    Cotton Belt CorridorBriefing

    DART Planning CommitteeJune 26, 2012

    1

  • 7/31/2019 Cotton Belt Regional Rail Project (Item 2)_Planning

    2/56

    Recent Developments

    March 20, 2012: Cotton Belt Project Briefingto Planning Committee

    May 8, 2012: Board extends iFi MOU

    May 22, 2012: Planning Committee Briefingon Public Involvement

    May 22, 2012: Board Authorizes Negotiation

    Objectives for use of the Cotton Belt by the T

    June 4, 2012: DCTA Vehicle receives FRA

    waiver to operate with freight

    2

  • 7/31/2019 Cotton Belt Regional Rail Project (Item 2)_Planning

    3/56

    Project Status

    Alignment (5% Design) Base plus Design Alternatives

    Environmental Analysis

    Existing Conditions

    Grade Separation Recommendations

    Ridership Analysis

    Stations

    3

  • 7/31/2019 Cotton Belt Regional Rail Project (Item 2)_Planning

    4/56

    Design Alternatives

    4

  • 7/31/2019 Cotton Belt Regional Rail Project (Item 2)_Planning

    5/56

    Environmental Analysis

    Existing Conditions:

    Water/Hydrology Biological Resources Land Use Noise/Vibration Parklands Community Facilities Traffic

    Visual Cultural Resources

    5

  • 7/31/2019 Cotton Belt Regional Rail Project (Item 2)_Planning

    6/56

    Denton TapSH 121 IH 635

    Proposed Grade Separations

    6

  • 7/31/2019 Cotton Belt Regional Rail Project (Item 2)_Planning

    7/56

    BNSF

    RR

    Bush

    Turnpike

    Midway Dallas

    North

    Tollway

    Green

    Line

    IH 35E

    Proposed Grade Separations

    7

  • 7/31/2019 Cotton Belt Regional Rail Project (Item 2)_Planning

    8/56

    North Dallas

    Tollway

    Proposed Grade Separations

    North Dallas Below Grade*

    *Preston; Davenport, Campbell, Davenport, Hillcrest, Meandering Way

    Coit KCS RR

    8

  • 7/31/2019 Cotton Belt Regional Rail Project (Item 2)_Planning

    9/56

    Bush Turnpike

    Proposed Grade Separations

    Red Line

    US 75/

    Plano Pkwy

    US 75 Bush

    Turnpike

    Red Line

    North:

    South:

    9

  • 7/31/2019 Cotton Belt Regional Rail Project (Item 2)_Planning

    10/56

    Ridership

    Average Daily Line Ridership: 16,400

    10

  • 7/31/2019 Cotton Belt Regional Rail Project (Item 2)_Planning

    11/56

    Eastern Terminus Ridership

    North Option South Option Both Option

    11

  • 7/31/2019 Cotton Belt Regional Rail Project (Item 2)_Planning

    12/56

    Eastern Terminus

    Mode Split: 40% Drive 37% LRT Transfer 23% Other

    Bush Station Parking 1193 Space March 2012 Utilization: 67%

    April 2012 Paid Parking Initiated

    at Parker Road May 2012 Utilization: 97%

    12

  • 7/31/2019 Cotton Belt Regional Rail Project (Item 2)_Planning

    13/56

    Station Locations

    13

  • 7/31/2019 Cotton Belt Regional Rail Project (Item 2)_Planning

    14/56

  • 7/31/2019 Cotton Belt Regional Rail Project (Item 2)_Planning

    15/56

    CottonB

    eltStation

    DFW Terminal A/B

    Stations

    Terminal ATerminal B

    15

  • 7/31/2019 Cotton Belt Regional Rail Project (Item 2)_Planning

    16/56

  • 7/31/2019 Cotton Belt Regional Rail Project (Item 2)_Planning

    17/56

    DFW North

    TEX Rail: EIS

    DFW Development Concept

    17

  • 7/31/2019 Cotton Belt Regional Rail Project (Item 2)_Planning

    18/56

  • 7/31/2019 Cotton Belt Regional Rail Project (Item 2)_Planning

    19/56

  • 7/31/2019 Cotton Belt Regional Rail Project (Item 2)_Planning

    20/56

  • 7/31/2019 Cotton Belt Regional Rail Project (Item 2)_Planning

    21/56

    Downtown Carrollton Station 21

  • 7/31/2019 Cotton Belt Regional Rail Project (Item 2)_Planning

    22/56

  • 7/31/2019 Cotton Belt Regional Rail Project (Item 2)_Planning

    23/56

    DCTA: A-Train

    23

  • 7/31/2019 Cotton Belt Regional Rail Project (Item 2)_Planning

    24/56

  • 7/31/2019 Cotton Belt Regional Rail Project (Item 2)_Planning

    25/56

  • 7/31/2019 Cotton Belt Regional Rail Project (Item 2)_Planning

    26/56

  • 7/31/2019 Cotton Belt Regional Rail Project (Item 2)_Planning

    27/56

  • 7/31/2019 Cotton Belt Regional Rail Project (Item 2)_Planning

    28/56

  • 7/31/2019 Cotton Belt Regional Rail Project (Item 2)_Planning

    29/56

  • 7/31/2019 Cotton Belt Regional Rail Project (Item 2)_Planning

    30/56

    Knoll Trail Station Concept:

    Proposed development may require

    implementation of no parking station

    Bus activity could take place on street

    Included in City Resolution

    30

  • 7/31/2019 Cotton Belt Regional Rail Project (Item 2)_Planning

    31/56

  • 7/31/2019 Cotton Belt Regional Rail Project (Item 2)_Planning

    32/56

    Preston Road Station Issues:

    Difficult access Circuitous access High traffic

    Constrained site Parking, kiss & ride, buses, amenities

    Fully developed station area Conflicts with roadway improvement plans Low ridership projections (544 Daily)

    Strong public opposition

    Included in City Resolution

    32

  • 7/31/2019 Cotton Belt Regional Rail Project (Item 2)_Planning

    33/56

  • 7/31/2019 Cotton Belt Regional Rail Project (Item 2)_Planning

    34/56

  • 7/31/2019 Cotton Belt Regional Rail Project (Item 2)_Planning

    35/56

    Renner Village Station

    35

  • 7/31/2019 Cotton Belt Regional Rail Project (Item 2)_Planning

    36/56

  • 7/31/2019 Cotton Belt Regional Rail Project (Item 2)_Planning

    37/56

  • 7/31/2019 Cotton Belt Regional Rail Project (Item 2)_Planning

    38/56

  • 7/31/2019 Cotton Belt Regional Rail Project (Item 2)_Planning

    39/56

  • 7/31/2019 Cotton Belt Regional Rail Project (Item 2)_Planning

    40/56

    40

  • 7/31/2019 Cotton Belt Regional Rail Project (Item 2)_Planning

    41/56

  • 7/31/2019 Cotton Belt Regional Rail Project (Item 2)_Planning

    42/56

  • 7/31/2019 Cotton Belt Regional Rail Project (Item 2)_Planning

    43/56

  • 7/31/2019 Cotton Belt Regional Rail Project (Item 2)_Planning

    44/56

  • 7/31/2019 Cotton Belt Regional Rail Project (Item 2)_Planning

    45/56

  • 7/31/2019 Cotton Belt Regional Rail Project (Item 2)_Planning

    46/56

  • 7/31/2019 Cotton Belt Regional Rail Project (Item 2)_Planning

    47/56

    47

  • 7/31/2019 Cotton Belt Regional Rail Project (Item 2)_Planning

    48/56

    Bush Station Concept:

    Requires new RR ROW Including significant aerial structure

    Cross-platform transfers

    May require parking expansion Existing parking at 97% capacity

    Proposed station area development Existing TIFs with 33% dedicated to Cotton Belt

    48

  • 7/31/2019 Cotton Belt Regional Rail Project (Item 2)_Planning

    49/56

    Both (12th/Bush) Station Issues:

    Adds station but notridership 1 mile apart

    Property Acquisition(Capital Wire)

    Increased traveltime

    2 TOD Opportunities Plano Richardson

    49

  • 7/31/2019 Cotton Belt Regional Rail Project (Item 2)_Planning

    50/56

  • 7/31/2019 Cotton Belt Regional Rail Project (Item 2)_Planning

    51/56

    Shiloh West Issues

    Power Substation Station Size

    Parking

    Buses

    PedestrianMovements

    564 Parking SpacesShiloh Station West

    51

  • 7/31/2019 Cotton Belt Regional Rail Project (Item 2)_Planning

    52/56

    Shiloh Station East52

    Shil h St ti C t

  • 7/31/2019 Cotton Belt Regional Rail Project (Item 2)_Planning

    53/56

    Shiloh Station Concept:

    Separates Cotton Belt terminus from Red Line

    Need to provide sufficient parking

    Addresses Bush Station parking concerns

    53

    C tt B lt R il Y d

  • 7/31/2019 Cotton Belt Regional Rail Project (Item 2)_Planning

    54/56

    Cotton Belt Rail Yard:

    Looking for opportunities

    Considerations Manufacturing of vehicle Consolidation with the T or DCTA

    Phasing of project

    54

  • 7/31/2019 Cotton Belt Regional Rail Project (Item 2)_Planning

    55/56

    Next Steps

    NCTCOG/iFi returns to DART in September Continue to advance design and

    environmental

    Reinitiate public involvement

    Recommendation: Advance all station and design alternatives

    through environmental phase

    Use environmental analysis as tool for comparingalternatives

    Funding availability will determine affordabilityand phasing.