'Cost effective measures and planning of traffic safety Planning philosophies and preferences Use of CBA in Sweden/Europe Physical planning Four step principal Speed Limit Review

Upload: ethelbert-lester

Post on 12-Jan-2016

214 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: Cost effective measures and planning of traffic safety Planning philosophies and preferences Use of CBA in Sweden/Europe Physical planning Four step principal

'Cost effective measures and planning of traffic safety

Planning philosophies and preferencesUse of CBA in Sweden/Europe

Physical planningFour step principal

Speed Limit Review

Page 2: Cost effective measures and planning of traffic safety Planning philosophies and preferences Use of CBA in Sweden/Europe Physical planning Four step principal

Planning philosophies

More complex

Rail investments – road development

Industries and villages

Conditions for living and welfare

Caused by many individual reasons and decisions not by strategic planning

Page 3: Cost effective measures and planning of traffic safety Planning philosophies and preferences Use of CBA in Sweden/Europe Physical planning Four step principal

Processes of decisions

• Extreme 1: Rational perspective• Extreme 2: Wagging the way forward

• Visionary: Main problem and future status in clear picture (Vision Zero)

• Planning: Defining goals from problems to solve. Goals define valuations.

• Consensus oriented: Acceptance through discussions with parties; goals, problems

Page 4: Cost effective measures and planning of traffic safety Planning philosophies and preferences Use of CBA in Sweden/Europe Physical planning Four step principal

European cities use of different decision models. Source: EU project PROSPECTS

Consider this! Russia model today and in the future? Russia and Tatarstan/Kazan?

Visionary

Visionary & Planning

Planning

Planning & Consensus

Consensus

Consensus & Visionary

Page 5: Cost effective measures and planning of traffic safety Planning philosophies and preferences Use of CBA in Sweden/Europe Physical planning Four step principal

1) He/she fixed the key and that made it possible to get into the basement. Compensation after work/Aristoteles

2) He/she is the strongest of them all and if he/she don’t get the puppet she will start a fight, which she probably will win. Negotiation positioning/Hobbes

3) He/she spotted the puppet first and thats why she must have it. Practical philosofic arguments/Locke, Nozick

4) It means most for he/she, because the collection will be completed then. Utility maximization principle

5) He/she is underprivileged and has no puppet at all. Maximize-Minimize principle/Rawls

Consider this! Who should have the puppet?

Welfare preferences5 children have found a puppet in a basement.

Page 6: Cost effective measures and planning of traffic safety Planning philosophies and preferences Use of CBA in Sweden/Europe Physical planning Four step principal

Cost Effective Measures and Planning of Traffic Safety in Sweden

• Beauty Contest!

• Cost Benefit Analysis Method

• Four step principal

• Physical planning

• Review of Speed Limits in Sweden

Page 7: Cost effective measures and planning of traffic safety Planning philosophies and preferences Use of CBA in Sweden/Europe Physical planning Four step principal

Goals in transport policy (1)

The overall goal of transport policy in accordance with the Swedish Parliament’s decision in 1998:

• to ensure a socio-economically efficient transport system that is sustainable in the long term for individuals and the business community throughout the country.

Page 8: Cost effective measures and planning of traffic safety Planning philosophies and preferences Use of CBA in Sweden/Europe Physical planning Four step principal

Goals in transport policy (2)

This goal is divided into six subsidiary goals:• An accessible transport system: The transport system is to be

designed so as to meet the basic transport needs of individuals and the business community.

• High transport quality: The design and function of the transport system is to permit a high level of transport quality for individuals and the business community.

• Positive regional development: The transport system should promote a positive regional development, both by evening out differences in the potential of various parts of the country to develop, and by counteracting the drawbacks of long transport distances.

Page 9: Cost effective measures and planning of traffic safety Planning philosophies and preferences Use of CBA in Sweden/Europe Physical planning Four step principal

Goals in transport policy (3)

This goal is divided into six subsidiary goals:• Safe traffic: The long-term goal for road traffic safety is for nobody to

be killed or seriously injured as a result of traffic accidents. The design and operation of the road transport system should be brought into line with the requirements that this goal entails.

• A good environment: The design and performance of the transport system should be adapted to the requirements for a good and healthy living environment for everyone, where natural and cultural environments are protected against damage. Good management of land, water, energy and other natural resources is to be promoted.

• A gender-equal road transport system: The road transport system is to be designed to fulfil the transport needs of both women and men. Women and men are to be offered an equal opportunity to influence the creation of the transport system, its design and management, and their values are to be equally important.

