![Page 1: CORROCOAT EGYPT - Case study...temperature, pressure 5 bars, using CORROCOAT materials: primer PPA, Polyglass Pipe Grade for 296 vertical hole of nozzle plate (hot spot of job), Corrofill,](https://reader033.vdocuments.us/reader033/viewer/2022042710/5f5d9b7deec5e1224e3e67c9/html5/thumbnails/1.jpg)
CORROCOAT EGYPT - Case studyInternal and external lining of Cation Exchanger Regeneration
Reference No.: 001PG_01_ref_vesselClient: Amreya Petroleum Refinering Company, Alexandria, EgyptApplication date: January 2010Scope of work: After taking down current hard ruber and 3 badly corroded parts rewelded, internal of the vessel protected against Sulphuric Acid 15% concentration attack at 60°C temperature, pressure 5 bars, using CORROCOAT materials: primer PPA, Polyglass Pipe Grade for 296 vertical hole of nozzle plate (hot spot of job), Corrofill, Polyglass VEF, Polyglass Veil Coat. Postcured. External protected by Plasmet ZF.
![Page 2: CORROCOAT EGYPT - Case study...temperature, pressure 5 bars, using CORROCOAT materials: primer PPA, Polyglass Pipe Grade for 296 vertical hole of nozzle plate (hot spot of job), Corrofill,](https://reader033.vdocuments.us/reader033/viewer/2022042710/5f5d9b7deec5e1224e3e67c9/html5/thumbnails/2.jpg)
A.P.R.C. ANOMALY REPORT - under corroded hard rubber, vessel out of service
![Page 3: CORROCOAT EGYPT - Case study...temperature, pressure 5 bars, using CORROCOAT materials: primer PPA, Polyglass Pipe Grade for 296 vertical hole of nozzle plate (hot spot of job), Corrofill,](https://reader033.vdocuments.us/reader033/viewer/2022042710/5f5d9b7deec5e1224e3e67c9/html5/thumbnails/3.jpg)
01 - CORROSION INSPECTION
![Page 4: CORROCOAT EGYPT - Case study...temperature, pressure 5 bars, using CORROCOAT materials: primer PPA, Polyglass Pipe Grade for 296 vertical hole of nozzle plate (hot spot of job), Corrofill,](https://reader033.vdocuments.us/reader033/viewer/2022042710/5f5d9b7deec5e1224e3e67c9/html5/thumbnails/4.jpg)
01 - CORROSION INSPECTIONUnder corroded hard rubber lining and deep corroded areas (pitting corrosion)
![Page 5: CORROCOAT EGYPT - Case study...temperature, pressure 5 bars, using CORROCOAT materials: primer PPA, Polyglass Pipe Grade for 296 vertical hole of nozzle plate (hot spot of job), Corrofill,](https://reader033.vdocuments.us/reader033/viewer/2022042710/5f5d9b7deec5e1224e3e67c9/html5/thumbnails/5.jpg)
01 - CORROSION INSPECTIONThree very badly corroded areas
![Page 6: CORROCOAT EGYPT - Case study...temperature, pressure 5 bars, using CORROCOAT materials: primer PPA, Polyglass Pipe Grade for 296 vertical hole of nozzle plate (hot spot of job), Corrofill,](https://reader033.vdocuments.us/reader033/viewer/2022042710/5f5d9b7deec5e1224e3e67c9/html5/thumbnails/6.jpg)
02 - SURFACE PREPARATION
![Page 7: CORROCOAT EGYPT - Case study...temperature, pressure 5 bars, using CORROCOAT materials: primer PPA, Polyglass Pipe Grade for 296 vertical hole of nozzle plate (hot spot of job), Corrofill,](https://reader033.vdocuments.us/reader033/viewer/2022042710/5f5d9b7deec5e1224e3e67c9/html5/thumbnails/7.jpg)
02 - SURFACE PREPARATIONRemoval of hard rubber by grinding method
![Page 8: CORROCOAT EGYPT - Case study...temperature, pressure 5 bars, using CORROCOAT materials: primer PPA, Polyglass Pipe Grade for 296 vertical hole of nozzle plate (hot spot of job), Corrofill,](https://reader033.vdocuments.us/reader033/viewer/2022042710/5f5d9b7deec5e1224e3e67c9/html5/thumbnails/8.jpg)
