copy of line list preferred
DESCRIPTION
Line List formatTRANSCRIPT
Line List
Instruction # 1
Instruction # 2
Instruction # 3
Instruction # 4
Add additional line number rows by copy and paste at the bottom of the current form.
Instruction # 5
Instruction #6
User Advisory - Each individual sheet of this Excel Workbook "Tool" is locked and password protected. The user may only enter date in the "yellow" cells of the blank form.
Before starting, study the Form with the sample data. Consider the header data, the line data columns and the number of lines for the largest Unit.
If you need to add columns or additional data boxes in the header area then you must unlock the form. The password is jop
Make whatever changes to the header block data fields and columns. Changes you may require is Deg. C vs. Deg F or Bar vs. psig.
If you made modifications to the blank form it is recommended that the same changes be made to the "Sample" sheet also.
After you have completed the modifications required to fit your project, select a new password and protect the new "Project" or "Company" version.form.
Line List
Add additional line number rows by copy and paste at the bottom of the current form.
- Each individual sheet of this Excel Workbook "Tool" is locked and password protected. The
Before starting, study the Form with the sample data. Consider the header data, the line data columns and the
If you need to add columns or additional data boxes in the header area then you must unlock the form. The
Make whatever changes to the header block data fields and columns. Changes you may require is Deg. C vs.
If you made modifications to the blank form it is recommended that the same changes be made to
After you have completed the modifications required to fit your project, select a new password and protect the
Page 3 of 36
Project Name: Distillation of IPA
PIPING LINE LISTPME: Date:
Proj. Number: CKR: Date:
Unit Number: 15 Revision: By:
RE
V.
P&
ID Line Class
Line
Siz
e
Service or Commodity Line origin Line Destination PWHT Req'd.
101 1 A1A 18" IP - Process Vapours G Column 1501 HE1501 Yes
101 2 A1A 4" IP - Process Liquid L HE 1501 D 1501
101 3 A1A 3" IP - Process Liquid L D 1501 P1501 A/B
101 4 A1A 2" IP - Process Liquid L P 1501 A/B
101 5 A1A 1.5" IP - Process Liquid L 15-101-04-P-50-A1A COLUMN 1501
101 6 A1A 2" IP - Process Liquid L 15-101-04-P-50-A1A HE1502
Line Number
Insu
latio
n T
ype Tracing
TypePhase
Gas/Liq
Design Press (PSIG)
Design Temp
(oF)
Stress Anal.
Req'd.
15-101-05-P-40-A1A 15-101-06-50-P-A1A
Page 4 of 36
Project Name: Distillation of IPA
PIPING LINE LISTPME: Date:
Proj. Number: CKR: Date:
Unit Number: 15 Revision: By:
RE
V.
P&
ID Line Class
Line
Siz
e
Service or Commodity Line origin Line Destination PWHT Req'd.Line Number
Insu
latio
n T
ype Tracing
TypePhase
Gas/Liq
Design Press (PSIG)
Design Temp
(oF)
Stress Anal.
Req'd.
Page 5 of 36
Project Name: Distillation of IPA
PIPING LINE LISTPME: Date:
Proj. Number: CKR: Date:
Unit Number: 15 Revision: By:
RE
V.
P&
ID Line Class
Line
Siz
e
Service or Commodity Line origin Line Destination PWHT Req'd.Line Number
Insu
latio
n T
ype Tracing
TypePhase
Gas/Liq
Design Press (PSIG)
Design Temp
(oF)
Stress Anal.
Req'd.
Page 6 of 36
Project Name: Distillation of IPA
PIPING LINE LISTPME: Date:
Proj. Number: CKR: Date:
Unit Number: 15 Revision: By:
RE
V.
P&
ID Line Class
Line
Siz
e
Service or Commodity Line origin Line Destination PWHT Req'd.Line Number
Insu
latio
n T
ype Tracing
TypePhase
Gas/Liq
Design Press (PSIG)
Design Temp
(oF)
Stress Anal.
Req'd.
Page 7 of 36
Project Name: Distillation of IPA
PIPING LINE LISTPME: Date:
Proj. Number: CKR: Date:
Unit Number: 15 Revision: By:
RE
V.
P&
ID Line Class
Line
Siz
e
Service or Commodity Line origin Line Destination PWHT Req'd.Line Number
Insu
latio
n T
ype Tracing
TypePhase
Gas/Liq
Design Press (PSIG)
Design Temp
(oF)
Stress Anal.
Req'd.
Page 8 of 36
Project Name: Distillation of IPA
PIPING LINE LISTPME: Date:
Proj. Number: CKR: Date:
Unit Number: 15 Revision: By:
RE
V.
