CONTENT LIST

S. NO. CONTENTS PAGE NO.

1.0 EXECUTIVE SUMMARY 1

2.0 INTRODUCTION OF THE PROJECT/ BACKGROUND INFORMATION 3

(i) IDENTIFICATION OF PROJECT & PROJECT PROPONENT 3

(ii) BRIEF DESCRIPTION OF NATURE OF THE PROJECT 3

(iii) NEED FOR THE PROJECT & ITS IMPORTANCE TO THE COUNTRY /REGION 4

(iv) DEMAND-SUPPLY GAP 4

(v) IMPORTS VS. INDIGENOUS PRODUCTION 4

(vi) EXPORT POSSIBILITY 5

(vii) DOMESTIC/EXPORT MARKETS 5

(viii) EMPLOYMENT GENERATION (DIRECT AND INDIRECT) DUE TO THE

PROJECT

5

3.0

PROJECT DESCRIPTION 5

(i) TYPE OF PROJECT INCLUDING INTERLINKED AND INDEPENDENT

PROJECTS, IF ANY

5

(ii) LOCATION (MAP SHOWING GENERAL LOCATION, SPECIFIC LOCATION,

AND PROJECT BOUNDARY & PROJECT SITE LAYOUT) WITH COORDINATES

6

(iii) DETAILS OF ALTERNATIVE SITE CONSIDERED 8

(iv) SIZE OR MAGNITUDE OF OPERATION 8

(v) PROJECT DESCRIPTION WITH PROCESS DETAILS 8

(vi) RAW MATERIAL REQUIRED ALONG WITH ESTIMATED QUANTITY, LIKELY

SOURCE, MARKETING AREA OF FINAL PRODUCTS, MODE OF TRANSPORT

OF RAW MATERIAL AND FINISHED PRODUCT

10

(vii) RESOURCES OPTIMIZATION/ RECYCLING AND REUSE ENVISAGED IN THE

PROJECT, IF ANY, SHOULD BE BRIEFLY OUTLINED

10

(viii) AVAILABILITY OF WATER ITS SOURCE, ENERGY /POWER REQUIREMENT

AND SOURCE

10

(ix) QUANTITY OF WASTE TO BE GENERATED (LIQUID AND SOLID) AND

SCHEME FOR THEIR MANAGEMENT/DISPOSAL

11

4.0 SITE ANALYSIS 11

(i) CONNECTIVITY 11

(ii) LAND FORM, LAND USE AND LAND OWNERSHIP 11

(iii) TOPOGRAPHY 12

(iv) EXISTING LAND USE PATTERN {AGRICULTURE, NON-AGRICULTURE,

FOREST, WATER BODIES (INCLUDING AREA UNDER CRZ)}, SHORTEST

DISTANCES FROM THE PERIPHERY OF THE PROJECT TO PERIPHERY OF THE

FORESTS, NATIONAL PARK, WILD LIFE SANCTUARY, ECO SENSITIVE AREAS,

WATER BODIES (DISTANCE FROM THE HFL OF THE RIVER), CRZ. IN CASE OF

NOTIFIED INDUSTRIAL AREA, A COPY OF THE GAZETTE NOTIFICATION

12

(v) EXISTING INFRASTRUCTURE 15

(vi) SOIL CLASSIFICATION 15

Page 3: CONTENT LIST · 2017-08-02 · LANDLESS LABORERS (BRIEF OUTLINE TO BE GIVEN) 17 ... Earmuffs/earplugs will be provided to all operators and employees working near the machinery. Proper

ii

S. NO. CONTENTS PAGE NO.

(vii) CLIMATIC DATA FROM SECONDARY SOURCES 15

(viii) SOCIAL INFRASTRUCTURE AVAILABLE 15

5.0 PLANNING BRIEF 15

(i) PLANNING CONCEPT (TYPE OF INDUSTRIES, FACILITIES, AND

TRANSPORTATION ETC.) TOWN AND COUNTRY PLANNING/DEVELOPMENT

AUTHORITY CLASSIFICATION

15

(ii) POPULATION PROJECTION 15

(iii) LAND USE PLANNING 15

(iv) ASSESSMENT OF INFRASTRUCTURE DEMAND (PHYSICAL & SOCIAL) 15

(v) AMENITIES/FACILITIES 15

6.0 PROPOSED INFRASTRUCTURE 16

(i) INDUSTRIAL AREA (PROCESSING AREA) 16

(ii) RESIDENTIAL AREA (NON PROCESSING AREA) 16

(iii) GREEN BELT DEVELOPMENT 16

(iv) SOCIAL INFRASTRUCTURE 16

(v) CONNECTIVITY 16

(vi) DRINKING WATER MANAGEMENT (SOURCE & SUPPLY OF WATER) 16

(vii) SEWERAGE SYSTEM 16

(viii) INDUSTRIAL WASTE MANAGEMENT 16

(ix) SOLID WASTE MANAGEMENT 16

(x) POWER REQUIREMENT & SUPPLY/SOURCE 17

7.0 REHABILITATION AND RESETTLEMENT (R & R) PLAN 17

(i) POLICY TO BE ADOPTED (CENTRAL/STATE)IN RESPECT OF THE PROJECT

AFFECTED PERSONS INCLUDING HOME OUSTEES, LAND OUSTEES AND

LANDLESS LABORERS (BRIEF OUTLINE TO BE GIVEN)

17

8.0 PROJECT SCHEDULE & COST ESTIMATES 17

(i) LIKELY DATE OF START OF CONSTRUCTION AND LIKELY DATE OF

COMPLETION (TIME SCHEDULE FOR THE PROJECT TO BE GIVEN)

17

(ii) ESTIMATED PROJECT COST ALONG WITH ANALYSIS IN TERMS OF

ECONOMIC VIABILITY OF THE PROJECT

17

(iii) ECONOMIC VIABILITY 17

9.0 ANALYSIS OF PROPOSAL 17

Page 4: CONTENT LIST · 2017-08-02 · LANDLESS LABORERS (BRIEF OUTLINE TO BE GIVEN) 17 ... Earmuffs/earplugs will be provided to all operators and employees working near the machinery. Proper

iii

LIST OF TABLES

TABLE NO. NAME PAGE NO.

1. SALIENT FEATURES OF THE PROJECT 1

2. EMPLOYMENT GENERATION 5

3. MINING DETAILS 9

4. WATER REQUIREMENT 10

5. LAND DETAILS 12

6. ENVIRONMENTAL SETTINGS DETAILS 13

LIST OF FIGURES

FIGURE NO. NAME PAGE NO.

