cosmo general meeting 2011 wg5 parallel session 5 september 2011

44
Federal Department of Home Affairs FDHA Federal Office of Meteorology and Climatology MeteoSwiss Verification results at MeteoSwiss in the year 2011 Francis Schubiger, Vanessa Stauch, Tanja Weusthoff, Pirmin Kaufmann MeteoSwiss COSMO General Meeting 2011 WG5 Parallel Session 5 September 2011

Upload: jon

Post on 01-Feb-2016

43 views

Category:

Documents


0 download

DESCRIPTION

Verification results at MeteoSwiss in the year 2011 Francis Schubiger, Vanessa Stauch, Tanja Weusthoff, Pirmin Kaufmann MeteoSwiss. COSMO General Meeting 2011 WG5 Parallel Session 5 September 2011. Content. results of the operational verification in 2011 - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: COSMO General Meeting 2011 WG5 Parallel Session 5 September 2011

Federal Department of Home Affairs FDHAFederal Office of Meteorology and Climatology MeteoSwiss

Verification resultsat MeteoSwiss in the year 2011

Francis Schubiger, Vanessa Stauch,Tanja Weusthoff, Pirmin Kaufmann

MeteoSwiss

COSMO General Meeting 2011

WG5 Parallel Session 5 September 2011

Page 2: COSMO General Meeting 2011 WG5 Parallel Session 5 September 2011

2 Verification results at MeteoSwiss in 2011

COSMO GM / WG5 Parallel Session, 05.09.2011

Content

• results of the operational verification in 2011

• separate verification of all eight daily COSMO-2 forecasts

• neighborhood verification (also weather type dependant)

• COSMO-2 03 UTC forecasts up to +48h

• extension of Beth Ebert‘s package: -> „fuzzy in time“

Page 3: COSMO General Meeting 2011 WG5 Parallel Session 5 September 2011

3 Verification results at MeteoSwiss in 2011

COSMO GM / WG5 Parallel Session, 05.09.2011

• Operational (COSMO-2, COSMO-7, COSMO-LEPS [mean], IFS):• Surface (3h-steps SYNOP and 1h-steps SMN [Swiss Met Net])

• psred, ps, T2m, Td2m, 10m-wind, cloud cover, gusts,precipitation (1h, 12h), global radiation

• Upper-air (TEMP)• T, RH, wind,

• Quasi-operational (COSMO-2, COSMO-7, IFS):• precipitation with RADAR (neighborhood/fuzzy verification, Ebert’s

package) also weather-type dependant• Monitoring: SMN (swiss SYNOPs) , RADAR, windprofilers• Ongoing in experimental modus:

• windprofiler over Switzerland• fluxes at Payerne

• New / Next developments:• VAD (locations of swiss radars)

=> All these packages should be replaced by VERSUS 2

Verification of COSMO-2, COSMO-7, COSMO-LEPS and IFS

Page 4: COSMO General Meeting 2011 WG5 Parallel Session 5 September 2011

4 Verification results at MeteoSwiss in 2011

COSMO GM / WG5 Parallel Session, 05.09.2011

T2m: mean diurnal cycle (first 24h forecasts)domain Switzerland (hourly SYNOP‘s)

V. Stauch, P. Kaufmann

OBS

COSMO-7

COSMO-2

Autumn 2010

Winter 2010/2011

Spring 2011

Summer 2011

Page 5: COSMO General Meeting 2011 WG5 Parallel Session 5 September 2011

5 Verification results at MeteoSwiss in 2011

COSMO GM / WG5 Parallel Session, 05.09.2011

T2m: mean diurnal cycle Spring 2011COSMO-7 vs IFSSYNOP‘s over COSMO-7 domain

OBS

COSMO-7

IFS

V. Stauch, P. Kaufmann

Page 6: COSMO General Meeting 2011 WG5 Parallel Session 5 September 2011

6 Verification results at MeteoSwiss in 2011

COSMO GM / WG5 Parallel Session, 05.09.2011

T2m: mean diurnal cycle Spring 2011COSMO-7 vs COSMO-LEPSSYNOP‘s over COSMO-7 domain

V. Stauch, P. Kaufmann

OBS

COSMO-7

COSMO-LEPS

Page 7: COSMO General Meeting 2011 WG5 Parallel Session 5 September 2011

7 Verification results at MeteoSwiss in 2011

COSMO GM / WG5 Parallel Session, 05.09.2011

Global radiation (inclined): Spring 2011COSMO-7 mean diurnal cycleSYNOP‘s over Switzerland

