contact information neighborhood council: hermon name...

19
Contact Information Neighborhood Council: Hermon Name: Jorge Quezada Phone Number: (818) 425-9976 Email: [email protected] The Board approved this CIS by a vote of: Yea(8) Nay(0) Abstain(0) Ineligible(0) Recusal(0) Date of NC Board Action: 03/08/2018 Type of NC Board Action: For Impact Information Date: 04/12/2018 Update to a Previous Input: No Directed To: City Council and Committees Council File Number: 17-0942 Agenda Date: Item Number: Summary: The Hermon Neighborhood Council (HNC) is very concerned about the Via Marisol street project located adjacent to Hermon Park at 5566 Via Marisol, Los Angeles. Via Marisol began to buckle three years ago and because of the unsafe condition, the Bureau of Street Services installed concrete barricades in August 2016, but that could have potentially increased the danger to pedestrians and moving vehicles. In August 2017, Councilmember Huizar issued an emergency motion (CF 17-0942) instructing the Bureau of Engineering to work with the CAO's office to “identify funding to address this critical infrastructure need. project is the top priority of the HNC since it official formed in October 2017. That said, we have received 18 separate community statements on this street project from concerned Hermon residents who travel this street every day and have personal accounts of the unsafe and dangerous conditions and include: (1) extreme danger to parents and kids traveling to the park, (2) concrete barricades are unsightly and gather much trash (3) several accidents have occurred due to the concrete barricades, (4) homeowners are unable to back out of their driveways, (5) bike lane was eliminated putting bikers at risk, (6) it is a main thoroughfare to the 110 freeway during morning and evening commute, (7) the street buckling is steadily increasing, (8) moving vehicles must slow down to 20 MPH and risk rear-end collisions, (9) vehicles are being damaged due to poor street condition, and (10) local high school students use the park for PE and the meandering vehicles pose a serious threat. The HNC strongly recommends that the City Council and the Mayor's Office collectively instruct the CAO's office and the Chief Legislative Analyst to complete a financial analysis to identify funding for the project. By completing a financial analysis, the project can be included in the next year's budget. There should be a permanent solution to avoid more accidents. This

Upload: others

Post on 13-Dec-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Contact Information Neighborhood Council: Hermon Name ...clkrep.lacity.org/onlinedocs/2017/17-0942_CIS_4-12-18.pdf · E-mail cherylhansen@pacbell.net Phone Number (323)2844296 Comment:

Contact Information Neighborhood Council: Hermon Name: Jorge Quezada Phone Number: (818) 425-9976 Email: [email protected] Board approved this CIS by a vote of: Yea(8) Nay(0) Abstain(0) Ineligible(0) Recusal(0) Date of NC Board Action: 03/08/2018 Type of NC Board Action: For

Impact InformationDate: 04/12/2018Update to a Previous Input: NoDirected To: City Council and CommitteesCouncil File Number: 17-0942Agenda Date:Item Number:Summary: The Hermon Neighborhood Council (HNC) is very concerned about the Via Marisol street

project located adjacent to Hermon Park at 5566 Via Marisol, Los Angeles. Via Marisol began to buckle three years ago and because of the unsafe condition, the Bureau of Street Services installed concrete barricades in August 2016, but that could have potentially increased the danger to pedestrians and moving vehicles. In August 2017, Councilmember Huizar issued an emergency motion (CF 17-0942) instructing the Bureau of Engineering to work with the CAO's office to “identify funding to address this critical infrastructure need. project is the top priority of the HNC since it official formed in October 2017. That said, we have received 18 separate community statements on this street project from concerned Hermon residents who travel this street every day and have personal accounts of the unsafe and dangerous conditions and include: (1) extreme danger to parents and kids traveling to the park, (2) concrete barricades are unsightly and gather much trash (3) several accidents have occurred due to the concrete barricades, (4) homeowners are unable to back out of their driveways, (5) bike lane was eliminated putting bikers at risk, (6) it is a main thoroughfare to the 110 freeway during morning and evening commute, (7) the street buckling is steadily increasing, (8) moving vehicles must slow down to 20 MPH and risk rear-end collisions, (9) vehicles are being damaged due to poor street condition, and (10) local high school students use the park for PE and the meandering vehicles pose a serious threat. The HNC strongly recommends that the City Council and the Mayor's Office collectively instruct the CAO's office and the Chief Legislative Analyst to complete a financial analysis to identify funding for the project. By completing a financial analysis, the project can be included in the next year's budget. There should be a permanent solution to avoid more accidents.