1. LOCATION MAP 7

2. MAP SHOWING 10 KM RADIUS STUDY AREA 14

ANNEXURES LIST

S. NO ANNEXURE ANNEXURE NO.

1. KHASRA MAP I

2. LEASE DOCUMENTS II

3. POWER OF ATTORNEY III

Page 5: CONTENT LIST · 2017-08-02 · LANDLESS LABORERS (BRIEF OUTLINE TO BE GIVEN) 17 ... Earmuffs/earplugs will be provided to all operators and employees working near the machinery. Proper

Ahirgaon Limestone Mining Project (ML Area: 2130.015 ha) Limestone Production Capacity 3.75 million TPA

At Villages – Bhumkahar, Ahirgaon, Bachwai, Karhi Kothar, Gaura, Rampur Chourasi, Bhad, Sagma & Majhgawan, Tehsil – Raghuraj Nagar , District–

Satna (Madhya Pradesh)

Pre Feasibility Report

M/s. Talavadi Cement Ltd. 1

PRE-FEASIBILITY REPORT

1.0 EXECUTIVE SUMMARY

M/s. Talavadi Cement limited has proposed Ahirgaon Limestone Mining Project (Area: 2130.015 ha)

with limestone Production capacity 3.75 million TPA at Villages Bhumkahar, Ahirgaon, Bachwai,

Karhi Kothar, Gaura, Rampur Chourasi, Bhad, Sagma & Majhgawan, Tehsil Raghuraj Nagar,

District–Satna (Madhya Pradesh).

Table - 1

S. No. Particulars Details

A. Nature of the Project Limestone Mining Project

B. Size of the Project

1. Mining Lease area 2130.015 ha

2. Proposed Limestone Production capacity 3.75 million TPA

C. Location Details

1. Villages Bhumkahar, Ahirgaon, Bachwai, Karhi Kothar, Gaura,

Rampur Chourasi, Bhad, Sagma & Majhgawan

2. Tehsil Raghuraj Nagar

3. District Satna

4. State Madhya Pradesh

5. Latitude & Longitude 240 35’ 45.2’’ 240 38’ 47.0’’ N

800 45’ 20.3’’ 800 49’ 22.6’’ E

6. Toposheet No. 63 D/10, 63 D/14

D. Cost Details

1. Total Project Cost Rs. 20.2 Crores/-

2. Cost for Environment Protection Measures Capital Cost: Rs. 20 Crores/-

Recurring Cost: Rs. 1.0 Crores/Annum

E. Requirements of The Project

1. Water Requirement

100 KLD

Source: Water will be sourced from bore well & tube well.

2. Power Requirement 2 MW

Source: MPSEB grid

3. Man Power Requirement Totally outsourced manpower through contract mining

Page 6: CONTENT LIST · 2017-08-02 · LANDLESS LABORERS (BRIEF OUTLINE TO BE GIVEN) 17 ... Earmuffs/earplugs will be provided to all operators and employees working near the machinery. Proper

Ahirgaon Limestone Mining Project (ML Area: 2130.015 ha) Limestone Production Capacity 3.75 million TPA

At Villages – Bhumkahar, Ahirgaon, Bachwai, Karhi Kothar, Gaura, Rampur Chourasi, Bhad, Sagma & Majhgawan, Tehsil – Raghuraj Nagar , District–

Satna (Madhya Pradesh)

Pre Feasibility Report

M/s. Talavadi Cement Ltd. 2

ENVIRONMENTAL MANAGEMENT PLAN

� AIR QUALITY MANAGEMENT

� Sharp drill bits will be used for drilling to reduce generation of dust.

� Drilling machines will be equipped with water spraying system to prevent dust from getting

air borne.

� Control Blasting will be done. Use of Non electric ignition system, millisecond delay

detonators and optimizing the blasting parameters to control & prevent the dust from

getting air borne will be made to control the fly rock.

� Rock breaker will be used for breaking over sized boulders, which eliminates the generation

of dust due to secondary blasting activities.

� Periodical water spraying on the haul roads will be done.

� De-dusting system will be provided at crushing plant with bag filter arrangements to collect

the dust generated during crushing. Besides water spraying will also be done to suppress

the dust.

� Green Belt will be developed around the periphery of the mining lease, along the roads,

crushing plant, office, workshop etc.

� WATER QUALITY MANAGEMENT

Adequate control measures will be adopted to check not only the wash-off from soil erosion but

also uncontrolled flow of mine water. The measures to be adopted are:

� Garland drains will be provided around the pit to prevent the entry of rainwater into the

mining pit.

� Garland drain/ filtration bund will be provided around dumps to retain the water percolation

coming from waste dumps for settling of solid particles. Clear water will be allowed to flow

in natural courses.

� Septic tanks and soak pits will be provided for the disposal of domestic effluents.

� Rainwater falling in the catchments area of mining pit will be collected in sump of mines i.e.

in lower benches

� Periodical testing of mine water is being carried out to check its quality.

� Ground water level is being monitored by piezo-meters in the project area

� NOISE QUALITY MANAGEMENT

All precautions are being taken to keep noise levels within the prescribed standards:

� Drilling will be carried out with the help of sharp drill bits which will help in reducing noise.

� Control Blasting will be carried out to minimize vibration.

� Rock breaker will be used to avoid secondary blasting

� Earmuffs/earplugs will be provided to all operators and employees working near the

machinery.

� Proper maintenance, oiling and greasing of machines at regular intervals will be done to

reduce generation of noise.

� Plantation will be done around lease, along haul road, around crusher etc. to minimize the

propagation of noise.

� Periodical monitoring will be done.

Page 7: CONTENT LIST · 2017-08-02 · LANDLESS LABORERS (BRIEF OUTLINE TO BE GIVEN) 17 ... Earmuffs/earplugs will be provided to all operators and employees working near the machinery. Proper

Ahirgaon Limestone Mining Project (ML Area: 2130.015 ha) Limestone Production Capacity 3.75 million TPA

At Villages – Bhumkahar, Ahirgaon, Bachwai, Karhi Kothar, Gaura, Rampur Chourasi, Bhad, Sagma & Majhgawan, Tehsil – Raghuraj Nagar , District–

Satna (Madhya Pradesh)

Pre Feasibility Report

M/s. Talavadi Cement Ltd. 3

� GREEN BELT DEVELOPMENT /PLANTATION

� At the end of life of mine, 15.0 ha will be covered under Green belt / Plantation area.