P&
ID Line Class
Line
Siz
e
Service or Commodity Line origin Line Destination PWHT Req'd.Line Number
Insu
latio
n T
ype Tracing
TypePhase
Gas/Liq
Design Press (PSIG)
Design Temp
(oF)
Stress Anal.
Req'd.
Page 9 of 36
Project Name: Distillation of IPA
PIPING LINE LISTPME: Date:
Proj. Number: CKR: Date:
Unit Number: 15 Revision: By:
RE
V.
P&
ID Line Class
Line
Siz
e
Service or Commodity Line origin Line Destination PWHT Req'd.Line Number
Insu
latio
n T
ype Tracing
TypePhase
Gas/Liq
Design Press (PSIG)
Design Temp
(oF)
Stress Anal.
Req'd.
Page 10 of 36
Project Name: Distillation of IPA
PIPING LINE LISTPME: Date:
Proj. Number: CKR: Date:
Unit Number: 15 Revision: By:
RE
V.
P&
ID Line Class
Line
Siz
e
Service or Commodity Line origin Line Destination PWHT Req'd.Line Number
Insu
latio
n T
ype Tracing
TypePhase
Gas/Liq
Design Press (PSIG)
Design Temp
(oF)
Stress Anal.
Req'd.
Page 11 of 36
Project Name: Distillation of IPA
PIPING LINE LISTPME: Date:
Proj. Number: CKR: Date:
Unit Number: 15 Revision: By:
RE
V.
P&
ID Line Class
Line
Siz
e
Service or Commodity Line origin Line Destination PWHT Req'd.Line Number
Insu
latio
n T
ype Tracing
TypePhase
Gas/Liq
Design Press (PSIG)
Design Temp
(oF)
Stress Anal.
Req'd.
Page 12 of 36
Project Name: Distillation of IPA
PIPING LINE LISTPME: Date:
Proj. Number: CKR: Date:
Unit Number: 15 Revision: By:
RE
V.
P&
ID Line Class
Line
Siz
e
Service or Commodity Line origin Line Destination PWHT Req'd.Line Number
Insu
latio
n T
ype Tracing
TypePhase
Gas/Liq
Design Press (PSIG)
Design Temp
(oF)
Stress Anal.
Req'd.
Page 13 of 36
Project Name: Distillation of IPA
PIPING LINE LISTPME: Date:
Proj. Number: CKR: Date:
Unit Number: 15 Revision: By:
RE
V.
P&
ID Line Class
Line
Siz
e
Service or Commodity Line origin Line Destination PWHT Req'd.Line Number
Insu
latio
n T
ype Tracing
TypePhase
Gas/Liq
Design Press (PSIG)
Design Temp
(oF)
Stress Anal.
Req'd.
Page 14 of 36
Project Name: Distillation of IPA
PIPING LINE LISTPME: Date:
Proj. Number: CKR: Date:
Unit Number: 15 Revision: By:
RE
V.
P&
ID Line Class
Line
Siz
e
Service or Commodity Line origin Line Destination PWHT Req'd.Line Number
Insu
latio
n T
ype Tracing
TypePhase
Gas/Liq
Design Press (PSIG)
Design Temp
(oF)
Stress Anal.
Req'd.
Page 15 of 36
Project Name: Distillation of IPA
PIPING LINE LISTPME: Date:
Proj. Number: CKR: Date:
Unit Number: 15 Revision: By:
RE
V.
P&
ID Line Class
Line
Siz
e
Service or Commodity Line origin Line Destination PWHT Req'd.Line Number
Insu
latio
n T
ype Tracing
TypePhase
Gas/Liq
Design Press (PSIG)
Design Temp
(oF)
Stress Anal.
Req'd.
Page 16 of 36
Project Name: Distillation of IPA
PIPING LINE LISTPME: Date:
Proj. Number: CKR: Date:
Unit Number: 15 Revision: By:
RE
V.
P&
ID Line Class
Line
Siz
e
Service or Commodity Line origin Line Destination PWHT Req'd.Line Number
Insu
latio
n T
ype Tracing
TypePhase
Gas/Liq
Design Press (PSIG)
Design Temp
(oF)
Stress Anal.
Req'd.
Page 17 of 36
Project Name: Distillation of IPA
PIPING LINE LISTPME: Date:
Proj. Number: CKR: Date:
Unit Number: 15 Revision: By:
RE
V.
P&
ID Line Class
Line
Siz
e
Service or Commodity Line origin Line Destination PWHT Req'd.Line Number
Insu
latio
n T
ype Tracing
TypePhase
Gas/Liq
Design Press (PSIG)
Design Temp
(oF)
Stress Anal.
Req'd.
Page 18 of 36
Project Name: Distillation of IPA
PIPING LINE LISTPME: Date:
Proj. Number: CKR: Date:
Unit Number: 15 Revision: By:
RE
V.
