cost
DESCRIPTION
3d costTRANSCRIPT
-
Test Block Housing SecurityFront
COGS Labor COGS Labor
uPrintData Preparation 5.85 5.85Part ConstructionMaterials 18.15 47.6Build Time 13.58 4.1 39.82 4.1Post Processing 31.73Sub-total 31.73 9.94 87.42 9.94Total 41.67 97.36
-
Panel- Security Panel-Back
COGS Labor COGS Labor
5.85 5.85
17.36 27.5210.86 4.1 23.53 4.1
28.22 9.94 51.05 9.9438.16 60.99
-
Sheet1