  • Slide 1
  • Copyright 2008 MIMOSA Oil&Gas/PetroChem Industry OpenO&M Interoperability Use Cases & Scenarios August 22, 2008
  • Slide 2
  • Copyright 2008 MIMOSA Enterprise Risk Management: Key Business Driver for Open Standards- based Interoperability
  • Slide 3
  • Copyright 2008 MIMOSA Enterprise Risk Management Due to pressures of financial markets and competition, businesses are often driven to a lowest-cost, near-term operating model which still meets their identified requirements for providing a product or service of the required quality and quantity to their customers Government regulatory bodies often seek to provide a counter-balancing force to help assure some level of health, safety and environmental risk management is applied within given industry groups under their jurisdiction Rather than looking at this as an inevitable conflict, world-class businesses and governmental regulators are increasingly realizing that they must partner in order to achieve operations that are both optimal on a near-term basis and sustainable on a long-term basis including acceptable Environmental, Health and Safety (EH&S) risks Achieving such unity of purpose requires an approach to capturing and managing overall enterprise performance information in a fashion that properly includes all operational risks Once this is done, all businesses in a given sector can be properly judged on an even playing field which properly rewards businesses for their systemic approach to risk management Some businesses already sell themselves as green or safe organizations, but we need greatly improved ways of modeling, monitoring and managing risks where economic rewards properly flow to enterprises for doing the right thing.
  • Slide 4
  • Copyright 2008 MIMOSA Enterprise Risk Management Enterprise Risk Management (ERM) can be broken down into several major sub-classes, but a major set of the risks, associated with EH&S risks are tightly interwoven and require a bottom up solutions approach based on sound engineering and business practices The same sound practices which help manage EHS risks, also contribute to properly managing the Operational risks associated with properly meeting a customers requirements for product or services quality (including product safety) and quantity As enterprises continue to extend their supply chains on a global basis, end-to-end risk management is going to become a larger and larger issue, where these risks must be properly modeled, monitored and managed on an inter-enterprise basis spanning cultures, industries and vast numbers of interrelated systems and sub-systems Rather than being subject to failure prone manual methods of capture and reporting, risk management related information must be systemically captured, evaluated and escalated so that accountability and the required risk management information flow together.
  • Slide 5
  • Copyright 2008 MIMOSA Enterprise Risk Management In the overall world of Operations and Maintenance (O&M) there a series of tasks which are often done on a limited and/or uncoordinated basis, which would provide a solid foundation for both Operational and EH&S risk management, if the processes were seen to be interrelated and the surrounding envelope of enterprise information was properly managed as a valuable enterprise asset Many different organizations within a given enterprise and its business partners, who do not normally act in a well coordinated way, need to be brought together in a holistic manner, so that they can properly and efficiently support both their own business unit requirements and ERM The problem space spans multiple functional domains in multiple enterprises, in multiple industries in multiple countries where no single vendor or even small combination of vendors provides a total solution and traditional systems integration approaches are useless In order to achieve the required levels of interoperability, substantial collaboration and coordination is required in process models, data models, data formats, metadata, and industry data as part of a comprehensive approach to enterprise information and knowledge management Open Standards-based Interoperability provides a practical strategy for achieving the required levels of data, information, systems and human interoperability on an incremental and sustainable basis.
