Cool to be Cool *Paint procurement & Instrument procurement *Building selection for coating and data logger installation – 50 buildings in the slum and 1 garment factory *People identified for thermal comfort survey & health survey *Questionnaires prepared *Volunteers and staff recruited *Test coating (2 bldgs.) – identifying the appropriate method for application

Upload: others

Post on 03-Feb-2022

13 views

Category:

Documents


0 download

TRANSCRIPT

Cool to be Cool

*Paint procurement & Instrument procurement*Building selection for coating and data logger installation –

50 buildings in the slum and 1 garment factory*People identified for thermal comfort survey & health survey *Questionnaires prepared*Volunteers and staff recruited*Test coating (2 bldgs.) –

identifying the appropriate method for application

15

20

25

30

35

40

Swapan House Temperature: Before and After Test Painting

Plot Title: HOBO NO 14 Temp, °C (Roof)

After Before

15

20

25

30

35

40

Saddam House Temperature: Before and After Test Painting

Plot Title: HOBO No. 13 Temp, °C (Roof)

Before After

Way Forward:

*Paint arrives - Sept. 15*Painting starts - Oct. 10*Datalogging - 1 Sept. 20 to June - 4 times*Questionnaire survey --Personal comfort sensation & Health conditions - 1 Sept. 20 to June 21 - 4 times