stations individual photovoltaic systems bull Technical and economic study related to different methods of supply including the solar as well as

the opportunity of introducing the single-phase system for the rural electrification bull Proposition for the public lighting and the management of photovoltaic systems bull Recommendations for the reinforcement of the existing stations and the existing networks to satisfy

the future demand due to the electrification of the new villages bull Tariff and profitability study bull Set up of the geographical maps and the low voltage electrification plan of the most important

villages (34 villages) bull Recommendations on privatizing power generation energy sector

Contract Identification Contract No 21 - Rural Electrification study of 80 villages in Comoros Isles

- Preparation of Tender Documents for the supply of equipment needed to the construction of 145 km MV lines 100 km LV lines and 80 MVLV stations

- Call for tenders evaluation of Bidders Award date November 2000 Completion date Dec 2002 Customerrsquos name

Ministry of Equipment Department of Energy and Water Resources

Address Moroni Avenue of the Democratic Republic of China

Main Tasks Performed

bull Data collection and visit of the existing electric utilities bull Situation analysis and proposal of electric infrastructure management solutions bull Electricity Demand Estimation and Forecasting bull Electric Calculation (Load Repartition Line Voltage Drop Losses and Voltage Drops

Calculations Short-Circuit Calculations Simulation of the Extension and Reinforcement of the Medium Voltage Networks Power System Stability Analysis Reactive Power Compensation

bull Low Voltage Studies for the Electrification of 80 villages bull RecommendationsSuggestions for the reinforcement of power generation utilities to satisfy

the future demand (by 2010) bull Electricity Tariffing study

- Review of electricity consumption patterns - Cost review - Review of tariff policies - Application and implementation of revised tariff levels

32

Contract Identification Contract Ndeg 22 Establishment and set up of a computerized accounting and budget system

Award date 1992 Completion date 1994 Customerrsquos name SOMELEC Address Nouakchott - MAURITANIA

Main Tasks Performed

bull Analytical accounting bull Bid evaluation bull Cash flow movements management bull Fixed assets management bull Centralizing bookkeeping bull Existing computer application interfaces update bull Transposition of the existing system to the new one bull Operation and maintenance Documents preparation bull Execution of the transposition of the existing system to the new one

Contract Identification Contract

No 23 Electricity sector reform technical assistance in the interim management of the ldquoCompagnie Energie Electrique du Togo ldquo(CEET)

Award date 41997

Completion date 122000

Employerrsquos Name Ministry of Mining Equipment transmission Mail and Telecommunications

Address TOGO

Main Tasks Performed

bull Technical assistance in the interim management of the CEET within the framework of the electricity sectorrsquos liberalization 1) termination of the current CEET management 2) analysis of the existing situation 3) interim management of the CEET prior to its privatization

bull Operation and maintenance of the electrical network for Lomeacute and its surrounding rural areas bull Electricity generation in isolated centers bull Electricity transmission and distribution bull Procurement and maintenance of new diesel production units bull Reduction of energy losses bull Customer management bull Increase in the number of Customers bull Accounting and billing bull Increase in payment recovery bull Call for tenders evaluation of proposals drafting of the technical annexes concerning the contracting

for a new independent operator (concession)

33

72 On-going and Under Bidding (UB) Projects

No Project Description Country

1 Training Center Update (on-going project) Republic of Congo BRAZZAVILLE

2 Master Plan elaboration in close cooperation with STUDI (Tunisia) (on-going project)

Republic of Senegal

3 Implementation of a Rural Electrification Project based on Single-Phase Four-Wires

with Neutral to Ground called MALT System (UB) Republic of Burkina Faso

4 Cost study connections to and extensions of electricity distribution networks

(UB)

Republic of Burkina Faso

5 Works Control and supervision of rural electrification of 33 communities in 4

regions of the Republic of Cameroon (UB) Republic of CAMEROUN

34

JUDICIOUS AND EFFICIENT ENERGY UTILIZATION

IS AT THE FOREFRONT OF OUR MINDS

35

Over the year 2008 STEG International Services (SIS) has widened its scope of activities to

include techno-economic studies and assistance in energy efficiency thereby providing support

to the national energy policy aiming at considering energy auditing energy efficiency energy

saving as a major priority target in Tunisiarsquos future energy strategic plan objectives In this

regard STEG International Services has carried out several projects including but not limited to

the following

80 Energy Efficiency

bull Performing obligatory periodical energy audits for industrial installations as well as energy audits on a consultancy basis

bull Assistance on projects involving energy efficiency bull Studies on energy efficiency of circuits hydraulic and thermal systems bull Upgrading energy management systems of industrial plants

81 Co-generation (Combined Heat and Power (CHP)) Studies

The main tasks performed included

bull Feasibility studies and project implementation assistance ndash RandaTunis

bull Assistance in electric utility restructuring from self power producer (electricity generation

only) to self-producing co-generatorsndash STSBEJATunisia

bull Technical assistance related to STEGrsquos grid connection with Co-generation plants in some

industrial units -SOTIPAPIER STS T-PAP and Carthago-GRE- Tunisia

82 Energy audits and energy efficiency

In any industry the three top operating expenses are often found to be energy (both electrical

and thermal) labour and materials Energy would invariably emerge as a top ranker and thus

energy management function constitutes a strategic area for cost reduction

Energy Audit will help to better understand how energy is used in any industry and in identifying

the areas where waste can occur and where scope for improvement exists In this regard the

Energy Audit would give a positive orientation to the energy cost reduction preventive

maintenance and quality control programs which are vital to production and utility activities Such

36

an audit program will help keep focus on variations which occur in the energy costs availability

and reliability of supply of energy decide on appropriate energy mix identify energy

conservation technologies retrofit for energy conservation equipment etc

Therefore SIS can carry out comprehensive assessment of techno-economic performance of

plants and equipment against the designed performance level or the industry best practice

aiming at optimizing consumption levels along with specific operating control targets

821 Samples of accomplished and on-going Energy Auditing projects

bull Energy Audit of the Liquefied Petroleum Gas (LPG) plant located in Gabegraves (Tunisia) with the assistance of Kvaerner Heurtey in 2001

bull Energy Performance Assessment of Rades and Sousse steam and Combined Cycle Power Plants as well as Bouchemma Menzel Bourguiba Korba Gas Turbines with the assistance of TRACTABEL and EDF in 2002

bull Energy Audit of Sousse Combined Cycle Power Plant with the assistance of CRA2E in 2007-2008

bull Periodic Performance Tests of Carthage Power Company (CPC) combined cycle an Impendent Power Producer (IPP) in Tunisia

37

SIS Future Commitments and Responsibilities

Endowed with a clear vision a sound project management and solid experiences and

know-how acquired by the parent company STEG through its various trades of over 48 years

SIS has put together a team of experts inndashline with its strategic intent- to be positioned as a

competitive and pre-eminent regional energy services company by spreading its expertise and

know-how throughout the African continent Arab countries and the rest of the world working on

a partnership basis with potential consultants andor the utilities of the respective countries

resulting in a keen focus and a strong sense of purpose

As part of its vision SIS management recognizes that it has responsibilities to all of its

stakeholders These include

Shareholders SIS will protect the investments of its shareholders and will provide an acceptable return on

investments through the application of its business principles Customers SIS will aim at optimizing its business activities through winning customers and maintaining

customerrsquos loyalty by offering them high quality services at competitive prices delivering on time

and supporting them with its management expertise

Employees SIS recognizes that its working employees are the key to its success and it nurtures loyalty

teamwork and trust between them SIS will strive to protect support and involve them in the

companyrsquos future to develop their skills and to reward them in line with the corporate values of

SISrsquos organization

Partners Suppliers Contractors and all External Contacts SIS will seek to treat all its partners suppliers contractors and other external stakeholders in a

consistently professional way and to ensure that their needs are fulfilled in every way possible

38

  • 72 On-going and Under Bidding (UB) Projects

24

25

SISrsquoS Experiences in Boilerrsquos Maintenance Work

Power plant location Boiler tech Details ampInspections

Rades A (ST) ST STEAM TURBINE Rades B (ST)

Unit 1 Unit 2 Unit 3 Unit 4

Manufacturer Mitsubishi H I Mitsubishi H I Ansaldo Energia Ansaldo Energia Type amp Model MHI CE RR

type out-door MHI CE RR type outdoor

AE RR type outdoor

AE RR type outdoor

Date of commissioning 1983 1984 1998 1999 MCR (th) 520000 520000 5335 5335

Steam conditions Pressure SHRH(bars) 1685 352 1685 352 1739 1739 Temperature( degC) 543 543 542 542

fuel Natural gas heavy Fuel Ndeg2

Natural gas heavy Fuel Ndeg2

Natural gas heavy Fuel Ndeg2

Natural gas heavy Fuel Ndeg2

Heating area Furnace(msup2) 5105 5105 5360 5360 Reheater (msup2) 3130 3130 1286 1286 Eco (msup2) 2600 2600 1556 1556

Fuel oil Burners type amp No 20 20 Y Ndeg 12 Y Ndeg 12 FDF type amp capacity ( Th) HC 591 HC 591 HC748 HC 748 IDF type amp capacity (Th) HC 640 HC 640 NA NA GRF type amp capacity ( Th) HC 500 HC 500 HC 300 HC 300

RegenAir Preheater Type Ljungstroumlm Ljungstroumlm Ljungstroumlm Ljungstroumlm No amp capacity 2 2 2 2 Heating surface(msup2) 12000 12000 18000 18000

Annual inspection No 20 20 10 10 Starting amp Completion dates

21 Days 21 days 21 days 21 days

Major overhaul No 04 04 01 01 Starting amp Completion dates

1221038843 days 611028854 days 56 days 59 days

Boiler conservation No 20 20 08 08 Boiler Rehabilitation No 0 0 0 0 Boiler Tube Acid cleaning No 01 01 01 01 ILA(Integrity Life Assessment)No 0 0 0 0

26

SISrsquos Experiences in Boilersrsquo Maintenance Work

Power plant location Boiler tech Details ampInspections

Sousse A (ST) Sousse B (CCPP)

Unitne1 Unitne 2 Unitne1 Unitne 2

Manufacturer SGP SGP STEIN INDUSTRY STEIN INDUSTRY Type amp Model Natural circulation Natural circulation Heat Recuperator Heat Recuperator Date of commissioning 1980 1980 1995 1995 MCR (th) 515 515 HP 182 BP 415 HP 182 BP 415 Steam conditions Pressure SHRH (bar) 16038 16038 HP 72 BP 66 HP 72 BP 66

Temperature (degC) 540degC 540degC HP 511 BP 213 HP 511 BP 213 fuel FUELGAZ FUELGAZ Gaz Gaz Heating area Furnace (m2 2080 ) 2080 HP evaporator 25251 LP evaporator 18627

Reheater (m2 1512 ) 1512 HP superheater 9418 LP superheater 2328 Eco (m2 2017 ) 2017 HP economizer 16834 13773 LP economizer 3060

Fuel oil Burners Type ampNo EVT8 EVT8 FDF type amp capacity R62250 7566 m3 R62250 7566 ms 3 s

GRF type amp capacity R62250 721 m3 R62250 721 ms 3 s

Regen Air Preheater

Type No amp capacity 2 220186 Nm3h 2 220186 Nm3h

Heating surface(m2) 2x924 2x924 Annual Inspection

No annually annually annually annually Starting amp completion dates 3 - 4 weeks 3 - 4 weeks 10 days 10 days

Major Overhaul No along with annual inspectioccediln along with annual inspectioccediln

Starting amp completion dates 3 - 4 weeks 3 - 4 weeks

Boiler Conservation No 3 2 Boiler Rehabilitation No Boiler Tube Acid Cleaning No 2 2 ILA (Integrity Life Assessment) No 1

27

SISrsquos Experiences in Boilersrsquo Maintenance Work

Power plant location Boiler tech Details ampInspections Unitne1 (ST) Unitne 2 (ST) Unitne 3 (ST) Unitne 4 (ST)

Manufacturer WALTHER Type amp Model WALTHER FN10 Natural Circulation Date of commissioning 05071965 01111965 22061968 20091968 MCR (th) 112 Steam conditions

Pressure 686 bar Temperature 510 degC

fuel Heavy fuel oil Ndeg2 light fuel oil

Heating area

Furnace (m2 540 m2 ) Reheater (m2 1542 m2 ) Eco (m2 480 m2 )

Fuel oil Burners Type ampNo SONVICO 4 FDF type amp capacity Centrifugal - 27 m3s IDF type amp capacity - - - - GRF type amp capacity - - - -

Regen Air Preheater Type Static LJUNGSTROM No amp capacity 1 1 1 1 Heating surface(m2) 7350 m2 -

Annual Inspection No every year until 1998 every year until

2005 every year until 1998

every year until 2005

Starting amp completion dates - - - -

Major Overhaul No 6 8 5 5 Starting amp completion dates - - - -

Boiler Conservation No - 2 - 2 Boiler Rehabilitation No 4 6 5 5 Boiler Tube Acid Cleaning No 0 0 0 0 ILA (Integrity Life Assessment) No 0 0 0 0

28

SISrsquos Experiences in Boilersrsquo Maintenance Work Power Plant Location

Boiler Tech Details ampInspections

Ghannouch (ST) Unitne1 (ST) Unitne 2

Manufacturer Stein Industrie Stein Industrie Type amp Model Natural circulation Natural circulation Date of commissioning 1972 1972 MCR (th) 120 120 Steam conditions Pressure SHRH (th) 70 bars 70 bars

Temperature 510 degC 510 degC fuel Natural GasHeavy fuel Natural GasHeavy fuel Heating area Furnace (m2 )

Reheater (m2 8880 dmsup3 ) 8880 dmsup3 Eco (m2 2400 dmsup3 ) 2400 dmsup3

Fuel oil Burners Type ampNo PILLARD GRC PILLARD GRC IDF type amp capacity GRF type amp capacity Regen Air Preheater Type Ljunstroumlm Ljunstroumlm

No amp capacity 140msup3h 140msup3h Heating surface(m2) _ _

Annual Inspection No 1 1 Starting amp completion dates 1 week 1 week

Major Overhaul No 15ans 15ans

Starting amp completion dates 2 months 2 months

Boiler Conservation No in case of being extended in case of being extended Boiler Rehabilitation No NO NO Boiler Tube Acid Cleaning No NO NO ILA (Integrity Life Assessment) No NO NO

29

ELECTRICAL TRANSMISSION SYSTEM

Accomplished Projects

bull Tests performed on Numerical relays manufactured by - ABB (Distance protection REL 316 ) - AREVA (Distance protection EPAC MICOMP442 hellip) - ICE (Over current protection NPID 800hellip) - SIEMENS (Distance protection 7SA 511 513 522 611) - REYROLLES (Differential protection DUOBIAS)

bull Test and setting of protective relays and checking the tripping circuits for Generators and

Substations belonging to Zaouia Petroleum Refinery (Libya)

bull Short circuit calculation selectivity study of protective relays by providing solutions for the

existing issues in PEC YEMEN Networks

bull Study and improvement of the existing protective system in close cooperation with Tractebel

Engineering

bull Technical Assistance for Independent Power Producers (IPP) Plant (Carthage Power

Company (CPC) Tunisia) regarding the maintenance and testing of protective relays

related to

- Generators - Main transformers - Auxiliaries - Etc

bull Technical Assistance testing and setting of protective relays at

- Steel ndashworks (Tunisia) - Cement ndashmarker (Tunisia) - Iron industries (Tunisia) - Chemical industries (Tunisia)

bull Commissioning and setting of protective relays at substations (High Medium and Low

voltages)

bull Renovation of the obsolete equipment (relays switchgear hellip)

bull Maintenance of the transmission lines and substations equipment

bull Cost-effective solutions establishment regarding the network issues (droop voltage over

voltage improvement of power factor etc)

30

ELECTRICAL DISTRIBUTION SYSTEM

Rural Electrification- Accomplished Projects

Contract Identification

Contract No 18 Technical Assistance and implementation of a Rural electrification project based upon SWER (Single Wire Earth Return) techniques

Award date 1998 Completion date 1999 Employerrsquos Name JIRAMA (JIRO SY RANO MALAGAS) Address

149 RUE RAINANDRIAMAMPANDRY Antananarivo BP 200 - MADAGASCAR

Main Tasks Performed

bull Training on SWER System bull Data collection needed for SWER System studies and implementation bull Finalization of technical studies and submission of report including

- Technical audit of the pilot project already in place - Technical description of the project - AdviseRecommendations on equipment specifications - Recommendations on possible changes in adjustment and coordination of electrical

protections

Contract Identification

Contract No 19 RWANDA Project (Phase 1) Implementation of a Pilot Rural Electrification Project based on Single-Phase with neutral to ground called MALT System 4000 Subscribers

Award date June 2008 Completion date June 2009

Employerrsquos Name

RECO ( former ELECTROGAZ) -RWANDA

Address BP 537 KIGALI -RWANA

Main Tasks performed

bull Study and Diagnosis of the existing Rwandan Power Distribution An inventory of the existing facilities including generation transmission and distribution systems was established

bull Implementation of a pilot rural electrification project based on MALT System Visit was arranged to some Tunisian rural regions and companies manufacturing electric equipment namely