Page 10: Cost effective measures and planning of traffic safety Planning philosophies and preferences Use of CBA in Sweden/Europe Physical planning Four step principal

Since 1997

• In October 1997 the Swedish Parliment adopted a ”Vision Zero” approach as a basis for Sweden´s long-term road safety objectives.

Page 11: Cost effective measures and planning of traffic safety Planning philosophies and preferences Use of CBA in Sweden/Europe Physical planning Four step principal

Beauty Contest!

• The most effect per invested capital– killed and seriously injured persons /

investing capital cost (euro)– Priority to maximize number of saved persons for a

given budget.

• Effects and impacts have been collected and documented in a knowledge based document used by all planning in road sector.

• Equivalent for other transport mode system

Page 12: Cost effective measures and planning of traffic safety Planning philosophies and preferences Use of CBA in Sweden/Europe Physical planning Four step principal

Estimate Effect examples

• Speed reduction - (speed after/speed before)4,5. If speed is reduced from 100 km/h to 90 km/h it will give about 38% reductions for expected fatalities.

• A pedestrian sidewalk can give somewhere between 40-80 percent reduction, depending on if the sidewalk is on both sides of the road or on one side; if its completely separated from vehicles or partly separated.

• Steel guard rails and/or removing obstacles from roadside can reduce the severity of accident outcome with 15-60%.

Page 13: Cost effective measures and planning of traffic safety Planning philosophies and preferences Use of CBA in Sweden/Europe Physical planning Four step principal

Estimate effects example

• Pedestrian crosswalks are estimated to about 20-30 %, with island and footpath extension and fences up to 50%.

• Medians give a reduction for pedestrian with about 20-25% and for head

on collisions almost 100%. • Improved visibility and guidance, including illumination is estimated to

give an accident reduction about 20-30%. Illumination can even give a bigger reduction, up to 65%, if a “black spot” is found where accidents appear in dark hours.

• Important that the situation in the specific village under investigation is taken into consideration when estimating the effects.

Page 14: Cost effective measures and planning of traffic safety Planning philosophies and preferences Use of CBA in Sweden/Europe Physical planning Four step principal

Estimate investment costs

• Calculate construction costs per unit of typical road construction works

• Calculate costs for the designed modules

• Determinate costs for maintenance and costs for individual measures, land aquisation, ..

Page 15: Cost effective measures and planning of traffic safety Planning philosophies and preferences Use of CBA in Sweden/Europe Physical planning Four step principal

Presentation about the Cost–Benefit Analysis

for the Road-Safety-Measure project

Page 16: Cost effective measures and planning of traffic safety Planning philosophies and preferences Use of CBA in Sweden/Europe Physical planning Four step principal

Cost–Benefit Analysis

• Weighing the total expected costs against the total expected benefits of one or more actions in order to choose the best or most profitable option

Page 17: Cost effective measures and planning of traffic safety Planning philosophies and preferences Use of CBA in Sweden/Europe Physical planning Four step principal

HEATCO

Developing Harmonised European Approaches for Transport Costing and Project Assessment.

Project in 6 frame programme 2002-2006.Project owner: European Commission, DGTREN

Final version report 17 maj 2006.

Consortium: IER University of Stuttgart Tyskland, University of Bath UK, EIT

University of Las Palmas Spain, COWI Denmark, BUTE Hungary, ISIS Italy, Ecoplan Schweiz, TNO Dutch Nederland, VTI Sweden, SWECO Norway, ITS Leeds UK, Herry Consult Germany, NTUA Greece and

Sudop Tjeckien.

Page 18: Cost effective measures and planning of traffic safety Planning philosophies and preferences Use of CBA in Sweden/Europe Physical planning Four step principal

• Evaluation methodes of projects with several countries involved• Evaluation of EU fonds projects• Harmonizing of assessment with one framework. (Some countries

without consistent method).• Purpose: Guidelines based on criterias socioeconomic efficiency,

open and clear studies, and support from member countries decision makers.

Page 19: Cost effective measures and planning of traffic safety Planning philosophies and preferences Use of CBA in Sweden/Europe Physical planning Four step principal

Decision criterias

• NPV (net present value) = (positive=recommend)• BCR (benefit cost ratio) = (>0 =recommend)• RNPSS (ratio of NPV and public sector support)

(>1=recommend, valid for priorities with limited budget)• FYRR (first year rate of return) – valid for decison of

optimal opening year for a project.

