contoh slide latihan industri

31
21st JUNE 2010 – 19th NOVEMBER 2010 MUHAMMAD DANIAL ZUHAIR BIN ISMAIL TROO17 POLITEKNIK SEBERANG POLITEKNIK SEBERANG PERAI PERAI

Upload: muhd-shahir-salleh

Post on 11-Nov-2014

645 views

Category:

Documents


21 download

DESCRIPTION

report

TRANSCRIPT

Page 1: Contoh Slide Latihan Industri

21st JUNE 2010 – 19th NOVEMBER 2010

MUHAMMAD DANIAL ZUHAIR BIN ISMAILTROO17

POLITEKNIK SEBERANG POLITEKNIK SEBERANG PERAIPERAI

Page 2: Contoh Slide Latihan Industri

Self Introduction

Institution Introduction

Industrial Training Objective

Schedule

Report

Objective vs. Actual

Improvements and Suggestions

Feeling

Memory

Page 3: Contoh Slide Latihan Industri

Name: Muhammad Danial Zuhair bin Ismail

GP No: TR 0017

Date Of Birth: 28th June 1990

Age: 20 years old

Hometown: Seberang Jaya, Penang

Institution: Seberang Perai Polytechnic (PSP)

Course: Diploma in Mechanical Engineering (Manufacturing)

Dream: To establish a successful engineering firm that

contributes to the industry and the community

Page 4: Contoh Slide Latihan Industri

Self Introduction

Institution Introduction

Industrial Training Objective

Schedule

Report

Objective vs. Actual

Improvements and Suggestions

Feelings

Memories

Page 5: Contoh Slide Latihan Industri

Politeknik Seberang Perai (PSP) is an institution under the Ministry of Higher Education (MoHE) and it is the 10th polytechnic in Malaysia.

PSP was officially opened by the 4th Prime Minister of Malaysia, Tun Dr. Mahathir Mohamad on 27th November 1999.

PSP offer full time and part-time courses in the field of engineering (Mechanical and Electrical). It also offers courses in Commerce at the Certificate and Diploma level.

Page 6: Contoh Slide Latihan Industri
Page 7: Contoh Slide Latihan Industri

Penang

Distance From PSP to BSH:

7 km (approx. 10 mins.)

Page 8: Contoh Slide Latihan Industri
Page 9: Contoh Slide Latihan Industri

MECHANICAL ENGINEERING DEPARTMENT

COMMERCE DEPARTMENT

ELECTRICAL ENGINEERING DEPARTMENTGENERAL

STUDIES DEPARTMENT

Page 10: Contoh Slide Latihan Industri

Engineering Labs &

Workshops

Recreational Lake

MainHall

Badminton & Tennis Courts

Library and Cyber Cafe

Lecture Hall

Page 11: Contoh Slide Latihan Industri

Self Introduction

Institution Introduction

Industrial Training Objective

Schedule

Report

Objective vs. Actual

Improvements and Suggestions

Feeling

Memory

Page 12: Contoh Slide Latihan Industri
Page 13: Contoh Slide Latihan Industri

Self Introduction

Institution Introduction

Industrial Training Objective

Schedule

Report

Improvements and Suggestions

Objective vs. Actual

Feelings

Memories

Page 14: Contoh Slide Latihan Industri

2 WEEKS GENERAL

ORIENTATION

2 WEEKS GENERAL

ORIENTATION

Page 15: Contoh Slide Latihan Industri

Self Introduction

Institution Introduction

Industrial Training Objective

Schedule

Report

Objective vs. Actual

Improvements and Suggestions

Feelings

Memories

Page 16: Contoh Slide Latihan Industri

2 weeks general orientation:• Understand the functions of each department.• Learnt the processes, procedures and responsibilities of each

department.• Built good relationship with associates from another department.

18 weeks in Assembly Frame department:Understand and done the processes, procedures and hands-on job to assemble various models of motorcycles:

◦ Tyre line◦ Sub assembly◦ Sub line◦ Sub main line◦ Main line

• Understand the functions and how to use air tools and torque wrench.

Page 17: Contoh Slide Latihan Industri

Ratings:

1-2 : Poor 3-4: Satisfactory 5-6 : Good 7-8 : Very Good9-10: Excellent

Page 18: Contoh Slide Latihan Industri

Partner : Aswadi

Date : 13 October 2010

Start : 2.30 PM

Finish : 4.20 PM

Total time : 90 minutes

Defects : None

Feelings : Very excited to get the chance

to assemble one unit of Honda

EX5

Page 19: Contoh Slide Latihan Industri

Self Introduction

Institution Introduction

Industrial Training Objective

Schedule

Report

Objective vs. Actual

Improvements and Suggestions

Feelings

Memories

Page 20: Contoh Slide Latihan Industri

Ratings:

1-2 : Poor 3-4: Satisfactory 5-6 : Good 7-8 : Very Good9-10: Excellent

Page 21: Contoh Slide Latihan Industri

RATING DESCRIPTIONS :-

0-2 : GAIN LITTLE INFORMATION

2-4 : BASIC UNDERSTANDING

4-6 : UNDERSTAND AND KNOW PROCES FLOW.

6-8 : UNDERSTAND HOW TO PERFORM HANDS-ON JOB PROCESS

8-10 : FULLY UNDERSTAND ABOUT THE WHOLE PROCESS

Page 22: Contoh Slide Latihan Industri

Self Introduction

Institution Introduction

Industrial Training Objective

Schedule

Report

Objective vs. Actual

Improvements and Suggestions

Feelings

Memories

Page 23: Contoh Slide Latihan Industri

Install safety performance statistic board

To encourage the safety awareness among all associates and throughout the factory

Page 24: Contoh Slide Latihan Industri

Rusty and damaged trolleys, hazardous to the safety and health of the associates

Repair, repaint or replace the trolleys periodically

Page 25: Contoh Slide Latihan Industri

Dimmed lighting at the assembly line

Install more light at the assembly line, especially at the Quality Gate section

Page 26: Contoh Slide Latihan Industri

Self Introduction

Institution Introduction

Industrial Training Objective

Schedule

Report

Improvements and Suggestions

Objective vs. Actual

Feelings

Memories

Page 27: Contoh Slide Latihan Industri

Credits to Boon Siew Honda Sdn. Bhd. for giving me the opportunity to undergo my industrial training here.

Happy because this is my first work experience.

Got the chance to interact with the associates that are exposed to the industry

Page 28: Contoh Slide Latihan Industri

Self Introduction

Institution Introduction

Industrial Training Objective

Schedule

Report

Improvements and Suggestions

Objective vs. Actual

Feelings

Memories

Page 29: Contoh Slide Latihan Industri

SAFETY RIDING

FUTSAL

Page 30: Contoh Slide Latihan Industri

HONDA MODEL BUILDING

RECREATIONAL ACTIVITIES

Page 31: Contoh Slide Latihan Industri