- Transformers

- Iron poles

- Concrete supports

- Electric cables

- Electronic meters and

- MV and LV line accessories

31

Contract Identification

Contract No 20 Local Electrification study of Tambacounda and Kedougou departments Award date October 2002 Completion date March 2003 Customerrsquos name SENELEC Address ELECTRICAL COMPANY SENEGAL

Main Tasks Performed

bull Data Collection bull Socio-economic survey bull Technical economic and financial analysis bull Electricity market forecast (demand forecast (2003-2015)) bull Estimation of worksrsquo costs regarding medium voltage single-phase and tri-phase lines medium

and low voltage stations low voltage lines diesel micro-stations individual photovoltaic systems bull Technical and economic study related to different methods of supply including the solar as well as

the opportunity of introducing the single-phase system for the rural electrification bull Proposition for the public lighting and the management of photovoltaic systems bull Recommendations for the reinforcement of the existing stations and the existing networks to satisfy

the future demand due to the electrification of the new villages bull Tariff and profitability study bull Set up of the geographical maps and the low voltage electrification plan of the most important

villages (34 villages) bull Recommendations on privatizing power generation energy sector

Contract Identification Contract No 21 - Rural Electrification study of 80 villages in Comoros Isles

- Preparation of Tender Documents for the supply of equipment needed to the construction of 145 km MV lines 100 km LV lines and 80 MVLV stations

- Call for tenders evaluation of Bidders Award date November 2000 Completion date Dec 2002 Customerrsquos name

Ministry of Equipment Department of Energy and Water Resources

Address Moroni Avenue of the Democratic Republic of China

Main Tasks Performed

bull Data collection and visit of the existing electric utilities bull Situation analysis and proposal of electric infrastructure management solutions bull Electricity Demand Estimation and Forecasting bull Electric Calculation (Load Repartition Line Voltage Drop Losses and Voltage Drops

Calculations Short-Circuit Calculations Simulation of the Extension and Reinforcement of the Medium Voltage Networks Power System Stability Analysis Reactive Power Compensation

bull Low Voltage Studies for the Electrification of 80 villages bull RecommendationsSuggestions for the reinforcement of power generation utilities to satisfy

the future demand (by 2010) bull Electricity Tariffing study

- Review of electricity consumption patterns - Cost review - Review of tariff policies - Application and implementation of revised tariff levels

32

Contract Identification Contract Ndeg 22 Establishment and set up of a computerized accounting and budget system

Award date 1992 Completion date 1994 Customerrsquos name SOMELEC Address Nouakchott - MAURITANIA

Main Tasks Performed

bull Analytical accounting bull Bid evaluation bull Cash flow movements management bull Fixed assets management bull Centralizing bookkeeping bull Existing computer application interfaces update bull Transposition of the existing system to the new one bull Operation and maintenance Documents preparation bull Execution of the transposition of the existing system to the new one

Contract Identification Contract

No 23 Electricity sector reform technical assistance in the interim management of the ldquoCompagnie Energie Electrique du Togo ldquo(CEET)

Award date 41997

Completion date 122000

Employerrsquos Name Ministry of Mining Equipment transmission Mail and Telecommunications

Address TOGO

Main Tasks Performed

bull Technical assistance in the interim management of the CEET within the framework of the electricity sectorrsquos liberalization 1) termination of the current CEET management 2) analysis of the existing situation 3) interim management of the CEET prior to its privatization

bull Operation and maintenance of the electrical network for Lomeacute and its surrounding rural areas bull Electricity generation in isolated centers bull Electricity transmission and distribution bull Procurement and maintenance of new diesel production units bull Reduction of energy losses bull Customer management bull Increase in the number of Customers bull Accounting and billing bull Increase in payment recovery bull Call for tenders evaluation of proposals drafting of the technical annexes concerning the contracting

for a new independent operator (concession)

33

72 On-going and Under Bidding (UB) Projects

No Project Description Country

1 Training Center Update (on-going project) Republic of Congo BRAZZAVILLE

2 Master Plan elaboration in close cooperation with STUDI (Tunisia) (on-going project)

Republic of Senegal

3 Implementation of a Rural Electrification Project based on Single-Phase Four-Wires

with Neutral to Ground called MALT System (UB) Republic of Burkina Faso

4 Cost study connections to and extensions of electricity distribution networks

(UB)

Republic of Burkina Faso

5 Works Control and supervision of rural electrification of 33 communities in 4

regions of the Republic of Cameroon (UB) Republic of CAMEROUN

34

JUDICIOUS AND EFFICIENT ENERGY UTILIZATION

IS AT THE FOREFRONT OF OUR MINDS

35

Over the year 2008 STEG International Services (SIS) has widened its scope of activities to

include techno-economic studies and assistance in energy efficiency thereby providing support

to the national energy policy aiming at considering energy auditing energy efficiency energy

saving as a major priority target in Tunisiarsquos future energy strategic plan objectives In this

regard STEG International Services has carried out several projects including but not limited to

the following

80 Energy Efficiency

bull Performing obligatory periodical energy audits for industrial installations as well as energy audits on a consultancy basis

bull Assistance on projects involving energy efficiency bull Studies on energy efficiency of circuits hydraulic and thermal systems bull Upgrading energy management systems of industrial plants

81 Co-generation (Combined Heat and Power (CHP)) Studies

The main tasks performed included

bull Feasibility studies and project implementation assistance ndash RandaTunis

bull Assistance in electric utility restructuring from self power producer (electricity generation

only) to self-producing co-generatorsndash STSBEJATunisia

bull Technical assistance related to STEGrsquos grid connection with Co-generation plants in some

industrial units -SOTIPAPIER STS T-PAP and Carthago-GRE- Tunisia

82 Energy audits and energy efficiency

In any industry the three top operating expenses are often found to be energy (both electrical

and thermal) labour and materials Energy would invariably emerge as a top ranker and thus

energy management function constitutes a strategic area for cost reduction

Energy Audit will help to better understand how energy is used in any industry and in identifying

the areas where waste can occur and where scope for improvement exists In this regard the

Energy Audit would give a positive orientation to the energy cost reduction preventive

maintenance and quality control programs which are vital to production and utility activities Such

36

an audit program will help keep focus on variations which occur in the energy costs availability

and reliability of supply of energy decide on appropriate energy mix identify energy

conservation technologies retrofit for energy conservation equipment etc

Therefore SIS can carry out comprehensive assessment of techno-economic performance of

plants and equipment against the designed performance level or the industry best practice

aiming at optimizing consumption levels along with specific operating control targets

821 Samples of accomplished and on-going Energy Auditing projects

bull Energy Audit of the Liquefied Petroleum Gas (LPG) plant located in Gabegraves (Tunisia) with the assistance of Kvaerner Heurtey in 2001

bull Energy Performance Assessment of Rades and Sousse steam and Combined Cycle Power Plants as well as Bouchemma Menzel Bourguiba Korba Gas Turbines with the assistance of TRACTABEL and EDF in 2002

bull Energy Audit of Sousse Combined Cycle Power Plant with the assistance of CRA2E in 2007-2008

bull Periodic Performance Tests of Carthage Power Company (CPC) combined cycle an Impendent Power Producer (IPP) in Tunisia

37

SIS Future Commitments and Responsibilities

Endowed with a clear vision a sound project management and solid experiences and

know-how acquired by the parent company STEG through its various trades of over 48 years

SIS has put together a team of experts inndashline with its strategic intent- to be positioned as a

competitive and pre-eminent regional energy services company by spreading its expertise and

know-how throughout the African continent Arab countries and the rest of the world working on

a partnership basis with potential consultants andor the utilities of the respective countries

resulting in a keen focus and a strong sense of purpose

As part of its vision SIS management recognizes that it has responsibilities to all of its

stakeholders These include

Shareholders SIS will protect the investments of its shareholders and will provide an acceptable return on

investments through the application of its business principles Customers SIS will aim at optimizing its business activities through winning customers and maintaining

customerrsquos loyalty by offering them high quality services at competitive prices delivering on time

and supporting them with its management expertise

Employees SIS recognizes that its working employees are the key to its success and it nurtures loyalty

teamwork and trust between them SIS will strive to protect support and involve them in the

companyrsquos future to develop their skills and to reward them in line with the corporate values of

SISrsquos organization

Partners Suppliers Contractors and all External Contacts SIS will seek to treat all its partners suppliers contractors and other external stakeholders in a

consistently professional way and to ensure that their needs are fulfilled in every way possible

38

  • 72 On-going and Under Bidding (UB) Projects

25

SISrsquoS Experiences in Boilerrsquos Maintenance Work

Power plant location Boiler tech Details ampInspections

Rades A (ST) ST STEAM TURBINE Rades B (ST)

Unit 1 Unit 2 Unit 3 Unit 4

Manufacturer Mitsubishi H I Mitsubishi H I Ansaldo Energia Ansaldo Energia Type amp Model MHI CE RR

type out-door MHI CE RR type outdoor

AE RR type outdoor

AE RR type outdoor

Date of commissioning 1983 1984 1998 1999 MCR (th) 520000 520000 5335 5335

Steam conditions Pressure SHRH(bars) 1685 352 1685 352 1739 1739 Temperature( degC) 543 543 542 542

fuel Natural gas heavy Fuel Ndeg2

Natural gas heavy Fuel Ndeg2

Natural gas heavy Fuel Ndeg2

Natural gas heavy Fuel Ndeg2

Heating area Furnace(msup2) 5105 5105 5360 5360 Reheater (msup2) 3130 3130 1286 1286 Eco (msup2) 2600 2600 1556 1556

Fuel oil Burners type amp No 20 20 Y Ndeg 12 Y Ndeg 12 FDF type amp capacity ( Th) HC 591 HC 591 HC748 HC 748 IDF type amp capacity (Th) HC 640 HC 640 NA NA GRF type amp capacity ( Th) HC 500 HC 500 HC 300 HC 300

RegenAir Preheater Type Ljungstroumlm Ljungstroumlm Ljungstroumlm Ljungstroumlm No amp capacity 2 2 2 2 Heating surface(msup2) 12000 12000 18000 18000

Annual inspection No 20 20 10 10 Starting amp Completion dates

21 Days 21 days 21 days 21 days

Major overhaul No 04 04 01 01 Starting amp Completion dates

1221038843 days 611028854 days 56 days 59 days

Boiler conservation No 20 20 08 08 Boiler Rehabilitation No 0 0 0 0 Boiler Tube Acid cleaning No 01 01 01 01 ILA(Integrity Life Assessment)No 0 0 0 0

26

SISrsquos Experiences in Boilersrsquo Maintenance Work

Power plant location Boiler tech Details ampInspections

Sousse A (ST) Sousse B (CCPP)

Unitne1 Unitne 2 Unitne1 Unitne 2

Manufacturer SGP SGP STEIN INDUSTRY STEIN INDUSTRY Type amp Model Natural circulation Natural circulation Heat Recuperator Heat Recuperator Date of commissioning 1980 1980 1995 1995 MCR (th) 515 515 HP 182 BP 415 HP 182 BP 415 Steam conditions Pressure SHRH (bar) 16038 16038 HP 72 BP 66 HP 72 BP 66

Temperature (degC) 540degC 540degC HP 511 BP 213 HP 511 BP 213 fuel FUELGAZ FUELGAZ Gaz Gaz Heating area Furnace (m2 2080 ) 2080 HP evaporator 25251 LP evaporator 18627

Reheater (m2 1512 ) 1512 HP superheater 9418 LP superheater 2328 Eco (m2 2017 ) 2017 HP economizer 16834 13773 LP economizer 3060

Fuel oil Burners Type ampNo EVT8 EVT8 FDF type amp capacity R62250 7566 m3 R62250 7566 ms 3 s

GRF type amp capacity R62250 721 m3 R62250 721 ms 3 s

Regen Air Preheater

Type No amp capacity 2 220186 Nm3h 2 220186 Nm3h

Heating surface(m2) 2x924 2x924 Annual Inspection

No annually annually annually annually Starting amp completion dates 3 - 4 weeks 3 - 4 weeks 10 days 10 days

Major Overhaul No along with annual inspectioccediln along with annual inspectioccediln

Starting amp completion dates 3 - 4 weeks 3 - 4 weeks

Boiler Conservation No 3 2 Boiler Rehabilitation No Boiler Tube Acid Cleaning No 2 2 ILA (Integrity Life Assessment) No 1

27

SISrsquos Experiences in Boilersrsquo Maintenance Work

Power plant location Boiler tech Details ampInspections Unitne1 (ST) Unitne 2 (ST) Unitne 3 (ST) Unitne 4 (ST)

Manufacturer WALTHER Type amp Model WALTHER FN10 Natural Circulation Date of commissioning 05071965 01111965 22061968 20091968 MCR (th) 112 Steam conditions

Pressure 686 bar Temperature 510 degC

fuel Heavy fuel oil Ndeg2 light fuel oil

Heating area

Furnace (m2 540 m2 ) Reheater (m2 1542 m2 ) Eco (m2 480 m2 )

Fuel oil Burners Type ampNo SONVICO 4 FDF type amp capacity Centrifugal - 27 m3s IDF type amp capacity - - - - GRF type amp capacity - - - -

Regen Air Preheater Type Static LJUNGSTROM No amp capacity 1 1 1 1 Heating surface(m2) 7350 m2 -

Annual Inspection No every year until 1998 every year until

2005 every year until 1998

every year until 2005

Starting amp completion dates - - - -

Major Overhaul No 6 8 5 5 Starting amp completion dates - - - -

Boiler Conservation No - 2 - 2 Boiler Rehabilitation No 4 6 5 5 Boiler Tube Acid Cleaning No 0 0 0 0 ILA (Integrity Life Assessment) No 0 0 0 0

28

SISrsquos Experiences in Boilersrsquo Maintenance Work Power Plant Location

Boiler Tech Details ampInspections

Ghannouch (ST) Unitne1 (ST) Unitne 2

Manufacturer Stein Industrie Stein Industrie Type amp Model Natural circulation Natural circulation Date of commissioning 1972 1972 MCR (th) 120 120 Steam conditions Pressure SHRH (th) 70 bars 70 bars

Temperature 510 degC 510 degC fuel Natural GasHeavy fuel Natural GasHeavy fuel Heating area Furnace (m2 )

Reheater (m2 8880 dmsup3 ) 8880 dmsup3 Eco (m2 2400 dmsup3 ) 2400 dmsup3

Fuel oil Burners Type ampNo PILLARD GRC PILLARD GRC IDF type amp capacity GRF type amp capacity Regen Air Preheater Type Ljunstroumlm Ljunstroumlm

No amp capacity 140msup3h 140msup3h Heating surface(m2) _ _

Annual Inspection No 1 1 Starting amp completion dates 1 week 1 week

Major Overhaul No 15ans 15ans

Starting amp completion dates 2 months 2 months

Boiler Conservation No in case of being extended in case of being extended Boiler Rehabilitation No NO NO Boiler Tube Acid Cleaning No NO NO ILA (Integrity Life Assessment) No NO NO

29

ELECTRICAL TRANSMISSION SYSTEM

Accomplished Projects

bull Tests performed on Numerical relays manufactured by - ABB (Distance protection REL 316 ) - AREVA (Distance protection EPAC MICOMP442 hellip) - ICE (Over current protection NPID 800hellip) - SIEMENS (Distance protection 7SA 511 513 522 611) - REYROLLES (Differential protection DUOBIAS)

bull Test and setting of protective relays and checking the tripping circuits for Generators and

Substations belonging to Zaouia Petroleum Refinery (Libya)

bull Short circuit calculation selectivity study of protective relays by providing solutions for the

existing issues in PEC YEMEN Networks

bull Study and improvement of the existing protective system in close cooperation with Tractebel

Engineering

bull Technical Assistance for Independent Power Producers (IPP) Plant (Carthage Power

Company (CPC) Tunisia) regarding the maintenance and testing of protective relays

related to

- Generators - Main transformers - Auxiliaries - Etc

bull Technical Assistance testing and setting of protective relays at

- Steel ndashworks (Tunisia) - Cement ndashmarker (Tunisia) - Iron industries (Tunisia) - Chemical industries (Tunisia)

bull Commissioning and setting of protective relays at substations (High Medium and Low

voltages)

bull Renovation of the obsolete equipment (relays switchgear hellip)

bull Maintenance of the transmission lines and substations equipment

bull Cost-effective solutions establishment regarding the network issues (droop voltage over

voltage improvement of power factor etc)

30

ELECTRICAL DISTRIBUTION SYSTEM

Rural Electrification- Accomplished Projects

Contract Identification

Contract No 18 Technical Assistance and implementation of a Rural electrification project based upon SWER (Single Wire Earth Return) techniques

Award date 1998 Completion date 1999 Employerrsquos Name JIRAMA (JIRO SY RANO MALAGAS) Address

149 RUE RAINANDRIAMAMPANDRY Antananarivo BP 200 - MADAGASCAR

Main Tasks Performed

bull Training on SWER System bull Data collection needed for SWER System studies and implementation bull Finalization of technical studies and submission of report including

- Technical audit of the pilot project already in place - Technical description of the project - AdviseRecommendations on equipment specifications - Recommendations on possible changes in adjustment and coordination of electrical

protections

Contract Identification

Contract No 19 RWANDA Project (Phase 1) Implementation of a Pilot Rural Electrification Project based on Single-Phase with neutral to ground called MALT System 4000 Subscribers

Award date June 2008 Completion date June 2009

Employerrsquos Name

RECO ( former ELECTROGAZ) -RWANDA

Address BP 537 KIGALI -RWANA

Main Tasks performed

bull Study and Diagnosis of the existing Rwandan Power Distribution An inventory of the existing facilities including generation transmission and distribution systems was established

bull Implementation of a pilot rural electrification project based on MALT System Visit was arranged to some Tunisian rural regions and companies manufacturing electric equipment namely

- Transformers

- Iron poles

- Concrete supports

- Electric cables

- Electronic meters and

- MV and LV line accessories

31

Contract Identification

Contract No 20 Local Electrification study of Tambacounda and Kedougou departments Award date October 2002 Completion date March 2003 Customerrsquos name SENELEC Address ELECTRICAL COMPANY SENEGAL

Main Tasks Performed

bull Data Collection bull Socio-economic survey bull Technical economic and financial analysis bull Electricity market forecast (demand forecast (2003-2015)) bull Estimation of worksrsquo costs regarding medium voltage single-phase and tri-phase lines medium

and low voltage stations low voltage lines diesel micro-stations individual photovoltaic systems bull Technical and economic study related to different methods of supply including the solar as well as

the opportunity of introducing the single-phase system for the rural electrification bull Proposition for the public lighting and the management of photovoltaic systems bull Recommendations for the reinforcement of the existing stations and the existing networks to satisfy

the future demand due to the electrification of the new villages bull Tariff and profitability study bull Set up of the geographical maps and the low voltage electrification plan of the most important

villages (34 villages) bull Recommendations on privatizing power generation energy sector

Contract Identification Contract No 21 - Rural Electrification study of 80 villages in Comoros Isles

- Preparation of Tender Documents for the supply of equipment needed to the construction of 145 km MV lines 100 km LV lines and 80 MVLV stations

- Call for tenders evaluation of Bidders Award date November 2000 Completion date Dec 2002 Customerrsquos name

Ministry of Equipment Department of Energy and Water Resources

Address Moroni Avenue of the Democratic Republic of China

Main Tasks Performed

bull Data collection and visit of the existing electric utilities bull Situation analysis and proposal of electric infrastructure management solutions bull Electricity Demand Estimation and Forecasting bull Electric Calculation (Load Repartition Line Voltage Drop Losses and Voltage Drops

Calculations Short-Circuit Calculations Simulation of the Extension and Reinforcement of the Medium Voltage Networks Power System Stability Analysis Reactive Power Compensation

bull Low Voltage Studies for the Electrification of 80 villages bull RecommendationsSuggestions for the reinforcement of power generation utilities to satisfy

the future demand (by 2010) bull Electricity Tariffing study

- Review of electricity consumption patterns - Cost review - Review of tariff policies - Application and implementation of revised tariff levels

32

Contract Identification Contract Ndeg 22 Establishment and set up of a computerized accounting and budget system

Award date 1992 Completion date 1994 Customerrsquos name SOMELEC Address Nouakchott - MAURITANIA

Main Tasks Performed

bull Analytical accounting bull Bid evaluation bull Cash flow movements management bull Fixed assets management bull Centralizing bookkeeping bull Existing computer application interfaces update bull Transposition of the existing system to the new one bull Operation and maintenance Documents preparation bull Execution of the transposition of the existing system to the new one

Contract Identification Contract

No 23 Electricity sector reform technical assistance in the interim management of the ldquoCompagnie Energie Electrique du Togo ldquo(CEET)

Award date 41997

Completion date 122000

Employerrsquos Name Ministry of Mining Equipment transmission Mail and Telecommunications

Address TOGO

Main Tasks Performed

bull Technical assistance in the interim management of the CEET within the framework of the electricity sectorrsquos liberalization 1) termination of the current CEET management 2) analysis of the existing situation 3) interim management of the CEET prior to its privatization

bull Operation and maintenance of the electrical network for Lomeacute and its surrounding rural areas bull Electricity generation in isolated centers bull Electricity transmission and distribution bull Procurement and maintenance of new diesel production units bull Reduction of energy losses bull Customer management bull Increase in the number of Customers bull Accounting and billing bull Increase in payment recovery bull Call for tenders evaluation of proposals drafting of the technical annexes concerning the contracting

for a new independent operator (concession)

33

72 On-going and Under Bidding (UB) Projects

No Project Description Country

1 Training Center Update (on-going project) Republic of Congo BRAZZAVILLE

2 Master Plan elaboration in close cooperation with STUDI (Tunisia) (on-going project)

Republic of Senegal

3 Implementation of a Rural Electrification Project based on Single-Phase Four-Wires

with Neutral to Ground called MALT System (UB) Republic of Burkina Faso

4 Cost study connections to and extensions of electricity distribution networks

(UB)

Republic of Burkina Faso

5 Works Control and supervision of rural electrification of 33 communities in 4

regions of the Republic of Cameroon (UB) Republic of CAMEROUN

34

JUDICIOUS AND EFFICIENT ENERGY UTILIZATION

IS AT THE FOREFRONT OF OUR MINDS

35

Over the year 2008 STEG International Services (SIS) has widened its scope of activities to

include techno-economic studies and assistance in energy efficiency thereby providing support

to the national energy policy aiming at considering energy auditing energy efficiency energy

saving as a major priority target in Tunisiarsquos future energy strategic plan objectives In this

regard STEG International Services has carried out several projects including but not limited to

the following

80 Energy Efficiency

bull Performing obligatory periodical energy audits for industrial installations as well as energy audits on a consultancy basis

bull Assistance on projects involving energy efficiency bull Studies on energy efficiency of circuits hydraulic and thermal systems bull Upgrading energy management systems of industrial plants

81 Co-generation (Combined Heat and Power (CHP)) Studies

The main tasks performed included

bull Feasibility studies and project implementation assistance ndash RandaTunis

bull Assistance in electric utility restructuring from self power producer (electricity generation

only) to self-producing co-generatorsndash STSBEJATunisia

bull Technical assistance related to STEGrsquos grid connection with Co-generation plants in some

industrial units -SOTIPAPIER STS T-PAP and Carthago-GRE- Tunisia

82 Energy audits and energy efficiency

In any industry the three top operating expenses are often found to be energy (both electrical

and thermal) labour and materials Energy would invariably emerge as a top ranker and thus

energy management function constitutes a strategic area for cost reduction

Energy Audit will help to better understand how energy is used in any industry and in identifying

the areas where waste can occur and where scope for improvement exists In this regard the

Energy Audit would give a positive orientation to the energy cost reduction preventive

maintenance and quality control programs which are vital to production and utility activities Such

36

an audit program will help keep focus on variations which occur in the energy costs availability

and reliability of supply of energy decide on appropriate energy mix identify energy

conservation technologies retrofit for energy conservation equipment etc

Therefore SIS can carry out comprehensive assessment of techno-economic performance of

plants and equipment against the designed performance level or the industry best practice

aiming at optimizing consumption levels along with specific operating control targets

821 Samples of accomplished and on-going Energy Auditing projects

bull Energy Audit of the Liquefied Petroleum Gas (LPG) plant located in Gabegraves (Tunisia) with the assistance of Kvaerner Heurtey in 2001

bull Energy Performance Assessment of Rades and Sousse steam and Combined Cycle Power Plants as well as Bouchemma Menzel Bourguiba Korba Gas Turbines with the assistance of TRACTABEL and EDF in 2002

bull Energy Audit of Sousse Combined Cycle Power Plant with the assistance of CRA2E in 2007-2008

bull Periodic Performance Tests of Carthage Power Company (CPC) combined cycle an Impendent Power Producer (IPP) in Tunisia

37

SIS Future Commitments and Responsibilities

Endowed with a clear vision a sound project management and solid experiences and

know-how acquired by the parent company STEG through its various trades of over 48 years

SIS has put together a team of experts inndashline with its strategic intent- to be positioned as a

competitive and pre-eminent regional energy services company by spreading its expertise and

know-how throughout the African continent Arab countries and the rest of the world working on

a partnership basis with potential consultants andor the utilities of the respective countries

resulting in a keen focus and a strong sense of purpose

As part of its vision SIS management recognizes that it has responsibilities to all of its

stakeholders These include

Shareholders SIS will protect the investments of its shareholders and will provide an acceptable return on

investments through the application of its business principles Customers SIS will aim at optimizing its business activities through winning customers and maintaining

customerrsquos loyalty by offering them high quality services at competitive prices delivering on time

and supporting them with its management expertise

Employees SIS recognizes that its working employees are the key to its success and it nurtures loyalty

teamwork and trust between them SIS will strive to protect support and involve them in the

companyrsquos future to develop their skills and to reward them in line with the corporate values of

SISrsquos organization

Partners Suppliers Contractors and all External Contacts SIS will seek to treat all its partners suppliers contractors and other external stakeholders in a

consistently professional way and to ensure that their needs are fulfilled in every way possible

38

  • 72 On-going and Under Bidding (UB) Projects

26

SISrsquos Experiences in Boilersrsquo Maintenance Work

Power plant location Boiler tech Details ampInspections

Sousse A (ST) Sousse B (CCPP)

Unitne1 Unitne 2 Unitne1 Unitne 2

Manufacturer SGP SGP STEIN INDUSTRY STEIN INDUSTRY Type amp Model Natural circulation Natural circulation Heat Recuperator Heat Recuperator Date of commissioning 1980 1980 1995 1995 MCR (th) 515 515 HP 182 BP 415 HP 182 BP 415 Steam conditions Pressure SHRH (bar) 16038 16038 HP 72 BP 66 HP 72 BP 66

Temperature (degC) 540degC 540degC HP 511 BP 213 HP 511 BP 213 fuel FUELGAZ FUELGAZ Gaz Gaz Heating area Furnace (m2 2080 ) 2080 HP evaporator 25251 LP evaporator 18627

Reheater (m2 1512 ) 1512 HP superheater 9418 LP superheater 2328 Eco (m2 2017 ) 2017 HP economizer 16834 13773 LP economizer 3060

Fuel oil Burners Type ampNo EVT8 EVT8 FDF type amp capacity R62250 7566 m3 R62250 7566 ms 3 s

GRF type amp capacity R62250 721 m3 R62250 721 ms 3 s

Regen Air Preheater

Type No amp capacity 2 220186 Nm3h 2 220186 Nm3h

Heating surface(m2) 2x924 2x924 Annual Inspection

No annually annually annually annually Starting amp completion dates 3 - 4 weeks 3 - 4 weeks 10 days 10 days

Major Overhaul No along with annual inspectioccediln along with annual inspectioccediln

Starting amp completion dates 3 - 4 weeks 3 - 4 weeks

Boiler Conservation No 3 2 Boiler Rehabilitation No Boiler Tube Acid Cleaning No 2 2 ILA (Integrity Life Assessment) No 1

27

SISrsquos Experiences in Boilersrsquo Maintenance Work

Power plant location Boiler tech Details ampInspections Unitne1 (ST) Unitne 2 (ST) Unitne 3 (ST) Unitne 4 (ST)

Manufacturer WALTHER Type amp Model WALTHER FN10 Natural Circulation Date of commissioning 05071965 01111965 22061968 20091968 MCR (th) 112 Steam conditions

Pressure 686 bar Temperature 510 degC

fuel Heavy fuel oil Ndeg2 light fuel oil

Heating area

Furnace (m2 540 m2 ) Reheater (m2 1542 m2 ) Eco (m2 480 m2 )

Fuel oil Burners Type ampNo SONVICO 4 FDF type amp capacity Centrifugal - 27 m3s IDF type amp capacity - - - - GRF type amp capacity - - - -

Regen Air Preheater Type Static LJUNGSTROM No amp capacity 1 1 1 1 Heating surface(m2) 7350 m2 -

Annual Inspection No every year until 1998 every year until

2005 every year until 1998

every year until 2005

Starting amp completion dates - - - -

Major Overhaul No 6 8 5 5 Starting amp completion dates - - - -

Boiler Conservation No - 2 - 2 Boiler Rehabilitation No 4 6 5 5 Boiler Tube Acid Cleaning No 0 0 0 0 ILA (Integrity Life Assessment) No 0 0 0 0

28

SISrsquos Experiences in Boilersrsquo Maintenance Work Power Plant Location

Boiler Tech Details ampInspections

Ghannouch (ST) Unitne1 (ST) Unitne 2

Manufacturer Stein Industrie Stein Industrie Type amp Model Natural circulation Natural circulation Date of commissioning 1972 1972 MCR (th) 120 120 Steam conditions Pressure SHRH (th) 70 bars 70 bars

Temperature 510 degC 510 degC fuel Natural GasHeavy fuel Natural GasHeavy fuel Heating area Furnace (m2 )

Reheater (m2 8880 dmsup3 ) 8880 dmsup3 Eco (m2 2400 dmsup3 ) 2400 dmsup3

Fuel oil Burners Type ampNo PILLARD GRC PILLARD GRC IDF type amp capacity GRF type amp capacity Regen Air Preheater Type Ljunstroumlm Ljunstroumlm

No amp capacity 140msup3h 140msup3h Heating surface(m2) _ _

Annual Inspection No 1 1 Starting amp completion dates 1 week 1 week

Major Overhaul No 15ans 15ans

Starting amp completion dates 2 months 2 months

Boiler Conservation No in case of being extended in case of being extended Boiler Rehabilitation No NO NO Boiler Tube Acid Cleaning No NO NO ILA (Integrity Life Assessment) No NO NO

29

ELECTRICAL TRANSMISSION SYSTEM

Accomplished Projects

bull Tests performed on Numerical relays manufactured by - ABB (Distance protection REL 316 ) - AREVA (Distance protection EPAC MICOMP442 hellip) - ICE (Over current protection NPID 800hellip) - SIEMENS (Distance protection 7SA 511 513 522 611) - REYROLLES (Differential protection DUOBIAS)

bull Test and setting of protective relays and checking the tripping circuits for Generators and

Substations belonging to Zaouia Petroleum Refinery (Libya)

bull Short circuit calculation selectivity study of protective relays by providing solutions for the

existing issues in PEC YEMEN Networks

bull Study and improvement of the existing protective system in close cooperation with Tractebel

Engineering

bull Technical Assistance for Independent Power Producers (IPP) Plant (Carthage Power

Company (CPC) Tunisia) regarding the maintenance and testing of protective relays

related to

- Generators - Main transformers - Auxiliaries - Etc

bull Technical Assistance testing and setting of protective relays at

- Steel ndashworks (Tunisia) - Cement ndashmarker (Tunisia) - Iron industries (Tunisia) - Chemical industries (Tunisia)

bull Commissioning and setting of protective relays at substations (High Medium and Low

voltages)

bull Renovation of the obsolete equipment (relays switchgear hellip)

bull Maintenance of the transmission lines and substations equipment

bull Cost-effective solutions establishment regarding the network issues (droop voltage over

voltage improvement of power factor etc)

30

ELECTRICAL DISTRIBUTION SYSTEM

Rural Electrification- Accomplished Projects

Contract Identification

Contract No 18 Technical Assistance and implementation of a Rural electrification project based upon SWER (Single Wire Earth Return) techniques

Award date 1998 Completion date 1999 Employerrsquos Name JIRAMA (JIRO SY RANO MALAGAS) Address

149 RUE RAINANDRIAMAMPANDRY Antananarivo BP 200 - MADAGASCAR

Main Tasks Performed

bull Training on SWER System bull Data collection needed for SWER System studies and implementation bull Finalization of technical studies and submission of report including

- Technical audit of the pilot project already in place - Technical description of the project - AdviseRecommendations on equipment specifications - Recommendations on possible changes in adjustment and coordination of electrical

protections

Contract Identification

Contract No 19 RWANDA Project (Phase 1) Implementation of a Pilot Rural Electrification Project based on Single-Phase with neutral to ground called MALT System 4000 Subscribers

Award date June 2008 Completion date June 2009

Employerrsquos Name

RECO ( former ELECTROGAZ) -RWANDA

Address BP 537 KIGALI -RWANA

Main Tasks performed

bull Study and Diagnosis of the existing Rwandan Power Distribution An inventory of the existing facilities including generation transmission and distribution systems was established

bull Implementation of a pilot rural electrification project based on MALT System Visit was arranged to some Tunisian rural regions and companies manufacturing electric equipment namely

- Transformers

- Iron poles

- Concrete supports

- Electric cables

- Electronic meters and

- MV and LV line accessories

31

Contract Identification

Contract No 20 Local Electrification study of Tambacounda and Kedougou departments Award date October 2002 Completion date March 2003 Customerrsquos name SENELEC Address ELECTRICAL COMPANY SENEGAL

Main Tasks Performed

bull Data Collection bull Socio-economic survey bull Technical economic and financial analysis bull Electricity market forecast (demand forecast (2003-2015)) bull Estimation of worksrsquo costs regarding medium voltage single-phase and tri-phase lines medium

and low voltage stations low voltage lines diesel micro-stations individual photovoltaic systems bull Technical and economic study related to different methods of supply including the solar as well as

the opportunity of introducing the single-phase system for the rural electrification bull Proposition for the public lighting and the management of photovoltaic systems bull Recommendations for the reinforcement of the existing stations and the existing networks to satisfy

the future demand due to the electrification of the new villages bull Tariff and profitability study bull Set up of the geographical maps and the low voltage electrification plan of the most important

villages (34 villages) bull Recommendations on privatizing power generation energy sector

