corporate presentation 20 · 2020-06-23 · corporate presentation. 20. 20. our. 3. presence. ......
TRANSCRIPT
![Page 1: Corporate Presentation 20 · 2020-06-23 · Corporate Presentation. 20. 20. Our. 3. presence. ... Civil works and installations in the expansion of the San Pablo Airport in Seville](https://reader034.vdocuments.us/reader034/viewer/2022050117/5f4dfb0e159aa544857c38ba/html5/thumbnails/1.jpg)
Corporate Presentation
2020
![Page 2: Corporate Presentation 20 · 2020-06-23 · Corporate Presentation. 20. 20. Our. 3. presence. ... Civil works and installations in the expansion of the San Pablo Airport in Seville](https://reader034.vdocuments.us/reader034/viewer/2022050117/5f4dfb0e159aa544857c38ba/html5/thumbnails/2.jpg)
Ourpresence3Business
areas2
Who are we?1
Page 3 Page 11 Page 18
2
Index
![Page 3: Corporate Presentation 20 · 2020-06-23 · Corporate Presentation. 20. 20. Our. 3. presence. ... Civil works and installations in the expansion of the San Pablo Airport in Seville](https://reader034.vdocuments.us/reader034/viewer/2022050117/5f4dfb0e159aa544857c38ba/html5/thumbnails/3.jpg)
Whoare we?1
3
![Page 4: Corporate Presentation 20 · 2020-06-23 · Corporate Presentation. 20. 20. Our. 3. presence. ... Civil works and installations in the expansion of the San Pablo Airport in Seville](https://reader034.vdocuments.us/reader034/viewer/2022050117/5f4dfb0e159aa544857c38ba/html5/thumbnails/4.jpg)
Who are we?
Constructing energy infrastructures Generating conventional and renewable energy. Transporting and distributing energy.
Providing solutions for the integrated water cycle Developing desalination and water treatment processes. Constructing hydraulic infrastructures.
Being a reference in the transmission and distribution sector Developing transmission lines, electric distribution and railway electrification projects. Constructing installations and infrastructures for all types of plants and buildings.
Obtaining results in the services area Providing operation and maintenance services for plants optimization. Managing private assets efficiently.
Furthering new horizons for development and innovation Our 280 accumulated awarded patents since 2008 position us as technological leaders in sectors such as
solar thermal technology. Renewable energy storage and our bet for energy efficiency and water consumption (water-energy nexus).
Abengoa (MCE: ABG.B) is an international company thatapplies innovative technology solutions for sustainabledevelopment in the infrastructure, energy and water sectors.
4
![Page 5: Corporate Presentation 20 · 2020-06-23 · Corporate Presentation. 20. 20. Our. 3. presence. ... Civil works and installations in the expansion of the San Pablo Airport in Seville](https://reader034.vdocuments.us/reader034/viewer/2022050117/5f4dfb0e159aa544857c38ba/html5/thumbnails/5.jpg)
Solid business of engineering, procurement, construction and operation and maintenance in high growth markets
Global footprint makes Abengoa’s business more resilient and the size of its backlog and pipeline provides revenue visibility
Leaner organizational structure and high operational efficiency
The development of commercially viable cutting-edge technology has become Abengoa’s key competitive advantage
A more focused business model and a healthier, sound capital structure, together with a multidisciplinary set of capabilities places Abengoa in a solid position for future value creation
Credibility regained with stakeholders
Formed by a team of committed and skilled people that have specialized and competitive know-how
A Viable Company with Solid Fundamentals
5
![Page 6: Corporate Presentation 20 · 2020-06-23 · Corporate Presentation. 20. 20. Our. 3. presence. ... Civil works and installations in the expansion of the San Pablo Airport in Seville](https://reader034.vdocuments.us/reader034/viewer/2022050117/5f4dfb0e159aa544857c38ba/html5/thumbnails/6.jpg)
Global presence with a recognized position of leadership in main world rankings (GWI, ENR).
9.3 GW of installed power in conventional generation plants, of which 1.4 GW are under construction.
2.3 GW* solar power constructed, 760 MW under construction, and 480 MW of wind power.
*35 % of solar thermal installed capacity worldwide.
+ 27,000 km of transmission and distribution lines and more than 330 substations worldwide over the last 15 years.
+ 1.7 million of m3/day of desalinated installed capacity and 2.6 million m3/day under construction.
