OWNER-ARCHITECT AGREEMENT
UAP DOCUMENT NO.401
BIDDING DOCUMENTS
•Bidding Requirements
•Contract Forms
•Contract Conditions
•Specifications
•Drawings
OWNER-ARCHITECT AGREEMENT
UAP DOCUMENT NO.401
CONTRACT DOCUMENTS
•Contract Forms
•Contract Conditions
•Specifications
•Drawings
OWNER-ARCHITECT AGREEMENT
UAP DOCUMENT NO.401
PROJECT MANUAL
•Bidding Requirements
•Contract Forms
•Contract Conditions
•Specifications
OWNER-ARCHITECT AGREEMENT
UAP DOCUMENT NO.401
•Bidding Requirements
• invitation
• instruction
• information
• bid form
• bid bond
OWNER-ARCHITECT AGREEMENT
UAP DOCUMENT NO.401
•Contract Forms
• agreement
• performance bond
• payment bond
• certificates
OWNER-ARCHITECT AGREEMENT
UAP DOCUMENT NO.401
•Contract Conditions
• general
• supplementary
DOCUMENTSDOCUMENTSDOCUMENTSDOCUMENTS
OWNER-ARCHITECT AGREEMENT
UAP DOCUMENT NO.401
•Specifications• general• siteworks• concrete• masonry• metals• wood and plastics• thermal&moisture
protection• doors&windows• finishes• specialties• equipment• furnishings• special construction• conveying systems• mechanical• electrical
DOCUMENTSDOCUMENTSDOCUMENTSDOCUMENTS
OWNER-ARCHITECT AGREEMENT
UAP DOCUMENT NO.401
BIDDING DOCUMENTS
•Bidding Requirements
•Contract Forms
•Contract Conditions
•Specifications
•Drawings
• architectural• structural• sanitary• mechanical• electrical
CONTRACT DOCUMENTS Contract Forms
- agreement
- performance bond
- payment bond
- certificates
Contract Conditions- general
- supplementary
Specifications
Drawings
AGREEMENTSAGREEMENTS
OWNER-ARCHITECT AGREEMENT
UAP DOCUMENT NO.401
Contracting Parties Scope of Work Architect’s Services Architect’s Fee and Manner of Payment Owner’s Responsibilities Expenses Chargeable to both parties Project Supervision Estimates Ownership of Documents Successors and Assigns Arbitration Acknowledgement and Jurat
BASIC PROVISIONS
PLANSPLANS
OWNER-ARCHITECT AGREEMENT
UAP DOCUMENT NO.401
• architectural- Perspective
- Location Plan- Vicinity Map - Floor Plans - Elevations- Sections
• structural- Foundation Plan- Footing Details- Beam & Column Details- Floor Slab Details- Floor Framing & Details- Roof Framing & Details
• sanitary- Water Distribution System- Drainage System- Liquid and Solid Waste
• mechanical- air-conditioning system- movement systems
• electrical- lighting system- power distribution system
OWNER-GENERAL CONTRACTOR AGREEMENT
UAP DOCUMENT NO.402
The Parties
Art.1. Scope of Work
Art.2. Time of Completion and liquidated damages
Art.3. The Contract Amount
Art.4. Payments
Art.5. The Contract Documents
Art.6. Performance and Payment Bonds
Art.7. Taxes, Licenses, Permits and Fees
Art.8. Insurance and other Conditions
SPECIFICATIONSSPECIFICATIONS
PRACTICAL SPECIFICATIONS WRITING
UAP DOCUMENT NO.307
a written document that provides
information required for proper
construction or material and equipment
procurement, which cannot be placed in
the drawings
• purpose&importance of specifications
• architect as specification writer
• qualifications of a specifications writer
• types of specs
• 16-division uniform construction index
• 3-part format
• elements of specs. composition
• spec. language
• step by step specification writing
SPECIFICATIONSSPECIFICATIONS
PRACTICAL SPECIFICATIONS WRITING
UAP DOCUMENT NO.307
• scope of work
• materials to be used
