construntion & installation of chenrezig statue
TRANSCRIPT
7/29/2019 Construntion & Installation of Chenrezig Statue
http://slidepdf.com/reader/full/construntion-installation-of-chenrezig-statue 1/27
CONSTRUCTION & INSTALATION OF STATUE OF CHENREZIG AT SANGA CHOELING MONASTERY COMPLEX
IN PELLING, WEST SIKKIM.
CONSULTANT Addl. Chief Engineer (S/W),
Buildings & Housing Department,
Government of Sikkim, Gangtok.
1
TENDER DOCUMENT
PROPOSAL FOR STRUCTURAL DESIGN FOR
“CONSTRUCTION & INSTALLATION OF STATUE OF
CHENREZIG AT SANGA CHOELLING MONASTERY
COMPLEX IN PELLING, WEST SIKKIM”
NAME AND ADDRESS OF THECONSULTANT TO WHOM ISSUED: _________________________________
Executing Agency: Buildings & Housing Department,
Government of SikkimPhone cum Fax: 03592 202418
7/29/2019 Construntion & Installation of Chenrezig Statue
http://slidepdf.com/reader/full/construntion-installation-of-chenrezig-statue 2/27
CONSTRUCTION & INSTALATION OF STATUE OF CHENREZIG AT SANGA CHOELING MONASTERY COMPLEX
IN PELLING, WEST SIKKIM.
CONSULTANT Addl. Chief Engineer (S/W),
Buildings & Housing Department,
Government of Sikkim, Gangtok.
2
BUILDINGS & HOUSING DEPARTMENT
GOVERNMENT OF SIKKIM
GANGTOK, SIKKIM.
Notice Inviting Expression of Interest‐cum‐Proposal for consultancy service for structural
design for “Construction & Installation of statue of Chenrezig at Sanga‐Choeling Monastery
Complex in Pelling in West Sikkim”.
Buildings & Housing Department, Government of Sikkim published the Notice Inviting Expression of
Interest‐cum‐Proposal in the National as well as local dailies, inviting expression of interest‐cum‐
proposal for consultancy service for structural design of the project “Construction & Installation of
the statue of Chenrezig at Sanga Choeling Monastery Complex in Pelling, West Sikkim”. The same
with the
details
was
also
hoisted
on
the
website:
www.sikkim.nic.in.
The
date
for
submission
and
opening of the tender document/bid was fixed on 16.02.2011. However, no proposal/bid was
received from any firm/consultant. Therefore, the Department, on behalf of the Governor of Sikkim,
re‐issue this Notice Inviting Expression of Interest‐cum‐Proposal from reputed firms/consultants. The
details of the tender process and the nature of the service required are as mentioned in the website:
www.sikim.nic.in.
The tender forms/documents can be availed from the Office of the Chief Accounts Officer,
Buildings & Housing Department, Government of Sikkim on payment.
The important dates are as mentioned below:
1. Date of issue of tender form : 21st & 22
nd March,2011 during office
hour.
2. Date of submission of tender document : 25th
March,1030hrs to 1200 hours.
3. Date and time of opening of tender : 25th
March,2011 at 1300 hours.
4. Cost of tender form/documents : Rs.10,000.00(Rupees ten thousand)only.
5. Venue of submission of the tender : Office of the Additional Chief
Engineer(S/W),
Buildings
&
Housing
Department,
Government of Sikkim,
Nirman Bhawan,
Gangtok,Sikkim.
Note: For further information, the interested firms/consultants may contact the following Officers.
1. Superintending Engineer(S/W) (94341‐74588)
2. Superintending Engineer(Planning) (94740‐57821)
3. Divisional Engineer(West) (94341‐94586)
4.
7/29/2019 Construntion & Installation of Chenrezig Statue
http://slidepdf.com/reader/full/construntion-installation-of-chenrezig-statue 3/27
CONSTRUCTION & INSTALATION OF STATUE OF CHENREZIG AT SANGA CHOELING MONASTERY COMPLEX
IN PELLING, WEST SIKKIM.
CONSULTANT Addl. Chief Engineer (S/W),
Buildings & Housing Department,
Government of Sikkim, Gangtok.
3
TENDER DOCUMENT
Dear Sir,
Subject: Proposal for Structural Design for the project “Construction & Installation ofstatue of Chenrezig at Sanga Choeling Monastery Complex in Pelling, West Sikkim” - Inviting
sealed tenders for consultancy service from reputed firms/structural engineer / institutes,
regarding.
The Buildings & Housing Department, Government of Sikkim, proposes to engage a
consultant for structural design for the above mentioned project. The implementing agency is
Buildings & Housing Department, Government of Sikkim. All structural designs have to be
done as per the relevant IS Code and National Building Code.