  • Slide 6
  • Copyright 2008 MIMOSA The Opportunity Organizations are already struggling to enable and sustain required levels of systems integration between their various Operations & Maintenance (O&M) systems Intra-Enterprise P2B Interoperability Inter-Enterprise SCM Interoperability Supporting critical new business risk management requirements will require significant new levels of systems interoperability Reliability Management Safety Management-(Process Safety Management-National Emphasis Program) Quality Management Environmental Management Leveraging of appropriate open standards enables the dovetailing between O&M Activities and Life-cycle Engineering providing the basis for open standards- based interoperability that is Agile Scalable Repeatable Sustainable Key Objective - Enable a fundamental shift from project- centric systems integration to industry-centric open-standards based interoperability
  • Slide 7
  • Copyright 2008 MIMOSA Physical Asset Control Real-time Systems Enterprise Business Systems Enterprise Resource Planning (ERP) The OpenO&M Solution: Open Standards & Collaboration Get Everyone on the Same Page & Fill the Whitespace OpenO&M Operations Maintenance
  • Slide 8
  • Copyright 2008 MIMOSA OpenO&M Initiative Current Participating Standards Organizational Model OpenO&M Initiative Joint Working Groups Life-cycle MGT NIBS OpenO&M MFG JWG ISA-95 WBF, OAGi OpenO&M Facilities JWG NIBS FMOC OpenO&M Military JWG US Army US Navy
  • Slide 9
  • Copyright 2008 MIMOSA MIMOSA Summary A 501 (c) (6) non profit organization Web Site: www.mimosa.orgwww.mimosa.org Funded by membership and collaborative projects Vendors Integrators End-Users Publishing interoperability standards & specifications Free public licensing of final versions since 1998 Members licensing of work in progress Standards & Specifications Tools & Technology An Operations and Maintenance Information Open Systems Alliance
  • Slide 10
  • Copyright 2008 MIMOSA OpenO&M Manufacturing JWG: OPC, ISA-95, WBF/B2MML, OAGi OpenO&M Facilities JWG: NIBS FMOC OpenO&M Military JWG: U.S. Army and U.S. Navy MIMOSA Center of Excellence: U.S. Army AMRDEC SED SMRP: Mapping MIMOSA Stds To SMRP Body of Knowledge ISO Draft STD 18435: TC 184/SC 5/WG 7D-Liaison (O&M Integration) Chair ISO TC184 Manufacturing Asset Management Integration Task Force ISO STD 13374: TC108/SC 5 - Condition Monitoring & Diagnostics- MIMOSA is the Informative Reference Technical Committee 108 Sub-Committee 5 Working Group 6 MIMOSA Collaboration For OpenO&M Technical Committee 184 Sub-Committee 5 Working Group 7
  • Slide 11
  • Copyright 2008 MIMOSA Application Domain Integration Diagram DRAFT ISO 18435 Application Domain Integration Diagram Update A4.1 Intra-enterprise activities: Business Planning, Orders & Production, and Maintenance A4.2 Inter-enterprise activities: Supply Chain Planning, Logistics Strategy A3.1 - Operations Planning & Scheduling A3.2 Capability Assessment & Order Fulfillment A3.3 - Maintenance Planning & Scheduling A2.2 - Asset Prognostics and Health, Quality, Safety, & Environmental Management A2.3 - Maintenance Execution & Tracking A2.1 - Supervisory Control & Human-Machine Interface A1.1- Control, I/O,Data Acquisition, Data Historian, Asset Utilization, & Displays A1.2 - Asset Condition Monitoring & Sample / Test / Diagnostic & Quality Monitoring A1.3 - Asset Configuration, Calibration & Repair / Replace Resources ( Material / Personnel ) A0.1 - Resource Identification and Location A0.2 - Asset Identification and Location Assets (Equipment / Facilities / Serialized Components / Sensors / Transducers / Software / Documents) Level R4 Enterprise / Site Level R3 Area Level R2 Work Center Level R1 Work Unit Level R0 Asset
  • Slide 12
  • Copyright 2008 MIMOSA Open Maintenance Management Open Reliability Management Open Condition Management Open Object Registry Management MIMOSA Open Interoperability Model Asset Management Functional Domains Open Modeling Of: Physical Assets Functional Segments Resources Agents Open Modeling For: Plants Facilities Fleets
  • Slide 13
  • Copyright 2008 MIMOSA MIMOSA Open Systems Architecture for Enterprise Application Integration (OSA-EAI) Copyright 2006 MIMOSA
  • Slide 14
  • Copyright 2008 MIMOSA Owner/Operator Leadership With Vendor Support Selected Supporting Organizations-Petrochemical and Oil and Gas Industry
  • Slide 15
  • Copyright 2008 MIMOSA OpenO&M Owner/Operator Leadership Council Oil and Gas Leadership Team Mike Brooks - Chevron, MESA Oil and Gas Working Group Acting Chair Mike Knight, Greg Pattinson BP Cliff Pederson - Suncor, NPRA Technical Committee Co-chair Fayez Kharbat Saudi Aramco, MESA Oil and Gas Working Group
  • Slide 16
  • Copyright 2008 MIMOSA OpenO&M Owner/Operator Leadership Councils The OpenO&M Initiative addresses many of the required elements for collaboration and coordination on an interdisciplinary, cross-industry basis The participating standards organizations provide key standards addressing processes, data and information on a cross-industry basis The Owner/Operators are being organized into industry-focused councils providing input, oversight and prioritization with respect to the development of critical interoperability use-cases and scenarios as part of an overall industry-driven strategy Many of the individual use cases address high-value added activities which need to be properly addressed in projects that are routinely occurring When they are combined as part of a coordinated strategy, each effort contributes towards the enterprise requirements for interoperability in a defined way, resulting in greater enterprise benefits and lower costs Taken as a whole, the use cases and the underlying scenarios support many of the key building blocks for ERM while also addressing many near-term low hanging fruit industry requirements.