Contract Identification Contract No 21 - Rural Electrification study of 80 villages in Comoros Isles

- Preparation of Tender Documents for the supply of equipment needed to the construction of 145 km MV lines 100 km LV lines and 80 MVLV stations

- Call for tenders evaluation of Bidders Award date November 2000 Completion date Dec 2002 Customerrsquos name

Ministry of Equipment Department of Energy and Water Resources

Address Moroni Avenue of the Democratic Republic of China

Main Tasks Performed

bull Data collection and visit of the existing electric utilities bull Situation analysis and proposal of electric infrastructure management solutions bull Electricity Demand Estimation and Forecasting bull Electric Calculation (Load Repartition Line Voltage Drop Losses and Voltage Drops

Calculations Short-Circuit Calculations Simulation of the Extension and Reinforcement of the Medium Voltage Networks Power System Stability Analysis Reactive Power Compensation

bull Low Voltage Studies for the Electrification of 80 villages bull RecommendationsSuggestions for the reinforcement of power generation utilities to satisfy

the future demand (by 2010) bull Electricity Tariffing study

- Review of electricity consumption patterns - Cost review - Review of tariff policies - Application and implementation of revised tariff levels

32

Contract Identification Contract Ndeg 22 Establishment and set up of a computerized accounting and budget system

Award date 1992 Completion date 1994 Customerrsquos name SOMELEC Address Nouakchott - MAURITANIA

Main Tasks Performed

bull Analytical accounting bull Bid evaluation bull Cash flow movements management bull Fixed assets management bull Centralizing bookkeeping bull Existing computer application interfaces update bull Transposition of the existing system to the new one bull Operation and maintenance Documents preparation bull Execution of the transposition of the existing system to the new one

Contract Identification Contract

No 23 Electricity sector reform technical assistance in the interim management of the ldquoCompagnie Energie Electrique du Togo ldquo(CEET)

Award date 41997

Completion date 122000

Employerrsquos Name Ministry of Mining Equipment transmission Mail and Telecommunications

Address TOGO

Main Tasks Performed

bull Technical assistance in the interim management of the CEET within the framework of the electricity sectorrsquos liberalization 1) termination of the current CEET management 2) analysis of the existing situation 3) interim management of the CEET prior to its privatization

bull Operation and maintenance of the electrical network for Lomeacute and its surrounding rural areas bull Electricity generation in isolated centers bull Electricity transmission and distribution bull Procurement and maintenance of new diesel production units bull Reduction of energy losses bull Customer management bull Increase in the number of Customers bull Accounting and billing bull Increase in payment recovery bull Call for tenders evaluation of proposals drafting of the technical annexes concerning the contracting

for a new independent operator (concession)

33

72 On-going and Under Bidding (UB) Projects

No Project Description Country

1 Training Center Update (on-going project) Republic of Congo BRAZZAVILLE

2 Master Plan elaboration in close cooperation with STUDI (Tunisia) (on-going project)

Republic of Senegal

3 Implementation of a Rural Electrification Project based on Single-Phase Four-Wires

with Neutral to Ground called MALT System (UB) Republic of Burkina Faso

4 Cost study connections to and extensions of electricity distribution networks

(UB)

Republic of Burkina Faso

5 Works Control and supervision of rural electrification of 33 communities in 4

regions of the Republic of Cameroon (UB) Republic of CAMEROUN

34

JUDICIOUS AND EFFICIENT ENERGY UTILIZATION

IS AT THE FOREFRONT OF OUR MINDS

35

Over the year 2008 STEG International Services (SIS) has widened its scope of activities to

include techno-economic studies and assistance in energy efficiency thereby providing support

to the national energy policy aiming at considering energy auditing energy efficiency energy

saving as a major priority target in Tunisiarsquos future energy strategic plan objectives In this

regard STEG International Services has carried out several projects including but not limited to

the following

80 Energy Efficiency

bull Performing obligatory periodical energy audits for industrial installations as well as energy audits on a consultancy basis

bull Assistance on projects involving energy efficiency bull Studies on energy efficiency of circuits hydraulic and thermal systems bull Upgrading energy management systems of industrial plants

81 Co-generation (Combined Heat and Power (CHP)) Studies

The main tasks performed included

bull Feasibility studies and project implementation assistance ndash RandaTunis

bull Assistance in electric utility restructuring from self power producer (electricity generation

only) to self-producing co-generatorsndash STSBEJATunisia

bull Technical assistance related to STEGrsquos grid connection with Co-generation plants in some

industrial units -SOTIPAPIER STS T-PAP and Carthago-GRE- Tunisia

82 Energy audits and energy efficiency

In any industry the three top operating expenses are often found to be energy (both electrical

and thermal) labour and materials Energy would invariably emerge as a top ranker and thus

energy management function constitutes a strategic area for cost reduction

Energy Audit will help to better understand how energy is used in any industry and in identifying

the areas where waste can occur and where scope for improvement exists In this regard the

Energy Audit would give a positive orientation to the energy cost reduction preventive

maintenance and quality control programs which are vital to production and utility activities Such

36

an audit program will help keep focus on variations which occur in the energy costs availability

and reliability of supply of energy decide on appropriate energy mix identify energy

conservation technologies retrofit for energy conservation equipment etc

Therefore SIS can carry out comprehensive assessment of techno-economic performance of

plants and equipment against the designed performance level or the industry best practice

aiming at optimizing consumption levels along with specific operating control targets

821 Samples of accomplished and on-going Energy Auditing projects

bull Energy Audit of the Liquefied Petroleum Gas (LPG) plant located in Gabegraves (Tunisia) with the assistance of Kvaerner Heurtey in 2001

bull Energy Performance Assessment of Rades and Sousse steam and Combined Cycle Power Plants as well as Bouchemma Menzel Bourguiba Korba Gas Turbines with the assistance of TRACTABEL and EDF in 2002

bull Energy Audit of Sousse Combined Cycle Power Plant with the assistance of CRA2E in 2007-2008

bull Periodic Performance Tests of Carthage Power Company (CPC) combined cycle an Impendent Power Producer (IPP) in Tunisia

37

SIS Future Commitments and Responsibilities

Endowed with a clear vision a sound project management and solid experiences and

know-how acquired by the parent company STEG through its various trades of over 48 years

SIS has put together a team of experts inndashline with its strategic intent- to be positioned as a

competitive and pre-eminent regional energy services company by spreading its expertise and

know-how throughout the African continent Arab countries and the rest of the world working on

a partnership basis with potential consultants andor the utilities of the respective countries

resulting in a keen focus and a strong sense of purpose

As part of its vision SIS management recognizes that it has responsibilities to all of its

stakeholders These include

Shareholders SIS will protect the investments of its shareholders and will provide an acceptable return on

investments through the application of its business principles Customers SIS will aim at optimizing its business activities through winning customers and maintaining

customerrsquos loyalty by offering them high quality services at competitive prices delivering on time

and supporting them with its management expertise

Employees SIS recognizes that its working employees are the key to its success and it nurtures loyalty

teamwork and trust between them SIS will strive to protect support and involve them in the

companyrsquos future to develop their skills and to reward them in line with the corporate values of

SISrsquos organization

Partners Suppliers Contractors and all External Contacts SIS will seek to treat all its partners suppliers contractors and other external stakeholders in a

consistently professional way and to ensure that their needs are fulfilled in every way possible

38

  • 72 On-going and Under Bidding (UB) Projects

27

SISrsquos Experiences in Boilersrsquo Maintenance Work

Power plant location Boiler tech Details ampInspections Unitne1 (ST) Unitne 2 (ST) Unitne 3 (ST) Unitne 4 (ST)

Manufacturer WALTHER Type amp Model WALTHER FN10 Natural Circulation Date of commissioning 05071965 01111965 22061968 20091968 MCR (th) 112 Steam conditions

Pressure 686 bar Temperature 510 degC

fuel Heavy fuel oil Ndeg2 light fuel oil

Heating area

Furnace (m2 540 m2 ) Reheater (m2 1542 m2 ) Eco (m2 480 m2 )

Fuel oil Burners Type ampNo SONVICO 4 FDF type amp capacity Centrifugal - 27 m3s IDF type amp capacity - - - - GRF type amp capacity - - - -

Regen Air Preheater Type Static LJUNGSTROM No amp capacity 1 1 1 1 Heating surface(m2) 7350 m2 -

Annual Inspection No every year until 1998 every year until

2005 every year until 1998

every year until 2005

Starting amp completion dates - - - -

Major Overhaul No 6 8 5 5 Starting amp completion dates - - - -

Boiler Conservation No - 2 - 2 Boiler Rehabilitation No 4 6 5 5 Boiler Tube Acid Cleaning No 0 0 0 0 ILA (Integrity Life Assessment) No 0 0 0 0

28

SISrsquos Experiences in Boilersrsquo Maintenance Work Power Plant Location

Boiler Tech Details ampInspections

Ghannouch (ST) Unitne1 (ST) Unitne 2

Manufacturer Stein Industrie Stein Industrie Type amp Model Natural circulation Natural circulation Date of commissioning 1972 1972 MCR (th) 120 120 Steam conditions Pressure SHRH (th) 70 bars 70 bars

Temperature 510 degC 510 degC fuel Natural GasHeavy fuel Natural GasHeavy fuel Heating area Furnace (m2 )

Reheater (m2 8880 dmsup3 ) 8880 dmsup3 Eco (m2 2400 dmsup3 ) 2400 dmsup3

Fuel oil Burners Type ampNo PILLARD GRC PILLARD GRC IDF type amp capacity GRF type amp capacity Regen Air Preheater Type Ljunstroumlm Ljunstroumlm

No amp capacity 140msup3h 140msup3h Heating surface(m2) _ _

Annual Inspection No 1 1 Starting amp completion dates 1 week 1 week

Major Overhaul No 15ans 15ans

Starting amp completion dates 2 months 2 months

Boiler Conservation No in case of being extended in case of being extended Boiler Rehabilitation No NO NO Boiler Tube Acid Cleaning No NO NO ILA (Integrity Life Assessment) No NO NO

29

ELECTRICAL TRANSMISSION SYSTEM

Accomplished Projects

bull Tests performed on Numerical relays manufactured by - ABB (Distance protection REL 316 ) - AREVA (Distance protection EPAC MICOMP442 hellip) - ICE (Over current protection NPID 800hellip) - SIEMENS (Distance protection 7SA 511 513 522 611) - REYROLLES (Differential protection DUOBIAS)

bull Test and setting of protective relays and checking the tripping circuits for Generators and

Substations belonging to Zaouia Petroleum Refinery (Libya)

bull Short circuit calculation selectivity study of protective relays by providing solutions for the

existing issues in PEC YEMEN Networks

bull Study and improvement of the existing protective system in close cooperation with Tractebel

Engineering

bull Technical Assistance for Independent Power Producers (IPP) Plant (Carthage Power

Company (CPC) Tunisia) regarding the maintenance and testing of protective relays

related to

- Generators - Main transformers - Auxiliaries - Etc

bull Technical Assistance testing and setting of protective relays at

- Steel ndashworks (Tunisia) - Cement ndashmarker (Tunisia) - Iron industries (Tunisia) - Chemical industries (Tunisia)

bull Commissioning and setting of protective relays at substations (High Medium and Low

voltages)

bull Renovation of the obsolete equipment (relays switchgear hellip)

bull Maintenance of the transmission lines and substations equipment

bull Cost-effective solutions establishment regarding the network issues (droop voltage over

voltage improvement of power factor etc)

30

ELECTRICAL DISTRIBUTION SYSTEM

Rural Electrification- Accomplished Projects

Contract Identification

Contract No 18 Technical Assistance and implementation of a Rural electrification project based upon SWER (Single Wire Earth Return) techniques

Award date 1998 Completion date 1999 Employerrsquos Name JIRAMA (JIRO SY RANO MALAGAS) Address

149 RUE RAINANDRIAMAMPANDRY Antananarivo BP 200 - MADAGASCAR

Main Tasks Performed

bull Training on SWER System bull Data collection needed for SWER System studies and implementation bull Finalization of technical studies and submission of report including

- Technical audit of the pilot project already in place - Technical description of the project - AdviseRecommendations on equipment specifications - Recommendations on possible changes in adjustment and coordination of electrical

protections

Contract Identification

Contract No 19 RWANDA Project (Phase 1) Implementation of a Pilot Rural Electrification Project based on Single-Phase with neutral to ground called MALT System 4000 Subscribers

Award date June 2008 Completion date June 2009

Employerrsquos Name

RECO ( former ELECTROGAZ) -RWANDA

Address BP 537 KIGALI -RWANA

Main Tasks performed

bull Study and Diagnosis of the existing Rwandan Power Distribution An inventory of the existing facilities including generation transmission and distribution systems was established

bull Implementation of a pilot rural electrification project based on MALT System Visit was arranged to some Tunisian rural regions and companies manufacturing electric equipment namely

- Transformers

- Iron poles

- Concrete supports

- Electric cables

- Electronic meters and

- MV and LV line accessories

31

Contract Identification

Contract No 20 Local Electrification study of Tambacounda and Kedougou departments Award date October 2002 Completion date March 2003 Customerrsquos name SENELEC Address ELECTRICAL COMPANY SENEGAL

Main Tasks Performed

bull Data Collection bull Socio-economic survey bull Technical economic and financial analysis bull Electricity market forecast (demand forecast (2003-2015)) bull Estimation of worksrsquo costs regarding medium voltage single-phase and tri-phase lines medium

and low voltage stations low voltage lines diesel micro-stations individual photovoltaic systems bull Technical and economic study related to different methods of supply including the solar as well as

the opportunity of introducing the single-phase system for the rural electrification bull Proposition for the public lighting and the management of photovoltaic systems bull Recommendations for the reinforcement of the existing stations and the existing networks to satisfy

the future demand due to the electrification of the new villages bull Tariff and profitability study bull Set up of the geographical maps and the low voltage electrification plan of the most important

villages (34 villages) bull Recommendations on privatizing power generation energy sector

Contract Identification Contract No 21 - Rural Electrification study of 80 villages in Comoros Isles

- Preparation of Tender Documents for the supply of equipment needed to the construction of 145 km MV lines 100 km LV lines and 80 MVLV stations

- Call for tenders evaluation of Bidders Award date November 2000 Completion date Dec 2002 Customerrsquos name

Ministry of Equipment Department of Energy and Water Resources

Address Moroni Avenue of the Democratic Republic of China

Main Tasks Performed

bull Data collection and visit of the existing electric utilities bull Situation analysis and proposal of electric infrastructure management solutions bull Electricity Demand Estimation and Forecasting bull Electric Calculation (Load Repartition Line Voltage Drop Losses and Voltage Drops

Calculations Short-Circuit Calculations Simulation of the Extension and Reinforcement of the Medium Voltage Networks Power System Stability Analysis Reactive Power Compensation

bull Low Voltage Studies for the Electrification of 80 villages bull RecommendationsSuggestions for the reinforcement of power generation utilities to satisfy

the future demand (by 2010) bull Electricity Tariffing study

- Review of electricity consumption patterns - Cost review - Review of tariff policies - Application and implementation of revised tariff levels

32

Contract Identification Contract Ndeg 22 Establishment and set up of a computerized accounting and budget system

Award date 1992 Completion date 1994 Customerrsquos name SOMELEC Address Nouakchott - MAURITANIA

Main Tasks Performed

bull Analytical accounting bull Bid evaluation bull Cash flow movements management bull Fixed assets management bull Centralizing bookkeeping bull Existing computer application interfaces update bull Transposition of the existing system to the new one bull Operation and maintenance Documents preparation bull Execution of the transposition of the existing system to the new one

Contract Identification Contract

No 23 Electricity sector reform technical assistance in the interim management of the ldquoCompagnie Energie Electrique du Togo ldquo(CEET)

Award date 41997

Completion date 122000

Employerrsquos Name Ministry of Mining Equipment transmission Mail and Telecommunications

Address TOGO

Main Tasks Performed

bull Technical assistance in the interim management of the CEET within the framework of the electricity sectorrsquos liberalization 1) termination of the current CEET management 2) analysis of the existing situation 3) interim management of the CEET prior to its privatization

bull Operation and maintenance of the electrical network for Lomeacute and its surrounding rural areas bull Electricity generation in isolated centers bull Electricity transmission and distribution bull Procurement and maintenance of new diesel production units bull Reduction of energy losses bull Customer management bull Increase in the number of Customers bull Accounting and billing bull Increase in payment recovery bull Call for tenders evaluation of proposals drafting of the technical annexes concerning the contracting

for a new independent operator (concession)

33

72 On-going and Under Bidding (UB) Projects

No Project Description Country

1 Training Center Update (on-going project) Republic of Congo BRAZZAVILLE

2 Master Plan elaboration in close cooperation with STUDI (Tunisia) (on-going project)

Republic of Senegal

3 Implementation of a Rural Electrification Project based on Single-Phase Four-Wires

with Neutral to Ground called MALT System (UB) Republic of Burkina Faso

4 Cost study connections to and extensions of electricity distribution networks

(UB)

