COST ESTIMATE GUIDE FOR SCOPING (These cost figures were last updated on 12-18-2017)
*These cost per mile factors contained within this document should in no case be considered to contain sufficient detail to allow their inclusion in the STIP, used to determine a Program Amount or used for the Asset Management Plan.*
Cost-per-mile AssumptionsNew 2 Lane (Major)
Grading & Drainage $846,000 44 ft. RoadbedBase & Surface $1,282,000 Medium Duty Pavement
New 2 Lane (Minor)Grading & Drainage $617,000 32 ft. RoadbedBase & Surface $619,000 32 ft. Light Duty Pavement (2 – 4’ Shoulders)
Add Lanes for Dual LanesGrading & Drainage $748,000 38 ft. RoadbedBase & Surface $1,117,000 Medium Duty Pavement
$1,430,000 Heavy Duty Pavement
New 4 LaneGrading & Drainage $1,300,000 2 - 38 ft. Roadbed & MedianBase & Surface $2,234,000 Medium Duty Pavement
$2,860,000 Heavy Duty Pavement
Interchanges-Ramps Only, Excludes bridges and crossroad
Lump sum eachGrading & Drainage $ 1,366,000Base & Surface $846,000
Note: Grading cost includes 30% Rock and assumes Medium Grading.
Grading Adjustment Factors
Flat: 0.7; Rolling: 1.0; Mountainous: 3.0
Use these grading factors, unless justified with district information and proper documentation.
Miscellaneous and Utility Costs may be assumed to total 20 percent of the sum of grading & drainage, and surface & base, unless additional analysis is warranted.
Maintenance Treatment Cost can be found on Page 5
Cost perBridge Structures Sq. foot
Typical Girder $105Temporary Bridge (State furnished) $60Temporary Bridge (Contractor furnished) $140Major Lake Crossing $200 - $250Major River Crossing $250 - $450
Percentage Cost Factors:
Bridge costs per square foot should be increased for the following:
Item % IncreaseStaged Construction 10
Page 1
Horizontal Curve Alignment 5Skews 20 to 30 degrees 10Skews 30 to 50 degrees 25Seismic Category B* 10Seismic Category C* 15Seismic Category D* 25Tight Site/Limited Access 10* Only applies to Major Routes or First and Second Priority Earthquake response routes. See Sheets 3 and 4 of this figure for details of seismic categories.
For Stream Crossings:
Bridge Replacement Length = 1.10 X Existing Bridge Length, unless otherwise documented. The existing bridge length can be obtained from TMS.
Bridge replacement length may be longer than 1.10 X Existing Bridge Length for bridges crossing FEMA regulatory floodways. Bridges on new alignments are required to span the entire floodway. For bridges on existing alignment, use 1.10 X Existing Bridge Length when the 100-year flood does not overtop the existing roadway. When the 100-year flood does overtop the existing roadway, the new bridge will be required to span the entire floodway.
For Companion Grade Separation Structures:
Bridge Replacement Length = Existing Bridge Length. The existing bridge length can be obtained from TMS.
Bridge Width should equal traveled way, shoulders and barrier rail width.
Bridge Approaches:
The cost of bridge approaches should be added to the total cost derived from the approach slab area. Bridge slab cost:
English: ($25/ft2) ( roadway width, ft) (20 ft.) (2)
Cost perBridge Removals Sq. footSimple Structures $8Steel Structures over Roads $10Concrete Structures over Interstates $25
(quick opening of lanes to traffic required)
Bridge Rehabilitations: Fill out a Structural Rehabilitation Checklist and contact Bridge Division for assistance.
Specialized Projects
Projects having unusual features and special scopes of work should be compared to similar types of district projects using historic data. Generic cost information listed in this guide should not be applied for projects such as traffic signal improvements, geometric improvements, and other types of small projects. Check with GHQ Design Bidding and Contract Services for assistance.
Additional costs should be included in the project estimate for retaining walls, extensive sound walls, temporary bypasses and traffic signals.
Page 2
Page 3
Page 4
Page 5
Page 6
Page 7
Page 8
Page 9
Page 10
Page 11
Page 12
Page 13
Page 14
Page 15
Page 16
Page 17
Page 18
Page 19
Page 20
Page 21
Mai
nten
ance
Tre
atm
ent (
Janu
ary
2017
)Co
st p
er 1
2'
Lane
Mile
Trea
tmen
t Des
crip
tion:
Stat
ewid
eRe
mar
ks:
Min
or S
eal C
oat (
Chi
p S
eal)
$8,9
00Fo
r Gra
de A
, B &
C s
eal c
oat u
se $
2.00
/gal
(0.3
3 ga
l/sy)
for b
inde
r and
$0.
60/s
y fo
r agg
rega
te.
MIn
or C
old
Mix
Ove
rlay
no h
isto
ryN
o hi
stor
y av
aila
ble.