  • Slide 17
  • Copyright 2008 MIMOSA OpenO&M Owner/Operator Leadership Councils The following slides cover industry-specific use cases and their relationships to scenarios showing the associated interaction between systems The included use cases have been collected primarily from the Oil and Gas, Petrochemical and Chemical industry Over time, other use cases, including both other functional areas and other industry groups will be collected, documented and prioritized The use cases are then related to the appropriate scenarios depicting the associated systems interactions Functional experts from the owner/operator community will validate and prioritize the use cases on an industry basis IT/IS experts from both the Owner/Operator and vendor communities will validate the associated scenarios Finally, working in conjunction with both the Owner/Operators and vendors, industry-standards experts provide a mapping of the standards-based methods to be employed in order to achieve the required levels of sustainable interoperability depicted in the scenarios Many of the use cases from differing industries are expected to map back to a common set of scenarios and methods The combination will provide both the Owner/Operators and the key vendors an industry specified strategy for achieving sustainable Open Standards-based Interoperability on an incremental basis, where individual product development and implementation efforts can be properly co-aligned for mutual benefit.
  • Slide 18
  • Copyright 2008 MIMOSA Oil & Gas / Petrochemical / Chemical Use Cases
  • Slide 19
  • Copyright 2008 MIMOSA Use Case #1 Handover of As-Designed Information from Engineering, Procurement, and Construction (EPC) Contractor(s) to Owner/Operator: A core problem for Owner/Operators (O/O), vendors and systems implementers is the lack of good mechanisms for managing the needed information exchanges between EPC activities and the O&M related systems, applications and technologies. Information to Be Exchanged: Information is needed to properly "bootstrap" O&M systems with as-designed functional segment data, including P&ID diagram information related to process/equipment data sheets. Need to have access to "tag" databases which identify where sensors have been installed for control and monitoring, related to the process equipment they are monitoring, and the meta-data about them (tag ID, update frequency, engineering unit, etc.). Scenarios Activated: #4 and #7
  • Slide 20
  • Copyright 2008 MIMOSA Use Case #2 Recurring Updates - Send Open Engineering Upgrades to O&M: Once a site is operational, plant or facility engineering and design organizations may continue to make changes to the as designed information models on a recurring basis. These changes can be driven by the need to operate more efficiently or with greater safety in support of the originally intended process supporting the same product mix or they can be associated with the need to change the process to yield new products, not envisioned in the original design. Once the new design information is developed it may be managed in several different ways depending on the driver for the change and the associated priority it will be assigned. Depending on the nature and scale of the changes involved, the actual work may be performed by the maintenance staff, a maintenance contractor or a construction contractor. In all cases, some type of appropriate feedback loop must be provided to ensure that the status is known and shared by Engineering Reference Databases and O&M systems. Information to Be Exchanged: Need to propagate changes to functional segment data, including P&ID diagram information related to process/equipment data sheets with guaranteed delivery despite network hiccups. Scenarios Activated: #5, #8, and #24
  • Slide 21