Republic of Burkina Faso

5 Works Control and supervision of rural electrification of 33 communities in 4

regions of the Republic of Cameroon (UB) Republic of CAMEROUN

34

JUDICIOUS AND EFFICIENT ENERGY UTILIZATION

IS AT THE FOREFRONT OF OUR MINDS

35

Over the year 2008 STEG International Services (SIS) has widened its scope of activities to

include techno-economic studies and assistance in energy efficiency thereby providing support

to the national energy policy aiming at considering energy auditing energy efficiency energy

saving as a major priority target in Tunisiarsquos future energy strategic plan objectives In this

regard STEG International Services has carried out several projects including but not limited to

the following

80 Energy Efficiency

bull Performing obligatory periodical energy audits for industrial installations as well as energy audits on a consultancy basis

bull Assistance on projects involving energy efficiency bull Studies on energy efficiency of circuits hydraulic and thermal systems bull Upgrading energy management systems of industrial plants

81 Co-generation (Combined Heat and Power (CHP)) Studies

The main tasks performed included

bull Feasibility studies and project implementation assistance ndash RandaTunis

bull Assistance in electric utility restructuring from self power producer (electricity generation

only) to self-producing co-generatorsndash STSBEJATunisia

bull Technical assistance related to STEGrsquos grid connection with Co-generation plants in some

industrial units -SOTIPAPIER STS T-PAP and Carthago-GRE- Tunisia

82 Energy audits and energy efficiency

In any industry the three top operating expenses are often found to be energy (both electrical

and thermal) labour and materials Energy would invariably emerge as a top ranker and thus

energy management function constitutes a strategic area for cost reduction

Energy Audit will help to better understand how energy is used in any industry and in identifying

the areas where waste can occur and where scope for improvement exists In this regard the

Energy Audit would give a positive orientation to the energy cost reduction preventive

maintenance and quality control programs which are vital to production and utility activities Such

36

an audit program will help keep focus on variations which occur in the energy costs availability

and reliability of supply of energy decide on appropriate energy mix identify energy

conservation technologies retrofit for energy conservation equipment etc

Therefore SIS can carry out comprehensive assessment of techno-economic performance of

plants and equipment against the designed performance level or the industry best practice

aiming at optimizing consumption levels along with specific operating control targets

821 Samples of accomplished and on-going Energy Auditing projects

bull Energy Audit of the Liquefied Petroleum Gas (LPG) plant located in Gabegraves (Tunisia) with the assistance of Kvaerner Heurtey in 2001

bull Energy Performance Assessment of Rades and Sousse steam and Combined Cycle Power Plants as well as Bouchemma Menzel Bourguiba Korba Gas Turbines with the assistance of TRACTABEL and EDF in 2002

bull Energy Audit of Sousse Combined Cycle Power Plant with the assistance of CRA2E in 2007-2008

bull Periodic Performance Tests of Carthage Power Company (CPC) combined cycle an Impendent Power Producer (IPP) in Tunisia

37

SIS Future Commitments and Responsibilities

Endowed with a clear vision a sound project management and solid experiences and

know-how acquired by the parent company STEG through its various trades of over 48 years

SIS has put together a team of experts inndashline with its strategic intent- to be positioned as a

competitive and pre-eminent regional energy services company by spreading its expertise and

know-how throughout the African continent Arab countries and the rest of the world working on

a partnership basis with potential consultants andor the utilities of the respective countries

resulting in a keen focus and a strong sense of purpose

As part of its vision SIS management recognizes that it has responsibilities to all of its

stakeholders These include

Shareholders SIS will protect the investments of its shareholders and will provide an acceptable return on

investments through the application of its business principles Customers SIS will aim at optimizing its business activities through winning customers and maintaining

customerrsquos loyalty by offering them high quality services at competitive prices delivering on time

and supporting them with its management expertise

Employees SIS recognizes that its working employees are the key to its success and it nurtures loyalty

teamwork and trust between them SIS will strive to protect support and involve them in the

companyrsquos future to develop their skills and to reward them in line with the corporate values of

SISrsquos organization

Partners Suppliers Contractors and all External Contacts SIS will seek to treat all its partners suppliers contractors and other external stakeholders in a

consistently professional way and to ensure that their needs are fulfilled in every way possible

38

  • 72 On-going and Under Bidding (UB) Projects

28

SISrsquos Experiences in Boilersrsquo Maintenance Work Power Plant Location

Boiler Tech Details ampInspections

Ghannouch (ST) Unitne1 (ST) Unitne 2

Manufacturer Stein Industrie Stein Industrie Type amp Model Natural circulation Natural circulation Date of commissioning 1972 1972 MCR (th) 120 120 Steam conditions Pressure SHRH (th) 70 bars 70 bars

Temperature 510 degC 510 degC fuel Natural GasHeavy fuel Natural GasHeavy fuel Heating area Furnace (m2 )

Reheater (m2 8880 dmsup3 ) 8880 dmsup3 Eco (m2 2400 dmsup3 ) 2400 dmsup3

Fuel oil Burners Type ampNo PILLARD GRC PILLARD GRC IDF type amp capacity GRF type amp capacity Regen Air Preheater Type Ljunstroumlm Ljunstroumlm

No amp capacity 140msup3h 140msup3h Heating surface(m2) _ _

Annual Inspection No 1 1 Starting amp completion dates 1 week 1 week

Major Overhaul No 15ans 15ans

Starting amp completion dates 2 months 2 months

Boiler Conservation No in case of being extended in case of being extended Boiler Rehabilitation No NO NO Boiler Tube Acid Cleaning No NO NO ILA (Integrity Life Assessment) No NO NO

29

ELECTRICAL TRANSMISSION SYSTEM

Accomplished Projects

bull Tests performed on Numerical relays manufactured by - ABB (Distance protection REL 316 ) - AREVA (Distance protection EPAC MICOMP442 hellip) - ICE (Over current protection NPID 800hellip) - SIEMENS (Distance protection 7SA 511 513 522 611) - REYROLLES (Differential protection DUOBIAS)

bull Test and setting of protective relays and checking the tripping circuits for Generators and

Substations belonging to Zaouia Petroleum Refinery (Libya)

bull Short circuit calculation selectivity study of protective relays by providing solutions for the

existing issues in PEC YEMEN Networks

bull Study and improvement of the existing protective system in close cooperation with Tractebel

Engineering

bull Technical Assistance for Independent Power Producers (IPP) Plant (Carthage Power

Company (CPC) Tunisia) regarding the maintenance and testing of protective relays

related to

- Generators - Main transformers - Auxiliaries - Etc

bull Technical Assistance testing and setting of protective relays at

- Steel ndashworks (Tunisia) - Cement ndashmarker (Tunisia) - Iron industries (Tunisia) - Chemical industries (Tunisia)

bull Commissioning and setting of protective relays at substations (High Medium and Low

voltages)

bull Renovation of the obsolete equipment (relays switchgear hellip)

bull Maintenance of the transmission lines and substations equipment

bull Cost-effective solutions establishment regarding the network issues (droop voltage over

voltage improvement of power factor etc)

30

ELECTRICAL DISTRIBUTION SYSTEM

Rural Electrification- Accomplished Projects

Contract Identification

Contract No 18 Technical Assistance and implementation of a Rural electrification project based upon SWER (Single Wire Earth Return) techniques

Award date 1998 Completion date 1999 Employerrsquos Name JIRAMA (JIRO SY RANO MALAGAS) Address

149 RUE RAINANDRIAMAMPANDRY Antananarivo BP 200 - MADAGASCAR

Main Tasks Performed

bull Training on SWER System bull Data collection needed for SWER System studies and implementation bull Finalization of technical studies and submission of report including

- Technical audit of the pilot project already in place - Technical description of the project - AdviseRecommendations on equipment specifications - Recommendations on possible changes in adjustment and coordination of electrical

protections

Contract Identification

Contract No 19 RWANDA Project (Phase 1) Implementation of a Pilot Rural Electrification Project based on Single-Phase with neutral to ground called MALT System 4000 Subscribers

Award date June 2008 Completion date June 2009

Employerrsquos Name

RECO ( former ELECTROGAZ) -RWANDA

Address BP 537 KIGALI -RWANA

Main Tasks performed

bull Study and Diagnosis of the existing Rwandan Power Distribution An inventory of the existing facilities including generation transmission and distribution systems was established

bull Implementation of a pilot rural electrification project based on MALT System Visit was arranged to some Tunisian rural regions and companies manufacturing electric equipment namely

- Transformers

- Iron poles

- Concrete supports

- Electric cables

- Electronic meters and

- MV and LV line accessories

31

Contract Identification

Contract No 20 Local Electrification study of Tambacounda and Kedougou departments Award date October 2002 Completion date March 2003 Customerrsquos name SENELEC Address ELECTRICAL COMPANY SENEGAL

Main Tasks Performed

bull Data Collection bull Socio-economic survey bull Technical economic and financial analysis bull Electricity market forecast (demand forecast (2003-2015)) bull Estimation of worksrsquo costs regarding medium voltage single-phase and tri-phase lines medium

and low voltage stations low voltage lines diesel micro-stations individual photovoltaic systems bull Technical and economic study related to different methods of supply including the solar as well as

the opportunity of introducing the single-phase system for the rural electrification bull Proposition for the public lighting and the management of photovoltaic systems bull Recommendations for the reinforcement of the existing stations and the existing networks to satisfy

the future demand due to the electrification of the new villages bull Tariff and profitability study bull Set up of the geographical maps and the low voltage electrification plan of the most important

villages (34 villages) bull Recommendations on privatizing power generation energy sector

Contract Identification Contract No 21 - Rural Electrification study of 80 villages in Comoros Isles

- Preparation of Tender Documents for the supply of equipment needed to the construction of 145 km MV lines 100 km LV lines and 80 MVLV stations

- Call for tenders evaluation of Bidders Award date November 2000 Completion date Dec 2002 Customerrsquos name

Ministry of Equipment Department of Energy and Water Resources

Address Moroni Avenue of the Democratic Republic of China

Main Tasks Performed

bull Data collection and visit of the existing electric utilities bull Situation analysis and proposal of electric infrastructure management solutions bull Electricity Demand Estimation and Forecasting bull Electric Calculation (Load Repartition Line Voltage Drop Losses and Voltage Drops

Calculations Short-Circuit Calculations Simulation of the Extension and Reinforcement of the Medium Voltage Networks Power System Stability Analysis Reactive Power Compensation

bull Low Voltage Studies for the Electrification of 80 villages bull RecommendationsSuggestions for the reinforcement of power generation utilities to satisfy

the future demand (by 2010) bull Electricity Tariffing study

- Review of electricity consumption patterns - Cost review - Review of tariff policies - Application and implementation of revised tariff levels

32

Contract Identification Contract Ndeg 22 Establishment and set up of a computerized accounting and budget system

Award date 1992 Completion date 1994 Customerrsquos name SOMELEC Address Nouakchott - MAURITANIA

Main Tasks Performed

bull Analytical accounting bull Bid evaluation bull Cash flow movements management bull Fixed assets management bull Centralizing bookkeeping bull Existing computer application interfaces update bull Transposition of the existing system to the new one bull Operation and maintenance Documents preparation bull Execution of the transposition of the existing system to the new one

Contract Identification Contract

No 23 Electricity sector reform technical assistance in the interim management of the ldquoCompagnie Energie Electrique du Togo ldquo(CEET)

Award date 41997

Completion date 122000

Employerrsquos Name Ministry of Mining Equipment transmission Mail and Telecommunications

Address TOGO

Main Tasks Performed

bull Technical assistance in the interim management of the CEET within the framework of the electricity sectorrsquos liberalization 1) termination of the current CEET management 2) analysis of the existing situation 3) interim management of the CEET prior to its privatization

bull Operation and maintenance of the electrical network for Lomeacute and its surrounding rural areas bull Electricity generation in isolated centers bull Electricity transmission and distribution bull Procurement and maintenance of new diesel production units bull Reduction of energy losses bull Customer management bull Increase in the number of Customers bull Accounting and billing bull Increase in payment recovery bull Call for tenders evaluation of proposals drafting of the technical annexes concerning the contracting

for a new independent operator (concession)

33

72 On-going and Under Bidding (UB) Projects

No Project Description Country

1 Training Center Update (on-going project) Republic of Congo BRAZZAVILLE

2 Master Plan elaboration in close cooperation with STUDI (Tunisia) (on-going project)

Republic of Senegal

3 Implementation of a Rural Electrification Project based on Single-Phase Four-Wires

with Neutral to Ground called MALT System (UB) Republic of Burkina Faso

4 Cost study connections to and extensions of electricity distribution networks

(UB)

Republic of Burkina Faso

5 Works Control and supervision of rural electrification of 33 communities in 4

regions of the Republic of Cameroon (UB) Republic of CAMEROUN

34

JUDICIOUS AND EFFICIENT ENERGY UTILIZATION

IS AT THE FOREFRONT OF OUR MINDS

35

Over the year 2008 STEG International Services (SIS) has widened its scope of activities to

include techno-economic studies and assistance in energy efficiency thereby providing support

to the national energy policy aiming at considering energy auditing energy efficiency energy

saving as a major priority target in Tunisiarsquos future energy strategic plan objectives In this

regard STEG International Services has carried out several projects including but not limited to

the following

80 Energy Efficiency

bull Performing obligatory periodical energy audits for industrial installations as well as energy audits on a consultancy basis

bull Assistance on projects involving energy efficiency bull Studies on energy efficiency of circuits hydraulic and thermal systems bull Upgrading energy management systems of industrial plants

81 Co-generation (Combined Heat and Power (CHP)) Studies

The main tasks performed included

bull Feasibility studies and project implementation assistance ndash RandaTunis

bull Assistance in electric utility restructuring from self power producer (electricity generation

only) to self-producing co-generatorsndash STSBEJATunisia

bull Technical assistance related to STEGrsquos grid connection with Co-generation plants in some

industrial units -SOTIPAPIER STS T-PAP and Carthago-GRE- Tunisia

82 Energy audits and energy efficiency

In any industry the three top operating expenses are often found to be energy (both electrical

and thermal) labour and materials Energy would invariably emerge as a top ranker and thus

energy management function constitutes a strategic area for cost reduction

Energy Audit will help to better understand how energy is used in any industry and in identifying

the areas where waste can occur and where scope for improvement exists In this regard the

Energy Audit would give a positive orientation to the energy cost reduction preventive

maintenance and quality control programs which are vital to production and utility activities Such

36

an audit program will help keep focus on variations which occur in the energy costs availability

and reliability of supply of energy decide on appropriate energy mix identify energy

conservation technologies retrofit for energy conservation equipment etc

Therefore SIS can carry out comprehensive assessment of techno-economic performance of

plants and equipment against the designed performance level or the industry best practice

aiming at optimizing consumption levels along with specific operating control targets

821 Samples of accomplished and on-going Energy Auditing projects

bull Energy Audit of the Liquefied Petroleum Gas (LPG) plant located in Gabegraves (Tunisia) with the assistance of Kvaerner Heurtey in 2001

bull Energy Performance Assessment of Rades and Sousse steam and Combined Cycle Power Plants as well as Bouchemma Menzel Bourguiba Korba Gas Turbines with the assistance of TRACTABEL and EDF in 2002

bull Energy Audit of Sousse Combined Cycle Power Plant with the assistance of CRA2E in 2007-2008

bull Periodic Performance Tests of Carthage Power Company (CPC) combined cycle an Impendent Power Producer (IPP) in Tunisia

37

SIS Future Commitments and Responsibilities

Endowed with a clear vision a sound project management and solid experiences and

know-how acquired by the parent company STEG through its various trades of over 48 years

SIS has put together a team of experts inndashline with its strategic intent- to be positioned as a

competitive and pre-eminent regional energy services company by spreading its expertise and

know-how throughout the African continent Arab countries and the rest of the world working on

a partnership basis with potential consultants andor the utilities of the respective countries

resulting in a keen focus and a strong sense of purpose

As part of its vision SIS management recognizes that it has responsibilities to all of its

stakeholders These include

Shareholders SIS will protect the investments of its shareholders and will provide an acceptable return on

investments through the application of its business principles Customers SIS will aim at optimizing its business activities through winning customers and maintaining

customerrsquos loyalty by offering them high quality services at competitive prices delivering on time

and supporting them with its management expertise

Employees SIS recognizes that its working employees are the key to its success and it nurtures loyalty

teamwork and trust between them SIS will strive to protect support and involve them in the

companyrsquos future to develop their skills and to reward them in line with the corporate values of

SISrsquos organization

Partners Suppliers Contractors and all External Contacts SIS will seek to treat all its partners suppliers contractors and other external stakeholders in a

consistently professional way and to ensure that their needs are fulfilled in every way possible

38

  • 72 On-going and Under Bidding (UB) Projects

29

ELECTRICAL TRANSMISSION SYSTEM

Accomplished Projects

bull Tests performed on Numerical relays manufactured by - ABB (Distance protection REL 316 ) - AREVA (Distance protection EPAC MICOMP442 hellip) - ICE (Over current protection NPID 800hellip) - SIEMENS (Distance protection 7SA 511 513 522 611) - REYROLLES (Differential protection DUOBIAS)

bull Test and setting of protective relays and checking the tripping circuits for Generators and

