copy of apa 2013 - shoaib - 80012790
TRANSCRIPT
Objective Setting Form - 2013ALL BU's other than Distribution and G&T
EMPLOYEE DETAILSEmployee Name Syed Muhammad ShoaibEmployee Number 80012790Employee Designation Senior AnalystReporting Manager Abdul Nasir KhanDepartment ITSub Department Enterprise Application Services - SAP-ISU DMRegionLocation KESC IT Division Elander Road
EVALUATION DETAILSSECTION 01: Business Objectives
Area of Focus Objective Performance Measure Extent of Achievement Points Assigned Points Scored Manager's Comments
25
Cross Module Learning Command on EDM module 10
Project 25
Process Optimization 10
Total: (70) 70 0
SECTION 02: Leadership Imperatives'
Area of Focus Objective Performance Measure Extent of Achievement Points Assigned Points Scored Manager's Comments
Responsibility / Ownership Responsibility / Ownership taking attitude during project / task / assignment • On time completion of project / task / assignment 15
People Development Build team capabilities to develop the organization 10
Total: (25) 25 0
SECTION 03: Safety Objectives
Area of Focus Objective Performance Measure Extent of Achievement Points Assigned Points Scored Manager's Comments
Energy Conservation Following energy conservation initiates in the Office environment
2
Office SafetyFollowing safety instructions, signage and procedure in the office
3
Total: (5) 5 0Grand Total: (100) 100 0
Rating Below Expectations
SignatureDate
SignatureDate
Technical and Functional Support
• ISU Device Management (DM) Support • Legacy Ordinary Billing System Support • Implementation of New requirements / Amendment in BMS
• All Issues Resolved on H2H (DM)• All Issues Resolved on H2H (Legacy)
• All Processes and Configurations Review• Successful Training Completion (All sessions attended)• Post go-live Support with all Issues Resolution on H2H
Project JOSH-3 & JOSH-4 • Garden/Lyari-II IT Coordinator• Cutover • User training • Authorization Matrix • Authorization Roles • Infrastructure• Integration Testing• Support at IBC
• Coordination between IT and IBC • Access Block on BMS • Client prep activity for DM • Provide training to PUs and EUs • Authorization matrix finalization (Level 1 & 2) • Authorization role testing • Infrastructure readiness at IBC • Timely completion of integration testings • Support during downtime entries • On-site support at IBC • Provide support and all Issues resolve after Go-live
Enhanced business processes in the system with business consent• De-centralization of meter department• Optimization of meter reading report• Enhancement in meter reading sheet generation process (IT-Operation)• SOP For mass meter replacement
• Meter department de-centralized • MR report optimized• Enhanced MRS generation process • SOP of mass meter replacement for ABC/Special projects
• Training sessions conducted • Delegation of work
EMPLOYEE'S COMMENT:
MANAGER'S COMMENT:
Premise installation consumer no
6000558191 4000491586 P25 138 7001352394 AL8123446000558195 4000491593 P25 138 7001352403 LA4121676000558197 4000491601 P25 138 7001352411 AL4087556000558198 4000491608 P25 138 7001352416 LA5728156000558200 4000491608 P25 138 7001352424 LA8547716000558202 4000491616 P25 138 7001352463 AL4572296000558204 4000491624 P25 138 7001352470 AL457231
Connection Object
Type of premise
Authorization Group