  • Copyright 2008 MIMOSA Use Case #3 Field Engineering Changes Sent To Plant or Facilities Engineering: In a perfect world, fully leveraging best practices, all engineering changes would flow through the enterprise design engineering and approval systems on a waterfall basis, even if the actual design work is done locally or through an independent contractor. All such engineering changes would be fully reconciled and rationalized before the work was actually done and the integrity of the Engineering Reference Databases would be ensured as a specialization of use case 2. Unfortunately, there are many situations where this does not occur (and may be impractical). This frequently results when a centralized plant or facilities engineering organization is overwhelmed by emergent situations and the plant or facilities manager must take responsibility for the situation without the ideal level of centralized support. Lack of proper synchronization of this work can result in anomalies with respect to the system of record for the engineering information, since in this case, the most up-to-date As- Designed information is flowing from the field to the enterprise, rather than the other way around. Information to Be Exchanged: The information is very similar to that which is contained in Use Case 2, but it now needs to flow from the field to the Engineering Reference Database so that the systems can be kept in synch. Need to propagate changes to functional segment data, including P&ID diagram information related to process/equipment data sheets with guaranteed delivery despite network hiccups. Scenarios Activated: #8 and #9
  • Slide 22
  • Copyright 2008 MIMOSA Use Case #4 Open On-line Product Data Library: All of the Use Cases contained in this document anticipate the on-line availability of appropriate product data libraries containing the detailed engineering reference information for makes and models of important classes of physical assets. Critical elements of ERM including both Operational Risk Management (ORM) and EH&S depend on the Enterprise Asset Management (EAM), Reliability Management (RM), Condition Based Maintenance (CBM) and ORM systems leveraging the most current product data. Manufacturers are often reluctant to publish some quality and reliability data about their products which is extremely important and this information needs to be gathered from trusted third parties and/or internal operating experience. As this new experience-based information becomes available, it also needs to be properly persisted and synchronized. Information to Be Exchanged: For all key originally installed and replaced equipment, ORM and EAM systems need on-line access to motor/pump/gear/bearing/valve/sensor OEM cut-sheet specification data in order for ORM systems to perform equipment diagnostics, validate current configurations meet the required process requirements, and for EAM systems to display to maintenance personnel. ORM and EAM systems need to know if this data is subsequently updated/modified to adjust algorithms with guaranteed delivery. ORM and EAM systems also need to ability to transfer newly- discovered product data into the PDM master database. Scenarios Activated: #1, #2, #3, and #23
  • Slide 23
  • Copyright 2008 MIMOSA Use Case #5 Automatic O&M Configuration (Remove/Replace) Updates: One of the largest headaches for any complex facility or plant is keeping accurate track of the uniquely identified physical assets which are currently installed in a given functional location. Use Cases 1 and 2 deal with top-down Design Engineering- driven activities and Use Case 3 deals with the situation where this is a bottom- up process, but routine remove/ replace operations are work flow-driven rather than design-driven. While all organizations make an attempt to properly keep track of this information for classes of assets with critical functions, experience has shown that substantial process and information gaps routinely exist. After a few years of operations, there is often a substantial difference between the assets that are shown to be installed in the system of record and those that actually are installed. This situation is normally verified and at-least partially corrected when a walk down takes place in conjunction with the implementation of some new related system (such as an EAM system). This is an expensive, labor intensive process and it does not solve the fundamental problem, which results in its recurrence. Lack of proper management of this seemingly straight-forward element of configuration change can have profound consequences for reliability, EH&S, quality, yield. Information to Be Exchanged: When a fieldbus device is replaced and a CMS system is able to sense that a new device has been removed/installed, it should immediately update the registry (REG) system of this configuration change, which should then be propagated to all other O&M systems. When data is keyed into an EAM system that an asset removal and/or installation has taken place, it should immediately update the registry (REG) system of this configuration change, which should then be propagated to all other O&M systems with guaranteed delivery despite any potential network connectivity and/or latency problems. Scenarios Activated: #6, #26, #28