V. Stauch, P. Kaufmann

Page 8: COSMO General Meeting 2011 WG5 Parallel Session 5 September 2011

8 Verification results at MeteoSwiss in 2011

COSMO GM / WG5 Parallel Session, 05.09.2011

Global radiation (horizontal): Spring 2011COSMO-7 mean diurnal cycleSYNOP‘s over Switzerland

V. Stauch, P. Kaufmann

Page 9: COSMO General Meeting 2011 WG5 Parallel Session 5 September 2011

9 Verification results at MeteoSwiss in 2011

COSMO GM / WG5 Parallel Session, 05.09.2011

Precipitation: Spring 2011geographical distribution

precipitation12h sums

frequency bias(1 mm/12h)

Spring 2011

COSMO-7+24 & +48h

V. Stauch, P. Kaufmann

Page 10: COSMO General Meeting 2011 WG5 Parallel Session 5 September 2011

10 Verification results at MeteoSwiss in 2011

COSMO GM / WG5 Parallel Session, 05.09.2011

Precipitation (12h-sums +12 to +24h):Spring 2011 over Switzerland (SYNOP‘s)frequency bias: COSMO-7 & COSMO-2

observed frequency

V. Stauch

Page 11: COSMO General Meeting 2011 WG5 Parallel Session 5 September 2011

11 Verification results at MeteoSwiss in 2011

COSMO GM / WG5 Parallel Session, 05.09.2011

Precipitation (12h-sums +36 to +48h):Spring 2011 over Switzerland (SYNOP‘s)frequency bias: COSMO-7 & IFS

observed frequency

V. Stauch

Page 12: COSMO General Meeting 2011 WG5 Parallel Session 5 September 2011

12 Verification results at MeteoSwiss in 2011

COSMO GM / WG5 Parallel Session, 05.09.2011

Precipitation (12h-sums +12 to +24h):Spring 2011 over Switzerland (SYNOP‘s)COSMO-7 & COSMO-2

V. Stauch

for both models mean over 9 gridpoints foreach station

Page 13: COSMO General Meeting 2011 WG5 Parallel Session 5 September 2011

13 Verification results at MeteoSwiss in 2011

COSMO GM / WG5 Parallel Session, 05.09.2011

Precipitation (12h-sums):Spring 2011 over Switzerland (SYNOP‘s)COSMO-7 & IFS

V. Stauch

Page 14: COSMO General Meeting 2011 WG5 Parallel Session 5 September 2011

14 Verification results at MeteoSwiss in 2011

COSMO GM / WG5 Parallel Session, 05.09.2011

Hourly precipitation: diurnal cycleSwiss SYNOPs (1h acc) CH-radarcomposit (3h acc)

July

201

0

03 09 15 21 00

fcst: +12..+24h fcst: +3..+6hRADAR

COSMO-7

COSMO-2

COSMO-2

COSMO-7

SMN

Au

gu

st 2

010

RADAR

COSMO-7

COSMO-2

COSMO-2

COSMO-7

SMN

03 09 15 21 00

fcst: +12..+24h fcst: +3..+6h

V. Stauch

Page 15: COSMO General Meeting 2011 WG5 Parallel Session 5 September 2011

15 Verification results at MeteoSwiss in 2011

COSMO GM / WG5 Parallel Session, 05.09.2011

• 2m-temperature:

• cold bias in winter and warm bias in summer• positive bias more pronounced during nighttime• COSMO-2 ~0.5 K warmer (higher values) than COSMO-7

• 2m-dewpoint:• negative bias (~1 K) in the summer and autumn period

• 10m-windspeed:• negative bias along the coast and on mountains, positive bias inland

• total cloudiness:• mean daily cycle not well represented (mainly overestimation during night

and underestimation during day)• precipitation:

• overestimation (except in Summer ~ no bias) most pronounced in Winter (over COSMO-2 domain: 30-35% ; over Swizerland ~45%)

• higher amounts in COSMO-2 / higher amounts over Alpine area• low amounts (0.1 mm/12h): overestimated in Winter (over the Alps all

seasons)• high amounts (10 mm/12h): underestimated in COSMO-7 (over full domain

by ~30% in summer, 20% in winter)