Main Magnitudes
6
280 patents at the end of 2019.
0
100
200
300
400
500
2015 2016 2017 2018 2019
Numbers of patents
![Page 7: Corporate Presentation 20 · 2020-06-23 · Corporate Presentation. 20. 20. Our. 3. presence. ... Civil works and installations in the expansion of the San Pablo Airport in Seville](https://reader034.vdocuments.us/reader034/viewer/2022050117/5f4dfb0e159aa544857c38ba/html5/thumbnails/7.jpg)
Abengoa Figures 2019
Sales 1,493 M€
EBITDA 300 M€
Employees 14,025
Main projects under execution
Waad Al Shamal (Saudi Arabia)
Salalah (Oman)
Noor Energy 1 (UAE)
Chuquicamata Humos Negros (Chile)
Agadir (Morocco)
Rabigh (Saudi Arabia)
O&M solar plants (Spain)
Fulcrum (USA)
Main indicatorsResults as of close of 2019
7
26%
22%
18%
11%
9%
9%4%
South America
Middle East
Africa
Mexico
USA
Spain
Europe (ex. Spain)
Others
Revenues by geographies Revenues by segment
21%
79%
E&C
Concessions
![Page 8: Corporate Presentation 20 · 2020-06-23 · Corporate Presentation. 20. 20. Our. 3. presence. ... Civil works and installations in the expansion of the San Pablo Airport in Seville](https://reader034.vdocuments.us/reader034/viewer/2022050117/5f4dfb0e159aa544857c38ba/html5/thumbnails/8.jpg)
Portadas
Taweelah UAE Construction of the world’s largest reverse osmosis desalination plant with total capacity of 909,000 m3/day.
Dubal UAE Construction of a seawater reverse osmosis desalination plant with total capacity of 41,000 m3/day..
RWEL Klaipeda-Vilnius
Lithuania Electrification of more than 730 km of railway lines.
Switching SubstationRío Malleco
Chile Construction of a 220 kV substation in Chile.
Seville Airport Spain Civil works and installations in the expansion of the San Pablo Airport in Seville.
Southern Peru Copper Corporation
Peru Construction of a retention dam to hold 40,000 m3 at 3,500 meters above sea-level, and several singular buildings within the copper mining facilities.
New Projects 2019Abengoa has been awarded in 2019 new projects for a total value of €1,107 million, including world’s largest reverse osmosis desalination plant in Taweelah. Among them:
8
![Page 9: Corporate Presentation 20 · 2020-06-23 · Corporate Presentation. 20. 20. Our. 3. presence. ... Civil works and installations in the expansion of the San Pablo Airport in Seville](https://reader034.vdocuments.us/reader034/viewer/2022050117/5f4dfb0e159aa544857c38ba/html5/thumbnails/9.jpg)
1 Reduction of debt through capitalization or write-off of 70% and dilution of 95% for shareholders.
New liquidity received, mainly dedicated to the repayment of outstanding debt and restructuring costs, net funds received by Abengoawere limited.
It represented an important, although not definitive, step in order to achieve a sustainable capital structure.
9
The business has been focused on engineering and construction projects for third parties.
Advances in the asset divestment plan: sale of 41.5 % of Atlantica Yield; the Norte III combined cycle in Mexico, bioenergy business in Europe, transmission lines in Brazil, among others.
2
Financial Restructuring 2019
The financial restructuring completed in April 2019 addressed the following objectives and implied:3
Financial Restructuring
9
Capital structure and balance sheet aligned with business profile.
€2.7bn financial debt (Old Money) transformed into mandatory convertibles.
![Page 10: Corporate Presentation 20 · 2020-06-23 · Corporate Presentation. 20. 20. Our. 3. presence. ... Civil works and installations in the expansion of the San Pablo Airport in Seville](https://reader034.vdocuments.us/reader034/viewer/2022050117/5f4dfb0e159aa544857c38ba/html5/thumbnails/10.jpg)
10
Liquidity
Soliciting new financing for an amount of €250 million and a term of five years, expected to be covered by a guarantee from ICO,
2020 Updated Business Plan
10
Due to the crisis caused by the COVID-19 pandemic and taking into consideration the evolution of the business, the financial projections included in the Viability Plan, published in 2019, has been revised, presenting an Updated Business Plan. In the UpdatedBusiness Plan, several measures are included in order to restore the equity balance of Abengoa S.A, ensure its long-term success and its position to compete globally..
