  • COURSE ON

    CONTRACT

    ADMINISTRATION 101

    DATE: 8th SEPTEMBER 2012

    VENUE: PAM NORTHERN CHAPTER

    PRESENTED BY: AR. DAVID CHEAH MING YEW

  • CONTENTS

    1.0 CONSTRUCTION CONTRACTS: INTRODUCTION

    2.0 COMMENCEMENT OF CONTRACT AT SITE

    3.0 MONITORING OF WORK PROGRESS

    4.0 SUPERVISION OF WORKS

    5.0 CONTRACT ADMINISTRATION (GENERAL)

    HSKS

  • HSKS

    CONSTRUCTION

    CONTRACTS:

    INTRODUCTION

  • 1.0 CONSTRUCTION CONTRACTS: INTRODUCTION

    TYPES OF CONTRACTS

    1. GENERAL CONTRACTS 2. CONSTRUCTION CONTRACTS

    TYPES OF BUILDING CONTRACTS BASED ON PRICING

    COMMON CONTRACT PROCUREMENT METHODS

    1. TRADITIONAL GENERAL CONTRACTS 2. MANAGEMENT TYPES 3. PACKAGE DEAL TYPES 4. MISCELLANEOUS METHODS

    HSKS

  • BASIC CONTRACT PRINCIPLES

    1. CONTRACT DEFINITIONS 2. ELEMENTS OF CONTRACT 3. STANDARD FORMS OF CONTRACT 4. BREACH OF CONTRACT: REMEDIES

    MISCELLANEOUS ISSUES

    HSKS

  • FIG. 1-1: GENERAL CONTRACTS - TYPES

    SIMPLE

    CONTRACTS

    SPECIALITY

    CONTRACTS

    (DEED)

    MATERIAL

    & LABOUR

    CONTRACTS

    SUB-SUB

    CONTRACTS

    INDEPENDENT

    CONTRACTS

    MATERIAL SUPPLY

    CONTRACT

    LABOUR

    CONTRACT

    COLLATERAL

    CONTRACTS

    ORAL

    CONTRACTS

    EXPRESS

    CONTRACTS

    EMPLOYMENT

    CONTRACTS

    MAIN CONTRACTS

    SUB-CONTRACTS

    GENERAL

    CONTRACTS:

    TYPES

    HSKS

  • HSKS

    CONSTRUCTION CONTRACTS:

    TYPES

    PERIODIC

    CONTRACT

    LUMP SUM

    CONTRACT

    PARTNERING

    PROJECT

    MANAGEMENT

    CONTRACTS

    MANAGEMENT

    CONTRACTING

    CONSTRUCTION

    MANAGEMENT

    FAST-TRACK CONTRACT

    TERM

    CONTRACT

    MEASURE &

    VALUE CONTRACTS

    TARGET COST

    CONTRACT

    FEE

    CONTRACTING

    PACKAGE DEAL

    CONTRACT

    SERIAL

    CONTRACT

    VALUE COST

    CONTRACT

    B.O.T.

    CONTRACT

    COST REIMBURSEMENT

    CONTRACTS

    FIG. 1-2 : CONSTRUCTION CONTRACTS - TYPES

  • HSKS

    FIG. 1-3 : TYPES OF CONTRACTS BASED ON PRICING

    TYPE OF CONTRACT

    LUMP SUM

    CONTRACTS

    COST REIMBURSEMENT

    CONTRACTS

    LUMP SUM

    WITH PLAN AND

    SPECIFICATION

    LUMP SUM

    WITH BILLS

    OF QUANTITIES

    COST PLUS

    FIXED FEE

    COST PLUS

    PERCENTAGE

    COST PLUS

    FLUCTUATING FEE

    TARGET COST

    VALUE COST

    MESUREMENT

    CONTRACTS

    BASED ON

    APPROXIMATE

    QUANTITIES

    BASED ON A

    SCHEDULE

  • HSKS

    TRADITIONAL

    GENERAL

    CONTRACTTING

    MANAGEMENT

    TYPE

    TURNKEY

    ENGINEERING, PROCUREMENT,

    CONSTRUCTION &

    COMMISSIONING

    DESIGN & BUILD/ DESIGN &

    CONSTRUCT

    FAST TRACKING

    CONSTRUCTION

    MANAGEMENT

    MANAGEMENT

    CONTRACTING

    MISCELLANEOUS

    METHODS

    PACKAGE

    DEAL TYPE

    BUILD, OPERATE

    & TRANSFER

    PARTNERING

    COMMON CONTRACT PROCUREMENT METHODS

    FIG. 1-4 : COMMON CONTRACT PROCUREMENT METHODS IN USE

  • FIG. 1-5: TRADITIONAL GENERAL CONTRACTING (TGC) - CONTRACTUAL RELATIONSHIPS

    HSKS

    EMPLOYER

    PROFESSIONAL

    TEAM - DESIGN AND

    CONTRACT ADMINISTRATION

    SUPPLIERS

    MAIN CONTRACTOR

    (MC)

    SUB-SUB

    CONTRACTORS

    1. Architect

    2. Engineers - C&S, M&E

    3. Quantity Surveyor

    4. Other Specialist

    SUB-SUB

    CONTRACTORS

    SUPPLIERS

    NOMINATED SUB-

    CONTRACTOR (NSC)

    DOMESTIC SUB-

    CONTRACTOR (DSC)

    Key

    _______ :

    Contractual Link

    _ _ _ _ _ :