Verification of surface weather parameters

Page 16: COSMO General Meeting 2011 WG5 Parallel Session 5 September 2011

16 Verification results at MeteoSwiss in 2011

COSMO GM / WG5 Parallel Session, 05.09.2011

TEMPS verification: Windspeed +24hWinter 10/11

COSMO-7

COSMO-2

all TEMPsCOSMO-2domain

Page 17: COSMO General Meeting 2011 WG5 Parallel Session 5 September 2011

17 Verification results at MeteoSwiss in 2011

COSMO GM / WG5 Parallel Session, 05.09.2011

• temperature: cold bias (~ 0.5 K) in winter and warm bias (~ 0.5 K) in summer from ground up to 300 hPa

• windspeed: positive bias in PBL (up to +1 m/s in winter) and slight negative bias above 400 hPa

Verification with vertical profiles: main results

Page 18: COSMO General Meeting 2011 WG5 Parallel Session 5 September 2011

18 Verification results at MeteoSwiss in 2011

COSMO GM / WG5 Parallel Session, 05.09.2011

Separate verification of the eight daily COSMO-2 forecasts• questions of interest:

• which is the best forecast for the afternoon/evening convection ? – is it the latest forecast or perhaps a forecast with a longer „spin up“ time ?

• are there significant differences between the eight forecasts ?

• period:COSMO-2 forecasts from 1 May to 31 July 2011• Verification with hourly obs over Switzerland

Page 19: COSMO General Meeting 2011 WG5 Parallel Session 5 September 2011

19 Verification results at MeteoSwiss in 2011

COSMO GM / WG5 Parallel Session, 05.09.2011

COSMO-2: precipitation diurnal cycleforecasts of 00, 03, 06 and 09 UTC

Vanessa Stauch

Page 20: COSMO General Meeting 2011 WG5 Parallel Session 5 September 2011

20 Verification results at MeteoSwiss in 2011

COSMO GM / WG5 Parallel Session, 05.09.2011

COSMO-2: precipitation diurnal cycleforecasts of 12, 15, 18 and 21 UTC

Vanessa Stauch

Page 21: COSMO General Meeting 2011 WG5 Parallel Session 5 September 2011

21 Verification results at MeteoSwiss in 2011

COSMO GM / WG5 Parallel Session, 05.09.2011

COSMO-2: precipitation diurnal cycleall eight daily forecasts

Vanessa Stauch

Page 22: COSMO General Meeting 2011 WG5 Parallel Session 5 September 2011

22 Verification results at MeteoSwiss in 2011

COSMO GM / WG5 Parallel Session, 05.09.2011

COSMO-2: 2m-temperature diurnal cycleall eight daily forecasts

Vanessa Stauch

Page 23: COSMO General Meeting 2011 WG5 Parallel Session 5 September 2011

23 Verification results at MeteoSwiss in 2011

COSMO GM / WG5 Parallel Session, 05.09.2011

COSMO-2: 2m-temperature biasall eight daily forecasts

Vanessa Stauch

Page 24: COSMO General Meeting 2011 WG5 Parallel Session 5 September 2011

24 Verification results at MeteoSwiss in 2011

COSMO GM / WG5 Parallel Session, 05.09.2011

COSMO-2: 10m-wind speed diurnal cycleall eight daily forecasts

Vanessa Stauch

Page 25: COSMO General Meeting 2011 WG5 Parallel Session 5 September 2011

27 Verification results at MeteoSwiss in 2011

COSMO GM / WG5 Parallel Session, 05.09.2011

results for 20103h accumulated precipitation sumsover the domain of the swiss radar composit

models: COSMO-2 and COSMO-7for all 8 daily forecast runs, precipitation sums from +3 to +6h

observation precipitation estimates of the swiss radar composit

in case of a missing value, the full date will not be evaluated

Neighborhood verification for precipitation

Page 26: COSMO General Meeting 2011 WG5 Parallel Session 5 September 2011

28 Verification results at MeteoSwiss in 2011

COSMO GM / WG5 Parallel Session, 05.09.2011

COSMO-2 COSMO-7 COSMO-2 - COSMO-7

- =

- =

goodbadCOSMO-7 better COSMO-2 better

Neighbourhood Verification, January–December 2010 3h sums (+3 ..+6h) Fractions Skill Score (top) and Upscaling (bottom)