Bonding Lines Debt restructuring
The foregoing measures require amendments to the financial instruments to which they affect for which agreements with the financial creditors must be reached.
![Page 11: Corporate Presentation 20 · 2020-06-23 · Corporate Presentation. 20. 20. Our. 3. presence. ... Civil works and installations in the expansion of the San Pablo Airport in Seville](https://reader034.vdocuments.us/reader034/viewer/2022050117/5f4dfb0e159aa544857c38ba/html5/thumbnails/11.jpg)
Accra 60,000 m3/day in Ghana
Ténès 200,000 m3/day in Algeria
Chennai 100,000 m3/day in India
SAWS 169,000 m3/day in United States
Agadir 275,000 m3/day in Morocco
The company completed, between March and November 2018, in two phases, the sale operation of its stake in Atlantica Yield (AY) to Algonquin Power & Utilities Corp. (APUC). The value of the operation amounted to 952 MUS.
Bioenergy USA 1G & 2G bioethanol
Bioenergy Europe 1G bioethanol
AB San Roque Biodiesel
Bioenergy Brazil 1G bioethanol
Khi 50 MW CSP – South Africa
Xina 100 MW – South Africa
SPP1 150 MW hybrid CC+CSP in Algeria
Hospital Manaus 300 beds hospital in Brazil
Real Estate Various assets
Norte III 924 MW combined cycle in Mexico
Atlantica Yield Sale
Progress in the sale of A3T
220 MW cogeneration plant in Mexico
Delivering energy to the grid since late December2018
PPAs signed for more than 80% of the capacity
Ongoing negotiations.
Brazil T&D 3,532 Km lines in operation in Brazil
Brazil T&D 6,218 km in construction
Peru T&D 320 km transmission line
11
Sale of concessional assets and non-core businesses will contribute to improve Abengoa’s leverage and liquidity profile. The divestment plan has been completed, so far, at 96.6% of its value.
Assets Disposal Plan
![Page 12: Corporate Presentation 20 · 2020-06-23 · Corporate Presentation. 20. 20. Our. 3. presence. ... Civil works and installations in the expansion of the San Pablo Airport in Seville](https://reader034.vdocuments.us/reader034/viewer/2022050117/5f4dfb0e159aa544857c38ba/html5/thumbnails/12.jpg)
BusinessAreas2
12
![Page 13: Corporate Presentation 20 · 2020-06-23 · Corporate Presentation. 20. 20. Our. 3. presence. ... Civil works and installations in the expansion of the San Pablo Airport in Seville](https://reader034.vdocuments.us/reader034/viewer/2022050117/5f4dfb0e159aa544857c38ba/html5/thumbnails/13.jpg)
hybridization
Specialist in infrastructure for the integral water cycle.
Excellence in technical capabilities.
Leader in the international desalination market and a worldwide reference in the construction of hydraulic infrastructures and treatment plants.
1.7 million m3 /day desalinated watercapacity and 2.2 million m3 /day ofdrinking water.
Energy Water Transmission & Infrastructure
Services
Lines of activity Abengoa organizes its activity in several business areas: Energy, Water, Transmission and Infrastructure and Services, all of which are based on R&D and Innovation.
