COST ESTIMATE GUIDE FOR SCOPING (These cost figures were last updated on 12-18-2017) *These cost per mile factors contained within this document should in no case be considered to contain sufficient detail to allow their inclusion in the STIP, used to determine a Program Amount or used for the Asset Management Plan. * Cost-per-mile Assumptions New 2 Lane (Major) Grading & Drainage $846,000 44 ft. Roadbed Base & Surface $1,282,000 Medium Duty Pavement New 2 Lane (Minor) Grading & Drainage $617,000 32 ft. Roadbed Base & Surface $619,000 32 ft. Light Duty Pavement (2 – 4’ Shoulders) Add Lanes for Dual Lanes Grading & Drainage $748,000 38 ft. Roadbed Base & Surface $1,117,000 Medium Duty Pavement $1,430,000 Heavy Duty Pavement New 4 Lane Grading & Drainage $1,300,000 2 - 38 ft. Roadbed & Median Base & Surface $2,234,000 Medium Duty Pavement $2,860,000 Heavy Duty Pavement Interchanges-Ramps Only , Excludes bridges and crossroad Lump sum each Grading & Drainage $ 1,366,000 Base & Surface $846,000 Note: Grading cost includes 30% Rock and assumes Medium Grading. Grading Adjustment Factors Flat: 0.7; Rolling: 1.0; Mountainous: 3.0 Use these grading factors, unless justified with district information and proper documentation. Miscellaneous and Utility Costs may be assumed to total 20 percent of the sum of grading & drainage, and surface & base, unless additional analysis is warranted. Maintenance Treatment Cost can be found on Page 5 Page 1

Upload: others

Post on 15-Apr-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: COST ESTIMATE GUIDE FOR RURAL PRELIMINARY … · Web view* Only applies to Major Routes or First and Second Priority Earthquake response routes. See Sheets 3 and 4 of this figure

COST ESTIMATE GUIDE FOR SCOPING (These cost figures were last updated on 12-18-2017)

*These cost per mile factors contained within this document should in no case be considered to contain sufficient detail to allow their inclusion in the STIP, used to determine a Program Amount or used for the Asset Management Plan.*

Cost-per-mile AssumptionsNew 2 Lane (Major)

Grading & Drainage $846,000 44 ft. RoadbedBase & Surface $1,282,000 Medium Duty Pavement

New 2 Lane (Minor)Grading & Drainage $617,000 32 ft. RoadbedBase & Surface $619,000 32 ft. Light Duty Pavement (2 – 4’ Shoulders)

Add Lanes for Dual LanesGrading & Drainage $748,000 38 ft. RoadbedBase & Surface $1,117,000 Medium Duty Pavement

$1,430,000 Heavy Duty Pavement

New 4 LaneGrading & Drainage $1,300,000 2 - 38 ft. Roadbed & MedianBase & Surface $2,234,000 Medium Duty Pavement

$2,860,000 Heavy Duty Pavement

Interchanges-Ramps Only, Excludes bridges and crossroad

Lump sum eachGrading & Drainage $ 1,366,000Base & Surface $846,000

Note: Grading cost includes 30% Rock and assumes Medium Grading.

Grading Adjustment Factors

Flat: 0.7; Rolling: 1.0; Mountainous: 3.0

Use these grading factors, unless justified with district information and proper documentation.

Miscellaneous and Utility Costs may be assumed to total 20 percent of the sum of grading & drainage, and surface & base, unless additional analysis is warranted.

Maintenance Treatment Cost can be found on Page 5

Cost perBridge Structures Sq. foot

Typical Girder $105Temporary Bridge (State furnished) $60Temporary Bridge (Contractor furnished) $140Major Lake Crossing $200 - $250Major River Crossing $250 - $450

Percentage Cost Factors:

Bridge costs per square foot should be increased for the following:

Item % IncreaseStaged Construction 10

Page 1

Page 2: COST ESTIMATE GUIDE FOR RURAL PRELIMINARY … · Web view* Only applies to Major Routes or First and Second Priority Earthquake response routes. See Sheets 3 and 4 of this figure

Horizontal Curve Alignment 5Skews 20 to 30 degrees 10Skews 30 to 50 degrees 25Seismic Category B* 10Seismic Category C* 15Seismic Category D* 25Tight Site/Limited Access 10* Only applies to Major Routes or First and Second Priority Earthquake response routes. See Sheets 3 and 4 of this figure for details of seismic categories.