� At the conceptual stage of mining the worked out pit will be converted in to water reservoir

and green belt will be developed in 15.0 ha earmarked area within the premises

� Plantation shall be carried out as per CPCB/MPCB guidelines.

2.0 INTRODUCTION OF THE PROJECT/ BACKGROUND INFORMATION

(I) IDENTIFICATION OF PROJECT AND PROJECT PROPONENT

� IDENTIFICATION OF PROJECT

Ahirgaon Limestone Mining Project (ML Area: 2130.015 ha) Limestone Production Capacity

3.75 million TPA at Villages Bhumkahar, Ahirgaon, Bachwai, Karhi Kothar, Gaura, Rampur

Chourasi, Bhad, Sagma & Majhgawan, Tehsil Raghuraj Nagar, District Satna (Madhya

Pradesh) of M/s. Talavadi Cement Limited is a subsidiary of M/s. Birla Corporation Ltd.

As per EIA Notification dated 14th Sep, 2006 as amended till date, the project falls under

Project or Activity ‘1 (a)’, Category “A”.

� IDENTIFICATION OF PROJECT PROPONENT

Applicant

: M/s. Talavadi Cements Ltd.

Birla Building, 3-4 floor Ahura Centre, 2nd Floor, Mahakali

Caves Roads, Andheri (East), Mumbai – 400 093

M/s. Talavadi Cements Limited is a subsidiary of M/s. Birla Corporation Limited.

Birla Corporation Limited (BCL) is a multi product, multi-interest conglomerate. It plays a

significant role in the cement industry & is one of the pioneers in the Cement manufacturing

business.

BCL plays a major role in the manufacturing of cement, jute, blended yarns, vinoleum

flooring, carbide, industrial gases, auto trim and steel casting industries.

BCL is always committed to adopt innovative ideas and installing world class machines and

technology. BCL is also committed to the environment and always stands as a front runner

for energy saving and conservation of natural resources.

BCL has taken an initiative to reduce CO2 emission by installing WHRS in both the plants and

plays a key role in reducing overall GHG emission and global warming. The company has

been certified by ISO-14001 & ISO-9001 certification.

Birla Corporation Limited is an India-based company. The Company's cement is marketed

under the brand names of Birla Cement KHAJURAHO, Birla Cement CHETAK and Birla

Cement SAMRAT.

II. BRIEF DESCRIPTION OF THE NATURE OF PROJECT

M/s. Talavadi Cement Ltd has proposed Greenfield Proposed Integrated Cement Project

(Clinker 2 MTPA, Cement 3 MTPA, Captive Power Plant 30 MW, WHRS 3 MW & D.G. Set 4

MW) at Villages Bhumkahar, Ahirgaon, Bachwai, Karhi Kothar, Gaura, Rampur Chourasi,

Bhad, Sagma & Majhgawan, Tehsil Raghuraj Nagar, District Satna (Madhya Pradesh).

Page 8: CONTENT LIST · 2017-08-02 · LANDLESS LABORERS (BRIEF OUTLINE TO BE GIVEN) 17 ... Earmuffs/earplugs will be provided to all operators and employees working near the machinery. Proper

Ahirgaon Limestone Mining Project (ML Area: 2130.015 ha) Limestone Production Capacity 3.75 million TPA

At Villages – Bhumkahar, Ahirgaon, Bachwai, Karhi Kothar, Gaura, Rampur Chourasi, Bhad, Sagma & Majhgawan, Tehsil – Raghuraj Nagar , District–

Satna (Madhya Pradesh)

Pre Feasibility Report

M/s. Talavadi Cement Ltd. 4

In order to meet the raw material requirement (limestone) for their proposed Cement

plant, M/s TCL has proposed Ahirgaon Limestone Mining Project (ML Area: 2130.015 ha)

Limestone Production Capacity 3.75 million TPA at Villages Bhumkahar, Ahirgaon, Bachwai,

Karhi Kothar, Gaura, Rampur Chourasi, Bhad, Sagma & Majhgawan, Tehsil Raghuraj Nagar,

District Satna (Madhya Pradesh).

MINING LEASE STATUS

� The applied area was initially sanctioned under prospecting license to M/s Phoenix

International Ltd., New Delhi for 2 years period vide State Government order no. 2-

328/92/12/2/3 dated 10.10.1993 with effect from date 23.12.1993 to 22.12.1995.

� The area sanctioned was 2461.754 Ha and the sanctioned area under ML is 2130.015 ha

which is part of PL area. The State Government cancelled the application of M/s

Phoenix International Ltd. Vide. order no. 3-128/1/1995/12/2 dated 02.12.2006. The area

was thrown open vide MP Gazette notification dated 02.03.2007 for erection of big

industry.

� The applicant applied for grant of mining lease vide application dated 02.04.2007 over

2461.754 Ha of thrown open area. The area being more than 10 sq km, permission under

Section 6 (1) (b) MMDR Act 1957 has been accorded by the Central Government vide

order no. 4/107/2008-M.IV dated 08.01.2012. The State Government of MP has taken

decision to grant precise area under mining lease and communicated such decision vide

letter No. 454/367/2010/12/1 Bhopal Dated 29.01.2013 (Copy of the same has been

enclosed as Annexure-II).

Screening category of Project

As per EIA Notification dated 14th Sep, 2006 as amended till date, the project falls under

Category “A”, Project or Activity 1(a)(3).

III. NEED FOR THE PROJECT & ITS IMPORTANCE TO THE COUNTRY/ REGION

In order to meet the raw material requirement (limestone) for their proposed Cement

plant, M/s TCL has proposed Ahirgaon Limestone Mining Project (ML Area: 2130.015 ha)

Limestone Production Capacity 3.75 million TPA at Villages Bhumkahar, Ahirgaon, Bachwai,

Karhi Kothar, Gaura, Rampur Chourasi, Bhad, Sagma & Majhgawan, Tehsil Raghuraj Nagar,

District Satna (Madhya Pradesh).

With respect to the importance of the project to the nation, it can be well said that in a

developing nation like India, cement is essential for infrastructural development. Thus,

keeping in mind this requirement, mining of limestone is essential for the nation`s growth.