    Responsibility

  • HSKS

    EMPLOYER

    PROFESSIONAL

    ADVISORS

    SUPPLIERS

    D & C CONTRACTOR

    SUB-SUB

    CONTRACTORS

    SUB-SUB

    CONTRACTORS

    SUPPLIERS

    SUB-

    CONTRACTOR

    SUB-

    CONTRACTOR

    PROFESSIONAL

    TEAM

    1. Architect

    2. Engineers - C&S, M&E

    3. Quantity Surveyor

    4. Other Specialist

    1. Setting up Employers

    Requirements

    2. Auditing role during

    construction

    FIG. 1.6: TURNKEY CONTRACTS/DESIGN & CONSTRUCT (D&C) CONTRACTUAL RELATIONSHIPS

    1. Architect

    2. Engineers - C&S, M&E

    3. Quantity Surveyor

    4. Other Specialist 1. Detailed Design

    2. Construction supervision

    Key

    _______ : Contractual Link

    _ _ _ _ _ : Responsibility

  • HSKS

    FIG. 1.7: MANAGEMENT CONTRACTING (MC) - CONTRACTUAL RELATIONSHIPS

    EMPLOYER

    PROFESSIONAL

    TEAM

    TRADE

    CONTRACTOR

    MANAGEMENT

    CONTRACTOR (MC)

    TRADE

    CONTRACTOR

    1. Architect

    2. Engineers - C&S, M&E

    3. Quantity Surveyor

    4. Other Specialist

    TRADE

    CONTRACTOR

    Key

    _______ :

    Contractual Link _ _ _ _ _ :

    Responsibility

  • FIG. 1-8: CONSTRUCTION MANAGEMENT (CM) - CONTRACTUAL RELATIONSHIPS

    HSKS

    EMPLOYER

    PROFESSIONAL

    TEAM

    TRADE

    CONTRACTORS

    CONSTRUCTION

    MANAGER (CM)

    TRADE

    CONTRACTORS

    1. Architect

    2. Engineers - C&S, M&E

    3. Quantity Surveyor

    4. Other Specialist

    Key

    _______ : Contractual Link _ _ _ _ _ _ : Responsibility

  • * CONTRACT - DEFINATIONS

    1.0 PER ANSON

    * Legally binding agreement

    * Between two or more parties

    * By which rights are acquired by one or more

    * To acts or forbearances on the part of the other or others

    2.0 PER SECTION 2(h) MALAYSIAN CONTRACTS ACT 1950 (REV. 1974)

    * An agreement

    * Enforceable by Law

    ** CONTRACT - BASIC ELEMENTS

    CLEAR + UNQUALIFIED + CONSIDERATION = CONTRACT

    OFFER ACCEPTANCE (LEGAL AGREEMENT)

    FIG. 1-9: CONTRACT DEFINITIONS

    HSKS

  • +

    +

    FIG. 1-10: ELEMENTS OF A VALID / ENFORCEABLE AGREEMENT

    FIRM OFFER /

    PROPOSAL

    UNQUALIFIED

    ACCEPTANCE

    CONSIDERATION

    INTENTION TO CREATE

    LEGAL RELATIONS

    CERTAINTY OF TERMS

    LEGAL CAPACI TY TO

    CONTRACT

    FREE CONSENT

    LAWFUL OBJECT AND

    CONSIDERATION

    PHYSICAL/LEGAL

    POSSIBILITY

    VALID / ENFORCEABLE

    AGREEMENT

    HSKS

  • HSKS

    GOVERNMENT/

    PUBLIC SECTOR

    STANDARD FORMS OF CONTRACT

    PRIVATE SECTOR

    INTERNATIONAL

    CONTRACTS

    BUILDING WORKS

    1. 203 (2007) - without

    quantities

    2. 203A (2007) - with quantities

    3. 203N (2007) - For NSC

    4. 203P (2007) - For Nominated

    Suppliers

    5. JKR Form For DB (2007

    Edn.) For Design&Build

    Contracts

    1. IEM Conditions

    IEM.CE 1/89

    IEM.CES 1/90

    JKR / PWD

    MISCELLANEOUS

    1. CIDB Form for Building

    Contracts 2000 Edn.

    2. Modified JKR/PWD

    Forms e.g. LPK, MHA,

    etc.

    1. FIDIC Conditions

    2. ICE Conditions

    3. IEEE Conditions

    4. IMechE Conditions

    5. JCT Conditions

    CIVIL ENGINEERING

    WORKS

    1. PAM 2006 - with quantities

    2. PAM 2006 - without quantities

    3. PAM NSC 2006

    M & E WORKS

    1. IEM Conditions

    - IEM.ME

    1/94

    2. TNB Conditions, etc.

    FIG. 1-11 : STANDARD FORMS OF CONTRACT

  • HSKS

    DAMAGES

    BREACH OF CONTRACT: REMEDIES

    SPECIFIC

    PERFORMANCE

    INJUNCTIONS

    NATURE

    STATUTORY

    PROVISIONS

    Equitable/

    Discretionary remedy

    Sections 74

    and 76 of

    Contracts Act

    1950

    Prohibitory

    Mandatory

    Interlocutory

    Quia-Timet

    Mareva

    Anton Pillar

    APPLICATION

    MODE

    STATUTORY

    PROVISIONS

    TYPES

    DUTY TO

    MITIGATE

    General damages

    Special damages

    Nominal damages

    Exemplary damages

    Liquidated damages

    Unliquidated

    damages

    Express duty

    Kabatasan Timber

    Extraction v Chong

    Fah Shing

    Ex-Parte

    Inter-Partes

    WHERE REFUSED

    WHERE GRANTED

    Land transactions

    Executionary Contracts

    Where actual damage

    cannot be ascertained.