Con
sult
with
Mai
nten
ance
Div
isio
n fo
r pric
e.M
inor
Col
d M
ix P
atch
no h
isto
ryN
o hi
stor
y av
aila
ble.
Con
sult
with
Mai
nten
ance
Div
isio
n fo
r pric
e.M
inor
Con
cret
e P
avem
ent R
epai
r$2
8,20
0B
ased
on
2% p
avem
ent r
epla
cem
ent.
Use
d hi
stor
y fo
r cla
ss a
full
dept
h pa
vem
ent r
epai
r. $2
00.0
0/sy
Min
or F
og S
eal (
Fly
Coa
t)$3
,200
Use
d hi
stor
y fo
r fog
sea
l (0.
2 ga
l/sy)
. $2.
25/g
alM
inor
Mic
ro-S
urfa
cing
(Typ
e II)
$22,
900
Use
d hi
stor
y fo
r typ
e II
mic
rosu
rfaci
ng (S
ingl
e lif
t). $
3.25
/sy
Min
or R
oto-
Mill
ing
(Col
dmill
ing
3" o
r les
s)$7
,000
Use
d hi
stor
y fo
r col
dmill
ing
(3" o
r les
s). $
1.00
/sy
Min
or S
crub
and
Bro
om S
eal
$14,
100
Ultr
athi
n B
onde
d W
earin
g S
urfa
ce, T
ype
C$2
5,30
0M
ajor
Con
cret
e R
epla
cem
ent
$600
,000
Maj
or C
oncr
ete
Unb
onde
d O
verla
y 8"
$386
,000
Maj
or C
ontra
ct H
ot-M
ix O
verla
y 1"
(Sur
face
Lev
elin
g)$2
8,10
0M
ajor
Con
tract
Hot
-Mix
Ove
rlay
1.75
" (S
uper
pave
) PG
64-2
2$3
7,30
0U
sed
$55.
00 p
er to
n fo
r SP
125
Maj
or D
iam
ond
Grin
ding
$19,
000
Use
d $2
.70/
syM
ajor
Lig
ht-D
uty
Ove
rlay
(1.2
5" S
uper
pave
) PG
64-2
2$3
4,90
0U
sed
$60.
00 p
er to
n fo
r SP
095.
581
Ton
s. A
ssum
es 1
/2" s
crat
ch c
ours
e on
50%
of o
verla
ys (c
oncr
ete)
.M
ajor
Lig
ht-D
uty
Ove
rlay
(1.7
5" S
uper
pave
) PG
64-2
2$4
2,60
0U
sed
$55.
00 p
er to
n fo
r SP
125.
775
Ton
s. A
ssum
es 1
/2" s
crat
ch c
ours
e on
50%
of o
verla
ys (c
oncr
ete)
.M
ajor
Lig
ht-D
uty
Ove
rlay
(Typ
e C
UB
AWS
& 2
" SP
190
PG
64-2
2)$7
1,60
0U
sed
$3.6
0/sy
for U
BAW
S a
nd $
53.0
0 pe
r ton
for S
P19
0. A
ssum
es 1
/2" s
crat
ch c
ours
e on
50%
of o
verla
ys (c
oncr
ete)
. M
ajor
Lig
ht-D
uty
Ove
rlay
(3.7
5" S
uper
pave
) PG
64-2
2$8
5,90
0U
sed
$58.
00 p
er to
n fo
r SP
125
and
$53.
00 p
er to
n fo
r SP
190.
Ass
umes
1/2
" scr
atch
cou
rse
on 5
0% o
f ove
rlays
(con
cret
e).
Maj
or L
ight
-Dut
y O
verla
y (3
" Sup
erpa
ve) P
G64
-22
$64,
800
Use
d $5
8.00
per
ton
for S
P12
5 an
d $6
5.00
per
ton
for S
P04
8. A
ssum
es 1
/2" s
crat
ch c
ours
e on
50%
of o
verla
ys (c
oncr
ete)
. M
ajor
Med
ium
-Dut
y O
verla
y (1
.25"
Sup
erpa
ve) P
G70
-22
$35,
400
Use
d $6
1.00
per
ton
for S
P09
5.
Assu
mes
1/2
" scr
atch
cou
rse
on 5
0% o
f ove
rlays
(con
cret
e).
Maj
or M
ediu
m-D
uty
Ove
rlay
(1.7
5" S
uper
pave
) PG
70-2
2$4
5,70
0U
sed
$59.
00 p
er to
n fo
r SP
125.
As
sum
es 1
/2" s
crat
ch c
ours
e on
50%
of o
verla
ys (c
oncr
ete)
.M
ajor
Med
ium
-Dut
y O
verla
y (T
ype
C U
BAW
S &
2" S
P19
0 P
G70
-22)
$74,
600
Use
d $3
.60/
sy fo
r UB
AWS
and
$55
.00
per t
on fo
r SP
190.
