construction using forms

90
CONSTRUCTION USING CONSTRUCTION USING FORMS FORMS

Upload: praveen-kapur

Post on 06-May-2015

335 views

Category:

Real Estate


0 download

TRANSCRIPT

Page 1: CONSTRUCTION USING FORMS

CONSTRUCTION CONSTRUCTION USING USING

FORMSFORMS

Page 2: CONSTRUCTION USING FORMS

PHASESPHASES

•TRADITIONAL TRADITIONAL METHOD OF METHOD OF CONSTRUCTIONCONSTRUCTION

Page 3: CONSTRUCTION USING FORMS

PHASESPHASES

• TRADITIONAL METHOD OF CONSTRUCTIONTRADITIONAL METHOD OF CONSTRUCTION

•CONSTRUCTION CONSTRUCTION USING FORMS.USING FORMS.

Page 4: CONSTRUCTION USING FORMS

PHASESPHASES

• TRADITIONAL METHOD OF CONSTRUCTIONTRADITIONAL METHOD OF CONSTRUCTION

• CONSTRUCTION USING FORMCONSTRUCTION USING FORM

•MAJOR DEPARTURES MAJOR DEPARTURES FROM TRADITIONAL FROM TRADITIONAL METHOD.METHOD.

Page 5: CONSTRUCTION USING FORMS

PHASESPHASES

• TRADITIONAL METHOD OF CONSTRUCTIONTRADITIONAL METHOD OF CONSTRUCTION

• CONSTRUCTION USING FORMCONSTRUCTION USING FORM

• MAJOR DEPARTURES FROM TRADITIONAL METHOD.MAJOR DEPARTURES FROM TRADITIONAL METHOD.

•SOME SOME NEGATIVESNEGATIVES..

Page 6: CONSTRUCTION USING FORMS
Page 7: CONSTRUCTION USING FORMS

TRADITIONAL METHOD OF CONSTRUCTION

FOUNDATIONS

COLUMNS

BEAMS

WALLS

ROOF

Page 8: CONSTRUCTION USING FORMS
Page 9: CONSTRUCTION USING FORMS

CONSTRUCTION USING FORMS -

FOUNDATIONS

DESIGN AS PER TRADITIONAL METHOD.

CAN BE MADE USING FORM WORKS.

MORE CONDUITS / PIPES CAN BE EMBEDDED.

Page 10: CONSTRUCTION USING FORMS

FOUNDATIONS

Page 11: CONSTRUCTION USING FORMS

FOUNDATIONS

Page 12: CONSTRUCTION USING FORMS

FINISHED FOUNDATION & FLOOR SLAB

Page 13: CONSTRUCTION USING FORMS

FINISHED FOUNDATION & FLOOR SLAB

Page 14: CONSTRUCTION USING FORMS

CONSTRUCTION USING FORMS - CONSTRUCTION USING FORMS -

WALLSWALLS STEEL WIRE MESH IS ERECTED WITH STEEL WIRE MESH IS ERECTED WITH

THE SUPPORT OF STARTERS.THE SUPPORT OF STARTERS.

THIS DEFINES THE CENTRE LINE OF THIS DEFINES THE CENTRE LINE OF THE WALLS.THE WALLS.

Page 15: CONSTRUCTION USING FORMS

FIXNG STEEL WIRE MESH

Page 16: CONSTRUCTION USING FORMS

PLINTHS WITH MESHES

Page 17: CONSTRUCTION USING FORMS
Page 18: CONSTRUCTION USING FORMS

CONSTRUCTION USING FORMS CONSTRUCTION USING FORMS

M & E FIXTURESM & E FIXTURES

ALL CONDUITS – ELECTRICAL, TELEPHONE, ALL CONDUITS – ELECTRICAL, TELEPHONE, DATA ETC ARE INSTALLED.DATA ETC ARE INSTALLED.

ALL ELECTRICAL BOXES INCLUDING ALL ELECTRICAL BOXES INCLUDING DISTRIBUTION BOXES ARE INSTALLED.DISTRIBUTION BOXES ARE INSTALLED.

ALL WATER SUPPLY AND DRAINAGE PIPE ALL WATER SUPPLY AND DRAINAGE PIPE LINES ARE INSTALLED.LINES ARE INSTALLED.

