Item Area Info Req'd Date Response Date Remarks
1 400 seater Confirmation of desired seating capacity 9/26/2013 There will be more than 400 seating.
May we confirm this on Monday?
10/3/2013
2 400 seater Drawing shows theatre on one level
only without a fly tower. Potential
requirment for auditorium balcony with
additional 50% capacity in the
auditorium and fly-tower over stage.
9/26/2013 There will be fly tower over the stage
but no auditorium balcony.
10/3/2013
3 400 seater Consultant's input with regard to local
regulations on requirements for fire
separation, fire exits, detection andsuppression, links, overides, alarms,
venting/extraction, makeup air etc
9/26/2013 Our drawing at the moment still very
much in a preliminary stage. Local
requirement/regulation input will comeconcurrently during design
development stage.
10/3/2013
4 400 seater Requirements for show specific smoke
extraction for pyro-shows and
additional overrides for exisiting alarm
system
9/26/2013 Required. 10/3/2013
5 400 seater Requirements for Water, Compressed
air, Additional power and Gas onstage.
9/26/2013 Required. 10/3/2013
6 400 seater Requiremnts for a modular, demoutable
stage with basement
9/26/2013 Not required 10/3/2013
7 400 seater Requirements for an orchestra pit. 9/26/2013 Not required 10/3/2013
8 400 seater Requirement for an orchestra pit and
forestage lift
9/26/2013 Advise us on forestage lift. 10/3/2013
9 400 seater Requirements for demountable seating
on above
9/26/2013 Advise us on necessity. 10/3/2013
-
7/27/2019 Copy of RFI1 2130926
2/14
RFI Perak Theme Park Development
10 400 seater Requiremetns for demountable seating
in mid stalls for sound operating
position
9/26/2013 Not required 10/3/2013
11 400 seater Requiremetns for productiondemountable production desk in mid
stalls
9/26/2013 Not required 10/3/2013
12 400 seater Requirements for follow-spot postions
in auditorium
9/26/2013 Required. 10/3/2013
13 400 seater Requirements for lighting bridges over
auditorium and connections between
control rooms roof and stage house
9/26/2013 Required. 10/3/2013
14 400 seater Requirements for stage fly-tower with
flying/winch system.
9/26/2013 Required. 10/3/2013
15 400 seater Requirements for four modes, being:
1. Under costruction of rebuilding.
2. Shut down at night
3. Daytime maintenance and show
install.
4. Show operation.
theatre lighting.
These affect: machinery, fire systems,
lighting, audio, comms, etc
9/26/2013 Not required 10/3/2013
16 400 seater Requirements for show and working
lighting, music stands, etc
9/26/2013 Required. 10/3/2013
17 400 seater Requiremetns for show audio 9/26/2013 Required. 10/3/2013
18 400 seater Requirements for show projection
including ventilated projection room
9/26/2013 Required. 10/3/2013
19 400 seater Requiremeents for show
communications
9/26/2013 Required. 10/3/2013
-
7/27/2019 Copy of RFI1 2130926
3/14
RFI Perak Theme Park Development
20 400 seater Requirements for CCTV 9/26/2013 Required. 10/3/2013
21 400 seater Requirements for offices, dressing
rooms, shower roomsworkshops,
storage, wardrobe maintenance, pyrostore etc
9/26/2013 Required. 10/3/2013
22 400 seater Arrangements for loading in 9/26/2013 Required. 10/3/2013
23 400 seater Requirements for Ironmongery 9/26/2013 Required. 10/3/2013
24 400 seater Requiremeetns for Security 9/26/2013 Required. 10/3/2013
25 400 seater Arrangements for adjustuing
proscenium opening
9/26/2013 Not required 10/3/2013
26 400 seater Requirements for stage rostra,
treadsdrapes, tab tracks, flattage,
weights and braces, cyclorama, cinema
screen, materials and tools, riggingequipment, access equipment, etc.
9/26/2013 Required. Please advise in further detail
on these.
10/3/2013
27 400 seater Requirements for a Hearing Loop 9/26/2013 Required. Please advise in further detail
on this.
10/3/2013
28 400 seater Arrangements Pass-doors from
auditorium to back stage
9/26/2013 Required 10/3/2013
29 400 seater Requirements for flooding protection 9/26/2013 Not required 10/3/2013
30 400 seater Arrangements for AC and ventilation in
all areas
9/26/2013 Required 10/3/2013
31 400 seater Arrangements for Acoustic treatments
to reduce sound transmission and
manage acoustic responses from stage
and auditorium surfaces
9/26/2013 10/3/2013
32 400 seater FOH arrangements: Box office,
manager's office, counters, POS pre and
post-show
9/26/2013 Not required 10/3/2013
-
7/27/2019 Copy of RFI1 2130926
4/14
RFI Perak Theme Park Development
33 400 seater Requirements for external and internal
signage
9/26/2013 Required 10/3/2013
34 400 seater
35 400 seater
-
7/27/2019 Copy of RFI1 2130926
5/14
RFI Perak Theme Park Development
-
7/27/2019 Copy of RFI1 2130926
6/14
RFI Perak Theme Park Development
-
7/27/2019 Copy of RFI1 2130926
7/14
RFI Perak Theme Park Development
-
7/27/2019 Copy of RFI1 2130926
8/14
RFI Perak Theme Park Development
-
7/27/2019 Copy of RFI1 2130926
9/14
RFI Perak Theme Park Development
-
7/27/2019 Copy of RFI1 2130926
10/14
RFI Perak Theme Park Development
-
7/27/2019 Copy of RFI1 2130926
11/14
RFI Perak Theme Park Development
-
7/27/2019 Copy of RFI1 2130926
12/14
RFI Perak Theme Park Development
-
7/27/2019 Copy of RFI1 2130926
13/14
RFI Perak Theme Park Development
-
7/27/2019 Copy of RFI1 2130926
14/14
RFI Perak Theme Park Development