This

Page 2: Contact Information Neighborhood Council: Hermon Name ...clkrep.lacity.org/onlinedocs/2017/17-0942_CIS_4-12-18.pdf · E-mail cherylhansen@pacbell.net Phone Number (323)2844296 Comment:

Via Marisol Construction Project

Community Impact Statement

Community Member Input

mfiu 2,Name: Date:

ZlO 735'*5755co/yt, Phone #:Email:

ML____a MVComment:

}4a /J amm/lW/)/ /Ma

O We ■; 6/'

park . /h__road /fJ M/trt

pnoards Mi/ U'UmiML /unsatf. [rn£LL______SH­IM.

'trMf Jar lucItsJna/iX . fidyditklrai fnbud /FicFi/// IrJaf (Js#u/>-Ia-n an

r'More

d l m2.

Jnw/ne?y

usA Jhp ..//mu/it? #w/y

Vu/ Of/msu/ and sJfps ,

IP— rhv /run//

d/L

Mj/ ^/rsn/rdnce-_______Firm—

tun cum,£2

Page 3: Contact Information Neighborhood Council: Hermon Name ...clkrep.lacity.org/onlinedocs/2017/17-0942_CIS_4-12-18.pdf · E-mail cherylhansen@pacbell.net Phone Number (323)2844296 Comment:

Via Marisol Construction Project

Community Impact Statement

Community Member Input

~z/ e>\Name: Date:O

(o*^Co— ^ &Email: Phone #:

EVtS t"? ______ t<L p~4rt

s irwhs'

Comment:

wiot^r -ra ir^rgrfo-e'c?

~t [.f <PM'2-U tKi^ V Ki

M>f A^i4b by

V-yv'Y -yp-we \/o^{ \JqjW t?<MA Qhiuo^ ,

VlY'M'fe evxc?i<^: VbfX^v^ - ^.Qp’Ari.vt—. ^

Page 4: Contact Information Neighborhood Council: Hermon Name ...clkrep.lacity.org/onlinedocs/2017/17-0942_CIS_4-12-18.pdf · E-mail cherylhansen@pacbell.net Phone Number (323)2844296 Comment:

htRMPM

nCKjnB?Rn99D

Council

i"

Name Cheryl Hansen

Date 03-28-2018

E-mail [email protected]

Phone Number(323)2844296

Comment: The ongoing construction on Via Marisol nearly caused j

collision for me and another driver as it caused the drive turn sharply to avoid the concrete berms. I have been avoiding that street ever since even though it is the close route to the freeway. It is an eyesore to an otherwise lo street and a danger to the community.

Page 5: Contact Information Neighborhood Council: Hermon Name ...clkrep.lacity.org/onlinedocs/2017/17-0942_CIS_4-12-18.pdf · E-mail cherylhansen@pacbell.net Phone Number (323)2844296 Comment:

Hmn?nrtKrtKW**)c°ira. Via Marisol Construction Project

Community Impact StatementHermonNC.org

Community Member Input

3/7/13Fiona Whelan Ojic:Name

3104235734fiuhe Ian22? @gmail comEmail: Phone D:

State of Via Marisol between m oriterey rd and ave 80Comment:

This read ha; been tom up former 2 ^ears and I want to know why it t; not being txed.

futonterey Rd was rep ate d last year and to me there seemed terylitte wrong with it.

Why did th3t get funded and Via Marisol not? Myself and my child were biking down

Via Maiisol to the park and were almost knocked down when having to veer

out into the road by the barriers. I: is not <3fe. 3 times i have almost been rear-ended

when haying to slowdown for the various large bumps in the road

Please get this fixed we have waited long enough.

