corrosion assesment and exceedance
TRANSCRIPT
Slide 613 April 2023
Corrosion Assessment – Failure Criterion
}{ Stress, Flow
Stress Failure Predicted
SMYSf
failure
},,{ Factor, Folias
}{ Area, Original
Metal Missing of Area
tDLfM
tLfA
A
11
1
MA
AA
A
o
oFailure
Slide 713 April 2023
Predicted Failure Stress
100% SMYS
MOP
0
10,000
20,000
30,000
40,000
50,000
60,000
70,000
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
Depth of Metal Loss, % Wall Thickness
Pre
dic
ted
Fa
ilure
Str
ess
, ps
i
Length = 0 inches
Length = 1 inches
Length = 2 inches
Length = 4 inches
Length = 8 inches
Length = 12 inches
Length = 24 inches
Length = 36 inches
24-inch diameter x 0.250-inch wall thickness, API 5L X52 (modified B31G)
Slide 1013 April 2023
Probability of Exceedance (POE)
Slide 1113 April 2023
Regression - Leak
y = 0.6211x + 0.141
R2 = 0.3955
0.0%
10.0%
20.0%
30.0%
40.0%
50.0%
60.0%
70.0%
80.0%
90.0%
100.0%
0.0% 10.0% 20.0% 30.0% 40.0% 50.0% 60.0% 70.0% 80.0% 90.0% 100.0%
ILI reported Depth (%WT)
Fie
ld M
easu
red
Dep
th (
%W
T)
Slide 1213 April 2023
SRF Comparison
y = 0.5049x + 0.4304
R2 = 0.297
0.00
0.10
0.20
0.30
0.40
0.50
0.60
0.70
0.80
0.90
1.00
0.00 0.10 0.20 0.30 0.40 0.50 0.60 0.70 0.80 0.90 1.00
SRF-ILI
SR
F-F
ield
Regression - Failure
Rupture (Depths and Lengths)
11
1
MA
AA
A
o
oFailure
SRF(Stress Reduction Factor)`
Slide 1413 April 2023
Cumulative POE
)1(11
i
n
iCumulative POEPOE
Slide 1613 April 2023
1.0E+00
1.0E+01
1.0E+02
1.0E+03
1.0E+04
1.0E+05
1.0E+06
1.0E+07
1.0E+08
1.0E+09
1.0E+10
1.0E+11
1.0E+12
1.0E+13
1.0E+14
1.0E+15
2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020
YearP
rob
abili
ty o
f E
xcee
dan
ce (
PO
E)
No excavations after
Excavations after survey
Increasing number of excavations done over time
Slide 1713 April 2023