IV. DEMAND – SUPPLY GAP

Limestone produced from the limestone mine will meet the requirement/demand of

limestone for the Cement Plant of M/s. Talavadi Cements Limited.

V. IMPORTS VS. INDIGENOUS PRODUCTION

Limestone produced from the Ahirgaon Limestone Mine will be used for captive purpose in

the proposed Cement Plant of Talavadi Cement Ltd.

Page 9: CONTENT LIST · 2017-08-02 · LANDLESS LABORERS (BRIEF OUTLINE TO BE GIVEN) 17 ... Earmuffs/earplugs will be provided to all operators and employees working near the machinery. Proper

Ahirgaon Limestone Mining Project (ML Area: 2130.015 ha) Limestone Production Capacity 3.75 million TPA

At Villages – Bhumkahar, Ahirgaon, Bachwai, Karhi Kothar, Gaura, Rampur Chourasi, Bhad, Sagma & Majhgawan, Tehsil – Raghuraj Nagar , District–

Satna (Madhya Pradesh)

Pre Feasibility Report

M/s. Talavadi Cement Ltd. 5

VI. EXPORT POSSIBILITY

Not applicable as mine is for captive use.

VII. DOMESTIC/EXPORT MARKETS

Limestone produced from Ahirgaon Limestone Mine will be utilized for captive use in the

cement plant. Thus there will be no other users for the limestone from this mine.

VIII. EMPLOYMENT GENERATION (DIRECT AND INDIRECT) DUE TO THE PROJECT

Since inception of mining activites in production of limestone mineral from this mining

project is beneficial. Direct and indirect employment will be generated when the need

arises due to the project. Unskilled /semi skilled manpower can be sourced from the local

area and skilled manpower will be sourced from outside. About 150 manpower including

technical, supervisory staff, wage board employees, officers and staff will be required for

the mining activities.

Table – 2

S. No. Category No. of persons

1. Mining Eng./First Class Mines Manager 2

2. Second Class Mines Manager 4

3. Mechanical Eng. 2

4. Mining Surveyor 1

5. Geologist 1

6. Electrical Foreman 1

7. Mines Foreman 4

8. Mechanical Foreman 4

9. Skilled 35

10. Semi skilled 50

11. Unskilled 46

Total 150

3.0 PROJECT DESCRIPTION

(i) TYPE OF PROJECT INCLUDING INTERLINKED AND INDEPENDENT PROJECTS, IF ANY

Ahirgaon Limestone Mining Project (ML Area: 2130.015 ha) Limestone Production Capacity

3.75 million TPA at Villages Bhumkahar, Ahirgaon, Bachwai, Karhi Kothar, Gaura, Rampur

Chourasi, Bhad, Sagma & Majhgawan, Tehsil Raghuraj Nagar, District–Satna (Madhya

Pradesh)of M/s. Talavadi Cement Ltd. is a subsidiary of M/s. Birla Corporation Ltd.

INTERLINKED PROJECT:

Greenfield Proposed Integrated Cement Project (Clinker 2 MTPA, Cement 3 MTPA, Captive

Power Plant 30 MW, WHRS 3 MW & D.G. Set 4 MW) at Villages – Bhumkahar, Ahirgaon,

Bachwai, Karhi Kothar, Gaura, Rampur Chourasi, Bhad, Sagma & Majhgawan, Tehsil

Raghuraj Nagar, District–Satna (Madhya Pradesh).

Page 10: CONTENT LIST · 2017-08-02 · LANDLESS LABORERS (BRIEF OUTLINE TO BE GIVEN) 17 ... Earmuffs/earplugs will be provided to all operators and employees working near the machinery. Proper

Ahirgaon Limestone Mining Project (ML Area: 2130.015 ha) Limestone Production Capacity 3.75 million TPA

At Villages – Bhumkahar, Ahirgaon, Bachwai, Karhi Kothar, Gaura, Rampur Chourasi, Bhad, Sagma & Majhgawan, Tehsil – Raghuraj Nagar , District–

Satna (Madhya Pradesh)

Pre Feasibility Report

M/s. Talavadi Cement Ltd. 6

(ii) LOCATION (MAP SHOWING GENERAL LOCATION, SPECIFIC LOCATION, AND PROJECT

BOUNDARY & PROJECT SITE LAYOUT) WITH COORDINATES

1. Villages Bhumkahar, Ahirgaon, Bachwai, Karhi Kothar, Gaura,

Rampur Chourasi, Bhad, Sagma & Majhgawan

2. Tehsil Raghuraj Nagar

3. District Satna

4. State Madhya Pradesh

5. Latitude & Longitude 240 35’ 45.2’’ 240 38’ 47.0’’ N

800 45’ 20.3’’ 800 49’ 22.6’’ E

6. Toposheet No. 63 D/10, 63 D/14

Page 11: CONTENT LIST · 2017-08-02 · LANDLESS LABORERS (BRIEF OUTLINE TO BE GIVEN) 17 ... Earmuffs/earplugs will be provided to all operators and employees working near the machinery. Proper

Ahirgaon Limestone Mining Project (ML Area: 2130.015 ha) Limestone Production Capacity 3.75 million TPA

At Villages – Bhumkahar, Ahirgaon, Bachwai, Karhi Kothar, Gaura, Rampur Chourasi, Bhad, Sagma & Majhgawan, Tehsil – Raghuraj Nagar , District–

Satna (Madhya Pradesh)

Pre Feasibility Report

M/s. Talavadi Cement Ltd. 7

Figure no. 1: Location Map Showing the General& Specific Location of the Mining Lease

Page 12: CONTENT LIST · 2017-08-02 · LANDLESS LABORERS (BRIEF OUTLINE TO BE GIVEN) 17 ... Earmuffs/earplugs will be provided to all operators and employees working near the machinery. Proper

Ahirgaon Limestone Mining Project (ML Area: 2130.015 ha) Limestone Production Capacity 3.75 million TPA

At Villages – Bhumkahar, Ahirgaon, Bachwai, Karhi Kothar, Gaura, Rampur Chourasi, Bhad, Sagma & Majhgawan, Tehsil – Raghuraj Nagar , District–

Satna (Madhya Pradesh)

Pre Feasibility Report

M/s. Talavadi Cement Ltd. 8

(iii) DETAILS OF ALTERNATE SITES CONSIDERED

No alternative site has been taken into consideration as the mineral (Limestone) is available

at this site. This is a captive Mine.

