N S E W Griffiths Drive 14th Avenue 12th Avenue Southgate Crescent 13th Avenue 11th Avenue 18th Street 10th Avenue Byrne Creek Community School Industrial Area Stride Avenue Community School Stride Avenue Community Garden City of New Westminster City of Burnaby PREFERRED SITE FOR THE SOUTH BURNABY ARENA N N N Southgate Community Island Neighbourhood South Burnaby Arena Context and Site Analysis SITE ZONING Site will require rezoning from the currently zoned M1 (Manufacturing) to CD (Comprehensive Development District). Byrne Creek Secondary School There is a 6m grade differential from the north to the south corners of the site that will required careful consideration to accommodate the large floorplate of the ice arenas. The ideal vehicular access onto the site for parking and service vehicles is opposite 11th Avenue. New bike lanes that link to the wider cycle network and an improved sidewalk would be provided along 18th Avenue. Between 134 to 186 new parking spaces would be required to accommodate a new twin pad arena. TOPOGRAPHY ACCESS AND PARKING LEGEND Future New Residential Greenspace Institutional (Church) Future Community Building Vehicular Route (Existing) Cycle Route (Existing) Pedestrian Route (Existing) Vehicular Route (Future) Cycle Route (Future) Pedestrian Route (Future) Byrne Creek Secondary School Future Southgate Development School Driveway 10th Avenue 18th Street PREFERRED SITE 11th Avenue Parking Vehicle Entry City of New Westminster existing single family housing 2.02 hectare (5 acre) City park Future Community Building Existing single family housing Church The Preferred site is located in south Burnaby within the Council adopted Edmonds Town Centre Plan area. N 3m 6m 6m 6m Byrne Creek Secondary School Byrne Creek Secondary School Future Southgate Development Future Southgate Development School Driveway School Driveway 10th Avenue 10th Avenue 18th Street 18th Street PREFERRED SITE 11th Avenue 11th Avenue PREFERRED SITE

Upload: lytruc

Post on 29-Jun-2018

212 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Context and Site Analysis - BurnabyThings+To+Do/Community+Centr… · Vision Concept Options Design Response South Burnaby Arena will be a welcoming and functional facility which

N

SE

W

Griffiths Drive

14th

Ave

nue

12th

Ave

nue

Sou

thga

te C

resc

ent

13th

Ave

nue

11th

Ave

nue

18th Street

10th

Ave

nue

Byrne Creek Community School

Industrial Area

Stride Avenue Community

School

Stride Avenue Community

Garden

City

of N

ew W

estm

inst

er

City

of B

urna

by

PREFERRED SITE FOR THE SOUTH BURNABY ARENA

NN N

Southgate Community Island Neighbourhood

South Burnaby Arena

Context and Site Analysis

SITE ZONING

• Site will require rezoning from the currently zoned M1 (Manufacturing) to CD (Comprehensive Development District).

Byrne Creek Secondary School

• There is a 6m grade differential from the north to the south corners of the site that will required careful consideration to accommodate the large floorplate of the ice arenas.

• The ideal vehicular access onto the site for parking and service vehicles is opposite 11th Avenue.

• New bike lanes that link to the wider cycle network and an improved sidewalk would be provided along 18th Avenue.

• Between 134 to 186 new parking spaces would be required to accommodate a new twin pad arena.

TOPOGRAPHY ACCESS AND PARKING

LEGEND

Future New Residential

Greenspace

Institutional (Church)

Future Community Building

Vehicular Route (Existing)

Cycle Route (Existing)

Pedestrian Route (Existing)

Vehicular Route (Future)

Cycle Route (Future)

Pedestrian Route (Future)

Byrne Creek Secondary School

Future Southgate Development

Scho

ol D

rivew

ay

10th Avenue

18th Street

PREFERRED SITE

11th

Ave

nue

Parking

Vehicl

e Entr

y

City of New Westminster existing single family housing

2.02 hectare (5 acre) City park

Future Community Building

Existing single family housing

Church

The Preferred site is located in south Burnaby within the Council adopted Edmonds Town Centre Plan area.

N

3m

6m

6m

6m

Byrne Creek Secondary School

Byrne Creek Secondary School

Future Southgate Development

Future Southgate Development

Scho

ol D

rivew

ay

Scho

ol D

rivew

ay

10th Avenue

10th Avenue

18th Street

18th Street

PREFERRED SITE

11th

Ave

nue

11th

Ave

nue

PREFERRED SITE

Page 2: Context and Site Analysis - BurnabyThings+To+Do/Community+Centr… · Vision Concept Options Design Response South Burnaby Arena will be a welcoming and functional facility which

The proposed building program was developed through discussions with city staff on functional and operational needs, including increasing winter and summer sport program capacity. The program includes:

Building Program

South Burnaby Arena

2 x NHL sized ice sheets, perimeter circulation and spectator seating for 100-250

10 x change rooms (18-person capacity)