1. SCOPE OF WORK: The purpose of the assignment is planned to obtain
a) Structural Design for the foundation and the super structure of the captioned project.
b) Preparation of Structural drawings for the foundation and the super structures of the
captioned subject.
c) Periodical visit by the structural engineer to ensure quality and construction as per the
approved design, plan and specification. Such engineers should have required
qualification and sound knowledge of the design and implementation of such projects.
d) Attending various review meetings at the site as required by Buildings & Housing
Department, Govt. of Sikkim.
e) Visits to the site as required, for monitoring progress and quality issues.
f) To take up the responsibility of periodical inspection of works at different stages of
construction and as required by the Buildings & Housing Department. (A minimum of
24 numbers (twenty-four) site visits are required after the commencement of the
construction work)
g) Submission of structural details in soft copy and hard copies incorporating all changes
wherever necessary.
h) Detailed schedule of services is enclosed as Annexure-II.
7/29/2019 Construntion & Installation of Chenrezig Statue
http://slidepdf.com/reader/full/construntion-installation-of-chenrezig-statue 4/27
CONSTRUCTION & INSTALATION OF STATUE OF CHENREZIG AT SANGA CHOELING MONASTERY COMPLEX
IN PELLING, WEST SIKKIM.
CONSULTANT Addl. Chief Engineer (S/W),
Buildings & Housing Department,
Government of Sikkim, Gangtok.
4
2. The following documents are to be enclosed to enable the consultants to submit their
proposal.
a. Terms of reference (TOR) (Annexure-1),
b. Supplementary information for consultants, including a suggested format of
Curriculum vitae (Annexure - III, Form F-5)
c. Conditions of Contract (Annexure-IV) and
d. Form of contract for Consultants Services under which the services will be performed
(Annexure - V).
3. In order to obtain first hand information on the assignment and the local conditions, it
is considered desirable that a representative of their firm visits the Buildings &
Housing Department, before the proposal is prepared and submitted.
The representative may meet the following officials:
For site inspection: Superintending Engineer (S/W) at Jorethang and Divisional Engineer
(West), Buildings & Housing Department, Gyalzing.
Please ensure that advance intimation regarding the consultants visit is required to enable
them to make appropriate arrangements.
4. The prospective consultant will have an opportunity to obtain clarification regarding the
scope of work, terms of reference, contract conditions and any other pertinent
information during visits to these offices. The consultant intending to apply should
essentially have adequate experience in designing and executing such projects. The
firm/consultant/institutes shall give details of such projects, their costs and the time
duration.
The outstation Consultants (i.e. outside Sikkim) should give the undertaking to locate
the Regional Office in Sikkim if the work is awarded to them.
7/29/2019 Construntion & Installation of Chenrezig Statue
http://slidepdf.com/reader/full/construntion-installation-of-chenrezig-statue 5/27
CONSTRUCTION & INSTALATION OF STATUE OF CHENREZIG AT SANGA CHOELING MONASTERY COMPLEX
IN PELLING, WEST SIKKIM.
CONSULTANT Addl. Chief Engineer (S/W),
Buildings & Housing Department,
Government of Sikkim, Gangtok.
5
5. Tender document Processing Fee :
The tender document for Expression of Interest (EOI) cum Proposal for detail
structural design shall be availed from the Chief Accounts Officer on production of a
Demand Draft for Rs. 10,000.00 ( Rupees Ten thousand) only drawn in favor of Chief
Accounts Officer, Buildings & Housing Department, Government of Sikkim, Gangtok-
737101, Sikkim on 21.03.2011 and 22.03.2011 during office hours.
6. Submission of proposals: The Intending consultant is expected to examine the
project in detail and carryout such studies required to submit detail structural design of
the project. The proposals shall be submitted in two parts viz., Technical & Financial.
7. The Technical and Financial proposals must be submitted in two separate sealed
envelopes (with respective marking in bold letters) following the formats/Schedules
given in the supplementary information for Consultants. The first envelope marked
"Technical proposal" should include the description of the firm/organization, the firm
general experience in the field of assignment, the qualification and competency of the
personnel proposed, for the assignment, and the proposed work plan methodology
and approach in response to suggested terms of reference. The second envelope
marked 'Financial Proposal' must also be sealed with sealing wax and should
contain the detailed price offer for the Consultancy Services. Both the sealed
envelopes should again be placed in a sealed cover and the address of the recipient
should be clearly written in bold letters. The same will be received in the office of the
Additional Chief Engineer (S/W), Buildings & Housing Department, Government of
Sikkim, Nirman Bhawan, Gangtok, Sikkim up to 1200 hrs on 25.3.2011. No proposal
after the time and date as indicated shall be entertained and the tender documentsshould be submitted in person or by the authorized representative of the
firm/consultant at the time and place as indicated.
8. Opening of proposal: The proposals (First envelope containing technical proposal
only) will be opened by the committee in the office of the Additional Chief Engineer
(S/W), Buildings & Housing Department, Government of Sikkim, Nirman Bhawan,
7/29/2019 Construntion & Installation of Chenrezig Statue
http://slidepdf.com/reader/full/construntion-installation-of-chenrezig-statue 6/27
CONSTRUCTION & INSTALATION OF STATUE OF CHENREZIG AT SANGA CHOELING MONASTERY COMPLEX
IN PELLING, WEST SIKKIM.
CONSULTANT Addl. Chief Engineer (S/W),
Buildings & Housing Department,
Government of Sikkim, Gangtok.