  • Slide 24
  • Copyright 2008 MIMOSA Use Case #6 Open Automatic Preventive Maintenance (PM) Triggering: While there has sometimes been confusion between automated triggering of PM and the evolving trend to use more Condition Based Maintenance (CBM) PM, along with Corrective Maintenance (CM) continue to be part of the Maintenance Mix, with the appropriate use of each to be dictated by a maintenance strategy properly linked to ERM. Parts of this linkage are normally established through an engineering practice known as Reliability Centered Maintenance (RCM), but comprehensive linkage to the ERM process has not been routinely to the degree which will be increasingly required. PM procedures are normally setup to be performed based on the passage of time, some sort of meter-based utilization record (such as miles driven) or a combination of the two. PM procedures must often be performed as part of a manufacturers warranty requirements or to meet external regulator agency requirements. While PM is expected to slowly decline in favor of CBM, it is still critical for systems which rely on it and it is often to easy to miss a PM that is required by utilization. PM, CBM and CM are often interrelated when a PM procedure is setup to trigger an inspection route work order which may subsequently result in either a CM or CBM activity. Proper integration with the controls and/or plant data historian environment enables the usage information to be captured for automatic PM triggering. The EAM system must be able to compare the newly proposed PM event to any pre-existing events to avoid generating multiple work orders for the same requested activity, but the individual request must enable a linkage with an audit trail from each requesting system (Agent). Information to Be Exchanged: In order to allow PM activities which are usage-based to be triggered at the appropriate time without manual entering of readings and to assist ORM systems which have usage logic included in their diagnostics/prognostics, then there is a need to automatically transfer usage readings captured on certain equipment from the Historian system to the EAM system (for PM-triggering) and ORM systems (for CBM-triggering). Scenarios Activated: #10, #11, #25, and #27
  • Slide 25
  • Copyright 2008 MIMOSA Use Case #7 Open Automatic or Semi-Automatic CBM Triggering: The benefits of interoperability start to pay significant dividends when the near-real time decision support systems (such as ORM) begin to properly interact with the transaction processing oriented business systems (such as EAM) based on data/information feeds from true real-time systems involved in monitoring and control. While it is fairly easy to show a hierarchy of data/information/knowledge on a PowerPoint slide, the nature of the use cases needs to be fully contemplated when the transforms are taking place as part of the systems interaction scenarios. This involves several categories of systems spanning 3 basic layers (real-time, near real-time and transaction processing) in the interoperability stack and they are normally provided by several communities of solutions providers, with multiple vendors in each community. Providing sustainable interoperability for all of these systems of systems is a critical focal- point for open standards based interoperability. This use case does NOT assume interaction with operations planning and scheduling oriented systems. It is limited to the current practice where specialized maintenance, reliability, quality and safety systems are able to diagnose or prognoses a need for a maintenance action. When an ORM system (PSMS< AHMS, QMS, EMS) determines that a maintenance action is required; it must be able to generate a CBM-driven request for action/work advisories using an open interface to an EAM system. The ORM should be smart enough to check beforehand to see if similar maintenance work entries are outstanding on an asset so as not to "flood" an EAM system with the exact same CBM request for action/work. In addition, the ORM system needs to be able to check the status of the work submitted. Information to Be Exchanged: All information required to generate a CBM request for action/work. Scenarios Activated: #12, #13, #14, #25, #26, #27, and #28