P&
ID Line Class
Line
Siz
e
Service or Commodity Line origin Line Destination PWHT Req'd.Line Number
Insu
latio
n T
ype Tracing
TypePhase
Gas/Liq
Design Press (PSIG)
Design Temp
(oF)
Stress Anal.
Req'd.
Page 19 of 36
Project Name: Distillation of IPA
PIPING LINE LISTPME: Date:
Proj. Number: CKR: Date:
Unit Number: 15 Revision: By:
RE
V.
P&
ID Line Class
Line
Siz
e
Service or Commodity Line origin Line Destination PWHT Req'd.Line Number
Insu
latio
n T
ype Tracing
TypePhase
Gas/Liq
Design Press (PSIG)
Design Temp
(oF)
Stress Anal.
Req'd.
Page 20 of 36
Project Name: Distillation of IPA
PIPING LINE LISTPME: Date:
Proj. Number: CKR: Date:
Unit Number: 15 Revision: By:
RE
V.
P&
ID Line Class
Line
Siz
e
Service or Commodity Line origin Line Destination PWHT Req'd.Line Number
Insu
latio
n T
ype Tracing
TypePhase
Gas/Liq
Design Press (PSIG)
Design Temp
(oF)
Stress Anal.
Req'd.
Page 21 of 36
Project Name: Distillation of IPA
PIPING LINE LISTPME: Date:
Proj. Number: CKR: Date:
Unit Number: 15 Revision: By:
RE
V.
P&
ID Line Class
Line
Siz
e
Service or Commodity Line origin Line Destination PWHT Req'd.Line Number
Insu
latio
n T
ype Tracing
TypePhase
Gas/Liq
Design Press (PSIG)
Design Temp
(oF)
Stress Anal.
Req'd.
Page 22 of 36
Project Name: Distillation of IPA
PIPING LINE LISTPME: Date:
Proj. Number: CKR: Date:
Unit Number: 15 Revision: By:
RE
V.
P&
ID Line Class
Line
Siz
e
Service or Commodity Line origin Line Destination PWHT Req'd.Line Number
Insu
latio
n T
ype Tracing
TypePhase
Gas/Liq
Design Press (PSIG)
Design Temp
(oF)
Stress Anal.
Req'd.
Page 23 of 36
Project Name: Distillation of IPA
PIPING LINE LISTPME: Date:
Proj. Number: CKR: Date:
Unit Number: 15 Revision: By:
RE
V.
P&
ID Line Class
Line
Siz
e
Service or Commodity Line origin Line Destination PWHT Req'd.Line Number
Insu
latio
n T
ype Tracing
TypePhase
Gas/Liq
Design Press (PSIG)
Design Temp
(oF)
Stress Anal.
Req'd.
Page 24 of 36
Project Name: Distillation of IPA
PIPING LINE LISTPME: Date:
Proj. Number: CKR: Date:
Unit Number: 15 Revision: By:
RE
V.
P&
ID Line Class
Line
Siz
e
Service or Commodity Line origin Line Destination PWHT Req'd.Line Number
Insu
latio
n T
ype Tracing
TypePhase
Gas/Liq
Design Press (PSIG)
Design Temp
(oF)
Stress Anal.
Req'd.
Page 25 of 36
Project Name: Distillation of IPA
PIPING LINE LISTPME: Date:
Proj. Number: CKR: Date:
Unit Number: 15 Revision: By:
RE
V.
P&
ID Line Class
Line
Siz
e
Service or Commodity Line origin Line Destination PWHT Req'd.Line Number
Insu
latio
n T
ype Tracing
TypePhase
Gas/Liq
Design Press (PSIG)
Design Temp
(oF)
Stress Anal.
Req'd.
Page 26 of 36
Project Name: Distillation of IPA
PIPING LINE LISTPME: Date:
Proj. Number: CKR: Date:
Unit Number: 15 Revision: By:
RE
V.
P&
ID Line Class
Line
Siz
e
Service or Commodity Line origin Line Destination PWHT Req'd.Line Number
Insu
latio
n T
ype Tracing
TypePhase
Gas/Liq
Design Press (PSIG)
Design Temp
(oF)
Stress Anal.
Req'd.
Page 27 of 36
Project Name: Distillation of IPA
PIPING LINE LISTPME: Date:
Proj. Number: CKR: Date:
Unit Number: 15 Revision: By:
RE
V.
P&
ID Line Class
Line
Siz
e
Service or Commodity Line origin Line Destination PWHT Req'd.Line Number
Insu
latio
n T
ype Tracing
TypePhase
Gas/Liq
Design Press (PSIG)
Design Temp
(oF)
Stress Anal.
Req'd.
Page 28 of 36
Project Name: Distillation of IPA
PIPING LINE LISTPME: Date:
Proj. Number: CKR: Date:
Unit Number: 15 Revision: By:
RE
V.