6
Gangtok, Sikkim and in presence of such Structural Engineers or their authorized
representative who may choose to be present at 1300 hrs on 25.03.2011. It may
please be noted that the 2nd envelope containing the detailed price offer will not be
opened until technical evaluation has been completed and the result approved by the
Committee or by the competent authority.
9. The bidder should submit the required / prescribed non refundable tender document
processing fee of Rs.10, 000.00 (Ten Thousand) only in the form of Demand Draft
drawn in favour of Chief Accounts’ Officer, Buildings & Housing Department,
Government of Sikkim along with tender form.
10. The consultant firm should have minimum experience of 10 (ten) years.
11. The firm should have provided Structural Consultancy services of value 20(twenty)
crores in a single project in the last 5 (five) years, in construction of multistoried
buildings / monuments.
12. The firm shall give details of these projects, their costs, the time duration.
13. Deciding Award of Contract: -A two stage procedure will be adopted in evaluating
the proposals.
13(a): In the 1st Stage, technical evaluation will be carried out by the evaluation
committee of the Department on the basis of the information submitted by the
firms/consultants as per the forms enclosed. Only those technical proposals, which
score at least 75 points out of 100, shall be considered for financial evaluation in the
2nd stage.
13(b): In the 2nd
Stage, evaluation of Financial Bid will be carried out by the EvaluationCommittee of the Department. The lowest financial bid (FM) will be given a financial
score of 100 points. The financial score (SF) of other proposals will be computed as
under:
SF= 100 x FM /F
Where,
SF is the financial score of the proposal.
FM is the price of the lowest price bid.
F is the price of the proposal.
7/29/2019 Construntion & Installation of Chenrezig Statue
http://slidepdf.com/reader/full/construntion-installation-of-chenrezig-statue 7/27
CONSTRUCTION & INSTALATION OF STATUE OF CHENREZIG AT SANGA CHOELING MONASTERY COMPLEX
IN PELLING, WEST SIKKIM.
CONSULTANT Addl. Chief Engineer (S/W),
Buildings & Housing Department,
Government of Sikkim, Gangtok.
7
13(c): The firm will be ranked using combined technical and financial scores. The
weightage of the technical bid (T) shall be 60 percent and weigtage of financial bid
shall be 40 percent.
14. The Buildings & Housing Department may reject any or all of the proposals received
without assigning any reason thereof. Further, as the selection is on the quality cum
cost based system, the Buildings &Housing Department does not bind itself in any
way to appoint the firm offering the lowest price.
15. The consultants are requested to hold their proposal valid for 90 (ninety) days from
the date of submission without change in the personnel proposed for the assignment
and their proposed price. The Buildings & Housing Department will make its best
efforts to select a Consultant firm within this period. The firm should submit the
willingness & commitment of personnel proposed for the assignment.
16. The cost of preparing proposals and of negotiating a contract including visits to the
office of Buildings & Housing Department and any other places including site visits,
survey etc., for submission of proposals, if any is not reimbursable as a direct cost of'
the assignment. If anybody wants to visit site before submission of the tender
conducting site visits and any quarries related to the project, survey, the consultantsshall contact the Officers as indicated above who will show the site allotted for the
project.
17. The consultants shall have to take up/ commence the assignment within 5 (five) days
from the date of issue of the order after approval.
18. Proposal Preparation Cost: The consultant shall be responsible for all of the costs
associated with the preparation of his proposal and his participation in the bidding
process. The Buildings & Housing Department will not be responsible for such costs,
regardless of the conduct or outcome of the bidding process.
19. The remuneration, which the consultants receive from the contract, will be subject to
normal tax liability in India. Kindly contact the concerned tax authorities for further
information in this regard if required.
7/29/2019 Construntion & Installation of Chenrezig Statue
http://slidepdf.com/reader/full/construntion-installation-of-chenrezig-statue 8/27
CONSTRUCTION & INSTALATION OF STATUE OF CHENREZIG AT SANGA CHOELING MONASTERY COMPLEX
IN PELLING, WEST SIKKIM.
CONSULTANT Addl. Chief Engineer (S/W),
Buildings & Housing Department,
Government of Sikkim, Gangtok.
8
20. We would appreciate if the consultants inform us by Telex /Fax.
a) Their acknowledgement of this letter of' invitation; and
b) Whether or not the consultants will be submitting a proposal.
Yours faithfully,
Encl:
1. Terms of reference (Annexure-I).
2. Schedule of Services (Annexure-II).
3. Supplementary information of consultants (Annexure-III)
4. Conditions of Contract (Annexure-IV)
5. Consultancy Services (Annexure-V)
7/29/2019 Construntion & Installation of Chenrezig Statue
http://slidepdf.com/reader/full/construntion-installation-of-chenrezig-statue 9/27
CONSTRUCTION & INSTALATION OF STATUE OF CHENREZIG AT SANGA CHOELING MONASTERY COMPLEX
IN PELLING, WEST SIKKIM.
CONSULTANT Addl. Chief Engineer (S/W),
Buildings & Housing Department,
Government of Sikkim, Gangtok.