02 - SURFACE PREPARATIONRemoval of hard rubber from 296 nozzle holes by hammering and burning method
![Page 9: CORROCOAT EGYPT - Case study...temperature, pressure 5 bars, using CORROCOAT materials: primer PPA, Polyglass Pipe Grade for 296 vertical hole of nozzle plate (hot spot of job), Corrofill,](https://reader033.vdocuments.us/reader033/viewer/2022042710/5f5d9b7deec5e1224e3e67c9/html5/thumbnails/9.jpg)
02 - SURFACE PREPARATIONSurface after hard rubber removal
![Page 10: CORROCOAT EGYPT - Case study...temperature, pressure 5 bars, using CORROCOAT materials: primer PPA, Polyglass Pipe Grade for 296 vertical hole of nozzle plate (hot spot of job), Corrofill,](https://reader033.vdocuments.us/reader033/viewer/2022042710/5f5d9b7deec5e1224e3e67c9/html5/thumbnails/10.jpg)
02 - SURFACE PREPARATIONProcess of rewelding
![Page 11: CORROCOAT EGYPT - Case study...temperature, pressure 5 bars, using CORROCOAT materials: primer PPA, Polyglass Pipe Grade for 296 vertical hole of nozzle plate (hot spot of job), Corrofill,](https://reader033.vdocuments.us/reader033/viewer/2022042710/5f5d9b7deec5e1224e3e67c9/html5/thumbnails/11.jpg)
02 - SURFACE PREPARATIONGrid blasting to clean metal Sa2 ½ with profile roughnes min. 50 microns
![Page 12: CORROCOAT EGYPT - Case study...temperature, pressure 5 bars, using CORROCOAT materials: primer PPA, Polyglass Pipe Grade for 296 vertical hole of nozzle plate (hot spot of job), Corrofill,](https://reader033.vdocuments.us/reader033/viewer/2022042710/5f5d9b7deec5e1224e3e67c9/html5/thumbnails/12.jpg)
02 - SURFACE PREPARATIONGrid blasting to clean metal Sa2 ½ with profile roughnes min. 50 microns
![Page 13: CORROCOAT EGYPT - Case study...temperature, pressure 5 bars, using CORROCOAT materials: primer PPA, Polyglass Pipe Grade for 296 vertical hole of nozzle plate (hot spot of job), Corrofill,](https://reader033.vdocuments.us/reader033/viewer/2022042710/5f5d9b7deec5e1224e3e67c9/html5/thumbnails/13.jpg)
03 - CORROCOAT APPLICATION
![Page 14: CORROCOAT EGYPT - Case study...temperature, pressure 5 bars, using CORROCOAT materials: primer PPA, Polyglass Pipe Grade for 296 vertical hole of nozzle plate (hot spot of job), Corrofill,](https://reader033.vdocuments.us/reader033/viewer/2022042710/5f5d9b7deec5e1224e3e67c9/html5/thumbnails/14.jpg)
03 - CORROCOAT APPLICATIONPriming by PPA, reparations by CORROFILL
![Page 15: CORROCOAT EGYPT - Case study...temperature, pressure 5 bars, using CORROCOAT materials: primer PPA, Polyglass Pipe Grade for 296 vertical hole of nozzle plate (hot spot of job), Corrofill,](https://reader033.vdocuments.us/reader033/viewer/2022042710/5f5d9b7deec5e1224e3e67c9/html5/thumbnails/15.jpg)
03 - CORROCOAT APPLICATIONCoating method of 296 nozzel holes
![Page 16: CORROCOAT EGYPT - Case study...temperature, pressure 5 bars, using CORROCOAT materials: primer PPA, Polyglass Pipe Grade for 296 vertical hole of nozzle plate (hot spot of job), Corrofill,](https://reader033.vdocuments.us/reader033/viewer/2022042710/5f5d9b7deec5e1224e3e67c9/html5/thumbnails/16.jpg)
03 - CORROCOAT APPLICATIONInjection coating of POLYGLASS VE PG to 296 nozzel holes
![Page 17: CORROCOAT EGYPT - Case study...temperature, pressure 5 bars, using CORROCOAT materials: primer PPA, Polyglass Pipe Grade for 296 vertical hole of nozzle plate (hot spot of job), Corrofill,](https://reader033.vdocuments.us/reader033/viewer/2022042710/5f5d9b7deec5e1224e3e67c9/html5/thumbnails/17.jpg)
03 - CORROCOAT APPLICATIONvertical surface of 296 nozzel holes coated by 4000 microns of POLYGLAS VE PG