Page 19: CONSTRUCTION USING FORMS

INSTALLATION OF CONDUITS

Page 20: CONSTRUCTION USING FORMS

INSTALLATION OF CONDUITS & PIPES

Page 21: CONSTRUCTION USING FORMS

Fixing electrical boxes

Page 22: CONSTRUCTION USING FORMS

FIXING ELECTRICAL BOXES

Page 23: CONSTRUCTION USING FORMS

FIXING ELECTRICAL BOXES

Page 24: CONSTRUCTION USING FORMS

FIXING WATER SUPPLY PIPES

Page 25: CONSTRUCTION USING FORMS

M & E FIXED ON THE MESH

Page 26: CONSTRUCTION USING FORMS
Page 27: CONSTRUCTION USING FORMS

CONSTRUCTION USING FORMS CONSTRUCTION USING FORMS

WALL PANELSWALL PANELS

INSTALLATION OF WALL PANELS INSTALLATION OF WALL PANELS ASTRIDE STEEL WIRE MESH ASTRIDE STEEL WIRE MESH DEFINING THE CENTRE OF THE DEFINING THE CENTRE OF THE WALLS.WALLS.

Page 28: CONSTRUCTION USING FORMS

INSTALLATION OF WALL PANELS

Page 29: CONSTRUCTION USING FORMS

CONSTRUCTION USING CONSTRUCTION USING FORMSFORMS - -

ROOFROOF

INSTALLATION OF ROOF PANELS INSTALLATION OF ROOF PANELS SUPPORTED ON THE WALLS.SUPPORTED ON THE WALLS.

INSTALLATION OF M & E FITTINGS ON INSTALLATION OF M & E FITTINGS ON THE ROOF SLAB.THE ROOF SLAB.

ROOF SUPPORTS.ROOF SUPPORTS.

Page 30: CONSTRUCTION USING FORMS

INSTALLATION OF ROOF PANELS

Page 31: CONSTRUCTION USING FORMS

ROOF SUPPORTS

Page 32: CONSTRUCTION USING FORMS

COMPLETE INSTALLATION OF ROOF PANELS

Page 33: CONSTRUCTION USING FORMS

INSTALLATION OF M & E FITTINGS ON THE ROOF SLAB

Page 34: CONSTRUCTION USING FORMS
Page 35: CONSTRUCTION USING FORMS

POURING CONCRETE AFTER ROOF PANELS ARE INSTALLED.

REINFORCEMENTS ARE POSITIONED AND FASTENED.

M & E FITTINGS ARE INSTALLED.

DONE WITH CONCRETE PUMP.

Page 36: CONSTRUCTION USING FORMS

PUMPING OF CONCRETE

Page 37: CONSTRUCTION USING FORMS

POURING CONCRETE

Page 38: CONSTRUCTION USING FORMS

VIBRATING THE CONCRETE

Page 39: CONSTRUCTION USING FORMS

LEVELLING OF CONCRETE

Page 40: CONSTRUCTION USING FORMS
Page 41: CONSTRUCTION USING FORMS

WALLS AFTER REMOVAL OF FORMS

• WALL AS OBTAINED AFTER REMOVAL OF FORM WORKS.

• SAME FINISH OBTAINED FOR CEILING.

• NO PLASTERING REQUIRED.