9
Annexure-I
TERMS OF REFERENCE
a. BACKGROUND: - The Govt. of Sikkim has approved the project for Installation of
“Chenrezig Statue at Sanga Choelling, Pelling in West Sikkim. The height of the statue
is 92’-4” which will be seated on a R.C.C pedestal of 36’11” and the section showing
different components of the structure and other drawings can be found enclosed at
Annexure –I, II, III & IV. All structural designs have to be done as per the IS Code and
National Building Code and any other relevant codes.
b. OBJECTIVES:- The consultants are required to design the foundation and the super
structure of the project.
c. The design submitted by the Consultant is considered approved, if the same is
technically vetted by a recognized engineering institute as decided by the department.
d) TASKS TO BE CARRIED OUT- by the consultants are as under:
i). Design of foundation and super structure of the statue and designs of any other
facilities provided in the project.
ii). working drawings: -
1. Structural drawings and design details: The specifications and structural
designs & drawings should be supported by design details for each proposed
building/ structure in both hard and soft copies.
2. Site inspection: - Consultants shall inspect the works periodically to apprise
themselves of proper interpretation of designs, drawings and their
implementation. During construction the consultants shall visit the sites
periodically at different stages of constructions and at least once in a month
during finishing stages. Minimum of 24 (twenty-four) site visits after
commencement of the work, with prior intimation and confirmation from the
Engineer in charge, concerned. The site visits made before commencement of
work for survey or collecting any field data shall be at consultants cost, these
shall not be included in minimum site visits. The site visit report should be
furnished immediately after the site visit to the Superintending Engineer (S/W),
7/29/2019 Construntion & Installation of Chenrezig Statue
http://slidepdf.com/reader/full/construntion-installation-of-chenrezig-statue 10/27
CONSTRUCTION & INSTALATION OF STATUE OF CHENREZIG AT SANGA CHOELING MONASTERY COMPLEX
IN PELLING, WEST SIKKIM.
CONSULTANT Addl. Chief Engineer (S/W),
Buildings & Housing Department,
Government of Sikkim, Gangtok.
10
Buildings & Housing Department, at Jorethang and the concerned Divisional
Engineer at Gyalzing. The consultant shall furnish a site inspection certificate
obtained from the Engineer-in-Charge.
c) DATA, SERVICES AND FACILITIES TO BE PROVIDED BY THE CLIENT:
The following information and details will be furnished by this Buildings &
Housing Department, Government of Sikkim.
i) Soil Investigation Report submitted by Mines & Geology Department, Govt. of
Sikkim.
ii) Architectural details.
d) FINAL OUTPUTS (i.e. REPORTS, DRAWINGS ETC.):
The following final outputs shall be furnished to the client.
I. Submission of all working drawings four sets for approval
II. Sufficient numbers of sets of all approved final working drawings with detailed
cross sections and elevations etc.
III. Sufficient No. of sets of Structural Design works both in hard and soft copies to
be submitted to the Buildings & Housing Department, Government of Sikkim.
IV. All original tracings of approved structural drawings shall be submitted to the
Buildings & Housing Department, Government of Sikkim.
V. Any revision and reviewed in the architectural and structural design during thecourse of execution of the project of the structure will have to be accepted by
the consultant for necessary modifications in the structural design without any
additional cost thereof.
1. COMPLETION PERIOD: The Consultant has to submit the detailed structural design
works within 25 (twenty five) days from the date of issue of the Letter Of Intent.
7/29/2019 Construntion & Installation of Chenrezig Statue
http://slidepdf.com/reader/full/construntion-installation-of-chenrezig-statue 11/27
CONSTRUCTION & INSTALATION OF STATUE OF CHENREZIG AT SANGA CHOELING MONASTERY COMPLEX
IN PELLING, WEST SIKKIM.
CONSULTANT Addl. Chief Engineer (S/W),
Buildings & Housing Department,
Government of Sikkim, Gangtok.
11
2. STATUTORY COMPLIANCE:
a) The Consultant will abide by all statutory requirements of Workmen
compensation Act, Labor License, Sales Tax, Income Tax etc.,
b) The Consultant shall indemnify and legally protect Buildings & Housing
Department of Sikkim and / or its employees from all claims, demands, causes
or action or suits arising out of services provided by the consultants under this
agreement and the consultant have to submit an indemnity letter to this effect.
The Buildings & Housing Department of Sikkim reserves the right to cancel the
above contract and get it done by any other agency if at any stage it is felt that
the work is not done in accordance with the specifications and progress
schedule for reasons solely attributable to the Consultant/Firm and no claim
would be entertained for the payment of the work done till that stage. For the
same, Buildings & Housing Department of Sikkim will give at least 15 days
written notice to the Consultant/Firm.
7/29/2019 Construntion & Installation of Chenrezig Statue
http://slidepdf.com/reader/full/construntion-installation-of-chenrezig-statue 12/27
CONSTRUCTION & INSTALATION OF STATUE OF CHENREZIG AT SANGA CHOELING MONASTERY COMPLEX
IN PELLING, WEST SIKKIM.
CONSULTANT Addl. Chief Engineer (S/W),
Buildings & Housing Department,
Government of Sikkim, Gangtok.