Program, Equipment and Maintenance Storage

Public washrooms, staff and support areas

Associated arena services: resurfacing, refrigeration, mechanical, and electrical rooms

Lobby, Concession and Skate-Shop in a large atrium social space

Referee and first aid rooms

Upper warm viewing lounge

Multipurpose and meeting rooms

FLOO

R P

RO

GR

AM

( Sum

mer m

onths)

The proposed facility would accommodate the following uses:

Ringette

Ball Hockey

Figure Skating Inline hockey

Speed Skating

Public inline skating

Sledge hockey

Community events

Skating lessons

Public skating

Hockey

Lacrosse

ICE

PR

OG

RA

M (W

inte

r mon

ths)

Page 3: Context and Site Analysis - BurnabyThings+To+Do/Community+Centr… · Vision Concept Options Design Response South Burnaby Arena will be a welcoming and functional facility which

Vision

Concept Options

Design Response

South Burnaby Arena will be a welcoming and functional facility which supports the evolving needs for community level based recreation, in a manner which elevates the experience of all users and makes a positive contribution to the surrounding neighbourhood.

A few key design strategies were used to help meet the project objectives of the facility being a good neighbour and connecting existing and emerging South Burnaby communities. One of the key design features was the creation of an articulated roof form using two diagonal roof trusses above each ice sheet.

North facing natural light is Introduced into the arena by lifting roof peaks. Natural light enhances user experience.

SIDE BY SIDE DIAGONAL

The resulting form provides an interesting visual outlook at street level and a dynamic roofscape for residents in the neighbouring future Southgate development.

END TO END

This L-shaped layout allows for the location of lobby and social spaces along 18th Street to create an active, transparent and welcoming street elevation. It allows for high visual connectivity between the arenas and support spaces for spectators and facility staff.

PROS• Compact envelope• Good functionality

CONS• Large blank elevations and massing• Inactive frontage on 18th Street• Limited visibility into arenas from lobby

PROS• Good active street frontage to 18th Street

CONS• Difficulty in achieving efficient facility operations by both staff

and users• Significant grade differential across site creates long,

large streetwall facing school• Additional cost from the need for two separate ice resurfacing

and mechanical spaces• Challenges in achieving vehicular circulation

and parking provision

PROS• Good active street frontage to 18th Street

CONS• Insufficient space for a circulation route between lobby/

front of house and change rooms/second ice sheet• Unable to achieve vehicular access and parking provision• Does not meet zoning setbacks – too close to property lines

PROS• Active elevation and presence on 18th Street• Good functionality• Strong visual connections between arenas, lobby and street

CONS• Slight increase in building envelope area

L-SHAPED

South Burnaby Arena

Good roof drainage is achieved by lowering the corners, which further reduces the building height at the edges. This is possible due to the shorter diagonal spans resulting in shallower beam depths.

PROJECT PRINCIPLE

“The South Burnaby Arena will be a good neighbour.”

HOW?

By sensitively integrating the large building volume into the site in a way which respects the Byrne Creek Secondary School and future Southgate Neighbourhood using urban design strategies.

STRATEGY 1 STRATEGY 3STRATEGY 2 STRATEGY 4

N

N

Scho

ol D

rivew

ay

Scho

ol D

rivew

ay

Scho

ol D

rivew

ay

Scho

ol

Drivew

ay

18th Street

18th Street

18th Street

18th Street

18th Street 18th Street

10th

Ave

nu

e

Sch

oo

l D

rive

way

18th Street 18th Street

10th

Ave

nu

e

Sch

oo

l D

rive

way

18th Street 18th Street

10th

Ave

nu

e

Sch

oo

l D

rive

way

18th Street 18th Street

10th

Ave

nu

e

Sch

oo

l D

rive

way

Page 4: Context and Site Analysis - BurnabyThings+To+Do/Community+Centr… · Vision Concept Options Design Response South Burnaby Arena will be a welcoming and functional facility which

N

Plans

LEVEL 2 PLAN

c Examples of connections between spectators and participants at West Vancouver Community Centre, BC (top), and Legends Centre Oshawa, ON (bottom)

c Example of light and bright lobby and social spaces at Timms Community Centre in Langley, BC

South Burnaby Arena

The proposed concept has been developed to offer the following advantages:

Strong visual connection between the lobby social space and street that addresses the urban design objectives by providing an active animated street frontage to the surrounding neighbourhood.

Functional layout with good operational flow based on arena design best practice, for both technical operations and users, while also meeting a variety of different programming needs.

Good visual connection between arenas and lobby social space. This creates a variety of warm viewing areas for spectators and encourages participation in the sports programs.

LEGEND

Arena: Sports Field Spectator Area

Arena: Players Service Social Space

Multi-purpose Spaces Arena Services

Officials & Reception

18TH STREET

18TH STREET

DOWN

DOWN

OPEN TO BELOW

OPEN TO BELOW

MULTI-PURPOSE

STORAGE

MEETING

MECHANICAL

VIEWING

OPEN TO BELOW

STAFF

ROOF BELOWROOF BELOW

ROOF BELOW

MECH.