    Where contract terms uncertain

    Delay in bringing action

    Evidence of fraud

    Where constant court

    supervision required

    TYPES

    Equitable remedy

    Principles:

    following

    American Cyanide

    v Ethican

    NATURE

    Sections 20 and 21 Specific

    Relief Act 1950 (Rev. 1974)

    FIG. 1-12 : BREACH OF CONTRACT : REMEDIES

  • HSKS

    COMMENCEMENT OF

    CONTRACT AT SITE

  • 2.0 COMMENCEMENT OF CONTRACT AT SITE

    APPROACHES IN :

    1. TRADITIONAL GENERAL CONTRACTS 2. DESIGN & BUILD / TURNKEY CONTRACTS FORMALITIES

    1. CONDITIONS PRECEDENT 2. INSURANCES, PERFORMANCE BONDS, ETC. SITE POSSESSION : MEANING AND EFFECT

    SUBMITTALS :

    1. CONSTRUCTION DRAWINGS 2. SHOP DRAWINGS 3. SAMPLES 4. QA AND QC DOCUMENTS 5. HEALTH AND SAFETY DOCUMENTS 6. METHOD STATEMENTS TEMPORARY WORKS

    ISSUES FOR ATTENDANCE OF NOMINATED SUB-CONTRACTORS

    MISCELLANEOUS ISSUES

    HSKS

  • RELEVANT CASES

    1. THE RADIO & GENERAL TRADING CO. SDN. BHD. V WYASS & FREYTAG (M) SDN. BHD. [1998] 1 MLJ 346

    2. LEC CONTRACTORS (M) SDN. BHD. V CASTLE INN SDN. BHD. & ANOR

    [2000] 3 MLJ 339 3. KLEINWORT BENSON LTD. V MALAYSIA MINING CORP. BHD [1989] 1

    WLR 379 4. NANYANG INSURANCE CO. LTD. V SALBIAH & ANOR [1967] 1 MLJ 94 5. SURREY HEALTH BOROUGH COUNCIL V LOVELL CONSTRUCTION

    [1988] 42 BLR 25 6. FREEMAN V HENSLER [1981] 20 BLR 78 7. TAN HOCK CHAN V KHO TECK SENG [1980] 1 MLJ 308 8. PUTRA PERDANA CONSTRUCTION SDN. BHD. V AMI INSURANCE

    BHD & ORS [2005] 2 MLJ 123 HC 9. YIP SHOU SHAN V SIN HEAP LEE MARUBENI SDN. BHD. [2002] 5

    MLJ 43, HC`

    HSKS

  • FIG. 2-1: PROTECTION AGAINST CONTRACTORS FAILURES COMMON MECHANISMS

    HSKS

    PARENT COMPANY GUARANTEE

    LETTER OF AWARENESS

    INSURANCE PERFORMANCE BOND

    STANDBY LETTER OF CREDIT LETTER OF COMFORT

    PROTECTION AGAINST CONTRACTORS

    FAILURES: COMMON MECHANISMS

  • FIG. 2-2 : CONTRACTORS INSURANCE POLICIES COMMON TYPES

    HSKS

    PUBLIC LIABILITY

    INSURANCE

    CONTRACTORS/ SUPPLIERS YARD/ WORKSHOP AND

    TRANSIT

    INSURANCES

    ERECTION

    ALL RISK

    POLICY

    WORKMENS COMPENSATION

    INSURANCE

    MISCELLANEOUS

    /SPECIFIC

    INSURANCES

    CONTRACTORS INSURANCE

    POLICIES:

    COMMON TYPES

    CONTRACTORS ALL RISK

    POLICY

  • FIG. 2-3 : SITE POSSESSION MEETINGS

    HSKS

    TIMING

    SITE POSSESSION MEETINGS

    EXPLANATION

    OF CONTRACT

    REQUIREMENTS

    PURPOSE

    MATTERS

    DEALT

    MINUTES

    PARTICIPANTS

    On Date of

    Commencement of

    Contract

    Date of Site Possession

    INTRODUCTION

    OF PROJECT

    MEMBERS

    HANDOVER

    OF VARIOUS

    DOCUMENTS

    1. All Project

    Team Member

    LETTER OF

    DELEGATION

    OF POWERS

    SET OUT

    PROCEDURES

    COVERING

    COPY OF

    CONTRACT

    DOCUMENTS

    PRICED COPY

    OF B.Q.

    SET OF

    CONSTRUCTION

    DRAWINGS

    To officially handover

    Possession of Site to the

    Contractor

    DISTRIBUTION/

    CIRCULATION

    WHO

    PREPARES?

    Document Submittals and

    Approvals

    Sample Submittals and

    Approvals

    Inspection of Work

    Interim Valuations

    Claim Procedures

    Contract

    Administrator

    To all parties

  • FIG. 2-4 : SITE POSSESSION AN OVERVIEW

    HSKS

    PROVISIONS

    FOR

    SITE POSSESSION: AN OVERVIEW

    EXCEPTIONS

    TO GENERAL

    PRINCIPLE

    MEANING

    DEGREE

    POSTPONEMENT

    FAILURE TO GIVE

    POSSESSION

    In Letter of

    Acceptance

    Or in

    Contract

    LATEST LEGAL

    POSITION

    POSSESSION

    ON PIECEMEAL

    BASIS?

    No

    GENERAL

    PRINCIPLE

    EXPRESS

    IMPLIED

    If not expressed,

    by Law

    Freeman & Son v Hensler

    Licence revocable by

    Employer at any time

    Licence to be free

    from any encumbrances

    Contractor entitled

    to Sole/exclusive

    possession

    Express Stipulations

    Case Law

    Sufficient degree

    of possession/

    access

    To execute work

    unimpeded

    To be able to

    perform work

    Express contract

    stipulations permitting

    postponement

    GENERAL

    LEGAL POSITION

    EXCEPTIONS

    GENERAL

    LEGAL POSITION

    EFFECT

    Breach of Contract

    Entitles Contractor

    to rescind Contract.