12
Annexure - II
CONSTRUCTION PHASE:
a. The Structural Engineer shall make periodical visits to the site to determine whether
the construction works are proceeding in accordance with the said final working
drawings and specifications and conditions stipulated in the contract documents and
shall issue necessary and appropriate instructions to the site engineers in presence of
the contractor. A written record of such meetings / instructions shall be maintained by
the designer.
b. The main Consultant shall perform all the functions and duties required to be
performed by him in accordance with the agreement for the Project.
7/29/2019 Construntion & Installation of Chenrezig Statue
http://slidepdf.com/reader/full/construntion-installation-of-chenrezig-statue 13/27
CONSTRUCTION & INSTALATION OF STATUE OF CHENREZIG AT SANGA CHOELING MONASTERY COMPLEX
IN PELLING, WEST SIKKIM.
CONSULTANT Addl. Chief Engineer (S/W),
Buildings & Housing Department,
Government of Sikkim, Gangtok.
13
Annexure – III
SUPPLEMENTARY INFORMATION FOR CONSULTANTS PROPOSALS
1. Proposals should include the following information
A. TECIINICAL PROPOSAL
a) A brief description of the firm, organization and an outline of experience on
assignments/projects of similar nature executed. The details to be furnished are
mentioned in form F-2.
b) Any comments or suggestions of the consultant on the terms of Reference (TOR).
c) The composition of the team of personnel which the consultants would propose to
provide and the tasks which would be assigned to each team member in Form F-4.
d) Curriculum vitae of the individual key staff members to be assigned to the work and of
the team leader who would be responsible for supervision of the team. The curriculum
vitae should follow the attached format (Form F-5) duly signed by the concerned
personnel.
e) The consultant’s comments, if any, on the data, services and facilities to be provided
by Buildings & Housing Department, Govt. of Sikkim, indicated in the terms of
Reference (TOR).
B. FINANCIAL PROPOSALS:
The financial proposals should include the following:
a. Schedule of' price bid in Form No. F-6.
2. CONTRACT NEGOTIATIONS: The aim of the negotiation is to reach an agreement
on all points with the consultant and initiate a draft contract by the conclusion of
negotiations. Negotiations commence with a discussion of consultant’s proposals, theproposed work plan, staffing and any suggestions the consultants may have made to
improve the terms of reference.
7/29/2019 Construntion & Installation of Chenrezig Statue
http://slidepdf.com/reader/full/construntion-installation-of-chenrezig-statue 14/27
CONSTRUCTION & INSTALATION OF STATUE OF CHENREZIG AT SANGA CHOELING MONASTERY COMPLEX
IN PELLING, WEST SIKKIM.
CONSULTANT Addl. Chief Engineer (S/W),
Buildings & Housing Department,
Government of Sikkim, Gangtok.
14
3. TERMS OF PAYMENT:
The payment to the consultant shall be made according to the progress of work and
according to the availability of fund with the department.
NOTE:-
1. All payments shall be made on submission of pre-receipted bills by the consultants in
quadruplicate duly certified by the concerned Divisional Engineer / Assistant Engineer
and the Junior Engineer in-charge of the project.
2. The above fee includes all the costs related to carrying out the services, including
overheads, service tax and any other taxes imposed on time to time by the
government.
7/29/2019 Construntion & Installation of Chenrezig Statue
http://slidepdf.com/reader/full/construntion-installation-of-chenrezig-statue 15/27
CONSTRUCTION & INSTALATION OF STATUE OF CHENREZIG AT SANGA CHOELING MONASTERY COMPLEX
IN PELLING, WEST SIKKIM.
CONSULTANT Addl. Chief Engineer (S/W),
Buildings & Housing Department,
Government of Sikkim, Gangtok.
15
FORM F-1
From: To:
Sir,
Subject: Expression of Interest cum Proposal for Structural Design for the
project “Construction & Installation of statue of Chenrezig at Sanga Choeling
Monastery Complex at Pelling in West Sikkim”.
Sir,
We,_________________________________________________________________
____________________________________________________________________
____________________________________________________________________
_____________________ Consultancy firm/organizations herewith enclose technical
& financial proposal for selection of my/our firm as consultant for Structural Design
consultancy for the Project “Construction & Installation of statue of Chenrezig at
Sanga Choeling Monastery Complex at Pelling in West Sikkim”.
.
Yours faithfully,
Signature
Full Name:
Address:(Authorized representative)
7/29/2019 Construntion & Installation of Chenrezig Statue
http://slidepdf.com/reader/full/construntion-installation-of-chenrezig-statue 16/27
CONSTRUCTION & INSTALATION OF STATUE OF CHENREZIG AT SANGA CHOELING MONASTERY COMPLEX
IN PELLING, WEST SIKKIM.
CONSULTANT Addl. Chief Engineer (S/W),
Buildings & Housing Department,
Government of Sikkim, Gangtok.
16
FORM – 2
ASSIGNMENTS OF SIMILAR NATURE OF WORKS SUCCESSFULLY COMPLETED
1. Brief Description of the Firm/Organization
2. Outline of experiences on assignments of similar nature.
Sl.
No.
Name of
Assignment
Name of
Project
Owner or
sponsoringauthority
Cost of
Assignment
Date of
commencement
Date of
completion
Was
assignmentsatisfactory
Completed?