Please return completed form to: [email protected]

Page 6: Contact Information Neighborhood Council: Hermon Name ...clkrep.lacity.org/onlinedocs/2017/17-0942_CIS_4-12-18.pdf · E-mail cherylhansen@pacbell.net Phone Number (323)2844296 Comment:

Via Marisol Construction Project

Community Impact Statement

Community Member Input

Name: Date:

F>QSS£aw.T«LNiateT Phone#: 323-OZg 3Email:

council, filf \i-nqq-x.Comment:

Vi iv b&cki&cX) itot^ioy Akip

Ho RDffP.irllg 5Tp&ex ms

IIP "n-ttS ~Poo(2- .p-rytTfe- r><2^ ffr Lgyysx ttO(?ijgftggXT' CCMtMkK -yujo gC?MF$ *TM0k)<2. ItT- HflMV Pfc-P<Fy^cie-S. 1M{Vgjj. A^>/fRQoMD ttfg

feVHP<;, CTiFA~riK]<£> AV OfjG'Dii^e A-ecoe*5r

'tate" ~nHteflr~ . ~TBtb s iPiadaud s aee- 44.$ 0IK) ft-Tt>0<2.

Page 7: Contact Information Neighborhood Council: Hermon Name ...clkrep.lacity.org/onlinedocs/2017/17-0942_CIS_4-12-18.pdf · E-mail cherylhansen@pacbell.net Phone Number (323)2844296 Comment:

HERM9MartWIBOfinpoD

C°unaLtpr

SflHHermonNC.org

Via Marisol Construction Project

Community Impact Statement

Community Member Input

Date: March6,2018Name: hioho hioitro

Phone #: 323-252-7176Email: -odooOnoOlyhOoh.cho

Comment: hhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhh

Council File 17-0942 - Via Marisol, between 110 frwy and Monterey Road.

Monterey Rd was repaved last year and to me there seemed very little wrong with it.

Why did that get funded and Via Marisol not? Myself and my child were biking down

Via Marisol to the park and were almost knocked down when having to veer

out into the road by the barriers. It is not safe. 3 times i have almost been rear-ended

when having to slow down for the various large bumps in the road

Also our cars are being damaged by driving over such a bad street over and over again.

Please expedite a permanent repair to this disastrous street. The residence of Hermon

are asking to please repair our street. THank you

Please return completed form to: [email protected]

Page 8: Contact Information Neighborhood Council: Hermon Name ...clkrep.lacity.org/onlinedocs/2017/17-0942_CIS_4-12-18.pdf · E-mail cherylhansen@pacbell.net Phone Number (323)2844296 Comment:

Via Marisol Construction Project

Community Impact Statement

Community Member Input

Name: Lin_a Licitra Date: March L, 2018

Email: tnda_nncnaaannn.nna Phone #: 323-252-7176

Comment: tLo-mat ate 13-3306 -ViamariLanOatwaaL tt Lla/ny aLLOao-eraa OaaL,

Monterey Rd was repaved last year and to me there seemed very little wrong with it.

Why did that get funded and Via Marisol not? Myself and my child were biking down

Via Marisol to the park and were almost knocked down when having to veer

out into the road by the barriers. It is not safe. 3 times i have almost been rear-ended

when having to slow down for the various large bumps in the road

Also our cars are being damaged by driving over such a bad street over and over again.

Please expedite a permanent repair to this disastrous street. The residence of Hermon

are asking to please repair our street. THank you

Page 9: Contact Information Neighborhood Council: Hermon Name ...clkrep.lacity.org/onlinedocs/2017/17-0942_CIS_4-12-18.pdf · E-mail cherylhansen@pacbell.net Phone Number (323)2844296 Comment:

FtRM9fi , ^rtmsqw9D

CPUTKlt. Via Marisol Construction Project

Community impact StatementHermonNC.org

Community Member Input

03/04/2018Kenneth Matzkin Date;Name;

[email protected]

I think that we have waited long enough.Comment;

Via Marisol was dangerous due to buckeled asphalt, it was ignored

for too long. When Street Services came I thought that the hazzard

would finally be eliminated. I was wrong, all they did was install barricades

to route the traffic around the damaged asphalt. The rerouting may be

a greater danger than the original one. I have experienced many near

misses from the oncoming traffic as cars cross the line to avoid

hitting the concrete barricades.