    Contractor entitled

    to loss occasioned

    Contractor entitled

    to EOT if expressly

    permitted

    contractually

    Otherwise, LAD

    cannot be imposed

    General Position: No

    Exceptions:

    a) Express

    stipulations to

    contrary

    b) Where Common

    Law applies

  • HSKS

    WORK PROGRAMME

    WORKS UNDER CONTRACT: TYPICAL SUBMITTALS

    BY CONTRACTOR

    HEALTH AND SAFETY

    DOCUMENTS

    DESIGN AND CALCULATIONS

    FOR WORKS UNDER P.C. SUM,

    PACKAGE DEAL TYPE CONTRACTS, ETC.

    DRAWINGS I.E. SHOP, FABRICATION,

    SETTING OUT, ETC.

    MISCELLANOUES REPORTS AND

    DOCUMENTS METHOD STATEMENTS

    DESIGN AND CALCULATIONS

    FOR TEMPORARY WORKS QA/QC DOCUMENTS

    FIG. 2-5: WORKS UNDER CONTRACT TYPICAL SUBMITTALS BY CONTRACTOR

  • HSKS

    MONITORING OF

    WORK PROGRESS

  • 3.0 MONITORING OF WORK PROGRESS

    PROGRAMMING OF WORKS

    PARTIES RESPONSIBLE:

    1. EMPLOYER

    2. MAIN CONTRACTOR

    3. CONTRACT ADMINISTRATOR

    PROGRESS REPORTS

    SITE RECORDS

    MEETINGS:

    1. SITE POSSESSION

    2. PROGRESS/SITE

    3. NSC COORDINATION

    4. AD-HOC

    MISCELLANEOUS ISSUES

    HSKS

  • RELEVANT CASES

    1. GLENLION CONSTRUCTION LTD. V THE GUINESS TRUST [1987] 39 BLR 89

    2. YORKSHIRE WATER AUTHORITY V SIR ALFRED MCALPINE & SON (NORTHERN) LTD. [1986] 32 BLR 114

    3. GREATER LONDON COUNCIL V CLEVELAND BRIDGE & ENGINEERING CO. LTD. [1986] 8 Con LR 30

    4. KITSONS SHEET METAL LTD. V MATTHEW HALL MECHANICAL & ELECTRICAL ENGINEERS LTD. [1989] 47 BLR 82

    5. WEST FAULKNER ASSOCIATES V LONDON BOROUGH OF NEWHAM [1994] 71 BLR 1

    6. EQUITABLE DEBENTURES ASSETS CORP. LTD. V MORGAN BRANCH ROBERTS & ORS [1984] 2-CLD-10-01

    HSKS

  • WORK

    PROGRAMME:

    TYPICAL

    FORMS

    FIG. 3-1 : WORK PROGRAMME - TYPICAL FORMS

    HSKS

    MICROSOFT PROJECT

    PROGRAMME SIMPLE BAR

    CHART

    PROJECT

    ACTIVITY

    FLOW CHART

    WORK

    BREAKDOWN

    STRUCTURE

    GANNT CHART

    PROJECT

    EVALUATION

    REVIEW

    TECHNIQUE

    PROJECT

    NETWORK

    CHART

    MULTI-LEVEL

    PROJECT

    SCHEDULING

    PRIMIVERA PROGRAMME

    CRITICAL PATH

    ANALYSIS

  • HSKS

    PRINCIPAL ACTIVITIES

    IDENTIFICATION OF CRITICAL

    ACTIVITIES AND CRITICAL PATH

    IMPORTANT MILESTONES

    FOR EMPLOYER TO MEET SEQUENCE OF ACTIVITIES

    IMPORTANT MILESTONES

    FOR CONTRACTOR TO MEET TIMING OF ACTIVITIES

    WORK PROGRAMME:

    PRINCIPAL CONTENTS

    FIG. 3-2 : WORK PROGRAMME PRINCIPAL CONTENTS

  • HSKS

    FIG. 3-3 : WORK PROGRAMME AN OVERVIEW

    RESPONSIBILITY

    WORK PROGRAMME: AN OVERVIEW

    OPTIONS ON

    SUBMISSION

    METHOD OF

    WORKING

    SEQUENCE OF

    WORKING

    MEANING

    FORM

    CONTENTS

    PURPOSE

    PART OF

    CONTRACT?

    ALTERATION/

    REVISION

    Express

    Provisions

    By Implication

    Sequence and

    Timing of

    Activities

    Critical

    Milestones

    FOR CONTRACT

    ADMINISTRATOR

    FOR

    CONTRACTOR

    Approval

    Rejection

    Withholding

    of Approval

    SUBMITTED AFTER

    TENDER AWARD

    PART OF TENDER

    SUBMISSION?