Page 42: CONSTRUCTION USING FORMS

WALLS AFTER REMOVAL OF FORM WORKS

Page 43: CONSTRUCTION USING FORMS

WALLS AFTER REMOVAL OF FORM WORKS

Page 44: CONSTRUCTION USING FORMS

WALLS AFTER REMOVAL OF FORM WORKS

Page 45: CONSTRUCTION USING FORMS

WALLS AFTER REMOVAL OF FORM WORKS

Page 46: CONSTRUCTION USING FORMS

INTERNAL WALL FINISH

Page 47: CONSTRUCTION USING FORMS

WALL FINISH ON REMOVAL OF FORMS

Page 48: CONSTRUCTION USING FORMS

WALL FINISH ON REMVAL OF FORMS

Page 49: CONSTRUCTION USING FORMS
Page 50: CONSTRUCTION USING FORMS

BUILDING UPPER FLOORS

Page 51: CONSTRUCTION USING FORMS

PREPARING TO BUILD UPPER FLOORS

Page 52: CONSTRUCTION USING FORMS

UPPER FLOORS UNDER CONSTRUCTION

Page 53: CONSTRUCTION USING FORMS

BUILDING UPPER FLOORS

Page 54: CONSTRUCTION USING FORMS

UPPER FLOORS UNDER CONSTRUCTION

Page 55: CONSTRUCTION USING FORMS

MULTI STOREY BUILDINGS UNDER CONSTRRUCTION

Page 56: CONSTRUCTION USING FORMS

MULTI STOREY BUILDINGS UNDER CONSTRRUCTION

Page 57: CONSTRUCTION USING FORMS
Page 58: CONSTRUCTION USING FORMS

FINISHED PRODUCT

Page 59: CONSTRUCTION USING FORMS
Page 60: CONSTRUCTION USING FORMS

FINISHED FRONT VIEW – ROW HOUSES

Page 61: CONSTRUCTION USING FORMS

FINISHED WALL

Page 62: CONSTRUCTION USING FORMS

MULTI STOREY CONSTRUCTION

Page 63: CONSTRUCTION USING FORMS

MULTI STOREY CONSTRUCTION

Page 64: CONSTRUCTION USING FORMS

MASS HOUSING

Page 65: CONSTRUCTION USING FORMS

MASS HOUSING

Page 66: CONSTRUCTION USING FORMS
Page 67: CONSTRUCTION USING FORMS

MAJOR DEPARTURES FROM TRADITIONAL METHOD

Page 68: CONSTRUCTION USING FORMS

MAJOR DEPARTURES FROM MAJOR DEPARTURES FROM TRADITIONAL METHODTRADITIONAL METHOD

TOTAL CONCRETE TOTAL CONCRETE STRUCTURESTRUCTURE..

Page 69: CONSTRUCTION USING FORMS

MAJOR DEPARTURES FROM TRADITIONAL METHOD

TOTAL CONCRETE STRUCTURE.

WALLS THICKNESS – 4 INCHES / 10 Cms.

Page 70: CONSTRUCTION USING FORMS

MAJOR DEPARTURES FROM MAJOR DEPARTURES FROM TRADITIONAL METHODTRADITIONAL METHOD

TOTAL CONCRETE STRUCTURE.TOTAL CONCRETE STRUCTURE.

WALLS THICKNESS – 4 INCHES / 10 Cms.WALLS THICKNESS – 4 INCHES / 10 Cms.

IRON MESH IN WALLS.IRON MESH IN WALLS.

Page 71: CONSTRUCTION USING FORMS

MAJOR DEPARTURES FROM MAJOR DEPARTURES FROM TRADITIONAL METHODTRADITIONAL METHOD

TOTAL CONCRETE STRUCTURE.TOTAL CONCRETE STRUCTURE.

WALLS THICKNESS – 4 INCHES / 10 Cms.WALLS THICKNESS – 4 INCHES / 10 Cms.

IRON MESH IN WALLS.IRON MESH IN WALLS.

NO COLUMNS OR BEAMS.NO COLUMNS OR BEAMS.

Page 72: CONSTRUCTION USING FORMS

MAJOR DEPARTURES FROM MAJOR DEPARTURES FROM TRADITIONAL METHODTRADITIONAL METHOD

TOTAL CONCRETE STRUCTURE.TOTAL CONCRETE STRUCTURE.

WALLS THICKNESS – 4 INCHES / 10 Cms.WALLS THICKNESS – 4 INCHES / 10 Cms.

IRON MESH IN WALLS.IRON MESH IN WALLS.

NO COLUMNS OR BEAMS.NO COLUMNS OR BEAMS.

NO PLASTERING REQUIRED.NO PLASTERING REQUIRED.

Page 73: CONSTRUCTION USING FORMS

MAJOR DEPARTURES FROM TRADITIONAL METHOD

TOTAL CONCRETE STRUCTURE.

WALLS THICKNESS – 4 INCHES / 10 Cms.

IRON MESH IN WALLS.

NO COLUMNS OR BEAMS.

NO PLASTERING REQUIRED.

M & E FIXTURES INSTALLED BEFORE CASTING.

Page 74: CONSTRUCTION USING FORMS
Page 75: CONSTRUCTION USING FORMS

COST SAVING COST SAVING ASPECTSASPECTS

Page 76: CONSTRUCTION USING FORMS

COST SAVING ASPECTSCOST SAVING ASPECTS

RE-USABILITY OF FORM WORKS – 1000 RE-USABILITY OF FORM WORKS – 1000 USES.USES.

THEREAFTER, THESE CAN BE SOLD TO THEREAFTER, THESE CAN BE SOLD TO ALLUMINUM FACTORIES.ALLUMINUM FACTORIES.

FINANCIALLY ECONOMICAL AFTER 50 FINANCIALLY ECONOMICAL AFTER 50 USES.USES.

Page 77: CONSTRUCTION USING FORMS

COST SAVING ASPECTSCOST SAVING ASPECTS

FOUR INCHES CONCRETE WALLS AS FOUR INCHES CONCRETE WALLS AS AGAINST NINE INCHES THICK WALLS AGAINST NINE INCHES THICK WALLS WITH MORTAR ON ALL THE SIDES.WITH MORTAR ON ALL THE SIDES.

