conventional facilities and siting global group global design effort 08-24-07 cfs edr kick-off mtg,...

6
1 Conventional Facilities and Siting Global Group Conventional Facilities and Siting Global Group Global Design Effort Global Design Effort 08-24-07 CFS EDR Kick-Off Mtg, FNAL Aug 22 – 24, 2007 CFS EDR Kick-Off Mtg, FNAL Aug 22 – 24, 2007 CFS EDR FNAL Kick-Off CFS EDR FNAL Kick-Off Planning Meeting Planning Meeting Overview of Regional Overview of Regional Interest Efforts Interest Efforts Vic Kuchler Vic Kuchler CFS Global Design Effort CFS Global Design Effort

Upload: todd-powers

Post on 19-Jan-2018

216 views

Category:

Documents


0 download

DESCRIPTION

Conventional Facilities and Siting Global Group Global Design Effort CFS EDR Kick-Off Mtg, FNAL Aug 22 – 24, Factors that will Impact the Transition to EDR Global Design Effort (GDE) Solutions Based on the Three Regional Sample Sites Need Further Refinement with Respect to Specific Siting and Alignments Global Design Effort (GDE) Solutions Based on the Three Regional Sample Sites Need Further Refinement with Respect to Specific Siting and Alignments Current Designs Indicate the Approximately 30% of the ILC Conventional Facilities can be Considered Site Independent While 70% can be Considered to be Site Dependent Current Designs Indicate the Approximately 30% of the ILC Conventional Facilities can be Considered Site Independent While 70% can be Considered to be Site Dependent The CFS Group will Proceed under the Assumption that the Site Dependent Conventional Facilities will be Provided by the Host Country as Part of the Expression of Regional Interest The CFS Group will Proceed under the Assumption that the Site Dependent Conventional Facilities will be Provided by the Host Country as Part of the Expression of Regional Interest Based on this Assumption, Construction of these Facilities will be Completed under Local Standards, Codes and Governmental Regulations Based on this Assumption, Construction of these Facilities will be Completed under Local Standards, Codes and Governmental Regulations

TRANSCRIPT

Page 1: Conventional Facilities and Siting Global Group Global Design Effort 08-24-07 CFS EDR Kick-Off Mtg, FNAL Aug 22  24, 2007 1 CFS EDR FNAL Kick-Off Planning

1

Conventional Facilities and Siting Global GroupConventional Facilities and Siting Global GroupGlobal Design EffortGlobal Design Effort

08-24-07 CFS EDR Kick-Off Mtg, FNAL Aug 22 – 24, 2007CFS EDR Kick-Off Mtg, FNAL Aug 22 – 24, 2007

CFS EDR FNAL Kick-Off CFS EDR FNAL Kick-Off Planning MeetingPlanning Meeting

Overview of RegionalOverview of RegionalInterest EffortsInterest Efforts

Vic KuchlerVic KuchlerCFS Global Design EffortCFS Global Design Effort

Page 2: Conventional Facilities and Siting Global Group Global Design Effort 08-24-07 CFS EDR Kick-Off Mtg, FNAL Aug 22  24, 2007 1 CFS EDR FNAL Kick-Off Planning

2

Conventional Facilities and Siting Global GroupConventional Facilities and Siting Global GroupGlobal Design EffortGlobal Design Effort

08-24-07 CFS EDR Kick-Off Mtg, FNAL Aug 22 – 24, 2007CFS EDR Kick-Off Mtg, FNAL Aug 22 – 24, 2007

Current StatusCurrent Status• The Responsibilities of the CFS Group During the Transition The Responsibilities of the CFS Group During the Transition

to the EDR Phase of the Project will Definitely have an to the EDR Phase of the Project will Definitely have an Expanded FocusExpanded Focus

• In Order to Keep Pace with the Technically Driven Schedule In Order to Keep Pace with the Technically Driven Schedule We will have to Devote Substantial Effort Toward the We will have to Devote Substantial Effort Toward the Regional Interest Aspects of the ProjectRegional Interest Aspects of the Project

• Each Region, and Perhaps Individual Countries, will need Each Region, and Perhaps Individual Countries, will need to to Develop a Plan that will Lead to an Eventual Develop a Plan that will Lead to an Eventual “Expression of “Expression of Regional Interest” for Each Proposed Regional Interest” for Each Proposed Site for the ILCSite for the ILC• The Extent of Regional Interest Efforts will be Determined, The Extent of Regional Interest Efforts will be Determined,

Guided and Subject to the Approval of Many Separate Guided and Subject to the Approval of Many Separate and and Distinct Entities and will Vary in Each Region and/or Distinct Entities and will Vary in Each Region and/or Country that Considers Hosting the ILCCountry that Considers Hosting the ILC

Page 3: Conventional Facilities and Siting Global Group Global Design Effort 08-24-07 CFS EDR Kick-Off Mtg, FNAL Aug 22  24, 2007 1 CFS EDR FNAL Kick-Off Planning

3

Conventional Facilities and Siting Global GroupConventional Facilities and Siting Global GroupGlobal Design EffortGlobal Design Effort

08-24-07 CFS EDR Kick-Off Mtg, FNAL Aug 22 – 24, 2007CFS EDR Kick-Off Mtg, FNAL Aug 22 – 24, 2007

Factors that will Impact the Transition to EDRFactors that will Impact the Transition to EDR• Global Design Effort (GDE) Solutions Based on the Three Global Design Effort (GDE) Solutions Based on the Three

Regional Sample Sites Need Further Refinement Regional Sample Sites Need Further Refinement with with Respect to Specific Siting and AlignmentsRespect to Specific Siting and Alignments• Current Designs Indicate the Approximately 30% of the Current Designs Indicate the Approximately 30% of the