    General

    Policies

    Mode of

    Alternatives /

    Revision

    Effect of

    Alternatives/

    Revision

    BAR

    CHARTS

    CRITICAL PATH

    ANALYSIS

    PERT

    PRIMIVERA/

    MICROSOFT

    PROJECT

    MISCELLANEOUS

  • FIG. 3-4 : PROGRESS MONITORING EMPLOYERS PURPOSES

    HSKS

    TO LEVY CONTROL OVER

    PROGRESS OF THE WORKS

    TO TAKE NECESSARY REMEDIAL

    MEASURES IF DELAY OCCURS OR IF

    EMPLOYER IS AT FAULT

    MISCELLANEOUS PURPOSES

    TO ENSURE CONTRACT IS

    COMPLETED ACCORDING

    TO SCHEDULE

    TO PLAN AND STREAMLINE

    FINANCIAL ARRANGEMENTS

    TO OBVIATE DEFAULT

    TO WARN CONTRACTOR

    TO TAKE REMEDIAL

    MEASURES IN CASE

    DELAY OCCURS

    PROGRESS MONITORING: EMPLOYERS PURPOSES

  • HSKS

    FIG. 3-5 : PROGRESS MONITORING AN OVERVIEW

    DURATION

    PROGRESS MONITORING: AN OVERVIEW

    SITE

    PROGRESS

    MEETINGS

    PURPOSE

    METHODS

    BASIS

    FREQUENCY/

    NATURE OF

    CHECKS

    SUB-

    CONTRACTORS

    MEETING

    COORDINATION/

    PROJECT

    MANAGEMENT

    MEETINGS

    DURATION

    SITE

    DIARY

    OFFICIAL WORK

    RECORDS

    OFFICIAL

    PROGRESS

    REPORTS

    PROGRESS

    MEETINGS

    SITE

    RECORDS

    SITE

    POSSESSION

    MEETINGS

    AD-HOC

    MEETINGS

    PURPOSE

    METHODS

    EVIDENTIAL VALUE

    PARTIES

    RESPONSIBLE

    From Site

    Possession

    To Issue of Final

    Certificate

    Normally up to

    Practical

    Completion only

    Use of

    Contractors Work Programme

    Primary Purposes

    Secondary Purposes

    Employer/

    contract

    administrator

    Contractor

    On regular basis

    Normally monthly

    Maybe

    i. Weekly

    ii. Fortnightly

    iii. Quarterly, etc.

  • FIG. 3-6 : POST CONTRACT AWARD STAGE PRINCIPAL TYPES OF MEETINGS

    HSKS

    POST CONTRACT AWARD STAGE:

    PRINCIPAL TYPES OF MEETINGS

    SITE POSSESSION MEETINGS

    MISCELLANEOUS MEETINGS

    SUB-CONTRACTORS MEETINGS

    COORDINATION/ PROJECT

    MANAGEMENT MEETINGS

    SITE PROGRESS MEETINGS

    AD-HOC MEETINGS

  • FIG. 3-7 : SITE PROGRESS MEETINGS AN OVERVIEW

    HSKS

    TIMING

    SITE PROGRESS MEETINGS: AN OVERVIEW

    ENABLE

    CONTRACTOR TO

    PURPOSE

    ISSUES/

    MATTERS DEALT

    MINUTES

    PARTICIPANTS

    PERMIT WORK PROGRESS TO

    MISCELLANEOUS

    S.O./ Contract Administrator

    DISTRIBUTION/ CIRCULATION

    WHO PREPARES?

    Officially present progress report

    Present problems encountered

    Be reviewed on regular basis

    Identify areas and causes of delay

    Enable Employer/ C.A. to redress delay caused by him/them

    Keep track of financial progress/allocation

    CONTRACT

    ADMINISTRATOR

    MAIN

    CONTRACTOR

    CONSULTANTS

    NSCs

    EMPLOYER

    Chairs Meeting

    Main participant

    Observers Only

    Participants if contract administrator's assistants/

    representatives

    By invitation only

    Observer only

    To all parties/ attendees

    Main participant

    ONLY SITE ISSUES

    FINANCIAL ISSUES

    3RD PARTY ISSUES AFFECTING

    CONTRACT

    MISCELLANEOUS ISSUES

  • FIG. 3-8 : SUB-CONTRACTORS MEETINGS AN OVERVIEW

    HSKS

    TIMING

    SUB-CONTRACTORS MEETINGS: AN OVERVIEW

    TO ENABLE SUB-

    CONTRACTOR TO

    PURPOSE

    ISSUES/

    MATTERS DEALT

    MINUTES

    TO PERMIT

    CONTRACTOR TO Main

    Contractor

    DISTRIBUTION/ CIRCULATION

    WHO

    PREPARES?

    Officially present progress report to Contractor

    Present problems encountered

    Review NSCs progress, areas of delay, etc.

    Identify and sort coordination problems

    CONTRACTOR

    (MAIN)

    NOMINATED SUB-

    CONTRACTORS

    DOMESTIC SUB-

    CONTRACTORS

    OTHERS (BY

    INVITATION)

    Chairs Meeting Employer

    Third Parties

    Contract Administrator

    To all parties/ attendees

    PARTICIPANTS

    Usually monthly prior to site meetings

    If necessary more frequently

    COORDINATION

    MATTERS

    SITE PROBLEMS

    FINANCIAL ISSUES

    3RD PARTY ISSUES

    MISCELLANEOUS ISSUES

    Design

    Site Work

    Possession

    Access

    Security

    Payments

    V.O.s

    Claims

    Authorities

    Utilities Providers

    Others

  • FIG. 3-9 : AD-HOC MEETINGS AN OVERVIEW

    HSKS

    AD-HOC MEETINGS: AN OVERVIEW

    AS AND WHEN

    NECESSARY FROM TIME TO TIME

    TIMING

    PURPOSE

    USUALLY

    DICTATED BY CIRCUMSTANCES

    TO DISCUSS

    SPECIFIC ISSUES / MATTERS

    EMERGENCY

    ISSUES

    FINANCIAL

    ISSUES

    TECHNICAL

    ISSUES

    ADMINISTRATIVE

    MATTERS

    Site Issues

    Design/ Work Issues

    3rd Party Issues

    Training

    Maintenance

    As-Built Records

    Payments

    V.O.s

    Claims

    Design

    Construction/Installation

    Testing and Commissioning

    Defects

    CONVENORS (AS APPLICABLE)