OFFICESW.C.

FW.C.

M

UNIV.

DOWN

BOILER ROOM

UP

DRENCH /EYEWASH

DATE:

SCALE:

HC

MA

Arc

hit

ectu

re +

Des

ign

Sui

te 4

00 -

675

Wes

t H

astin

gs A

venu

eVan

couv

er B

C V

6B 1

N2

Can

ada

T

604

.732

.662

0

W

hcm

a.ca

1:500

A11MAY_26_2017

--COMPLEX_(SBIAC)

SOUTH_BURNABY_ICE_ARENA

UP

UP

1 2

3

4

5

6

7

8

910

13

14

15

16

17

18*

11*

12

1 2

3

4

5

6

7

8

910

13

14

15

16

17

18*

11*

12

1 2

3

4

5

6

7

8

910

13

14

15

16

17

18*

11*

12

RINK A

RINK B

12

3

4

5

6

7

8

9 10

13

14

15

16

17

18*

11*

12

12

3

4

5

6

7

8

9 10

13

14

15

16

17

18*

11*

12

CHANGEB1

CHANGEB2

CHANGEB3

CHANGEB4

CHANGEB5

12

345678

910

13 14 15 16 17

18*

11*

12

12

345678

910

13 14 15 16 17

18*

11*

12

12

3456

78

9*

10 13

14*

11 12

12

345678

910

13 14 15 16 17

18*

11*

12

12

345678

910

13 14 15 16 17

18*

11*

12

CHANGEA1

CHANGEA2

CHANGEA3

CHANGEA4

CHANGEA5

REFRIGERATION MAINTENACESTORAGE

W.C.F

W.C.M

SKATESHOP

WATERENTRY

CONC.

UNIV.

CASH

RECEPTION

DOWN

OFFICE

REFREF FIRSTAID

LOBBY

ICE RESURFACINGRINK A

ICE RESURFACINGRINK B

MAINTENACESTORAGE

ELECTRICAL

ICE PIT

JAN.

MAIN ENTRY

EXIT

PLA

YE

R B

OX

1P

LAY

ER

BO

X 2

EXIT

EXIT

EXIT

EXIT

EXIT

EXIT

UP

PROGRAM STORAGEPROGRAMSTORAGE

DATE:

SCALE:

HC

MA

Arc

hit

ectu

re +

Des

ign

Sui

te 4

00 -

675

Wes

t H

astin

gs A

venu

eVan

couv

er B

C V

6B 1

N2

Can

ada

T 6

04.7

32.6

620

W h

cma.

ca1:500

A10MAY_26_2017

--COMPLEX_(SBIAC)

SOUTH_BURNABY_ICE_ARENA

ME

CH

AN

ICA

LR

OO

M

0 5 25m

Page 5: Context and Site Analysis - BurnabyThings+To+Do/Community+Centr… · Vision Concept Options Design Response South Burnaby Arena will be a welcoming and functional facility which

N

Landscape and Sustainability

South Burnaby Arena

Use of natural light

Sustainable landscape design

High efficiency mechanical & refrigeration systems

High efficiency lighting

Heat recovery

Energy saving measures

Contributes to social sustainability of wider area by providing an important community hub

Low consumption plumbing fixtures & fittings

Bike Lane Perimeter Sidewalk Raised Crossing Planted Boulevard Planted Swale Parking Access WalkwayBleacher-Style Seating/Retainer ElementStreet Tree Planting

LANDSCAPE PLAN

PRECEDENT EXAMPLES SUSTAINABILITY STRATEGIES

d Stepped seating and landscaped banks d Planted swales for rainwater capture in the parking lot The following have been integrated into the design:

0 5 25m

Page 6: Context and Site Analysis - BurnabyThings+To+Do/Community+Centr… · Vision Concept Options Design Response South Burnaby Arena will be a welcoming and functional facility which

Views

South Burnaby Arena

CONCEPT RENDER 1

CONCEPT RENDER 2

View from neighbouring tower in future Southgate Development

View from within rink.

Page 7: Context and Site Analysis - BurnabyThings+To+Do/Community+Centr… · Vision Concept Options Design Response South Burnaby Arena will be a welcoming and functional facility which

Views

South Burnaby Arena

CONCEPT RENDER 3

CONCEPT RENDER 4

View from 18th Street looking towards the transparent, active and welcoming entrance lobby and social space.

Interior view from within reception, lobby and social space.

Page 8: Context and Site Analysis - BurnabyThings+To+Do/Community+Centr… · Vision Concept Options Design Response South Burnaby Arena will be a welcoming and functional facility which

Next Steps

South Burnaby Arena

Feasibility Study & Concept Design

Review Feedback

Completion of Concept Design

Commence Detailed Design

Community Review at Public Open House

Complete Detailed Design

Anticipated Construction Start-date

FALL 2017

WINTER 2017

14 SEPTEMBER 2017

SUMMER 2018

FALL 2018

You are here!