Ass
umes
1/2
" scr
atch
cou
rse
on 5
0% o
f ove
rlays
(con
cret
e).
Maj
or M
ediu
m-D
uty
Ove
rlay
(3.7
5" S
uper
pave
) PG
70-2
2$8
8,30
0U
sed
$59.
00 p
er to
n fo
r SP
125
and
Use
d $5
5.00
per
ton
for S
P19
0. A
ssum
es 1
/2" s
crat
ch c
ours
e on
50%
of o
verla
ys (c
oncr
ete)
.M
ajor
Med
ium
-Dut
y O
verla
y (3
" Sup
erpa
ve) P
G70
-22
$65,
900
Use
d $5
9.00
per
ton
for S
P12
5 an
d $6
6.00
per
ton
for S
P04
8. A
ssum
es 1
/2" s
crat
ch c
ours
e on
50%
of o
verla
ys (c
oncr
ete)
. M
ajor
Hea
vy-D
uty
Ove
rlay
(1.7
5" S
uper
pave
) PG
76-2
2 S
MA/
LP$6
2,80
0U
sed
$81.
00 p
er to
n fo
r SP
125
(SM
A/LP
). As
sum
es 1
/2" s
crat
ch c
ours
e on
50%
of o
verla
ys (c
oncr
ete)
.M
ajor
Hea
vy-D
uty
Ove
rlay
(3.7
5" S
uper
pave
) PG
76-2
2 S
MA/
LP$1
07,7
00U
sed
$81.
00 p
er to
n fo
r SP
125
(SM
A/LP
) and
$60
.00
per t
on fo
r SP
190.
Ass
umes
1/2
" scr
atch
cou
rse
on 5
0% o
f ove
rlays
(con
cret
e).
Maj
or H
eavy
-Dut
y O
verla
y (3
" Sup
erpa
ve) P
G76
-22
SM
A/LP
$80,
400
Use
d $8
1.00
per
ton
for S
P12
5 (S
MA/
LP) a
nd $
65.0
0 pe
r ton
for S
P04
8. A
ssum
es 1
/2" s
crat
ch c
ours
e on
50%
of o
verla
ys (c
oncr
ete)
.M
ajor
Hea
vy-D
uty
Ove
rlay
(1.7
5" S
uper
pave
) PG
76-2
2 S
MAR
$62,
000
Rur
al -
Use
d $8
0.00
per
ton
for S
P12
5 (S
MAR
). As
sum
es 1
/2" s
crat
ch c
ours
e on
50%
of o
verla
ys (c
oncr
ete)
.M
ajor
Hea
vy-D
uty
Ove
rlay
(3.7
5" S
uper
pave
) PG
76-2
2 S
MAR
$107
,000
Rur
al -
Use
d $8
0.00
per
ton
for S
P12
5 (S
MAR
) and
$60
.00
per t
on fo
r SP
190.
Ass
umes
1/2
" scr
atch
cou
rse
on 5
0% o
f ove
rlays
(con
cret
e).
Maj
or H
eavy
-Dut
y O
verla
y (3
" Sup
erpa
ve) P
G76
-22
SM
AR$7
9,70
0R
ural
- U
sed
$80.
00 p
er to
n fo
r SP
125
(SM
AR) a
nd $
65.0
0 pe
r ton
for S
P04
8. A
ssum
es 1
/2" s
crat
ch c
ours
e on
50%
of o
verla
ys (c
oncr
ete)
.
Not
e: T
he a
bove
pric
es a
re fo
r the
spe
cific
pav
emen
t tre
atm
ents
onl
y an
d do
not
incl
ude
inci
dent
al it
ems
such
as:
mob
iliza
tion,
traf
fic c
ontro
l, st
ripin
g, e
tc.
Mis
c. C
osts
Cost
per
12'
La
ne M
ileRe
mar
ksS
tripi
ng (H
igh
Bui
ld)
$1,2
00.0
0U
sed
$0.2
0 pe
r foo
t for
pai
nt (1
.125
stri
pes
per l
ane
mile
).S
tripi
ng (P
aint
)$9
00.0
0U
sed
$0.1
5 pe
r foo
t for
pai
nt (1
.125
stri
pes
per l
ane
mile
).Tr
affic
Con
trol
$500
.00
Rum
ble
Stri
ps$8
00.0
0U
sed
$15.
00 p
er s
tatio
n.M
obili
zatio
n4.
5%
Use
d hi
stor
y fo
r scr
ub s
eal.
$2.0
0/sy
Use
d $3
.60/
sy.
Rem
oval
, Gra
ding
, Bas
e &
Con
cret
e P
avin
g w
ork
only
.B
ond
Bre
aker
, Sur
face
Pre
p. &
Con
cret
e P
avin
g w
ork
only
.U
sed
$58/
ton.
Inc
lude
s 25
% fo
r irr
egul
ariti
es.
Page 22
Page 23