costain -...

7
1 Costain Presentation by Adrian Burgess MSc, BSc(Hons) Business Systems Group Costain ICT Strategy 2001 - 2006 Costain Costain’s 5 Year ICT Strategy. iCosNet - Enterprise Portal - Demo Future ICT Strategy ? Costain Costain 138 Years of ‘Engineering Excellence’ The Thames Barrier Tsing Ma Suspension bridge The Channel Tunnel Costain Costain 138 Years of ‘Engineering Excellence’ 2003 – 2004 Cont….Growth Turnover up 20% £650.2m. Profit up 42% £16.1m. Forward Orders of £805 m. Strong Cash Balance 70.6m. Growth Strategy – Set 2001 1. Restructure 2. Shift towards Asset Mmt 3. International Markets. 4. Best Practise program (ICT strategy) Targets for 2006 1 billion £ turnover 3% Margins on Projects 386 m 462.9 m 543.4 m 650.5m 2000 2001 2002 2003 6.5m 8.7m 11.3m 16.1m 2000 2001 2002 2003 COSTAIN GROUP TURNOVER PRE TAX PROFIT Costain iCosNet ICT Platform Costain ICT Strategy 2001 - 2006 Standards & Best Practise Gateway to Costain Apps Project Collaboration Sub Contractor Payments Material Purchase online Tendering Online Document Management Knowledge Management Outline of ICT Strategy Costain Costain ICT Strategy 2001 - 2006 ICT Strategy : 3 Phases 1 Infrastructure 1.Staff PC Upgrades. 2.Windows 2000 3.Hardware & Data centre. 4.Fast connections to WAN 5.Fast connections to Internet 2 Enterprise Portal 1.Document Management 2.Standards & Best Practise 3.Knowledge Management 4.Gateway to H/O Programmes 5.Project Collaboration 6.Ecommerce Modules 3 Commercial Apps 1.Accounts Payable /Receivable 2.Advanced Cost Accounting 3.Cash Accounting 4.Expense Management 5.Financial Planning 6.Financial Budgeting 7.Financial Reporting 8.Fixed Asset Accounting 9.General Ledger

Upload: others

Post on 17-Aug-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Costain - construction-innovation.infoconstruction-innovation.info/images/pdfs/conference_cd_2004/confe… · ICT strategy futures ! The Future 4. Project Extranets - Process Management

1

Costain

Presentation by

Adrian Burgess MSc, BSc(Hons)

Business Systems Group

Costain ICT Strategy 2001 - 2006

Costain

• Costain’s 5 Year ICT Strategy.

• iCosNet - Enterprise Portal - Demo

• Future ICT Strategy ?

CostainCostain138 Years of ‘Engineering Excellence’

The Thames BarrierTsing Ma Suspension bridge The Channel Tunnel

CostainCostain138 Years of ‘Engineering Excellence’

2003 – 2004 Cont….Growth

Turnover up 20% £650.2m.

Profit up 42% £16.1m.

Forward Orders of £805 m.

Strong Cash Balance 70.6m.

Growth Strategy – Set 2001

1. Restructure

2. Shift towards Asset Mmt

3. International Markets.

4. Best Practise program

(ICT strategy)

Targets for 2006

1 billion £ turnover

3% Margins on Projects

386 m

462.9 m

543.4 m

650.5m

2000 2001 2002 2003

Pre Tax Profit

6.5m

8.7m

11.3m

16.1m

2000 2001 2002 2003

COSTAIN GROUP TURNOVERCOSTAIN GROUP TURNOVERPRE TAX PROFIT

Costain

iCosNetICT Platform

CostainICT Strategy 2001 - 2006

Standards & Best Practise

Gateway to Costain Apps

ProjectCollaboration Sub

ContractorPayments

MaterialPurchase

online

Tendering Online

DocumentManagement

KnowledgeManagement

Outline of ICT Strategy CostainCostain

ICT Strategy 2001 - 2006ICT Strategy : 3 Phases

1 Infrastructure

1.Staff PC Upgrades.2.Windows 20003.Hardware & Data centre.4.Fast connections to WAN5.Fast connections to Internet

2 Enterprise Portal

1.Document Management2.Standards & Best Practise3.Knowledge Management4.Gateway to H/O Programmes5.Project Collaboration6.Ecommerce Modules

3 Commercial Apps1.Accounts Payable /Receivable2.Advanced Cost Accounting 3.Cash Accounting 4.Expense Management 5.Financial Planning6.Financial Budgeting7.Financial Reporting 8.Fixed Asset Accounting9.General Ledger

Page 2: Costain - construction-innovation.infoconstruction-innovation.info/images/pdfs/conference_cd_2004/confe… · ICT strategy futures ! The Future 4. Project Extranets - Process Management

2

CostainICT Strategy 2001 - 2006 ICT Programme

2002Activity 2002 2003 2004 2005 2006

(1) Infrastructure

Vendor Selection

Server Hosting & New Network

Windows 2000 Roll Out

(2) iCosNet – Enterprise Portal

Vendor Selection

Document Management

Standards & Best Practice

Knowledge Management

Gateway to H/O applications

Project Collaboration

(3) Commercial Applications

vendor Selection

Subcontractor Payments.