Page 20: Cost effective measures and planning of traffic safety Planning philosophies and preferences Use of CBA in Sweden/Europe Physical planning Four step principal

• Real changes during project lifetime years• Factor prices/market prices• No monetized effects• Lifetime period• Risk and uncertainty• Discounting• Allocation of effects• Marginal Cost of Public Funds

Page 21: Cost effective measures and planning of traffic safety Planning philosophies and preferences Use of CBA in Sweden/Europe Physical planning Four step principal

• Values of Time• Values of risk and accidents• Noice• Air pollutions• Climate gases• Other specific situations of environmental aspects• Construction cost• Planning cost: Only costs after decision made• Land use costs: land value, cost for buying process.• Cost for trafficants during activities: (=Trafficant extra cost):

Estimate effect and value as ordinary time value• Maintenance costs

Page 22: Cost effective measures and planning of traffic safety Planning philosophies and preferences Use of CBA in Sweden/Europe Physical planning Four step principal

Accident dataWe assume that reported fatalities are probably most

accurate. With the figures of fatalities as a starting point

one could expect the number of severe injured to be

about 3 times the fatalities and light injured and damage

only about 8 times the fatalities

Page 23: Cost effective measures and planning of traffic safety Planning philosophies and preferences Use of CBA in Sweden/Europe Physical planning Four step principal

Accident cost in European countries related to GDP (Gross Domestic

Product)

Page 24: Cost effective measures and planning of traffic safety Planning philosophies and preferences Use of CBA in Sweden/Europe Physical planning Four step principal

Consider this!!A positive CBA-ratio is an information to the decision maker that the project is

positive for the society.

The non monetized effects can on the other hand be positive (better) or negative (worse) for the society.

How to prioritize between investment package A, B, C and D?

Non monetized effect better

Non monetized effect worse

CBA Positive A C

CBA Negative B D

Page 25: Cost effective measures and planning of traffic safety Planning philosophies and preferences Use of CBA in Sweden/Europe Physical planning Four step principal
Page 26: Cost effective measures and planning of traffic safety Planning philosophies and preferences Use of CBA in Sweden/Europe Physical planning Four step principal

Typical costs - if made right from the beginning

Current costsin EURO

Costs for highest safety Increase Effectiveness

Road 1500 1,515 (barriers) 1% 90%

Vehicle 20,000 20,002 (SBR) 0.01% 20%

Vehicle 20,000 20,020 (alcohol) 0.1% 20%

Vehicle 20,000 20,200 (speed) 1% 20%

Page 27: Cost effective measures and planning of traffic safety Planning philosophies and preferences Use of CBA in Sweden/Europe Physical planning Four step principal

MID-BARRIERS / CENTRE GUARD RAILS

• A centre guard rail prevents head-on collisions, thereby making a rural road of standard width considerably safer.

• Appr. 1000 km in 2004• Goal: 2000 km in 2007• Test started in 1998

with 6 projects• AADT 4000 - 22000

Page 28: Cost effective measures and planning of traffic safety Planning philosophies and preferences Use of CBA in Sweden/Europe Physical planning Four step principal

What purpose have socioeconomic analysis and calculations had so far, and how should it be tomorrow?

• It’s obvious that decisions divert from results. This goes for beneficial and non-beneficial projects!– Rail tunnel in Malmoe (NPV/C<0)– Road plans in Stockholm (NPV<0)– A number of rail projects (bothnia stretch, Hallands tunnel)

(NPV/C < 0)– Bypass Sveg (NPV/C= 6)

– Russia projects?

Page 29: Cost effective measures and planning of traffic safety Planning philosophies and preferences Use of CBA in Sweden/Europe Physical planning Four step principal

The Four Step Principle

Short-comings/

Needs

Measures that affect transport needs and choice of mode of

transport

Possible measuresstep 1

Measures that lead to more efficient

utilisation of the existing road

network

Possible measuresstep 2

Road improvements and minor

conversions

Possible measuresstep 3

New investments and major conversions

Possible measuresstep 4

Balancing and

prioritising

measures with

different effects,

costs and time

perspectives

Page 30: Cost effective measures and planning of traffic safety Planning philosophies and preferences Use of CBA in Sweden/Europe Physical planning Four step principal

The use of Cost Benefit Analysis at SRA

Page 31: Cost effective measures and planning of traffic safety Planning philosophies and preferences Use of CBA in Sweden/Europe Physical planning Four step principal