Please help our neighborhood and provide us with the safe

Street we deserve.

Please return completed form to: [email protected]

Figure 1

Page 10: Contact Information Neighborhood Council: Hermon Name ...clkrep.lacity.org/onlinedocs/2017/17-0942_CIS_4-12-18.pdf · E-mail cherylhansen@pacbell.net Phone Number (323)2844296 Comment:

Mmn°n rtxreqwto C9ina Via Marisol Construction Project

Community Impact StatementHermonNC.org

Community Member Input

Tim CuSoton Date: 3-5-2018Name

timcullcton© yahco.comEmail: Phone D:

The shoring up ol Via Marisol should be of the upmost importance toCommon::

to the newly formed Hermon neighborhood council as well as Huizar. The

absence of any progress or at the very least detailed information on why we are

are now heading into 2 years since the road starting failing in my eyes is a deriect

of duty to the community. I have had a business and own a home Mr. Huizar'

district. He has shown to be fairly responsive on most matters when pressed directly.

My point of contention particularly with this project is it's close proximity to the grade

school and the park not to mention that the road wfl continue to fail as bulges are

increasing in the road and making vehicles swerve into the south b*e lanes. I have

seen several close calls between bicyclist, cars and pedestrians. Added to pressing

safety issues of the road is the High School that traverses that very road to the park

for physical education classes. No progress means an eventual accident.

Please return completed form to: [email protected]

Page 11: Contact Information Neighborhood Council: Hermon Name ...clkrep.lacity.org/onlinedocs/2017/17-0942_CIS_4-12-18.pdf · E-mail cherylhansen@pacbell.net Phone Number (323)2844296 Comment:

Hermpm■ *

'Lr-

CouncilA Via Marisol Construction Project

Community Impact StatementHermonNC.org

Community Member Input

(rdnck *-PrdiName: Date:7eccA)

/ />? e /71 h f&L Phone #: Sp3/ 3<Email:

/> /(tf. • i

// 7m<7e U /Comment: ^3 ^

f

/ //^ /W &L± 7=/&>tY /?C 'Ss/AScy

e / -

__^____ fi/scfr#/y/jL/ es d- cZS/SSjp/?&/O <£<2S/l>g

AfetcefZ * &M7 LAL r/ *- P/ye&vyysyy

£/TA £ 3>s?Af&g£0t?s s?s*jd pyr/&#/z d~ /&s& /?

/£???ss pyPAS?cryy j- /?s/yy/7' //A'/se' a/u Scs/?/y, yryp) yz>

<£**t>&y/yyt?j+.As /-/LV't/l/P AdsD /r/yc'> /lr^Tr-.D sz/7 AteryTJ}SM* At^f/YeAJS/Mrs syk sr/Ztr^T y$ yscPsyrP ^ y7~/s A /f/lss&T^Te

^ A //# /Syy-' Xy ivy s/AiA /? S/ssS A **AJ <ry>y &/=>yy yjc- urcfcse /? ysf/z- tc?/spy/*-><£

ys&y /? AsSs yy ^r/s&A £f7cyTy/uy 7/y^5Cvrs £*>&*& /Pf /*<f^A/?TSA /7Ao>srs?Ay <rsyr y-y yysyr c'srf

,/fP& #7? M.. SVi' /y rtnz*? y^zJ) y& yyji z>y^ yyyy syeer&- T&szyz/'S /?sy /yyc^/z <ss s & y> ssyypsAg:

y/y yoA 0 y yyAAS'S^y:s'

y/y?ys A?<*?/?/psjesss&

<ss'

/? /f/ jyy y L'<fs </ /psyyyry' y?/s /Sey^yssZr'SisAr&l) ■

f*/?7/Sajs <? yy^/f/rsp /y yr&s& &gsf££r py/7 y7 7sa*a y*>yZys Py^y A/g s/u? al a cyy?s//>ss, r<y a- /s&cl? yyy^ yyssy s/s?y

y7/y ysr? yy yyys's ypssysss y?ys y> ypys<osyfy-yr ^yyy stSs&'Tfeu?

