Page 1 of 11 Consultancy agreement and term sheet Agreement of consultancy between M/s “ABCD Developers” (hence forth referred as the developer) represented by Mr. XXX Managing Director and M/s “Consultant” (hence forth referred as the consultant) represented by Mr. YYY-Managing Director Both the parties entered in to agreement on this day of ------------------2015. The following few points are agreed between the developer and the consultant. This agreement contains a total of-8-.pages numbered from 1 to 8 including this page. Summary of agreement A. The developer is in the business of setting up a solar photovoltaic (SPV) technology based power plants . B. The consultant is in the business of arranging EPC contractors with differed credit facility for solar photovoltaic power generating plants developers. C. The developer agreed to engage the consultant for identifying a suitable EPC contractor who offers differed credit facility, for their upcoming solar PV power projects . Summary of the project Location ----- (village), ------ (District), ------ (State). Latitude Longitude Solar radiation KWh /Sq. Mt/Day End consumer DISCOM / Third party sale /

Upload: gantasri8

Post on 14-Dec-2015

6 views

Category:

Documents


1 download

DESCRIPTION

Consultancy Agreement and Term Sheet

TRANSCRIPT

Page 1: Consultancy Agreement and Term Sheet

Page 1 of 8

Consultancy agreement and term sheet

Agreement of consultancy between

M/s “ABCD Developers” (hence forth referred as the developer) represented by Mr. XXX Managing Director and

M/s “Consultant” (hence forth referred as the consultant) represented by Mr. YYY-Managing Director

Both the parties entered in to agreement on this day of ------------------2015. The following few points are agreed between the developer and the consultant.

This agreement contains a total of-8-.pages numbered from 1 to 8 including this page.

Summary of agreement

A. The developer is in the business of setting up a solar photovoltaic (SPV) technology based power plants.

B. The consultant is in the business of arranging EPC contractors with differed credit facility for solar photovoltaic power generating plants developers.

C. The developer agreed to engage the consultant for identifying a suitable EPC

contractor who offers differed credit facility, for their upcoming solar PV power projects.

Summary of the project

Location ----- (village), ------ (District), ------ (State).LatitudeLongitudeSolar radiation KWh/Sq. Mt/Day

End consumer DISCOM / Third party sale / Captive own consumption

Plant capacity ---MW AC with crystalline silicon technologyMinimum target generation 17,50,000 Units (subject to final survey)Total time required for execution

6-7 months from signing EPC contract.

Page 2: Consultancy Agreement and Term Sheet

Page 2 of 8

Part 1: Consultancy terms.

A. The consultant shall do the all required liasoning work in obtaining all the all relevant approvals from the relevant government departments to setup the solar PV power plant.

B. The developer shall pay all the statutory duties, fees and incidental charges required in obtaining the permissions, including right of way for the evacuation line.

C. The developer shall give all the relevant documents and sign all the required formats, documents and give all the required declarations from time to time to the consultant for a speedy processing.

D. The token liasoning fee for the above work is Rs………………………………….

E. The consultant at his cost shall identify an EPC contractor and funding agency as per the comfort of the developer.

F. Commitment of developer: Once the developer approves all the terms of the EPC contractor and funding agency, the developer recognizing the efforts put by the consultant,and he promises to enter into agreement with the respective agency without retracting.

G. If due to any circumstances including standard force major circumstances, if the developer cannot take up the project, after sanction letter of loan, in such a case the developer agrees to pay an amount of Rs 10,00,000 (Rupees Ten Lakhs only) as reimbursement of the expenses incurred by the consultant.

H. Time period for identifying the EPC contractor and funding agency: The EPC contractor and financier should be identified and the agreements should be arranged to be concluded within 30 days from the date of signing of this agreement.

Page 3: Consultancy Agreement and Term Sheet

Page 3 of 8

I. Non circumventing and Non-disclosing clause: Bothe the developer and consultant under oath promises to each other tha they abide by the below non-circumventing and non- disclosing terms.

1.Bothe the parties recognize the efforts put by the other party in developing the respective businesses in terms of time, money and good will and reputation at stake in the society.

