COST ESTIMATION SHEET PROJECT : HYDRAULIC ROBOT (JCB) NAME OF PART: BASE PLATE (18 MM) PART NO:1 CLASS: MECHANICAL (6 TH SEM / 2 ND SHIFT) YEAR:2010 -2011 MATERIAL : WOOD MATERIAL COST LENGTH *WIDTH 3*2 RATE/MM 44 QTY 1 TOTAL 260 MACHINING COST PROCESS COST/ HOUR MINS NET COST CUTTING 20 60 20 SLOTTING 10 15 10 DRILLING TOTAL 75 30 LABOUR COST LABOUR COST 50 TRANSPROTATION COST (ALL DIMENSION IN FOOT)

Upload: gopal-jetani

Post on 13-Apr-2015

655 views

Category:

Documents


0 download

DESCRIPTION

product

TRANSCRIPT

Page 1: Costing Format

COST ESTIMATION SHEET

PROJECT : HYDRAULIC ROBOT (JCB)

NAME OF PART: BASE PLATE (18 MM)

PART NO:1

CLASS: MECHANICAL (6 TH SEM / 2NDSHIFT)

YEAR:2010 -2011

MATERIAL : WOOD

MATERIAL COST

LENGTH *WIDTH 3*2RATE/MM 44QTY 1TOTAL 260

MACHINING COST

PROCESS COST/ HOUR MINS NET COST

CUTTING 20 60 20SLOTTING 10 15 10DRILLINGTOTAL 75 30

LABOUR COST

LABOUR COST 50

TRANSPROTATION COST

TRANSPROTATION 20

(ALL DIMENSION IN FOOT)

Page 2: Costing Format

COST ESTIMATION SHEET

PROJECT : HYDRAULIC ROBOT (JCB)

NAME OF PART: CIRCULER LINK(12MM)

PART NO:2

CLASS: MECHANICAL (6 TH SEM / 2NDSHIFT)

YEAR:2010 -2011

MATERIAL : WOOD

MATERIAL COST

LENGTH *WIDTH 2*2RATE/MM 45QTY 1TOTAL 180

MACHINING COST

PROCESS COST/ HOUR MINS NET COST

CUTTING 20 60 20TURNING 10 15 10DRILLINGTOTAL 75 30

LABOUR COST

LABOUR COST 50

TRANSPROTATION COST

TRANSPROTATION 20

(ALL DIMENSION IN FOOT)

Page 3: Costing Format

COST ESTIMATION SHEETPROJECT : HYDRAULIC ROBOT (JCB)

NAME OF PART: VERTICAL LINK (18MM)

PART NO:3

CLASS: MECHANICAL (6 TH SEM / 2NDSHIFT)

YEAR:2010 -2011

MATERIAL : WOOD

MATERIAL COST

LENGTH *WIDTH 3*3RATE/MM 60QTY 2TOTAL 540

MACHINING COST

PROCESS COST/ HOUR MINS NET COST

CUTTING 20 60 20DRILLINGTOTAL 60 20

LABOUR COST

LABOUR COST 50

TRANSPROTATION COST

TRANSPROTATION 20

(ALL DIMENSION IN FOOT)

Page 4: Costing Format

COST ESTIMATION SHEETPROJECT : HYDRAULIC ROBOT (JCB)

NAME OF PART: HORIZONTAL LINK-1 (8MM)

PART NO:4

CLASS: MECHANICAL (6 TH SEM / 2NDSHIFT)

YEAR:2010 -2011

MATERIAL : WOOD

MATERIAL COST

LENGTH *WIDTH 3*3RATE/MM 27QTY 2TOTAL 245

MACHINING COST

PROCESS COST/ HOUR MINS NET COST

CUTTING 20 60 20DRILLINGTOTAL 60 20

LABOUR COST

LABOUR COST 50

TRANSPROTATION COST

TRANSPROTATION 20

(ALL DIMENSION IN FOOT)

Page 5: Costing Format

COST ESTIMATION SHEETPROJECT : HYDRAULIC ROBOT (JCB)

NAME OF PART: HORIZONTAL LINK-2 (6MM)

PART NO:5

CLASS: MECHANICAL (6 TH SEM / 2NDSHIFT)

YEAR:2010 -2011

MATERIAL : WOOD

MATERIAL COST

LENGTH *WIDTH 3*3RATE/MM 23QTY 2TOTAL 210

MACHINING COST

PROCESS COST/ HOUR MINS NET COST

CUTTING 20 60 20DRILLINGTOTAL 60 20

LABOUR COST

LABOUR COST 50

TRANSPROTATION COST

TRANSPROTATION 20

(ALL DIMENSION IN FOOT)

Page 6: Costing Format

COST ESTIMATION SHEETPROJECT : HYDRAULIC ROBOT (JCB)

NAME OF PART: TOOL LINK-1(6MM)

PART NO:6

CLASS: MECHANICAL (6 TH SEM / 2NDSHIFT)

YEAR:2010 -2011

MATERIAL : WOOD

MATERIAL COST

LENGTH *WIDTH 2*2RATE/MM 7QTY 2TOTAL 30

MACHINING COST

PROCESS COST/ HOUR MINS NET COST

CUTTING 20 60 20SHAPING 20 15 20DRILLINGTOTAL 75 40

LABOUR COST

LABOUR COST 50

TRANSPROTATION COST

TRANSPROTATION 20

(ALL DIMENSION IN FOOT)

Page 7: Costing Format

COST ESTIMATION SHEETPROJECT : HYDRAULIC ROBOT (JCB)

NAME OF PART: TOOL LINK-2 (6MM)

PART NO: 7

CLASS: MECHANICAL (6 TH SEM / 2NDSHIFT)

YEAR:2010 -2011

MATERIAL : WOOD

MATERIAL COST

LENGTH *WIDTH 0.5*0.5RATE/MM 7QTY 2TOTAL 30

MACHINING COST

PROCESS COST/ HOUR MINS NET COST

CUTTING 20 30 20DRILLINGTOTAL 30 20

LABOUR COST

LABOUR COST 50

TRANSPROTATION COST

TRANSPROTATION 20

(ALL DIMENSION IN FOOT)

Page 8: Costing Format

COST ESTIMATION SHEETPROJECT : HYDRAULIC ROBOT (JCB)

NAME OF PART: CONNECTING LINK-1/2 (6MM)

PART NO:8

CLASS: MECHANICAL (6 TH SEM / 2NDSHIFT)

YEAR:2010 -2011

MATERIAL : WOOD

MATERIAL COST

LENGTH *WIDTH 1*1RATE/MM 7QTY 4TOTAL 45

MACHINING COST

PROCESS COST/ HOUR MINS NET COST

CUTTING 20 60 20DRILLINGTOTAL 60 20

LABOUR COST

LABOUR COST 50

TRANSPROTATION COST

TRANSPROTATION 20

(ALL DIMENSION IN FOOT)

Page 9: Costing Format

COST ESTIMATION SHEET

PURCHASED PART ESTIMATION SHEET

PURCHASED MATERIAL QTY RS

SMALL GEAR PLASTIC 1 30

BIG GEAR PLASTIC 2 120

THREADED SHAFT M.S. 12 200

RACK PLASTIC 2 30

SYRINGE FIBER 12 350

FLEXIBLE PIPE (HARD) P.V.C 6 FOOT 60

BOLT NUT AND OTHER FASTERNES M.S. AS PER USE 30

HOOK M.S. 10 50

TOTAL 870

(ALL DIMENSION IN FOOT)