ILC Conventional Facilities can be Considered Site ILC Conventional Facilities can be Considered Site Independent While 70% can be Considered to be Independent While 70% can be Considered to be

Site Site DependentDependent• The CFS Group will Proceed under the Assumption that The CFS Group will Proceed under the Assumption that

the Site Dependent Conventional Facilities will be the Site Dependent Conventional Facilities will be Provided by the Host Country as Part of the Provided by the Host Country as Part of the

Expression Expression of Regional Interestof Regional Interest• Based on this Assumption, Construction of these Based on this Assumption, Construction of these Facilities will be Completed under Local Standards, Facilities will be Completed under Local Standards, Codes Codes and Governmental Regulationsand Governmental Regulations

Page 4: Conventional Facilities and Siting Global Group Global Design Effort 08-24-07 CFS EDR Kick-Off Mtg, FNAL Aug 22  24, 2007 1 CFS EDR FNAL Kick-Off Planning

4

Conventional Facilities and Siting Global GroupConventional Facilities and Siting Global GroupGlobal Design EffortGlobal Design Effort

08-24-07 CFS EDR Kick-Off Mtg, FNAL Aug 22 – 24, 2007CFS EDR Kick-Off Mtg, FNAL Aug 22 – 24, 2007

Participants in a United States Site ProposalParticipants in a United States Site Proposal• The International Linear Collider Steering Committee will The International Linear Collider Steering Committee will Eventually Provide Guidance for the International Site Eventually Provide Guidance for the International Site Selection ProcessSelection Process• Fermilab will need a Strategic Plan for Future Laboratory Fermilab will need a Strategic Plan for Future Laboratory ActivitiesActivities• Collar Communities and Counties will need to Incorporate this Collar Communities and Counties will need to Incorporate this

Project into Strategic Plans and Provide Input into the Project into Strategic Plans and Provide Input into the ProcessProcess• The State of Illinois will have Stipulations, Requirements and also The State of Illinois will have Stipulations, Requirements and also

need a Strategic Planneed a Strategic Plan• The Office of Science in the Department of Energy Could Likely The Office of Science in the Department of Energy Could Likely

Oversee the Site Dependent Conventional Construction for Oversee the Site Dependent Conventional Construction for the the ILC in the United StatesILC in the United States• Office of Management and Budget, Congress and the President Office of Management and Budget, Congress and the President

will also need to Endorse the Projectwill also need to Endorse the Project• All of this Effort will Take Financial CommitmentAll of this Effort will Take Financial Commitment

Page 5: Conventional Facilities and Siting Global Group Global Design Effort 08-24-07 CFS EDR Kick-Off Mtg, FNAL Aug 22  24, 2007 1 CFS EDR FNAL Kick-Off Planning

5

Conventional Facilities and Siting Global GroupConventional Facilities and Siting Global GroupGlobal Design EffortGlobal Design Effort

08-24-07 CFS EDR Kick-Off Mtg, FNAL Aug 22 – 24, 2007CFS EDR Kick-Off Mtg, FNAL Aug 22 – 24, 2007

CFS Efforts in the Americas RegionCFS Efforts in the Americas Region• As a Starting Point, the CFS Group will Begin to As a Starting Point, the CFS Group will Begin to Explore the Feasibility for a Potential ILC Alignment Explore the Feasibility for a Potential ILC Alignment that is that is Centered on the Fermilab Site and Extends in a Centered on the Fermilab Site and Extends in a North-North-South OrientationSouth Orientation• This will be used as the Baseline to Compare Other This will be used as the Baseline to Compare Other

Alignments Including the Possibility of a Site West Alignments Including the Possibility of a Site West of of the Fox River Valleythe Fox River Valley• CFS will also Pursue a Definitive Investigation of a Near CFS will also Pursue a Definitive Investigation of a Near

Surface/Cut-and-Cover Design SolutionSurface/Cut-and-Cover Design Solution• Many Factors will need to be Identified and Compared in Many Factors will need to be Identified and Compared in

Order to Optimize an Eventual Proposed Site for the Order to Optimize an Eventual Proposed Site for the Americas Region/United States Expression of Americas Region/United States Expression of

Regional Regional InterestInterest

Page 6: Conventional Facilities and Siting Global Group Global Design Effort 08-24-07 CFS EDR Kick-Off Mtg, FNAL Aug 22  24, 2007 1 CFS EDR FNAL Kick-Off Planning

6

Conventional Facilities and Siting Global GroupConventional Facilities and Siting Global GroupGlobal Design EffortGlobal Design Effort

08-24-07 CFS EDR Kick-Off Mtg, FNAL Aug 22 – 24, 2007CFS EDR Kick-Off Mtg, FNAL Aug 22 – 24, 2007

So How to ProceedSo How to Proceed• To Begin, Each Region will Produce a Set of Work To Begin, Each Region will Produce a Set of Work

Activities that will Develop Into a Work Package(s) Activities that will Develop Into a Work Package(s) to to Define the Regional Interest EffortDefine the Regional Interest Effort• These Work Packages will then be Included in the Overall These Work Packages will then be Included in the Overall

CFS EDR PlanCFS EDR Plan• Local Influences (Described for the Americas Region Local Influences (Described for the Americas Region

Above) will need to be Identified and Incorporated Above) will need to be Identified and Incorporated into into Each Regional EffortEach Regional Effort• Once Identified, Regional and National Timeframes for Once Identified, Regional and National Timeframes for

Bid to Host Efforts will need to be ReconciledBid to Host Efforts will need to be Reconciled• The International Site Selection Process will Also need to The International Site Selection Process will Also need to

be Reconciled with the International Processbe Reconciled with the International Process• A Substantial Portion of this Process is Beyond the A Substantial Portion of this Process is Beyond the

Control of the CFS Group Control of the CFS Group