2. The developer recognizes the efforts put by consultant in identifying the EPC contractor and funding source in terms of money and time.

3. The consultant recognizes the efforts put by the developer in identifying and developing a power purchaser and importance of the confidentiality of the end customer and PPA terms.

4. The developer agrees that all the information and contacts shared with him including the details of the EPC contractor, funding agency, terms of EPC, terms of finance, costs of equipment and services are proprietary information of the consultant which the consultant developed with much effort.

5. The developer hence agrees not to circumvent the consultant and approach the EPC contractor and funding agency not only for this project and for the future projects envisaged by the developer as it hampers the business of the consultant and causes huge financial loss to the consultant.

6. The developer agrees to not to disclose the EPC contractor details and funding agency details to any other party, as it will hamper the future business prospects of the consultant and causes financial loss to the consultant.

7. The developer agrees to not to disclose the finance terms and EPC terms to any other party, as it will hamper the future business prospects of the consultant and also of the funding agency and of the EPC contractor identified by the consultant.

8. The consultant agrees to not to disclose any information like regarding the end customer, PPA terms, about the developer’s organization, the project, end customer’s information made available to the consultant, and any such information which is sensitive to the developer’s organization and to his end customer as it may cause huge loss to the developer and his end client in terms of finance and market good will which cannot be valued in terms of money.

9. The information shall mean any written information in the form of records, charts, drawings, memoranda and any such data not limiting to the forms mentioned here which constitutes information in any form other than verbal communication.

10. Both the parties are responsible to hold information secret and confidential. They shall instruct their respective employees to whom they may need to disclose the confidential information to keep it confidential. The onus of maintaining the confidentiality and secrecy rests with the respective organizations.

11. Both the parties indemnify the other party if the other party requires disclosing the information under an act of law, government enquiry and /or statutory disclosure requirement.

Page 4: Consultancy Agreement and Term Sheet

Page 4 of 8

12. Up on the breach of the NCND terms and submitting proof of the same the other party shall take the legal route or through arbitration shall claim such an amount of Rs 10,00,000 (Rupees Ten lakhs only) as a token reimbursement of invaluable loss caused.

J. Validity of the agreement period: This agreement shall be in force for a time period of 2 years from the date of signing as far as the non-disclosure terms are concerned.

K. Jurisdiction: Hyderabad city of Telangana state shall be the jurisdiction for this agreement.

Part 2: LSTK EPC funding terms:

Page 5: Consultancy Agreement and Term Sheet

Page 5 of 8

A. The following are the basic terms under which the EPC deferred credit provider is arranged by the consultant.

B. This part forms the basis for the term sheet or preliminary agreement between the developer and the EPC cum deferred credit provider at later date once identified.

EPC contract size

---MW AC with single axis tracker system

Type of plantDISCOM / Third party sale / Captive own consumption

EPC implementation in India by

Differed EPC credit provider or their associate company

Minimum KWH units’ generation target.

Units17.50 Lakhs/MWp (Subject to site study)

Power Tariff as per the PPA entered by the developer with the buyer

Rs_________

Credit period 7 Years (84 monthly installments) (Subject to final discussions with the EPC credit provider)

Land and evacuation line Client Scope

Project EPC cost considered

Subject to discussion. Quoted cost shall include credit insurance for entire loan period.

Advance investment for the project by developer

30% of the agreed EPC cost.

Credit amount Balance 70% of agreed EPC cost. will be disbursed and collected in rupee terms.

Loan details Currency and deferred credit amount to be paid subject to negotiations. (Term of currency subject to discussion after signing the preliminary term sheet with EPC credit provider.

Taxes and duties As applicable

$cost considered:

EPC cost estimate is based on quotes for Module and Inverter as of today.

Page 6: Consultancy Agreement and Term Sheet

Page 6 of 8

Flow of activities

1. Initiation of project by signing the “Term Sheet with EPC contractor”. Negotiation and finalization of terms.

2. Formal agreement between client and EPC credit provider along with lump sum token advance.2.1.The advance shall be adjusted towards mobilization.2.2. We shall give a security against the token advance taken valid till

obtaining the sanctions from the lender and supplier

3. After the agreement and payment of token advance work will begin for 3.1.Soil testing, water testing, cantor study, estimation of evacuation line,

preparation of DPR, and validation of the PPA.3.2.Getting in principle loan sanction letter from the lender, 3.3.Suppliers credit sanction letter from suppliers.