1 2 3 4 5 6 7 8
Note: Please attach certificates from the employer by way of documentary proof duly attested
by a gazette officer, Govt. of Sikkim (Issued by the Officer of rank not below the rank of
Superintending Engineer or equivalent if the certificate is issued by Govt. organizations).
7/29/2019 Construntion & Installation of Chenrezig Statue
http://slidepdf.com/reader/full/construntion-installation-of-chenrezig-statue 17/27
CONSTRUCTION & INSTALATION OF STATUE OF CHENREZIG AT SANGA CHOELING MONASTERY COMPLEX
IN PELLING, WEST SIKKIM.
CONSULTANT Addl. Chief Engineer (S/W),
Buildings & Housing Department,
Government of Sikkim, Gangtok.
17
FORM F-3
COMPOSITION OF THE TEAM PERSONNEL AND THE TASK, WHICH WOULD BE
ASSIGNED TO EACH TEAM MEMBER.
1. Technical/Managerial Staff.
Sl.
No
Name Position Task Assignment
1
2
3
4
5
6
2. Supporting Staff
Sl.
No
Name Position Task Assignment
1
2
3
4
5
6
* Certificate of willingness / commitment of personnel proposed for the assignment
should be appended (Mandatory).
7/29/2019 Construntion & Installation of Chenrezig Statue
http://slidepdf.com/reader/full/construntion-installation-of-chenrezig-statue 18/27
CONSTRUCTION & INSTALATION OF STATUE OF CHENREZIG AT SANGA CHOELING MONASTERY COMPLEX
IN PELLING, WEST SIKKIM.
CONSULTANT Addl. Chief Engineer (S/W),
Buildings & Housing Department,
Government of Sikkim, Gangtok.
18
FORM F-4
SUGGESTED FORMAT OF CURRICULAM VITAE
FOR MEMBERS OF CONSULTANTS TEAM
AS PER TECHNICAL BID
1. Name ____________________________________________________
2. Professional/Present Designation: _____________________________
3. Years with Firm / Organization: _______________ Nationality ____________
4. Area of Specialization:
5. Proposed Position on Team:
6. Key qualifications:
(Under this heading, give outline of staff member's experience and training most pertinent
to assigned work on proposed team. Describe degree of responsibility held by staff
member on relevant previous assignments and give dates and locations. Use upto half-a-
page.)
Education:
(Under this heading, summarize college/university and other specialized education of
names of colleges, etc., dates attended and degrees obtained. Use till to a quarter page.)
Experience:
(Under this heading, list all positions held by staff member since graduation, giving dates,
names of' employing organization, title of positions held and location of assignments for
experience in last ten years also give types of activities performed and client references,
where appropriated. Use upto three quarters of a page.)Languages:
(Indicate proficiency in speaking, reading and writing of each language by 'excellent',
'good' or.’poor’.)
Signature of Staff Member Date :
7/29/2019 Construntion & Installation of Chenrezig Statue
http://slidepdf.com/reader/full/construntion-installation-of-chenrezig-statue 19/27
CONSTRUCTION & INSTALATION OF STATUE OF CHENREZIG AT SANGA CHOELING MONASTERY COMPLEX
IN PELLING, WEST SIKKIM.
CONSULTANT Addl. Chief Engineer (S/W),
Buildings & Housing Department,
Government of Sikkim, Gangtok.
19
FORM F – 5
SCHEDULE OF PRICE BID
Sl.No. Items Percentage in Figures (*) Percentage in Words
1 Structural Engineering
Consultancy for design of
foundation and the
superstructure for the
project “Construction &
Installation of statue of
Chenrezig at Pelling in
West Sikkim”
________ %
Signature of Consultant
Note:
1. For extra site visit if required, over and above the stipulated ____visits, an
amount of Rs._________ per each visit will be paid for.
2. For less no. of site visits than the stipulated ______visits, an amount of Rs.
________/- will be deducted for each no. of site visits.
3. The above quoted fee includes all taxes overheads including service tax and
any other taxes imposed on from time to time by the Government.
(*) – Percentage on the cost of the designed components of the project.
7/29/2019 Construntion & Installation of Chenrezig Statue
http://slidepdf.com/reader/full/construntion-installation-of-chenrezig-statue 20/27
CONSTRUCTION & INSTALATION OF STATUE OF CHENREZIG AT SANGA CHOELING MONASTERY COMPLEX
IN PELLING, WEST SIKKIM.
CONSULTANT Addl. Chief Engineer (S/W),
Buildings & Housing Department,
Government of Sikkim, Gangtok.
20
Annexure - IV
CONDITIONS OF CONTRACT
A. GENERAL
1. Interpretation:
a. In interpreting the Conditions of Contract, singular also means plural, male also
means female, and vice-versa. Headings have no significance. Works have their
normal meaning under the language of the contract unless specifically defined. The
Engineers-in-charge will provide instructions clarifying queries about the conditions
of Contract.
2. Decisions:
a. Except where otherwise specifically stated, the Secretary, Buildings & Housing
Department Govt. of Sikkim will decide the contractual matters between the
Department and the Consultant in the role representing the Department.
3. Delegation: The Secretary, Buildings & Housing Department Govt. of Sikkim may
delegate any of his duties and responsibilities to other officers and may cancel any
delegation by an official order issued.