13
![Page 14: Corporate Presentation 20 · 2020-06-23 · Corporate Presentation. 20. 20. Our. 3. presence. ... Civil works and installations in the expansion of the San Pablo Airport in Seville](https://reader034.vdocuments.us/reader034/viewer/2022050117/5f4dfb0e159aa544857c38ba/html5/thumbnails/14.jpg)
Energy
Noor Energy IUnited Arab Emirates
3x200 MW parabolic troughcollector plant + 12 hours ofstorage
ACT + A3T Mexico
300 and 220 MW efficientcogeneration plants
Cerro Dominador Chile
110 MW solar termal plant+100 MW photovoltaic plant+17,5 hours of storage
FulcrumUSA
Plant to produce biofuels for theaviation sector from municipal solid waste
14
Hassi R’MelAlgeria
150 MW integrated solar combined cycle hybrid plant
![Page 15: Corporate Presentation 20 · 2020-06-23 · Corporate Presentation. 20. 20. Our. 3. presence. ... Civil works and installations in the expansion of the San Pablo Airport in Seville](https://reader034.vdocuments.us/reader034/viewer/2022050117/5f4dfb0e159aa544857c38ba/html5/thumbnails/15.jpg)
Water
15
Desalination Water Treatment Hydraulic infrastructure
Taweelahdesalination plantUnited Arab Emirates
Cunene supply and sanitation systemAngola
Sewage treatmentplant RanillaSpain
Tierra Amarilla AqueductChile
Canal de Navarra IrrigationSpain
Agadir desalination plantMorocco
![Page 16: Corporate Presentation 20 · 2020-06-23 · Corporate Presentation. 20. 20. Our. 3. presence. ... Civil works and installations in the expansion of the San Pablo Airport in Seville](https://reader034.vdocuments.us/reader034/viewer/2022050117/5f4dfb0e159aa544857c38ba/html5/thumbnails/16.jpg)
Transmission & Infrastructures
Transmission and distribution
Transmission linesFrance
Installations in industriesSpain
Railway
SubstationsOman
Meca-Medina highspeed lineSaudi Arabia
Railway electrificationUnited Kingdom
Installations & Infrastructures
Electromechanical installationsSpain
Electrical panels & ElectronicsSpain
CP metallic structuresSpain
Production centers
![Page 17: Corporate Presentation 20 · 2020-06-23 · Corporate Presentation. 20. 20. Our. 3. presence. ... Civil works and installations in the expansion of the San Pablo Airport in Seville](https://reader034.vdocuments.us/reader034/viewer/2022050117/5f4dfb0e159aa544857c38ba/html5/thumbnails/17.jpg)
O&M Services
Ain Beni MatharMorocco
472 MWe Combined cycle (solar+gas)
SolanaUSA
280 MW parabolic trough plant with six hours of storage
HonaineAlgeria
Desalination plant producing 200,000 m3/day of drinking water
Cerro Dominador Chile
100 MW PV solar plant
Abent 3T Mexico
220 MW high efficiency cogeneration plant
17
•
•
•
![Page 18: Corporate Presentation 20 · 2020-06-23 · Corporate Presentation. 20. 20. Our. 3. presence. ... Civil works and installations in the expansion of the San Pablo Airport in Seville](https://reader034.vdocuments.us/reader034/viewer/2022050117/5f4dfb0e159aa544857c38ba/html5/thumbnails/18.jpg)
R&D and Innovation
Solar Thermal Energy Storage Hydrogen and Fuel Cells Aerospace & Defense
Development of more efficient solar thermal plants to improve the competitiveness and dispatchability of solar technology in the energy mix. Abengoa has its own technology and a worldwide solar thermal installed capacity of 35%.
Development of storage systems with the objectives of improving the quality of the electricity network and favoring the integration and dispatchability of renewable energies.
Development of power generation plants, based on fuel cells, as well as hydrogen production plants and hydrogen service stations for vehicles.
The main activities focus on the development of electronic products for the aerospace, large facilities and defense sectors, as well as R&D which explores synergies between these sectors and energy.
H2
18
![Page 19: Corporate Presentation 20 · 2020-06-23 · Corporate Presentation. 20. 20. Our. 3. presence. ... Civil works and installations in the expansion of the San Pablo Airport in Seville](https://reader034.vdocuments.us/reader034/viewer/2022050117/5f4dfb0e159aa544857c38ba/html5/thumbnails/19.jpg)
Ourpresence3
19
![Page 20: Corporate Presentation 20 · 2020-06-23 · Corporate Presentation. 20. 20. Our. 3. presence. ... Civil works and installations in the expansion of the San Pablo Airport in Seville](https://reader034.vdocuments.us/reader034/viewer/2022050117/5f4dfb0e159aa544857c38ba/html5/thumbnails/20.jpg)