(iv) SIZE OR MAGNITUDE OF OPERATION

Ahirgaon Limestone Mining Project (ML Area: 2130.015 ha) with Limestone Production

Capacity 3.75 million TPA at Villages Bhumkahar, Ahirgaon, Bachwai, Karhi Kothar, Gaura,

Rampur Chourasi, Bhad, Sagma & Majhgawan, Tehsil Raghuraj Nagar, District–Satna

(Madhya Pradesh) of M/s. Talavadi Cement Ltd. is a subsidiary of M/s. Birla Corporation Ltd.

(v) PROJECT DESCRIPTION WITH PROCESS DETAIL

Method of Mining

Opencast fully mechanized method of mining will be done. All operations of mining will be

done by deployment of heavy earth moving machineries for deep hole drilling, excavation,

loading & transport. Various mining activities such as drilling, blasting, loading and

transportation will be so conducted as to ensure maximum mineral conservation and

minimum environmental degradation.

Sequence of Mining

� Top soil and OB removal by loader cum excavator

� Drilling

� Blasting

� Loading

� Transportation

Removal of over burden will be done by loader cum excavator. Drilling in hard strata will be

done by DTH drills of hole dia 115 to 150 mm. For blasting, three types of explosives will be

used i.e. Emulsion explosives (cap sensitive), Slurry explosive (cap sensitive) and ANFO

(Non cap sensitive). Cap sensitive explosives are used as base charge (@ 12 to 15% of total

explosive) where as non cap sensitive explosives are used as column charge. Blasting will be

done for heaving effect and fragmentation of the deposit. Blasted lime stone will be loaded

in to the dumpers by loaders and will be transported to the crushing plant. The over

burden will be loaded by loaders and transported to the dumping yard by dumpers.

Winning of limestone and handling of waste rock will be done by excavators of bucket

capacity 3.5 to 5 cum. capacity and dumpers of 35 to 60 t. capacity.

Present method of mining in Ore for production of limestone & shale:-

a) Drilling Practices:-

Height of bench 6 m

Width of bench 30 m

Slope of the bench 450 approx

Diameter of blast hole 150 mm

Depth of hole 6.60 m

Spacing 5 m

Page 13: CONTENT LIST · 2017-08-02 · LANDLESS LABORERS (BRIEF OUTLINE TO BE GIVEN) 17 ... Earmuffs/earplugs will be provided to all operators and employees working near the machinery. Proper

Ahirgaon Limestone Mining Project (ML Area: 2130.015 ha) Limestone Production Capacity 3.75 million TPA

At Villages – Bhumkahar, Ahirgaon, Bachwai, Karhi Kothar, Gaura, Rampur Chourasi, Bhad, Sagma & Majhgawan, Tehsil – Raghuraj Nagar , District–

Satna (Madhya Pradesh)

Pre Feasibility Report

M/s. Talavadi Cement Ltd. 9

Burden 4 m

No of row of holes 2

b) Blasting practice:-

For Blasting, three type of Explosive will be used-

1) Emulsion Explosive-

2) Slurry Explosive-

3) ANFO Charging:-

c) Loading & Transport system:-

Limestone from quarries will be loaded by hydraulic excavators into the dumpers & will be

dispatched to the crusher (for limestone) and waste dump (for waste and inter burden).

Limestone will be crushed at crusher located within proposed limestone mine and crushed

limestone will be transported to cement plant by overland covered Belt Conveyor.

Table – 3

Mining Details

S. No. PARTICULARS DETAILS

1. Method of Mining Opencast fully mechanized method

2. Proposed Production per year 3.75 MTPA

3. Probable Mineral Reserves 52.244736 Million Tonne

4. Life of Mine (Based on Probable Mineral

Reserves

21 Year (Detailed close grid prospecting is planned in the

first five years Mining plan period where we will able to

establish proved mineral reserve (111 as per UNFC). Then

after final life of the mine will be concluded.

5. Bench Height 6 m

6. Bench Width 30 m

7. Elevation Range 312 m RL to 322 m RL

8. General Ground Level 310 m RL

9. Ultimate Working Depth 300 m RL

10. Overall Pit Slope 450

11. Stripping ratio 1:0.20

12. Number of Working Days 300

13. Number shifts per day 2

14. Crusher Capacity 1200 TPH

15. OB/Waste to be generated during conceptual

period (Based on the influenced area

covering under probable mineral reserve

zone)

15.0 million cum

16. Total Excavated area at the conceptual period

(Based on the influenced area covering under

probable mineral reserve zone)

332.0 ha

17. Total Dumping area at the conceptual stage

(Based on the influenced area covering under

probable mineral reserve zone)

25.0 ha

Page 14: CONTENT LIST · 2017-08-02 · LANDLESS LABORERS (BRIEF OUTLINE TO BE GIVEN) 17 ... Earmuffs/earplugs will be provided to all operators and employees working near the machinery. Proper

Ahirgaon Limestone Mining Project (ML Area: 2130.015 ha) Limestone Production Capacity 3.75 million TPA

At Villages – Bhumkahar, Ahirgaon, Bachwai, Karhi Kothar, Gaura, Rampur Chourasi, Bhad, Sagma & Majhgawan, Tehsil – Raghuraj Nagar , District–

Satna (Madhya Pradesh)

Pre Feasibility Report

M/s. Talavadi Cement Ltd. 10

(vi) RAW MATERIAL REQUIRED ALONG WITH ESTIMATED QUANTITY, LIKELY SOURCE,

MARKETING AREA OF FINAL PRODUCTS, MODE OF TRANSPORT OF RAW MATERIAL AND

FINISHED PRODUCT

� This is a Limestone Mining project, thus no raw material is required.

� Limestone will be used in captive cement plant, so no marketing area is required.

� Limestone will be transported from mine up to the crusher by dumpers and to

cement plant via covered belt conveyor.

(vii) RESOURCES OPTIMIZATION/ RECYCLING AND REUSE ENVISAGED IN THE PROJECT, IF ANY,

SHOULD BE BRIEFLY OUTLINED

� No waste water will be generated from proposed limestone mine.

� Top soil will be utilized for greenbelt/plantation within the lease area.