The Planning Procedure in three levels

1. Planning in a strategically level.

Concerning all traffic modes: road, railway, air and shipping

2. System analysis of the road network.Improvement of the road network in a large scale

3. Road projects.Individual actions to the roads

CBA is used in all three levels

Page 32: Cost effective measures and planning of traffic safety Planning philosophies and preferences Use of CBA in Sweden/Europe Physical planning Four step principal

Factors to CBA

- Land use

- Recreatio

n

- Touris

m

- Water Supply

- Impacts of a region

ValuedImpacts

EstimatedImpacts

Impacts not tobe settled

Valued Impacts• Travel time• Vehicle costs• Traffic Safety• Environmental issues• Maintenance costs• Noise

Estimated Impacts• Barrier impacts

- Environmental protection

Page 33: Cost effective measures and planning of traffic safety Planning philosophies and preferences Use of CBA in Sweden/Europe Physical planning Four step principal

Foundation of decisions

Total judgement

The PopulationThe Economy etc

Forecast concerning the future need of transportation

The Road network

Can be improved by..

Cost Benefit Analysis

Impacts Valued into money

Impacts Not valued into money

Fulfilment ofthe Aims

Alternative actions

Lead to impacts..

Decision of action

As a basisfor ...

Page 34: Cost effective measures and planning of traffic safety Planning philosophies and preferences Use of CBA in Sweden/Europe Physical planning Four step principal

Transport demand forecasting models Overall assumptions now and in the future

National institute Models for national long term for statistik etc. economic forecast

- EMEC - rAps

SAMGODS – The Swedish model system for freight transports- Foreign trade- VTI/TPR

- STAN (system optimizing)

SAMKALK GODS

SAMPERS – The Swedish model system for passenger traveling - Car ownership- Regional travel (5 models)- National travel- International travel- EMME/2 (user optimizing)

ACCESSIBILITY SAMKALKMODUL

- Population - Business sector, export and import - Employment, incoms - Infrastructure- Car ownership - GDP-growth - Taxation, charges, regulation

Page 35: Cost effective measures and planning of traffic safety Planning philosophies and preferences Use of CBA in Sweden/Europe Physical planning Four step principal

Use of SAMGODS / SAMPERS

• Strategic infrastructure planning for the planning period 2004-15

• Freight transport forecast for 2010 and for 2020• Freight corridor study• Transport mileage forecast for 2020 – analys

enviroment impacts• Impacts from congestion charges Stockholm• Bothnia railway

Page 36: Cost effective measures and planning of traffic safety Planning philosophies and preferences Use of CBA in Sweden/Europe Physical planning Four step principal

Effect profile Summary of impacts according to the

Transport policy

Transport sub goal Negative Positive

Effect --- -- - 0 + ++ +++ Comments

Accessibility

..for pedestrians and bicyclists

..for public transports/buses

..for cars

..for heavy vehicles

Flexibility between modes

Transport quality

Bearing capacity, surface, winter service level

Safe Traffic

Number of killed and severely wounded

..and pedestrians/unprotected

Page 37: Cost effective measures and planning of traffic safety Planning philosophies and preferences Use of CBA in Sweden/Europe Physical planning Four step principal

Effect profile - continued ..Transport sub goal Negative Positive

Good environment

Emissions of Carbondioxid (CO2)

Health effects

Noise and vibrations

Sustainability

Nature, culture and landscape

Positive Regional Development

Regional growth

Regional distribution

Gender equality

Gender-equal road transport system

Page 38: Cost effective measures and planning of traffic safety Planning philosophies and preferences Use of CBA in Sweden/Europe Physical planning Four step principal

Fulfilment of transport policy

Impacts

Action to the road network

Transport policyGoals and aims

Contribution to the goals ?

Page 39: Cost effective measures and planning of traffic safety Planning philosophies and preferences Use of CBA in Sweden/Europe Physical planning Four step principal

Summary and conclusions

• CBA is a useful method to the long-term planning, but be useful in some other cases of planning matters.

• CBA is one of many foundations for decision-making.

• CBA doesn’t present the whole truth.

• CBA could in some cases be misused by the decision-makers.

• CBA is used more a less for investments only

• Need to extend the use of CBA for other actions.

• Lack of measure / effect correlation for some of actions.

