    Economical and, Ecological Solution Two component solvent free Polyurethane's have been used as

    a single protective coating for steel pipes, valves fittings and

    other steel structures for over forty years.

    Many internationally recognized examples where polyurethane

    systems have been selected as the most cost effective and best

    suited, for pipeline rehabilitation projects

  • 8/14/2019 CORCON 2009 MJ.ppt

    3/27

    Excellent Chemical Mechanical Properties:

    Excellent Adhesion Capacity High Impact & Abrasion resistance.

    Corrosion protection with good chemical resistance.

    Extremely Short Curing Time.

    Advantages of easy application and control on-site.

  • 8/14/2019 CORCON 2009 MJ.ppt

    4/27

    Surface PreparationManual

    Automated Equipment

    Requires

    SA 2 (ISO 8501-1)

  • 8/14/2019 CORCON 2009 MJ.ppt

    5/27

    Manual Surface Preparation In The Trench Project: IOCL Vadinar

    Pipeline Rehabilitation:

    42 Parallel Pipes

  • 8/14/2019 CORCON 2009 MJ.ppt

    6/27

    Automated Surface Preparation

    Uniform surface preparation

    Faster

    High quality

    Good Anchor pattern

    More Expensive

  • 8/14/2019 CORCON 2009 MJ.ppt

    7/27

    Coating Application:100% Solids polyurethane coating technology allows

    several application techniques including:

    Manual two component heated airless spray machine

    Automated Rotary Spraying Ring (In-Situ)

    Automated Line Travel Equipment (Out of the Trench)

  • 8/14/2019 CORCON 2009 MJ.ppt

    8/27

    Coating Application:100% Solids polyurethane coating technology allows several application

    techniques including:

    Manual (two component heated airless spray machine)

  • 8/14/2019 CORCON 2009 MJ.ppt

    9/27

    Coating Manual Application

  • 8/14/2019 CORCON 2009 MJ.ppt

    10/27

    Manual ApplicationCan be completed in open areas and areas with difficult access

  • 8/14/2019 CORCON 2009 MJ.ppt

    11/27

    Manual Application Manual application in

    Compressor Station

    Operating pipeline(operating @ +40oC)

    Tenting used to protectspray area and surfacepreparation

  • 8/14/2019 CORCON 2009 MJ.ppt

    12/27

    Manual ApplicationIOCL 42 Pipeline Vadinar

  • 8/14/2019 CORCON 2009 MJ.ppt

    13/27

    Manual ApplicationPossible Problems Encountered:

    Slower (Than Automated Spraying Equipment)

    Can be inconsistent with thickness

    Over consumption can run @ 40% to 100% over

    theoretical Qualified skilled labour can prove hard to find

    More Economical than Automatic line travel equipment

    method

  • 8/14/2019 CORCON 2009 MJ.ppt

    14/27

    Rotary Automatic Spray System(In the Trench) Automatic spray ring system can be employed when speed

    of application is an important requirement.

    When short distances (Bell hole) Automatic rotary sprayring apparatus, offers the advantages that manual sprayingmethod cannot.

    Speed of application. (0.5 meters-to-1 meter per minute)

    Consistent & Uniformed thickness. Reduced overspray.

    Reducing material costs.

  • 8/14/2019 CORCON 2009 MJ.ppt

    15/27

    Automated Application In-Situ

  • 8/14/2019 CORCON 2009 MJ.ppt

    16/27

    Automated Line Travel

    Removal of the existing coating. (CTE, Tapes etc,) using

    high pressure water jetting.

    Abrasive blast cleaning (Sa 2.5 - ISO 8501-1)

    Application of Two Component Polyurethane

    Providing a single (Homogeneous) coating.

    Multi-step Operation

  • 8/14/2019 CORCON 2009 MJ.ppt

    17/27

    Coating RemovalCTE coating 38 Gas Pipeline Texas USA (1994)

  • 8/14/2019 CORCON 2009 MJ.ppt

    18/27

    Surface Preparation Abrasive Blast

  • 8/14/2019 CORCON 2009 MJ.ppt

    19/27

    Automated ApplicationLine Travel

    Single Pass Application of Two Component Polyurethane Coating38 @ DFT 800 m/100m

  • 8/14/2019 CORCON 2009 MJ.ppt

    20/27

    HighBuild CharacteristicsBy

    Automated or Manual Application

    1.7 mm in 1 pass

  • 8/14/2019 CORCON 2009 MJ.ppt

    21/27

    Typical Alternative Liquid Systems:Two Component Liquid Epoxy :

    Slower curing,

    Low build thickness characteristics,

    Less flexibility; and

    Approximately 15% more expensive.

    Two Component Liquid Epoxy Offers High operating temperatures (90oC+)

  • 8/14/2019 CORCON 2009 MJ.ppt

    22/27

    Typical Testing Results:S/F Epoxy S/F Polyurethane

    These typical testing values illustrate why, solvent free polyurethanes are

    selected as the preferred coating system for pipeline rehabilitation

    programmes.

    Test Standard Solvent Free Epoxy Solvent Free P.U.Sag Resistance Typically 1mm Typically 2mm

    Hard dry time

    (Fast Setting)

    4 Hours 1 Hour

    Flexibility: ASTM-D522 Typically < 5% Typically < 40%

    Impact Resistance: ASTM-G14 Typically: 3-4 Joules > 8.8 Joules

  • 8/14/2019 CORCON 2009 MJ.ppt

    23/27

  • 8/14/2019 CORCON 2009 MJ.ppt

    24/27

    Application Temperatures and Curing Time100% Solvent Free Polyurethane

    Application Temp. Substrate > 10CComp. A 50C 80C

    Comp. B 40C 60C

    Pot Life Approx. 40 sec. At 60CCuring Time At 20C At 50C At 90C

    touch dry 10 min. 2 min. * < 1 min. *

    stackable 8 hours 30 min. * Immediately

  • 8/14/2019 CORCON 2009 MJ.ppt

    25/27

    Holiday Testing - Within 2 Hours

  • 8/14/2019 CORCON 2009 MJ.ppt

    26/27

    Solvent Free PolyurethaneTypical Performance Properties

    Test Standard ResultsAdhesion: ASTM-D4541 Greater than 150 kg/cm onto blast

    cleaned steel.

    Chemical Resistance: - Good in most solutions other than,

    aromatic solvents.

    Flexibility ASTM-D522 Average 30% - 50% elongation tobreak, with cold bend resistance

    down to 12.7mm mandrel.

    Hardness: ASTM-D2240 Typically 70-80 Shore D

    Abrasion Resistance: ASTM-D4060 Typically 70 mg loss (Taber

    abrader, 1000 cycles, CS 10 wheels, 1kg loading)

    Tensile Strength: ASTM-D638 13 N/mm

    Penetration Resistance: ASTM-G17 Less than 10% of the thickness

    penetrated

    Impact Resistance: ASTM-G14 > 8.8 Joules

  • 8/14/2019 CORCON 2009 MJ.ppt

    27/27

    Conclusions

    Appointment of qualified approved applicators /contractors.

    Experience and proven track record in theapplication of, Multi Component Liquid CoatingSystems. Results, Surface preparation, application of the newcoating and final testing, completed to thespecification requirements / criteria.

    Which ever method of application selected forpipeline rehabilitation. The most important factorsare: