AXIS BSC SWAPSITE SURVEY REPORT
SITE NAME : Royal Tower Riverside Apartemen
CITY : JAKARTA
AREA : NORTH JAKARTA
SITE TYPE : BUILDING
ADDRESS
Acknowledged by:
Name : Disra Agifral Name : Teguh P. LaksonoID : WX44837 ID :Position : Survey & Design Position : Site Survey PIC
EngineerSignature : Signature :
Date : Date :
: Jl. Pluit Karang Barat, no 50, Kel. Pluit, Kec. Penjaringan, North Jakarta
1. INDEXSite Name Royal Tower Riverside Apartemen City Jakarta
Area North Jakarta Site Type Building
0 . COVER
1 . INDEX
2 . GENERAL INFORMATION
3 . ENVIRONMENT INSPECTION FORM
4 . BSC SURVEY DATA
5 . DATACOM SURVEY DATA
6 . POWER SUPPLY
7 . SMR WORKS & REMARKS
8 . PHYSICAL NETWORK DIAGRAM
9 . PROPOSED FLOOR PLAN
10 . PHOTO REPORT
Site View
2. GENERAL INFORMATION
Project Name Axis BSC Swap ProjectSite Name Royal Tower Riverside Apartemen Jakarta Area PluitStreet Address Jl. Pluit Karang Barat no. 50, kel.Pluit, kec. Penjaringan - Jakarta UtaraSite Type Building Owner Ericsson Date of Survey 8-Jul-11List of Surveyor:
No. Name Company E-mail Cell Phone1 Disra Agifral Huawei +62878800011072 Hariyadi Widagdo Huawei +628119108707
List of Customer PIC:No. Name Company E-mail Cell Phone1 Teguh P. Laksono Axis +6283828000522 Immanuel Suranta Axis
List of Proposed Equipments:
No. Equipment Type
1 BSC6900 Cabinet 2 600x800x2200 2(2500) 2(63A x 2, 100A x 2)
2 RNC6900 Cabinet 1 600x800x2200 2500 63A x 2, 100A x 22 CX600-X3 Cabinet 1 600x800x2200 1200 63A x 2
3 OSN 1800 (Module) 450
4 NE40E-X3 Cabinet 2200 63A x 2
[email protected]@huawei.com
CabinetQuantity
Dimension(W x D x H) mm
Power(Watt)
MCB x Pcs(AC / DC)
Insert to CX600 Cabinet
1Cab+1 Module
5 S9303 700 32A x 2
6789
2 modules will be inserted to NE40 Cabinet
3. ENVIRONMENT INSPECTION FORMSite Name Royal Tower Riverside Apartemen City Jakarta
Area Jakarta Site Type Building
BSC6900
Inspection Items Status RemarkEquipment Room
There is an available equipment room for this project
The existing room is ready in space
The existing room is ready in decoration
The existing room is ready in air conditioner
The existing room is ready in cable tray Require New Tray
Power System
The main AC power (for rectifier & UPS) is available
The main AC breaker(for rectifier & UPS) is enough
The branch AC power (for equipment) is available
The branch AC breaker(for equipment) is enough
The rectifier is available and enough in capacity
The rectifier fuse is available and enough in capacity
The DCPDB/PDF is available and enough in capacity Require New DCPDB
The DCPDB MCB is available and enough in capacity Require New MCBs
The grounding bus bar is available
Transmission & Signal
The ODF/OTB is available and enough in capacity
The DDF/DSX is available and enough in capacity
The MDF is available and enough in capacity
The LAN/IP is available and enough ports
The CLOCK is available and enough ports
Remarks
█Yes □No □N/A
█Yes □No □N/A
□Yes █No □N/ANeed to move
computer desks to get space
█Yes □No □N/A Pak Teguh wants to propose 1 AC
□Yes █No □N/A
█Yes □No □N/A
█Yes □No □N/A
█Yes □No □N/A
█Yes □No □N/A
█Yes □No □N/A
□Yes □No █N/A
□Yes █No □N/A
□Yes █No □N/A
█Yes □No □N/A
█Yes □No □N/A
□Yes □No █N/A
□Yes □No █N/A
□Yes □No █N/A
□Yes □No █N/A
Note: “N/A” means “not involved”.
4. BSC SURVEY DATASite Name Royal Tower Riverside Apartemen City Jakarta
Area North Jakarta Site Type Building
BSC6900
- Cabinet: * Cabinet Quantity: __5__Units * Floor Height (mm): __400__mm * Cabling mode (Up/Down): __Down__ * Cable Tray Height: __300__mm
- Power Cables: * -48V (m) : __20__Lines x __15__m (Total: __180__m) * GND (m) : __20__Lines x __15__m (Total: __180__m) * PGND (m) : __150__m
- Optical Fibre Cables: (A) Switch S6502 --------6_m-------- NE40-4 (LC)-----------------------------(LC)
(B) NE40-4 --------__15__m-------- ODF (LC)--------------------------- (LC) (C) ODF --------__15__m-------- OSN 1800 (LC) --------------------------- (LC)
- FE Cables: * BSC 6900 --------__15__m-------- CX600-X3 * BSC 6900 --------__15__m-------- Switch S6502
- Alarm Cables: * Signal Cable Length : __8__m * Power Cable Length : __14__m
6.1. AC POWER SUPPLY
Site Name Royal Tower Riverside ApartemenCity Jakarta
Area Pluit Site Type Building
AIR CONDITIONING UNIT Aircon 1 Aircon 2 Aircon 3 Aircon 4
Brand Liebert Hiros Liebert Hiros
Type Hiros Hiros
Cooling Capacity PK 5 5(AC is not working properly)
Phase 1 / 3 Phase
Circuit Breaker Input Capacity Ampere
R Current Load Ampere
S Current Load Ampere
T Current Load Ampere
R-N Voltage Volt
S-N Voltage Volt
T-N Voltage Volt
Shelter Dimension
Length 11 meter
Width 5 meter
Lamp Installed inside shelter 40 watt x 6 pc(s)
Existing Aircon Calculation
Aircon Volume Unit BTU Conversion (BTUH)
Room Size 55 m2 18535
People 0 Prsn(s) 0
Lighting 240 Watt 1020
Equipment 18198.00 Watt 62109.77
TOTAL BTU Needed 81664.77
Aircon Installed 2 Pcs
Cooling Capacity / unit 45000 BTUH
Total Cooling Capacity 90000 BTUH
45000 BTUH
Total BTU Needed 89831 BTUH
Result Not OK
New Equipment Aircon Calculation
Aircon Volume Unit BTU Conversion (BTUH)Room Size 55 m2 18535
People 0 Prsn(s) 0
Lighting 240 Watt 1020
Equipment 30248.00 Watt 103236.42
TOTAL BTU Needed 122791.42
Aircon Installed 2 Pcs
Cooling Capacity / unit 45000 BTUH
Total Cooling Capacity 90000 BTUH
45000 BTUH
Total BTU Needed 135071 BTUH
Result Not OK
Note
Total Cooling Capacity (n+1 redundancy)
Total Cooling Capacity (n+1 redundancy)
6
6.1. AC POWER SUPPLY
Site Name Royal Tower Riverside ApartemenCity Jakarta
Area Pluit Site Type Building
AIR CONDITIONING UNIT Aircon 1 Aircon 2 Aircon 3 Aircon 4
Brand Daikin
Type
Cooling Capacity PK 2.5
Phase 1 / 3 Phase
Circuit Breaker Input Capacity Ampere
R Current Load Ampere
S Current Load Ampere
T Current Load Ampere
R-N Voltage Volt
S-N Voltage Volt
T-N Voltage Volt
Shelter Dimension
Length 6.8 meter
Width 5 meter
Lamp Installed inside shelter 40 watt x 4 pc(s)
Aircon Calculation
Aircon Volume Unit BTU Conversion (BTUH)
Room Size 34 m2 11458
People 0 Prsn(s) 0
Lighting 160 Watt 680
Batt Heat Dissipation 12000.00 Watt 40956.00
TOTAL BTU Needed 53094.00
Aircon Installed 3 Pcs
Cooling Capacity / unit 22500 BTUH
Total Cooling Capacity 67500 BTUH
45000 BTUH
Total BTU Needed 66368 BTUH
Result Not OK
Total Cooling Capacity (n+1 redundancy)
6
6.1. AC POWER SUPPLYSite Name Royal Tower Riverside Apartemen City Jakarta
Area North Jakarta Site Type Building
KWH UNIT KWH 1 KWH 2 KWH 3
Phase 1 / 3 Phase 3
Circuit Breaker Capacity Ampere 100
kVA Capacity kVA 66
R Current Load Ampere 19.9
S Current Load Ampere 22.5
T Current Load Ampere 25.4
GENSET UNIT GENSET 1 GENSET 2 GENSET 3
Brand -
Model -
kVA Capacity kVA -
ACPDB UNIT ACPDB 1 ACPDB 2 ACPDB 3
Phase 1 / 3 Phase 3
Circuit Breaker Input Capacity Ampere 100
R Current Load Ampere -
S Current Load Ampere -
T Current Load Ampere -
Existing 14916 VA
Battery Charging 29038 VA
AC power Availability 66000 VAPower Usage 44 %
Remain kVA 23762 VA
Result OK
New Equipment Power Calculation
Existing 14916 VA
Battery Charging 29038 VA
New Proposed Equipment 11568 VA
0.00 VA
Total AC Power Requirement 55522 VAAC power Availability 66000 VAPower Usage 84 %
Remain kVA VA
Result Not Ok
*Power Calculation:
Aircon ( if any changes from previous Cooling capacity or running sequence)
Exceed 80% cap
6.2. DC POWER SUPPLYSite Name:Gondrong Royal Tower Riverside Apartemen City Jakarta
Area North Jakarta Site Type Building
Rectifier UNIT PS 1 PS 2 PS 3
Brand Eltek
Model Flatpack 2
Current Load Ampere 137
Total Rectifier Module Slots Slot 16
Capacity per Rectifier Module Ampere 37.5
Qty of Rectifier Module Installed Pcs 12
Current Max Output Ampere 450
Rectifier Efficiency % 96%
Qty of Idle Rectifier Module Slots Slot 4
Total Circuit Breaker Slots Slot 135
Qty of Circuit Breaker Installed Pcs 115
Qty of Occupied Circuit Breaker Pcs 78
Qty of Idle Circuit Breaker Pcs 37
Qty of Idle Circuit Breaker Slots Slot 20
Battery UNIT Battery 1 Battery 2 Battery 3
Brand Fiamm
Model 2GM 1000
Ah per Bank Ah 1000
Qty of Banks Banks 2
Total Ah 2000
Remarks
Existing DC Power Calculation
Existing Power Consumption 7398 Watt
Battery Charging 10800 WattTotal DC Power Consumption 337.00 A
DC Power Avalibility 450 A
Rectifier Usage 74.89 %
Remaining Power 113 A
Result OK
New Upgrade DC Power Calculation
Existing Power Consumption 7398 Watt
Battery Charging 10800 WattTotal power of Proposed Equipment 12050 Watt- BSC6900 7500- NE40E-3 2200- S9303 700- CX600-X3 1200- OSN1800 450- BTS3900 0Total DC Power Consumption 560.15 A
DC Power Avalibility 450 A
Rectifier Usage 124.48 %
Remaining Power 0 A
Result Not Ok
7. SMR WORKS & REMARKSSite Name Royal Tower Riverside ApartemenCity Jakarta
Area North Jakarta Site Type Building
Supporting Facilities Requirement:- New MCB, Cable Tray Breakers are as follows: 4 x 100A & 4 x 63A (For 2 BSC 6900), 2 x 50A (For CX600-X3), 2 x 10A (For OSN 1800), 4 x 16A (For 2 S6502), 4 x 32A (For NE40-4), proposal new rectifier.
- New Cable Tray, Width 35 cm, Length 2 m, with Accessories
- Other required Materials for Installation, pease refer to the Material List
- Need discuss with Technical Team about which equipmen can install first coz space limitted, only can install 5 cabinet in this site.
8. PHYSICAL NETWORK CONNECTIONSite Name Royal Tower Riverside Apartemen City Jakarta
Area P Site Type Building
Lan cable
RNC Name
HW OSN1800
HW MGW
HW SGSN
IuCS interface GE Port::Port1-?Port2-?
HW cs-router
IuPS GE Port:Port3-?Port4-?
HW ps-router
HW NodeB
IuB interface Port:Port0-?Port1-?
HW CX600
Customer OM network
OM link FE Port:Port5-?Port6-?Port7-?Port8-?
DCPDB Rectifier2*63A + 2*100A
HW Lanswitch
HW NE-40
MM optical cable
power cable
None
ODF
9. PROPOSED FLOOR PLANSite Name Royal Tower Riverside Apartemen City Jakarta
Area North Jakarta Site Type Building
GEM&
APZ21233C
ET4-1&
APG40
BSCJK04
RNCJK02
RXTJK01
GEM&
APZ21233C
ET4-1&
APG40
BSCJK05
MPBN
MPBN
BatteryBank 1
BatteryBank 2
BatteryBank 2
AC
Rectifier(InstalledModules:12 of 16)
AC
AC
Upper Tray
DDFBSCJK04
DDF
DDFBSCJK05
ODF
DDFBSCJK04
DXX
ODFRNCJK02
ProposedCX600-X3
&OSN1800
ProposedBSC6900
ProposedBSC6900
ProposedNE40-E
&S6502
AC
AC
ProposedLowerCableTray
Lower Tray
GND
ACPDB
ComputerDesks
ExpansionRoof.
Height:235 cm
ExpansionRoof.
Height:210 cm
10.1. ENVIRONMENT PHOTOSSite Name Royal Tower Riverside Apartemen City Jakarta
Area North Jakarta Site Type Building
1 . Situation Around Room (Left) 2 . Situation Around Room (Right)
3 . Inside Room 4 . Inside Room (Right View from Entrance)
5 . Inside Room (Left View from Entrance) 6 . Battery Room
10.3. AC POWER PHOTOSSite Name Royal Tower Riverside Apartemen City Jakarta
Area North Jakarta Site Type Building
1 . KWH 2 . ACPDB
3 . Circuit Breaker in KWH 4 . R Current Load = 19.9 A
5 . S Current Load = 22.5 A 6 . T Current Load = 25.3 A
10.4. DC POWER PHOTOSSite Name Royal Tower Riverside Apartemen City Jakarta
Area North Jakarta Site Type Building
1 . Rectifier: Eltek Type: Flatpack 2 2 . Battery: 3 Banks x 1000 Ah
3 . Current Load: 137A 4 . PDF (Front View)
5 . Proposed MCB Position
10.6. EQUIPMENT PHOTOSSite Name Royal Tower Riverside Apartemen City Jakarta
Area North Jakarta Site Type Building
1 . Prop. Cabinets: BSC6900, CX600-X3, NE40-4 2 . Proposed Cable Tray
3 . Proposed Cable Duct for Power Cables
10.5. EXISTING EQUIPMENT PHOTOSSite Name Royal Tower Riverside Apartemen City Jakarta
Area North Jakarta Site Type Building
1 . Existing ODF TRM 2 . Existing ODF
3 . Existing Huawei Switch (S6502) 4 .Existing RNC Ericsson