Monitoring Report #1
Ralph J. Stephenson, P.E., P.C. Consulting Engineer 323 Hiawatha Drive Mt. Pleasant, Michigan 48853 (517) 7722537 March 15,1992
First Colony Life Insurance Building Remodeling Lynchburg, Virginia
91:37
283 &304
Dates of monitoring: March 3 and 4, 1992 (wd's 299 and 300)
Monitored from: ,
Sht #LL - issue #3, dated December 3, 1991 (wd 236) Sht #1-79 - issue #3, dated December 3, 1991 (wd 236) Sht #3-79/68 ne - issue #3, dated December 3, 1991 (wd 236) Sheet #T-79 - issue #3, dated December 3, 1991 (wd 236) Sheet #2-79/68 - issue #3, dated December 3, 1991 (wd 236) Sheet #1-68 - issue #3, dated December 3, 1991 (wd 236) Sheet #T-68 - issue #3, dated December 3, 1991 (wd 236)
Start and move in dates from Issue *3 network models:
• Lower level started in December, 1991 completed 01/09/92 (wd 262)
• 1-79 started in December, 1991 to be complete 04/10/92 (wd 328)
• 3-79/68 ne started 12/03/91 (wd 236) to be complete 04/22/92 (wd 336)
• T -79 started 01/13/92 (wd 263) to be complete 05/13/92 (wd 351)
.2-79/68 started in December, 1991 to be complete 05/18/92 (wd 354)
• 1-68 start 05/19/92 (wd 354) to be complete 10/22/92 (wd 464)
• T -68 start 10/23/92 (wd 464) to be complete 04/02/93 (wd 577)
• 3-68 e no issue #3 diagram prepared
1
![Page 2: Consulting Engineer Mt. Pleasant, Michigan 48853 · the lags must be identified immediately and corrections made if the project is to be completed as desired. I suggest close front](https://reader035.vdocuments.us/reader035/viewer/2022071023/5fd766c08fb1193ae7244cdc/html5/thumbnails/2.jpg)
/ Ralph]. Stephenson, P.E., P.e. Consulting Engineer 323 Hiawatha Drive Mt. Pleasant, Michigan 48853 (517) 772 2537 March 15, 1992
Start and move in dates from updated Issue #4 network models:
• Lower level • 1-79
• 3-79/68 ne
• T-79
• 2-79/68
• 1-68
• T-68
• 3-68 e
Actions taken:
work completed. 1st Colony moved in on 01/08/92 (261) started in December, 1991 to be complete 06/09/92 (wd 369)
started 12/03/91 (wd 236) to be complete OS/29/92 (wd 362)
started 01/13/92 (wd 263) to be complete 04/20/92 (wd 334)
started in December, 1991 to be complete 06/17/92 (375)
start 06/09/92 (wd 368) to be complete 11/11/92 (wd 478)
start 11/12/92 (wd 478) to be complete 04/22/93 (wd 591)
start 03/03/92 (wd 299) to be complete - 06/08/92 (wd 368)
• Inspected project with Mr. Steve Greene and Mr. Phil Jamerson • Reviewed current project status relative to areas not yet in work • Updated network models for areas
1-79 3-79/68 ne T-79 2-79/68 1-68 T- 68 3-68 e
• Prepared monitoring report
Summary
The main purpose of this session was to monitor the project, evaluate current
2
![Page 3: Consulting Engineer Mt. Pleasant, Michigan 48853 · the lags must be identified immediately and corrections made if the project is to be completed as desired. I suggest close front](https://reader035.vdocuments.us/reader035/viewer/2022071023/5fd766c08fb1193ae7244cdc/html5/thumbnails/3.jpg)
RalphJ. Stephenson, P.E., P.C. Consulting Engineer 323 Hiawatha Drive Mt. Pleasant, Michigan 48853 (517) 7722537 March IS, 1992
status and update the network plans as required.
Work at the lower level (LL) was completed on January 8,1992 (wd 261), one day ahead of the scheduled completion of January 9,1992 (wd 262).
Currently four areas are in work. They are the 1979 addition 1st level (1-79), the 1979/1968 non executive (ne) addition 3rd level (3-79/68 ne), the 1979 addition Terrace Level (T-79), and the 1979/1968 addition 2nd level (2-79/68).
Level 1-79 interior rough work is nearly complete except for above floor sheet metal work and some above floor electrical and fire protection work. The new Issue #4 target date for completion of move into the 1-79 area is the pm of June 9, 1992 (wd 369).
Level 3-79 / 68 ne interior rough and finish work has been completed to where new ceiling work, finish painting and carpet could proceed. The new Issue #4 target date for move into the 3-79/68 area is the pm of May 29, 1992 (wd 362).
Work at the T -79 level has proceeded through most of the bulk rough work and the floor is now ready for finish painting, installation of carpet and completion of following interior finish work. The new Issue #4 target date for completion of move into the T-79 area is the pm of Apri120, 1992 (wd 334).
At the level 2-79/68 addition most rough interior work and some interior finish work is complete, and finish painting and carpet could start soon. This will be followed by remaining interior finish operations. The new Issue #4 target date for move into the 2-79/68 area is the pm of June 17,1992 (wd 375).
As of the am of March 23,1992 (wd 313) Mr. Jamerson estimates the approximate ahead or behind position at each area measured against the Issue #3 networks, dated December 3,1992 (wd 236) as follows. These are projected lags based on progress expectations for the next few weeks.
First Level-1979 addition (1-79) Third Level-1979/68 addition (3-79/68 ne) Terrace Level- 1979 addition (T-79) Second Level - 1979/68 addition (2-79/68)
20 working day lag 25 working day lag 15 working days ahead 10 working day lag
The updating of the networks to Issue #4, dated March 3, 1992 (wd 299) incorporated the revised sequencing and times into the network. The new starting dates as established for remaining areas are listed in tabulation and narrative above.
3
![Page 4: Consulting Engineer Mt. Pleasant, Michigan 48853 · the lags must be identified immediately and corrections made if the project is to be completed as desired. I suggest close front](https://reader035.vdocuments.us/reader035/viewer/2022071023/5fd766c08fb1193ae7244cdc/html5/thumbnails/4.jpg)
/ Ralph]. Stephenson, P.E., P.e. Consulting Engineer 323 Hiawatha Drive Mt. Pleasant, Michigan 48853 (517) 772 2537 March 15, 1992
Mr. Greene, Mr. Jamerson and I prepared a full set of updated or new network models for the entire project. These were reviewed at our meetings and finish printed copies left with Mr. Greene and Mr. Jamerson for their use and distribution. The updated data appears to be achievable. However these revised plans of action must be accompanied by continuous expediting of approvals and deliveries of critical materials. If additional lags are experienced, the causes for the lags must be identified immediately and corrections made if the project is to be completed as desired.
I suggest close front end procurement attention be given the 3-68 e area for the executive offices. This will be a critical area for predictable reoccupation.
I also recommend that the project be monitored again in from 11/2 to 3 months to insure that the plan of work is being followed and to assist to pick up any deteriorating trends in project progress. Continuous monitoring and analysis efforts should be maintained by the project team agains t the issue #4 networks.
I shall be in touch with Mr. Greene shortly to determine needed, the timing of the next major monitoring and 'If, d
4
![Page 5: Consulting Engineer Mt. Pleasant, Michigan 48853 · the lags must be identified immediately and corrections made if the project is to be completed as desired. I suggest close front](https://reader035.vdocuments.us/reader035/viewer/2022071023/5fd766c08fb1193ae7244cdc/html5/thumbnails/5.jpg)
122/81
122/81
3-78/68 0 JLaLI2 3/3112
1- t4 UPDATING - 03103112
313/82
3rd Floor 79/68 non executive (3-79/68 ne) Interior work
Location Early start
Duration Eany finish
3-78/68 1 ~ 3/41111
003-SELECT NUMBER OF TEST
PILES TO BE USED & LOCATION - 1
(_urnpl_)
3/4/81 3/4/111
Late start Late finish
ACTIVITY KEY
Activity number Activity description Activity estimated duration in elapsed working days
4 3/61112
022-APPROVE NEW HVAC DESIGN &
PRICE - 4
13/02 1'2
3~/68 1 3/31112 313/12
04S-PREPARE NEW PA DESIGN & ISSUE
FOR COSTING - 1
4/81112
BalDed "lIy;ty Numbe"
01710040 046 047 048 049
045 050
LAN 017 !IAN 108
3-711/68 0 3/31112 3/31112
3/11/11
3-711/68 4 3-78168 3/11/112 3/12/112 3/131112
067-COMPLETE On-COMP INSTALL INSTALL ABOVE NEW CEILING
CEILING DUCTWORK DIFFUSERS. LIGHTS.
AT 3-7OI68NE - 4 t-------I:~~~7N:ti:C.J~R;S t-----T-------------
318/82 3112/n
3-711/68 1 314/112 3141112
046-APPROVE NEW PA DESIGN AND
PRICE - 1
AT 3-79168NE - 4
3/13112 3118192
3-711/68 2 315/112 3/6/112
06&-INSTALL NEW ABOVE CEILING
CONDUIT & WIRING
I-____ -IFOR POWER. VOICE &
DATA. PUBLIC ADDRESS SYSTEM &
4/81112 41 182 4/10/12
SPEAKERS AT 3-7Il168NE - 2
41131112
3-7111G8 0 3/6/112 3/6/112
41 141IR,-1-4-111-2----
1 3131112
072-INSTALL NEW ACOUSTIC CEILING
SUSPENSION & GRID AT 3-79168NE - 1
3/6112 192
![Page 6: Consulting Engineer Mt. Pleasant, Michigan 48853 · the lags must be identified immediately and corrections made if the project is to be completed as desired. I suggest close front](https://reader035.vdocuments.us/reader035/viewer/2022071023/5fd766c08fb1193ae7244cdc/html5/thumbnails/6.jpg)
3·711/68 0
3-7t/1I8 15 3/31t2 3/231t2
01l3-REPAINT DEMONTABLE
PARTITIONS AT 3-7Q/IleNE - 15
3/101112
3/18/112 3/181112
-------------------------3-1-,-II/..;IIR/111/112
3· 711/68 3/4/112
4 3/111112
080-INSTALL DOORS .. HARDWARE AT
3·711111eNE • 4
3-711/68 3110/112
4 3113/112
083-COMP FINISH PAINTING AND
APPLYING VINYL
OM· INSTALL NEW CARPET AT
3-711111eNE • 8
3·711/88 5 3/3/12 31t/1l2
008-PREPARE .. SUBMIT HARDWARE
SCHEDULE· 5
/
1141112
3-711168 0 ~ 313182
4 192
3-711168 0 3/61112 3161112
4/14/112 4/14/112
OO2-T/R TO ISSUE 14 " UPDATING • 031031112
4114/112 414/112
10 ~ 3·711/68 4/13/112 ~/14/112 12
4/211/02
087-1NSTALL O!lO-CLEAN EXISTING DEMOUNTABLE CEILING GRID .. PARTITIONS .. INSTALL NEW
3·711/68 4/30/112
3 5/41112
101·BALANCE HVAC SYSTEMS AT
3-7Q/IleNE - MAY WALL COVERING AT DOORS AT 3-7II/118NE ACOUSTIC TILES AT HAVE TO BALANCE
3·7!1168NE 4
3/0112 3112192 3113192 311aroZ 311 1112 3130~3131/112 3·7t/68 3/3/112
II ""'~'711/118 3/10/1l~/16/112 4 31U/1I2
311
082·ROUGH IN CONDUIT FOR
TOMBSTONES .. SEAL HOlES AT
3-7!l/1I8NE • 6
';J;;,.' .:,/ = ":,,, 002-TIR TO ISSUE 14 002·T/R TO ISSUE 14 UPDATING - 03103102 UPDATING - 03103102
311l/Vi/! 3111/92
O85-TRIM OUT NEW ELECTRICAL .. LIFE SAFETY SYSTEMS AT 3-711168NE· 4
412m..,-------z7T
3·7111118 0 JllLI2 3131112
086-TIR TO NOTIFY PUBLIC .. OTHER
AGENCIES OF DATE OF TESTING LIFE
SAFETY SYSTEMS AT 2-711188 - ?
- 10
411 1112
3·711/68NE • 12
4/14102
3·711/68 3/311112
4129192
8 4/111112
088-lNSTALL VOICE, DATA .. POWER
TOMBSTONES AT 3-7Q/88NE - 8
412.rn.T"'-----ml!l2
3·711/88 3120/112 31201 2
08I1-cONDUCT LIFE SAFETY TESTS AND APPROVE SYSTEMS
AT 3-7Q/68NE - 1
5 102
WITH OTHER AREAS OF BUILDING· 3
4130/112
3-711168 4/111112
515111
5/4192
15/112
![Page 7: Consulting Engineer Mt. Pleasant, Michigan 48853 · the lags must be identified immediately and corrections made if the project is to be completed as desired. I suggest close front](https://reader035.vdocuments.us/reader035/viewer/2022071023/5fd766c08fb1193ae7244cdc/html5/thumbnails/7.jpg)
3-70188 31101112
OOII-REVIEW ... APPROVE
HARDWARE SCHEDULE ...
5 31181112
SUBMIT TEMPLATES TO HM FABRICATOR -
II
3-711168 31171112
10 31301112
012-FAB ... DELIVER HARDWARE - 10
412 1112 4/Z 1112 4128/92 511 1112
3-711168 2! /
3131112 3141112/
023-RE-KEY LOCK CYLINDERS
NECESSARY FOR
----I OWNER'S NEEDS - 2
412J11S12 41271112
3-711168 5 5/51112 51111112
lOZ-FINAL CLEAN ...
5151 2
/
MOVE OUT OF 3-7!l1lI8NE - II
51111112
3-711188 5112112
103-0WNER
2 51131112
PREPARE ... ISSUE PUNCH LIST FOR
3-711188NE - 2
5/1: 1112 5/1 1112
3-711168 112lIZ.
o 3131112
104-TIR TO APPLY FOR CERllFICATE OCCUPANCY AT
3-70/S8NE
511 5/112 5115102
3-711188 511"'112
• 511111112
101i-CONTRACTOR CORRECT PUNCH
LIsT ITEIiS ... OWNER ACCEPT AREA AT
3-71l188NE - •
5/141112 5 HI n
3-70168 3131112
3 '- 3-711168 315102 ~1201Q2 5
5127102 3-U168 51281112
2 51211/112
106-APPlY FOR ... RECEIVE
CERllF1CA TE OF OCCUPANCY FOR
3-70188NE - 3
5/15182 5/111/112
Issue #1 • Odober 9, 19!H Issue #2 - October 22, 1991 Issue #3 - December 3, 1991 Issue #3 • monilored 03103192 Issue #4 - Marcb 3, 1!l92 i4sbt#3·79/68 be
disk 304
107-FCL INSTALL 10ll-FCL MOVE INTO OFFICE FURNITURE 3-711168NE AREA - 2
AT 3-711168NE • 5
51201112 5/271112 6126/112
3rd HOOT 79/68 non executive (3-79/68 ne) Interior work
5129
NETWORK MODEL FOR FIRST COLONY LIFE INSURANCE COMPANY OFFICE ADDITION Lynchbun:. Yireinja
H. J. Construction Joint Venture Lynchburg, Virginia 24506
Ralph J. Stephenson PE PE Consulting Engineer 323 Hiawolha Drive MI. Pleasant, Michigan 4885 3 ph 517 772 2537
/112
Sheet 3-79/68ne
![Page 8: Consulting Engineer Mt. Pleasant, Michigan 48853 · the lags must be identified immediately and corrections made if the project is to be completed as desired. I suggest close front](https://reader035.vdocuments.us/reader035/viewer/2022071023/5fd766c08fb1193ae7244cdc/html5/thumbnails/8.jpg)
122/91
122/91
Terrace 79 (T-79) Interior work T·n 0 0
313192 3131112 313192 3131f12
T·lI 2 31111112 3112/112
021·RE·KEY LOCK CYLINDERS
NECESSARY FOR OWNER'S NEEDS • 2
."ff-11-2-111-2--------------------------31-1-2-,flHI12/f12
.;J:, ."\,, ,;;;:, •• " ,,;;:, ~,;J:, 3~~~~----~d
6 ./ T·79 3110192/ 3111192
045·PREPARE NEW 046-APPROVE NEW 072·COIIP INSTl PA DESIGN" ISSUE PA DESIGN AND NEW ABOVE ClG
FOR COSnNG • 1 PRICE • 1 CONDUIT " WIRING FOR POWER, VOICE ,.
~-----~ DATA, PUBLIC
312knr...-----"1"m.
ADDRESS" SPEAKERS AT T-7l1 •
5 312.!-nr,..-------.".,"*'/1I2 31
Ole·PREPARE " .,
SUBMIT HARDWARE SCHEDULE· 6
1 ,,.'" ~I 192
4 3/6192
~T.7l1 3/301112
3 4/1/112
077-CO S AL NEW CEILING
DIFFUSERS. LIGHTS. SMOKE DETECTORS. SPRINKLER HEADS
AT T·7fI· 4
31
T-n 0 T·n 4 ~ T-7l1 /,
3111 31692
lllLii 3131112 3/3192 3/6192 ~lfl192 5 3113192
T·711 31161112
10/ 312719
DOl·TIR ISSU 14 076-CO FIN H UPDATING· MARCH PAINTING AND
3, 1.2 APPLYING VINYL
I------i WALL ;.~~:R!NG AT 1-___ -1
313/12 313 2 3/3192 3 92 319 92
oel·INS AL DEMOUNTABLE PARTITIONS"
1------1 DOORS AT T·7\I • 10
3116192 31 7/112
~;;J:2 3IZ9X;Q;:2
2 3110192
T·7\l 31111112
1 31111112
....... -0,..7-1"'.CO=M""p""L--:e"'T"'E,...... .... INSTALL ABove
CEILING DUCTWORK AT T·7l1· 2
3/5/112 3161112
070-TRIM OUT NEW ELECTRICAL " LIFE SAFETY SYSTEMS
AT T·7fI· 2
41 1102 41
T·7l1 lliLll
O8O·TlR TO NOTIFY PUBLIC ,. OTHER
AGENCIES OF DATE OF TESTING LIFE
SAFETY SYSTEMS AT T·7f1 • ?
4131l1z
082·CONDUCT LIFE SAFETY TESTS AND APPROVE SYSTEIIS
AT T-711 • 1
IlI2 413 1112 41 192
083·CLEAN EXISTING CEILING GRID " INSTALL NEW
ACOUSTIC nlES AT T·7f1 • 3
3 1112 4/1/112
OOll·REVIEW " APPROVE
HARDWARE SCHEDULE· 5
312 II,.", 'II; 1112
T·79 4/2192
2 4/3/92
064·BAlANCE HVAC SYSTEMS AT T-79 • 0
MAY HAVE TO BALANCE WITH
OTHER AREAS OF BUILDING· 2
4/2 !92 4/: 1112
T·79 0 31111112 11 11/112
416111 41 &/lI2
![Page 9: Consulting Engineer Mt. Pleasant, Michigan 48853 · the lags must be identified immediately and corrections made if the project is to be completed as desired. I suggest close front](https://reader035.vdocuments.us/reader035/viewer/2022071023/5fd766c08fb1193ae7244cdc/html5/thumbnails/9.jpg)
T ·711 8 T 711 31181112 31271112 4181112 4181112
OI2-FAB .. DELIVER 086·0WNER HARDWARE· 8 PREPARE .. ISSUE
PUNCH LIST FOR T·711 • I -
312 '/V2 41 102 41 'VOl 4 1112
T·70 2/T'711 416102 417102 1llLU
o 313/112
085-FINAL CLEAN .. MOVE OUT OF T·70·
2
41
087·TIR TO APPLY FOR CERTIFICATE
OCCUPANCY AT T·711
8/112 4/8102
Location Early start
Duration Early finish
T·711 1llLU
1 313102
GOa·SELECT NUMBER OF TEST
PILES TO BE USED ..
313'112
LOCATION· 1 (example)
3t: 1112
• Activity numbgr • Activity description
Activity estimated duration in elapsed working days
Late start la1e finish
ACTIVITY KEY
T 711 2 41111112 4110111 2
G8a-CONTRACTOR CORRECT PUNCH
LIST ITEMS .. OWNER ACCEPT AREA AT
T·70 • 2
4111'112 411 }J:
T·711 3131112
3' T·711 315/112 "113102
I 4/13/02
T·711 4/141112
5 4/201112
T·70 4120/112
a 4/201112
O8!I-APPL Y FOR .. " OIlO-FCL INSTALL IOt·FCL MOVE INTO 100-E TIR TO SET RECEIVE
CERTIACATE OF OCCUPANCY FOR •
T·70·3
4/8f02 4/1 1112
Reseryed Activity Numbers
017 to 040 041 046 042 047 043 046 044 049 045 050
Ian 001 han 101
OFACE FURNITURE .. VENDING MACHINES
411 1112
AT T·711 • I
4/1 192 4/141.,,,
Issue #1 . October 9, 1"1 Issue #2 - October 22, 1991 Issue #3 • December 3, 1991 Issue #3 - monitored 03/03/92 I.,.u< #4 - Marcb 3, 1"2 i4sbt#T-79 disk 304
T·7Q AREA· 5 LATE AN ISH OF
41" 102 4/211i2
Terrace 79 (T-79) Interior work.
ACTIVITY
4/2 I 02
NETWORK MODEL FOR FIRST COLONY LIFE INSURANCE COMPANY OFFICE ADDITION Lynchburg, Virginia
H. J. Construction Joint Venture Lynchburg, Virginia 24506
Ralph I. Stephenson PE PE Consulting Engineer 323 Hiawatha Drive ML Pleasant, Michigan 48853 ph 517772 2537
Sheet T-79
![Page 10: Consulting Engineer Mt. Pleasant, Michigan 48853 · the lags must be identified immediately and corrections made if the project is to be completed as desired. I suggest close front](https://reader035.vdocuments.us/reader035/viewer/2022071023/5fd766c08fb1193ae7244cdc/html5/thumbnails/10.jpg)
12ZIIIl
122/01
2nd Floor 79/68 (2-79/68) Interior work
311
3116/112
1-711 4 3131112 3/611)2
APPROVE NEW HVAC DESIGN " PRICE - 4
1 3131112
045-PREPARE NEW PA DESIGN .. ISSUE
FOR COSTING - 1
2-781118 II 3/31112 3/10/112
006-PREPARE .. SUBMIT HARDWARE
SCHEDULE - II
4/2.m['lJ""-----'7Er4i /82
/ 2-711/68
13/02 3
3/1S/112
072-COMP INSTALL ABOVE CEILING FIRE
ALARM ROUGH WIRING AT ~7W88 -
3
tWZ at17/02
088- N CONDUIT FOR
TOMBSTONES "
8 3/25/112
SEAL HOLES AT
2-711/68 3/31112
2-711168 - 8
08o-COUP FINISH PAINTING AND
APPLYING VINYL
2-7t/68 5 3/11/112 3/17/112
008-REVIEW .. APPROVE
HARDWARE SCHEDULE - 5'
~c~~-----yr,I~'/1l2
2-711/11~ 6 3/6/11Z' ~'3/112
083-COMP INSTALL ............ NEW CEILING
DIFFUSERS, LIGHTS, SMOKE DETECTORS .. SPRINKLER HEADS
AT 2-711/88 - I>
311 I .. " \alz j 112
\ WALL COVERING AT 1-______________ _
2-7W88 - 4
knr"..-----.....".,j....!25IOZ
2-70/68 6 3/11/112 3116/112
073--COMPLETE INSTALL ABOVE
CEILING DUCTWORK AT 2-711188 - I>
311.m~----",m/02
1-711 1 3/4/112 314/02
046-APPROVE NEW PA DESIGN AND
PRICE - 1
2-711168 4 3/5102 311 0/112
074-COMP INSTL NEW ABOVE CLG
CONDUIT .. WIRING
I-___ -.;FOR POWER, VOICE .. '---__ _
DATA, PUBLIC r ADDRESS SYSTEM ..
4/141 2 414/82
SPEAKERS AT 2-711188 - 4
4/15~/;;;1I"--------'...,.n.
![Page 11: Consulting Engineer Mt. Pleasant, Michigan 48853 · the lags must be identified immediately and corrections made if the project is to be completed as desired. I suggest close front](https://reader035.vdocuments.us/reader035/viewer/2022071023/5fd766c08fb1193ae7244cdc/html5/thumbnails/11.jpg)
3117/112
5/12/11
2·711/68 ,/
3/11112 3/1 21112
01B-RE-KEY TO SUIT OWNER - 2
511/92
112/112
2·711/68 3/111112
4 3/12/112
2·711/68 4/111112
8 4/201112
101· TRill OUT NEW ELECTRICAL & LFE SAFETY SYSTEIIS
AT 2·79168· 4
10a·INSTAll DEMOUNTABLE PARTITIONS &
DOORS AT 2·79168 -8
11/112 4/20/112
711/68 1 13/112 3113/112
10S..cONDUCT LIFE SAFETY TESTS AND APPROVE SYSTEMS
AT 2-79168 • 1
3/26/11 48 2 51 1 f4/l>1I"'2,..------S.m.14/112
2·711168 0 ~'711/68 mru 313/112~/lI/n 4/20/11
l02-TIR TO NOTIFY l04-1NSTALL VOICE, PUBLIC & OTHER DATA & POWER
AGENCIES OF DATE TOMBSTONES AT OF TESTING LIFE 2·711/68 - 8
SAFETY SYSTEMS AT 2-79168 • ?
5/14/112 5/14/112 S/5'1I2
2-711168 4/211112
15 5/111112
lOS·CLEAN EXISTING CEILING GRID & INSTALL NEW
ACOUSTIC TILES AT 2-711/68 • 15
~""j S/11102
2-711/68 5112/112
3 5/14/112
10r·BALANCE HVAC SYSTEMS AT 2-7V168
• 0 MAY HAVE TO BALANCE WITH
OTHER AREAS OF BUILDING· 3
5/12/112 5/14/112
2·7\1/68 4/20/112
5/15/11 1151112
2-78/68 8 3118/112 31271112
012·FAB & DELIVER HARDWARE - 8
5/1 'v,.
2-711/68 5/15/112
"",,.,/112
5 5121/112
lOa-FiNAL CLEAN & MOVE OUT OF
2·711/68 • 5
5/15/92 5/21102
2-711/68 mru
o 3/31112
110-T/R TO APPLY FOR CERTIFICATE OCCUPANCY AT
2-711/68
5/2.m"..------rm.1 2~
2·78168 5/22/11-2
101l-0WNER
2 5/26/112
PREPARE & ISSUE PUNCH LIST FOR
2-79168 - 2 -
5/22/112 S/26/112
![Page 12: Consulting Engineer Mt. Pleasant, Michigan 48853 · the lags must be identified immediately and corrections made if the project is to be completed as desired. I suggest close front](https://reader035.vdocuments.us/reader035/viewer/2022071023/5fd766c08fb1193ae7244cdc/html5/thumbnails/12.jpg)
, 2-71168 3 ,313182 315182
" 112-APPLY FOR & RECEIVE
CERTIACATE OF OCCUPANCY FOR
2-78168 - 3
5128/92 6111112
2-711168 4 5127182 6111112
~~~~R;~~~~ LIST ITEIIS & OWNER
ACCEPT AREA AT - 2-78168 - 4
51271n D/1/1l2
RcS!!rud Adlvity Numbers
017 to 040 041 046 042 047 043 048 044 049 045 050
LAN 001 HAN 115
2-78168 6121112
10 6115182
1,3-FCL INSTALL OFACE FURNITURE
AT 2-711168 - 10
Location Early start
6115192
Duration Early finish
2-71l168 61161112
6116192
Activity number Activity desc ription
• Activrty estimated duration in elapsed working days
Late start Lat .. finish
ACTIVITY KEY
2 61171112
61171112
2-711168 6117192
o 61 171112
1~iE T~~~~ ':,~T ACTIVITY
6117192 6117182
Issue #1 - Oclober 9, 1991 Issue #l - October 22, 1991 Issue #3 - December 3, 19'1 Issue #3 - mObitored 03/03192 Issue #4 - Marell 3, 1992 145111#2-79/68 disk 304
2nd Floor 79/68 (2-79/68) Interior work
NETWORK MODEL FOR FIRST COLONY LIFE INSURANCE COMPANY OFFICE ADDITION Lynchbura. Vin~inia
H. J. Constroction Joint Venture Lynchburg. Virginia 24506
Ralph J. Stephenson PE ffi Consulting Engineer 323 Hiawatha Drive Mt Pleasalll. Michigan 48853 ph 517 772 2537
Sheet 2-79/68
![Page 13: Consulting Engineer Mt. Pleasant, Michigan 48853 · the lags must be identified immediately and corrections made if the project is to be completed as desired. I suggest close front](https://reader035.vdocuments.us/reader035/viewer/2022071023/5fd766c08fb1193ae7244cdc/html5/thumbnails/13.jpg)
122191
122191
1st Floor 68 (1-68) Interior work
![Page 14: Consulting Engineer Mt. Pleasant, Michigan 48853 · the lags must be identified immediately and corrections made if the project is to be completed as desired. I suggest close front](https://reader035.vdocuments.us/reader035/viewer/2022071023/5fd766c08fb1193ae7244cdc/html5/thumbnails/14.jpg)
1·18 15 6/111/112 7/7/92
082·REPAINT DEMONTABLE
PARTITIONS AT HIS ·15
1I/3/uz 11/24/112
1·68 3 7/30192 8/3192
OIl6-INSTALL ABOVE CEILING FIRE ALARM
ROUGH WIRING AT 1-$8 • 3
811 IV'"' al'" 1112
/
![Page 15: Consulting Engineer Mt. Pleasant, Michigan 48853 · the lags must be identified immediately and corrections made if the project is to be completed as desired. I suggest close front](https://reader035.vdocuments.us/reader035/viewer/2022071023/5fd766c08fb1193ae7244cdc/html5/thumbnails/15.jpg)
1·68 0 813182 813102
812410HIUI02
\
1·68 8110102
076-LAYOUT DEMOUNTABLE
5 8125102
PARTITIONS AT 1-68 ·5
182 811182
1·68 0 111101112 0110182
1·68 8126182
8 014102
078·DRILL HOLES FOR
POKETHROUGHS AT 1·68 • 8
11121112 11114102
T·68 11181112
1·68 0 l..IIlZ.2lJ!l 1 0122182
FROM 080 • FINAL CLEAN & MOVE OUT
OF 1-68 • PM 10121182
1012·1mi------!!I2182
1·88 717182
o 7171e2
INSTALL CABLE TRAYS ABOVE
CEILING OF T-I18 • 8
1112 1112 10111
![Page 16: Consulting Engineer Mt. Pleasant, Michigan 48853 · the lags must be identified immediately and corrections made if the project is to be completed as desired. I suggest close front](https://reader035.vdocuments.us/reader035/viewer/2022071023/5fd766c08fb1193ae7244cdc/html5/thumbnails/16.jpg)
1·68 101221112
2 101231112
-1012
101"()WNER PREPARE .. ISSUE PUNCH LIST FOR
1-68 - 2
~1!/2 lUI: 31112
o 3131112
lQ2.TIR TO APPLY FOR CERTIFICATE
OCCUPANCY AT 1-68 - ?
111 219« 11121112
1·68 101261112
5 101301112
103·CONTRACTOR CORRECT PUNCH
LIST ITEMS .. OWNER ACCEPT AREA AT
1-68 - 5
1012 j/II;Z
1-68 3131112
101: 0711 2
o "- 1-68 3131112 ~11121112 5
1116192
I04-APPlY FOR .. .....
RECEIVE CERTIFICATE OF
OCCUPANCY FOR 1-68 - ?
11121112 11121i2 111
105-FCL INSTALL OFFICE FURNITURE
AT 1-68 - 5
1112 1116192
1-68 5 10171112 10113192
88- N EXISTING CEILING GRID .. INSTAll NEW
1-68 1119102
3 111111112
106~iA ~a.:8E I~TO
11111192 11/111112
1-68 2 101lMII2 10115192
08ll-BALANCE HVAC SYSTEMS AT 1-68 • 2
~ _________ .....l", _________________ -I ACOUS,r.:; ~I~ES AT 1------1
1-68 111257112
Oas-INSTAlL DEMOUNTABLE
PARTITIONS AT 1-68 - 8
hr------nr'1l102
10113192 101141!!2 10115192
1-68 11111192
o 111111112
1~;E I:NI1~ ~~I
11111/112
1-&8 101161112
ACTIVITY
11/11 1112
10/21192
1-68 10121102
o 101211!!2
101- 0 PREPARE .. ISSUE PUNCH lIST FOR
1-68
101211112 101211112
![Page 17: Consulting Engineer Mt. Pleasant, Michigan 48853 · the lags must be identified immediately and corrections made if the project is to be completed as desired. I suggest close front](https://reader035.vdocuments.us/reader035/viewer/2022071023/5fd766c08fb1193ae7244cdc/html5/thumbnails/17.jpg)
Note: Phase 2 sla rts after Phase 1 at9a~ occupied on p~
1-68 5 610102 6115102
OS2-REMOVE • 1-68 6115/112 STORE EXISnNG
DEMOUNTABLE PARTITIONS AS
REQUIRED AT 1-68 - 1----------; 5 713019
o 6/151112
301112
1-68 6125182
4 6130/92
1-68 5 111102 7/8192 O56-OWNER 05!)'()WNER ABATE
IDENTIFY LOCATION ASBESTOS MASTIC OF ASBESTOS ON DUCTWORK AS
MASTIC ON REQUIRED AT 1-68 DUCTWORK AT 1-68 -1-----; 5
•
.J.::, .,::.:~,~-::, \",/:,1I;5'~"':"'2------6"'lrlI3"'~::: 711~:-------7~8192
053-SALVAG .....,-~Om5!15r"1_m:r.0~V:r.E!!"""-'IA 067-REMOVE STORE EXISnNG EXISnNG CEILING EXISTING ABOVE
LIGHTS, DIFFUSERS, GRID. nLE AS CEILING VOICE,
J.-'::.-__ -IS~:~~E:~T~M~~iR 1-_____ -; REQUIRED. AT 1-68 - ~~J.~~~ ;~:R4
619192
7/1
REQUIRED AT 1-68 -8
OS4-REMOVE
61 18/112
10 6122192
EXISnNG DRY WALL • MASONRY
PARTITIONS AS REQUIRED AT 1-68 -
10
6,,,,, 712i1IU
611919 6124192
'\ 058-REMOVE
EXISTING CARPET AT 1-68 0 1-68 - 5 6/3(1192 6130102
8161i1 8161112
7130192 815192
![Page 18: Consulting Engineer Mt. Pleasant, Michigan 48853 · the lags must be identified immediately and corrections made if the project is to be completed as desired. I suggest close front](https://reader035.vdocuments.us/reader035/viewer/2022071023/5fd766c08fb1193ae7244cdc/html5/thumbnails/18.jpg)
3 7113/82
oeO·ReMove ABOVE CEILING DUCTWORK
AS REQUIRED AT 1-68 • 3
1·118 7/1~/t12 • 7/21/82
1·68 7/22/82
063-PAIIT INSTALL 065-COMP INSTALL ABOVE CEILING ABOVE CEILING
ROUGH FIRE ROUGH FIRE PROTEcnON PIPING PROTECTION PIPING
1------1 AT 1-68 - 6 1-------1 AT l-GB - 6
/11'11"" 71 1112 7/1~IVZ
1·68 II 7/0/U 7/15102
OB1-CLEAN EXISTING ABOVE CEILING
DUCTWORK WITH
({ 1/82 7/2 IV" fl. 192", 1·68 II
7/30/112 8/51112
oe7-lNSTALL ABOVE CEILING DUCTWORK
AT 1-68 • II
IN WALL ITEMS INCLUDE
• BLOCKING • CONDUIT • FRAMES • PIPING
1-68 ~ 1·68 5 / 8/6/112 8/11182 8112/82 811818
oell-lNSTALl METAL 07o-HANG .. FINISH STUDS .. IN WALL NEW DRY WALL AT WORK FOR WALLS STRUCT TO STRUCT
VACUUM CLeANING AT 1-68·5 r-------------------------------------------------------------i 1-_______ -tS~~~D~':,G S~~ t--------t PARTITIO~~ AT 1-68 1-__ _
AT 1-68 • ~
8 111112 8/,.m~-------:8rni,8/112
![Page 19: Consulting Engineer Mt. Pleasant, Michigan 48853 · the lags must be identified immediately and corrections made if the project is to be completed as desired. I suggest close front](https://reader035.vdocuments.us/reader035/viewer/2022071023/5fd766c08fb1193ae7244cdc/html5/thumbnails/19.jpg)
1-68 3 81111/112 8/211112
071-A LY FIRST COAT OF PAINT TO
DRY WALL
1-$8 8 8131102 lII101ll2
074·INSTALL NEW CEILING DIFFUSERS.
LIGHTS. SMOKE DETECTORS.
SPRINKLER HEADS & SPEAKERS AT1·68 •
8
114..-.r------;,m11l2
1-G8\. 5 / 8/24102 8128/liZ
072-INSTALL NEW ACOUSTIC CEILING
SUSPENSION & GRID
1-68 5 8131112 lIl4I02
070-INSTALL DOORS .. HARDWARE AT
1..$8 - 5
1·118 5 018112 11114112
0II1-COMP FINISH PAINTING AND
APPL YING VINYL I-------t WALL ~a:~R!NG AT 1-__ _
41!12 /8
8/~'1~:2 !l1~1I2/ OlIO-PART APPLY FINISH PAINT &
VINYL WALL SURFACES AT 1..$8 •
-----; 3 ~----~ AT 1..$8 - 5 COVERING AT 1..$8 -
~---------------------------------------~ 3
811 m-----"'I"!I"
![Page 20: Consulting Engineer Mt. Pleasant, Michigan 48853 · the lags must be identified immediately and corrections made if the project is to be completed as desired. I suggest close front](https://reader035.vdocuments.us/reader035/viewer/2022071023/5fd766c08fb1193ae7244cdc/html5/thumbnails/20.jpg)
48 81' .f',cS/12 1112~11I2
082·INSTALL NEW CARPET AT 1-58 • 8
~68 11121f1l2
8 10161112
086-INSTALL VOICE, DATA & POWER
TOMBSTONES AT 1-58 • 8
1·68 0 1016/112 1016/112
10116111 10116/112
1I11 m-----""'lI'1'I'l , 1·68
"-11115/112 3
111171112 1·68
111181112 '.'/
1I/1~11I2 0$3-TRIM OUT NEW O$7-CONDUCT liFE ELECTRICAL & lIFE SAFETY TESTS AND SAFETY SYSTEMS APPROVE SYSTEMS
AT 1-$8·3 AT 1-58 • 1
10 11;t.11I2 101141112 1011 51112 101151
1·61/ 0/ all£iZ 3/3111
082·TIR TO NOTIFY PUBLIC & OTHER
AGENCIES OF DATE OF TESTING liFE
SAFETY SYSTEMS AT 1-58· 7
10/15112 10/151112
Location Early start
Duration Early finish
1 101221111
03·SELECT NUMBER OF TEST PILES TO
BE USED & LOCATION· 1
(example)
• Activity number • Activity description • Activity estimated duration
in elapsed wOrking days
Late starl Late finish
ACTIVITY KEY
112
Reserved Activitv Numbm
017 to 040 041 046 042 047 043 048 044 049 045 050
LAN 001 HANW7
1·68 1016/112
101161t 10/161112
Issllr #1 • not isslled Issllo #2 • Ottober 12, 1991 Issue #3 • December 3, 1991 Issue #4 • Marcb 3, 1992 i4sbllll·/i8 int work disk #304
1st Boor 68 (1-68)
NET,,~~:tA. W?::vvf:L FOR FIRST COLONY LIFE INSURANCE COMPANY OFFICE ADDITION Lynchbure. Yireinia
H. J. Construction Joint Venture Lynchburg, Virginia 24506
Ralph 1. Stephenson PE PH Consulting Engineer 323 Hiawatha Drive MI. Pleasant, Michigan 48853 ph 517 772 2531
Sheet #1-68
![Page 21: Consulting Engineer Mt. Pleasant, Michigan 48853 · the lags must be identified immediately and corrections made if the project is to be completed as desired. I suggest close front](https://reader035.vdocuments.us/reader035/viewer/2022071023/5fd766c08fb1193ae7244cdc/html5/thumbnails/21.jpg)
122101
122101
Terrace 68 (T-68) Interior work
![Page 22: Consulting Engineer Mt. Pleasant, Michigan 48853 · the lags must be identified immediately and corrections made if the project is to be completed as desired. I suggest close front](https://reader035.vdocuments.us/reader035/viewer/2022071023/5fd766c08fb1193ae7244cdc/html5/thumbnails/22.jpg)
T·68 15 11/111H12 12/10/92
062·REPAINT DEMONTABLE
PARTIl10NS AT T·68 • 15
2/16/113 3/5/113
T·68 3 12/30/92 1/4/93
GGG-INSTALL ABOVE CEILING FIRE ALARM
ROUGH WIRING AT T-68 - 3
21: /113
d
![Page 23: Consulting Engineer Mt. Pleasant, Michigan 48853 · the lags must be identified immediately and corrections made if the project is to be completed as desired. I suggest close front](https://reader035.vdocuments.us/reader035/viewer/2022071023/5fd766c08fb1193ae7244cdc/html5/thumbnails/23.jpg)
T·68 4LZW
o 4/2/113
FROM 00 • FINAL CLEAN • MOVE OUT
OF T·60 • PM 04101/113
412 la 41./93
T·68 0 12/10/82 12/10/112
-----------------------------------------------------------------------------------------------------------------------------------------------3-1-8-/1I~/8/113
T·68 0 1141113 1141113
~31113
\
T·6e .1.ZWl1
o 12/3/111
on·T/R TO START LAYOUT PARmlONS
AT T-68·
5/11" 2/5/03
T·68 12/3/111
076·LAYOUT DEMOUNTABLE
5 12/11/111
PARTInONS AT HIe ·5
2/5 rn 2/11/113
T·68 0 2/1111113 211111113
1811/3
8 T·68 12/10181 12/111/01 12/20/111
078·DRILL HOLES INSTALL CABLE FOR TRAY. WIRING
POKETHROUGHS AT ABOVE CEILING AT 1-68 • 8 LL·3
2/12/11;0 21231113 31121113 al16
![Page 24: Consulting Engineer Mt. Pleasant, Michigan 48853 · the lags must be identified immediately and corrections made if the project is to be completed as desired. I suggest close front](https://reader035.vdocuments.us/reader035/viewer/2022071023/5fd766c08fb1193ae7244cdc/html5/thumbnails/24.jpg)
T-68 4/2/Q3
2 4/5/03
101-OWNER PREPARE & ISSUE PUNCH LIST FOR
T-68 - 2 -
4/2 '113 4/5/93
T·68 l.2Ql1l
o 12/3101
102· TIR TO APPLY FOR CERTIFICATE
OCCUPANCY AT T·68 - ?
411 1113 4/13/03
T-68 4/G/Q3
5 4112/03
t03·CONTRACTOR CORRECT PUNCH
LIST ITEMS .. OWNER ACCEPT AREA AT
T-68 - 5
4/6 , .. ~ T-68
12/3/91
41 llf:
o 3, T-68
12/3/01 ~/13/03 " 4110/03
104-... PPLY FOR & " RECEIVE
CERTIFICATE OF OCCUPANCY FOR
T-68 • ?
4/1 1183 4/13193 4/1
O~iLF~~~~~~E AT T-68 • 5
1113 4119/113
T·68 5 3/18/03 3/24103
088- N ING CEILING ORID .. INST"'ll NEW
T·68 4/20/03
3 4122/03
1 UIi-.... L IIIOVE INTO
4/20/93
T·1Ie 3125/03
AREA T-68 3
4/22/93
...... .-________ -"~-----------------_I ... COUS;: :';ES AT 1-------1
OS5-INSTALl DEMOUNTABLE
PARTITIONS AT T-68 - 8
3124/93 31251 3/26/93
T·6a 4122/83
o 4/22/83
107-E TIR TO SET L ... TE FINIS H OF
41221113
T-68 3/20/03
... CTIVITY
4122 193
4/11113
T-68 4/1183
4/11113
o 4/1/93
4/1/93
![Page 25: Consulting Engineer Mt. Pleasant, Michigan 48853 · the lags must be identified immediately and corrections made if the project is to be completed as desired. I suggest close front](https://reader035.vdocuments.us/reader035/viewer/2022071023/5fd766c08fb1193ae7244cdc/html5/thumbnails/25.jpg)
T·Ga II 11 It 2/1/2 11118/112
T·G8 12/1/112
4 12/41112
052·REMOVE .. STORE EXISTING
DEMOUNTABLE T-e8
11/18/112
R::J!~~~o:~ :1. f---------; II 12130192
° 111181112
12/30/112
Phase 2 area 1-68 is 111 7 1 3 02 1
056-OWNER IDENTIFY LOCATION
OF ASBESTOS MASTIC ON
DUCTWORK AT T-68 -4
21 1112 121 4192
Note: Phase 3 starts after \
occupied on PM 11/11192 /. "-.. /
~ 1111°2111 1l;;:~112 llI:3/1/2 "llI2:~1I2 l1I311HI2 li;'~:2 051-TI", TO OWNER Osa·SALVA ... ", '" "-"O=5':"5.'IlR:!E':IM~O~V'I!'E-""'-A.,\\ 057·REMOVE
4 12141112
MAKE AREA T-68 STORE EXISTING EXISTING CEILING EXISTING ABOVE AVAILABLE FOR LIGHTS. DIFFUSERS. GRID .. TILE AS CEILING VOICE,
PHASE 3 SPEAKERS .. OTHER REQUIRED AT T-68 • DATA AND POWER REMODELING WORK· CEILING ITEMS AS 1-------1 4 1----' ..... \--,-1 WIRING AT T-6II· 4
PM 11/11/112 REQUIRED AT T-611 • 8
T-68 12/7/112
ASBESTOS MASTIC ON DUCTWORK AS
REQUIRED AT T-66 5
"" -
121 1112 121111112
1111 1112 11/121112 111121112 111231112 111241112 11/30H'2 12/31f"~ 116/113
",:".~ ~T'G8 11112/112
OM-REMOVE
10 111251112
EXISTING DRY WALL
~, 11127/112
OR-REMOVE EXISTING CARPET AT T·n 0
.. MASONRY T-68 - II 1214102 12141112 PARTITIONS AS
REQUIRED AT T-68 • 10 1/7/g tl71!!3
121 15/112 121211/112 1213 01112 116103
![Page 26: Consulting Engineer Mt. Pleasant, Michigan 48853 · the lags must be identified immediately and corrections made if the project is to be completed as desired. I suggest close front](https://reader035.vdocuments.us/reader035/viewer/2022071023/5fd766c08fb1193ae7244cdc/html5/thumbnails/26.jpg)
3 12116102
~~i.':~:O:~~~ AS REQUIRED AT
T-88 • 3
!T14JVZ /12 1'lJ16/92
T·&8 4 121141112 12117182
on·CLEAN EXISTING ABOVE CEILING
DUCTWORK WITH VACUUM CLEANING
AT T-88 • 5
T·68 12117"2
4 121221t2
063-PART INSTALL ABOVE CEILING
ROUGH FIRE PROTEC1l0N PIPING
ATT-68·4
12/1 7/IJ7. 121: 2192
T·88 12123102
06::~: C~~:;L ROUGH FIRE
PROTECTION PIPING AT T-68·4
1212 3/87. 121. 871
U, T-66
"121301112 5
116183
067-1NSTALL ABOVE CEILING DUCTWORK
AT T-88 - 5
IN WALL WORK ITEMS INCLUDE
BLOCKING CONDUIT FRAMES PIPING
T·68 II T·68 5 1171113 1110193 11201113 11261113
0611-INSTALL METAL 07()'HANG .. FINISH STUDS .. IN WALL NEW DRY WALL AT WORK FOR WALLS STRUCT TO STRUCT
I--------IS~~~D~~Q S~~T I-____ -IPARTITIO~~ AT T-66I-__ _
AT T-68 - 11
1213'!m1'll"'-----';"1 ~11I3 1 1 103
T·68 0 ___________________________________________________________________________________________ 1_2_1_41_1I~2141112
117103 1171113
![Page 27: Consulting Engineer Mt. Pleasant, Michigan 48853 · the lags must be identified immediately and corrections made if the project is to be completed as desired. I suggest close front](https://reader035.vdocuments.us/reader035/viewer/2022071023/5fd766c08fb1193ae7244cdc/html5/thumbnails/27.jpg)
T.S8 5 1/27/03 2/2103
011·APPL Y FIRST COAT OF PAINT TO
DRY WALL
T·Se 5 2/3/03 2/0/0
072·INSTALL NEW ACOUSTIC CEILING
SUSPENSION & GRID
T·S8 8 2/10/83 2/18183
074·INSTALL NEW CEILING DIFFUSERS,
LIGHTS, SIIOKE DETECTORS,
SPRINKLER HEADS & SPEAKERS AT T·68 •
8
/
l.em;-------u<-!,/03
T·S8 2/10/83
5 2/1S/83
ON·INSTALL DOORS & HARDWARE AT
T-68 • 5
T·S8 2/17183
5 2/23/83
081oCOIiP FINISH PAINTING AND
APPL YING VINYL WALL COVERING AT
1------; T.68 • 5 1------
2/1mT----....,~1 103 ./ 17 13",
2/~'0~:3 2/1~m/ 08O-PART APPLY FINISH PAINT &
VINYL WALL ___ -tSURFACESS AT T-68 .1-___ --1 AT T-68 • 5 1------------------------------------1 COVERING3 AT T-68 •
1/27m""""-----'IfTII/03 2/3mr-----"""II~/·03 2/1.mr.------......,.i1 103
![Page 28: Consulting Engineer Mt. Pleasant, Michigan 48853 · the lags must be identified immediately and corrections made if the project is to be completed as desired. I suggest close front](https://reader035.vdocuments.us/reader035/viewer/2022071023/5fd766c08fb1193ae7244cdc/html5/thumbnails/28.jpg)
,:88 81' 2124fi3 3111"/113
_INSTAll NEW CARPET AT T ..... 8
"T·68 3/8/03
8 31171113
086·IHSTALL VOICE, DATA. POWER
TOMBSTONES AT T-68 • 8
T·1I8 31171113
3/2919
311 193 /'
3 21261113
T·G8 3/11113 3/1~n/'
103 312
T·G8 0 / .12l.Ui1 12/31111
OM-TIR TO NOTIFY PUBLIC • OTHER
AGENCIES OF DATE OF TESTING LIFE
SAFETY SYSTEMS
3126lw~
Location Early start
AT T .... ·?
al 6/03
Duration Early finish
T·G8 1 1JIlULt1 10122101
03·SELECT NUMBER
087oCONDUCT LIFE SAFETY TESTS AND APPROVE SYSTEMS
ATT-68·1
OF TEST PilES TO BE USED.
• Activity n ... mber • Activity de.cription
103
o 31171113
1211103
LOCAnON·l (example, • Activity eSlimated duration
in elapsed working days Reserved Activity Numbers
10122101 10122101
Late start Late finish
ACTIVITY KEY
017 to 040 041 046 042 047 043 048 044 049 045 050
LAN 001 HAN 107
T·1I8 3117113
31211111 129193
Issue #1 • lIot Issued (""ue #2 • October 22, 1991 Issue #3 • December 3, 1991 Issue $4 • Marcls 3. 1992 13shl#T·68 illt work disk #283
H. J. Construction Joint Venture Lynchburg. Virginia 24506
Ralph J. Stepbenson FE PE Consulting Engineer 323 Hiawatha Drive Mi. Pleasant, Micbigan 48853 ph 517 772 2537
Sheet T-68
![Page 29: Consulting Engineer Mt. Pleasant, Michigan 48853 · the lags must be identified immediately and corrections made if the project is to be completed as desired. I suggest close front](https://reader035.vdocuments.us/reader035/viewer/2022071023/5fd766c08fb1193ae7244cdc/html5/thumbnails/29.jpg)
122/81
122/81
3rd Floor 68 executive (3-68 e) Interior work
3-868 3/3/82
4 3/8/82
054-COMP PATCH AT EXISTING T STATS,
TOMBSTONES & OTHER FLOOR
MOUNTED DEVICES AS REQUIRED AT
3-78/8 - 4
4/;:L'
3-68e 3/3/82
00 A &
4/:L 102
5 3/0/02
SUBMIT HARDWARE SCHEDULE - 5
3-68e 5 3/1 0/82 3/16/02
GOO-REVI W & APPROVE
HARDWARE
3-68e 3/17/82
10 3/30/82
01 -,. & ELIVER HARDWARE - 10
t--------1sUB~~~E~~~:L:TES 1------1
3/3/82
3/9/82
TO HM FABRICATOR -5
3/10/02
3-68e 3/13/82
3/16/82
4 3/18/82
042-PREPARE & SUBMIT FIRE
PROTECTION SHOP DRAWINGS FOR 3 -
68 E - 4
182 3/1 382 3/18/82
~-::; .,:,/:~:, '''~" 1-..,0"'1"'8'"'-CO=M=PL'"'E"'T .. E,........ 018-APPROVE NEW
PREPARE & ISSUE HVAC DESIGN & ARCH, MECH, ELECT PRICE - 4
& FURNITURE LAYOUT WORKING
DRAWINGS - 8
3/3m~---"'T"lI"I'l'" 3/1,m...------=li /92
5 3/18/82
060-INSTALL METAL
3/17/92 3/30/82
3-68e 3/18/82
015-REVIEW & APPROVE FIRE
10 4/1182
PROTECTION SHOP DRAWINGS - 10
3/18/82 4/1182
3-68e 3 3/1 8/82 3/23/82
MARK ASBESTOS DEMOLITION AREAS
& REMOVE ASBESTOS DUCT INSULATION AS
REQUIRED - 3
..-k: ...... -----....,..,..n4/82
3-68e 3/20/82
5 3/26/82
DEMOLISH EXISTG CEILING, WALLS &
FLOOR COVERINGS AS REQD AT EXEC
AREA - 4
STUDS & IN WALL WORK FOR WALLS EXTENDING FROM
1-----, STRUCT TO STRUCT 1--------1
070-HANG & ANISH NEW DRY WALL AT
STRUCT TO STRUCT PARTITIONS AT 3-
68 E - 5 AT 3 - 68 E - 5
3/16~/ft82;;--------'1'7/'-!'1 8/82 3/23/82 3/27/82 3/3 182 4/3/82
3-66e 4/2/82
2 4/3/82
SP~I~-~Lir:I:~;~M DESIGN TO
MECHANICAL CONTRACTOR FOR
FIRE ALARM CONTACT POINTS - 2
4/2/92 4/3/82
3-68e 4/6/82
2 4/7/82
066-INSTALL ABOVE CEILING FIRE ALARM ROUGH WIRING AT 3
- 68 E - 2 -
4/8/82 4/9/82
" 3-68e 3 3/24/82 3/26/82
061-REMOVE ABOVE CEILING DUCTWORK AS REQUIRED AT 3 -
68 E - 3
3-68e 4/6T82
4 4/8/82
INSTALL ABOVE CEILING SPRINKLER ROUGH IN PIPING - 4
3/25l-nr..--------.""'b-.82 4/6'\ozoor-------m
~~;~~:2 41~82// ~06~2~-~C~LE~A~N~E~X~IS~T~I~N~G'~
ABOVE CEILING DUCTWORK WITH
VACUUM CLEANING AT 3 - 68 E - 5
3/30/82 41 182
![Page 30: Consulting Engineer Mt. Pleasant, Michigan 48853 · the lags must be identified immediately and corrections made if the project is to be completed as desired. I suggest close front](https://reader035.vdocuments.us/reader035/viewer/2022071023/5fd766c08fb1193ae7244cdc/html5/thumbnails/30.jpg)
3-688 0 3/6/92 3/6/92
--------------------------------------------------------------------------------------------------------4-1-2-9/~9~/29/92
3-688 --,,473/82 ~ '""'06=S"""'-I=-=N=S=TA""L'"'L""'-:N"'E=W""""""
ABOVE CEILING DUCTWORK AT 3-
68 E - 5
4 192
3-688 4 3/27/92 4/1192
071-APPLY FIRST COAT OF PAINT TO
DRY WALL SURFACES AT 3-
68 E - 4
41
68. 0 3/3/82
TIR TO START OF WORK AT EXECUTIVE
AREA - 03103182
4/20/92 4/20/92
3-688 S 4/1 0/92 4/16/92
072-INS ALL NEW ACOUSTIC CEILING
SUSPENSION & GRID AT 3 - 68 E - S
3-688 0 3/3/82 3/3/92
045-PREPARE NEW PA DESIGN & ISSUE
FOR COSTING - 4
4120/92 4/20/112
3-688 5 4/17192 4/23/92
074-INSTALL NEW CEILING DIFFUSERS,
LIGHTS, SMOKE DETECTORS,
SPRINKLER HEADS AT 3 - 68 E - 5
,... ~ 3/3/92 3/6
046-APPROVE NEW PA DESIGN AND
PRICE - 4
4/20/92
3-68. S 3/9/92 3/131 92
068-INSTALL NEW ABOVE CEILING
CONDUIT & WIRING FOR PUBLIC
'\ ADDRESS SYSTEM & SPEAKERS AT 3 - 68
E - S
4/24/92 4/30/92
~ .. 5 4/24{92 4/30/92
OlIO-INSTALL NEW ACOUSTIC TILES AT
3-68E-5
2,,4/24/92 4/30/92
3-68. 4 117/92 4/22/82
5/7/92
3-680 4 4/23/92 4/28/92
3-680 5 4/29/92 5/5192
o 3/13/92
073-T/R TO PROVIDE FURNITURE LAYOUT
- MARCH 13, 1992
3/92 41 192
OBO-INSTALL DOORS & HARDWARE AT 3-
68 E - 4
083-COMP FINISH PAINTING AND
APPLYING VINYL
084-INSTALL NEW CARPET AT 3 - 68 E -
1-________ -1 WAL; ~:EER~N: AT 1------------------------------------4
4/22/92 4/2 192
4 ~688 411m2 4/22/9(" 3~2~/92 6
3/30/92
081-CONT(1)083-APPLY FINISH PAINT
& VINYL WALL COVERING AT 3 - 68
E-4
079-DRILL HOLES
~11"'"----"""'lr'7'lll/92 4/1
3-688 3/13/92
076-LAY OUT TOMBSTONES AT
68 EE- 6
4/3/92
.,:,/ 3 -
4/10 192
FOR POKE THROUGHS AT 3 - 68
E - 6
IY2 4/2' 192
4/29/92 5/5192
3-688 3/31/92 /
3-68. 4/7/~ 4/29/92
4 5/4/92
082-ROUGH IN CONDUIT FOR
TOMBSTONES & SEAL HOLES AT 3-
68 E - 6
4/21/Y2 4/281 92
085-TRIM OUT NEW ELECTRICAL & LIFE SAFETY SYSTEMS
3-68. .uaw.
AT 3·68 E - 4
086-T/R TO NOTIFY PUBLIC & OTHER
AGENCIES OF DATE OF TESTING LIFE
SAFETY SYSTEMS AT 2-79168 - ?
5/12/92 5/12/92
![Page 31: Consulting Engineer Mt. Pleasant, Michigan 48853 · the lags must be identified immediately and corrections made if the project is to be completed as desired. I suggest close front](https://reader035.vdocuments.us/reader035/viewer/2022071023/5fd766c08fb1193ae7244cdc/html5/thumbnails/31.jpg)
3·IISe 5/1182
:I 515/02
101·BALANCE HVAC SYSTEMS AT :I - 68
E - MAY HAVE TO BALANCE WITH
OTHER AREAS OF BUILDING·3
5/8/0 5/12/82
5/6102
3·118. 1 5/5/02 16102
5/1
/
080-CONDUCT LIFE SAFETY TESTS AND APPROVE SYSTEMS
AT 3 - 68 E-1
3·68. 5 5/13/02 5/10/02
102..fINAL CLEAN & MOVE OUT OF 3· 68
E-5
51 102
Location Earty start
3·6S. 5/20/02
2 5/21/02
1_ #1. 1 /I; 3 • not used Issue #4 - MardI 3, 1992 145111#3-68 3e int work disk 304
3·68. 4 5/22/02 SI28/02
10S-CONTRACTOR CORRECT PUNCH
LIST ITEMS & OWNER
iDS-OWNER PREPARE & ISSUE
PUNCH LIST FOR 3· 68 E - 2 ACCEPT AREA AT 3-
1-------1 68 E ·4
5/20182 5/21/82 6/22102 5/28/92
300 Floor 68 executive (3-68 e) Interior work
NETWORK MODEL FOR FIRST COLONY LIFE INSURANCE COMPANY OFFICE ADDITION Lynchburg, Virginia
H. 1. Construction Joint Venture Lynchburg, Virginia 24506
Ralph J. Stephenson PE PE Consulting Engineer 323 Hiawatha Drive Mi. Pleasant. Michigan 48853 phSl7 772 2537
Sheet 3-68 e
3·6S8 1illn
o 313102
3-6e8 3 , 3·6S. 5 313102 3/5/02 'i120/02 6/41112
3·688 2
104·T/R TO APPLY i0G-APPLY FOR & 107·FCL INSTALL FOR CERTIFICATE RECEIVE OFFICE FURNITURE
OCCUPANCY AT 3· CERTIFICATE OF AT 3 - 68 E - 5
5126/112
Duration Early finish
68 E t--___ -ioCCUP::~Y.~OR 3 -I-----i
5/26/02 5/26b/"'0..------S"'/"..!.28/112 5/20/112 6/41112
6/6112 6/8/112
106·FCL MOVE INTO 3 - 68 E AREA· 2
6/51 2 6/8/02
3·68. 1 1illn 313102
03-SELECT NUMBER OF TEST PILES TO
3131112
BE USED & LOCATION - 1
(exampl.)
3/3/02
• Activity number • Activity description
Activity estimated duration in elapsed working days
Late start Late finish
ACTIVITY KEY
Reurycd Aetiyjty Npmhcn
017 1<>040 046 047 048 049
045 OSO
LAN 017 HAN 108
![Page 32: Consulting Engineer Mt. Pleasant, Michigan 48853 · the lags must be identified immediately and corrections made if the project is to be completed as desired. I suggest close front](https://reader035.vdocuments.us/reader035/viewer/2022071023/5fd766c08fb1193ae7244cdc/html5/thumbnails/32.jpg)
1/01
!lOl
lst Floor 79 (1-79) Interior work
1-7!I ~
o 31310
042-TIR TO ISSUE 14 V' UPDATING - 03I03/!l2
043-AIIEND FIRE PROTECTION SHOP
311 2/112 :s11
DRAWINGS TO INCLUDE CODE
COIIPLIANCE FOR ATRIUII - 1
'.2 3117/,,2 31171U
~ 1-711 ~/3I112 5
3111/112
044-IIAKE PENETRATIONS
THROUGH ARTIFICIAL SLATE
PANELS (ASBESTOS?) - 5
31 1 If.</ all IU
1-70 3131112
1 3/3/112
412
04S-PREPARE NEW PA DESIGN .. ISSUE
FOR COSTING - 1
!I Vii! 4/20/112
1-711 3/3/02
4 316/!12
APPROVE NEW HVAC DESIGN .. PRICE • 4
1-711 3141112
1 3141112
046-APPROVE NEW PA DESIGN AND
PRICE 1
4/21/02 4/" 11112
1-70 al2§l.U
o 3/26/Q2
TIR TO START OF INSTALLATION OF
ELEC ROUGH IN FOR TOIIBSTONES -
03/26/02 ??
3/2 1112 '3/2 1112
1-711 ). .aL3LU 31~~
042-TIR TO ISSUE 14 UPDATING - 031031112
067-INSTALL NEW ABOVE CEILING
CONDUIT .. WIRING FOR POWER. VOICE ..
DATA. PUBLIC ADDRESS SYSTEM .. SPEAKERS AT 1-711 -
5
41221112 '41281
1·7\1 '\
n
3/111112 3112/!l2
1-------------------; AT H!I -4 c£;j:~~~=RK \
01S-REVIEW .. APPROVE FIRE
PROTECTION SHOP DRAWINGS - 1
3118192 31181
3120111 51n
1·711 3151112
2 316102
D16·DISTRIBUTE SPRINKLER SYSTEM
DESIGN TO IIECH CONTRACTOR FOR
FIRE ALARII CONTACT POINTS - 2
3/111/02 312 1112
~~' •• '. 1·70
"'3110102 5
3/16/n -.....
047-COMPLETE INSTALL ROUGH IN
FOR SPRINKLER PIPING· 5
3/1 IViI! :Sf 102
~ 1·711 31111112 31111112
\ 068-INSTALL ABOVE CEILING FIRE ALARM
ROUGH WIRING AT 1·7\1 • 3
3/231!12 3/25/8
![Page 33: Consulting Engineer Mt. Pleasant, Michigan 48853 · the lags must be identified immediately and corrections made if the project is to be completed as desired. I suggest close front](https://reader035.vdocuments.us/reader035/viewer/2022071023/5fd766c08fb1193ae7244cdc/html5/thumbnails/33.jpg)
1·711 3131112
4 3161112
D78-COMP FINISH PAINTING AND
APPLYING VINYL WALL COVERING AT - 1·711 - 4
\121112 "''' 1102
1-711 3101112
2 3110182
081·TRIM OUT NEW ELECTRICAL & LIFE SAFETY SYSTEMS
AT 1·711·2
1·711 5 4181112 41141112
OM·INSTALL VOICE, DATA & POWER
TOMBSTONES AT 1-711 - 5
1·711 0 41141112 41141112
51151112 51151112
51,10 511 "'Ii' 1-711 • '" "',.n ' ''',''/, •
3131112 ~ill1112 3111/112 1Lal12 313112 ;::=;:08=2=-."'TI;;:R"-;;;'TO=-=N"'0"'n"'FY='" 08S-CONDUCT LIFE 042-TIR TO ISSUE IN
PUBLIC & OTHER SAFETY TESTS AND UPDATING - 031031112 AGENCIES OF DATE APPROVE SYSTEMS
1·70 3131112
1-711 0 41141112 41141112
018-RE·KEY LOCK CYLINDERS
NECESSARY FOR OF TESTING LIFE AT 1·711 • 1
SAFETY SYSTEMS AT 1·711
1-________________ -; OWNER'S NEEDS· 2
\126!-:1::':!l2::------=~ ~
048·RESOLVE REVISIONS TO
CARPET COLORS • 0 (USED TO SHOW ES r-------I
& EF)
4 120102
070·INSTAlL NEW CEILING DIFFUSERS,
LIGHTS, SMOKE DETECTORS &
SPRINKLER HEADS AT 1-711 • 4
312,milr-------,'I7'rllI02
1·711 4181112
15 41281112
on·INSTAll DEMOUNTABLE PARTITIONS &
DOORS AT 1-711 • 1$ t------I
4171112 4181{12 412 1112
1·111 3111/112
41211111
4,~k~--------.,,~'1I2
~~3;:2 6 3110/02
Q06-PREPARE & SUBMIT HARDWARE
SCHEDULE· 6
412 31112 41301112
10 5112/112
086·CLEAN EXISTING CEILING GRID a. INSTALL NEW
ACOUSTIC TILES AT
5161112
1·111 3111/112
DOlI-REVIEW & APPROVE
HARDWARE SCHEDULE &
II 31171Q2
SUBMIT TEMPLATES TO HM FABRICATOR·
5
5111112 Sl71112
1·70 2 5113102 5114/02
087·BALANCE HVAC SYSTEMS AT 1·10 • 0
MAY HAVE TO BALANCE WITH
1-10 • 10 t-------I OTHER AREAS OF BUILDING·2
412m-----"""I!~1:t,102 511m-----"""I!SmI1l2
![Page 34: Consulting Engineer Mt. Pleasant, Michigan 48853 · the lags must be identified immediately and corrections made if the project is to be completed as desired. I suggest close front](https://reader035.vdocuments.us/reader035/viewer/2022071023/5fd766c08fb1193ae7244cdc/html5/thumbnails/34.jpg)
10 3/31/Q2
012·FAB ., DELIVER HARDWARE - 10
5/8/112
1-7. 5 5/15/112 5/21/t2
Oaa.FINAL CLEAN ., MOVE OUT OF I·N •
5
S/15~or-----""""'I/Q2
o 313/112
OIIO-T/R TO APPLY FOR CERTIFICATE
OCCUPANCY AT T'711 • ?
5/281112 51 8/02
2 5/26/82
0811"()WNER PREPARE., ISSUE PUNCH LIST FOR
1·N • 2
S/2.lor.or------r"d,'1I2
Ba,n. "dM'! Ngmbm
018'0040 050
LAN 001 HAN lOS
1·711 3 3/3/112 3/5/112
l02-APPLY FOR & RECEIVE
CERTIFICATE OF OCCUPANCY FOR
1-711 • 3
51281112
1·711 5/27/82 " 6/1/112
101-CONTRACTOR CORRECT PUNCH
LIST ITEMS ., OWNER ACCEPT AREA AT
I-N - "
5/27mor-----"""IITI,I'12
Issue #1 • Od;)ber 9, 1"1 Issue #2 - <ktober 22, 1')'1 Issue #3 December J, 1991 l_e #3 - mOllltored 03103192 Issue #4 - March 3, 1992 14sht#1-79 disk 304
" 6/5/112 103-FCL INSTALL
OFFICE FURNITURE AT 1-711 - "
6/2·mr------"""II7II·!l2
1-711 6/8ft2
1st Floor 79 (1-79) lnterior work
NETWORK MODEL FOR FIRST COLONY LIFE INSURANCE COMPANY OFFICE ADDITION Lynchburg, Virginia
H. J. Construction Joint Venture Lynchburg, Virginia 24506
Ralph J. Stephenson PE PE CODSulting Engineer 323 Hiawatha Drive MI. Pleasant, Michigan 4885 3 pb 517 772 2537
Location Early start
Duration Early finish
1-711 1.2LWi1
o 10/22ftl
• Achvtty number
Sheet #1-79
03-SELECT NUMBER OF TEST PILES TO
BE USED ., LOCATION - 1
(examplo)
• Activity doscription
10122/11t
Late start
• Activity estimated duration in elapsed working days
101221111
Late finish
ACTIVITY KEY
2 6/t/1l2
o 6/t11l2
104-FCL MOVE INTO I-N AREA· 2
10S-E TIR TO SET LATE FINISH OF
ACTIVITY
![Page 35: Consulting Engineer Mt. Pleasant, Michigan 48853 · the lags must be identified immediately and corrections made if the project is to be completed as desired. I suggest close front](https://reader035.vdocuments.us/reader035/viewer/2022071023/5fd766c08fb1193ae7244cdc/html5/thumbnails/35.jpg)
@!iV
Mr. Steve Greene, Assistant Vice President First Colony Life Insurance Company PO Box 1280 700 Main Street Lynchburg, V A 24505
Ralph J. Stephenson PE PC Consulting Engineer
October 25, 1991
Re: Issue ##2 network models of existing building renovation - First Colony Office Building, Lynchburg, Virginia - rjs project 91:37
Dear Steve:
Enclosed are seven network models of the various geographic areas to be remodeled in the existing building renovation. All are labeled issue #2, dated October 22, 1991 and were updated from the issue #1 networks prepared in our October 7th and 8th, 1991 sessions.
Included are the following:
• Sheet LL - issue 2, dated October 22, 1991 - move in date - pm January 7, 1992
• Sheet 3 - 79179 tie - issue 2, dated October 22, 1991 - move in date - pm March 30, 1992
• Sheet T - 79 - issue 2, dated October 22, 1991 - move in date - pm April 8, 1992
• Sheet 1 - 79 - issue 2, dated October 22,1991 - move in date - pm April 15, 1992
• Sheet 2 - 79168 - issue 2, dated October 22, 1991 - move in date - pm May 7, 1992
• Sheet 1 - 68 - issue 2, dated October 22, 1991 - move in date - pm October 27,1992
• Sheet T - 79 - issue 2, dated October 22, 1991 - move in date - pm April 21, 1993
These networks have been left unassembled as we discussed on the phone the other day. However I
have stapled a small key plan to each set of diagrams and the paste up process should be relatively
simple.
Once you have all had a chance to go through the diagrams in detail I'm certain there will be some
revisions and additions. The total project end date seems to be considerably later than I should think
it would be on a project of this type. However I have taken the material sent to me and converted it
1
kL2-
![Page 36: Consulting Engineer Mt. Pleasant, Michigan 48853 · the lags must be identified immediately and corrections made if the project is to be completed as desired. I suggest close front](https://reader035.vdocuments.us/reader035/viewer/2022071023/5fd766c08fb1193ae7244cdc/html5/thumbnails/36.jpg)
Ralph J. Stephenson PE PC Consulting Engineer
October 25, 1991
as well as possible to what is considered to be the desired sequence of work. It would be well to
carefully review the dates, logic and durations with your construction team before officially issuing
the diagrams.
Notice the summary network model is not included. After trying to accommodate some of the partial
moves and intermediate dates in the summary plan, I decided to wait until we meet again to
complete this network model to insure accuracy.
If you do need the summary sooner I can construct it from the detailed diagrams already prepared.
However I would prefer to complete it with you, Phil and Don.
If there are any questions please call or write.
Enclosures: Network models Sincerely yours,
Ralph J. Stephenson, P. E.
2
![Page 37: Consulting Engineer Mt. Pleasant, Michigan 48853 · the lags must be identified immediately and corrections made if the project is to be completed as desired. I suggest close front](https://reader035.vdocuments.us/reader035/viewer/2022071023/5fd766c08fb1193ae7244cdc/html5/thumbnails/37.jpg)
2/91
2101
o I 01el9 I 10/819 I
OWNER .. CONTRACTOR RESOLVE STATUS OF
19 FIRE ALARM SVSTEI'1
II fl Sill I 11/25191
.wDlJJ. 10~IlI/WDI91 10I~191
10
T /I TO OCTOIER O. PREPARE It. SlllMIT 1991 SIf.'P DRAWIIIGS FOR
EARL'!' DELlIlERIES
101819 ~0I1I191 10111191
o 1018191 I 0181 Il I
PREPARE .. Sl.llMIT HOLLOW !'lET Al SH:lP
ORAWII'GS
91 II/Mil
0 \ I 018l1l I 1 O/elO I
PREPARE .. SUBl'tIT HARDWARE SCH£OULE
1018191
l0/3I/1l1 101311111
11125101
o 10/8/91
11125101
° 10/11191 10111191
REVIEW .. APPRtlYE SHOP DRAWINGS FOR
EARL'!' DEL IIIERIES
o 1018l1l1 10181111
FAe& DEllYEREARL'I' o:wSTRUCT'lON ITEMS
o 1018101 1018191
E TlRTO SET LA,TE FINISH OF ACTI .... ITY
10/11/91 10111191 10 91 10 III 10181111 1018191
10/8/1l' o
1018191
RFtlIEW It. APPROY[ HOUOW"ETAlSIf.'P
DRAWII'GS
11/8101 1118191
10/8191
FAII& DELIVER HOUOW"ETAl
o 1018191
FRAtES & DOORS
11~1I91 NOI
\10 0
10/elOI IOI8l01/IONIlI 10NIII
RFtlIEW .. APPROYE FAIS&DELIVER HARDWARE SCHEDl.l.[ HARDWARE .. SUDMIT TEI'1PLATES
TO KI1 FABRICATOR
1018191 1018l1l1 91
10Ie/91
1018191
o ION91
PREPARE & SUBttIT FIRE PRIITECTIOII SHOP
DRAWINGS
10131 III I 013111l I
![Page 38: Consulting Engineer Mt. Pleasant, Michigan 48853 · the lags must be identified immediately and corrections made if the project is to be completed as desired. I suggest close front](https://reader035.vdocuments.us/reader035/viewer/2022071023/5fd766c08fb1193ae7244cdc/html5/thumbnails/38.jpg)
o 10f8191 10f8191
II/Z$l9H I/Z$l9 I
101e/91 DISTRIIIUT£
o 10f8191
SPRINKLER SY$TEM DESIINTO
H£CIiANltAL OJIf'I'RACTOR FOR FI RE
ALARM CQIIIT' ACT PDINrS
o 1019191 10191111
REPAIIIIT' DEI1CWT' ABLE PARTITIONS AT U - 0
121191111
.....
12/191111
o 10/W9I
PART INSTAU NJ(N[ CEILIN& FIRE ALARM
ROJGH WIRINI AT I.L-0
~ 11/25191 II f25111 1 11/25191 1If25191"-....
1018191 10~91/'0/23191 10/~1I~0I2 ... 419."..:,..I-:-=~~~1~0I~iIl191 ~IO/:29l91 10~91 REVIEW r. N'f'fl(NE ;':'P"=NlT--III-"-ST.;A-U-NJ(N"""-'""[;;,I COtf> IIiST ALL AIIOYE Cll'tP INSTAU N!J(NE
FIRE PROTECTION StlllP CEILING AOLGH FIfI£ CEILINS ROUI8 FIRE CElLINI FIIIE ALARM
101S1 II
DU,WINlS PROTECTION PIPING AT PROTECTION PIPIIIi AT AOLGH WlltlNI AT U -
IOl3l1lH 10131 91 /'
U-O LL-3 2
10 1/111
" 10/31191 11 4191
\ 1112=519 I 1112t1191
![Page 39: Consulting Engineer Mt. Pleasant, Michigan 48853 · the lags must be identified immediately and corrections made if the project is to be completed as desired. I suggest close front](https://reader035.vdocuments.us/reader035/viewer/2022071023/5fd766c08fb1193ae7244cdc/html5/thumbnails/39.jpg)
Q
1019/91 1019/91
---------------------------------------------------------------------------------------------------------------------------------12-,-1-9/~9~2/1~91
101lOl91 o 10130191
1212191 Q
1212191 PART INSTALL NEW CElLI .... DIFFUSERS,
LIGHTS. St10ICE CETECT'ORS.
SPRIN<lER HEADS &. SPLUERSAT LL - 0
121 12191/ 12112191
1~91
1213191
1 211 1al'91
121:191/ V COI'IP INSf IU.L NEW
C£ILlNG OIFf'U9ERS, L IOHTS, SNOKE
DErECTORS. ~INI(LER HEADS &. Sf£AkERS AT lL - 5
1211219, WIISI9
Q
1219191
12/19.191
~
o 1212191 12/219 I
INSTll1lLLWDRK AT LL
12(10191 /'
-0
![Page 40: Consulting Engineer Mt. Pleasant, Michigan 48853 · the lags must be identified immediately and corrections made if the project is to be completed as desired. I suggest close front](https://reader035.vdocuments.us/reader035/viewer/2022071023/5fd766c08fb1193ae7244cdc/html5/thumbnails/40.jpg)
o 12J3I1QI 12/311111 121311111
1 12131/; I
FROI1 FINAl CUAH &. OWNER PRePARE &. MOVE OUT OF LL - AI'! ISSUE I"lIIICW UST FOR
12131181 U -1
1213111i11 121311111 121311111 12131191
1121111 o
112191
i IR TO APPLY FOR CERrIFICATE
OCCUPANCY AT
1/6192 1/6192
112/92 :2
113192
CDII'TIiACTlR CORRECT PIMCH LIST ITEI'1S ... OWNER ACCIiFT' AREA
AT LL - 2
112192
1/2191
APPLY FOR .. RECEIVE CER'TIFICAiE OF OCClPANC¥ FOR
1/6192 Tl. I 6192
", 1
1I6I1I2
FCL INIT;.u. VErI)ING nACHINES I/I,T LL - I
1/6192
12/19/91
116192
5 12/26191
1 111192
FCL I1D'o'E INIl) LL (111£1/1,-1
117/92
o 12/26191 12/26191
a..EAN EXISTING 1WAIIa: HVAC CEILING GRID &. S\'STi1'lS Ai U - 0
IIiSTALL fEW HAY HAVE 10 kANa:
E TIR iO SET LATE FINISH OF ACTIVITY
111192
o 12/26191 121261111
CONDUCT BAS TEST AT Ll - 0
-------------------:::...:~-----------------_tACOUSTIC TILES AT UI--_--IWITHOTI£I MEASOF ..... ___ -I - 5 BUILDING
12118191
INSTALL 0E11C1lffUBU PAR'TlTlcrtS Ai LL - 0
12/19191 12/111191
'"
1226191 12/27/91 12 27191 1212791 12127111
![Page 41: Consulting Engineer Mt. Pleasant, Michigan 48853 · the lags must be identified immediately and corrections made if the project is to be completed as desired. I suggest close front](https://reader035.vdocuments.us/reader035/viewer/2022071023/5fd766c08fb1193ae7244cdc/html5/thumbnails/41.jpg)
121!719 I :2
12/3<1/91
FIliAl. ClEAN" HOVE OUT OF LL -:2
7" 12 3<1/91
![Page 42: Consulting Engineer Mt. Pleasant, Michigan 48853 · the lags must be identified immediately and corrections made if the project is to be completed as desired. I suggest close front](https://reader035.vdocuments.us/reader035/viewer/2022071023/5fd766c08fb1193ae7244cdc/html5/thumbnails/42.jpg)
10
o IIVgl I/V91
D 1/2191 1/2191
•
o 1019191 1019191
REltOVE &. STORIE ElCISTIII&
DErt::urr ABLE PMTITIO'IS AS
REQJIREDAT U·O
1019191
IIMl91
o 1019.191
.IINIII
\
10/9191 '" 10114191 OWNER IDEHTIFY
UX'ATIa.OF ASBESTOS HASTIC 011 DUClwtRK AT LL - '"
1019191
10":'91/'01919 I
10/9191
rO~gl"101W91 91 \ 10191
\0 ./' 10(9J9~ 10(9J91
,~
10114191
'" 10"4191 Till "TO OWNER I"IAKt
AREA A .... AIUd!LE FCR RfJ10DEl.Ir«! WORt( •
10108191
.... "'91 I D19/9 I 10~
S ..... VAIIE& STORE ElUSTINB LI8IfTS,
DIFFUSERS, SPEAKERS &. an-EII CEILINB
"EltS M. R£QUIRED tilT LL ·0
1/91 1019/91
o '0/9191
RfJ1I1VE ElIISTIM& T STATS, TOtt:'JSTllNES'&' DTHERFLOOR rtQUIITED
..... 1IfJ10 .... DISTIllS "\ REltO'IE ElCISTING
CEILINB BRIDt. TILE ABDYE tElLING VOICE, AS REQJlRm AT LL - (I DATA All) POWER
""IRIN! ~T LL - '"
10/'1/" 10r~gl
1019111' REIOVE EKISTIr.B OR\' WALL.&.rt~ PART'ITICRS ... S
\" ... " 11119191
\ 2 10/919".. IOflO/91
REltO'IE ElCISTING CARPET" AT LL - 2
DEVICES M. REQUIREO 1-------1 ATU-O
R~IR£I)AT U ·0 1-----;
III il91
10115191 ......... ,. 7\ ASBESTOS HASTIC ON
OUCTWOI<:!< AS REQUIR£D-5
10I1S/91 10121191
1111"" 1116191 11(6191 11/10191 Ilnl91
~''{1 "" "';;'" CONPL.ETE COtiTRIX:T I1ISC I1ASONliIV ITB'lS
ATU -5
II/HIt" III:l :vg,,,
![Page 43: Consulting Engineer Mt. Pleasant, Michigan 48853 · the lags must be identified immediately and corrections made if the project is to be completed as desired. I suggest close front](https://reader035.vdocuments.us/reader035/viewer/2022071023/5fd766c08fb1193ae7244cdc/html5/thumbnails/43.jpg)
10t.l2J01 101;''.,111/ RD'IDYE IIDOYE
CEILI.a DUC'T~ AS REOJIRID AT LL - 2
/101:1 5]9 I 1012819 I
10122/01 10I:iv91~10129l91 11';'01
CUNI OIISTIIIG INSTALl. NEW A80YE A80YECEILII'f> CEILING ELECTRICAL
tu:TWBRIC WITH CA8LE TRAY .AT LL - S
o 11/<4191
PART INSTALL NEW Ir«NE CEILlI'f>
DUCTWORIC AT LL - 0
3 11(7/91
COHPUTE IIIST ALL AlltNE CEILlI'f>
DIJC'I'W(R( AT LL - 3 ----I VACWn a.EAHII'f> AT 1------1
LL ·S
11/4'9' I INIal Ii/SIIII 1115191 11(7/01
" 0 ~ '11'41111 11/<4191 1115191 11111191
10/281111 I o 129J II 1
PART INSTALL IInI COHP INSrAU. IIEW Ir«NE CEILlI'f> ASOIIE CEILING
CQlDJIT 6. WIRIII6 FOR CON)UIT 6. WIII .. a FOR ---~.-------------------------IPOfIER. VDICE6.D4TA 1------1 POWER. VOICE6.D4TA I---~:---____________________ _
NO PU!LIC AOORESS #IR> PUlLIC ADDRESS
II
o .;':"':':"::'-.lo-__ ~I.;;;O/;...;101I1I
PARr IHSTALL METAL STUDS6. III WALL ..... FORWALLS EtrrEliDING FROM
STRUCT TO STRUtT AT LL -0
91 1118191
"'-
IN WAU ITEMS INCLUDE
-BlOCKING -CONDUIT • FRAl'ES • PIPING
o 10/10191 10/10191
;';"';:'PUI.t"-"-HA-Jl6""'6.-""FI""N~ISH~ HEW DR" WALL AT STRUCT TO STRUCT
SYST£M AT LL - 0 SVSTEtI AT - :I
1I/2OJ91 11/20191 11120/91 11126191
6 111819 I It 1151111
COMP IHST ALL METAL STUDS 6. III WALL WOIiIK FOR WALLS EXTEIIDING FROM
STRUCT TO STRUtT AT LL -6
1118191 " 15191
" 111111191 11122191
CDMP HAilS &. FINISH IIEW DRY WALL AT
PUl.tITI~ATLL-O~----------------------------------_____________________________ ~ STRUtT TO STRUCT PARTITIONS - S
11(11119 I I 1/11119 I 11/111191
~ 0 0 U/11JOI 10117191 10/17/9~·0/17J91
~~---------------------------------------------------------------------------------------~ 1112510 I 11125191 1I/~0 I 1I/:r.s191
![Page 44: Consulting Engineer Mt. Pleasant, Michigan 48853 · the lags must be identified immediately and corrections made if the project is to be completed as desired. I suggest close front](https://reader035.vdocuments.us/reader035/viewer/2022071023/5fd766c08fb1193ae7244cdc/html5/thumbnails/44.jpg)
2/2791
11125/91 1 1126/91
APPt.'t FIRST COAT OF PA-IIIT TO DRY WALL SURfACES AT LL - 2
11(26/91
1212191
12/2/91 o
12/2191
CO"'" NISI' ALL NET IoL STUDS ... III WALL WtRC FOR WALLS EmHDl1'G FROM
STRUC'T TO CEILIIIG AT U -0
-'" 213191 1213191
12/2/91
PART IIIST ALI. I'1ETAL PART IWCB &. FINISH Sl'UDS &. III WIoU NEW DRY WALL AT WORI( FOR WALLS STRUI:T TO CEILlN8 EXTEHOII'G FROM 1-_____ --IPARTIlICJiS AT LL - 0
Sl'RUC'T'TO CEILIII8 II.T LL -0
12~/91 12 1213 91 1213191
3/ 12/2191
12/2191
1212191 0/
12/2/91 1213191 5
12191"
121:
CO,... HAilS&' FINISH INSTAU DOORS &. IIEW "RV WALL AT HARDWARE AT LL - 5
STRUI:T TO CEILlII8 PARTITICWS AT U - 0 -
:191 1213/91 1213/91 1219111
~ 0 1212191 12/21"""'-
PART APPL't FIIIISH V PAINT &. YIIWI. WAt.L COVERIIIS ATlL - 0
12/10/91 12/1Oi91
![Page 45: Consulting Engineer Mt. Pleasant, Michigan 48853 · the lags must be identified immediately and corrections made if the project is to be completed as desired. I suggest close front](https://reader035.vdocuments.us/reader035/viewer/2022071023/5fd766c08fb1193ae7244cdc/html5/thumbnails/45.jpg)
""U/l0191 .'" COrP mUSK , ... ltrTllS
-,~ '" 12113191 12/16191
/ lUI
IMST AlL NEW CARPET /III) APPUIIS YINYL 101 U. ~3 WAlL ONERIII& - '"
l:l/n/ill 121t6l1l1 12118191 )/91
'" 2 12/171ti1l 12/t6JIII
TRII'1 OUT MEW ELECTlUCAL .. LIFE
SAFETY S'I'STEMS "T U. - 2
121231 91 12/24191
o 12/18191
IMSTM.~ WIt(, D"TIo So POWEll TOI'BSTONES
AT LL - 0 12/18191
12/21/91
12127/91 121211111 ,/ 12/1e/91 12I1e/91
CIIMDUCT LIfe SAF£T'f TESTS AICl APPROYt
SYSTEMS AT U. - 1
12126191 121': res..-91
0 12/let91
12/27191
112191 1/~91/ /
T IR TO NOTIFY PlI!I.IC .. OTHER A&EMCIES a: DATi Of' T£STIIS LIFt SAFETY S'I'STEMS "T
LL -7
12/261111 12/26191
(edllstert Dlfttlon Eerlll tlllith
I ~ 11/15190
03-sELECT IIUt1llER OF TiST PILES TO Be
USED &. LOCATIOII - 1 (1IlIIIIftPI~
11115190
• ACtlvltv IWl"*er • ACtlvltv dlKr1ptlan • ACtlvltv eaUmeted dntlen
In 11",,881:1 WllI'klnll dIU'
"'.alert Lete tlnl.h
.6&g,RI
• 7 I"ftI!I 6tiIbRJ "'1l1l'i __ ·1·~9.1~1 t ~Lll.llt wm <lilt 203
12/18/111 I
12/27/91 I 2/27191
NETWQRI( MODEL FOR FIRST COLONY LIFE INSURANCE COMPANY OFFICE ADDITION LynchbUCI. Virainia
B. J. Coutruotl.oA Jotm VeAta:r. L,.~ Vil'~. 24506
Ralph J. S\.ephenlcm PE PE ConsultJnQ EngIneer 323 HIawatha ~ MI.. P1eesent. N1c1'Ilim 48653 ph 517 n2 2537
Sheet #LL
![Page 46: Consulting Engineer Mt. Pleasant, Michigan 48853 · the lags must be identified immediately and corrections made if the project is to be completed as desired. I suggest close front](https://reader035.vdocuments.us/reader035/viewer/2022071023/5fd766c08fb1193ae7244cdc/html5/thumbnails/46.jpg)
191
191
il 7-79
o 10/0191 1018191
OWNER & CONTItIoCTOR R£SIl..YE STATUS or
79 FIRE ALARM SVSTm
215192
1018191 10~(I~ OWNER RESa'iE a8 ELEVATOR REtALL
SVSTEl'I DESISN 101819 I
21'51(12
o 1018191
215192
~~ 92 215192
~ 10~1/ 10111191 1~191 1018191 ° 1018191
1(1
T IR TO OCTOBER 8, PREPARE" SUIll'tIT 19'1 SHOP DRAWIII6S FOR
EARl" DELI'iERIES
10181(11 1018191 1018191
~ 1018191
o 1018191
PREPARE &. Sl81IT HOLLOW METAL SHOP
ORAWII'GS
12 215192
0 \ 10/0191 10181(11
PREPARE &. Sl811T HARDWARE StHItU.E
1018191
1120/92 1/20192
REVIEW &. APPROVE SHOP CQAW1"GS FOR
EAIL" DELIVERIES
10111191 8/91
1018191 o
1018111
REVIEW r. o\PPROY£ HOLLOWI'IETAL SHOP
DRAWII'GS
2(5)92 2151(12
101Ell91
REVIEW IS. AI'F'1mYE HMDWAR£ SCHEDt.lE " SUI MIT TB1PLATES TO.., rAIIRICATOR
0
IOlEll91 1018191
o 1018191 lOlEll91
FASa. IIELIYEREARLY awsnaJeTlON ITEt1S
101eJ91 o
1018191 E TlR TO SET LATE
FINISH or ACTIVITY
91 10/0191 101eJ11 10f81(l1
1018191
rAS&DELIVER HOLLOW M£TAL
o ION91
FRAMES & DOORS
~r.: '92
1018191
\21": 92
FAil & DELIVER HARDWARE
1018191
1018191
(I
1018191 1018l!U
PREPARE & SUl!lttIT fiRE PROT£CT11Jt SHOP
DRAWINGS
92
![Page 47: Consulting Engineer Mt. Pleasant, Michigan 48853 · the lags must be identified immediately and corrections made if the project is to be completed as desired. I suggest close front](https://reader035.vdocuments.us/reader035/viewer/2022071023/5fd766c08fb1193ae7244cdc/html5/thumbnails/47.jpg)
o 1018191 1018/91
-------------------~--~9~~92
o 1018/9 I 1018/91
DISTlUIIUTE SPRINKLETC S'r'STE11
DESI&IITO nEOfANICAL
ctWT'RACTOR FIR FIRE ALARI1 CCIfT ACT
POINTS
e 1219191 12/18191
REPAINT DEI'DfTAI.lLE PARTITIONS AT T-79
-II
o 1I1~2\ 111519
PART INSTAll A!IOYE CEILlN& FIRE ALARI"!
RCU3H WIRIN& AT T-79 - 0
:2
:-::-.
1018191
215192 215192 215192 21519~
10~91/'110J92 1/1:"9/'/16192 112~J92 ~1I22192 112!,9:Z r.P::-:AI!T-=-=INSt=A:7Ll:-:":;lJ(N::-:::-:':'"[ -t r-COtt,---,-P-INST--A-Ll-;lJ(N--E.... r-COtt===P"':':INST=A~Ll:-:-:I>I!tCN=-::E:-1 REVIEW S. APPROVE
FIRE PROTECTION SHOP DRAWINGS
92
CEILING fn.ClH FIRE CEILING fn.ClH FIRE CEILIII8 FIRE ALARI"! PROTECTION PIPING AT PROTECTION PIPING AT RW6H WIRIH& AT
T-7g-4 T-79-4 T-7!1-3
1/2lI92 1/:24192 1119192
" \
![Page 48: Consulting Engineer Mt. Pleasant, Michigan 48853 · the lags must be identified immediately and corrections made if the project is to be completed as desired. I suggest close front](https://reader035.vdocuments.us/reader035/viewer/2022071023/5fd766c08fb1193ae7244cdc/html5/thumbnails/48.jpg)
o 12/u5l9 1 12/1e191
-------------------------------------------------------------------------------------------------------------------3-/~--9~(~92
o 11.24192 1/24192
2f20192 <4
2/25192 PART INSTALL NEW CEILING DIFFUSERS.
LlMS, SI10KE mECT'O!S.
SPRlflKLER II:AOS& SPEAKERS AT T-19-
<I
31 'e 92 / 5/11/92
~
o 312192 3/2192
3/1el92q-"-e/-'-2---------------
21l!619:2 3J2V V 2119192
I)
2(19192 COif" INn,t,LL NEW CEILlII6 OIFFlJSERS,
LIGHTS. SNOKE DErECTDRS,
SPRINKLER HEADS ... SPEAKERSAT T-N-
<4 $11219:2 3,111
INSTLMILL~AT T-19-0
![Page 49: Consulting Engineer Mt. Pleasant, Michigan 48853 · the lags must be identified immediately and corrections made if the project is to be completed as desired. I suggest close front](https://reader035.vdocuments.us/reader035/viewer/2022071023/5fd766c08fb1193ae7244cdc/html5/thumbnails/49.jpg)
o 3/21/92 3121192
1 3/21/g2
FRIl'1 FINAL CLEAN" MOVE OLIT Of T-79 -
1.1103127/92
7/92 3/21/92
OWNER PREPARE &. ISSUE PUfIICtI LIST FOR
T-79 - I
3/21/fJ2 3/21192
I/:2Igl o
112191 T IR TO APPLY FOR
CERTIFICATE OCCUPANCY AT T-79
41 1/92 411/92
3130/92 2
3131192
COIITRACTOR CORRECl PUNCH LIST ITE/'1S &. OWNER ACCEPT AREA
ATT-79-2
3130192 31311
1/2191
APPLY FOR&'RECEtVE CERTIFICATE OF
OCCUPANCY FOR - T19
411192 471192
INSTALL DEI10UIIT ABLE PARTITIONS&. DOORS
ATT-7'.'I-IO
3 17/92
- .... 1
4111!il2 fClINSTALL OFFICE
FURHITURE & V£IIDIMl I'IACHlflES AT T - 79 - 1
41:2192 1
41:21112 FCL I"IOVE INTO T-19
AREA-I
411/92 411192 41:2192 41211]2
2 3118192
3 3/20192 3123J92 3/24{92
CLEAN EXISTI"B eALAlCCE HV~ CEILING GRID&. S'lSTEttS AT T-79 - 0 IIIST ALL flEW MAY HAVE TO IW.ANCE
4121!il2 o
412/92 ET/RTOSETLATE FINISH OF ACTIVITY
41:211]2 41:
o S/24{92 3/2419:2
CDNOUCT BAS TEST AT T-79 - 0
ACOUSTIC TILES AT I---~ WITH OTIER AREAS OF f------1 T-79 -3 SUILDINJ- 2
'3 20192 31 92 '3 24{92 31 92 3/2519:2
![Page 50: Consulting Engineer Mt. Pleasant, Michigan 48853 · the lags must be identified immediately and corrections made if the project is to be completed as desired. I suggest close front](https://reader035.vdocuments.us/reader035/viewer/2022071023/5fd766c08fb1193ae7244cdc/html5/thumbnails/50.jpg)
1125192 2
"S126I92
FINAL ClEAN & !'lOVE OI1l'OFT-79-2
![Page 51: Consulting Engineer Mt. Pleasant, Michigan 48853 · the lags must be identified immediately and corrections made if the project is to be completed as desired. I suggest close front](https://reader035.vdocuments.us/reader035/viewer/2022071023/5fd766c08fb1193ae7244cdc/html5/thumbnails/51.jpg)
L,' ! 7-71
5 4 12Ngi 12/6191 12I:Bf91 12/27J .. 12130191
IIE110'IE &. S'I'l:Jl:E OWNER lCEKTIF¥ OWNER ABATE [)IISTINS 0 I..OCATICfi IF ASBESTOS "ASTIC OM
DEtnM'"ABLE 12/6191 1216191 A!lBESTOSI'IASTIC OM DUCTWORK AS PWlrITlCftS AS IllCTWORK AT T~?1iI - 1-----IREOUIRED AT T-?9 - 51-_ ......
REQUIREb AT T-?g - 5 113OJ92 1130192 ,
" " " " \"" ",."" .L2£.1lIJ.. 12/~J9I/'2t21gl 12/~9I"'1219191 I 2J!.g 1/,':U231gl 12ri.t91
12 III 116192
12
I,)
1/2191 1/2191
o 1/2/91 1/2191
TIR70 OWNER t'lAJ(£ SA\.VAGEISo STORE REI'1OYE [)IISTlN' IIE110VE [)lISTING AIlEA A .... AILAILE FCR [JUSTING lIGHTS, CEILING GIIIO ISo TILE ABOVE CEILlM6 \IOICE.. REI1OD£lING WORK· DIFtI..ISERS, SPEAK£RS Na REQUIIiID AT T19 - DATA N.:J POWER
12101(91 &.anERCEILlN& 3 WlRINGATT-J9- 3 r----------------fTEI1S Na REQUIRED AT
91 12I2I9~2t21gl
12t2111
T-?9 -5
12/6191
2 1213191
1219191 I 2f1019 1
10 12/419 I 12/17/g1
REI10VE [)lIST INS T REt«:NE elUSTING DR'r' ST' ATS, TOI'8STCN:S &. WAll &. rt~
\
"\ 1~1J92
4 1:l/le/gl 121:2l191
lEI10VE [)lISTING CARPET AT 1 -701 - 4
O£'llIO!S Na REQUIRED 1-------1 REQUIRED /l.T T-?1iI - 1------1
\
OTHER F~ 1'I0UHTEO PNn"ITIIW> AS
ATT-79- 2 10
1/141g2 1/15192 1/16192 I/29Jg2
\ 12t21gl
e 12111191
REI'D\'E LIEBERT t.nfTS ATT-79- B
1/17/92
12/12191 5
1211&'91
REI1INE ACCESS F~ AT T-19- 5
92 2 "'92
1130192
o 12/:2319 I 12/23191
CCliPLETE CXJmll:IX:T I1ISC t'lASOMR't fTEI1S
ATT-19- 0
2 92
![Page 52: Consulting Engineer Mt. Pleasant, Michigan 48853 · the lags must be identified immediately and corrections made if the project is to be completed as desired. I suggest close front](https://reader035.vdocuments.us/reader035/viewer/2022071023/5fd766c08fb1193ae7244cdc/html5/thumbnails/52.jpg)
Ihl92 I~~/ A£I'IMA8OVE
CEILING DI£TWORK AS REQUIRED -'T T-79 - 3:
I hili 2
11161,
1/1:'92 ~1/17/92 5 Ir2:3I92
<4 214192
1116192 1117/02 I r2:3192 1124102
~1/23I92 1129192
o 1/23192
CQ'1PLETE IIISTALL A.flOVE CEILlN6
ou::TWDRK AT T-79 -
"
InoI02
1124ID2
14I!il2 , s...
113OI!il2 PAIIT INSTALLICW CQ'1P INSrALLIIEW
N!KNE CE ILING A.flOVE CEILIN6 CtII)UIT &. WIRIIIGI'OR aNlUlT" ""'RIII6 FM
----\------------------------1 POWER. VOICE&.tI4TA 1-----1 POWER. VDIa:&.fMTAI---~----------------------_ Nfl) P\A.IC ADORESS ItR> PU.l.IC ADDRESS
o 12/231!i11
PARTIIISTALLMETAL STUDS&' III WALL WOAK FOR WALLS ElCT£IIDII'tG FROM
STRUer TO STRUCT AT T-79-0
IN WAll ITEMS INCLUDE
-IlOClCING -OONIIUIT
SYSTEM AT T-19 - 0 S'lS"TEtI AT T-1!I - ~
213192 2/3/92 2/3192 217/92
o 214192
COMP IIIST ALL METAL STUDS &. III WALL WOAK FOR WALLS EkTEIIDING FROM
STRUer TO STRUCT AT T-79- 0
• fRAltES 215192 2/51~ • PlPING
O
2/5192,
12/:2319 I 12r2:31!11 ~/4I92
215192
PART HAllEi &. FINISH · ..... .;:;C~OMP"!'!!"'!HA .... II ... Ei-&.-F-INI-S.:::H:..;; ~~~~ ~~~~
STRUCTTO S"IRUCT STRUCTTO STRUCT PARTITlOIIS ATT-19 -l--------------------------------------------IPARTITIDNS ~TT-711-
o 0
.2 02 215102 215102
"'0 ItlSllll 12123191 12/231110' 12123191
~r-------------------------------------------------------------------2115192 215192 215192 215192
![Page 53: Consulting Engineer Mt. Pleasant, Michigan 48853 · the lags must be identified immediately and corrections made if the project is to be completed as desired. I suggest close front](https://reader035.vdocuments.us/reader035/viewer/2022071023/5fd766c08fb1193ae7244cdc/html5/thumbnails/53.jpg)
215m /IFP\.'1 FIRST COAl OF P""IIT TO 01'1 WAlL
SURfACESAl T-l9-3
217/92
2119192
2119/92 o
2/19192 tDI'P INSTALLNETAL
STUDS &. IN WALL WIRIC FOR WAUS EXT£NDlfG FAon
STRUCl TO CEILIIiS AT r-79 - 0
~/92 2/20192
2/19/92 PART INSTAlL METAL PART HANS &. FINISH
STUDS &. IN WAU NEW DRY WALL AT WORk FOI WAUS STRUCTTO CElLINI EXTENDING FRDI1 J-_____ ~PARTITIDIIS AT T-n-
STRIICT TD CEILINS AT 0 T-79-0
21 92 2 1:0/92 2/20 92 2 1:0/92
e/ 2119192
2 19/92
0/ 211g192 2119192 2/19/92
o 21191'2
tDI'P HAilS &. FINISH INSTAU DOORS&' NEW DRr WALL AT HARDWARE AT T -79 -STRun TO CEIUNS 0
ARTITIOIIS ATT-79- f---0
l21:li92 2/20192 2120/92 21201'2
" o 21191.2/ 2119/92
PART APPlV fiNISH PAINT &. VINYL WAU COVERlfG AT T-l9-
o
2120/92 2120/'2
![Page 54: Consulting Engineer Mt. Pleasant, Michigan 48853 · the lags must be identified immediately and corrections made if the project is to be completed as desired. I suggest close front](https://reader035.vdocuments.us/reader035/viewer/2022071023/5fd766c08fb1193ae7244cdc/html5/thumbnails/54.jpg)
.. 2/25192 ~20/92
" CO!1P FINISH P"IIfTINS /IN) APPLYIN3 VINYL WAU COYERINS AT
T-79 -4
2/26192 ., IIIST Alll'EW CARPET
ATT-N- 5
/20192 2/2S192 2/26192 313192
~ 2/26192
2 2/'Z1192
TRII'! OIrT"E."fII ELECTRICAL &. LIFE
SAFETYSVSTD1S AT T-79 -2
o 313192
I"STAlL VOla, DATA eo. POWEI! TOtIISTOIES
ATT-N-O
21:28192
CIJlOOCT LIFE SAFm TESTS All) APPROVE SVSTD1S AT T-79 - 1
3n0J92 3/23192 312~92 3/24192
1/2191 I/~I/ Tlno IIIJTIFY I'lB..IC .. OTHER A&DCIESCE DATE or TEST' .... LIFE SAmy SVSTD1S AT
LL -1
3/24192 3/24192
lilly start DUI'Itlon Eer1y'llIl ....
I ~ 11/15190
03-5E1.ECT HUMBER or TEST PILES TO BE
USED &. LOCATIO" - 1 (Illampll>
11114190 1111:1t90
• Ac:tlylty numDer • Ac:tlylty daIcr1ptlon • Ac:tlylty IIIItlmalAd drntlon
In .1.se., Wlll1<lngdlllll
LaIA 'Inlth
~crl'"'
0 313192 313192
311:5192 311:5192
[ .... ] • ()::tQbar •• 1991 ! 18tI~ -79-1 II:lt 109IJJ'k 4tat 203
./ 313192 3 /3/92
3/25/92 3 11:5192
NETWORK MODEL POR PIRST COLONY LIFE INSURANCE COMPANY OFFICE ADDITION Lynchbura. Virainia
H. J. Co:ubuetioa Joird VlH\tUt L~ ViI'PI 24506
Ralph J. Stephenson PE PE CoI:lsuIUng ~ 323 Hlewatha Drtve MI.. Pleesant, MIchlitm 46853 ph. 5177722537
Sheet T-79-1
![Page 55: Consulting Engineer Mt. Pleasant, Michigan 48853 · the lags must be identified immediately and corrections made if the project is to be completed as desired. I suggest close front](https://reader035.vdocuments.us/reader035/viewer/2022071023/5fd766c08fb1193ae7244cdc/html5/thumbnails/55.jpg)
· "
"
2/111
2/111
.1MIlI..I. TIl! 10 Ot'TOBER EI.
11191
o IOte19 I 10181111
OWNER '" ccwrRAt'TOI RESII..VE STATUS OF
79 FIRE ALARM SVSTErI
','2' ',:~~' OWNER RE'SCLVE 6B ELEVATOR RECALL
Slr'STErI DESISN ION91
12110191
12110111
/)
10/8191
1211()J0 I
o o I01B191 loJB191 1 ()JB191
PREPARE & SUBMIT SH(F DRAWINEiS Fa!!
ENI1.¥ DELIVERIES
REVIE'lI' 6. APPROVE SID' CfttoWIN&S FOR
EARl.. ¥ DEL IVERIES
10 1018l1l~0/8/111 1018191
o 1018191
1018191 1 8191
(I
1018111 1018J1I1
PREPARE & SU!II"IIT HOlLOW METAL SID'
DRAWl rES
29/91 11/29i1l1
\ 0 10181111
PREPARE & SUf!ttIT HAAOWARE SCHEDllE
11lI8I1I1 INIEW r. APPRQY[
HOlLOW METAL SID' DU.WIIIGS
11f29J01 II(: 9191
10NDI
RNIE .... & N'AI.'OY[ HMDWARE SCIEDll.E r. SUIMIT TErlPLATES
TO HM FIIDRICIITDR
0
10NlI 1018111
/)
1018111 I 10NtI
FAa&. IIELIVERURt.¥ CCRml1.CTION ITEttS
o 1018/91 1018191
E TIR TO SET L .. TE FINISH OF ACTIVIT"!'
III 1018111 10 10181111
1018191
FAil & DELIVEI HOlLOW METAL
., ION91
FRAtES & DOORS
II/.U/IiI
1018191
29i91 ,\"0 FAB&DELIVER
KAROWARE
ION91
I Ol8lg I
o I 018J1I I ION"
PfiEPARE & SlBfIT FIRE PRIrTECTIDH SKOP
DIAWING8
11/1 91 I I 141111
![Page 56: Consulting Engineer Mt. Pleasant, Michigan 48853 · the lags must be identified immediately and corrections made if the project is to be completed as desired. I suggest close front](https://reader035.vdocuments.us/reader035/viewer/2022071023/5fd766c08fb1193ae7244cdc/html5/thumbnails/56.jpg)
o 101el91 IOIS/9'
12/10l9H 211019 1
IOlS/91 o
IOtel91
DISTRIBUTE SPRINKlER SYSTEM
DESISNTO I1ECHANICAL
CCIII'I'RACTDR ~ FIlii ALARI'I COIIIT ACT
POINTS
IS 10/14191 II/V91
REPAINT DE/'OVTABLE PARTITI!HI AT 3-79J6I1NE- 15
1129J92
(I
I I tel 9 I
PART INSTALL N!J(1tI[
tElLING fiRE ALARM RIUlH WIRING AT
3-79/68NE - 0
12/10/91 12/10191 12110191~
10f&/91
12/10191
1I~91/ 1l18J91 "; 0/
litelil 11111/91 I ,,::Vgl "'"/1Qf91 -, 4 11/22191
RE\IIEW'~E PART INSTALl N!J(1tI[ COIfP INSTALl N!J(1tI[ COIfP INSTALL N!lt:NE FIRE PROTECTIDN SHIP CEILI~ IiOlGH FIRE CEILI~ ROOOHFlliE CEILING FIRE ALARM
DRAWIIIGS PROT'ECTICII P IPlNii AT PROTECTICII PIPINii AT RIl.I'3H WIIi! 1MB AT 3-79JRME - 0 3-79J68NE - 6 3-79168NE - 4
1111 "91 11/14191 1111 "'lill 11/14191 11/14191 II 12 VII 12/1~91 12713191 \.
•
![Page 57: Consulting Engineer Mt. Pleasant, Michigan 48853 · the lags must be identified immediately and corrections made if the project is to be completed as desired. I suggest close front](https://reader035.vdocuments.us/reader035/viewer/2022071023/5fd766c08fb1193ae7244cdc/html5/thumbnails/57.jpg)
11;'22191 o 11/22/91
12123191 '" 12127/91 PART INSTAll"EW CEILtI'fl DiffUSERS.
LIGHTS, St'D(E DETECTORS,
SPRIN<LER foEADS &. SPEAICERSAT
3-79168N£ - 4
112191 o
1/2191
TIR TO START LA'" OUT TD'tllSTOMES - ?
1211 91111 12119/111
112191 i!>
1/11/91
lit.'" OUT 10l'llSnNS O\T l-1II/6e1'E- e.
1:2'1 ~gl 12127/91
o 11'3;192 1 flIII2
o 11/1/91 11/1/111
1/30/9RI3OJI2
~ 1/10/91
i!> 1/17/1'
DRIU HOLES ~ P'(ft THROUGHS O\T 3-79/68"E- &
12/ )/91 ",nl
\ 2/13.lI12q:.....(-1'$1-11-2---------------
12130/91 1J3~ cotP INSTALL NEW CEILlH8 DIFfUSERS.
LtaHTS, Sl'tOICE DmnORS.
SPRINKLER HEADS & SPEAKERS .. T
l-jlg/6eIIE - AI 217m. 121112
I/l/92 o
1,t:'$I!Z!
INSTL t1IU WCIIJ( AT 3-79168"£- 0
1/10/92 /
![Page 58: Consulting Engineer Mt. Pleasant, Michigan 48853 · the lags must be identified immediately and corrections made if the project is to be completed as desired. I suggest close front](https://reader035.vdocuments.us/reader035/viewer/2022071023/5fd766c08fb1193ae7244cdc/html5/thumbnails/58.jpg)
o 3/12102 3/12192
:2 3/13192
FRQtt FINAL CLEAN t-HOVE OUT OF 2-70168
- An 03/1211112
3/1 :2192 3/12192
t/U!1I91 6
1125191 aDUSH I" COfCIUrr Fat TIlt'BmJ'ES & SEAL
IO.ES Al 3-79168NEiI
lIe 92 1/1SlD:!
"
OWNER PREPIIR£ & ISSUE FUIICH LIST FDa
3-7916"'E - 2
3/121512 3113192
1/2101 o
1/2191
ll'R TO APPL't' Fat CERTIFICATE
UCCUPMC'f {l.r 3-79/l1f1NE
3/1 7/92 3/17/02
5/16192
CONTRACTOR CORA£CT PUNCH LIST rrms .. OWNER ACCEPT AREA
AT 3-79/i58NE -",
5116192 31191
112191
APPLY Fat & RECEIVE CERTIFICATE OF OCCUPANCY FOR 3-7916f1NE - 3
5/17192 3/19/92
1130192
1 /'
INST ALL DEMOlIITAISLE PARTITIONS .. DODaS AT 3-791i58NE - 10
92 2 12192
-, S
3/26192 FCLINSTALL OFFICE
Fl.RNrrURE' AT !-791I5BNE' - 5
3(21 V92 3/26192
2/13192 12
2/28192
C1.£AN ElIISTIN6 CEILINGGRID& IIISlALLNEW
ACDUS'lICTILES AT '-7916I1NE' - 12
:2 W92
3I'D192 FCL I'IOVE IIITO
:2 3130/92
3-791I5BN£ MEA - :2
3/'0192
S/2I92
3/30/92
3 3/4192
8Al..AMCE HYAC S'fSI'Et1S AT
3-7916"'E - flAY HAVE TO 8Al..AMCE
WITH O'nER AREAS OF IIIILDING - 3
$1 92 3/4192
3130192 o
3130192 ET/InO SEI" LATE FINISH OF ACTI .... I"
3IW92 3
3/4192 CONDUCT 8AS TEST AT
3179168NE - 0
3 92 3/S1112
/
![Page 59: Consulting Engineer Mt. Pleasant, Michigan 48853 · the lags must be identified immediately and corrections made if the project is to be completed as desired. I suggest close front](https://reader035.vdocuments.us/reader035/viewer/2022071023/5fd766c08fb1193ae7244cdc/html5/thumbnails/59.jpg)
5 315192 3/11/92
FIN ..... CLEANS. tINE OUT rE 3-NJI58NE - 5
3/11192
![Page 60: Consulting Engineer Mt. Pleasant, Michigan 48853 · the lags must be identified immediately and corrections made if the project is to be completed as desired. I suggest close front](https://reader035.vdocuments.us/reader035/viewer/2022071023/5fd766c08fb1193ae7244cdc/html5/thumbnails/60.jpg)
10
o 1/2111 11219 I
D 1/2191 1/2191
1019191 3
10/11191 REI1DYE .. STORE
ElIISTIN6 DEI"IOI.JNT ABLE
PWITIONS AS REQUIRED AT
'-791Ii8H[ - 3
lOllS/III,
10":', 1/.019191 T/RTD DWfER t1AKE !W.VAGE& STDRE
AREA " .... "ILAIILE F'tR ElCISTIN6 LIGHTS, REI100ELllia WCR( AT DIFfU!lERS. SPEAKERS
'-7916INE- &. OTl£R CEllINa 10/091Q1 ITEt1S AS REQUIRED II.r
3-7911i811E -1
.., "91 I 019J9 I 101' V91 10/17/91
~ e 10/18191 1019191
REtIOVE & PII.TCH E1USTIN6T STATS.
TDI'IISTONES .. OTHER FUlOR I'IDUIITED
DEVICES "5 REQUIRED "T 3-19/66I'E - e
\I;' \4191 11/13191
10/11191 o 10111191
10122/91 (,
10'2919' D'ftNiR IDENTIFY
LOCATION OF ASIIESTOS I1ASTIC DII
101'JOl91 OWNER ABATE
DUCTW(RC AT 1-----1
ASBESTOS I1I1.STIC DN DUCTWORK AS REQUIRlDAT
3-79/611NE - 5 11/19191 11/19191 3-79IMIIE -"
",
1011
\ ,,~, 10121191/.0/22/91
10(29191
:5 10/24191 "",,"
REND"'" EXIST'ING "\ REI1DYfl ElUST'IN& CEIL INa allD& TILE AIIOVE CEllIN6 VOICE,
...s REQUIRED "T O"TA AND POWER 3-7916INE-2 WIRIN6 AT 3-7IJ/158'E
\U4M' -3
et91 10121191 1216191
\ 10/21191
:5 10123191 10/24191
7 11/1191
REtmE EIC 1ST I 116 DRY REMOVE ElIISTINB WALL &. HMaIR'# CARPET AT 3-79I1511NE PoUn"lTICRi AS -1
RIXJJIRED AT 3-79115111[ - 3
11114191 II/lelt! "/19/91 1If.l 191
91 1I~91
'" 0 ". !!1I91 11/1191 C01PLETE COIISTAUCT Mise nASONRY ITEI1S
"T 3-19/661'E-0
12111)191 12110191 .....
![Page 61: Consulting Engineer Mt. Pleasant, Michigan 48853 · the lags must be identified immediately and corrections made if the project is to be completed as desired. I suggest close front](https://reader035.vdocuments.us/reader035/viewer/2022071023/5fd766c08fb1193ae7244cdc/html5/thumbnails/61.jpg)
II/!;U// IlEl'l=O~VE~AI!fI1tI~:::-E-""'"
.flLlIIS DIX:'TWORk AS IIEQUIRED AT
3-79/68I1E - 3
/11/11 91 11113191
o 11/15191 11/&lF9",,!' ~~=~~1.;.;1I...;~9'~11{1!5I9'
Cl£M [XlsrlllS INSTtlU flEW ABOVE NDlE CEILItG CEILItG ELECTIlICAL
tu:TWORIC WITII C,I8.E TRIo ... AT ---4 '1ACUUI1 ClEAMItG AT 3-79J6IIME - 0
3-79/68I1E - 8
11/151111 11/1811i11 11/18111
11/1819' .-
111:21191
PAIIT INSTALL HEW Iil!JCNE CE ILING DUCTWOI!K AT 3-79168I1E - "
11/1810 I 11/211111
4 11122191 I I 127111 I
a»'IPLETE IIiST ALL A.IIO\IE CEILING DUCTWORK AT 3-79J68ME - '"
11/22101 111211111
~1I/15191 III~III 11/l8I1a! II~O_,\I PAIIT INSTALL MEW CCI1P INSTAU IIEW
Iil!JCNE CEILING MJt:NE CEILING IX'OJn &. WIRIIIS FOR CXlNXJIT &. WIIIIIIS FOR
------l'r-------------------------lPOWER. VOICE&. DAT" 1----; POWER VDICE&.DAToI.I---~------------------------
o 1111191 11I1I1I1
PARTIIISTALLMETAL STUDS&. III WALL WORI( FOil WALLS EXTEIIDlftG FIIOI1
STRUCT TO STRUCT /f,T 3-79/6IME - 0
11129191 11129/111 ,. IN WAU ITEMS INCLlIlE
- 8l0CXlNG -CONDUIT -FRAIES • PIPING
1111191 f)
1111191
Pili((" .... IIS &. FINISH MEW DRf WALL AT
STRUCT TO STRUCT PIII(("ITIQNSAT 3-7916111£ - 0
S":t~~~~::6~£ ::s, ~~~~:'Ra~ \ -0 -5
12111f91 121' III 1219191 12/13191
3 11/29I1iI1 121311i11
Cal'lPlMSTALLMETAL STUDS&. III WALL w.:IIK FOR WALLS EKTEIIDING FROI1
STRUCT TO STRUCT AT FJ9IallllE - :5
11/:29191 1213191
"""121410 I .-
1219191 .. ? COI'IP .... IIS &. FINIS.
MEW DRY WALL AT STRUCT TO STRUCT
P /f,RT IlIIJIS AT 3-1916811£ - "
~ 0 "'''01 ''''/II ",.", 7 11/1/9t::Jr'_/I_'_9_' ___________________________________________________________ 1 1_1_' __ /9C::J I/V91
12/10191 1211019, 12110191 12t1Of91
![Page 62: Consulting Engineer Mt. Pleasant, Michigan 48853 · the lags must be identified immediately and corrections made if the project is to be completed as desired. I suggest close front](https://reader035.vdocuments.us/reader035/viewer/2022071023/5fd766c08fb1193ae7244cdc/html5/thumbnails/62.jpg)
12/10191
./'~' 12113/91
APPlYFIRSTCOAT OF P;'IIIT TO DRV WAlL
5l.RFACES AT 3-79/68I'tE - 4
12/HI/91
12/25191 3
12/20191
COMPINSTAlLNETAL STUDS .. IN WAll WORk FDa WAllS EmNOlfG FRO"
STRUCT TO CEILI.S AT 3-191681'1E- 3
12121/91 lIit92/ 1/6192 r=D»P==~~~m~"~F~IH~I:~~ ~~~~~.
NEW DIY WAlL AT STRUCT TO CEILINB
PARrITIONS AT 3-19I68NE - 5
1 3/92 1/6192
""1/6192
/12/:23/91 12120191 12 21 91
12/:0.,91/ 121:201r-::-9..;..1 ___ --..;.1.;;..2f..;;;:O,:.;t191/
119192
12120191
PART IMSTAllI'1ETAL PARr ~6&'FI"'I9H STUDS&. 1M WAll MEW DRY WAlL AT WORk FOR WAllS STRUCT TO CElLINI EmIllIHG FROM PARrIlIl::WS AT
STRUCT TO CEILING AT 3-79168NE - 0 3-79/68ME - 0
12/:23191 12 12121 91 12 27/91
5/ 12/20191
12 91
........ -=PARr':':~A~P=Pl:-:y:-:F:::IN=,SH::"!"".,..,oI PAIIIT .. VINYL WAll
tov£RIN6AT 3-7916.E - 4
116/92 119192
![Page 63: Consulting Engineer Mt. Pleasant, Michigan 48853 · the lags must be identified immediately and corrections made if the project is to be completed as desired. I suggest close front](https://reader035.vdocuments.us/reader035/viewer/2022071023/5fd766c08fb1193ae7244cdc/html5/thumbnails/63.jpg)
.. " IIlSlIJZ I I 161IJ2 "
10 ./ 1129192" 1/W92
e 2/10192
.Iff" fiNISH PAIlfTINB INSTAlL NEW CARPET Nl) APPLYI"" YI",L AT 3-?IJ/68IIE - 10 WAU COllER1NB AT
- 3-""".1E-4
1/1S102 1/16102 1129192
'" 1/16102 4
I12l1IJ2
rz
TRII'IOUT NEW ELECTRiCAl ... LIFE
SAFETY SYSTEMS AT 3-""".1E-4
'192 313192
TlRTO IIITIF' RiLle .. OTHER: A8DICIES ~ DATE OFTESTINB LIFE SAFETY SYSTEMS AT
2-19J61J-1'
S/~ 112 3141IJ2
Dantlon £enU flnlSr.
I 11114190 11J15/90
03--sELECT NUI1I!ER OF TEST PILES TO eE
USED&. LOCATlDN - 1 (1IIIIInple)
11/14190 11/15190
• ,t,ctl" ltu IM'IIIIr • A.ctMtu dllCl"lpthlfl • A.ctl\lltu Mtlm ..... d dll"lthlfl
In .I .... a wl'lI1Clftg dill.
LI18 flnlsr.
Amy"1
INSTALL VOICE, DATA .. powe. TOI"l!lS'l"O\ES
AT r?IJ/68'>E - e
2t:l:4IIJ2
I/W92
CONDUCT LIFE wm TESTS AND N"f!1R(1tIE
S 'l'STE1'IS AT 3-79JDIJ"E - I
3/41D2 3/419 2
0 2/1OJIJ2 211Q1IJ2
3f5JIJ2 31S/IJ2
III'IIt .. J - 0c:I:DtI4Ir 9. J99 J i 1Sbt'"',-79168M IS wm: 0lIl:2'3
0 2110192
/ 1101IJ2
315192 3 15/92
IaWrior 'WOrt for 8I.'H 3 -19168 BOA ItDCIIltiw (JII!>
NETWORfC MODEL FOR FIRST COLONY LIFE INSURANCE COMPANY OFFICE ADDITION Lynchbur8. Virainia
B. J. CoMb:uotioa JoiD.t V.atur. L~ Vi.:nlime 24506
Ralph J. St.ephenson :FE PI ConsuJting~ 323 HIawatha Drtve Nt. P1easant.~ 46653 ph. 5177722537
Sheet 3-79/6Sne
![Page 64: Consulting Engineer Mt. Pleasant, Michigan 48853 · the lags must be identified immediately and corrections made if the project is to be completed as desired. I suggest close front](https://reader035.vdocuments.us/reader035/viewer/2022071023/5fd766c08fb1193ae7244cdc/html5/thumbnails/64.jpg)
C!D 2(91 /-7r 2/91
10
1018191 o
1018191
DwrER .. COIIT'RACTDR RESOLVE STATUS DF
19 FIREALARI1 SVSTEI1
:z ::~: OWI'ER RESQ.\IE 88 ELEVATOR RECALL
SYSTEI1 DESISN 1018191
1120/92
f'
/1/2"92
10:.,91. .... '/ 1011191
1120192 a
1018191 IOIB191
1/20102
o 10/B191 1018191
o I OlBlg I
T IA TO oaOlER El. V· PREPARE & SUII'IIT REVIEW .. APPROIIE FM.'I t. DEl.I't,IER EARl.. '" 1001
IlIl9I
9HfP MAWlfI6S FeR StU' DRAWIN&S lUi c:aenu::TIDNITEI1S EARl. Y DELIVERIES EAII. 'I' DEL 1IIEIIIES
\'\~018l91 101.191 1018191 1011/91 1018191 10/'01'91 10111111
~ o 101819 I 1018191
PREPME .. SUlII"IIT HDUOW METAL 9HfP
OR"WIIIDS
1125I!il2 I/23JliI2
\ o 10NGI 10l8lDI
PREPME .. SUlII"IIT HARDWARE SCHEDU.E
o 1018191 10/8/91
REVIEW. APPROVE HOLLDW"[TAl 5KF
OR"WlfES
loIe/91 o
101el11
FAil .. IlEtiVER HDLLOW"ETAl
FRAtES .. IlCJCJ1S
1I23JliI2 1123/112 I 92 1f2S192
10/MI 1~91/loIe/91 REVIEW & N'PROYE
HMDW_ SCHEDtU FAB&IlElIVER
HNI>'WME
o 101el11
" SUBI1IT TEI1PLA TES 1-------1 TO.., FAlRICATOR 1------1
117/92
10/8/91
o 1010/91
117192
1018191 101el1i1 loIe/liIl 1018191
o loIe/91 101el91
PREPARE & SlI!I'IIT FIRE PROTECTION SHOP
DIlAWIMlS
111/92 I 192
o 1018191
ET/RTOSETU.TE FINISH OF AalvrN
1018/91 10 IeIIII
![Page 65: Consulting Engineer Mt. Pleasant, Michigan 48853 · the lags must be identified immediately and corrections made if the project is to be completed as desired. I suggest close front](https://reader035.vdocuments.us/reader035/viewer/2022071023/5fd766c08fb1193ae7244cdc/html5/thumbnails/65.jpg)
o I 0te/9 I 1018191
-----------I-/~---O~/~n
10181111 o
101el91
DISTWIBllTE SPRINKLER S¥$TE11
DESI6MTO I'IEJ:HAMICAL
ccrm:u.CTDR FlJl fifE ALAII1 CCM"AtT
PDINTS
1219191 e
12/1e191
REPAINT DEI'Ofl"AlBLE PARTITIOIIS ... T 1-79 -
B
2 13192
o 112192
PAIRT INSTAll. III!J(NE CElLINI FIRE ALARI1 ROlGI WIRINII ~T
1-79 - 0
":20192 I t.2CV92 1(2()I92
1018191 1'~91/'2'27191 1':92/'15192 1~92 1I1~92 REVIEW" I>i'ffll.CNE PAlrTINSTAll. M!!tNE OO1P INSTAll. III!J(NE OO1P INSTALL /ll!Jl:NE
FII'i£ PRIFTECTIIlII SHIP CEIL!!. RCUlHFIRE CEILING RCUlHFIf1.E CEILlN& FIRE AlLARI1 D''''WIIDS PROTECTIl»! PIPING At PROTECTION PIPINS AiT ~ WIRIN& ... T 1-79
1-79-4 1-79-4 1---------4 -3 1--------------------------
I /92 IflQ192
" "13192 1116192
\ 92 92
![Page 66: Consulting Engineer Mt. Pleasant, Michigan 48853 · the lags must be identified immediately and corrections made if the project is to be completed as desired. I suggest close front](https://reader035.vdocuments.us/reader035/viewer/2022071023/5fd766c08fb1193ae7244cdc/html5/thumbnails/66.jpg)
o 1113/92 1/13/92
- ,_,I '\"
1/231112 4
11%8192 PART lET ALL NEW CEILING DIFFUSERS.
LIGHTS, StUE DIETECTtlRS,
SPIiIIM<1£R lEADS&. SPEAKERS 'T '-'19 -"
21 2lVII2/ 212 "'12
11219' o
1121111
T/RTO START LAV OUT T(J1E1STOIES - ?
112 4192 1124192
If2JIII :$
1141111
L'V OUT 10teSTQfES AT 1-19- 3
11.2 "92 1126192
o 213192 2(3192
o 12/,.,/111 12/,efll'
2"419~/14192
Inl91
~ :$
119191 DRIU IllLES F1:R POkE THI!.O.JIJiS AT 1-19 - :5
1129192 1131
:5~92~-(~-9-2-------------------------------
1129/92 2J3~ V ItlOI92
o 113OJ12
COHP INST Al..L NEW CEILlII6 DIFFUSERS,
liGHt'S, StlOICE DETECTORS,
~INICLER HEADS & SPEAKERS AT l-n-4
312192 315192
INSTl t1IUwaIC AT 1-711-0
2~ 92 /'
![Page 67: Consulting Engineer Mt. Pleasant, Michigan 48853 · the lags must be identified immediately and corrections made if the project is to be completed as desired. I suggest close front](https://reader035.vdocuments.us/reader035/viewer/2022071023/5fd766c08fb1193ae7244cdc/html5/thumbnails/67.jpg)
(I 2 3131102 3131102 ..... 1192
FROtt FINAL CUM & NOVE OUT Dr 1-711 -
AN 03131182
1192 3131192
1110191 '" 1115191 RO ... H IN aIIIlUli Fat TIltlllSTCN:S &. SEtIIL HDLES"'T 1-711 - 4
!IJ 92
OWNER PREPARE &. ISSUE PUIICH LIST FDR
1-79 - 2
3131/02
1/21111
..... 1192
o 112191
i IR TO APPLY f(J!
CERTIFICATE OCCUPN«:Y AT T-?9
192 413192
4 417/92
COIITRN:11Ii! CXRIECT PI.KH LIST (TEns &. OWNER ACCEPT" AREA
AT 1-79- 4
417/9 412192
";'.~" 112191 4
..... ,3192 ' .....
2 411 ..... 92 ..... ,!S192 4Il!S192
(I
..--,5191 APPLY Fa! & RECeiVE
CElITlFICAiE CI' OCClPANC'tFOR 1-79
-3
411 92 41"
11 ..... 92
INSTALL DEI1CUIIT ABLE PARrIilOE:& DOORS
ATI-N-IS
211 92 ./
/92
ra. INSTALL DFFICE ra. I1JI.IE IIITO 1-?9 FURMITlRE AT 1-79 - AIIE"'-2
418192
3/6192
4
""13192 411 ..... 92
312:)/92
...,,5192
2 3/23192
Il.tAl ElIISTIN& BALANCE HV~ CSL~GRID&' SY5TEtlS "'T 1-711- (I
list tllLL lEW NAY HAVE TO BALANCE
E T IR TO SET LAn: m.'SH OF ACTIVlrl
4/15/92 411 5191
5/W9::! CONDUCT lAS TEST AT
,-711-0
ACOUstiC TILES AT t------I\tIITHOTtER ARfASCI'I------1 1-711- 10 ItUILD~- 2
92 3/19192 2 :5 92 512 92
/
![Page 68: Consulting Engineer Mt. Pleasant, Michigan 48853 · the lags must be identified immediately and corrections made if the project is to be completed as desired. I suggest close front](https://reader035.vdocuments.us/reader035/viewer/2022071023/5fd766c08fb1193ae7244cdc/html5/thumbnails/68.jpg)
rl24192 5
3130192
FIM .... CLEAN &. t'IIVE OUT OF 1-113 - 5
3130192
![Page 69: Consulting Engineer Mt. Pleasant, Michigan 48853 · the lags must be identified immediately and corrections made if the project is to be completed as desired. I suggest close front](https://reader035.vdocuments.us/reader035/viewer/2022071023/5fd766c08fb1193ae7244cdc/html5/thumbnails/69.jpg)
1-11
12
o 11219 I 1/;219 I
CJ 112191 111191
TIR TO OWNER 11111([ AREA AYAILABLE FCR REI'IXELINB WCfiI( AT
1-""'- 10(09191
r:. 91 12f ygl
1212191
12/
RD10VE &. snRE ElIISTIIB
OEI'O..M"ABLE PMTITICWS AS
REqUIRED ATI-79 - 5
SALVABE & STORE ElIISTINB LIBHTS,
DIFFUSERS, SPEAICERS &. OIlER CEILINB
ITD1S AS I<£QUII<£D .. r 1-79 - 3
Lt91 1210191
~ 5 12/619 121219 I I
I<£If)YE & P .. TCH ElIISTIIB T ST ~TS.
TOI'Im'"CNS &. OllER FL.OI:R MOUNTED
DEVICES IJ.SI<£QUIRED AT 1-""'- 5
III 92 1(141'92
....
121'
12/61'91
1/15192
o 12N91
REtlOIE ElIISTING CEILlNB BIIO& TILE
AS REQUIRED ~r 1-79 - I
V9 I 12f
w
"\ ~91
I 21619 I I o
2(619 I
REIf)YE EICISTlm DR'I' WALL &. MoIr.SOIR'I PIJ.RTITICWS AS
REQUIRED "T 1-79 - 0
111 "92 1115192
12/10191 4
12(1:sJ9 I 12/16/91
\~ I
111
OwrER IIlENTIFf OWNER ABATt LCCATICW (F ASBESTOS MASTIC ON
ASBESTOS l"IoISTlC ON DUCTW(JIJ( AS DOCTWDRK .. r 1-79 - 1------1 REQUIRED .. r 1-79 - 5
4
12(1:sJ9 I
5 12(16191
RD101E ElIlSTINB .. BOlE CEILIM& Io'OICE.
DATA IIIC POWER WIRIMlAT 1-79 - 5
'2
I,
1/15192
6 12(16191
RD10VE ElIISTINB CARPET AT 1-79 - 6
"'92 112219
12/16 91 12 91
~"".'" .... o
12114191
C01PLETE o:rena.cT MISC MASONR ... ITD1S
AT 1-""'- 0
1/2 '192
![Page 70: Consulting Engineer Mt. Pleasant, Michigan 48853 · the lags must be identified immediately and corrections made if the project is to be completed as desired. I suggest close front](https://reader035.vdocuments.us/reader035/viewer/2022071023/5fd766c08fb1193ae7244cdc/html5/thumbnails/70.jpg)
113I9~
1~92 ~116I92
\
5 1/10192
'--""!CUAII:":"::"~DI=IST=IN~i--' INSTALL NEW AIM I>I!!£NE alLIMl alLIMl ELE.CTRICltL
Dt.J:TWORIC WITH CAlLE. TRAY AT 1-19-__ ..... YAtoo" ClEANINl AT 1------1 5
\ ..
1116192 PART INSTAll IIEW
N!II:NE CEILING DUCTWORK AT 1-79-
4
4 1122/92
ta'1PlETE INSTAlL AlKNE CEILING
DUCTWORIC AT 1-79-
'\ 1-19-11
t2t.23/9 I 113102 1/10102 1/13/92 1116192 1117192 1122/92 1/61112
\
~1/10I92 1/1:'92 1/13192 1~2 CCMlUIT 6. WIRINS FeR a:roJIT 6. WIRINS FOR
.... PART INSTAll NEW ta'1P INSTAll NEW ""
\
N!II:NE aiLING "-!ICNE CEILING
------It------------------------IPOWER. vOla 6. OATAt-----i POWER. VOla&DATA I-----~------------------------
o 12/16191 12/16191
PART IIiSTILL METAL STUDS 6. III WAll W(Jik FOI WAllS EXTEIIDlnG FROM
STRUCT TO STRUCT II.T 1-79- 0
IfZ :t92 If23I92
'",-
.N WALllllMS INCLUDE
-1Lt:Ja:ING -COHIUIT -FRAnES -PIPING
12(16191 o
12I16J91 PART HIlliS 6. FINISH
HEW DR' WALL AT STRUCT TO STRUC'T
PARTITIOIIS AT 1-7'il-0
NIC PlIIlIC ADORm ~ PUl.IC ADDRESS SVSTEM AT 1-1'9 - Q S't'STEn AT 1-79-:5
1/16192 ,,, 1/92 1/16/92 1122/92
o 1/22192
CDrP IIiSTILL METAL STUDS 6. III WALL WORK FOR WALLS ElCTEIIDlnG FROM
STRUCT TO STRUCT AT 1-19- 0
IfW92 IIW92
"'-1/22J92 <>
1122I9z,. to .... HAilS &. FINISH 7
lEW DRIf WALL AT STRuer TO STRUCT
PARTITIONS O\T 1-'79 -0
~ 0 ''''''' II..," " .. '" 7 IVl619t==J_2_/l_61_9_' ___________________________________________________________ 1_2/_1_61 __ 9[::]2/16191
V'23I92 IIal92 11aI92 1/23/92
![Page 71: Consulting Engineer Mt. Pleasant, Michigan 48853 · the lags must be identified immediately and corrections made if the project is to be completed as desired. I suggest close front](https://reader035.vdocuments.us/reader035/viewer/2022071023/5fd766c08fb1193ae7244cdc/html5/thumbnails/71.jpg)
. /..," 1/22192 1122/92
/ItIIPl't FIRST COAT OF p~lIrr TO DIY WAll
SURFACES AT 1-70-
112:519:2
I 23/92
3/ ',23192 1130192 1131192
COrP .. Sf ALL METAL COrP HAIII&. FINISH SlUDS &. .. WALl IIEW DRY WALL AT \ftIIII( FOR WAllS STRUtT TO CEllIlIG
INSTAll DO HARDWARE AT I
I EmllOlMi FRaM 1------IPloRTtnOIlS AT 1-711 -1-___ -1
STROCT TO CEllI.S AT :s 1-19-3
11221112 1/22192 PART INSTALL METAL PART HAIlS &. FINISH
STUOS &. III WAll NEW DRY WALL AT WOf!I( FOR WAllS STRUtT TO CElLINI ElCTEII)IIIll FROM t-------IPARTITI€*S AT 1-79 -
STRUCT TO CEllfllS AT 0 1-79- 0
'2 1/23192 1120192 2
112 1131192
~ 1/30/92
PART APPLY FIIII&I PAIIIT &. VIN'I'l WALL COVERIIill AT 1-79-
o
2/3/92 2/11'92
![Page 72: Consulting Engineer Mt. Pleasant, Michigan 48853 · the lags must be identified immediately and corrections made if the project is to be completed as desired. I suggest close front](https://reader035.vdocuments.us/reader035/viewer/2022071023/5fd766c08fb1193ae7244cdc/html5/thumbnails/72.jpg)
-
.. "-216192 217192 ,Ji
.Q/'P FINISH P"IIfTIr,e INST ALL IIIW CARPET Nf:} APPL1111G '~I""L AT 1-79- 5 WALL CaWRIr,e Ai
1-71 -.II
216192 217/92 2113192
~217192 Tllitt Otrr "EW
2 2/10/92
ELECTRICAl.. & LIFE SIom'!' S'¥STEr1S "'T
1-19 - 2
S 2/2OJ92
I"STALL \IOICE,DUII .. POWEll TOI18STONES
AT 1-70-5
5(17/92
2111192 COfiOUCT LIFE SAFETY TWI'S All) APPROVE SYST£l'IS AT 1-79-1
3/19192 3/20192 3/23112 3/23192
11219 I I/:'J.I/ Till iO IIOTIF' Ft.ft.IC & OTHER.t.II£l11CI£S(F DATE OF TESTING LIFE SIom'!' S'¥STEr1S AT
1-19 -7
3/23J1iI2 3123192
!iIIr1y atart .",Uon EIIr111 tlnl"
1 11/14190 I 11 1 5t90
03-5eLECT IIUttlE. ElF TEST PILES TO ££
USED & LOCATlOII- 1 (1OlIlI'lIplel
11/14190 1 1115190
• Hotly'ty .... nelf' • Hotlylty dllCMPtldn • Hotlylty "tlrnfltAld Ilretlen
In 11.,,12 wll1elng IlIIIII
Ldl ,Inllh
A':II,".
0 2I2OJ12 2t201!12
5124192 3124192
~ -I • 0I:t.t::iC0W 9. 1991 USll~F79 iIlt 'WOJl .sa: 2113
0 / 2120/92 2 120192
3124192 :5 124192
Iaterior 'WIDl'k for arM 1-19
NETWORK. MODEL FOR FIRST COLONY LIFE INSURANCE COMPANY OFfICE ADDITION Lynchbufa. Virginia
B. J. CouhuotiO:D Joint veata::n L~ V'u ..... 24506
Ralph J.~FEPE CoasulI.tni ~ 323 Hlewathl.lriv& MI.. P.Ieasent. MIchiaIn 48653 ph ;177722537
Sheet #1-79
![Page 73: Consulting Engineer Mt. Pleasant, Michigan 48853 · the lags must be identified immediately and corrections made if the project is to be completed as desired. I suggest close front](https://reader035.vdocuments.us/reader035/viewer/2022071023/5fd766c08fb1193ae7244cdc/html5/thumbnails/73.jpg)
,
2/91
2191
10
o 10/el91 10tefgl
DWYEII &. Ol\I1llJoCTOR ReSOL .... E STAlIIS OF
19 FIIIE ALAR" $'ISTEM
:z :~.~: O\IINEII IIESCL 'Al lie ELEYAl'Q'i: ReCALL " ION9I $'ISTEI1 Del6M I ON9 I
1;17/92 o
1018191
PIIEPARE " SUBMIT SJo«IP I)RAWIM6S f(R
EARLY tELI'AlIIIE5
!II~0I8191
1018191
1011J191
o 1018191
PREPN;£ &. S1..8'fIT HOLLOW "£rAL SH:P
DRAWI1'IiS
II 17/92
1018191
1/17/92
o 1018191
Re ... IN &IoPPIIM SIO' ORAWIII6S f(R
EARl.. Y DELI'o'EIIIES
10/8191
ION9I
1018191
o 10181111
R[\/IEW" ~E HOllOW I1ETAL SIO'
DIIAWIFG
o 10tefgl 10tef91
FII8& DELIVEREtUII!{ ~IDMITEttS
o 1018101 10t81gl
E TIl! TO srr LATe FINISH OF ACTI .... I"
10 91 1018111 10 91 10181111
o 10I8I9I I O/ao'g I
F .. e&.tELI..,.R HOllOW I1ETAl
f'R4I'ES &. OOCRS
\Ir~ 92 I(JID2 I(JI02 1(JI92 113 92
\ 0 0 I OI8lDI/. OI8Ig I 10/ao'91 1018191 1018191
92
IO/ao'91 PREPARE &. S1..8'fIT
HARDWARE StHo:u..E
ION91
o 101B/91
121121111
liN lEW & AfPII.'O'IIE HMD'fIARE SCI£DU..E .. SUBnIT TEMPLATES
TO tIM FABRICATOII
1018191 IGI8I!iII 1018191 I 8/ao'9 1
o I OI8Ig I I O/ao'll I
PREPARE &. SlEiI1IT FiRe PRIITOCTIDM SHOP
DRAWIN3S
12/1 91 12 12191
![Page 74: Consulting Engineer Mt. Pleasant, Michigan 48853 · the lags must be identified immediately and corrections made if the project is to be completed as desired. I suggest close front](https://reader035.vdocuments.us/reader035/viewer/2022071023/5fd766c08fb1193ae7244cdc/html5/thumbnails/74.jpg)
o IOle/gl 1018/91
-----------I-n-7-'9H 117/92
DISTRIIIUTE 5FRIIIKLER S\'$TIt1
OESI611TO nECHAlllCAL
c:cr.rrRACTDR FeR FIRE ALAI!t1 COIITIoCT
POINTS
10114191
REPAINT DEI'1(WTAllLE PARTITIONS AT 2-791118 - 13
3 1219191
PART INSTAlL ABOVE CEILING FIRE ALARM IItlUGH WIRING AT
2-79/68 -3
1117/92 1117192 1121J9~
lotll/91
1117192
18I:'91/.11'2IJJ91 6/
1214191 1215/91 12f~2191 ~12/13191 :5 12(17/91
"" "-. C01P INSTALl.I«NE REVIEW & I>I'fI'RtNE PART INSTAll. I«NE C01P INSTAll. ABOVE FIRE PRDTECTIOII SHOP aiLlt.G fO.JlH FIRE alLlN8 ROIJ3H FIRE CEILINB FIRE ALARM
DRAWINGS PAOTECTICW PIPIN8 AT PROTECTIOII PIPING AT RO.JeH WIRIMB AT 2-791611-6 2-7Q/6E1- 6 2-791611- :5
RI12/91 12/12191 12/12191 12119191 12/20191 121: 019 I lIZ ~!il2 '(24192 \ \
..