FvfrJ?3 77?

7Py7/yyyy SP/yyA7 y%<s?S£ cy/yyyyy-P y />p p /yyy p yyy? Js*£&yy>y&sP c'/ssyszyrsr a/jsa?as// yu~s>sf'*yp /9ss9/P y?s/P *y y y?y?A~

s

Please return completed form to: [email protected]

Page 12: Contact Information Neighborhood Council: Hermon Name ...clkrep.lacity.org/onlinedocs/2017/17-0942_CIS_4-12-18.pdf · E-mail cherylhansen@pacbell.net Phone Number (323)2844296 Comment:

HERM9MrtlGnB9m99DCpunciL Via Marisol Construction Project

Community Impact StatementHermonNC.org

Community Member Input

'XQkA yp:! I/k ~U. y/))Qflc>k ^ -^><3o Date:Name: )

Phone #:Email:

C-A ^05 jh/3f?/hri4j>^V:£>Comment: £

<4 tpeAP.a

2^-s to Rr A .S>^ d?k.

^4-*>

'T^-f

Stn^T* /) 3o' f^>r^

iA-* /Aft -A$r fCs* Co y*'1

<Afa> J# JA/: 7^i*._&±L

tA* jA?J <% {(?\A kc ukp*fcx

lAS'fl £>& 'J& 1/^6 feb I tdrf'C—

A^sfW><W

^ t/jVr 4^^

ShajJ- 'J/)/0*id'■evUiA^y

£Aju s/- J4>

Ivl^Afr L^/m/HAZ> r- U-t

t7^/PV+JC'A oS.

Please return completed form to: [email protected]

Page 13: Contact Information Neighborhood Council: Hermon Name ...clkrep.lacity.org/onlinedocs/2017/17-0942_CIS_4-12-18.pdf · E-mail cherylhansen@pacbell.net Phone Number (323)2844296 Comment:

j—nmon& j? iiftWlWW9D|P|gCg|j3^J Va Marisol Construction Project

Community Member input

3

#>Ac/(V\Ctr(I l'p a. 3/v >*/?£'

l 'Sd<zau<3> e~ ^/t CLAc_

Vy4s- K” iso-115 f-L.^SJ e/J 4-h £—£5 «=

0CLS&- u)Ii

■ ■'Ml > — ■l...l.ll.|i„i ....

*^3/- v&-t 33*54 At 7 ^ • •'LL? «sy Z> i+-1

i jJ-^cCS <L ^3 3 A.‘**“*-> •■ ■ II.«.,,,• —»■»■■ if I-r -rn - ptuns <Z set a^L--C3JT-

h4^>„ i

£ 1/S&T5 —»■»»

/^r

(0 n <(c£<A c- 1dl rd^s?/

cuJ£2££l mljtv33Jfv'ULC !<c

y' t /c

;b 3

/■/ o■.... .

''V/ \J£L-U<L

k /ly

>

£ i/£ Ac/ci& ty ^

-ItfaLJ)a 'O® /u*.

iOlctZi 3A 0

r<zL

^{z&p Iz &L I/W /ZA^our6-<9to; in

Page 14: Contact Information Neighborhood Council: Hermon Name ...clkrep.lacity.org/onlinedocs/2017/17-0942_CIS_4-12-18.pdf · E-mail cherylhansen@pacbell.net Phone Number (323)2844296 Comment:

IWiWItmwmmCWKL

*uVia Man so! Construction Project

Community impact Statement

Community Member Input •'

\

LUO

3 it)CO[ 4 VO 0<2^ 430r<2 . « »-•■• ---—■— wx-^.v,

r

»'W «** ■*—*~

\ *

l^fvj M^l A AaA-H

tttfs DRh A ta+£ uyrsr pew

\

ir^QO AM9 tfAS K/H9C ir biLujCAMr

rO P?M? pA^McfJ^, y^ors - KDT*lM5r HTA-

flur f^r- cfornp/u Hjo.