For Stream Crossings:

Bridge Replacement Length = 1.10 X Existing Bridge Length, unless otherwise documented. The existing bridge length can be obtained from TMS.

Bridge replacement length may be longer than 1.10 X Existing Bridge Length for bridges crossing FEMA regulatory floodways. Bridges on new alignments are required to span the entire floodway. For bridges on existing alignment, use 1.10 X Existing Bridge Length when the 100-year flood does not overtop the existing roadway. When the 100-year flood does overtop the existing roadway, the new bridge will be required to span the entire floodway.

For Companion Grade Separation Structures:

Bridge Replacement Length = Existing Bridge Length. The existing bridge length can be obtained from TMS.

Bridge Width should equal traveled way, shoulders and barrier rail width.

Bridge Approaches:

The cost of bridge approaches should be added to the total cost derived from the approach slab area. Bridge slab cost:

English: ($25/ft2) ( roadway width, ft) (20 ft.) (2)

Cost perBridge Removals Sq. footSimple Structures $8Steel Structures over Roads $10Concrete Structures over Interstates $25

(quick opening of lanes to traffic required)

Bridge Rehabilitations: Fill out a Structural Rehabilitation Checklist and contact Bridge Division for assistance.

Specialized Projects

Projects having unusual features and special scopes of work should be compared to similar types of district projects using historic data. Generic cost information listed in this guide should not be applied for projects such as traffic signal improvements, geometric improvements, and other types of small projects. Check with GHQ Design Bidding and Contract Services for assistance.

Additional costs should be included in the project estimate for retaining walls, extensive sound walls, temporary bypasses and traffic signals.

Page 2

Page 3: COST ESTIMATE GUIDE FOR RURAL PRELIMINARY … · Web view* Only applies to Major Routes or First and Second Priority Earthquake response routes. See Sheets 3 and 4 of this figure

Page 3

Page 4: COST ESTIMATE GUIDE FOR RURAL PRELIMINARY … · Web view* Only applies to Major Routes or First and Second Priority Earthquake response routes. See Sheets 3 and 4 of this figure

Page 4

Page 5: COST ESTIMATE GUIDE FOR RURAL PRELIMINARY … · Web view* Only applies to Major Routes or First and Second Priority Earthquake response routes. See Sheets 3 and 4 of this figure

Page 5

Page 6: COST ESTIMATE GUIDE FOR RURAL PRELIMINARY … · Web view* Only applies to Major Routes or First and Second Priority Earthquake response routes. See Sheets 3 and 4 of this figure

Page 6

Page 7: COST ESTIMATE GUIDE FOR RURAL PRELIMINARY … · Web view* Only applies to Major Routes or First and Second Priority Earthquake response routes. See Sheets 3 and 4 of this figure

Page 7

Page 8: COST ESTIMATE GUIDE FOR RURAL PRELIMINARY … · Web view* Only applies to Major Routes or First and Second Priority Earthquake response routes. See Sheets 3 and 4 of this figure

Page 8

Page 9: COST ESTIMATE GUIDE FOR RURAL PRELIMINARY … · Web view* Only applies to Major Routes or First and Second Priority Earthquake response routes. See Sheets 3 and 4 of this figure

Page 9

Page 10: COST ESTIMATE GUIDE FOR RURAL PRELIMINARY … · Web view* Only applies to Major Routes or First and Second Priority Earthquake response routes. See Sheets 3 and 4 of this figure

Page 10

Page 11: COST ESTIMATE GUIDE FOR RURAL PRELIMINARY … · Web view* Only applies to Major Routes or First and Second Priority Earthquake response routes. See Sheets 3 and 4 of this figure

Page 11

Page 12: COST ESTIMATE GUIDE FOR RURAL PRELIMINARY … · Web view* Only applies to Major Routes or First and Second Priority Earthquake response routes. See Sheets 3 and 4 of this figure

Page 12

Page 13: COST ESTIMATE GUIDE FOR RURAL PRELIMINARY … · Web view* Only applies to Major Routes or First and Second Priority Earthquake response routes. See Sheets 3 and 4 of this figure