*
Our Presence
20
![Page 21: Corporate Presentation 20 · 2020-06-23 · Corporate Presentation. 20. 20. Our. 3. presence. ... Civil works and installations in the expansion of the San Pablo Airport in Seville](https://reader034.vdocuments.us/reader034/viewer/2022050117/5f4dfb0e159aa544857c38ba/html5/thumbnails/21.jpg)
South America
Peru
Shougang Mine extension packages 4 and 5
Argentina
500 kV Neuquen -Mendoza Line
Uruguay
Fishing terminal Puerto Capurro
Chile
500 kV Changos – KimalLine
Brasil
Norte Brazil LineDC 600 kV 2,411 km
21
Transmissionlines19,000 Km
Constructedsubstations165
Solar energy100 MW
Conventionalenergy
1.6 GW
Water treatment1.5 M m3/día
Renewableenergy O&M400 MW
![Page 22: Corporate Presentation 20 · 2020-06-23 · Corporate Presentation. 20. 20. Our. 3. presence. ... Civil works and installations in the expansion of the San Pablo Airport in Seville](https://reader034.vdocuments.us/reader034/viewer/2022050117/5f4dfb0e159aa544857c38ba/html5/thumbnails/22.jpg)
North America
Mexico
A3T 220 MW
Mexico
Centro Morelos 724 MW
United States
Sierra Biofuel plant Agua Prieta II 14 MW
22
Conventionalenergy2.6 GW
Renewableenergy959 MW
Transmissionlines4,000 Km
Biofuel plants761,000 m3/año
Water treatment38,800m3/día
Conventional and renewable energyO&M
220 MW
Mexico
![Page 23: Corporate Presentation 20 · 2020-06-23 · Corporate Presentation. 20. 20. Our. 3. presence. ... Civil works and installations in the expansion of the San Pablo Airport in Seville](https://reader034.vdocuments.us/reader034/viewer/2022050117/5f4dfb0e159aa544857c38ba/html5/thumbnails/23.jpg)
Spain
Solar thermal plants
Ukraine
Transmission lines
Denmark
Electromechanical installations Desalination plants
23
Energía convencional
Railwayelectrification
2,500 Km
Constructed solar energy700 MW
Desalination462,000 m3/day
Water treatment1,500,000m3/day
O&M conventionaland renewableenergy
731 MW
Spain
Europe
Transmissionlines1,500 Km
![Page 24: Corporate Presentation 20 · 2020-06-23 · Corporate Presentation. 20. 20. Our. 3. presence. ... Civil works and installations in the expansion of the San Pablo Airport in Seville](https://reader034.vdocuments.us/reader034/viewer/2022050117/5f4dfb0e159aa544857c38ba/html5/thumbnails/24.jpg)
Morocco
Ain Beni Mathar
South Africa
Xina Solar One
Angola
Cunene
Ghana
Accra
Morocco
225 kV line
24
Desalination and O&M desalinationplants
560,000m3/day
Desalinationunderconstruction
325,000 m3/day
2,000 km
250 MW
622 MW
O&M conventional and renewable energy
912 MW
Africa
Transmissionlines
Solar energy
Conventionalenergy
![Page 25: Corporate Presentation 20 · 2020-06-23 · Corporate Presentation. 20. 20. Our. 3. presence. ... Civil works and installations in the expansion of the San Pablo Airport in Seville](https://reader034.vdocuments.us/reader034/viewer/2022050117/5f4dfb0e159aa544857c38ba/html5/thumbnails/25.jpg)
Saudi Arabia
Faya-Shamka Line Shuaibah Desalination Plant
25
Energía convencional
Solar energyunderconstruction
650 MW
Conventionalenergy underconstruction
1,390 MW
Desalination295,000 m3/day
Desalinationunderconstruction
2.3 Mm3/day
Railwayelectrification900 km
Middle East
Solar energyin operation100 MW
United Arab Emirates Saudi Arabia
Waad Al Shamal
![Page 26: Corporate Presentation 20 · 2020-06-23 · Corporate Presentation. 20. 20. Our. 3. presence. ... Civil works and installations in the expansion of the San Pablo Airport in Seville](https://reader034.vdocuments.us/reader034/viewer/2022050117/5f4dfb0e159aa544857c38ba/html5/thumbnails/26.jpg)
India
Chennai desalination plant
China
Qingdao desalinationplant
India
Transmission lines Luneng
26
Energía convencional
Railwayelectrification
880 Km
Solar energy
Desalination200,000 m3/day
Water treatment20,000m3/day
China
Asia
Transmissionlines+1,000 Km
200 MWO&M desalinationplants
200,000 m3/day
![Page 27: Corporate Presentation 20 · 2020-06-23 · Corporate Presentation. 20. 20. Our. 3. presence. ... Civil works and installations in the expansion of the San Pablo Airport in Seville](https://reader034.vdocuments.us/reader034/viewer/2022050117/5f4dfb0e159aa544857c38ba/html5/thumbnails/27.jpg)
Innovative technology solutionsfor sustainability
Thank you