Substations belonging to Zaouia Petroleum Refinery (Libya)

bull Short circuit calculation selectivity study of protective relays by providing solutions for the

existing issues in PEC YEMEN Networks

bull Study and improvement of the existing protective system in close cooperation with Tractebel

Engineering

bull Technical Assistance for Independent Power Producers (IPP) Plant (Carthage Power

Company (CPC) Tunisia) regarding the maintenance and testing of protective relays

related to

- Generators - Main transformers - Auxiliaries - Etc

bull Technical Assistance testing and setting of protective relays at

- Steel ndashworks (Tunisia) - Cement ndashmarker (Tunisia) - Iron industries (Tunisia) - Chemical industries (Tunisia)

bull Commissioning and setting of protective relays at substations (High Medium and Low

voltages)

bull Renovation of the obsolete equipment (relays switchgear hellip)

bull Maintenance of the transmission lines and substations equipment

bull Cost-effective solutions establishment regarding the network issues (droop voltage over

voltage improvement of power factor etc)

30

ELECTRICAL DISTRIBUTION SYSTEM

Rural Electrification- Accomplished Projects

Contract Identification

Contract No 18 Technical Assistance and implementation of a Rural electrification project based upon SWER (Single Wire Earth Return) techniques

Award date 1998 Completion date 1999 Employerrsquos Name JIRAMA (JIRO SY RANO MALAGAS) Address

149 RUE RAINANDRIAMAMPANDRY Antananarivo BP 200 - MADAGASCAR

Main Tasks Performed

bull Training on SWER System bull Data collection needed for SWER System studies and implementation bull Finalization of technical studies and submission of report including

- Technical audit of the pilot project already in place - Technical description of the project - AdviseRecommendations on equipment specifications - Recommendations on possible changes in adjustment and coordination of electrical

protections

Contract Identification

Contract No 19 RWANDA Project (Phase 1) Implementation of a Pilot Rural Electrification Project based on Single-Phase with neutral to ground called MALT System 4000 Subscribers

Award date June 2008 Completion date June 2009

Employerrsquos Name

RECO ( former ELECTROGAZ) -RWANDA

Address BP 537 KIGALI -RWANA

Main Tasks performed

bull Study and Diagnosis of the existing Rwandan Power Distribution An inventory of the existing facilities including generation transmission and distribution systems was established

bull Implementation of a pilot rural electrification project based on MALT System Visit was arranged to some Tunisian rural regions and companies manufacturing electric equipment namely

- Transformers

- Iron poles

- Concrete supports

- Electric cables

- Electronic meters and

- MV and LV line accessories

31

Contract Identification

Contract No 20 Local Electrification study of Tambacounda and Kedougou departments Award date October 2002 Completion date March 2003 Customerrsquos name SENELEC Address ELECTRICAL COMPANY SENEGAL

Main Tasks Performed

bull Data Collection bull Socio-economic survey bull Technical economic and financial analysis bull Electricity market forecast (demand forecast (2003-2015)) bull Estimation of worksrsquo costs regarding medium voltage single-phase and tri-phase lines medium

and low voltage stations low voltage lines diesel micro-stations individual photovoltaic systems bull Technical and economic study related to different methods of supply including the solar as well as

the opportunity of introducing the single-phase system for the rural electrification bull Proposition for the public lighting and the management of photovoltaic systems bull Recommendations for the reinforcement of the existing stations and the existing networks to satisfy

the future demand due to the electrification of the new villages bull Tariff and profitability study bull Set up of the geographical maps and the low voltage electrification plan of the most important

villages (34 villages) bull Recommendations on privatizing power generation energy sector

Contract Identification Contract No 21 - Rural Electrification study of 80 villages in Comoros Isles

- Preparation of Tender Documents for the supply of equipment needed to the construction of 145 km MV lines 100 km LV lines and 80 MVLV stations

- Call for tenders evaluation of Bidders Award date November 2000 Completion date Dec 2002 Customerrsquos name

Ministry of Equipment Department of Energy and Water Resources

Address Moroni Avenue of the Democratic Republic of China

Main Tasks Performed

bull Data collection and visit of the existing electric utilities bull Situation analysis and proposal of electric infrastructure management solutions bull Electricity Demand Estimation and Forecasting bull Electric Calculation (Load Repartition Line Voltage Drop Losses and Voltage Drops

Calculations Short-Circuit Calculations Simulation of the Extension and Reinforcement of the Medium Voltage Networks Power System Stability Analysis Reactive Power Compensation

bull Low Voltage Studies for the Electrification of 80 villages bull RecommendationsSuggestions for the reinforcement of power generation utilities to satisfy

the future demand (by 2010) bull Electricity Tariffing study

- Review of electricity consumption patterns - Cost review - Review of tariff policies - Application and implementation of revised tariff levels

32

Contract Identification Contract Ndeg 22 Establishment and set up of a computerized accounting and budget system

Award date 1992 Completion date 1994 Customerrsquos name SOMELEC Address Nouakchott - MAURITANIA

Main Tasks Performed

bull Analytical accounting bull Bid evaluation bull Cash flow movements management bull Fixed assets management bull Centralizing bookkeeping bull Existing computer application interfaces update bull Transposition of the existing system to the new one bull Operation and maintenance Documents preparation bull Execution of the transposition of the existing system to the new one

Contract Identification Contract

No 23 Electricity sector reform technical assistance in the interim management of the ldquoCompagnie Energie Electrique du Togo ldquo(CEET)

Award date 41997

Completion date 122000

Employerrsquos Name Ministry of Mining Equipment transmission Mail and Telecommunications

Address TOGO

Main Tasks Performed

bull Technical assistance in the interim management of the CEET within the framework of the electricity sectorrsquos liberalization 1) termination of the current CEET management 2) analysis of the existing situation 3) interim management of the CEET prior to its privatization

bull Operation and maintenance of the electrical network for Lomeacute and its surrounding rural areas bull Electricity generation in isolated centers bull Electricity transmission and distribution bull Procurement and maintenance of new diesel production units bull Reduction of energy losses bull Customer management bull Increase in the number of Customers bull Accounting and billing bull Increase in payment recovery bull Call for tenders evaluation of proposals drafting of the technical annexes concerning the contracting

for a new independent operator (concession)

33

72 On-going and Under Bidding (UB) Projects

No Project Description Country

1 Training Center Update (on-going project) Republic of Congo BRAZZAVILLE

2 Master Plan elaboration in close cooperation with STUDI (Tunisia) (on-going project)

Republic of Senegal

3 Implementation of a Rural Electrification Project based on Single-Phase Four-Wires

with Neutral to Ground called MALT System (UB) Republic of Burkina Faso

4 Cost study connections to and extensions of electricity distribution networks

(UB)

Republic of Burkina Faso

5 Works Control and supervision of rural electrification of 33 communities in 4

regions of the Republic of Cameroon (UB) Republic of CAMEROUN

34

JUDICIOUS AND EFFICIENT ENERGY UTILIZATION

IS AT THE FOREFRONT OF OUR MINDS

35

Over the year 2008 STEG International Services (SIS) has widened its scope of activities to

include techno-economic studies and assistance in energy efficiency thereby providing support

to the national energy policy aiming at considering energy auditing energy efficiency energy

saving as a major priority target in Tunisiarsquos future energy strategic plan objectives In this

regard STEG International Services has carried out several projects including but not limited to

the following

80 Energy Efficiency

bull Performing obligatory periodical energy audits for industrial installations as well as energy audits on a consultancy basis

bull Assistance on projects involving energy efficiency bull Studies on energy efficiency of circuits hydraulic and thermal systems bull Upgrading energy management systems of industrial plants

81 Co-generation (Combined Heat and Power (CHP)) Studies

The main tasks performed included

bull Feasibility studies and project implementation assistance ndash RandaTunis

bull Assistance in electric utility restructuring from self power producer (electricity generation

only) to self-producing co-generatorsndash STSBEJATunisia

bull Technical assistance related to STEGrsquos grid connection with Co-generation plants in some

industrial units -SOTIPAPIER STS T-PAP and Carthago-GRE- Tunisia

82 Energy audits and energy efficiency

In any industry the three top operating expenses are often found to be energy (both electrical

and thermal) labour and materials Energy would invariably emerge as a top ranker and thus

energy management function constitutes a strategic area for cost reduction

Energy Audit will help to better understand how energy is used in any industry and in identifying

the areas where waste can occur and where scope for improvement exists In this regard the

Energy Audit would give a positive orientation to the energy cost reduction preventive

maintenance and quality control programs which are vital to production and utility activities Such

36

an audit program will help keep focus on variations which occur in the energy costs availability

and reliability of supply of energy decide on appropriate energy mix identify energy

conservation technologies retrofit for energy conservation equipment etc

Therefore SIS can carry out comprehensive assessment of techno-economic performance of

plants and equipment against the designed performance level or the industry best practice

aiming at optimizing consumption levels along with specific operating control targets

821 Samples of accomplished and on-going Energy Auditing projects

bull Energy Audit of the Liquefied Petroleum Gas (LPG) plant located in Gabegraves (Tunisia) with the assistance of Kvaerner Heurtey in 2001

bull Energy Performance Assessment of Rades and Sousse steam and Combined Cycle Power Plants as well as Bouchemma Menzel Bourguiba Korba Gas Turbines with the assistance of TRACTABEL and EDF in 2002

bull Energy Audit of Sousse Combined Cycle Power Plant with the assistance of CRA2E in 2007-2008

bull Periodic Performance Tests of Carthage Power Company (CPC) combined cycle an Impendent Power Producer (IPP) in Tunisia

37

SIS Future Commitments and Responsibilities

Endowed with a clear vision a sound project management and solid experiences and

know-how acquired by the parent company STEG through its various trades of over 48 years

SIS has put together a team of experts inndashline with its strategic intent- to be positioned as a

competitive and pre-eminent regional energy services company by spreading its expertise and

know-how throughout the African continent Arab countries and the rest of the world working on

a partnership basis with potential consultants andor the utilities of the respective countries

resulting in a keen focus and a strong sense of purpose

As part of its vision SIS management recognizes that it has responsibilities to all of its

stakeholders These include

Shareholders SIS will protect the investments of its shareholders and will provide an acceptable return on

investments through the application of its business principles Customers SIS will aim at optimizing its business activities through winning customers and maintaining

customerrsquos loyalty by offering them high quality services at competitive prices delivering on time

and supporting them with its management expertise

Employees SIS recognizes that its working employees are the key to its success and it nurtures loyalty

teamwork and trust between them SIS will strive to protect support and involve them in the

companyrsquos future to develop their skills and to reward them in line with the corporate values of

SISrsquos organization

Partners Suppliers Contractors and all External Contacts SIS will seek to treat all its partners suppliers contractors and other external stakeholders in a

consistently professional way and to ensure that their needs are fulfilled in every way possible

38

  • 72 On-going and Under Bidding (UB) Projects

30

ELECTRICAL DISTRIBUTION SYSTEM

Rural Electrification- Accomplished Projects

Contract Identification

Contract No 18 Technical Assistance and implementation of a Rural electrification project based upon SWER (Single Wire Earth Return) techniques

Award date 1998 Completion date 1999 Employerrsquos Name JIRAMA (JIRO SY RANO MALAGAS) Address

149 RUE RAINANDRIAMAMPANDRY Antananarivo BP 200 - MADAGASCAR

Main Tasks Performed

bull Training on SWER System bull Data collection needed for SWER System studies and implementation bull Finalization of technical studies and submission of report including

- Technical audit of the pilot project already in place - Technical description of the project - AdviseRecommendations on equipment specifications - Recommendations on possible changes in adjustment and coordination of electrical

protections

Contract Identification

Contract No 19 RWANDA Project (Phase 1) Implementation of a Pilot Rural Electrification Project based on Single-Phase with neutral to ground called MALT System 4000 Subscribers

Award date June 2008 Completion date June 2009

Employerrsquos Name

RECO ( former ELECTROGAZ) -RWANDA

Address BP 537 KIGALI -RWANA

Main Tasks performed

bull Study and Diagnosis of the existing Rwandan Power Distribution An inventory of the existing facilities including generation transmission and distribution systems was established

bull Implementation of a pilot rural electrification project based on MALT System Visit was arranged to some Tunisian rural regions and companies manufacturing electric equipment namely

- Transformers

- Iron poles

- Concrete supports

- Electric cables

- Electronic meters and

- MV and LV line accessories

31

Contract Identification

Contract No 20 Local Electrification study of Tambacounda and Kedougou departments Award date October 2002 Completion date March 2003 Customerrsquos name SENELEC Address ELECTRICAL COMPANY SENEGAL

Main Tasks Performed

bull Data Collection bull Socio-economic survey bull Technical economic and financial analysis bull Electricity market forecast (demand forecast (2003-2015)) bull Estimation of worksrsquo costs regarding medium voltage single-phase and tri-phase lines medium

and low voltage stations low voltage lines diesel micro-stations individual photovoltaic systems bull Technical and economic study related to different methods of supply including the solar as well as

the opportunity of introducing the single-phase system for the rural electrification bull Proposition for the public lighting and the management of photovoltaic systems bull Recommendations for the reinforcement of the existing stations and the existing networks to satisfy

the future demand due to the electrification of the new villages bull Tariff and profitability study bull Set up of the geographical maps and the low voltage electrification plan of the most important

villages (34 villages) bull Recommendations on privatizing power generation energy sector

Contract Identification Contract No 21 - Rural Electrification study of 80 villages in Comoros Isles

- Preparation of Tender Documents for the supply of equipment needed to the construction of 145 km MV lines 100 km LV lines and 80 MVLV stations

- Call for tenders evaluation of Bidders Award date November 2000 Completion date Dec 2002 Customerrsquos name

Ministry of Equipment Department of Energy and Water Resources

Address Moroni Avenue of the Democratic Republic of China

Main Tasks Performed

bull Data collection and visit of the existing electric utilities bull Situation analysis and proposal of electric infrastructure management solutions bull Electricity Demand Estimation and Forecasting bull Electric Calculation (Load Repartition Line Voltage Drop Losses and Voltage Drops

Calculations Short-Circuit Calculations Simulation of the Extension and Reinforcement of the Medium Voltage Networks Power System Stability Analysis Reactive Power Compensation

bull Low Voltage Studies for the Electrification of 80 villages bull RecommendationsSuggestions for the reinforcement of power generation utilities to satisfy

the future demand (by 2010) bull Electricity Tariffing study

- Review of electricity consumption patterns - Cost review - Review of tariff policies - Application and implementation of revised tariff levels

32

Contract Identification Contract Ndeg 22 Establishment and set up of a computerized accounting and budget system

Award date 1992 Completion date 1994 Customerrsquos name SOMELEC Address Nouakchott - MAURITANIA

Main Tasks Performed

bull Analytical accounting bull Bid evaluation bull Cash flow movements management bull Fixed assets management bull Centralizing bookkeeping bull Existing computer application interfaces update bull Transposition of the existing system to the new one bull Operation and maintenance Documents preparation bull Execution of the transposition of the existing system to the new one

Contract Identification Contract

No 23 Electricity sector reform technical assistance in the interim management of the ldquoCompagnie Energie Electrique du Togo ldquo(CEET)

Award date 41997

Completion date 122000

Employerrsquos Name Ministry of Mining Equipment transmission Mail and Telecommunications

Address TOGO

Main Tasks Performed

bull Technical assistance in the interim management of the CEET within the framework of the electricity sectorrsquos liberalization 1) termination of the current CEET management 2) analysis of the existing situation 3) interim management of the CEET prior to its privatization

bull Operation and maintenance of the electrical network for Lomeacute and its surrounding rural areas bull Electricity generation in isolated centers bull Electricity transmission and distribution bull Procurement and maintenance of new diesel production units bull Reduction of energy losses bull Customer management bull Increase in the number of Customers bull Accounting and billing bull Increase in payment recovery bull Call for tenders evaluation of proposals drafting of the technical annexes concerning the contracting

for a new independent operator (concession)

33

72 On-going and Under Bidding (UB) Projects

No Project Description Country

1 Training Center Update (on-going project) Republic of Congo BRAZZAVILLE

2 Master Plan elaboration in close cooperation with STUDI (Tunisia) (on-going project)

Republic of Senegal

3 Implementation of a Rural Electrification Project based on Single-Phase Four-Wires

with Neutral to Ground called MALT System (UB) Republic of Burkina Faso

4 Cost study connections to and extensions of electricity distribution networks

(UB)

Republic of Burkina Faso

5 Works Control and supervision of rural electrification of 33 communities in 4

regions of the Republic of Cameroon (UB) Republic of CAMEROUN

34

JUDICIOUS AND EFFICIENT ENERGY UTILIZATION

IS AT THE FOREFRONT OF OUR MINDS

35

Over the year 2008 STEG International Services (SIS) has widened its scope of activities to

include techno-economic studies and assistance in energy efficiency thereby providing support

to the national energy policy aiming at considering energy auditing energy efficiency energy

saving as a major priority target in Tunisiarsquos future energy strategic plan objectives In this

regard STEG International Services has carried out several projects including but not limited to

the following

80 Energy Efficiency

bull Performing obligatory periodical energy audits for industrial installations as well as energy audits on a consultancy basis

bull Assistance on projects involving energy efficiency bull Studies on energy efficiency of circuits hydraulic and thermal systems bull Upgrading energy management systems of industrial plants