p/ £A••h&tMmmm*:■ '■■■"»■■,.>.■:■■■->■■■*»■. ■'•■:—;•.-■■».• ft ...^«..m..m.cb~f]- TVf{ 3..&0<v£ €

*****

twvv#r,Y. w^-*«******wm*********

***"•

**

Page 15: Contact Information Neighborhood Council: Hermon Name ...clkrep.lacity.org/onlinedocs/2017/17-0942_CIS_4-12-18.pdf · E-mail cherylhansen@pacbell.net Phone Number (323)2844296 Comment:

ttwrn

C9im. via Marisol Construction Project

Community Impact Statement

Community Member Input

hi

ZL-D* %

SJW*

2,6

C

I-Vas q(m too u?fv/4 - rne i fvfMW 6^\

>/l\

>pic1

g'ttfr^ N(\ iyPX) v^tO, Ka/H^'{-A iT~ Hft-p-o -po---------------------- ’■ .......................................... .....................................................~ —“

w/wiftfer% - MmsA) ^ccij>trK^ ocoyfu^pSiN6£ Ti+c QwOA6t£ VMW4LH t-WK£

^A^CTM) pU?A^ E f\p p/U 53 TvH 5 S<?CW

mw frft-t- Hi 5 Oct H H-j r 5tWi:-M'i ^ Mt^s £y J&il J^PiJsr£ -. - .,,, ....... .................. , ,

Page 16: Contact Information Neighborhood Council: Hermon Name ...clkrep.lacity.org/onlinedocs/2017/17-0942_CIS_4-12-18.pdf · E-mail cherylhansen@pacbell.net Phone Number (323)2844296 Comment:

Via Marisol Construction Project

Community Impact Statement

Community Member Input

^\\ \X V ^ cX t X \o t $ Date:Name:

: \> e-Voc^tA^o tO ass^wlPhone #:Email:

cX*b\ Z <• w -c , CO wv

V\C\V O.X V\x \j \ ?v rSS O L \jjY\e_re ~W\ o \ sComment: o o ^

rv

V W CXr C ovOCc\ ^ ecec\ec\."X Vcxmc Xttcxr^ CrSee<> <x

(Y>\ Xr\\;cwa^ ^or

XcCccNi^c. Q-X\\\MC\ \X V30 cX^O^ejrOO^-

c\ ~Vo

CaX>\^ Vo ^ e% rV.O ov

kS Oore

Coofv\ Xo •rvxA.^o'vic c v <X'V\ rce

VkXxec <0 r\\t\ ^\r\cX cVxVxKj^ iah \l cK\ C\C

\S> ^xVt^t\A CVTvC^r QV) ■ ~“XXc AS Wo

Wc \

3

\or\r^c c (\

cxrxX Sc cyn'a m tV\\ cAe. V>ckf^\\\ XAX

W0cAa\Q \Xc XVc\^>\M £\ . C X V\c\y/c a S^wXA CJvr.^)

^ 'VcoAXo

XvvtXr\ < 1

AW^r s *> o \ X CV S VsN^V \y o\v csT^ONlc\!X

(NNfsx-O Yvoco^Xcve: Wrt.C\r\ D\ c VJ Vo

OOC OoryN/sAV^X^I Ur\^c

~Y X CnN c oA>CvC ( v « c\ Xesj t rC\\ X cocX cxc CacX e \tOV^CCcxvSe XV\^_

Q^M CM o^ F\^ cA 0» V/ rv\t<-0 ^ ^X>e\voeecs \|cV\CN^

'X^ocecA ^A-r- Voo

x'o Ckvir^> .

iWi Wo Xreewa^-

WVo Oov^Vt

cX c\ ^ Cock

OX<AcX<^^\ie VvcVt- WxC^Vt .