SPACE EFFICIENCY.SPACE EFFICIENCY.

NO REQUIREMENT FOR COLUMNS OR NO REQUIREMENT FOR COLUMNS OR BEAMS.BEAMS.

Page 78: CONSTRUCTION USING FORMS

COST SAVING ASPECTSCOST SAVING ASPECTSVERY FAST CONSTRUCTION – LESS MAN - VERY FAST CONSTRUCTION – LESS MAN - DAYS REQUIRED.DAYS REQUIRED.

NO NEED FOR BRICKS / HOLLOW BLOCKS.NO NEED FOR BRICKS / HOLLOW BLOCKS.

REDUCED LABOUR REQUIREMENT.REDUCED LABOUR REQUIREMENT.

REDUCED TECHNICAL STAFF REDUCED TECHNICAL STAFF REQUIREMENT. REQUIREMENT.

Page 79: CONSTRUCTION USING FORMS

COST SAVING ASPECTSCOST SAVING ASPECTS

• CONCEALED M & E FITTINGS BEFORE CONCEALED M & E FITTINGS BEFORE CASTING.CASTING.

• NO PLASTERING REQUIRED. JUST A NO PLASTERING REQUIRED. JUST A LIGHT SCREEDIS REQUIRED.LIGHT SCREEDIS REQUIRED.

• NO NEED FOR CHISELLING AND REPAIR.NO NEED FOR CHISELLING AND REPAIR.

Page 80: CONSTRUCTION USING FORMS
Page 81: CONSTRUCTION USING FORMS

SOME NEGATIVESSOME NEGATIVES

Page 82: CONSTRUCTION USING FORMS

SOME NEGATIVESSOME NEGATIVES

HIGH INITIAL CAPITAL HIGH INITIAL CAPITAL COST.COST.

-- COST OF FORMS.COST OF FORMS.

Page 83: CONSTRUCTION USING FORMS

SOME NEGATIVESSOME NEGATIVES

• HIGH INITIAL CAPITAL COST.HIGH INITIAL CAPITAL COST.

-- COST OF FORMS.COST OF FORMS.

-- COST OF MACHINES.COST OF MACHINES.

-- CONCRETE MIXER.CONCRETE MIXER.

-- CONCRETE PUMP.CONCRETE PUMP.

-- PAY LOADER.PAY LOADER.

-- AND SO ON.AND SO ON.

Page 84: CONSTRUCTION USING FORMS

SOME NEGATIVESSOME NEGATIVES• HIGH INITIAL CAPITAL COST.HIGH INITIAL CAPITAL COST.

•RELATIVE RELATIVE RIGIDITY IN RIGIDITY IN DESIGN.DESIGN.

Page 85: CONSTRUCTION USING FORMS

SOME NEGATIVES

HIGH INITIAL CAPITAL COST.

RELATIVE RIGIDITY IN DESIGN.

SPEED OF CONSTRUCTION Vs CASH FLOW.

Page 86: CONSTRUCTION USING FORMS

SOME NEGATIVESSOME NEGATIVES

HIGH INITIAL CAPITAL COST.HIGH INITIAL CAPITAL COST.

RELATIVE RIGIDITY IN DESIGN.RELATIVE RIGIDITY IN DESIGN.

SPEED OF CONSTRUCTION Vs CASH FLOW.SPEED OF CONSTRUCTION Vs CASH FLOW.

INITIAL TRAINING OF INITIAL TRAINING OF LABOUR.LABOUR.

Page 87: CONSTRUCTION USING FORMS

SOME NEGATIVES

HIGH INITIAL CAPITAL COST. RELATIVE RIGIDITY IN DESIGN. SPEED OF CONSTRUCTION Vs CASH FLOW. INITIAL TRAINING OF LABOUR.

RETENTION OF NOW TRAINED LABOUR.

Page 88: CONSTRUCTION USING FORMS

SOME NEGATIVES HIGH INITIAL CAPITAL COST. RELATIVE RIGIDITY IN DESIGN. SPEED OF CONSTRUCTION Vs CASH FLOW. INITIAL TRAINING OF LABOUR. RETENTION OF NOW TRAINED LABOUR.

INTENSE BACK END PLANNING WORK.

Page 89: CONSTRUCTION USING FORMS
Page 90: CONSTRUCTION USING FORMS

THANK YOUTHANK YOU