  • Slide 26
  • Copyright 2008 MIMOSA Use Case #8 Open Early Warning Notifications: As we attempt to move from a purely reactive world to a world where we optimize overall operations, all of the various systems must be able to provide each other with some degree of early notifications about impending situations which will require an optimal decision to be made. If optimal operations are to be achieved, a fully informed dialog needs to take place between all of the participating systems and personnel as they make optimization decisions in support of a previously agreed upon definition of optimum for a particular organization, which may be established using tools such as balanced scorecards. This use case contemplates the situation where an Operational Performance Modeling & Optimization (OPM) system is receiving early warning notifications from a variety of systems which are contributing inputs to the overall optimization effort. The objective is to avoid the collisions which routinely occur in planning and scheduling meetings. While this case focuses on the maintenance and reliability oriented systems, equal attention must be played to all of the operational planning and scheduling systems. The OPM can then be used to generate a unified O&M schedule that is optimized according to agreed upon metrics and that should be the basis for any discussion about further optimization (or deviations). Information to Be Exchanged: OPM systems (Operational Performance Modeling & Optimization Systems) and enterprise portals (PORT) need to be guaranteed immediate notification of ORM significant actual and early warning ORM events and KPI's. In addition, Portals need guaranteed delivery of KPI's from OPM, ORM, EAM, DCS, HMI, and HIST systems. Scenarios Activated: #15, #16, #17, #18, #19, #20, #21, #22, #25, #26, #27, and #28
  • Slide 27
  • Copyright 2008 MIMOSA Use Case #9 Incident Management: With the increasing emphasis on risk management topics including Operational Risks and Health, Safety and Environmental risks, better incident management methods must be established. While traditional incident management systems relied on somewhat arbitrary (and frequently manual) methods to declare, capture, escalate and respond to various categories of incidents, a more systemic approach enables a substantially improved approach to risk management. Post mortem analysis shows that in many cases, a catastrophic event is proceeded by a series of improperly captured and escalated incidents. When the catastrophe occurs, management often responds by indicating they were unaware of the situation in spite of prior related incidents. In response, regulatory agencies such as OSHA are communicating their intent to hold management increasingly accountable (including criminal prosecution) for future catastrophes with ignorance to not be an excuse. In order to enable management to be properly aware of these incidents (in addition to the other risk indicators flowing in association with use case 8), industry must make sure that critical information is captured and escalated along the lines of accountability. An automated approach offers the greatest assurance of such a flow by eliminating unnecessary gaps in the process. This will also properly support the forthcoming requirements to capture, track and report near-miss incidents. Information to Be Exchanged: Enterprise Risk Management Systems must be guaranteed delivery of actual and near miss incidents as they are declared and captured at the lowest practical level in the data/information food chain. They can then escalate and manage the incidents bases upon previously defined rules. Scenarios Activated: #19, #20, #25, #26, #27, and #28
  • Slide 28
  • Copyright 2008 MIMOSA Systems Requiring Interoperability
  • Slide 29
