Contributing to South Africa’s Growth
USAASA: Budget, Strategy Plan and Priorities for 2008/09
Presentation to the Portfolio Committee: Communications
18 March 2008Parliament
![Page 2: Contributing to South Africa’s Growth USAASA: Budget, Strategy Plan and Priorities for 2008/09 Presentation to the Portfolio Committee: Communications](https://reader035.vdocuments.us/reader035/viewer/2022062807/5697bff21a28abf838cbc12b/html5/thumbnails/2.jpg)
Outline
• Introduction– The Board– Executive Management
• The Agency within the ICT Framework – Universal service and access evolution– ITU criteria on universal service and access– Legislative evolution
• Legacy Projects– Support to Legacy Projects: Rehabilitation to School Cyberlabs– Legacy Projects: Rehabilitation of Telecentres– Current Projects:
Training, PUSANO• Financial Review: USAF and USAASA• Strategy Plan and Priorities for 2008/09:
– Turnaround Strategy– Focus Areas– USAF Budget – MTEF 2008/11– USAASA – MTEF 2008/11
• Challenges and concluding remarks
![Page 3: Contributing to South Africa’s Growth USAASA: Budget, Strategy Plan and Priorities for 2008/09 Presentation to the Portfolio Committee: Communications](https://reader035.vdocuments.us/reader035/viewer/2022062807/5697bff21a28abf838cbc12b/html5/thumbnails/3.jpg)
USAASA Board
![Page 4: Contributing to South Africa’s Growth USAASA: Budget, Strategy Plan and Priorities for 2008/09 Presentation to the Portfolio Committee: Communications](https://reader035.vdocuments.us/reader035/viewer/2022062807/5697bff21a28abf838cbc12b/html5/thumbnails/4.jpg)
USAASA Executive Management
Mr. James Theledi: Chief Executive Officer
Dr. Sharon HortonHead: Corporate
Affairs
Mr. Winile LamaniHead: USAF
Projects
Mr. Keith KeysChief Financial
Officer
Mr. Phineas MoleeleHead: Legal
& Regulatory
VacantHead: Research
& Strategy
VacantHead: Human
Resources
![Page 5: Contributing to South Africa’s Growth USAASA: Budget, Strategy Plan and Priorities for 2008/09 Presentation to the Portfolio Committee: Communications](https://reader035.vdocuments.us/reader035/viewer/2022062807/5697bff21a28abf838cbc12b/html5/thumbnails/5.jpg)
The Agency Within the ICT Framework
James Theledi
![Page 6: Contributing to South Africa’s Growth USAASA: Budget, Strategy Plan and Priorities for 2008/09 Presentation to the Portfolio Committee: Communications](https://reader035.vdocuments.us/reader035/viewer/2022062807/5697bff21a28abf838cbc12b/html5/thumbnails/6.jpg)
Universal Service and Access Evolution
1907
TheodoreVail: AT&TPresident
TheodoreVail: AT&TPresident
• “One System, One Policy, Universal Service”
1934
CommunicationsAct 1934 (USA)
CommunicationsAct 1934 (USA)
• Preamble: “To make available to all the people of the United States, a rapid, efficient, Nation-wide, and world-wide wire and radio communication service with adequate facilities at reasonable charges.”
• USA establishes the Universal Service Administrative Company (USAC) to administer and manage the USF.
• USAC collects more than $7.5 Billion from Telecoms Operators Annually
• Other countries follow the example of USA and implement their own universal service strategies:
• Chile: Telecommunications Development Fund
• India: Universal Service Obligations Fund• England: Universal Service Obligations
![Page 7: Contributing to South Africa’s Growth USAASA: Budget, Strategy Plan and Priorities for 2008/09 Presentation to the Portfolio Committee: Communications](https://reader035.vdocuments.us/reader035/viewer/2022062807/5697bff21a28abf838cbc12b/html5/thumbnails/7.jpg)
ITU Criteria on Universal Service & Access
General principles
• Availability: National coverage of ICT services
• Accessibility: Users treated alike, non-discrimination i.t.o. price, service quality irrespective of locations, race etc.
• Affordability: Voice and data services should be priced so that most users can afford
Criteria
• Definitions - Develop appropriate definitions of Universal Service and Access
• Information - Collect relevant information
• Targets - Establish targets preferably in licence conditions
• Affordability - Ensure affordability
• Funding mechanism - Establishment of Universal Service Fund
• Technology - Cheaper access technology
• Monitoring - Monitoring (and enforce) progress and targets
![Page 8: Contributing to South Africa’s Growth USAASA: Budget, Strategy Plan and Priorities for 2008/09 Presentation to the Portfolio Committee: Communications](https://reader035.vdocuments.us/reader035/viewer/2022062807/5697bff21a28abf838cbc12b/html5/thumbnails/8.jpg)
ICT market growth vs Universal Service & Access
• Government recognised the positive impact of improved ICT rollout on economic growth and well being of society
• Access gaps are left while market concentrates on high end customers
• Industry will not bring about higher levels of penetration of ICT services at affordable costs
• Market structure dominated by fixed line incumbent and cellular operators
• Costs to communicate remain high i.e. prepaid offerings
• USAASA exists to close the gaps the market has failed to address
• USAASA to utilise the USAF to facilitate the closure of access gaps
• USAASA is needed to do evaluation and monitoring of access gaps
![Page 9: Contributing to South Africa’s Growth USAASA: Budget, Strategy Plan and Priorities for 2008/09 Presentation to the Portfolio Committee: Communications](https://reader035.vdocuments.us/reader035/viewer/2022062807/5697bff21a28abf838cbc12b/html5/thumbnails/9.jpg)
Legislative Evolution in South Africa
Future1996
TelecomsAct
(Act 103 of1996)
TelecomsAct
(Act 103 of1996)
• The Agency (USA) established under Chapter VII
• The Fund (USF) established under Chapter VIII
• Exclusivity period granted to Telkom
2001
TelecomsAmendment
Act(Act 64 of
2001)
TelecomsAmendment
Act(Act 64 of
2001)
• Amendments of Sections 58, 61, 65, 66 and 67
• Insertion of Section 67A
• Provision for USALs
2005
ElectronicCommunications
Act(Act 36 of
2005)
ElectronicCommunications
Act(Act 36 of
2005)
• Renaming of the Agency (USAASA) and the Fund (USAF)
• Extended mandate
![Page 10: Contributing to South Africa’s Growth USAASA: Budget, Strategy Plan and Priorities for 2008/09 Presentation to the Portfolio Committee: Communications](https://reader035.vdocuments.us/reader035/viewer/2022062807/5697bff21a28abf838cbc12b/html5/thumbnails/10.jpg)
Variance between Rural and Metro ICT penetration
Source: AMPS 2006
23%
2%
63%
13%
55%
69%69%76%
81%
60%
18%
13%
6%
19%12%
0%
10%
20%
30%
40%
50%
60%
70%
80%
90%
Less than500/ Rural
500 - 39 999 40 000 - 249999
250 000+ Average
Cellphone
Land line
PC
Community size From BMI T
![Page 11: Contributing to South Africa’s Growth USAASA: Budget, Strategy Plan and Priorities for 2008/09 Presentation to the Portfolio Committee: Communications](https://reader035.vdocuments.us/reader035/viewer/2022062807/5697bff21a28abf838cbc12b/html5/thumbnails/11.jpg)
Communications penetration by Income Group
42%
16%
31%
69%
46%
68%
26%23%
3%11%13%
0%
10%
20%
30%
40%
50%
60%
70%
80%
90%
100%
UP to599
600 to999
1000 to1599
1600 to2999
3000 to 4999
5000 to 7999
8000 to 13999
14000+ GrandTotal
Cellphone- 2003 Cellphone-2006Land line- 2003 Land line-2006PC- 2003 PC-2006
-3%
+2%
Average
Huge increase in cellular access Reduction in fixed line accessMinimal increase in PCs in the home
R/m
+30%
+27%+37%
Source: BMI T
![Page 12: Contributing to South Africa’s Growth USAASA: Budget, Strategy Plan and Priorities for 2008/09 Presentation to the Portfolio Committee: Communications](https://reader035.vdocuments.us/reader035/viewer/2022062807/5697bff21a28abf838cbc12b/html5/thumbnails/12.jpg)
Legacy Projects
![Page 13: Contributing to South Africa’s Growth USAASA: Budget, Strategy Plan and Priorities for 2008/09 Presentation to the Portfolio Committee: Communications](https://reader035.vdocuments.us/reader035/viewer/2022062807/5697bff21a28abf838cbc12b/html5/thumbnails/13.jpg)
Support to Legacy Projects
Province WC EC KZN FS NC NW LP MP GP Total
Cyberlab 2 5 8 13 3 9 9 11 5 65
Equipment PC’s, printer, copier, VSAT
PC’s, printer, copier, VSAT
PC’s, printer, copier, VSAT
PC’s, printer, copier, VSAT
PC’s, printer, copier, VSAT
PC’s, printer, copier, VSAT
PC’s, printer, copier, VSAT
PC’s, printer, copier, VSAT
PC’s, printer, copier, VSAT
Rehabilitation ProgrammeSchool Cyberlabs
Challenges• No mechanism for monitoring and evaluating real impact: usage of Cyberlabs
by learners• Lack of coordination with other parties providing similar facilities i.e.
Department of Education, Khanya, Gauteng Online, CSI
![Page 14: Contributing to South Africa’s Growth USAASA: Budget, Strategy Plan and Priorities for 2008/09 Presentation to the Portfolio Committee: Communications](https://reader035.vdocuments.us/reader035/viewer/2022062807/5697bff21a28abf838cbc12b/html5/thumbnails/14.jpg)
Support to Legacy Projects
Province WC EC KZN FS NC NW LP MP GP Total
Telecentres 2 4 4 4 4 2 2 5 3 30
Digital hubs 1 1
Equipment 10 PC,s and
VSAT
10 PC,s and
VSAT
10 PC,s and
VSAT
10 PC,s and
VSAT
10 PC,s and
VSAT
10 PC,s and
VSAT
10 PC,s and
VSAT
10 PC,s & VSAT
10 PC,s&VSAT
Rehabilitation ProgrammeCommunity Access Centres; 30
Total of 30 Telecentres were rehabilitatedDigital Hubs – 1 Cradock Digital Hub
Challenges• No mechanism of monitoring and evaluating real impact: usage of Access
Centres by the community• Lack of coordination with other parties providing similar facilities i.e.
Operators, CSI
![Page 15: Contributing to South Africa’s Growth USAASA: Budget, Strategy Plan and Priorities for 2008/09 Presentation to the Portfolio Committee: Communications](https://reader035.vdocuments.us/reader035/viewer/2022062807/5697bff21a28abf838cbc12b/html5/thumbnails/15.jpg)
Current Projects
Training
• Microsoft Training:
– Assessors and Moderators (Unlimited Potential Curriculum Programme) – Telecentre Managers
– Train the Trainer Programme: 30 Telecentre managers
– Digital Literacy: Free Online Training
• Training Partnerships
- INK Hub Training: (100 students trained on ICDL - Women and Youth in Business -60, Community radio personnel – 20 and Local civil society organisation – 20)
- Fort Hare University: (15 Telecentre managers trained on basic computer skills)
- DoE, DoC and Isett Seta FET Skills Training
![Page 16: Contributing to South Africa’s Growth USAASA: Budget, Strategy Plan and Priorities for 2008/09 Presentation to the Portfolio Committee: Communications](https://reader035.vdocuments.us/reader035/viewer/2022062807/5697bff21a28abf838cbc12b/html5/thumbnails/16.jpg)
Current Projects
Group Photo: USALS – 21/02/2008
![Page 17: Contributing to South Africa’s Growth USAASA: Budget, Strategy Plan and Priorities for 2008/09 Presentation to the Portfolio Committee: Communications](https://reader035.vdocuments.us/reader035/viewer/2022062807/5697bff21a28abf838cbc12b/html5/thumbnails/17.jpg)
PUSANO Process
- Ministerial Policy Directives on PUSANO– Working group between USAASA, DoC & ICASA to accelerate
PUSANO process– ICASA process of licensing - Continuous meetings with USALs- Funding requests attended according to individual merits
![Page 18: Contributing to South Africa’s Growth USAASA: Budget, Strategy Plan and Priorities for 2008/09 Presentation to the Portfolio Committee: Communications](https://reader035.vdocuments.us/reader035/viewer/2022062807/5697bff21a28abf838cbc12b/html5/thumbnails/18.jpg)
Financial Review
![Page 19: Contributing to South Africa’s Growth USAASA: Budget, Strategy Plan and Priorities for 2008/09 Presentation to the Portfolio Committee: Communications](https://reader035.vdocuments.us/reader035/viewer/2022062807/5697bff21a28abf838cbc12b/html5/thumbnails/19.jpg)
Financial Review: USAF Budget
2000/01 2001/02 2002/03 2003/04 2004/05 2005/06 2006/07 2007/08 Total
Opening balance 32,892 37,179 58,811 86,449 88,327 61,267 22,513 23,479
In year Allocation 25,595 22,486 23,679 24,745 26,230 29,400 31,164 32,722 257,034
other income 1,966 2,917 6,305 6,933 4,583 3,261 2,122 4,158 38,271
Total Available 60,453 62,582 88,795 118,127119,14
0 93,928 55,799 60,359 295,305
Expenditure 23,274 3,771 2,346 29,800 57,873 71,415 32,320 60,668 295,614
Unspent funds 37,179 58,811 86,449 88,327 61,267 22,513 23,479 -309 -309
Treasury is correct i.t.o. USAASA capacity to spend in the past - this demonstrates USAASA is spending guided by a strategy to work with partnerships to address the gaps