/
/
![Page 75: Consulting Engineer Mt. Pleasant, Michigan 48853 · the lags must be identified immediately and corrections made if the project is to be completed as desired. I suggest close front](https://reader035.vdocuments.us/reader035/viewer/2022071023/5fd766c08fb1193ae7244cdc/html5/thumbnails/75.jpg)
o '17191 12117/91
\" 2f3J92
6 2/101112
PAII1INSTALl NEW CEILING DIF'FUSDI!S,
LIGHTS, SI'QE 1ETtt:rCRS.
SPRIJlQ.ER HEA.tIS & SPEAlCIRS oIIT 2-70/6e
-6
112191 o
112/91
T/RTO STMT LAY OIlT TQ'IBSTOIES - ?
192 tmlft
112.1111
LollY DUT 'OmsnHS Ar 2-79161- 1\
Im/92 213/92
o 2/161112 2118/92
o 11/1/91 1 I filII
31919RI9Ig2
~ 1/10/91
r. 1/111.1
DRILL HOLES f'(R Pa:E THROWHS Ar 2-N11S!
-6
21'4 92 2'11
3f1~9~-tl-~-9-2------------------------------
2.11:/ COI1P INSTALl NEW CElliNS DIFFUSERS,
LIGHTS, SI10ICE DETECTORS,
SPRINKLER HEADS & SPU.':ERS Ar 2-791611
-6
2/11192 D
2/111.2 INSTL I1ILLW(RI(Ar
2-791611-0
2/1 1192
/
![Page 76: Consulting Engineer Mt. Pleasant, Michigan 48853 · the lags must be identified immediately and corrections made if the project is to be completed as desired. I suggest close front](https://reader035.vdocuments.us/reader035/viewer/2022071023/5fd766c08fb1193ae7244cdc/html5/thumbnails/76.jpg)
412
o 41211Q2 4121/92
FIIOtI FINAL CU ..... & I10VE OUT OF 2-19168
- N'I 04121/92
1192 4121192
OWNER PREPARE ... ISSUE PI.N:M LIST FOR
2-791615 - 2
4121192
1121111
04122192
o 112191
T/IHOAPPL¥ FCR C£RfIFICATE
accuPMCY AT 2-19tee
1192 ~2
CONTRACTOR CORRECT PUNCH LIST ITEMS & OWNER ACCEPT AREA
AT 2-711168 - ..
41f31!12 412fJJ~
112191
APfI\. Y FOR & RECEIVE CERTIFICATE OF OCCtJPANCYFDR
2-79/68 - 3
412 "92 412e192
...: S
5NIl2 f'CI. IIIST ALL OFF ICE
FUl:NlTURE AT 2-19/68 - 5
41211/92 515192
3119192
I1EAII DISTINS CEILING GRID ...
IIISTALLfEW
15 .atel92
5/6192 f'CI. I'OYE INTO
2-19168 AREA - 2
5/6192
419/92
517/92
3 411S192
I!W.ANCE HV~ SYSTEMS AT 2-711/68
- 0 I1AY HAVE TO
517/92 o
517/92
U/RTO SET LATE FINISH OF ACTIVITY
517 92 5171 92
4113/112 o
4113.192 CONDUCT BAS TEST AT
2-79-68 -0
----~----------------------------------~~--------------------------------------~ ACOUSTICTWESAT 1-----1 BALANCE WITH OTHER 1-----1 AREAS OF BUILDt,. -
8 Vl8191 1/29/91
ROUSH IN cuc)uIT FOR TOI18STONES & SEAL
HOLES AT 2-N/68 - iii
~12192 2/21/112
~
3/!i1192 IIIST ALL DEI10UIIT ABLE PARTITIOIIIS & DOORS
AT 2-7!i1/68 - e
92 3 18192
2-79168- 15 3
2 41992 1S/92 411 92
![Page 77: Consulting Engineer Mt. Pleasant, Michigan 48853 · the lags must be identified immediately and corrections made if the project is to be completed as desired. I suggest close front](https://reader035.vdocuments.us/reader035/viewer/2022071023/5fd766c08fb1193ae7244cdc/html5/thumbnails/77.jpg)
5 "'14192 oU2(N'92
FINAL ru..".& mYE DIlT DF 2-7D/e8 - 5
"'1 V92
/
![Page 78: Consulting Engineer Mt. Pleasant, Michigan 48853 · the lags must be identified immediately and corrections made if the project is to be completed as desired. I suggest close front](https://reader035.vdocuments.us/reader035/viewer/2022071023/5fd766c08fb1193ae7244cdc/html5/thumbnails/78.jpg)
10
o 112/91 1/2/511
o 112/91 112/91
101'9J91 3
10111lgi
RmOIlE .. STORE EXIST IllS
OEMOUNT AILE PotRTlTllIftS AS
REQUIRED AT 2-79168 -3
1011 91
~/ 10191'1 101'9J91
TIR TO OWNER /'lAKE SAlVASE&. STORE AREA AVAlLA8LE FCR £lUSTING LlGIfTS, REtt:IlE1.IIIG WCfI:I( AT DIFFUSERS, SPEAKERS 2-79/~ - 10lOQigi &. onER CEILING
ITDtS AS REQUIRED AT 2-79/61 - 10
I'~gl lONg I 10/W91 lOll 2191
~ 101'9J91
10 10122191
REItOVE &. PATCH ElIISTIIIGT STATS,
lOteSTONES .. OTHER FLOOR MQUIfTEI)
DEVICES AS /ll£QUIRED AT 2-751/68 - 10
12 r.:~1 12113191
....
10/11191
121 I 1S/9 I
o 10111191
REttDVE EXISTING CEILING BRII> &. TILE
AS REQUIRED AT
iif
\
I O(Xllg I 6
II/6Igl
IIWNER IOENTIFf L.CCA TICft Il'
ASflESTOSI'I#STIC 011 DUCTw.:R<: AT 2-191&8 -6
91 1116t91
II 1118/91
REl'tOVE DISTIllS ABOVE CEILlIIS VOICE.
DATA IIIf'J POWER
Iln/91 OWNER ABATE '"
ASBESTOS "UriC ON DUCTWOIIJ( AS
REQUIRED AT 2-71l1ee -8
IIn/91 Il/le/91
2-70161 - 5 WIRIIIB AT 2-79/~-
\n 8
10~ Sl91 1M 91'91 !l2 1/14192
10123/91 :2
101':24191
REItOVE EXISTING DRY WALL" "ASONR'f PARTITIONS AS
REQUIRED AT 2-79/68 -2
12/1 WIll 12117/91
\ 10125191
10 Iln/91
IIEl'tOVE DISTIIIB CARPET AT 2-191611 -
10
12/1 51'91 1(2/92-..
~llnl91 Ilhl!ili .... COttPLETE a.sTRI.CT MISC I1ASDHR'I' ITEl'tS
AT 2-19168 - 0
I/2H/92
~. ,
![Page 79: Consulting Engineer Mt. Pleasant, Michigan 48853 · the lags must be identified immediately and corrections made if the project is to be completed as desired. I suggest close front](https://reader035.vdocuments.us/reader035/viewer/2022071023/5fd766c08fb1193ae7244cdc/html5/thumbnails/79.jpg)
RD1DII'E MOYE CEILINB DUCTWCWlK AS REQUIRE!) ",T 2--1D/ee
-s
I MilO I
10 12/19191
IHST AU. NEW A80\1E CElLINI ELEtTRIt'AL
CAIU 11UY AT 2-791611 -10
6 1213OJ!il1
PART INSTAll !lEW N!JtNE CEILING DUCT\tORI( AT 2-79168 -6
12~V91 6
118192
CCI'1PLET£ INSTAlL I4DIE CEILING DUCT\tORI( AT 2-791611- 6
12/6101 12119191 12120JIIII I 2130JIJ 1 12~1 It 118I!il2
~1212011i11 4 12/261111 12/:27J!il1
, " 1/219
PART INSTALL !lEW CCI'1P INSTALL NEW N!JtNE CEILING N!JtNE CEILING
ctrQJlT &. WIRING FOR OJIP.JIT 40. WIRING FOR -----'r-------------------------IPOWER. "OICE&'~TA i------IfIO'IIIER.. "OICE&.I),IITAI---~------------------------
:3 1118111 1 '/l2l1il1
PART'MSTALLNETAL STUIIS&.IIIWAll \tORI( FOR WALLS EICTEMIIING fRIIM
STRUCT TO STRUtT AT 2-791811 -3
92 '('1192
IN WAU ITEMS INCLUDE
• BlOCKING -CONDUIT • FRAItES • PIPING
4 '" 11/13/91 I II 18I!iI I
PARr HIIIG&. FINISH IIEW DR' WALL AT IiTRUtT TO STRUCT
PARrITIONS AT 2-W68-4
IteJIiI2 1I1~1iI2
~ o IInl91 IInl91
Nfl PI.Il.IC ADDRESS Nt) PlIl.IC ADDRESS S¥STEM AT 2-7911'111 - S'l'STEt'l AT 2-19It11 -
4 4
1I1S/92 1120192 11:21192 f(2<4I92
:3 1~!iI 1/1~92
COMP'"&TAl.LNETAL STUDS&. 'M WALL wa;IK FOil WALLS EICTEMIIIII$ FROM
IiTRUCT TO &TIIUtT AT 2-7911111 -:I
1~1iI2
COI"P HANG &. FINIS. NEW DRV WAU. AT
STRUCT TO STRUCT PARTITICNSAT
2-79168 -4
1114/92
~-------------------------------------------------------------------------1121)/92 1120192
,/'
![Page 80: Consulting Engineer Mt. Pleasant, Michigan 48853 · the lags must be identified immediately and corrections made if the project is to be completed as desired. I suggest close front](https://reader035.vdocuments.us/reader035/viewer/2022071023/5fd766c08fb1193ae7244cdc/html5/thumbnails/80.jpg)
1120/92 ItI'f'l Y FIRST COAT Of' PAIIIT TO DRY WAlL
SlR'ACES AT 1-19/68 - 5
1131192 PARTINSTAllHETAl
STUDS & IN WAlL \IIOIIk FOR WALLS EXTENDING FROt1
STRUCT TO CEiliNG AT 2-70/68- 0
2 92 2
5/ 1131/92
I 1/92
:s 2115/92
CO .... INSTAll METAL STUDS &. III WALL WORK FOR WALLS EmllDlfG FROI'I
STRUCT TO CEILlII6 AT 2-79/68 - 3
1/31/92 PART lIANG & FINISH
NEW DRY WAlL AT STRUCT TO CElLINI
PARTrTlONS AT 2-79168 - 0
21&192 26192
4/ 216192 2111192 2/12192
2 2/1S1P2
CO .... HAilS & FINISH NEW IIR' WAll AT
STRUCT TO CEILING PAIlI"IT IONS AT
2-70168 - <4
92
INSTALL DOORS & HARDWARE AT 2-79168·2
11/92 2114/92
" 2112192
PART APPLY FINISH PAINT & VINYL WALL
COVERtNS AT 2-701611 - <4
2/1 92 2/17/92
![Page 81: Consulting Engineer Mt. Pleasant, Michigan 48853 · the lags must be identified immediately and corrections made if the project is to be completed as desired. I suggest close front](https://reader035.vdocuments.us/reader035/viewer/2022071023/5fd766c08fb1193ae7244cdc/html5/thumbnails/81.jpg)
.. " 10 ./ ~2118192 -, 21211112 21241!12 :5/eJ9~ 319192 ;;r-
., 3118112
COt'P FINISH P,t,IHTINB INST ALL NEW CARPET INST ..... L YOICE, D~TA /IN) APPLYINO VINYL AT 2-79168 - 10 .. POWU TOI"8STONES WIoU COYERING AT AT 2-7W68 - 8
2-79168 - 4
0 3118192 :$/18112
41141'92 41140'92
18192 2121/92 21241D2 :SleJ92 4I2J92 4113/92
/' "" 2/241112 ~./ TRII'I OUT NEW
ElECTRICAL" LIfE SAFETY S'l'STEl"IS ~T
2-79168 - 4
192 4110192
112191 T IR TO NlJTIFf FUI!l.IC I), aTHER A&ENCIES '* D,t,TE OF TESTINB LIFE SAmy S'l'STEl"IS ~T
2-79168 -,
4113/112 4113/92
terly start DlAtlan Elrty flnlan
I 11115190
03-SELECT NUt'llER OF TEST PILES TO til
USED 3. LOC,t,TIOII- 1 (exlllll'lpl.)
11114190 11115190
• tIoI:;tlYltli rulNlt' • tIoI:;tlvlty dllCr1l1t1an • tIoI:;U ... lty 118Umllted dlll'llUOn
In .II111NG WIRing d'll_
Lete stllrt LIIte tlnl,h
As;n Ylt I
CONDUCT LIFE SAFm TESTS 10110 ~E SVSTEMS ,t,T 2-7!11e8
- I
"1 '192 <41131
, 9 aM Ac#dI';J .......
92
[tmt·l-~ t 1991 j II1IP2 -79/68 tilt 'III'OR. 4B1: :ld3
0 3/18192 :5
/ 118192
4114192 41141'92
IatKior wr:lr for vee 2-? 9/6 8
NETWORK MODEL FOR FIRST COLONY LIFE INSURANCE COMPANY OFfICE ADDITION Lynebbura. Vireinia
B. J. Co:ub:atio:a Joint V.Atun L~"" Vu'" 24,06
Ralph J. Stephenson FE PE ConsuJl.inS~ 323 HleWlUvl Jrtve MI.. Pleasant, MIchtIIn 4:6653 ph 5171722537
![Page 82: Consulting Engineer Mt. Pleasant, Michigan 48853 · the lags must be identified immediately and corrections made if the project is to be completed as desired. I suggest close front](https://reader035.vdocuments.us/reader035/viewer/2022071023/5fd766c08fb1193ae7244cdc/html5/thumbnails/82.jpg)
.. -tIA-.
PHASE 1 TinD START OF
REI'O'.)ELlII6 ElUSTllI1 D WING - Fa. REI100EL
-W16101
FWoSE 1 'lAC ATE L'IotR LEVEL, I an ADDrTlCW AT
TERRACE .... 1ST FL. ENTIRE 2110 n &.
ENTIRE lRD n DCfPT EIlECUTIYE AREA
PHASE 1
OWNER REt'D'VE HIP.ZMtOJS
";'TERIAL$AT REAR
PHASE 1
E T IR TO SET LATE FINISH OF ACTIVITV
ST ;'11 &. LD'II'I:R LEVEL /----004
PHASE 1
PART IlEI1Il.ISH REaD ¥lUilCAT LOWER
LEYEL-158
PHASE 1
PART IlEI1Il.ISH REaD WORK AT 1ST FL 1079
ADDITION
PHASE 1
CIJI1> DEI1Il.ISIi REaD WORK AT La"""R LEVEL
PHASE 1 CIJI1> DEI1l.ISH REaD 'IotORK AT lSTFL lD70
ADO IT 1011
PHASE 1 r:R~EI'IOOEl=-==--L:-:OW~ER~L£\I~D..'" TO TEt'IPORAR'I' LOUIIIE
AREA
PHASE 1 REMODEL 1ST n 111
![Page 83: Consulting Engineer Mt. Pleasant, Michigan 48853 · the lags must be identified immediately and corrections made if the project is to be completed as desired. I suggest close front](https://reader035.vdocuments.us/reader035/viewer/2022071023/5fd766c08fb1193ae7244cdc/html5/thumbnails/83.jpg)
IMASE 1 PHASE I PHASE I PHASE I PHAIIE 1
fCI. Kl\I£ IHTO TEI'IP DEI"IIl..ISH REDO WORK REHODEL TERRACE Kl\I£ LUNCH ROil'! ET/RTO SET LIlUNGE FR\l'I TERRACE AT TERRACE LE\IEL-19 LEVEl.-79 FROM LOWER LEVEL TO COMPLETION DATE 0' LEVEL 197'i ADDITION REnOOELED TERRACE UJNCH RIXI1I'1OVE
LEVEL - 1919 ADDITION
5E I PHASE I PHASE I
COtA.ETE ALL I1DYE CENTRAL fiLES ET IR TO SET LATE TEIRACE LEVEL FROM TERRACE LEVEL FINISH IJ'" CENTRAL
IIB1ODELINl4T In9 AT 11I6111i1E1"1lDELED FILE MOYE AOOTION AREA TO NEW TERRACE
LEVEL - 1919 ADDITION
![Page 84: Consulting Engineer Mt. Pleasant, Michigan 48853 · the lags must be identified immediately and corrections made if the project is to be completed as desired. I suggest close front](https://reader035.vdocuments.us/reader035/viewer/2022071023/5fd766c08fb1193ae7244cdc/html5/thumbnails/84.jpg)
D
rill TO DCT 7. 1001
"-PHASE I PHAS[ 1 PHASE 1 PART DEI'IOLISH REQD WORK AT ENTIRE 2ND
FL
CDI'F' DEI'IOLISH REQD WORK AT EICTIRE 211D
Fl
REl"IOOEL ENTIRE :2M) Fl
PHASE I PHASE I
PARI' DEI1OI.ISH REQD CDI'F' DEI'IOLISH REQD REMODEL 3-68" 3·79 WORK Ar ~68 &. 3-79 WORK AT ~68 &. ~ 79 AREAS EtaP'T FIR EXCEPT fIR EkECUTIV£ EXCEPT FIR EICECUTI\'E EXECUTIVE SUITE AREA
AREA 1------1 AREA 1------4
PHASE 2
PREPARE" ISSUE EXECUTIVE SUITE DESIIIIDRAWIN6S
PWtSE2
EXECUTIYE GRn.P VACATE :SRD Fl fi8
AD[QUATE FtJI CHANGEI-____ -I ORDER
ORDER. DETAIL. APPROVE, FAB &
DELIYER LOMB LEAD
AIIS[2
ORDER &. DELIVER EARLY MATERIALS FOR
EXECUTIVE SUITE REl'IOOElINS AOEQUA TE
TO ElE61N WtJlK
PHASE 2 OEI'I(I.ISHREQD
EXISTINS W!H( AT 3RD FL 68 ElI£C11f lYE I-____ ~ AREA
rrEl"l9AREXECUTWEr-________________________________________ ~
SUITE REIfQOELlMB
![Page 85: Consulting Engineer Mt. Pleasant, Michigan 48853 · the lags must be identified immediately and corrections made if the project is to be completed as desired. I suggest close front](https://reader035.vdocuments.us/reader035/viewer/2022071023/5fd766c08fb1193ae7244cdc/html5/thumbnails/85.jpg)
PIIAIE 1 MOllE POLICY HOI.DER ~V'CESFRDn tSTFL 68 TO MIRE 2M> fL -
MSE 1 MOllE CLAlnS.
PRDDlI:T SUPPORT. EMPLOYEE P\..ANS ...
ANNUITIES III'TO REl'1ODELED H8 ...
3-19 SPACE EICCPT FOR EIlEC AREA
MSE2 REMODEl EXECUTIVE AREAS AT liD FL 68
Totl' noet time ElIrly $\1I"t
PHASE 1
PHASE 2
1IB100B.. 1ST FL M TO NEW INIlESTrElI'T
ACCOUNT'I«>
PHASE 1
ET IR TO SET IXHI' I'IOVE INTO lllO FL 6fI
SPACEn,NJS EIlECUTI'oIE AIlEA
PHASE 2
FCL EIlECUTIVE Sf AFF MOllE IIITO RErDl:ELED
3RDFL 68
DunnIon Early lint, ..
03-5£LECT N\JI1I!lER OF TEST PILES TO II! • Activity 1'.,lIntlll"
~S£2 tIM M:COUHI"IH
FAOI'lTiRRACE 611TO REKJDEUD ENTIRE
ISTFL
PllASE2
E TIl TO SET LATE FIIiSH Of e:xa:urIYE DCQlPAICY OF 3RO FL
r-----I 68
USED&' LOCATION - t (llCIImple)
• Actlvll.\l dlSCl'1pllan • Actlvll.\l88l1mOUld dlnlUan
III 'I~ w0l'1dll9 deys
otl ot6 ot2 ot7 ot3 ote ()oH 0t9 ot:) ~o
PHASE :s REr100B.. YACATED EVLlCO ItOIIE F10I OFF
TERRACE 68 TO lEW SITE INTO RB'tOOB..£D EVLICO tERRM:l 6fI
J\ kI~: ",I f;:' ",",,, .. f <"/'l
'j;."" ';.
,
r:.'~1
r C HEIWOK:~ODEL FOR FIRSI COLONY LIFE INSURANCE
l8IIu4t"l - Octo1*' 7, 1991 IltIIV8l tCia ..., ~ p1al1 I'IIG. zez
COMPANY OFFICE ADDITION Lyncbbufa. Virginia
H. J. ColwtLuutioA Joiat v.atun Ly~ Vi.rstI.aia at506
Ralph J. S\ephenson P£ PE Ca:IsuJLtng ~ 323 H:IIrwa1ha Ik'tve Nt. P.IeIsant.. Mi.Ghi&Jen 4:ee 53 ph 511 T72 2537
Sheet #s1