  • Copyright 2008 MIMOSA System Systems Requiring Interoperability With Abbreviations AHM:Asset Health Management System CMS:Condition Monitoring System DCS:Distributed Control System DEV:Instrumentation & Control Device Monitoring System EAM:Enterprise Asset Management (Maintenance Management) System EH&S:Environmental, Health, and Safety Management System EIS:Engineering Information System (Plant/Process Engineering As-Designed & As-Built Network/Segment/Tag Information, Configuration Management Historian) EOM:Event-Oriented Message Bus ERM:Enterprise Risk Management System HIST:Process/Asset Data Historian System HMI:Human-Machine Interface (Operator Console) System MES:Manufacturing Execution System / Production Forecasting & Scheduling System OPM:Operational Performance Modeling & Optimization System ORM:Operational Risk Management System such as EH&S, PSM, AHM, QMS PDM:Product Data Management (As-Designed Product/Part Model Identification and Data Sheets, As-Built Asset identification and Data Sheets) PORT:Enterprise KPI/Event Portal PSM:Process Safety Management System QMS:Quality Management System REG:As-Installed & Maintained Plant/Process Nework/Segment/Asset/Tag Registry & Configuration Management Historian System
  • Slide 30
  • Copyright 2008 MIMOSA Oil & Gas/PetroChem Industry OpenO&M Interoperability Scenarios (Complete View) NOTE: Arrows with Do Not Connect Directly to Another System Publish Information Which Can Be Subscribed to By Multiple Systems Open Standards Which Define Data Content for Information Exchange: OAGIS, CIDX ISO 15926 & MIMOSA B2MML B2MML & PRODML MIMOSA & B2MML MIMOSA OPC Fieldbus (Foundation, Profibus, etc.)
  • Slide 31
  • Copyright 2008 MIMOSA Enterprise Risk Management System, Enterprise Resource Planning System & Enterprise KPI/Event Portals Oil & Gas/PetroChem Industry OpenO&M Interoperability Scenarios Production Forecasting & Scheduling Systems Operational Performance Modeling & Optimization Systems Enterprise Asset Management Systems CBM Advisories (MIMOSA) Control/SCADA, HMI, & Historians CBO Advisories (MIMOSA) Measurements, Events, Inspections, Calibrations, Conditions, Usage, and Sensed O&M Actions O&M Event Monitoring I&C Device Monitoring Portable Monitors (Off- & On-line) Online Surveillance Monitors Online Protection Monitors Online Transient Monitors Laboratory Information Management Systems (LIMS) Operational Risk Management Systems (EH&S, PSMS, AHMS, QMS) Event-Oriented Message Bus Production Performance (B2MML) Asset Performance Prediction (B2MML & PRODML) Full-resolution Condition Data & Events (MIMOSA) As-Installed & As-Maintained Master Data (MIMOSA & B2MML) Significant Actual & Early Warning ORM Events (MIMOSA) ORM KPIs (MIMOSA & B2MML) Maintenance Work Status, & Work History (MIMOSA) Production Orders (OAGIS, CIDX, B2MML) RFQ Cost/Delivery Schedule & PO Delivery Status (OAGIS, CIDX) RFQs & POs (OAGIS, CIDX) Suppliers Customers Detailed Prod. Performance (B2MML) Detailed Prod. Schedules (B2MML) Plant/Process Engineering As-Designed & As-Built Network/Segment/Tag Information, Config. Mgmt. Historians Plant/Process As-Installed & As-Maintained Network/Segment/Asset/Tag Registry & Configuration Management Historians OEM Product Data Mgmt. Systems As-Designed & As-Built Product/Part Data (ISO 15926 & MIMOSA) Asset Removals & Installations (MIMOSA) EOM ORM EAM HIST DCS HMI CMS DEV REG OPM MES EIS PDM OPM KPIs (MIMOSA & B2MML) Forecasted Demand (B2MML & PRODML) Planned Asset Unavailability Schedule (MIMOSA & B2MML) MES KPIs (B2MML) As-Designed & As-Built Plant/Process Engineering Data (ISO 15926 & MIMOSA) Usage Readings (MIMOSA) CBM/Calib. Schedule (MIMOSA) CBM/Calib. Work Completed (MIMOSA) Maint. KPIs (MIMOSA) ERM PORT ERP Plant/Process Engineering Change Advisories Product/Part Engineering Change Advisories Hist. Op. Data & Events (OPC UA-HDA) Current Op. Data & Events (OPC UA DA/A&E) Op. Work Status & Work History (MIMOSA) Control Data (Fieldbus)
  • Slide 32
  • Copyright 2008 MIMOSA Oil & Gas/PetroChem Industry OpenO&M Interoperability Top-Priority Scenarios As Determined By Top-Priority Use Cases NOTE: Arrows with Do Not Connect Directly to Another System Publish Information Which Can Be Subscribed to By Multiple Systems Open Standards Which Define Data Content for Information Exchange: OAGIS, CIDX ISO 15926 & MIMOSA B2MML B2MML & PRODML MIMOSA & B2MML MIMOSA OPC Fieldbus (Foundation, Profibus, etc.)
  • Slide 33