Fractions Skill Score

Upscaling

T. Weusthoff

Page 27: COSMO General Meeting 2011 WG5 Parallel Session 5 September 2011

29 Verification results at MeteoSwiss in 2011

COSMO GM / WG5 Parallel Session, 05.09.2011

FSS, COSMO-2 minus COSMO-7, 2010

Winter Spring

AutumnSummer

numbers = FSS-Score of COSMO-2

colours = differences COSMO-2 minus COSMO-7

COSMO-2 better

COSMO-7 better

• COSMO-2: similar skill in all seasons

• COSMO-2 better than COSMO-7 on almost all scales

• COSMO-2 better than COSMO-7 especially in Winter and Summer

Tanja Weusthoff

Page 28: COSMO General Meeting 2011 WG5 Parallel Session 5 September 2011

32 Verification results at MeteoSwiss in 2011

COSMO GM / WG5 Parallel Session, 05.09.2011

NE

(11x)

N

(18x)

NW

(38x)

SE

(4x)

S

(10x)

SW

(49x)

E

(4x)

W

(56x)

F

(78x)

H

(73x)

L

(25x)

COSMO-7 better COSMO-2 better

differences in Fractions Skill Score for weather-type dependant verif

COSMO-2 minus COSMO-7

YEAR 2010

Page 29: COSMO General Meeting 2011 WG5 Parallel Session 5 September 2011

33 Verification results at MeteoSwiss in 2011

COSMO GM / WG5 Parallel Session, 05.09.2011

Summary neighbourhood Verifikation precipitation in 2010

• COSMO-2 better than COSMO-7 on all scales,differences become less with increasing leadtime

• good forecast of the spatial structure on higher scales

• The skill of the models varies for different weather types and the differences between COSMO-2 and COSMO-7 varies also:- best skill: Autumn and Spring, south to northwest weather types- greatest difference COSMO-2 minus COSMO-7: Summer and Winter, north- and east types, convective cases

Tanja Weusthoff

Page 30: COSMO General Meeting 2011 WG5 Parallel Session 5 September 2011

34 Verification results at MeteoSwiss in 2011

COSMO GM / WG5 Parallel Session, 05.09.2011

COSMO-2 03 UTC up to +48h:Comparison COSMO-2 to COSMO-7• period (full year): 1 June 2010 – 31 May 2011• Main interest:

• advance of COSMO-2 as compared to COSMO-7• question: “are the COSMO-2 forecasts at +48h

still better than those of COSMO-7” ?• Verification with:

• SYNOP over Switzerland (hourly):comparison +0 to +24h vs +24 to +48h

• Swiss RadarComposit: neighborhood Verifikation for four 12h-Summen (0..+12, +12..+24, +24..+36, +36..+48h)

• TEMPs for +21h and +45h

Page 31: COSMO General Meeting 2011 WG5 Parallel Session 5 September 2011

35 Verification results at MeteoSwiss in 2011

COSMO GM / WG5 Parallel Session, 05.09.2011

Verification SYNOP-CH: 2m-temperatureCOSMO-2 vs COSMO-7

COSMO-2COSMO-7

advance of COSMO-2 also in the second day

BIAS

MAE

VAL

STDE

V. Stauch

Page 32: COSMO General Meeting 2011 WG5 Parallel Session 5 September 2011

36 Verification results at MeteoSwiss in 2011

COSMO GM / WG5 Parallel Session, 05.09.2011

Verification SYNOP-CH: precipitation COSMO-2 vs COSMO-7 [+0 to +24h]

Frequency bias (mm/h)

COSMO-2COSMO-7

0.1 mm/h

10 mm/h

1.0 mm/h

V. Stauch

Page 33: COSMO General Meeting 2011 WG5 Parallel Session 5 September 2011

37 Verification results at MeteoSwiss in 2011

COSMO GM / WG5 Parallel Session, 05.09.2011

COSMO-2COSMO-7

0.1 mm/h

10 mm/h

1.0 mm/h

V. Stauch

Verification SYNOP-CH: precipitation COSMO-2 vs COSMO-7 [+24 to +48h]

Frequency bias (mm/h)

Page 34: COSMO General Meeting 2011 WG5 Parallel Session 5 September 2011

38 Verification results at MeteoSwiss in 2011

COSMO GM / WG5 Parallel Session, 05.09.2011

Verification with swiss radarcomposit

second forecast day

first forecast day+0.. +12h

+24..+36h

+12..+24h

+36..+48h

daytime: 03-15 UTC nighttime: 15-03 UTC

T. Weusthoff

COSMO-2 COSMO-7 COSMO-2 COSMO-7

COSMO-2 COSMO-7 COSMO-2 COSMO-7

Page 35: COSMO General Meeting 2011 WG5 Parallel Session 5 September 2011

39 Verification results at MeteoSwiss in 2011

COSMO GM / WG5 Parallel Session, 05.09.2011

FRACTIONS SKILL SCORE: COSMO-2 – COSMO-7precipitation sums of 12h

+ 0 .. + 12h

+ 24 .. + 36h

+ 12 .. + 24h

+ 36 .. + 48h

T. Weusthoff

COSMO-2 better

COSMO-7 better

Page 36: COSMO General Meeting 2011 WG5 Parallel Session 5 September 2011

40 Verification results at MeteoSwiss in 2011

COSMO GM / WG5 Parallel Session, 05.09.2011

UPSCALING: COSMO-2 – COSMO-7precipitation sums of 12h; score: ETS (equitable threat score)