4. After getting the in-principle loan sanction and supplier’s credit sanction letter

4.1. The initial token advance will be adjusted against Mobilization.(non- refundable if the project stopped at the instance of developer at this stage),

4.2. The site shall be handed over to the EPC contractor after basic jungle clearance and levelling.

4.3. The balance of the advance amount should be paid to the EPC contractor. (here the advance means the 30% agreed investment by the developer)

4.4. After receiving the final installment of the balance advance the work shall be started on the site.

Note:Final Supplier credit Sanction will be given only after the developer obtains all thestatutory, local and central government clearances including approval (NOC) for landthat can be used for commercial purpose and land conversion, permission fromDISCOM for evacuation to the nearest 33/13210KVA substation including where it isrequired right of way for the evacuation and environmental clearance.

5. All the above process will take about 30 to 45 days depending on the clients support.

6. Project implementation will begin and be executed as per the agreed terms.

7. The whole process will be completed within 6-7 months after the final credit sanction, payment of balance of 30% advance, and site handover to the EPCcontractor whichever is the last.

Page 7: Consultancy Agreement and Term Sheet

Page 7 of 8

8. The CEIG approval process is the responsibility of the developer. The EPC contractor will assist in the inspection process and, shall rectify any comments made by the inspector subject to the terms and conditions in the EPC agreement at EPC contractor’s cost. EPC contractor shall not be held responsible for the comments made by the inspector which are not covered in the EPC agreement and which are beyond statutory requirement.

9. Differed credit repayment. The repayment will be in 7 years (84 monthly installments) by way of assignment of PPA monthly installments. Addition to this the plant shall beprovided as security to the differed credit provider, and differed credit provider, himself or through authorized entity shall have the first lean onthe account in which the PPA bills are received. Any additional terms are subject to discussion and negotiation.

The payment terms for the project:

Milestone Percentage of total contract

Initial token advance to be adjustedagainst Mobilization after the disbursal ofthe first tranche of loan.(Once final agreement is signed the tokenadvance has to be paid.

The EPC credit provider can givea security to the advance taken.

Rs.20 Lakhs lump sum for obtaining in-principle approval from lender and suppliers, preparation of DPR and detailed costing for the specific site.

Advance upon receipt of credit approval Rs.30% of EPC cost

Repayment 7 years (84 monthly) installments in agreed currency amount directly assigned from the PPA provider’s payments along with revolving BG/LC

Security Plant shall be given as security and credit provider shall have the first lean on the receivables account.

10.Owner scope of the project: The following activities are under the scope of the project developer.

10.1. Obtaining all the relevant approval required for setting up of project.

10.2. All the statutory, local and central government clearances including tax & duty exemptions and any other clearances.

10.3. Evacuation clearance from DISCOM/TRANSCO, obtaining right of way and environmental clearance for evacuation line where it is required.

Page 8: Consultancy Agreement and Term Sheet

Page 8 of 8

10.4. Levelling of land, fencing the boundaries, providing security, laying the approach roads, providing internal lights, providing water and power at site.If the above listed are to be done by the EPC contractor the costs will be separately quoted at extra.

10.5. All costs associated with the above and insurance cost from the EPC work commissioning date.

Action to be initiated

To initiate the process as a token of acceptance of the terms and conditions and a “Letter of Intent” shall be given from the developer side along with signing this “consultancy agreementand term sheet”.

After obtaining the “Letter of Intent” from the developer the consultant through the identified EPC differed credit provider shall begin the action for

a. Preparation of detailed financial calculations,b. Submitting preliminary list of equipment.c. Preliminary site study and generation estimation.d. Preparation of detailed agreement.

Thanking You

For M/s ABCD DEVELOPER Authorized Signatory

Mr. XXX

We have understood and accept to the above terms to initiate the process.

For M/s CONSULTANTAuthorized signatory.