(viii) AVAILABILITY OF WATER ITS SOURCE, ENERGY /POWER REQUIREMENT AND SOURCE

A. Water requirement:

Total water requirement for the proposed mining project will be 100 KLD which will be

sourced from Bore Well & Tube well. The breakup of water requirement and its source is

given in the following table:

Table – 4

Water Requirement

S. No Water Requirement Quantity (in KLD)

1 Mine Operation

40 2 Dust Suppression

3 Green Belt 20

4 Drinking 40

5 Other (Sanitation etc.) 00

Total 100

B. POWER REQUIREMENT

Power requirement for proposed lime stone mine will be about 2.0 MW, which will be

sourced from MPSEB grid.

C. EXTENT OF MECHANIZATION

S. No. Type Nos. Size / capacity

1. Bull Dozer

BEML (D-155 A-1)

L&T (D-155 A- 5)

1

1

63cum

10.44 cum

2. Dewatering pumps 6 290-2000 GPM

3. Explosive Van, Tata 1210 1 10 t.

4. Water Tanker with water Sprinkler 1 18000 ltr.

Page 15: CONTENT LIST · 2017-08-02 · LANDLESS LABORERS (BRIEF OUTLINE TO BE GIVEN) 17 ... Earmuffs/earplugs will be provided to all operators and employees working near the machinery. Proper

Ahirgaon Limestone Mining Project (ML Area: 2130.015 ha) Limestone Production Capacity 3.75 million TPA

At Villages – Bhumkahar, Ahirgaon, Bachwai, Karhi Kothar, Gaura, Rampur Chourasi, Bhad, Sagma & Majhgawan, Tehsil – Raghuraj Nagar , District–

Satna (Madhya Pradesh)

Pre Feasibility Report

M/s. Talavadi Cement Ltd. 11

5. Maintenance Van 1 -

6. Crane 2 3-10 t.

7. Rock Breaker L&T-90CK II 3

8. Air Compressors

KG Khosla TDS-400 1 400 cfm

KG Khosla TDS H2 – 620 1 620 cfm

9. Tractors 2

10. Maintenance Van 1 10 t.

11. Portable diesel engine driven welding set 5 10 t.

12. Surface Miner 1

13. Rammer /Ripper 2

(ix) QUANTITY OF WASTE TO BE GENERATED (LIQUID AND SOLID) AND SCHEME FOR THEIR

MANAGEMENT/DISPOSAL

A. Liquid

� Domestic Waste water generated from mine office will be disposed off in soak pits

via septic tank.

� Waste water generated from workshop due to washing of HEMM will be routed

through Treatment Plant (TP). Scrapper oil/water separator and Sand Bed will be

provided in the workshop and after treatment the same will be used for dust

suppression and plantation.

B. Solid

� Top soil will be stacked properly and will be used in plantation.

� OB generated will be stacked separately and dumped in the non- mineralized area

within the lease area.

� Dumps will be stabilized followed by plantation after maturation of dumps.

� Garland drains will be made around the dumps to check wash off during rainy

season.

4.0 SITE ANALYSIS

(i) CONNECTIVITY

The site is well connected to SH-11 (Adjacent to mine site) & to NH-75 (~ 2.5 Km in South

direction). Nearest city to the mine site is Satna (~4.0 Km in SE direction), Nearest railway

Station is at Sagma (~0.5 km) from proposed mine site.

(ii) LAND FORM, LAND USE AND LAND OWNERSHIP

Total mining lease area is 2130.015 ha which spreads in nine villages namely; Bhumkahar,

Ahirgaon, Bachwai, Karhi Kothar, Gaura, Rampur Chourasi, Bhad, Sagma & Majhgawan. The

entire area is agriculture, barren & township dominating area.

The area granted under Mining Lease is as below:

Page 16: CONTENT LIST · 2017-08-02 · LANDLESS LABORERS (BRIEF OUTLINE TO BE GIVEN) 17 ... Earmuffs/earplugs will be provided to all operators and employees working near the machinery. Proper

Ahirgaon Limestone Mining Project (ML Area: 2130.015 ha) Limestone Production Capacity 3.75 million TPA

At Villages – Bhumkahar, Ahirgaon, Bachwai, Karhi Kothar, Gaura, Rampur Chourasi, Bhad, Sagma & Majhgawan, Tehsil – Raghuraj Nagar , District–

Satna (Madhya Pradesh)

Pre Feasibility Report

M/s. Talavadi Cement Ltd. 12

TABLE – 6

Land Details

District & State Taluka Villages Area in ha

Satna (Madhya Pradesh)

Raghuraj Nagar

Bhumkahar 121.901

Ahirgaon 339.370

Bachwai 243.967

Karhi Kothar 76.191

Gaura 251.448

Rampur Chourasi 425.902

Bhad 377.487

Sagma 104.548

Majhgawan 189.201

Total Area in ha. 2130.015 ha

(iii) TOPOGRAPHY & DRAINAGE

The lease area is almost plain having gentle slope towards south. The highest level is 322m

RL towards south west while the lowest elevation is 312 m in north east.

Drainage: The main drainage of the area is through seasonal water courses situated in

south, north west and north east side of the applied area. The drainage of applied area

from north east side is towards further north east in Magardaha nalla situated at 3 km

distance. The drainage of northwest of the applied area is through chaura nala in Satna river

situated at 7.5 km in SW. The south west and southern part of the applied area has drainage

towards Satna River in south west of the applied area.

(iv) EXISTING LAND USE PATTERN {AGRICULTURE, NON-AGRICULTURE, FOREST, WATER

BODIES (INCLUDING AREA UNDER CRZ)}, SHORTEST DISTANCES FROM THE PERIPHERY OF

THE PROJECT TO PERIPHERY OF THE FORESTS, NATIONAL PARK, WILD LIFE SANCTUARY,

ECO SENSITIVE AREAS, WATER BODIES (DISTANCE FROM THE HFL OF THE RIVER), CRZ. IN

CASE OF NOTIFIED INDUSTRIAL AREA, A COPY OF THE GAZETTE NOTIFICATION.

� Total mining lease area is 2130.015 ha.

� There is no National Park, Wild Life Sanctuaries, Biosphere Reserves, Tiger Reserves,

and Wildlife Corridors etc. within 10 km radius of the mining lease area.