+ 0 .. + 12h

+ 24 .. + 36h

+ 12 .. + 24h

+ 36 .. + 48h

T. Weusthoff

COSMO-2 better

COSMO-7 better

Page 37: COSMO General Meeting 2011 WG5 Parallel Session 5 September 2011

43 Verification results at MeteoSwiss in 2011

COSMO GM / WG5 Parallel Session, 05.09.2011

3. „Fuzzy in Time“

• Extension of the spatial window with a window in time volume (dx * dy * dt)

• Evaluation of the forecasts in this volume• Time-window ntm = [1h,3h,5h,7h,9h]

dt

dx

dy

T. Weusthoff

Page 38: COSMO General Meeting 2011 WG5 Parallel Session 5 September 2011

44 Verification results at MeteoSwiss in 2011

COSMO GM / WG5 Parallel Session, 05.09.2011

dxdy

dx

dymodel

observation

e.g. FSS

fraction blue pxiels model = 12/75 (dt=3), 5/25 (dt=1)

fraction blue pxiels obs = 12/75 (dt=3), 3/25 (dt=1)

t0

t0-1

t0+1

t0

t0-1

t0+1

T. Weusthoff

Page 39: COSMO General Meeting 2011 WG5 Parallel Session 5 September 2011

45 Verification results at MeteoSwiss in 2011

COSMO GM / WG5 Parallel Session, 05.09.2011

00 01 02 03 04 05 06 07 08 09 10 11 12 13 1420 21 22 23

00-02

01-03

02-04

03-05

04-06

05-07

23-01

22-00

21-23

20-22

hourly accumulated precipitation

Evaluation of 3h accumulations, time window ntm = 5 (t0 +-2h)

00 UTC 03 UTC 06 UTC 08 UTC

22 UTC 02 UTC

01 UTC 05 UTC

3 hourly accumulated precipitation

Evaluation of 3h accumulations, time window ntm = 1

09 UTC00 UTC 03 UTC 06 UTC

23 UTC 01 UTC 02 UTC 04 UTC

T. Weusthoff

Page 40: COSMO General Meeting 2011 WG5 Parallel Session 5 September 2011

46 Verification results at MeteoSwiss in 2011

COSMO GM / WG5 Parallel Session, 05.09.2011

FSS for different time-windowsCOSMO-2, July 2010

T. Weusthoff

Page 41: COSMO General Meeting 2011 WG5 Parallel Session 5 September 2011

47 Verification results at MeteoSwiss in 2011

COSMO GM / WG5 Parallel Session, 05.09.2011 T. Weusthoff

FSS for different time-windowsCOSMO-7, July 2010

Page 42: COSMO General Meeting 2011 WG5 Parallel Session 5 September 2011

48 Verification results at MeteoSwiss in 2011

COSMO GM / WG5 Parallel Session, 05.09.2011

FSS for different time-windows COSMO-2 minus COSMO-7, July 2010

T. Weusthoff

Page 43: COSMO General Meeting 2011 WG5 Parallel Session 5 September 2011

49 Verification results at MeteoSwiss in 2011

COSMO GM / WG5 Parallel Session, 05.09.2011

Summary „fuzzy in time“

• FSS increases on all scales with increasing time-window• greatest effect for small spatical scales• lowest effect for high threshods

• Both models show a similar increase• difference COSMO-2 minus COSMO-7 stays equal, resp.

becomes littler for high time-windows

• For Upscaling the influence of a time tolerance is relatively low und restricted on low thresholds ( effect of the avergaing)

Application of time-windows on the gridsclae would make sense; simultaneous application with space tolerance brings no great change

T. Weusthoff

Page 44: COSMO General Meeting 2011 WG5 Parallel Session 5 September 2011

50 Verification results at MeteoSwiss in 2011

COSMO GM / WG5 Parallel Session, 05.09.2011