4. Communications:
3.1. Communications between parties, which are referred to in the conditions, are
effective only when in writing. A notice shall be effective only when it is delivered (in
terms of Indian Contract Act)
5. Personnel: The Consultant shall employ the required Key Personnel named in the
Schedule of Key Personnel to carry out the functions stated in the Schedule or otherpersonnel approved by the Engineer-in-charge. The Engineer-in-charge will approve
any proposed replacement of Key Personnel only if their qualifications, abilities, and
relevant experience are substantially equal to or better than those of the personnel
listed in the Schedule.
7/29/2019 Construntion & Installation of Chenrezig Statue
http://slidepdf.com/reader/full/construntion-installation-of-chenrezig-statue 21/27
CONSTRUCTION & INSTALATION OF STATUE OF CHENREZIG AT SANGA CHOELING MONASTERY COMPLEX
IN PELLING, WEST SIKKIM.
CONSULTANT Addl. Chief Engineer (S/W),
Buildings & Housing Department,
Government of Sikkim, Gangtok.
21
B. TIME FOR COMPLETION
b. Programme:
The total period for consultancy services for the project is 30 months. However, the
time of completion can be revised or changed by the Buildings & Housing
Department, Govt. of Sikkim.
1. Delays and extension of time: No claim for compensation on account of delays or
hindrances to the assigned work from any cause whatsoever shall lie, except as
hereafter defined.
Reasonable extension of time will be allowed by the Secretary, Buildings & Housing
Department Govt. of Sikkim or by the officer competent to sanction the time extension,
for unavoidable delays, such may result from causes, which in the opinion of the
Engineer-in-charge, are undoubtedly beyond the control of the Consultant. The
Consultant shall lodge in writing with the Engineer-in-charge for any delay or
hindrance on their assignment within 7 days from its commencement, otherwise no
extension of time will be allowed. If for any unavoidable reasons the project period
extends beyond 30 days, the service of the consultant will be considered as continuing
till the final completion of the project. Whenever authorized alterations or additions
made during the progress of the assigned work are of such a nature in the opinion of
the Engineer-in-charge as to justify an extension of time in consequence thereof, such
extension will be granted in writing by the Engineer-in-charge or other competent
authority when ordering such alterations or additions.
2. Suspension of works by the Consultant:
a. If the Consultant shall suspend the works, or sublet the work without sanction of
the Engineer-in-charge, or in the opinion of the Engineer-in-charge shall neglect
or fail to proceed with due diligence in the performance of his part of the
Contract as laid down in the Schedule rate of progress, or if he shall continue to
default or repeat such default, the Engineer-in-charge can initiate action for
rescinding the contract.
7/29/2019 Construntion & Installation of Chenrezig Statue
http://slidepdf.com/reader/full/construntion-installation-of-chenrezig-statue 22/27
CONSTRUCTION & INSTALATION OF STATUE OF CHENREZIG AT SANGA CHOELING MONASTERY COMPLEX
IN PELLING, WEST SIKKIM.
CONSULTANT Addl. Chief Engineer (S/W),
Buildings & Housing Department,
Government of Sikkim, Gangtok.
22
b. If the Consultant has delayed the completion of works the Contract will be
terminated forthwith.
FINISHING THE CONTRACT
3. Termination:
8.1. The Buildings & Housing Department, Government of Sikkim may terminate
the Contract if the Consultant causes a fundamental breach of the Contract.
9. Payment upon Termination:
9.1. If the Contract is terminated because of a fundamental breach of Contract
by the Consultant, the Engineer-in-charge shall issue a certificate for the
value of the work done less advance payments received upon the date of
the issue of the certificate, less other recoveries due in terms of the
Contract, less taxes due to be deducted at source as per applicable law and
the percentage to apply to the value of the work not completed representing
additional cost for completing the works at the rate of 20 percent of balance
work. Additional Liquidated Damages shall not apply. If the total amount due
to the Department exceeds any payment due to the Consultant the
difference shall be a debt payable to the Buildings & Housing Department
Govt. of Sikkim .
10. Property:
All plans, drawings, original drawings, specification, designs, reports and
other documents or software submitted by the Consultants in performance
of the services, shall become and remain the property of the Government of
Sikkim, Buildings & Housing Department Govt. of Sikkim if the Contract isterminated because of Consultant’s default.
11. Release from Performance:
If the Contract is frustrated by the outbreak of war or by any other event
entirely outside the control of either the Buildings & Housing Department
Govt. of Sikkim or the Consultant the Engineer-in-charge shall certify that
the contract has been frustrated. The Consultant shall make the site safe
7/29/2019 Construntion & Installation of Chenrezig Statue
http://slidepdf.com/reader/full/construntion-installation-of-chenrezig-statue 23/27
CONSTRUCTION & INSTALATION OF STATUE OF CHENREZIG AT SANGA CHOELING MONASTERY COMPLEX
IN PELLING, WEST SIKKIM.
CONSULTANT Addl. Chief Engineer (S/W),
Buildings & Housing Department,
Government of Sikkim, Gangtok.