81 Co-generation (Combined Heat and Power (CHP)) Studies

The main tasks performed included

bull Feasibility studies and project implementation assistance ndash RandaTunis

bull Assistance in electric utility restructuring from self power producer (electricity generation

only) to self-producing co-generatorsndash STSBEJATunisia

bull Technical assistance related to STEGrsquos grid connection with Co-generation plants in some

industrial units -SOTIPAPIER STS T-PAP and Carthago-GRE- Tunisia

82 Energy audits and energy efficiency

In any industry the three top operating expenses are often found to be energy (both electrical

and thermal) labour and materials Energy would invariably emerge as a top ranker and thus

energy management function constitutes a strategic area for cost reduction

Energy Audit will help to better understand how energy is used in any industry and in identifying

the areas where waste can occur and where scope for improvement exists In this regard the

Energy Audit would give a positive orientation to the energy cost reduction preventive

maintenance and quality control programs which are vital to production and utility activities Such

36

an audit program will help keep focus on variations which occur in the energy costs availability

and reliability of supply of energy decide on appropriate energy mix identify energy

conservation technologies retrofit for energy conservation equipment etc

Therefore SIS can carry out comprehensive assessment of techno-economic performance of

plants and equipment against the designed performance level or the industry best practice

aiming at optimizing consumption levels along with specific operating control targets

821 Samples of accomplished and on-going Energy Auditing projects

bull Energy Audit of the Liquefied Petroleum Gas (LPG) plant located in Gabegraves (Tunisia) with the assistance of Kvaerner Heurtey in 2001

bull Energy Performance Assessment of Rades and Sousse steam and Combined Cycle Power Plants as well as Bouchemma Menzel Bourguiba Korba Gas Turbines with the assistance of TRACTABEL and EDF in 2002

bull Energy Audit of Sousse Combined Cycle Power Plant with the assistance of CRA2E in 2007-2008

bull Periodic Performance Tests of Carthage Power Company (CPC) combined cycle an Impendent Power Producer (IPP) in Tunisia

37

SIS Future Commitments and Responsibilities

Endowed with a clear vision a sound project management and solid experiences and

know-how acquired by the parent company STEG through its various trades of over 48 years

SIS has put together a team of experts inndashline with its strategic intent- to be positioned as a

competitive and pre-eminent regional energy services company by spreading its expertise and

know-how throughout the African continent Arab countries and the rest of the world working on

a partnership basis with potential consultants andor the utilities of the respective countries

resulting in a keen focus and a strong sense of purpose

As part of its vision SIS management recognizes that it has responsibilities to all of its

stakeholders These include

Shareholders SIS will protect the investments of its shareholders and will provide an acceptable return on

investments through the application of its business principles Customers SIS will aim at optimizing its business activities through winning customers and maintaining

customerrsquos loyalty by offering them high quality services at competitive prices delivering on time

and supporting them with its management expertise

Employees SIS recognizes that its working employees are the key to its success and it nurtures loyalty

teamwork and trust between them SIS will strive to protect support and involve them in the

companyrsquos future to develop their skills and to reward them in line with the corporate values of

SISrsquos organization

Partners Suppliers Contractors and all External Contacts SIS will seek to treat all its partners suppliers contractors and other external stakeholders in a

consistently professional way and to ensure that their needs are fulfilled in every way possible

38

  • 72 On-going and Under Bidding (UB) Projects

31

Contract Identification

Contract No 20 Local Electrification study of Tambacounda and Kedougou departments Award date October 2002 Completion date March 2003 Customerrsquos name SENELEC Address ELECTRICAL COMPANY SENEGAL

Main Tasks Performed

bull Data Collection bull Socio-economic survey bull Technical economic and financial analysis bull Electricity market forecast (demand forecast (2003-2015)) bull Estimation of worksrsquo costs regarding medium voltage single-phase and tri-phase lines medium

and low voltage stations low voltage lines diesel micro-stations individual photovoltaic systems bull Technical and economic study related to different methods of supply including the solar as well as

the opportunity of introducing the single-phase system for the rural electrification bull Proposition for the public lighting and the management of photovoltaic systems bull Recommendations for the reinforcement of the existing stations and the existing networks to satisfy

the future demand due to the electrification of the new villages bull Tariff and profitability study bull Set up of the geographical maps and the low voltage electrification plan of the most important

villages (34 villages) bull Recommendations on privatizing power generation energy sector

Contract Identification Contract No 21 - Rural Electrification study of 80 villages in Comoros Isles

- Preparation of Tender Documents for the supply of equipment needed to the construction of 145 km MV lines 100 km LV lines and 80 MVLV stations

- Call for tenders evaluation of Bidders Award date November 2000 Completion date Dec 2002 Customerrsquos name

Ministry of Equipment Department of Energy and Water Resources

Address Moroni Avenue of the Democratic Republic of China

Main Tasks Performed

bull Data collection and visit of the existing electric utilities bull Situation analysis and proposal of electric infrastructure management solutions bull Electricity Demand Estimation and Forecasting bull Electric Calculation (Load Repartition Line Voltage Drop Losses and Voltage Drops

Calculations Short-Circuit Calculations Simulation of the Extension and Reinforcement of the Medium Voltage Networks Power System Stability Analysis Reactive Power Compensation

bull Low Voltage Studies for the Electrification of 80 villages bull RecommendationsSuggestions for the reinforcement of power generation utilities to satisfy

the future demand (by 2010) bull Electricity Tariffing study

- Review of electricity consumption patterns - Cost review - Review of tariff policies - Application and implementation of revised tariff levels

32

Contract Identification Contract Ndeg 22 Establishment and set up of a computerized accounting and budget system

Award date 1992 Completion date 1994 Customerrsquos name SOMELEC Address Nouakchott - MAURITANIA

Main Tasks Performed

bull Analytical accounting bull Bid evaluation bull Cash flow movements management bull Fixed assets management bull Centralizing bookkeeping bull Existing computer application interfaces update bull Transposition of the existing system to the new one bull Operation and maintenance Documents preparation bull Execution of the transposition of the existing system to the new one

Contract Identification Contract

No 23 Electricity sector reform technical assistance in the interim management of the ldquoCompagnie Energie Electrique du Togo ldquo(CEET)

Award date 41997

Completion date 122000

Employerrsquos Name Ministry of Mining Equipment transmission Mail and Telecommunications

Address TOGO

Main Tasks Performed

bull Technical assistance in the interim management of the CEET within the framework of the electricity sectorrsquos liberalization 1) termination of the current CEET management 2) analysis of the existing situation 3) interim management of the CEET prior to its privatization

bull Operation and maintenance of the electrical network for Lomeacute and its surrounding rural areas bull Electricity generation in isolated centers bull Electricity transmission and distribution bull Procurement and maintenance of new diesel production units bull Reduction of energy losses bull Customer management bull Increase in the number of Customers bull Accounting and billing bull Increase in payment recovery bull Call for tenders evaluation of proposals drafting of the technical annexes concerning the contracting

for a new independent operator (concession)

33

72 On-going and Under Bidding (UB) Projects

No Project Description Country

1 Training Center Update (on-going project) Republic of Congo BRAZZAVILLE

2 Master Plan elaboration in close cooperation with STUDI (Tunisia) (on-going project)

Republic of Senegal

3 Implementation of a Rural Electrification Project based on Single-Phase Four-Wires

with Neutral to Ground called MALT System (UB) Republic of Burkina Faso

4 Cost study connections to and extensions of electricity distribution networks

(UB)

Republic of Burkina Faso

5 Works Control and supervision of rural electrification of 33 communities in 4

regions of the Republic of Cameroon (UB) Republic of CAMEROUN

34

JUDICIOUS AND EFFICIENT ENERGY UTILIZATION

IS AT THE FOREFRONT OF OUR MINDS

35

Over the year 2008 STEG International Services (SIS) has widened its scope of activities to

include techno-economic studies and assistance in energy efficiency thereby providing support

to the national energy policy aiming at considering energy auditing energy efficiency energy

saving as a major priority target in Tunisiarsquos future energy strategic plan objectives In this

regard STEG International Services has carried out several projects including but not limited to

the following

80 Energy Efficiency

bull Performing obligatory periodical energy audits for industrial installations as well as energy audits on a consultancy basis

bull Assistance on projects involving energy efficiency bull Studies on energy efficiency of circuits hydraulic and thermal systems bull Upgrading energy management systems of industrial plants

81 Co-generation (Combined Heat and Power (CHP)) Studies

The main tasks performed included

bull Feasibility studies and project implementation assistance ndash RandaTunis

bull Assistance in electric utility restructuring from self power producer (electricity generation

only) to self-producing co-generatorsndash STSBEJATunisia

bull Technical assistance related to STEGrsquos grid connection with Co-generation plants in some

industrial units -SOTIPAPIER STS T-PAP and Carthago-GRE- Tunisia

82 Energy audits and energy efficiency

In any industry the three top operating expenses are often found to be energy (both electrical

and thermal) labour and materials Energy would invariably emerge as a top ranker and thus

energy management function constitutes a strategic area for cost reduction

Energy Audit will help to better understand how energy is used in any industry and in identifying

the areas where waste can occur and where scope for improvement exists In this regard the

Energy Audit would give a positive orientation to the energy cost reduction preventive

maintenance and quality control programs which are vital to production and utility activities Such

36

an audit program will help keep focus on variations which occur in the energy costs availability

and reliability of supply of energy decide on appropriate energy mix identify energy

conservation technologies retrofit for energy conservation equipment etc

Therefore SIS can carry out comprehensive assessment of techno-economic performance of

plants and equipment against the designed performance level or the industry best practice

aiming at optimizing consumption levels along with specific operating control targets

821 Samples of accomplished and on-going Energy Auditing projects

bull Energy Audit of the Liquefied Petroleum Gas (LPG) plant located in Gabegraves (Tunisia) with the assistance of Kvaerner Heurtey in 2001

bull Energy Performance Assessment of Rades and Sousse steam and Combined Cycle Power Plants as well as Bouchemma Menzel Bourguiba Korba Gas Turbines with the assistance of TRACTABEL and EDF in 2002

bull Energy Audit of Sousse Combined Cycle Power Plant with the assistance of CRA2E in 2007-2008

bull Periodic Performance Tests of Carthage Power Company (CPC) combined cycle an Impendent Power Producer (IPP) in Tunisia

37

SIS Future Commitments and Responsibilities

Endowed with a clear vision a sound project management and solid experiences and

know-how acquired by the parent company STEG through its various trades of over 48 years

SIS has put together a team of experts inndashline with its strategic intent- to be positioned as a

competitive and pre-eminent regional energy services company by spreading its expertise and

know-how throughout the African continent Arab countries and the rest of the world working on

a partnership basis with potential consultants andor the utilities of the respective countries

resulting in a keen focus and a strong sense of purpose

As part of its vision SIS management recognizes that it has responsibilities to all of its

stakeholders These include

Shareholders SIS will protect the investments of its shareholders and will provide an acceptable return on

investments through the application of its business principles Customers SIS will aim at optimizing its business activities through winning customers and maintaining

customerrsquos loyalty by offering them high quality services at competitive prices delivering on time

and supporting them with its management expertise

Employees SIS recognizes that its working employees are the key to its success and it nurtures loyalty

teamwork and trust between them SIS will strive to protect support and involve them in the

companyrsquos future to develop their skills and to reward them in line with the corporate values of

SISrsquos organization

Partners Suppliers Contractors and all External Contacts SIS will seek to treat all its partners suppliers contractors and other external stakeholders in a

consistently professional way and to ensure that their needs are fulfilled in every way possible

38

  • 72 On-going and Under Bidding (UB) Projects

32

Contract Identification Contract Ndeg 22 Establishment and set up of a computerized accounting and budget system

Award date 1992 Completion date 1994 Customerrsquos name SOMELEC Address Nouakchott - MAURITANIA

Main Tasks Performed

bull Analytical accounting bull Bid evaluation bull Cash flow movements management bull Fixed assets management bull Centralizing bookkeeping bull Existing computer application interfaces update bull Transposition of the existing system to the new one bull Operation and maintenance Documents preparation bull Execution of the transposition of the existing system to the new one

Contract Identification Contract

No 23 Electricity sector reform technical assistance in the interim management of the ldquoCompagnie Energie Electrique du Togo ldquo(CEET)

Award date 41997

Completion date 122000

Employerrsquos Name Ministry of Mining Equipment transmission Mail and Telecommunications

Address TOGO

Main Tasks Performed

bull Technical assistance in the interim management of the CEET within the framework of the electricity sectorrsquos liberalization 1) termination of the current CEET management 2) analysis of the existing situation 3) interim management of the CEET prior to its privatization

bull Operation and maintenance of the electrical network for Lomeacute and its surrounding rural areas bull Electricity generation in isolated centers bull Electricity transmission and distribution bull Procurement and maintenance of new diesel production units bull Reduction of energy losses bull Customer management bull Increase in the number of Customers bull Accounting and billing bull Increase in payment recovery bull Call for tenders evaluation of proposals drafting of the technical annexes concerning the contracting

for a new independent operator (concession)

33

72 On-going and Under Bidding (UB) Projects

No Project Description Country

1 Training Center Update (on-going project) Republic of Congo BRAZZAVILLE

2 Master Plan elaboration in close cooperation with STUDI (Tunisia) (on-going project)

Republic of Senegal

3 Implementation of a Rural Electrification Project based on Single-Phase Four-Wires

with Neutral to Ground called MALT System (UB) Republic of Burkina Faso

4 Cost study connections to and extensions of electricity distribution networks

(UB)

Republic of Burkina Faso

5 Works Control and supervision of rural electrification of 33 communities in 4

regions of the Republic of Cameroon (UB) Republic of CAMEROUN

34

JUDICIOUS AND EFFICIENT ENERGY UTILIZATION

IS AT THE FOREFRONT OF OUR MINDS

35

Over the year 2008 STEG International Services (SIS) has widened its scope of activities to

include techno-economic studies and assistance in energy efficiency thereby providing support

to the national energy policy aiming at considering energy auditing energy efficiency energy

saving as a major priority target in Tunisiarsquos future energy strategic plan objectives In this

regard STEG International Services has carried out several projects including but not limited to

the following

80 Energy Efficiency

bull Performing obligatory periodical energy audits for industrial installations as well as energy audits on a consultancy basis

bull Assistance on projects involving energy efficiency bull Studies on energy efficiency of circuits hydraulic and thermal systems bull Upgrading energy management systems of industrial plants

81 Co-generation (Combined Heat and Power (CHP)) Studies

The main tasks performed included

bull Feasibility studies and project implementation assistance ndash RandaTunis

bull Assistance in electric utility restructuring from self power producer (electricity generation

only) to self-producing co-generatorsndash STSBEJATunisia

bull Technical assistance related to STEGrsquos grid connection with Co-generation plants in some

industrial units -SOTIPAPIER STS T-PAP and Carthago-GRE- Tunisia

82 Energy audits and energy efficiency

In any industry the three top operating expenses are often found to be energy (both electrical

and thermal) labour and materials Energy would invariably emerge as a top ranker and thus

energy management function constitutes a strategic area for cost reduction

Energy Audit will help to better understand how energy is used in any industry and in identifying

the areas where waste can occur and where scope for improvement exists In this regard the

Energy Audit would give a positive orientation to the energy cost reduction preventive

maintenance and quality control programs which are vital to production and utility activities Such

36

an audit program will help keep focus on variations which occur in the energy costs availability

and reliability of supply of energy decide on appropriate energy mix identify energy

conservation technologies retrofit for energy conservation equipment etc

Therefore SIS can carry out comprehensive assessment of techno-economic performance of

plants and equipment against the designed performance level or the industry best practice

aiming at optimizing consumption levels along with specific operating control targets

821 Samples of accomplished and on-going Energy Auditing projects

bull Energy Audit of the Liquefied Petroleum Gas (LPG) plant located in Gabegraves (Tunisia) with the assistance of Kvaerner Heurtey in 2001

bull Energy Performance Assessment of Rades and Sousse steam and Combined Cycle Power Plants as well as Bouchemma Menzel Bourguiba Korba Gas Turbines with the assistance of TRACTABEL and EDF in 2002

bull Energy Audit of Sousse Combined Cycle Power Plant with the assistance of CRA2E in 2007-2008

bull Periodic Performance Tests of Carthage Power Company (CPC) combined cycle an Impendent Power Producer (IPP) in Tunisia

37

SIS Future Commitments and Responsibilities

Endowed with a clear vision a sound project management and solid experiences and

know-how acquired by the parent company STEG through its various trades of over 48 years