• method of installation
• quality of workmanship
•purpose&importance of specifications
• architect as specification writer
• qualifications of a specifications writer
• types of specs
• 16-division uniform construction index
• 3-part format
• elements of specs. composition
• spec. language
• step by step specification writing
SPECIFICATIONSSPECIFICATIONS
PRACTICAL SPECIFICATIONS WRITING
UAP DOCUMENT NO.307
The 16-division uniform construction index:
1- General Requirements
2- Sitework
3- Concrete
4- Masonry
5- Metals
6- Wood and Plastics
7- Thermal and Moisture Protection
8- Doors and Windows
9- Finishes
10- Specialties
11- Equipment
12- Furnishings
13- Special Construction
14- Conveying Systems
15- Mechanical
16- Electrical
SPECIFICATIONSSPECIFICATIONS
PRACTICAL SPECIFICATIONS WRITING
UAP DOCUMENT NO.307
the three-part section format:
part 1: general-scope-description of systems-reqts of regulatory agencies-qualifications-submittals-mock-up-product handling-environmental conditions-protection-operating instructions-extra stock-alternates-measurement and payment
part 2: product-materials-mixes-equipment-fabrication-source quality control
part 3: execution-condition of surfaces-preparation-installation-field quality control-adjusting-patching-cleaning-schedules
SPECIFICATIONSSPECIFICATIONS
PRACTICAL SPECIFICATIONS WRITING
UAP DOCUMENT NO.307
types of specifications:
• performance specifications
• descriptive specifications
• brand name specifications
- closed
- open
• reference specifications
• combination
scheduling techniques
• bar chart
• s-curve
• linked bar chart
• line balance
• critical path method
importance of time management
• contract stipulations
• labor paid by hour/day
• equipment rental by hour/day
• liquidated damages
PROJECT SCHEDULEPROJECT SCHEDULE
pert-cpm• activity
• network
• duration
• event
• dummy activity
• critical path
• float/slack
• early start
• late start
• late finish
A B
I
E
C
D
F
J
K
H J
2 2 4 6 3
.53
3
2
.5 1
G
1
I1
bar-chartCOST OF TOTAL COSTDESIGN & WITH LABOR MONTH 0 MONTH 1 MONTH 2 MONTH 3 MONTH 4 MONTH 5 MONTH 6MATERIALS & ADD-ONS
DESIGN PREPARATION 1,000,000 1,000,000 1,000,000
PRE-CONSTRUCTION 332,000 332,000 332,000
SITEWORKS 100,000 168,231 168,231
UTILITIES 222,800 374,820 374,820
CONCRETE 1,012,494 1,703,333 1,277,500 425,833
MASONRY 488,640 822,046 822,046
METALS 3,831,600 6,445,955 2,148,652 2,148,652 2,148,652
WOOD AND PLASTIC 252,500 424,784 212,392 212,392
THERMAL AND MOISTURE PROTECTION 3,261,800 5,487,373 1,829,124 1,829,124 1,829,124
DOORS AND WINDOWS 696,000 1,170,891 390,297 780,594
FINISHES 5,375,954 9,044,044 2,214,681 3,414,681 3,414,681
SPECIALTIES 239,790 403,402 403,402
EQUIPMENT 87,000 146,361 146,361
FURNISHINGS 287,410 483,514 483,514
MECHANICAL AND ELECTRICAL 1,430,411 2,406,401 601,600 1,203,200 601,600
18,618,399
11,794,756
PROJECTED MONTHLY ACCOMPLISHMENT 30,413,155 30,413,155 1,332,000 2,466,312 5,202,420 5,359,970 6,192,457 5,647,208 4,212,788PROJECTED CUMULATIVE ACCOMPLISHMENT 1,332,000 3,798,312 9,000,732 14,360,702 20,553,159 26,200,367 30,413,155% ACCOMPLISHMENT 4.38% 12.49% 29.59% 47.22% 67.58% 86.15% 100.00%
17,286,399 29,081,155
ITEMS
s-curve
S-CURVE
0
20
40
60
80
100
120
MONTH
% A
CC
OM
PL
ISH
ME
NT
Series1
Series1 4.38 12.49 29.59 47.22 67.58 86.15 100
1 2 3 4 5 6 7
line balance