![Page 20: Contributing to South Africa’s Growth USAASA: Budget, Strategy Plan and Priorities for 2008/09 Presentation to the Portfolio Committee: Communications](https://reader035.vdocuments.us/reader035/viewer/2022062807/5697bff21a28abf838cbc12b/html5/thumbnails/20.jpg)
2007/2008 USAF Expenditure
Schools Connectivity and Rehabilitation: R30,607m
Community Access Centres Connectivity and RehabilitationR13,339m
USALS SubsidiesR11,624m
Training R ,868m
Research R ,563m
Project Costs and Audit Fees R 1,116m
![Page 21: Contributing to South Africa’s Growth USAASA: Budget, Strategy Plan and Priorities for 2008/09 Presentation to the Portfolio Committee: Communications](https://reader035.vdocuments.us/reader035/viewer/2022062807/5697bff21a28abf838cbc12b/html5/thumbnails/21.jpg)
Financial Review: USAASA Budget
2000/01 2001/02 2002/03 2003/04 2004/05 2005/06 2006/07 2007/08 Total
Opening balance 1,806 3,256 5,152 2,889 1,456 -343 -571 1,203
In year Allocation 9,641 10,205 10,711 14,211 15,884 17,500 20,100 21,105 119,357
other income 28 18 94 1,191 629 135 123 0 2,218
Total Available 11,475 13,479 15,957 18,291 17,969 17,292 19,652 22,308 123,381
Expenditure 8,219 8,327 13,068 16,835 18,312 17,863 18,449 21,703 122,776
Unspent funds 3,256 5,152 2,889 1,456 -343 -571 1,203 605 605
![Page 22: Contributing to South Africa’s Growth USAASA: Budget, Strategy Plan and Priorities for 2008/09 Presentation to the Portfolio Committee: Communications](https://reader035.vdocuments.us/reader035/viewer/2022062807/5697bff21a28abf838cbc12b/html5/thumbnails/22.jpg)
Strategy Plan and Priorities for 2008/09
![Page 23: Contributing to South Africa’s Growth USAASA: Budget, Strategy Plan and Priorities for 2008/09 Presentation to the Portfolio Committee: Communications](https://reader035.vdocuments.us/reader035/viewer/2022062807/5697bff21a28abf838cbc12b/html5/thumbnails/23.jpg)
Turnaround Strategy
• Support the Government Business Unusual theme
– Economic Cluster
– ISAD Cluster Apex Project
• Strategic goals & objectives:
– From implementer to facilitator, advisor and monitor
– Elevate the role of the Agency and its impact
• Support processes of DoC and ICASA
• Cooperation through partnerships
– MOU’s and Public Private Partnerships
– Forum of contributors
• Manage the USAF
– Collect contributions from operators
– Define access and subsidy rules
![Page 24: Contributing to South Africa’s Growth USAASA: Budget, Strategy Plan and Priorities for 2008/09 Presentation to the Portfolio Committee: Communications](https://reader035.vdocuments.us/reader035/viewer/2022062807/5697bff21a28abf838cbc12b/html5/thumbnails/24.jpg)
Focus Areas
• Fund Manual– Standard Operating Procedures– Fund manual – 31 October 2008– Competitive bidding process (reverse-auction)
• Project Sustainability Plan– Business plan– Skills development plan
• Subsidy Focus– Internet Connectivity to Community Access Centers
Libraries, Telecentres, Digital Hubs, Kiosks– Infrastructure
• Training – Capacity building initiatives
• Research– Definitions on Universal Service and Universal Access– Universal Service Obligations– GIS Web Mapping
![Page 25: Contributing to South Africa’s Growth USAASA: Budget, Strategy Plan and Priorities for 2008/09 Presentation to the Portfolio Committee: Communications](https://reader035.vdocuments.us/reader035/viewer/2022062807/5697bff21a28abf838cbc12b/html5/thumbnails/25.jpg)
Funding – USAF & USAASA2008-2011
![Page 26: Contributing to South Africa’s Growth USAASA: Budget, Strategy Plan and Priorities for 2008/09 Presentation to the Portfolio Committee: Communications](https://reader035.vdocuments.us/reader035/viewer/2022062807/5697bff21a28abf838cbc12b/html5/thumbnails/26.jpg)
USAF Planned Budget MTEF 2008/11
2007/2008
Projected 2008/2009 2009/2010 2010/2011
USAF Projects32,722,000
34,581,000 36,389,203 36,399,436
![Page 27: Contributing to South Africa’s Growth USAASA: Budget, Strategy Plan and Priorities for 2008/09 Presentation to the Portfolio Committee: Communications](https://reader035.vdocuments.us/reader035/viewer/2022062807/5697bff21a28abf838cbc12b/html5/thumbnails/27.jpg)