Material Purchase

Online Tendering.

Costain

Costain Costain

Costain Costain

Page 3: Costain - construction-innovation.infoconstruction-innovation.info/images/pdfs/conference_cd_2004/confe… · ICT strategy futures ! The Future 4. Project Extranets - Process Management

3

Costain Costain

Costain Costain

Costain Costain

Page 4: Costain - construction-innovation.infoconstruction-innovation.info/images/pdfs/conference_cd_2004/confe… · ICT strategy futures ! The Future 4. Project Extranets - Process Management

4

Costain Costain

Costain Costain

Costain Costain

Page 5: Costain - construction-innovation.infoconstruction-innovation.info/images/pdfs/conference_cd_2004/confe… · ICT strategy futures ! The Future 4. Project Extranets - Process Management

5

Costain Costain

Costain Costain

Costain Costain

Page 6: Costain - construction-innovation.infoconstruction-innovation.info/images/pdfs/conference_cd_2004/confe… · ICT strategy futures ! The Future 4. Project Extranets - Process Management

6

CostainCostain

• 1,200,000 Hits / week

• 300 GB of documents. Approx 1,000,000 docs

• 200 Supply Chain Companies

• 200 concurrent users

• 3500 + users

• 65 Active Projects Workspaces

• 33 Active Company Workspaces

iCosNet - Enterprise Portal

Hits on iCosNet

0

200,000

400,000

600,000

800,000

1,000,000

1,200,000

1,400,000

Jan-

03

Feb

-03

Mar

-03

Apr

-03

May

-03

Jun-

03

Jul-0

3

Aug

-03

Sep

-03

Oct

-03

Nov

-03

Dec

-03

Jan-

04

Feb

-04

Mar

-04

Apr

-04

May

-04

Jun-

04

Costain

• Not technology led & Business Owned

• Balance of People: Process : technology

• Clear Vision Strategy & Plan

• Easy of Use

• Incentives

• Training Programme (1000 man days 2003, 600 - 2004 )

• People & Champions

iCosNet - Enterprise Portal

CostainThe FutureICT strategy futures !

3. 3D Single Model Environments. ( Design Management)

Next 5 years1. Technology will move faster and faster.

2. Next 5 years could be more change than in the last 50

Heathrow Express Up to 15 %

Endeavour House10%

Basingstoke ShoppingCentre 9.8 %

Heathrow Terminal 5??% (targeting 10%)

Beyond that

CostainThe FutureICT strategy futures !

4. Project Extranets - Process Management

3. 3D Single Model Environments.

Next 5 years

Beyond that

1. Technology will move faster and faster.

2. Next 5 years could be more change than in the last 50

• Easier to use

• More flexible Workflow - Processes

• Extended use >> Supply Chain & life cycle

• Strategies, Methods and protocols -

CostainThe FutureICT strategy futures !

4. Project Extranets - Process Management

5. Client led - Life Cycle ICT strategies

3. 3D Single Model Environments.

Next 5 years

Beyond that

1. Technology will move faster and faster.

2. Next 5 years could be more change than in the last 50

Economicstudies

Operation &Maintenance

Production /Construction

ConceptDesign

Workingdrawings

Tender

Decommission

Built Asset Life Cycle

NIST report : Waste$15 Billion / yr

Owner Operatorscost : $10.6 Billion /yr

Fragmented Information & Communication processes !!Inadequate Interoperability

CostainThe FutureICT strategy futures !

4. Project Extranets - Process Management

5. Client led - Life Cycle ICT strategies

3. 3D Single Model Environments.

6. Visualisation & Simulation Tools

Next 5 years

Beyond that

1. Technology will move faster and faster.

2. Next 5 years could be more change than in the last 50

•3D renditions & Animated Fly throughs

•Simulation tools

• 4 D Planning

Page 7: Costain - construction-innovation.infoconstruction-innovation.info/images/pdfs/conference_cd_2004/confe… · ICT strategy futures ! The Future 4. Project Extranets - Process Management

7

CostainThe FutureICT strategy futures !

4. Project Extranets - Process Management

7. E – Commerce

5. Client led - Life Cycle ICT strategies

3. 3D Single Model Environments.

6. Visualisation & Simulation Tools

Next 5 years

Beyond that

1. Technology will move faster and faster.

2. Next 5 years could be more change than in the last 50

• On Line tendering & Estimating tools

• Subcontractor Payments

• Online catalogues and procurement

CostainThe FutureICT strategy futures !

4. Project Extranets - Process Management

7. E – Commerce

5. Client led - Life Cycle ICT strategies

3. 3D Single Model Environments.

6. Visualisation & Simulation Tools

Next 5 years

Beyond that

1. Technology will move faster and faster.

2. Next 5 years could be more change than in the last 50

8. BIM – Building Information Model ( Intelligent Object Design)

• Architectural

• Real Time Internet Collaboration ??

• Too complicated

Costain

We are no longer constrained by Technology

Just our ability to harness it !