ETP Sludge Dehydration Building Hoist Sl No. Doc no Location 1 2 22.08.15 EMD 2 3 22.08.15 EMD 3 9 22.08.15 BMD 4 12 22.08.15 BMD Source/ Reference Point Rasied on KMPCL Department Equipment/S ystem Name Joint Inspection Electrical Hoist ETP dehydration Building Joint Inspection Electrical Hoist ETP dehydration Building Joint Inspection Electrical Hoist ETP dehydration Building Joint Inspection Electrical Hoist ETP dehydration Building

Upload: dreamboy87

Post on 11-Jul-2016

213 views

Category:

Documents


0 download

DESCRIPTION

dfff

TRANSCRIPT

Page 1: Copy of Punch Point Etp Sludge Dehydration Building Hoist (2)r

ETP Sludge Dehydration Building Hoist

Sl No. Doc no Location

1 2 22.08.15 EMD

2 3 22.08.15 EMD

3 9 22.08.15 BMD

4 12 22.08.15 BMD

Source/ Reference

Point Rasied on

KMPCL Department

Equipment/System Name

Joint Inspection

Electrical Hoist

ETP dehydration Building

Joint Inspection

Electrical Hoist

ETP dehydration Building

Joint Inspection

Electrical Hoist

ETP dehydration Building

Joint Inspection

Electrical Hoist

ETP dehydration Building

Page 2: Copy of Punch Point Etp Sludge Dehydration Building Hoist (2)r

5 3 09.03.16 EMDInternal inspection

Electrical Hoist

ETP dehydration Building

Page 3: Copy of Punch Point Etp Sludge Dehydration Building Hoist (2)r

ETP Sludge Dehydration Building Hoist

Description of Punch point Category Raised by Contact no. Status

Important Mr.Rohit Gupta 7869915081

Motor have a sound required to be check. Important Mr.Rohit Gupta 7869915081

Critical Ramesh 7869911044

Critical Ramesh 7869911044

As per RFC Drg/Contract

/DBR

Work to be done during

with Duration

Motor cable gland broken and requird to be sealing

Occurring more abnormal vibration during travelling.

Proposed crane is not capable for handling of material from ground to floor or floor to ground, whereas no one other arrangement is available to do the same.

Page 4: Copy of Punch Point Etp Sludge Dehydration Building Hoist (2)r

Small Motor Glands are not available Important Mr.Sourab 7024115137

Page 5: Copy of Punch Point Etp Sludge Dehydration Building Hoist (2)r

ETP Sludge Dehydration Building Hoist

E&I 10.05.2016

Civil/mech

Civil/mech

Civil/mech

SEPCO Department

SEPCO reply with subject

to Material/Ma

npower

Target date for attending

During travelling sound was found(which was reduced compare to initial checking) , SEPCO will analysis this issue for further reduction.

presently vibration reduced as much as it can

Work will be done as per Discussion(Refer joint inspection note dated - 09.03.2016)

Page 6: Copy of Punch Point Etp Sludge Dehydration Building Hoist (2)r

E&I 10.05.2016