    The Employer

    The Contract Administrator

    The Contractor

    The Sub-Contractors

    MISCELLANEOUS

    ISSUES

  • FIG. 3-10 : SITE RECORDS AN OVERVIEW

    HSKS

    DURATION

    SITE RECORDS: AN OVERVIEW

    PURPOSE

    METHODS

    EVIDENTIAL VALUE

    From Date of Commencement

    /Site Possession to

    Completion of works

    Normally up to Practical Completion only

    OFFICIAL

    PROGRESS REPORT

    OFFICIAL WORK

    RECORDS

    Contractors Scope

    NSCs/DSCs Scope

    Extension of Time

    Additional Work

    Direct loss and/or expense

    Miscellaneous matters

    REVIEW WORK

    PROGRESS

    EVALUATE

    CONTRACTORS CLAIMS TO

    PERMIT

    DECISION MAKING

    PROVIDE NECESSARY

    INFORMATION/ EVIDENCE TO

    SITE DIARY

    DULY SIGNED/

    ENDORSED RECORDS

    ACKNOWLEDGEMENT OF RECEIPT RECORDS

    Best evidential value

    Some evidential value

  • FIG. 3-11 : OFFICIAL WORK RECORDS AN OVERVIEW

    HSKS

    TIMING OF

    SUBMISSION

    OFFICIAL WORK RECORDS: AN OVERVIEW

    RECORD OF

    SITE INFORMATION

    PURPOSE

    CONTENTS

    PROCEDURAL

    MATTERS

    FOR CONTRACT

    ADMINISTRATION

    SIGNING OR

    ENDORSEMENT

    TIME OF ENTRY

    FOR BASIS OF OFFICIAL

    PROGRESS REPORT

    Planned Undertaken

    SAFE KEEPING

    DAILY

    WEEKLY

    FORTNIGHTLY

    USE OF DESIGNATED

    STAFF FOR

    SITE WORK/ ACTIVITIES

    RECORD

    OF WORKERS

    RECORD OF

    PLANT/MACHINERY

    WEATHER

    CONDITIONS

    PROBLEMS

    ENCOUNTERED

    INSTRUCTIONS

    MISCELLANEOUS

    Skilled Unskilled

    Design

    Site

    Coordination

    Due to 3rd Parties

    Received

    Carried Out

    Outstanding

    Site/ Factory Visits

    Inspections

    Preparing Maintaining

    Submitting

    Daily

    By authorized Person(s)

    S.O/ Contract Administrator

    On site

    By S.O./Contract administrator

    Up to lapse of period of limitation

    Affecting work

    Delaying site operations

  • FIG. 3-12 : SITE DIARY AN OVERVIEW

    HSKS

    NATURE

    SITE DIARY: AN OVERVIEW

    CONTENTS

    PROCEDURAL

    MATTERS

    Undertaken

    PRESENTATION ON REQUEST/ DEMAND

    CHECKING /

    ENDORSEMENT

    SAFE KEEPING/

    CUSTODY

    ENTRIES ON DAILY BASIS

    SITE WORK/ ACTIVITIES

    PROBLEMS

    ENCOUNTERED

    INSTRUCTIONS

    RECORD OF

    MISCELLANEOUS

    ATTACHMENTS

    As to Site Work Coordination

    Site/ factory visits

    Weather conditions

    Disruption to site activities

    As-Built sketches, drawings, diagrams, etc.

    As-erected/ As-Installed Work/ plant, etc.

    By Employers Representative/ Designated person

    Accuracy of entries

    By S.O./ contract administrator

    Up to lapse of

    period of limitation

    Preferably kept by each and every site personnel

    Personal record of site activities

    Otherwise by designated site supervision team member

    Issued to Contractors

    Carried out by Contractor

    Contractors defaults /omissions

    DURATION

    From commencement of work on site until completion

    If necessary until the end of the contract

    By designated person

    By Employer/ S.O./ any interested party

  • HSKS

    SUPERVISION

    OF WORKS

  • HSKS

    4.0 SUPERVISION OF WORKS

    PURPOSE FOR:

    1. EMPLOYER/CONTRACT ADMINISTRATOR

    2. MAIN CONTRACTOR

    PARTIES RESPONSIBLE:

    1. EMPLOYER

    2. CONTRACT ADMINISTRATOR

    3. MAIN CONTRACTOR

    4. SUB-CONTRACTOR

    5. 3RD PARTIES

    METHODS

    RESPONSIBILITY AND LIABILITY

    ROLE OF RESIDENT SITE STAFF (RSS)

    MISCELLANEOUS ISSUES

  • RELEVANT CASES

    1. EQUITABLE DEBENTURES ASSETS CORP. LTD. V WILLIAM MOSS GROUP & ORS [1984] 3 CONSTR. LR 1

    2. WILLIAM TOMKINSON & SONS V ST. MICHAEL IN THE HAMLET [1991] Chartered Surveyor Weekly 4 July

    3. JAMESON V SIMON [1899] 1 F (Ct. of Sess) 1211: 7 SLT 133

    4. SAUNDERS & COLLARD V BROADSTAIRS LOCAL BOARD [1890] HBC (4th edn) Vol 2, p 164 (DC)

    5. EAST HAM CORP. V BERNARD SUNLEY [1965] 3 All ER 619

    HSKS

  • FIG. 4-1 : CONTRACT ADMINISTRATORS COMMON DESIGNATIONS

    HSKS

    CONTRACT

    ADMINISTRATORS:

    COMMON

    DESIGNATIONS

    SUPERINTENDING

    OFFICER/ S.O. CONSTRUCTION

    MANAGER

    EMPLOYERS REPRESENTATIVE

    ENGINEER

    ARCHITECT PROJECT

    DIRECTOR

  • HSKS

    FIG. 4-2 : CONTRACT ADMINISTRATORS REPRESENTATIVES/ASSISTANTS - TYPICAL EXAMPLES

    CONTRACT ADMINISTRATORS REPRESENTATIVES/

    ASSISTANTS: TYPICAL EXAMPLES

    ARCHITECT

    ELECTRICAL ENGINEER

    PROJECT MANAGER STRUCTURAL ENGINEER

    SPECIALIST CONSULTANT CIVIL ENGINEER

    QUANTITY SURVEYOR MECHANICAL ENGINEER

  • HSKS

    FIG. 4-3 : FORMS OF SUPERVISION COMMON LABELS

    FORMS OF SUPERVISION:

    COMMON LABELS

    FULL-TIME SUPERVISION

    PART-TIME SUPERVISION

    NOMINAL SUPERVISION STANDING SUPERVISION

    PERIODIC SUPERVISION CONSTANT SUPERVISION

  • FIG. 4-4 : SUPERVISION/INSPECTIONS OVERVIEW (PART I)

    HSKS

    TYPICAL

    CLAUSES IN

    AGREEMENTS

    SUPERVISION/INSPECTIONS: OVERVIEW (PART I)

    NATURE

    AND MEANING

    PURPOSES

    TYPICAL

    PROVISIONS IN

    BY-LAWS

    Terms used synonymously

    See Newey Js definition

    Distinction: Inspection

    imposes a lesser duty:

    William Tompkinson v St.

    Michael in the Hamlet.

    In absence of express

    provisions to contrary courts

    imply a duty of supervision:

    Alexander Corfield v David

    Grant.

    Malaysia: Statutory

    provisions necessitate

    supervision

    Building (Federal Territory

    of Kuala Lumpur) By-Laws

    1985:

    1. By-Law 6: Supervision

    of Works

    2. By-Law 23(1):

    Certificate For

    Occupation

    By-Law 5(1) City of Kuala

    Lumpur (Earthworks) By-

    Laws 1975

    Engineers Agreement:

    1. Clause 8.1 and 8.7 BEM

    Form (1999)

    Architects Agreement

    1. Clause 5(4)(iv) Part II:

    Architects (Scale of

    Minimum Fees)

    (Amendment) Rules

    1992

    2. Clause 9 Conditions of

    Engagement of

    Architect

    See Keatings definition in Building Contracts

    Three fold purpose:

    1. To ensure contractor

    carries out work in

    accordance with

    contract.

    2. To enable contract

    administrator to

    discharge his

    obligations to

    employer.

    3. To enable contract

    administrator to meet

    his statutory

    obligations

  • FIG. 4-5 : SUPERVISION/INSPECTIONS OVERVIEW (PART II)

    HSKS

    DURATION

    SUPERVISION/INSPECTIONS: OVERVIEW (PART II)

    RESIDENT

    SITE STAFF

    LIABILITIES

    LEVEL OF SUPERVISION

    REQUIRED

    Necessity for Resident Site Staff (RSS)

    Typical examples:

    1. Resident architect/engineer

    2. Clerk-of-works. 3. Other relevant staff

    Engagement:

    1. By employer; or 2. By contract

    administrator

    Powers and duties determined by engineering/construction contract being administered and/or letter of delegation of power.

    Responsibilities of:

    1. RSS 2. Contract Administrator

    Determined by:

    1. Conditions of engagement

    2. Applicable statutory provisions e.g. By-Laws

    Prevailing Forms:

    1. Category I: Full-time/Standing/ Constant supervision

    2. Category II: Part-Time/Periodic Supervision

    3. Category III: Nominal Supervision

    Legal Position:

    1. Must be reasonable for works involved

    2. Must be sufficient to check the important elements

    3. Adequate to meet statutory requirements

    4. Sufficient to meet obligations of engagement

    Determining factors:

    1. Nature of works under contract

    2. Conditions of engagement

    Normal periods:

    1. Up to issue of Practical Completion; or

    2. Up to application of certificate for occupation; or

    3. Up to issue of Certificate of Making Good Defects

    Common practice is up to issue of Certificate of Making Good Defects

    Primary responsibility for supervision: contractors. See East Ham Corp. v Bernard Sunley.

    Heads of liabilities of contract administrator for defaults/ breaches:

    1. Contractual 2. In tort 3. Statutory

    Position of contract administrators who are professional engineers, architects, etc.

  • HSKS

    CONTRACT

    ADMINISTRATION

    (GENERAL)

  • HSKS

    5.0 CONTRACT ADMINISTRATION: GENERAL

    DEFINITION PURPOSES

    PRINCIPAL DUTIES:

    1. FOR TRADITIONAL GENERAL CONTRACTS 2. FOR DESIGN & BUILD/TURNKEY

    INFORMATION TO THE CONTRACTOR

    ADVICE TO EMPLOYER INSTRUCTIONS TO CONTRACTOR

    DECISION MAKING FUNCTIONS

    LIABILITIES

    MISCELLANEOUS ISSUES

    RELEVANT CASES

    1. CHUAH NGAH CHIN V NG KIE EN [1968] 1 MLJ 267 2. PACIFIC ASSOCIATES INC. V BAXTER [1989] 2 ALL ER 159

  • 3. GUNUNG BAYU SDN. BHD. V SYARIKAT PEMBINAAN PERLIS SDN. BHD. [1987] 2 MLJ 332

    4. ALEXANDER CORFIELD V DAVID GRANT [1992] 59 BLR 102 5. PEARSON V DUBLIN CORPORATION [1907] AC 351 6. DAY V OST [1972] 2 NZLR 385 7. PRATT V GEORGE J HILL ASSOCIATES [1987] 38 BLR 25 8. NYE SAUNDERS & PARTNERS V BRISTOW [1987] 37 BLR 92 9. EMS BOWE (M) SDN. BHD. V KFC HOLDINGS (M) BHD & ANOR [1999] 6