Page 13

Page 14: COST ESTIMATE GUIDE FOR RURAL PRELIMINARY … · Web view* Only applies to Major Routes or First and Second Priority Earthquake response routes. See Sheets 3 and 4 of this figure

Page 14

Page 15: COST ESTIMATE GUIDE FOR RURAL PRELIMINARY … · Web view* Only applies to Major Routes or First and Second Priority Earthquake response routes. See Sheets 3 and 4 of this figure

Page 15

Page 16: COST ESTIMATE GUIDE FOR RURAL PRELIMINARY … · Web view* Only applies to Major Routes or First and Second Priority Earthquake response routes. See Sheets 3 and 4 of this figure

Page 16

Page 17: COST ESTIMATE GUIDE FOR RURAL PRELIMINARY … · Web view* Only applies to Major Routes or First and Second Priority Earthquake response routes. See Sheets 3 and 4 of this figure

Page 17

Page 18: COST ESTIMATE GUIDE FOR RURAL PRELIMINARY … · Web view* Only applies to Major Routes or First and Second Priority Earthquake response routes. See Sheets 3 and 4 of this figure

Page 18

Page 19: COST ESTIMATE GUIDE FOR RURAL PRELIMINARY … · Web view* Only applies to Major Routes or First and Second Priority Earthquake response routes. See Sheets 3 and 4 of this figure

Page 19

Page 20: COST ESTIMATE GUIDE FOR RURAL PRELIMINARY … · Web view* Only applies to Major Routes or First and Second Priority Earthquake response routes. See Sheets 3 and 4 of this figure

Page 20

Page 21: COST ESTIMATE GUIDE FOR RURAL PRELIMINARY … · Web view* Only applies to Major Routes or First and Second Priority Earthquake response routes. See Sheets 3 and 4 of this figure

Page 21

Page 22: COST ESTIMATE GUIDE FOR RURAL PRELIMINARY … · Web view* Only applies to Major Routes or First and Second Priority Earthquake response routes. See Sheets 3 and 4 of this figure

Mai

nten

ance

Tre

atm

ent (

Janu

ary

2017

)Co

st p

er 1

2'

Lane

Mile

Trea

tmen

t Des

crip

tion:

Stat

ewid

eRe

mar

ks:

Min

or S

eal C

oat (

Chi

p S

eal)

$8,9

00Fo

r Gra

de A

, B &

C s

eal c

oat u

se $

2.00

/gal

(0.3

3 ga

l/sy)

for b

inde

r and

$0.

60/s

y fo

r agg

rega

te.

MIn

or C

old

Mix

Ove

rlay

no h

isto

ryN

o hi

stor

y av

aila

ble.

Con

sult

with

Mai

nten

ance

Div

isio

n fo

r pric

e.M

inor

Col

d M

ix P

atch

no h

isto

ryN

o hi

stor

y av

aila

ble.

Con

sult

with

Mai

nten

ance

Div

isio

n fo

r pric

e.M

inor

Con

cret

e P

avem

ent R

epai

r$2

8,20

0B

ased

on

2% p

avem

ent r

epla

cem

ent.

Use

d hi

stor

y fo

r cla

ss a

full

dept

h pa

vem

ent r

epai

r. $2

00.0

0/sy

Min

or F

og S

eal (

Fly

Coa

t)$3

,200

Use

d hi

stor

y fo

r fog

sea

l (0.

2 ga

l/sy)

. $2.

25/g

alM

inor

Mic

ro-S

urfa

cing

(Typ

e II)

$22,

900

Use

d hi

stor

y fo

r typ

e II

mic

rosu

rfaci

ng (S

ingl

e lif

t). $

3.25

/sy

Min

or R

oto-

Mill

ing

(Col

dmill

ing

3" o

r les

s)$7

,000

Use

d hi

stor

y fo

r col

dmill

ing

(3" o

r les

s). $

1.00

/sy

Min

or S

crub

and

Bro

om S

eal

$14,

100

Ultr

athi

n B

onde

d W

earin

g S

urfa

ce, T

ype

C$2

5,30

0M

ajor

Con

cret

e R

epla

cem

ent

$600

,000

Maj

or C

oncr

ete

Unb

onde

d O

verla

y 8"

$386

,000

Maj

or C

ontra

ct H

ot-M

ix O

verla

y 1"

(Sur

face

Lev

elin

g)$2

8,10

0M

ajor

Con

tract

Hot

-Mix

Ove

rlay

1.75

" (S

uper

pave

) PG

64-2

2$3

7,30

0U

sed

$55.