� Details of Environmental settings around the mine site are given in the table below

Page 17: CONTENT LIST · 2017-08-02 · LANDLESS LABORERS (BRIEF OUTLINE TO BE GIVEN) 17 ... Earmuffs/earplugs will be provided to all operators and employees working near the machinery. Proper

Ahirgaon Limestone Mining Project (ML Area: 2130.015 ha) Limestone Production Capacity 3.75 million TPA

At Villages – Bhumkahar, Ahirgaon, Bachwai, Karhi Kothar, Gaura, Rampur Chourasi, Bhad, Sagma & Majhgawan, Tehsil – Raghuraj Nagar , District–

Satna (Madhya Pradesh)

Pre Feasibility Report

M/s. Talavadi Cement Ltd. 13

Table - 7

Environmental Settings

S. No. Particulars Details

1. Nearest Town / City Satna (~4.0 km in NE direction)

2. Nearest National Highway � NH – 75 (~2.5 km in South direction)

� SH-11 (Adjacent to mine site)

3. Nearest Railway Station Sagma Railway Station (~0.5 km in East direction)

4. Nearest Airport Khajuraho Airport (~80 km in WNW direction) & Allahabad

Airport (~ 130 km in NE direction)

5. Archaeological Important Place None within 10 km radius of the mine site.

6. Ecological Sensitive Areas

(National Park, Wild Life Sanctuary,

Biosphere Reserves etc.) with in 10

km radius.

No Ecological Sensitive Areas (National Park, Wild Life

Sanctuary, Biosphere Reserves etc.) within 15 km radius of the

project site

7. Reserved / Protected Forest within

10km radius (Boundary to

boundary distance)

None, within 10 km radius of the mine site.

8. Nearest River/Dam/Reservoir � Kothlari Nadi (~ 9.0 km in North direction )

� Simrawal Nadi (~ 8.0 km in North direction)

� Chaura Nala (~ 0.3 km in West direction)

� Magardaha Nala (~ 3.0 km in NNE direction)

� Chuhar Nala (~ 7.0 km in NNE direction)

� Shyamnagar Nala (~ 6.5 km in SW direction)

� Satna River (~ 0.8 km in SW direction)

� Badkhar Nala (~ 8.00 km im ESE direction)

9. Seismic Zone Zone – II as per IS: 1893 (Part-I) : 2002

Page 18: CONTENT LIST · 2017-08-02 · LANDLESS LABORERS (BRIEF OUTLINE TO BE GIVEN) 17 ... Earmuffs/earplugs will be provided to all operators and employees working near the machinery. Proper

Ahirgaon Limestone Mining Project (ML Area: 2130.015 ha) Limestone Production Capacity 3.75 million TPA

At Villages – Bhumkahar, Ahirgaon, Bachwai, Karhi Kothar, Gaura, Rampur Chourasi, Bhad, Sagma & Majhgawan, Tehsil – Raghuraj Nagar , District–Satna (Madhya Pradesh)

Pre Feasibility Report

M/s. Talavadi Cement Ltd. 14

Figure No. 2: Environmental Setting Map

Page 19: CONTENT LIST · 2017-08-02 · LANDLESS LABORERS (BRIEF OUTLINE TO BE GIVEN) 17 ... Earmuffs/earplugs will be provided to all operators and employees working near the machinery. Proper

Ahirgaon Limestone Mining Project (ML Area: 2130.015 ha) Limestone Production Capacity 3.75 million TPA

At Villages – Bhumkahar, Ahirgaon, Bachwai, Karhi Kothar, Gaura, Rampur Chourasi, Bhad, Sagma & Majhgawan, Tehsil – Raghuraj Nagar , District–

Satna (Madhya Pradesh)

Pre Feasibility Report

M/s. Talavadi Cement Ltd. 15

v) EXISTING INFRASTRUCTURE:

The site is well connected to SH-11 (Adjacent to mine site) & to NH-75 (~ 2.5 Km in South

direction). Nearest city to the mine site is Satna (~4.0 Km in SE direction), Nearest Railway

Station is at Sagma (~0.5 Km) from proposed mine site.

vi) SOIL CLASSIFICATION

The soil within the applied area is sandy loam in nature.

vii) CLIMATIC DATA FROM SECONDARY SOURCES

The region has a tropical monsoon climate with long humid summer and short winters. The

rain fall is heavy during S-W monsoon and light during pre-monsoon season. The monsoon

normally begins during June and retracts during September. The climate of the region is

tropical and the average rainfall is 1100 mm. The maximum precipitation is received during

the rainy season with little to moderate rain during winter.

viii) SOCIAL INFRASTRUCTURE AVAILABLE

The site is well connected with social infrastructure facilities like medical, post office,

schools, police stations etc. and as such no constraints are envisaged in this aspect. Tehsil

and district headquarter are near to the site.

5.0 PLANNING BRIEF

(i) PLANNING CONCEPT (TYPE OF INDUSTRIES, FACILITIES, AND TRANSPORTATION ETC.)

TOWN AND COUNTRY PLANNING/DEVELOPMENT AUTHORITY CLASSIFICATION

This is Ahirgaon Limestone Mining Project. Limestone is transported to the captive cement

plant via covered conveyor belt.

(ii) POPULATION PROJECTION

Temporary influx of people will be there as the managerial and supervisory staff will

generally be outsider.

(iii) LAND USE PLANNING

Total mining lease area is 2130.015 ha which spreads in nine villages namely; Bhumkahar,

Ahirgaon, Bachwai, Karhi Kothra, Gaura, Rampur Chourasi, Bhad, Sagma & Majhgawan.

The entire area is agriculture, barren & township dominating area.

(iv) ASSESSMENT OF INFRASTRUCTURE DEMAND (PHYSICAL & SOCIAL)

Talavadi Cement Limited (TCL) has assessed the demand of infrastructure (Physical &

Social) in nearby area of the mine site and same will be developed under corporate social

responsibilities programs.

(v) AMENITIES/FACILITIES

Talavadi Cement Limited (TCL) will develop the Amenities/Facilities in the nearby area of

the proposed mine site as per requirement of local people of the nearby area under

corporate social responsibilities program.

Page 20: CONTENT LIST · 2017-08-02 · LANDLESS LABORERS (BRIEF OUTLINE TO BE GIVEN) 17 ... Earmuffs/earplugs will be provided to all operators and employees working near the machinery. Proper

Ahirgaon Limestone Mining Project (ML Area: 2130.015 ha) Limestone Production Capacity 3.75 million TPA

At Villages – Bhumkahar, Ahirgaon, Bachwai, Karhi Kothar, Gaura, Rampur Chourasi, Bhad, Sagma & Majhgawan, Tehsil – Raghuraj Nagar , District–

Satna (Madhya Pradesh)

Pre Feasibility Report

M/s. Talavadi Cement Ltd. 16

6.0 PROPOSED INFRASTRUCTURE

(i) INDUSTRIAL AREA (PROCESSING AREA)

Proposed limestone mining lease area is 2130.015 ha and required infrastructure for

limestone mining activities will be provided.

