cost effectivness analisys country report - hungary

11
COST EFFECTIVNESS ANALISYS Country report - HUNGARY Ibolya GAZDAG – Veolia Water Hungary Ministry of Environment and Water (MoEW)

Upload: milos

Post on 15-Jan-2016

30 views

Category:

Documents


0 download

DESCRIPTION

Ministry of Environment and Water (MoEW ). COST EFFECTIVNESS ANALISYS Country report - HUNGARY. Ibolya GAZDAG – Veolia Water Hungary. MoEW. 1. Status of W FD implementation 2. Main findings of the country report 3 . Ongoing activities preparing CEA. INTRODUCTION. MoEW. - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: COST EFFECTIVNESS ANALISYS Country report  - HUNGARY

COST EFFECTIVNESS ANALISYS

Country report - HUNGARYIbolya GAZDAG – Veolia Water Hungary

Ministry of Environment and Water (MoEW)

Page 2: COST EFFECTIVNESS ANALISYS Country report  - HUNGARY

INTRODUCTION

1. Status of W1. Status of WFDFD implementation implementation

2. Main findings of the country report 2. Main findings of the country report

33. Ongoing activities preparing CEA. Ongoing activities preparing CEA

MoEW

Page 3: COST EFFECTIVNESS ANALISYS Country report  - HUNGARY

WFD implementation MoEW

The legal harmonisation completed

The Hungarian Strategic Document and

related acts/regulations and governmental

decrees accepted

Institutional background ensured

As Hungary’s whole territory is in Danube basin – work in strong relationship with ICPDR in order to create basin wide development plan to reach WFD goals

The sub-basins for river basin management plans defined, and main rules for working out the programmme of measures are regulated in governmental decrees

Page 4: COST EFFECTIVNESS ANALISYS Country report  - HUNGARY

WFD implementation MoEW

4 planning units necessary for international agreements and EU reporting

18 planning subunit for programmes of measures

Page 5: COST EFFECTIVNESS ANALISYS Country report  - HUNGARY

WFD implementation MoEW

Water bodies at risk based on organic load

Page 6: COST EFFECTIVNESS ANALISYS Country report  - HUNGARY

WFD implementation MoEW

Water bodies at risk based on nutrient load

Page 7: COST EFFECTIVNESS ANALISYS Country report  - HUNGARY

WFD implementation MoEW

Water bodies at risk based on hazardous material load

Page 8: COST EFFECTIVNESS ANALISYS Country report  - HUNGARY

WFD implementation MoEW

Water bodies defined as at risk based on

presence of point or diffuse pollution sources or pollutions from cross border origin

Organic pollution (74) Nutrient pollution (470) Dangerous material (201)

Point source

Diffuse source

Cross border

Point source

Diffuse source

Cross border

Point source

Diffuse source

Cross border

46 23 5 130 201 3 26 170 5

Page 9: COST EFFECTIVNESS ANALISYS Country report  - HUNGARY

WFD implementation MoEW

Preparatory works, projects:

-Általér project / 2001-2003– water management plan prepared in frame of MATRA project , some economic elements, but different principles

- Szamos pilot project / 2002-2003 – international (HU-Ro) testing of EU-WFD guidance for surface water bodies, common GIS and monitoring systems and economic characterisation

- PHARE project /2001-2005 – two subproject in frame of twinning: survey of the ecological status of the surface waters, survey of chemical status of ground waters and some institutional development

- Zagyva- Tarna pilot project / 2004-2006 to develop programme of measures under the WFD requirements

Page 10: COST EFFECTIVNESS ANALISYS Country report  - HUNGARY

WFD implementation MoEW

-Zagyva- Tarna pilot project:

- Characterisation and water management issues including economic analysis and level of cost recovery is already completed

- Pressure and Impact analysis, Baseline scenario and risk analysis is available, but working out programme of measures with CEA will be tasks for 2006

Budapest

Zagyva-Tarna river basin

Page 11: COST EFFECTIVNESS ANALISYS Country report  - HUNGARY

WFD implementation MoEW

New EU funded project to support WFD implementation(funded from Transitional Facility)Starting date: 2005 DecemberDeadline for completion: 2007 III. Quarter

Main tasks:

-methodology for defining programmes of measures most favourable from cost effectiveness point of view ( guidance for use of CEA in selection of the measures, proposal for evaluation and critical analysis of cost recovery in water services)

- testing the results of economic analysis on Upper-Tisza watershed and in ongoing pilot project of Zagyva-Tarna. Final goal of the work is to work out a guidance for Hungarian water management planning process – how to use the economic analysis and CEA

- Strategy for implementation of public involvement on national, regional and subunit level in planning process