00 p

er to

n fo

r SP

125

Maj

or D

iam

ond

Grin

ding

$19,

000

Use

d $2

.70/

syM

ajor

Lig

ht-D

uty

Ove

rlay

(1.2

5" S

uper

pave

) PG

64-2

2$3

4,90

0U

sed

$60.

00 p

er to

n fo

r SP

095.

581

Ton

s. A

ssum

es 1

/2" s

crat

ch c

ours

e on

50%

of o

verla

ys (c

oncr

ete)

.M

ajor

Lig

ht-D

uty

Ove

rlay

(1.7

5" S

uper

pave

) PG

64-2

2$4

2,60

0U

sed

$55.

00 p

er to

n fo

r SP

125.

775

Ton

s. A

ssum

es 1

/2" s

crat

ch c

ours

e on

50%

of o

verla

ys (c

oncr

ete)

.M

ajor

Lig

ht-D

uty

Ove

rlay

(Typ

e C

UB

AWS

& 2

" SP

190

PG

64-2

2)$7

1,60

0U

sed

$3.6

0/sy

for U

BAW

S a

nd $

53.0

0 pe

r ton

for S

P19

0. A

ssum

es 1

/2" s

crat

ch c

ours

e on

50%

of o

verla

ys (c

oncr

ete)

. M

ajor

Lig

ht-D

uty

Ove

rlay

(3.7

5" S

uper

pave

) PG

64-2

2$8

5,90

0U

sed

$58.

00 p

er to

n fo

r SP

125

and

$53.

00 p

er to

n fo

r SP

190.

Ass

umes

1/2

" scr

atch

cou

rse

on 5

0% o

f ove

rlays

(con

cret

e).

Maj

or L

ight

-Dut

y O

verla

y (3

" Sup

erpa

ve) P

G64

-22

$64,

800

Use

d $5

8.00

per

ton

for S

P12

5 an

d $6

5.00

per

ton

for S

P04

8. A

ssum

es 1

/2" s

crat

ch c

ours

e on

50%

of o

verla

ys (c

oncr

ete)

. M

ajor

Med

ium

-Dut

y O

verla

y (1

.25"

Sup

erpa

ve) P

G70

-22

$35,

400

Use

d $6

1.00

per

ton

for S

P09

5.

Assu

mes

1/2

" scr

atch

cou

rse

on 5

0% o

f ove

rlays

(con

cret

e).

Maj

or M

ediu

m-D

uty

Ove

rlay

(1.7

5" S

uper

pave

) PG

70-2

2$4

5,70

0U

sed

$59.

00 p

er to

n fo

r SP

125.

As

sum

es 1

/2" s

crat

ch c

ours

e on

50%

of o

verla

ys (c

oncr

ete)

.M

ajor

Med

ium

-Dut

y O

verla

y (T

ype

C U

BAW

S &

2" S

P19

0 P

G70

-22)

$74,

600

Use

d $3

.60/

sy fo

r UB

AWS

and

$55

.00

per t

on fo

r SP

190.

Ass

umes

1/2

" scr

atch

cou

rse

on 5

0% o

f ove

rlays

(con

cret

e).

Maj

or M

ediu

m-D

uty

Ove

rlay

(3.7

5" S

uper

pave

) PG

70-2

2$8

8,30

0U

sed

$59.

00 p

er to

n fo

r SP

125

and

Use

d $5

5.00

per

ton

for S

P19

0. A

ssum

es 1

/2" s

crat

ch c

ours

e on

50%

of o

verla

ys (c

oncr

ete)

.M

ajor

Med

ium

-Dut

y O

verla

y (3

" Sup

erpa

ve) P

G70

-22

$65,

900

Use

d $5

9.00

per

ton

for S

P12

5 an

d $6

6.00

per

ton

for S

P04

8. A

ssum

es 1

/2" s

crat

ch c

ours

e on

50%

of o

verla

ys (c

oncr

ete)

. M

ajor

Hea

vy-D

uty

Ove

rlay

(1.7

5" S

uper

pave

) PG

76-2

2 S

MA/

LP$6

2,80

0U

sed

$81.