(ii) RESIDENTIAL AREA (NON PROCESSING AREA)

Existing facilities at Talavadi Cement Limited will be used for proposed limestone mine. At a

later stage residential colony may be developed outside the mining lease for mine workers.

(iii) GREEN BELT DEVELOPMENT

� At the conceptual stage of mining the worked out pit will be converted in to water

reservoir and green belt will be developed in 15.0 ha earmarked area within the

premises

� Green Belt will be developed around the lease boundary, haul roads and plantation will

be done on undisturbed area, reclaimed area, nearby workshop & mine office etc.

� The dead plants will be replaced by fresh plants.

� Local species will be planted after consultation with local forest officer and as per

CPCB/MPCB guidelines.

(iv) SOCIAL INFRASTRUCTURE

Proposed limestone project will result in growth of the surrounding areas by increased

direct and indirect employment including ancillary development and supporting

infrastructure.

(v) CONNECTIVITY

The site is well connected to SH-11 (Adjacent to mine site) & to NH-75 (~ 2.5 Km in South

direction). Nearest city to the mine site is Satna (~4.0 Km in SE direction), Nearest Railway

Station is Sagma Railway Station (~0.5 Km in East direction) from proposed mine site. The

site is well connected with communication facilities like telephone, fax, wireless and telex

and as such, no constraints are envisaged.

(vi) DRINKING WATER MANAGEMENT (SOURCE & SUPPLY OF WATER)

40 KLD water will be required for drinking purpose which will be sourced from Dug well &

tube well.

(vii) SEWERAGE SYSTEM

The domestic wastewater generated from mine and utilities will be disposed of Septic tanks

and soak pits.

(viii) INDUSTRIAL WASTE MANAGEMENT

No industrial waste will be generated from limestone mining activities

(ix) SOLID WASTE MANAGEMENT

� OB/rejects will be stacked separately and dumped within the lease area.

Page 21: CONTENT LIST · 2017-08-02 · LANDLESS LABORERS (BRIEF OUTLINE TO BE GIVEN) 17 ... Earmuffs/earplugs will be provided to all operators and employees working near the machinery. Proper

Ahirgaon Limestone Mining Project (ML Area: 2130.015 ha) Limestone Production Capacity 3.75 million TPA

At Villages – Bhumkahar, Ahirgaon, Bachwai, Karhi Kothar, Gaura, Rampur Chourasi, Bhad, Sagma & Majhgawan, Tehsil – Raghuraj Nagar , District–

Satna (Madhya Pradesh)

Pre Feasibility Report

M/s. Talavadi Cement Ltd. 17

� Dumps will be stabilized followed by plantation after maturation of dumps.

� Top soil will be stacked properly and will be used in plantation.

(x) POWER REQUIREMENT & SUPPLY/SOURCE

Power Requirement: 2 MW

Source: From MPSEB grid.

7.0 REHABILITATION AND RESETTLEMENT (R & R) PLAN

(i) POLICY TO BE ADOPTED (CENTRAL/STATE)IN RESPECT OF THE PROJECT AFFECTED

PERSONS INCLUDING HOME OUSTEES, LAND OUSTEES AND LANDLESS LABORERS

The entire M.L. Area i.e. 2130.015 ha is in private and govt. land and R & R is applicable as per

requirement.

8.0 PROJECT SCHEDULE & COST ESTIMATES

(i) LIKELY DATE OF START OF CONSTRUCTION AND LIKELY DATE OF COMPLETION (TIME

SCHEDULE FOR THE PROJECT TO BE GIVEN)

The mine will start after obtaining Environmental Clearance from the MoEFCC, New Delhi.

(ii) ESTIMATED PROJECT COST ALONG WITH ANALYSIS IN TERMS OF ECONOMIC VIABILITY

OF THE PROJECT (KINDLY VERIFY)

� Total cost of the Project is: Rs. 20.2 Crores/-

� Cost for Environment Protection for the Proposed Project:

o Capital cost –Rs. 1 Crores/-

o Recurring cost- Rs. 1.5 Crores/Annum

9.0 ANALYSIS OF PROPOSAL

Proposed limestone mine project will result in growth of the surrounding areas by increased direct

and indirect employment in the region including ancillary development and supporting

infrastructure.

Development of social amenities will be in the form of medical facilities, education to

underprivileged children and creation of self help groups.

No major adverse effect on environment is envisaged as the required mitigation measures will be

inbuilt in the project.

Page 22: CONTENT LIST · 2017-08-02 · LANDLESS LABORERS (BRIEF OUTLINE TO BE GIVEN) 17 ... Earmuffs/earplugs will be provided to all operators and employees working near the machinery. Proper

ANNEXURE -I

KHASRA MAP

Page 23: CONTENT LIST · 2017-08-02 · LANDLESS LABORERS (BRIEF OUTLINE TO BE GIVEN) 17 ... Earmuffs/earplugs will be provided to all operators and employees working near the machinery. Proper
Page 24: CONTENT LIST · 2017-08-02 · LANDLESS LABORERS (BRIEF OUTLINE TO BE GIVEN) 17 ... Earmuffs/earplugs will be provided to all operators and employees working near the machinery. Proper

ANNEXURE -II

MINING LEASE DOCUMENTS

Page 25: CONTENT LIST · 2017-08-02 · LANDLESS LABORERS (BRIEF OUTLINE TO BE GIVEN) 17 ... Earmuffs/earplugs will be provided to all operators and employees working near the machinery. Proper
Page 26: CONTENT LIST · 2017-08-02 · LANDLESS LABORERS (BRIEF OUTLINE TO BE GIVEN) 17 ... Earmuffs/earplugs will be provided to all operators and employees working near the machinery. Proper
Page 27: CONTENT LIST · 2017-08-02 · LANDLESS LABORERS (BRIEF OUTLINE TO BE GIVEN) 17 ... Earmuffs/earplugs will be provided to all operators and employees working near the machinery. Proper
Page 28: CONTENT LIST · 2017-08-02 · LANDLESS LABORERS (BRIEF OUTLINE TO BE GIVEN) 17 ... Earmuffs/earplugs will be provided to all operators and employees working near the machinery. Proper