![Page 18: CORROCOAT EGYPT - Case study...temperature, pressure 5 bars, using CORROCOAT materials: primer PPA, Polyglass Pipe Grade for 296 vertical hole of nozzle plate (hot spot of job), Corrofill,](https://reader033.vdocuments.us/reader033/viewer/2022042710/5f5d9b7deec5e1224e3e67c9/html5/thumbnails/18.jpg)
03 - CORROCOAT APPLICATIONSparying of POLYGLASS VEF
![Page 19: CORROCOAT EGYPT - Case study...temperature, pressure 5 bars, using CORROCOAT materials: primer PPA, Polyglass Pipe Grade for 296 vertical hole of nozzle plate (hot spot of job), Corrofill,](https://reader033.vdocuments.us/reader033/viewer/2022042710/5f5d9b7deec5e1224e3e67c9/html5/thumbnails/19.jpg)
03 - CORROCOAT APPLICATIONSparying of POLYGLASS VEF to accessories parts and external PLAZMET ZF
![Page 20: CORROCOAT EGYPT - Case study...temperature, pressure 5 bars, using CORROCOAT materials: primer PPA, Polyglass Pipe Grade for 296 vertical hole of nozzle plate (hot spot of job), Corrofill,](https://reader033.vdocuments.us/reader033/viewer/2022042710/5f5d9b7deec5e1224e3e67c9/html5/thumbnails/20.jpg)
03 - CORROCOAT APPLICATIONPostcuring, DFT test, Spark test, Finishing
![Page 21: CORROCOAT EGYPT - Case study...temperature, pressure 5 bars, using CORROCOAT materials: primer PPA, Polyglass Pipe Grade for 296 vertical hole of nozzle plate (hot spot of job), Corrofill,](https://reader033.vdocuments.us/reader033/viewer/2022042710/5f5d9b7deec5e1224e3e67c9/html5/thumbnails/21.jpg)
Internal and external lining of Cation Exchanger Regeneration
NEW FOR OLD
![Page 22: CORROCOAT EGYPT - Case study...temperature, pressure 5 bars, using CORROCOAT materials: primer PPA, Polyglass Pipe Grade for 296 vertical hole of nozzle plate (hot spot of job), Corrofill,](https://reader033.vdocuments.us/reader033/viewer/2022042710/5f5d9b7deec5e1224e3e67c9/html5/thumbnails/22.jpg)
Internal and external lining of Cation Exchanger Regeneration – nozzels inst.
NEW FOR OLD
![Page 23: CORROCOAT EGYPT - Case study...temperature, pressure 5 bars, using CORROCOAT materials: primer PPA, Polyglass Pipe Grade for 296 vertical hole of nozzle plate (hot spot of job), Corrofill,](https://reader033.vdocuments.us/reader033/viewer/2022042710/5f5d9b7deec5e1224e3e67c9/html5/thumbnails/23.jpg)
Internal and external lining of Cation Exchanger Regeneration - back in service
NEW FOR OLD
![Page 24: CORROCOAT EGYPT - Case study...temperature, pressure 5 bars, using CORROCOAT materials: primer PPA, Polyglass Pipe Grade for 296 vertical hole of nozzle plate (hot spot of job), Corrofill,](https://reader033.vdocuments.us/reader033/viewer/2022042710/5f5d9b7deec5e1224e3e67c9/html5/thumbnails/24.jpg)
EvaluationInternal and external lining of Cation Exchanger Regeneration
Taking down hard rubber: 18 daysSurface preparation / application works: 8 daysGuarantee: 2 yearsExpected service life: 4-8 years
![Page 25: CORROCOAT EGYPT - Case study...temperature, pressure 5 bars, using CORROCOAT materials: primer PPA, Polyglass Pipe Grade for 296 vertical hole of nozzle plate (hot spot of job), Corrofill,](https://reader033.vdocuments.us/reader033/viewer/2022042710/5f5d9b7deec5e1224e3e67c9/html5/thumbnails/25.jpg)
Thank You
CORROCOAT EGYPTHead office: 15, El Rahala El Boghdadi St, Ard AlGolf, Nasr City, Cairo
Workshop: New Industrial Zone, Bany Swaif Governorate
Tel.: +2 02 24178309, Fax: +2 02 24178309 E-mail: [email protected]
www.corrocoategypt.com www.corrocoat.com