00 p

er to

n fo

r SP

125

(SM

A/LP

). As

sum

es 1

/2" s

crat

ch c

ours

e on

50%

of o

verla

ys (c

oncr

ete)

.M

ajor

Hea

vy-D

uty

Ove

rlay

(3.7

5" S

uper

pave

) PG

76-2

2 S

MA/

LP$1

07,7

00U

sed

$81.

00 p

er to

n fo

r SP

125

(SM

A/LP

) and

$60

.00

per t

on fo

r SP

190.

Ass

umes

1/2

" scr

atch

cou

rse

on 5

0% o

f ove

rlays

(con

cret

e).

Maj

or H

eavy

-Dut

y O

verla

y (3

" Sup

erpa

ve) P

G76

-22

SM

A/LP

$80,

400

Use

d $8

1.00

per

ton

for S

P12

5 (S

MA/

LP) a

nd $

65.0

0 pe

r ton

for S

P04

8. A

ssum

es 1

/2" s

crat

ch c

ours

e on

50%

of o

verla

ys (c

oncr

ete)

.M

ajor

Hea

vy-D

uty

Ove

rlay

(1.7

5" S

uper

pave

) PG

76-2

2 S

MAR

$62,

000

Rur

al -

Use

d $8

0.00

per

ton

for S

P12

5 (S

MAR

). As

sum

es 1

/2" s

crat

ch c

ours

e on

50%

of o

verla

ys (c

oncr

ete)

.M

ajor

Hea

vy-D

uty

Ove

rlay

(3.7

5" S

uper

pave

) PG

76-2

2 S

MAR

$107

,000

Rur

al -

Use

d $8

0.00

per

ton

for S

P12

5 (S

MAR

) and

$60

.00

per t

on fo

r SP

190.

Ass

umes

1/2

" scr

atch

cou

rse

on 5

0% o

f ove

rlays

(con

cret

e).

Maj

or H

eavy

-Dut

y O

verla

y (3

" Sup

erpa

ve) P

G76

-22

SM

AR$7

9,70

0R

ural

- U

sed

$80.

00 p

er to

n fo

r SP

125

(SM

AR) a

nd $

65.0

0 pe

r ton

for S

P04

8. A

ssum

es 1

/2" s

crat

ch c

ours

e on

50%

of o

verla

ys (c

oncr

ete)

.

Not

e: T

he a

bove

pric

es a

re fo

r the

spe

cific

pav

emen

t tre

atm

ents

onl

y an

d do

not

incl

ude

inci

dent

al it

ems

such

as:

mob

iliza

tion,

traf

fic c

ontro

l, st

ripin

g, e

tc.

Mis

c. C

osts

Cost

per

12'

La

ne M

ileRe

mar

ksS

tripi

ng (H

igh

Bui

ld)

$1,2

00.0

0U

sed

$0.2

0 pe

r foo

t for

pai

nt (1

.125

stri

pes

per l

ane

mile

).S

tripi

ng (P

aint

)$9

00.0

0U

sed

$0.1

5 pe

r foo

t for

pai

nt (1

.125

stri

pes

per l

ane

mile

).Tr

affic

Con

trol

$500

.00

Rum

ble

Stri

ps$8

00.0

0U

sed

$15.

00 p

er s

tatio

n.M

obili

zatio

n4.

5%

Use

d hi

stor

y fo

r scr

ub s

eal.

$2.0

0/sy

Use

d $3

.60/

sy.

Rem

oval

, Gra

ding

, Bas

e &

Con

cret

e P

avin

g w

ork

only

.B

ond

Bre

aker

, Sur

face

Pre

p. &

Con

cret

e P

avin

g w

ork

only

.U

sed

$58/

ton.

Inc

lude

s 25

% fo

r irr

egul

ariti

es.

Page 22

Page 23: COST ESTIMATE GUIDE FOR RURAL PRELIMINARY … · Web view* Only applies to Major Routes or First and Second Priority Earthquake response routes. See Sheets 3 and 4 of this figure

Page 23