    CLJ 513 10. SWEE PTE. LTD. V LIM KIAN CHAI [1983] 1 MLJ 353 11. SUTCLIFFE V THACKRAH [1974] 727 (HC) 12. TOKEN CONSTRUCTION CO. LTD. V CHARLTON ESTATES LTD. [1973] 1

    BLR 50 13. H. FAIRWEATHER LTD. V ADEN SECURITIES LTD. [1979] 12 BLR 40 14. DR. ABDUL HAMID ABDUL RASHID V JURUSAN MALAYSIA

    CONSULTANTS & 4 ORS [1997] 3 MLJ 546 15. STEVEN PHOA CHENG LOON & 72 ORS V HIGHLAND PROPERTIES SDN.

    BHD. & 9 ORS [2000] 3 AMR 3567 16. SAMI MOUSAWI-UTAMA SDN. BHD. V KERAJAAN NEGERI SARAWAK

    [2004] 2 MLJ 414, CA

    HSKS

  • HSKS

    CONTRACT ADMINISTRATION:

    PRIMARY PURPOSES

    FIG. 5-1 : CONTRACT ADMINISTRATION PRIMARY PURPOSES

    ENSURE THAT CONTRACTOR

    FULFILLS HIS OBLIGATIONS

    UNDER THE CONTRACT

    ENSURE THAT EMPLOYERS POSITION ADEQUATELY PROTECTED

    AGAINST VARIOUS CLAIMS

    ENSURE WORKS SATISFACTORILY

    COMPLETED WITHIN ORIGINAL

    CONTRACT PERIOD AND PRICE

    ENSURE THAT EMPLOYER

    FULFILLS HIS OBLIGATIONS

    UNDER THE CONTRACT

    ENSURE THAT NEEDS/OBLIGATIONS

    OF CONTRACT ADMINISTRATOR

    UNDER CONTRACT/STATUTE

    ADEQUATELY FULFILLED

    ENSURE THAT EMPLOYER

    FULFILS HIS

    STATUTORY/LOCAL

    AUTHORITY REQUIREMENTS

  • HSKS

    CONTRACT ADMINISTRATOR: RANGE OF ROLES

    PERFORMED

    WITH EXPRESS

    AUTHORITY

    AS AN AGENT OF THE EMPLOYER

    AS AN ADVISOR TO THE EMPLOYER

    AS AN INDEPENDENT CONTRACTOR

    AS AN INDEPENDENT/ IMPARTIAL

    ADJUDICATOR

    WITH IMPLIED/

    OSTENSIBLE

    AUTHORITY

    WHERE SUCH WORK

    IS REQUIRED POST-

    CONTRACT

    FOR MAINLY DESIGN/

    DETAILING WORK

    AS TO

    MATTERS OF COST

    AS TO

    OTHER MATTERS

    AS TO

    RIGHTS/ DUTIES UNDER

    THE CONTRACT

    AS TO DISPUTE

    RESOLUTION

    AS TO

    CERTIFICATION

    FIG. 5-2 : CONTRACT ADMINISTRATOR RANGE OF ROLES PERFORMED

  • HSKS

    CONTRACT ADMINISTRATOR: SOURCES OF DUTIES AND POWERS

    TERMS OF REFERENCE

    OF APPOINTMENT

    EXTERNAL BODY/ PERSON

    IN-HOUSE EMPLOYEE

    CONDITIONS OF CONTRACT

    BEING ADMINISTERED

    CONDITIONS OF ENGAGEMENT/

    SERVICES AGREEMENT

    CONDITIONS OF CONTRACT

    BEING ADMINISTERED

    FIG. 5-3 : CONTRACT ADMINISTRATOR SOURCES OF DUTIES AND POWERS

  • FIG. 5-4 : CONTRACT ADMINISTRATORS PRINCIPAL DUTIES FOR TRADITIONAL GENERAL CONTRACTS

    HSKS

    CONTRACT ADMINISTRATORS PRINCIPAL DUTIES FOR TRADITIONAL

    GENERAL CONTRACTS

    OVERSEEING TRAINING OF EMPLOYERS O & M PERSONNEL

    PROGRESS MONITORING

    ADVISING EMPLOYER

    ORDERING VARIATIONS

    PARTICIPATING IN PREPARATION OF MIGRATION/ FACILITIES MANAGEMENT PLANS

    CLOSING-OFF CONTRACT

    PARTICIPATING IN TESTING AND COMMISSIONING

    ISSUING INFORMATION, DRAWINGS, DETAILS, ETC.

    ADMINISTRATION OF PAYMENTS

    OVERALL SUPERVISION

    GRANTING APPROVALS, CONSENTS, ETC.

    NOMINATING SUB-CONTRACTORS, ETC.

    ISSUING RELEVANT INSTRUCTIONS

    INSPECTIONS OF WORKS

    MONITORING RECTIFICATION OF DEFECTS

    OVERSEEING COMPLETION & HANDING OVER OF WORKS

    PREPARING FINAL ACCOUNT

    CHECKING AND APPROVING O & M MANUALS & AS-BUILT DRAWINGS

    ISSUING NECESSARY REPORTS

    MONITORING SERVICING AND MAINTENANCE

  • THANK YOU