Page 40: Cost effective measures and planning of traffic safety Planning philosophies and preferences Use of CBA in Sweden/Europe Physical planning Four step principal

Physical Transport Planning Process

INITIAL STUDY

FEASIBILITY STUDY

DESIGN PLAN

BUILDING DOCUMENT

”GAP ANALYSIS”

Page 41: Cost effective measures and planning of traffic safety Planning philosophies and preferences Use of CBA in Sweden/Europe Physical planning Four step principal

1

2

3

4

Transport needs and means of transport

More efficient use of the road network

Improvements and minor conversions

New investments and major conversions

The four-step principle

Page 42: Cost effective measures and planning of traffic safety Planning philosophies and preferences Use of CBA in Sweden/Europe Physical planning Four step principal

The four steps1.Measures that effect transport

needs and choice of mode of transport

2.Measures that lead to more efficient utilisation of the existing road network

3.Road improvements and minor conversions

4.New investments and major conversions

Page 43: Cost effective measures and planning of traffic safety Planning philosophies and preferences Use of CBA in Sweden/Europe Physical planning Four step principal

Work method

Short-comings/

Needs

Measures that affect transport needs and choice of mode of

transport

Possible measuresstep 1

Measures that lead to more efficient

utilisation of the existing road

network

Possible measuresstep 2

Road improvements and minor

conversions

Possible measuresstep 3

New investments and major conversions

Possible measuresstep 4

Balancing and

prioritising

measures with

different effects,

costs and time

perspectives

Page 44: Cost effective measures and planning of traffic safety Planning philosophies and preferences Use of CBA in Sweden/Europe Physical planning Four step principal

Example

Severe head on

coll-isions

Lower traffic intensity ?

Traffic regulation ?

Minor road construction measures ?

Major road construction measures?

No measure found

Lowered speed

Construction midbarrier 2+1

Construction motorway 2+2

Choise of measures:

• Immidiate Lower speed 110 to 80 km/h

• Short perspective Midbarrier 2+1

• Long perspective Motorway 2+2

E4 Ljungby

Page 45: Cost effective measures and planning of traffic safety Planning philosophies and preferences Use of CBA in Sweden/Europe Physical planning Four step principal

Review and Implementation of new Speed Limits Sweden 2008 – 2009

incorporated to present speed limits 30 50 70 90 110

Page 46: Cost effective measures and planning of traffic safety Planning philosophies and preferences Use of CBA in Sweden/Europe Physical planning Four step principal

New Speed Limits Parliament decision may 2007: Road Administration, Regional

Governments and Municipalities have the right to decide on speed limits from 30 to 120 km/h with succession of 10 km/h step.

Government decide in traffic regulation so Road Administration can implement speed limits 80, 100 and 120 km/h.

The new regulation starts from 2 may 2008.

General Director of Road Administration decide on guidelines for the implementation of new speed limits, December 2007.

Page 47: Cost effective measures and planning of traffic safety Planning philosophies and preferences Use of CBA in Sweden/Europe Physical planning Four step principal

In a long term perspective shall…

”… a consecutive adjustment of speed limits towards vision zero and that demand on accessibility, good environment, positive regional development and an equal transport system been taken in consideration.

Governmental Proposition of New Speed Limits

Page 48: Cost effective measures and planning of traffic safety Planning philosophies and preferences Use of CBA in Sweden/Europe Physical planning Four step principal

New Speed Limits – Why ??? Present system from 1971 (1955 urban areas) ”Inconsistency” of decisions during that time period. Speed limits have not been considered from humans ability to

handle physical violence. New transport policy goals have been decided. From safety- and environmental perspective, is 20-step to big. Road transport system can be utilized more efficiently with respect

to all transport policy goals. Acceptance for new speed limits should increase. New road types since 1971.

Page 49: Cost effective measures and planning of traffic safety Planning philosophies and preferences Use of CBA in Sweden/Europe Physical planning Four step principal

How shall this be implemented?? Road Administration review of roads outside urban

areas (mostly 90 and 110 roads)

Municipalities implement new speed limits within planned urban areas.

Regional governments adjust local speed limit decisions and private roads.

Review in close coperation with new long term plan 2010 – 2020.

Page 50: Cost effective measures and planning of traffic safety Planning philosophies and preferences Use of CBA in Sweden/Europe Physical planning Four step principal

(When) Time schedule state roads

Phase 1 - National roads Autumn 2008 European road and major other roads

- Motorway 120 km/h Autumn 2008 European road and major other roads

Phase 2 - Other major roads

Spring 2009 Secondary roads

Phase 3 – Other roads Autumn 2009 Other roads

Page 51: Cost effective measures and planning of traffic safety Planning philosophies and preferences Use of CBA in Sweden/Europe Physical planning Four step principal

Criteria for speed limit decision Accessibility – road connections important to keep or preserve higher

speed limit, is road connections important for commuting, extended local labour market functionality, high share of long distance transports, rural areas with longer transports in sparsely populated areas or high importance for freight transports.