^e^c^cr-ovS C o fxXvXvtix AWxV XoS V^vjC

o

We f\<~~VooVWV>vS \s cx.no-V o<^

f\ncK \/tWkC\t^

r\

Page 17: Contact Information Neighborhood Council: Hermon Name ...clkrep.lacity.org/onlinedocs/2017/17-0942_CIS_4-12-18.pdf · E-mail cherylhansen@pacbell.net Phone Number (323)2844296 Comment:

hmnonrtlQf1B9Rf199DC°umcilf Via Marisol Construction Project

Community Impact StatementHermonNC.org

Community Member Input

S(X.v\Arfr M Q eg 3~ 1' IfName: Date:

/11 mouxAahd0Z/1 Com Phone#: tOlM> Hie*!

(o^nii 1 Tt li. '

Email:

Comment:

jn fftj-to ViA hansel Cwd fly4 Cim Lori hnj

6irvt+- i viuL jhat hen k pAASc^h f vneo Spf i n(y 2-0l(p~Uj±

Mm bc\v*m M britrreij f2*> finJ -\L< Mtmol

AsK/hhirtv/im-si.__htu had COntinupui awn durmy fly

b a by ■fha\

iki!5

Idit___ IS y-‘u'i ■

hnru4 '+UrDa>jhout fhn ir^cnen a most r^a^-hh^

j2Mt__2<yfe-i (un X h'Wiil kiw^ rvj hy k Unf>

Ka.V k^c»i hsfnuil. tKi

]

n 'ItvL

arc.

bu m \p has A pyr+ion of jU.r

by a Ic 'IPuil„

This IS (a Mopr .Stb U W j^' tu, frYi.L:^ Also 4Wr-^ IS nvirm

b Jcf.kgc/

L &i-ia.rW 41jp*jpAftnti -fhA-h dra/e rkir

•>

Please return completed form to: info(5)hermonnc.org

Page 18: Contact Information Neighborhood Council: Hermon Name ...clkrep.lacity.org/onlinedocs/2017/17-0942_CIS_4-12-18.pdf · E-mail cherylhansen@pacbell.net Phone Number (323)2844296 Comment:

fltRMon rtlQnB9f\n<?9DC°unciL Via Marisol Construction Project

Community Impact StatementHermonNC.org

Community Member Input

03Date:1084 K>PName:

Email: 4? Ola LrjulX jC**\ Phone#:

AM sComment:

Fc*f 6- if A. y y FT) A 5

S CArtr 7/■*?&£7 7'6F/C £

ft + C £.&j> £

■70 /Uo £<s 7 C AU't/O Ft b **+ ■

faSTS____ OF.

T/¥;o /s 07___F? c €r. ) U'/Z/F/Jl/C; r l’

Please return completed form to: [email protected]

Page 19: Contact Information Neighborhood Council: Hermon Name ...clkrep.lacity.org/onlinedocs/2017/17-0942_CIS_4-12-18.pdf · E-mail cherylhansen@pacbell.net Phone Number (323)2844296 Comment:

Ftmonm ^tlQMB9Rt199D

Cpudcil Via Marisol Construction Project

Community Impact StatementHermonNC.org

Community Member Input

Name: ftVeia.v\cleC N\qs<ck -8-18Date:

Phone#: ^2^ 8LfO"2^S'7Email: flftf • ic<. wq«k \.Con

r ^r:A -P.\e -fe P-c*IMZ.Comment:

Twc. o\a v;<^ \a«s In* We V\ y4V-\^A, UPors-e£3

by- Q>^€< 4-wc> pO y6Ar$ /Uo^Q Uaye u>e c^al^-

4~W-g. ^-ov^fc^oxn ~A~V^h4- geA^s so c<-e <*\*cA u^ocsjZ- • XL4 »$ ^

Cats do aW Aa/qw -Vue ^rg>\

kJo ^ \r^aSj 4W^Va f9v^- ^\o^o do

~Z.& AAg\/\ ~\-Q A-V>e 4cfl . 'X-4- ^ Os^isJCi.

U*L \w A'>Ccc^Qv\ 4W lolVe lo-we COi\A^V W U5^ f 4-W.

4-o gef ck^or/WK^ upWqIa to it I MnU,r ~VW,

^v-Ce-^ (S^£a^ r^ore, .___________________________________

~4-\aa.€>

<5A-Ce4-y

W> 1-^55- 4Wv> \A

Please return completed form to: [email protected]