P&
ID Line Class
Line
Siz
e
Service or Commodity Line origin Line Destination PWHT Req'd.Line Number
Insu
latio
n T
ype Tracing
TypePhase
Gas/Liq
Design Press (PSIG)
Design Temp
(oF)
Stress Anal.
Req'd.
Page 29 of 36
Project Name: Distillation of IPA
PIPING LINE LISTPME: Date:
Proj. Number: CKR: Date:
Unit Number: 15 Revision: By:
RE
V.
P&
ID Line Class
Line
Siz
e
Service or Commodity Line origin Line Destination PWHT Req'd.Line Number
Insu
latio
n T
ype Tracing
TypePhase
Gas/Liq
Design Press (PSIG)
Design Temp
(oF)
Stress Anal.
Req'd.
Page 30 of 36
Project Name: Distillation of IPA
PIPING LINE LISTPME: Date:
Proj. Number: CKR: Date:
Unit Number: 15 Revision: By:
RE
V.
P&
ID Line Class
Line
Siz
e
Service or Commodity Line origin Line Destination PWHT Req'd.Line Number
Insu
latio
n T
ype Tracing
TypePhase
Gas/Liq
Design Press (PSIG)
Design Temp
(oF)
Stress Anal.
Req'd.
Page 31 of 36
Project Name: Distillation of IPA
PIPING LINE LISTPME: Date:
Proj. Number: CKR: Date:
Unit Number: 15 Revision: By:
RE
V.
P&
ID Line Class
Line
Siz
e
Service or Commodity Line origin Line Destination PWHT Req'd.Line Number
Insu
latio
n T
ype Tracing
TypePhase
Gas/Liq
Design Press (PSIG)
Design Temp
(oF)
Stress Anal.
Req'd.
Page 32 of 36
Project Name: Distillation of IPA
PIPING LINE LISTPME: Date:
Proj. Number: CKR: Date:
Unit Number: 15 Revision: By:
RE
V.
P&
ID Line Class
Line
Siz
e
Service or Commodity Line origin Line Destination PWHT Req'd.Line Number
Insu
latio
n T
ype Tracing
TypePhase
Gas/Liq
Design Press (PSIG)
Design Temp
(oF)
Stress Anal.
Req'd.
Page 33 of 36
Project Name: Distillation of IPA
PIPING LINE LISTPME: Date:
Proj. Number: CKR: Date:
Unit Number: 15 Revision: By:
RE
V.
P&
ID Line Class
Line
Siz
e
Service or Commodity Line origin Line Destination PWHT Req'd.Line Number
Insu
latio
n T
ype Tracing
TypePhase
Gas/Liq
Design Press (PSIG)
Design Temp
(oF)
Stress Anal.
Req'd.
Page 34 of 36
Project Name: Distillation of IPA
PIPING LINE LISTPME: Date:
Proj. Number: CKR: Date:
Unit Number: 15 Revision: By:
RE
V.
P&
ID Line Class
Line
Siz
e
Service or Commodity Line origin Line Destination PWHT Req'd.Line Number
Insu
latio
n T
ype Tracing
TypePhase
Gas/Liq
Design Press (PSIG)
Design Temp
(oF)
Stress Anal.
Req'd.
Project Name: Jamnagar Cumine Upgrade
PIPING LINE LISTProj. Number: 2007-123455
Unit Number: 20 (And prefix for all line Numbers)
RE
V.
P&
ID Line Number Line Class
Line
Siz
e
20-21 2001 AGL1 3" Ih Unit Feed L
20-21 2002 AGL1 3" Ih Reactor #1 F L
20-21 2003 AGL1 3" Ih Reactor #2 F L
20-21 2004 AGL1 3" Ih Reactor #3 F L
3 20-21 2005 AGL1 2"& 1" Nitrogen Gas
20-21 2006 AGL1 6" Ih Product Liq
20-21 2007 AGL1 16" Process Vent Gas
SAMPLE
Insu
latio
n T
ype Tracing
TypeService or
CommodityPhase
Gas/Liq
PIPING LINE LIST
PME: JOP Date: 17/10/07
CKR: ARL Date: 17/10/07
Revision: 3 By: JOP
Line origin
100 300
Reactor #1 100 300
Reactor #2 100 300
Reactor #3 100 300
100 300
Reactor #1 100 300
90 350 Yes
SAMPLE
Line Destination
Design Press (PSIG)
Design Temp
(oF)
Stress Anal.
Req'd.
PWHT Req'd.
Battery Limits
Reactor Feed
Line 20-2001AGL1
Line 20-2001AGL1
Line 20-2001AGL1
Line 20-2110AGL1
Reactor #1,2 & 3
Line 20-2007AGL1
Line 20-2006AGL1
Unit Relief Header - Line 20-2120AGL2