USAF Planned Budget MTEF 2008/11
Project Outcome 2008/2009 2009/2010 2010/2011
Develop a Universal service & access strategy
Fund policy, Fund manual, Identify ICT schemes, subsidy model and competitive bidding process completed 1,500,000 - -
Subsidise FET colleges Subsidies paid to FET where SLAs have been signed 2,700,000 5,687,820 6,823,061
Connect Thusong Service centres ICT blue print for TSC's implemented, 5,000,000 5,485,938 5,296,810
15% Administration Costs 750,000 822,891 794,521
Rollout community access centres Digital hubs to be completed 4,000,000 - -
New access centre infrastructure - 4,500,000 4,100,000
15% Administration Costs 600,000 675,000 615,000
Subsidise public schools Mindset project (Pilot project) 1,000,100 3,511,351 3,254,685
New school cyberlab - 8,450,000 7,500,000
15% Administration Costs - 1,267,500 1,125,000
Subsidise connectivity to Community access centres Continue Internet payment 1,500,000 750,000 789,975
Subsidise broadcasting infrastructure Low power transmitters 1,000,000 1,053,300
15% Administration Costs 150,000 157,995
Sustainability plan Subsidies to entrepreneurs 10,800,000 - -
15% Administration Costs 1,620,000 - -
ICT Kiosk 525,000 1,105,965 1,747,369
Training 1,785,900 1,881,088 1,981,350
Research Web Portal 500,000 526,650 554,720
Public Consultation on Definitions 2,000,000 500,000 526,650
15% Administration Costs 300,000 75,000 78,998
34,581,000 36,389,203 36,399,436
![Page 28: Contributing to South Africa’s Growth USAASA: Budget, Strategy Plan and Priorities for 2008/09 Presentation to the Portfolio Committee: Communications](https://reader035.vdocuments.us/reader035/viewer/2022062807/5697bff21a28abf838cbc12b/html5/thumbnails/28.jpg)
USAASA Planned Budget MTEF 2008/11
2007/2008
Projected 2008/2009 2009/2010 2010/2011
Fixed costs
- Staff costs
12,542,836 16,128,647 16,935,079 17,849,573
- Operational lease
1,283,881 1,328,630 1,395,061 1,470,395
- Finance lease
- 74,640 78,372 82,604
Variable costs
7,378,552 4,681,050 4,915,102 5,180,518
Capital expenditure 1,562,447 90,000 171,386 180,641
22,767,716 22,302,966 23,495,000 24,763,730
![Page 29: Contributing to South Africa’s Growth USAASA: Budget, Strategy Plan and Priorities for 2008/09 Presentation to the Portfolio Committee: Communications](https://reader035.vdocuments.us/reader035/viewer/2022062807/5697bff21a28abf838cbc12b/html5/thumbnails/29.jpg)
Concluding Remarks
![Page 30: Contributing to South Africa’s Growth USAASA: Budget, Strategy Plan and Priorities for 2008/09 Presentation to the Portfolio Committee: Communications](https://reader035.vdocuments.us/reader035/viewer/2022062807/5697bff21a28abf838cbc12b/html5/thumbnails/30.jpg)
Challenges
• USAASA should be empowered to deliver on requirements placed on it by ECA
– Engaging with DoC & Treasury on expanding resources
• USAASA and USAF Budget allocation
– Ongoing engagement with DoC & Treasury to unlock existing funds
• Control of USAF - Collection & Account
– Development of standard terms and procedures manual
– Addressing method of collection with ICASA and contributors
• Contributions to USAF – Basis, manner & purpose of contributions
– Addressing through public consultations and Fund Manual
• Monitoring and evaluation to measure impact and progress
– Increasing research and monitoring capacity
• Fragmented approach to ICT infrastructure service provisioning
– Encourage partnerships
![Page 31: Contributing to South Africa’s Growth USAASA: Budget, Strategy Plan and Priorities for 2008/09 Presentation to the Portfolio Committee: Communications](https://reader035.vdocuments.us/reader035/viewer/2022062807/5697bff21a28abf838cbc12b/html5/thumbnails/31.jpg)
Conclusion
• Turnaround strategy
• Provision of definitions on under serviced areas, needy persons
• Review of Universal Service Obligations
• Fund Manual
• Partnership and collaboration