SIS has put together a team of experts inndashline with its strategic intent- to be positioned as a

competitive and pre-eminent regional energy services company by spreading its expertise and

know-how throughout the African continent Arab countries and the rest of the world working on

a partnership basis with potential consultants andor the utilities of the respective countries

resulting in a keen focus and a strong sense of purpose

As part of its vision SIS management recognizes that it has responsibilities to all of its

stakeholders These include

Shareholders SIS will protect the investments of its shareholders and will provide an acceptable return on

investments through the application of its business principles Customers SIS will aim at optimizing its business activities through winning customers and maintaining

customerrsquos loyalty by offering them high quality services at competitive prices delivering on time

and supporting them with its management expertise

Employees SIS recognizes that its working employees are the key to its success and it nurtures loyalty

teamwork and trust between them SIS will strive to protect support and involve them in the

companyrsquos future to develop their skills and to reward them in line with the corporate values of

SISrsquos organization

Partners Suppliers Contractors and all External Contacts SIS will seek to treat all its partners suppliers contractors and other external stakeholders in a

consistently professional way and to ensure that their needs are fulfilled in every way possible

38

  • 72 On-going and Under Bidding (UB) Projects

33

72 On-going and Under Bidding (UB) Projects

No Project Description Country

1 Training Center Update (on-going project) Republic of Congo BRAZZAVILLE

2 Master Plan elaboration in close cooperation with STUDI (Tunisia) (on-going project)

Republic of Senegal

3 Implementation of a Rural Electrification Project based on Single-Phase Four-Wires

with Neutral to Ground called MALT System (UB) Republic of Burkina Faso

4 Cost study connections to and extensions of electricity distribution networks

(UB)

Republic of Burkina Faso

5 Works Control and supervision of rural electrification of 33 communities in 4

regions of the Republic of Cameroon (UB) Republic of CAMEROUN

34

JUDICIOUS AND EFFICIENT ENERGY UTILIZATION

IS AT THE FOREFRONT OF OUR MINDS

35

Over the year 2008 STEG International Services (SIS) has widened its scope of activities to

include techno-economic studies and assistance in energy efficiency thereby providing support

to the national energy policy aiming at considering energy auditing energy efficiency energy

saving as a major priority target in Tunisiarsquos future energy strategic plan objectives In this

regard STEG International Services has carried out several projects including but not limited to

the following

80 Energy Efficiency

bull Performing obligatory periodical energy audits for industrial installations as well as energy audits on a consultancy basis

bull Assistance on projects involving energy efficiency bull Studies on energy efficiency of circuits hydraulic and thermal systems bull Upgrading energy management systems of industrial plants

81 Co-generation (Combined Heat and Power (CHP)) Studies

The main tasks performed included

bull Feasibility studies and project implementation assistance ndash RandaTunis

bull Assistance in electric utility restructuring from self power producer (electricity generation

only) to self-producing co-generatorsndash STSBEJATunisia

bull Technical assistance related to STEGrsquos grid connection with Co-generation plants in some

industrial units -SOTIPAPIER STS T-PAP and Carthago-GRE- Tunisia

82 Energy audits and energy efficiency

In any industry the three top operating expenses are often found to be energy (both electrical

and thermal) labour and materials Energy would invariably emerge as a top ranker and thus

energy management function constitutes a strategic area for cost reduction

Energy Audit will help to better understand how energy is used in any industry and in identifying

the areas where waste can occur and where scope for improvement exists In this regard the

Energy Audit would give a positive orientation to the energy cost reduction preventive

maintenance and quality control programs which are vital to production and utility activities Such

36

an audit program will help keep focus on variations which occur in the energy costs availability

and reliability of supply of energy decide on appropriate energy mix identify energy

conservation technologies retrofit for energy conservation equipment etc

Therefore SIS can carry out comprehensive assessment of techno-economic performance of

plants and equipment against the designed performance level or the industry best practice

aiming at optimizing consumption levels along with specific operating control targets

821 Samples of accomplished and on-going Energy Auditing projects

bull Energy Audit of the Liquefied Petroleum Gas (LPG) plant located in Gabegraves (Tunisia) with the assistance of Kvaerner Heurtey in 2001

bull Energy Performance Assessment of Rades and Sousse steam and Combined Cycle Power Plants as well as Bouchemma Menzel Bourguiba Korba Gas Turbines with the assistance of TRACTABEL and EDF in 2002

bull Energy Audit of Sousse Combined Cycle Power Plant with the assistance of CRA2E in 2007-2008

bull Periodic Performance Tests of Carthage Power Company (CPC) combined cycle an Impendent Power Producer (IPP) in Tunisia

37

SIS Future Commitments and Responsibilities

Endowed with a clear vision a sound project management and solid experiences and

know-how acquired by the parent company STEG through its various trades of over 48 years

SIS has put together a team of experts inndashline with its strategic intent- to be positioned as a

competitive and pre-eminent regional energy services company by spreading its expertise and

know-how throughout the African continent Arab countries and the rest of the world working on

a partnership basis with potential consultants andor the utilities of the respective countries

resulting in a keen focus and a strong sense of purpose

As part of its vision SIS management recognizes that it has responsibilities to all of its

stakeholders These include

Shareholders SIS will protect the investments of its shareholders and will provide an acceptable return on

investments through the application of its business principles Customers SIS will aim at optimizing its business activities through winning customers and maintaining

customerrsquos loyalty by offering them high quality services at competitive prices delivering on time

and supporting them with its management expertise

Employees SIS recognizes that its working employees are the key to its success and it nurtures loyalty

teamwork and trust between them SIS will strive to protect support and involve them in the

companyrsquos future to develop their skills and to reward them in line with the corporate values of

SISrsquos organization

Partners Suppliers Contractors and all External Contacts SIS will seek to treat all its partners suppliers contractors and other external stakeholders in a

consistently professional way and to ensure that their needs are fulfilled in every way possible

38

  • 72 On-going and Under Bidding (UB) Projects

34

JUDICIOUS AND EFFICIENT ENERGY UTILIZATION

IS AT THE FOREFRONT OF OUR MINDS

35

Over the year 2008 STEG International Services (SIS) has widened its scope of activities to

include techno-economic studies and assistance in energy efficiency thereby providing support

to the national energy policy aiming at considering energy auditing energy efficiency energy

saving as a major priority target in Tunisiarsquos future energy strategic plan objectives In this

regard STEG International Services has carried out several projects including but not limited to

the following

80 Energy Efficiency

bull Performing obligatory periodical energy audits for industrial installations as well as energy audits on a consultancy basis

bull Assistance on projects involving energy efficiency bull Studies on energy efficiency of circuits hydraulic and thermal systems bull Upgrading energy management systems of industrial plants

81 Co-generation (Combined Heat and Power (CHP)) Studies

The main tasks performed included

bull Feasibility studies and project implementation assistance ndash RandaTunis

bull Assistance in electric utility restructuring from self power producer (electricity generation

only) to self-producing co-generatorsndash STSBEJATunisia

bull Technical assistance related to STEGrsquos grid connection with Co-generation plants in some

industrial units -SOTIPAPIER STS T-PAP and Carthago-GRE- Tunisia

82 Energy audits and energy efficiency

In any industry the three top operating expenses are often found to be energy (both electrical

and thermal) labour and materials Energy would invariably emerge as a top ranker and thus

energy management function constitutes a strategic area for cost reduction

Energy Audit will help to better understand how energy is used in any industry and in identifying

the areas where waste can occur and where scope for improvement exists In this regard the

Energy Audit would give a positive orientation to the energy cost reduction preventive

maintenance and quality control programs which are vital to production and utility activities Such

36

an audit program will help keep focus on variations which occur in the energy costs availability

and reliability of supply of energy decide on appropriate energy mix identify energy

conservation technologies retrofit for energy conservation equipment etc

Therefore SIS can carry out comprehensive assessment of techno-economic performance of

plants and equipment against the designed performance level or the industry best practice

aiming at optimizing consumption levels along with specific operating control targets

821 Samples of accomplished and on-going Energy Auditing projects

bull Energy Audit of the Liquefied Petroleum Gas (LPG) plant located in Gabegraves (Tunisia) with the assistance of Kvaerner Heurtey in 2001

bull Energy Performance Assessment of Rades and Sousse steam and Combined Cycle Power Plants as well as Bouchemma Menzel Bourguiba Korba Gas Turbines with the assistance of TRACTABEL and EDF in 2002

bull Energy Audit of Sousse Combined Cycle Power Plant with the assistance of CRA2E in 2007-2008

bull Periodic Performance Tests of Carthage Power Company (CPC) combined cycle an Impendent Power Producer (IPP) in Tunisia

37

SIS Future Commitments and Responsibilities

Endowed with a clear vision a sound project management and solid experiences and

know-how acquired by the parent company STEG through its various trades of over 48 years

SIS has put together a team of experts inndashline with its strategic intent- to be positioned as a

competitive and pre-eminent regional energy services company by spreading its expertise and

know-how throughout the African continent Arab countries and the rest of the world working on

a partnership basis with potential consultants andor the utilities of the respective countries

resulting in a keen focus and a strong sense of purpose

As part of its vision SIS management recognizes that it has responsibilities to all of its

stakeholders These include

Shareholders SIS will protect the investments of its shareholders and will provide an acceptable return on

investments through the application of its business principles Customers SIS will aim at optimizing its business activities through winning customers and maintaining

customerrsquos loyalty by offering them high quality services at competitive prices delivering on time

and supporting them with its management expertise

Employees SIS recognizes that its working employees are the key to its success and it nurtures loyalty

teamwork and trust between them SIS will strive to protect support and involve them in the

companyrsquos future to develop their skills and to reward them in line with the corporate values of

SISrsquos organization

Partners Suppliers Contractors and all External Contacts SIS will seek to treat all its partners suppliers contractors and other external stakeholders in a

consistently professional way and to ensure that their needs are fulfilled in every way possible

38

  • 72 On-going and Under Bidding (UB) Projects

35

Over the year 2008 STEG International Services (SIS) has widened its scope of activities to

include techno-economic studies and assistance in energy efficiency thereby providing support

to the national energy policy aiming at considering energy auditing energy efficiency energy

saving as a major priority target in Tunisiarsquos future energy strategic plan objectives In this

regard STEG International Services has carried out several projects including but not limited to

the following

80 Energy Efficiency

bull Performing obligatory periodical energy audits for industrial installations as well as energy audits on a consultancy basis

bull Assistance on projects involving energy efficiency bull Studies on energy efficiency of circuits hydraulic and thermal systems bull Upgrading energy management systems of industrial plants

81 Co-generation (Combined Heat and Power (CHP)) Studies

The main tasks performed included

bull Feasibility studies and project implementation assistance ndash RandaTunis

bull Assistance in electric utility restructuring from self power producer (electricity generation

only) to self-producing co-generatorsndash STSBEJATunisia

bull Technical assistance related to STEGrsquos grid connection with Co-generation plants in some

industrial units -SOTIPAPIER STS T-PAP and Carthago-GRE- Tunisia

82 Energy audits and energy efficiency

In any industry the three top operating expenses are often found to be energy (both electrical

and thermal) labour and materials Energy would invariably emerge as a top ranker and thus

energy management function constitutes a strategic area for cost reduction

Energy Audit will help to better understand how energy is used in any industry and in identifying

the areas where waste can occur and where scope for improvement exists In this regard the

Energy Audit would give a positive orientation to the energy cost reduction preventive

maintenance and quality control programs which are vital to production and utility activities Such

36

an audit program will help keep focus on variations which occur in the energy costs availability

and reliability of supply of energy decide on appropriate energy mix identify energy

conservation technologies retrofit for energy conservation equipment etc

Therefore SIS can carry out comprehensive assessment of techno-economic performance of

plants and equipment against the designed performance level or the industry best practice

aiming at optimizing consumption levels along with specific operating control targets

821 Samples of accomplished and on-going Energy Auditing projects

bull Energy Audit of the Liquefied Petroleum Gas (LPG) plant located in Gabegraves (Tunisia) with the assistance of Kvaerner Heurtey in 2001

bull Energy Performance Assessment of Rades and Sousse steam and Combined Cycle Power Plants as well as Bouchemma Menzel Bourguiba Korba Gas Turbines with the assistance of TRACTABEL and EDF in 2002

bull Energy Audit of Sousse Combined Cycle Power Plant with the assistance of CRA2E in 2007-2008

bull Periodic Performance Tests of Carthage Power Company (CPC) combined cycle an Impendent Power Producer (IPP) in Tunisia

37

SIS Future Commitments and Responsibilities

Endowed with a clear vision a sound project management and solid experiences and

know-how acquired by the parent company STEG through its various trades of over 48 years

SIS has put together a team of experts inndashline with its strategic intent- to be positioned as a

competitive and pre-eminent regional energy services company by spreading its expertise and

know-how throughout the African continent Arab countries and the rest of the world working on

a partnership basis with potential consultants andor the utilities of the respective countries

resulting in a keen focus and a strong sense of purpose

As part of its vision SIS management recognizes that it has responsibilities to all of its

stakeholders These include

Shareholders SIS will protect the investments of its shareholders and will provide an acceptable return on

investments through the application of its business principles Customers SIS will aim at optimizing its business activities through winning customers and maintaining

customerrsquos loyalty by offering them high quality services at competitive prices delivering on time

and supporting them with its management expertise

Employees SIS recognizes that its working employees are the key to its success and it nurtures loyalty

teamwork and trust between them SIS will strive to protect support and involve them in the

companyrsquos future to develop their skills and to reward them in line with the corporate values of

SISrsquos organization

Partners Suppliers Contractors and all External Contacts SIS will seek to treat all its partners suppliers contractors and other external stakeholders in a

consistently professional way and to ensure that their needs are fulfilled in every way possible

38

  • 72 On-going and Under Bidding (UB) Projects

36

an audit program will help keep focus on variations which occur in the energy costs availability

and reliability of supply of energy decide on appropriate energy mix identify energy

conservation technologies retrofit for energy conservation equipment etc

Therefore SIS can carry out comprehensive assessment of techno-economic performance of

plants and equipment against the designed performance level or the industry best practice

aiming at optimizing consumption levels along with specific operating control targets

821 Samples of accomplished and on-going Energy Auditing projects

bull Energy Audit of the Liquefied Petroleum Gas (LPG) plant located in Gabegraves (Tunisia) with the assistance of Kvaerner Heurtey in 2001

bull Energy Performance Assessment of Rades and Sousse steam and Combined Cycle Power Plants as well as Bouchemma Menzel Bourguiba Korba Gas Turbines with the assistance of TRACTABEL and EDF in 2002

bull Energy Audit of Sousse Combined Cycle Power Plant with the assistance of CRA2E in 2007-2008

bull Periodic Performance Tests of Carthage Power Company (CPC) combined cycle an Impendent Power Producer (IPP) in Tunisia

37

SIS Future Commitments and Responsibilities

Endowed with a clear vision a sound project management and solid experiences and

know-how acquired by the parent company STEG through its various trades of over 48 years

SIS has put together a team of experts inndashline with its strategic intent- to be positioned as a

competitive and pre-eminent regional energy services company by spreading its expertise and

know-how throughout the African continent Arab countries and the rest of the world working on

a partnership basis with potential consultants andor the utilities of the respective countries

resulting in a keen focus and a strong sense of purpose

As part of its vision SIS management recognizes that it has responsibilities to all of its

stakeholders These include

Shareholders SIS will protect the investments of its shareholders and will provide an acceptable return on

investments through the application of its business principles Customers SIS will aim at optimizing its business activities through winning customers and maintaining

customerrsquos loyalty by offering them high quality services at competitive prices delivering on time

and supporting them with its management expertise

Employees SIS recognizes that its working employees are the key to its success and it nurtures loyalty

teamwork and trust between them SIS will strive to protect support and involve them in the

companyrsquos future to develop their skills and to reward them in line with the corporate values of

SISrsquos organization

Partners Suppliers Contractors and all External Contacts SIS will seek to treat all its partners suppliers contractors and other external stakeholders in a

consistently professional way and to ensure that their needs are fulfilled in every way possible

38

  • 72 On-going and Under Bidding (UB) Projects

37

SIS Future Commitments and Responsibilities

Endowed with a clear vision a sound project management and solid experiences and

know-how acquired by the parent company STEG through its various trades of over 48 years

SIS has put together a team of experts inndashline with its strategic intent- to be positioned as a

competitive and pre-eminent regional energy services company by spreading its expertise and

know-how throughout the African continent Arab countries and the rest of the world working on

a partnership basis with potential consultants andor the utilities of the respective countries

resulting in a keen focus and a strong sense of purpose

As part of its vision SIS management recognizes that it has responsibilities to all of its

stakeholders These include

Shareholders SIS will protect the investments of its shareholders and will provide an acceptable return on

investments through the application of its business principles Customers SIS will aim at optimizing its business activities through winning customers and maintaining

customerrsquos loyalty by offering them high quality services at competitive prices delivering on time

and supporting them with its management expertise

Employees SIS recognizes that its working employees are the key to its success and it nurtures loyalty

teamwork and trust between them SIS will strive to protect support and involve them in the

companyrsquos future to develop their skills and to reward them in line with the corporate values of

SISrsquos organization

Partners Suppliers Contractors and all External Contacts SIS will seek to treat all its partners suppliers contractors and other external stakeholders in a

consistently professional way and to ensure that their needs are fulfilled in every way possible

38

  • 72 On-going and Under Bidding (UB) Projects

38