23
and stop work as quickly as possible after receiving this certificate and shall
be paid for all works carried out before receiving it and for any work carried
out after wards to which commitment was made.
7/29/2019 Construntion & Installation of Chenrezig Statue
http://slidepdf.com/reader/full/construntion-installation-of-chenrezig-statue 24/27
CONSTRUCTION & INSTALATION OF STATUE OF CHENREZIG AT SANGA CHOELING MONASTERY COMPLEX
IN PELLING, WEST SIKKIM.
CONSULTANT Addl. Chief Engineer (S/W),
Buildings & Housing Department,
Government of Sikkim, Gangtok.
24
Annexure - V
CONSULTING SERVICES
Consultant:
Subject: Proposal for Structural Design for the project “Construction & Installation
of statue of Chenrezig at Sanga Choeling Monastery Complex at Pelling in West
Sikkim”.
Set out below are the terms and conditions under which
M/s. ______________________________________________________________________
__________________________________________________________________________
_________________________________________________________________ have
agreed to carry out for Buildings & Housing Department Govt. of Sikkim the above
mentioned assignment specified in the attached Terms of reference.
1) For administrative purposes (The Engineer-in-charge, Buildings & Housing Department
Govt. of Sikkim ) has been assigned to administer the assignment and to provide the
Consultant with all relevant information needed to carry out the assignment. The
services will be required for the work “Construction & Installation of statue of Chenrezig
at Pelling in West Sikkim” for the entire construction period from the date of concluding
the agreement.
2) In course time, the Engineer-in-charge may find it necessary to postpone or cancel the
assignment and / or shorten or extend its duration. However, every effort will be made
to give the consultants, as early as possible; notice of any such changes in the event of
termination, the Consultants shall be paid for the services rendered for carrying out the
assignment to the date or termination. The firm based on the terms of payment and the
firm Consultants will provide the Engineer-in-charge with any reports or parts thereof,
or any other information and documentation gathered under this agreement prior to the
date of termination.
3) The services to be performed, the estimated time to be spent, and the reports to be
submitted will be in accordance with the attached form F–3, TOR & Supplementary
information for consultants proposals.
4) This agreement, its meaning and interpretation and the relation between the parties
shall be governed by the laws of Union of India.
7/29/2019 Construntion & Installation of Chenrezig Statue
http://slidepdf.com/reader/full/construntion-installation-of-chenrezig-statue 25/27
CONSTRUCTION & INSTALATION OF STATUE OF CHENREZIG AT SANGA CHOELING MONASTERY COMPLEX
IN PELLING, WEST SIKKIM.
CONSULTANT Addl. Chief Engineer (S/W),
Buildings & Housing Department,
Government of Sikkim, Gangtok.
25
5) The financial proposal shall include the cost of preparation of structural drawings, initial
site visits before start of work, discussions with the Buildings & Housing Department,
preparation of detail final structural drawings and minimum of 24 site visits during the
execution of works at regular intervals.
6) FEES
7.1 Payments for the services will be made on the amount of the works proposed to
taken up only as per the scope of work for which services are rendered including all
taxes applicable from time to time. The fees is inclusive of all the taxes and duties
including Income Tax etc.,) Provident fund, Insurance and all other statutory charges
applicable as per prevailing State and Central Government rules.
7.2 PAYMENT TERMS
Payment will be made by cheque payable at Gangtok (State Bank of Sikkim) after
deducting;
a. Amount of appropriate tax deduction at source under IT Act, 1961.
b. Any other tax payable by the consultants, for services rendered to the owner, to any
of Central Government or State Government Agencies.c. Any other recoveries as per Contract.
The Buildings & Housing Department Govt. of Sikkim will pay remuneration of Amount to
payable to Consultants on receipt of invoices depending upon the availability of the fund at
the disposal of the Department at the time of such claim by the consultant.
NOTE: All payments shall be made on submission of bills by the consultants in
quadruplicate duly certified by the concerned Assistant Engineer & Divisional Engineer /
Engineer-in-charge .
1. The above fee includes all the costs related to carrying out the services, including
overheads, service tax and any other taxes imposed on time to time by the
government.
2. The consultant agrees to visit the site periodically at different stages of construction
duly intimating to the Divisional Engineer, concerned or on the request of Divisional
Engineer concerned wherever necessary. Such site visits shall be minimum 24 Nos
7/29/2019 Construntion & Installation of Chenrezig Statue
http://slidepdf.com/reader/full/construntion-installation-of-chenrezig-statue 26/27
7/29/2019 Construntion & Installation of Chenrezig Statue
http://slidepdf.com/reader/full/construntion-installation-of-chenrezig-statue 27/27
CONSTRUCTION & INSTALATION OF STATUE OF CHENREZIG AT SANGA CHOELING MONASTERY COMPLEX
IN PELLING, WEST SIKKIM.
9. All questions or disputes arising out of or in respect of this agreement except as to
any matters the decision of which are expressly provided for, shall be decided by the
Secretary, Buildings & Housing Department Govt. of Sikkim which will be final and
binding upon both the parties.
10. All disputes that may arise between the parties shall be resolved only by courts
situated in Gangtok and no other courts shall have jurisdiction to entertain any
petition, application or suit to resolve such disputes.