Traffic Safety – physical damage violence on human being

Environment – harmonically speed limits, national Carbondioxide (CO2) goals, local concentrations of pollutions and noice level. Increased externalities on a certain road network can be compensated of reductions on other road network.

Trafficant acceptance – Fare, logical, clear and self explanatory speed limits

Page 52: Cost effective measures and planning of traffic safety Planning philosophies and preferences Use of CBA in Sweden/Europe Physical planning Four step principal

Consequences

• Reduction of killed persons annually: 10 persons• Carbondioxide (CO2) reduction: 10’000 ton/year • Travel time increase with 2 miljon hour/year cars

and buses• Indifferent transport time for heavy lorries.• Valuable socioeconomic benefits annually 6 MECU

(Milj Euros)

• But … 700’000 ton/year CO2 and 150 saved lifeJust follow the present speed limits

Page 53: Cost effective measures and planning of traffic safety Planning philosophies and preferences Use of CBA in Sweden/Europe Physical planning Four step principal

5 4,5

6,5

0,95 1,35 10

1

2

3

4

5

6

7

Relative risk

2 la

ne ro

ad 6

m 7

0 km

/h

2 la

ne ro

ad 8

- 9m

90

km/h

2 la

ne ro

ad 1

3m 9

0 km

/h

2+1

separ

ated

90

km/h

Separ

ated

moto

rway

110

km

/h

Moto

rway

110

km

/h

Relative risk of killed

Page 54: Cost effective measures and planning of traffic safety Planning philosophies and preferences Use of CBA in Sweden/Europe Physical planning Four step principal

City streets Schools

Mixed trafficants

Page 55: Cost effective measures and planning of traffic safety Planning philosophies and preferences Use of CBA in Sweden/Europe Physical planning Four step principal

Streets on main net Pedestrian ways Bicycles on road Walking strips

Page 56: Cost effective measures and planning of traffic safety Planning philosophies and preferences Use of CBA in Sweden/Europe Physical planning Four step principal

Urban areas

Major Traffic links Few/distant intersections Separated pedestrian roadway

Page 57: Cost effective measures and planning of traffic safety Planning philosophies and preferences Use of CBA in Sweden/Europe Physical planning Four step principal

Two lane roads with high risk accidents with killed and severly damage

(Today 90-road without mid barrier fence, non satisfied standard on side areas)

Page 58: Cost effective measures and planning of traffic safety Planning philosophies and preferences Use of CBA in Sweden/Europe Physical planning Four step principal

Road important for business and industry transports – today 70 - road

Page 59: Cost effective measures and planning of traffic safety Planning philosophies and preferences Use of CBA in Sweden/Europe Physical planning Four step principal

> 1 k m> 1 k m 5 -1 0 k m

7 - 9 m

Roads with rumble strip barrier and placed streches for passing (2+1) < 4000 vehicle/day

Page 60: Cost effective measures and planning of traffic safety Planning philosophies and preferences Use of CBA in Sweden/Europe Physical planning Four step principal

Normal speed limit with mid barrier fence

Separated lanes with mid barrier fence (2+1, 2+2, 1+1) with good standard on road side areas

Page 61: Cost effective measures and planning of traffic safety Planning philosophies and preferences Use of CBA in Sweden/Europe Physical planning Four step principal

Motorways

Normal 110 km/hour

120 km/hour with high safety standard and relatively low traffic volume

Page 62: Cost effective measures and planning of traffic safety Planning philosophies and preferences Use of CBA in Sweden/Europe Physical planning Four step principal
Page 63: Cost effective measures and planning of traffic safety Planning philosophies and preferences Use of CBA in Sweden/Europe Physical planning Four step principal

Schematic review new speed limits in Sweden 2008

Higher Lower

Page 64: Cost effective measures and planning of traffic safety Planning philosophies and preferences Use of CBA in Sweden/Europe Physical planning Four step principal

Communication with partners

Meetings, suggestions, discussions

Police Swedish spedition org

NTF (traffic safety org) Swedish Municipalities and Health care

Taxi/Cab org Bus org

Motormännen/Org for trafficants Regional governments

Traffic education org . . .

Car testing institute . . .

Municipalities . . .

Page 66: Cost effective measures and planning of traffic safety Planning philosophies and preferences Use of CBA in Sweden/Europe Physical planning Four step principal

Questions?