  • Copyright 2008 MIMOSA Enterprise Risk Management System, Enterprise Resource Planning System & Enterprise KPI/Event Portals Oil & Gas/PetroChem Industry OpenO&M Interoperability Top-Priority Scenarios Production Forecasting & Scheduling Systems Operational Performance Modeling & Optimization Systems Enterprise Asset Management Systems CBM Advisories (MIMOSA) Control/SCADA, HMI, & Historians CBO Advisories (MIMOSA) Measurements, Events, Inspections, Calibrations, Conditions, Usage, and Sensed O&M Actions O&M Event Monitoring I&C Device Monitoring Portable Monitors (Off- & On-line) Online Surveillance Monitors Online Protection Monitors Online Transient Monitors Laboratory Information Management Systems (LIMS) Operational Risk Management Systems (EH&S, PSMS, AHMS, QMS) Event-Oriented Message Bus Production Performance (B2MML) Asset Performance Prediction (B2MML & PRODML) Full-resolution Condition Data & Events (MIMOSA) As-Installed & As-Maintained Master Data (MIMOSA & B2MML) Significant Actual & Early Warning ORM Events (MIMOSA) ORM Risk KPIs (MIMOSA & B2MML) Maintenance Work Status, & Work History (MIMOSA) Production Orders (OAGIS, CIDX, B2MML) Control Data (Fieldbus) RFQ Cost/Delivery Schedule & PO Delivery Status (OAGIS, CIDX) RFQs & POs (OAGIS, CIDX) Detailed Prod. Performance (B2MML) Detailed Prod. Schedules (B2MML) Plant/Process Engineering As-Designed & As-Built Segment/Tag Information, Configuration Management Historians Plant/Process As-Installed & As-Maintained Segment/Asset/Tag Registry & Configuration Management Historians OEM Product Data Mgmt. Systems As-Designed & As-Built Product/Part Data (ISO 15926 & MIMOSA) Asset Removals & Installations (MIMOSA) EOM ERM PORT ERP ORM EAM HIST DCS HMI CMS DEV REG OPM MES EIS PDM OPM KPIs (MIMOSA & B2MML) Forecasted Demand (B2MML & PRODML) Planned Asset Unavailability Schedule (MIMOSA & B2MML) MES KPIs (B2MML) As-Designed & As-Built Plant/Process Engineering Data (ISO 15926 & MIMOSA) Usage Readings (MIMOSA) CBM/Calib. Schedule (MIMOSA) CBM/Calib. Work Completed (MIMOSA) Hist. Op. Data & Events (OPC UA-HDA) Op. Work Status & Work History (MIMOSA) 1 2 3 4 5 6 7 8 9 10 21 2019 11 12 1314 15 16 17 18 Maint. KPIs (MIMOSA) 22 Current Op. Data & Events (OPC UA DA/A&E) Suppliers Customers Plant/Process Engineering Change Advisories 24 Product/Part Engineering Change Advisories 23 25 26 27 28
  • Slide 34
  • Oil & Gas/PetroChem Industry OpenO&M Interoperability Top-Priority Scenarios 1 2 3 4 5 6 7 8 9 10 21 20 19 11 12 13 14 15 17 18 22 16 Pull Model Data Out of PDM to ERM, ERP, PORT, ORM, EAM, EIS, REG, CMS, HMI, HIST Synch Creation/Update of Model Data Out of PDM to ERM, ERP, ORM, EAM, EIS, REG, CMS, HIST Push Model Data Into PDM from ERM, ERP, PORT, ORM, EAM, EIS, REG, CMS, HMI, HIST Pull As-Designed Plant/Process Engineering Network/Segment/Tag Data Out of EIS to REG Synch Creation/Update of As-Designed Process Engineering Network/Segment/Tag Data Out of EIS to REG Push Asset Removal/Installation into REG from CMS Pull Registry Data Out of REG to ERM, ERP, PORT, ORM, EAM, HMI, HIST, OPM, MES, CMS Synch Creation/Update of Registry Data Out of REG to ERM, ERP, EIS, ORM, EAM, HIST, OPM, MES, CMS Push Registry Data Into REG from ERM, ERP, ORM, EAM, HMI, HIST, OPM, MES, CMS Pull Usage Readings Out of HIST to EAM, ORM Synch Creation/Update of Usage Readings Out of HIST to EAM, ORM Push CBM Advisories into EAM from ORM Pull Maintenance Work Status/Work History Out of EAM to ORM, HMI, OPM Synch Creation/Update of Maintenance Work Status/Work History Out of EAM to ORM, HMI, OPM Pull EAM KPIs Out of EAM to PORT, ORM, OPM Synch Creation/Update of EAM KPIs Out of EAM to PORT, ORM, OPM Pull ORM KPIs Out of ORM to ERM, PORT, OPM Synch Creation/Update of ORM KPIs Out of ORM to ERM, PORT, OPM Pull Significant ORM Events Out of ORM to ERM, PORT, OPM Synch Creation/Update of Significant ORM Events Out of ORM to ERM, PORT, OPM Pull OPM KPIs Out of OPM to ERM, PORT, MES Synch Creation/Update of OPM KPIs Out of OPM to ERM, PORT, MES Synch Product/Part Engineering Change Advisories Out of PDM to ORM, REG Synch Plant/Process Change Advisories Out of EIS to ORM, REG 23 24
  • Slide 35
  • Oil & Gas/PetroChem Industry OpenO&M Interoperability Top-Priority Scenarios 25 26 27 28 (OPC UA) Pull Current Operating Data and Events Out of CMS to ORM, OPM, HMI, HIST (OPC UA) Synch Current Operating Data and Events Out of CMS to ORM, OPM, HMI, HIST (OPC UA) Pull Historical Operating Data and Events Out of HIST to ORM, OPM
  • Slide 36
  • Scenarios Activated by Use Cases
  • Slide 37
  • Copyright 2008 MIMOSA Top-Priority Scenarios Sequence Diagrams
  • Slide 38
  • Copyright 2008 MIMOSA
  • Slide 39
  • Slide 40
  • Slide 41
  • Slide 42
  • Slide 43
  • Slide 44
  • Slide 45
  • Slide 46
  • Slide 47
  • Slide 48
  • Slide 49
  • Slide 50
  • Slide 51
  • Slide 52
  • Slide 53
  • Slide 54
  • Slide 55
  • Slide 56
  • Slide 57
  • Slide 58
  • Slide 59
  • Slide 60
  • Slide 61