construction using forms
TRANSCRIPT
CONSTRUCTION CONSTRUCTION USING USING
FORMSFORMS
PHASESPHASES
•TRADITIONAL TRADITIONAL METHOD OF METHOD OF CONSTRUCTIONCONSTRUCTION
PHASESPHASES
• TRADITIONAL METHOD OF CONSTRUCTIONTRADITIONAL METHOD OF CONSTRUCTION
•CONSTRUCTION CONSTRUCTION USING FORMS.USING FORMS.
PHASESPHASES
• TRADITIONAL METHOD OF CONSTRUCTIONTRADITIONAL METHOD OF CONSTRUCTION
• CONSTRUCTION USING FORMCONSTRUCTION USING FORM
•MAJOR DEPARTURES MAJOR DEPARTURES FROM TRADITIONAL FROM TRADITIONAL METHOD.METHOD.
PHASESPHASES
• TRADITIONAL METHOD OF CONSTRUCTIONTRADITIONAL METHOD OF CONSTRUCTION
• CONSTRUCTION USING FORMCONSTRUCTION USING FORM
• MAJOR DEPARTURES FROM TRADITIONAL METHOD.MAJOR DEPARTURES FROM TRADITIONAL METHOD.
•SOME SOME NEGATIVESNEGATIVES..
TRADITIONAL METHOD OF CONSTRUCTION
FOUNDATIONS
COLUMNS
BEAMS
WALLS
ROOF
CONSTRUCTION USING FORMS -
FOUNDATIONS
DESIGN AS PER TRADITIONAL METHOD.
CAN BE MADE USING FORM WORKS.
MORE CONDUITS / PIPES CAN BE EMBEDDED.
FOUNDATIONS
FOUNDATIONS
FINISHED FOUNDATION & FLOOR SLAB
FINISHED FOUNDATION & FLOOR SLAB
CONSTRUCTION USING FORMS - CONSTRUCTION USING FORMS -
WALLSWALLS STEEL WIRE MESH IS ERECTED WITH STEEL WIRE MESH IS ERECTED WITH
THE SUPPORT OF STARTERS.THE SUPPORT OF STARTERS.
THIS DEFINES THE CENTRE LINE OF THIS DEFINES THE CENTRE LINE OF THE WALLS.THE WALLS.
FIXNG STEEL WIRE MESH
PLINTHS WITH MESHES
CONSTRUCTION USING FORMS CONSTRUCTION USING FORMS
M & E FIXTURESM & E FIXTURES
ALL CONDUITS – ELECTRICAL, TELEPHONE, ALL CONDUITS – ELECTRICAL, TELEPHONE, DATA ETC ARE INSTALLED.DATA ETC ARE INSTALLED.
ALL ELECTRICAL BOXES INCLUDING ALL ELECTRICAL BOXES INCLUDING DISTRIBUTION BOXES ARE INSTALLED.DISTRIBUTION BOXES ARE INSTALLED.
ALL WATER SUPPLY AND DRAINAGE PIPE ALL WATER SUPPLY AND DRAINAGE PIPE LINES ARE INSTALLED.LINES ARE INSTALLED.
INSTALLATION OF CONDUITS
INSTALLATION OF CONDUITS & PIPES
Fixing electrical boxes
FIXING ELECTRICAL BOXES
FIXING ELECTRICAL BOXES
FIXING WATER SUPPLY PIPES
M & E FIXED ON THE MESH
CONSTRUCTION USING FORMS CONSTRUCTION USING FORMS
WALL PANELSWALL PANELS
INSTALLATION OF WALL PANELS INSTALLATION OF WALL PANELS ASTRIDE STEEL WIRE MESH ASTRIDE STEEL WIRE MESH DEFINING THE CENTRE OF THE DEFINING THE CENTRE OF THE WALLS.WALLS.
INSTALLATION OF WALL PANELS
CONSTRUCTION USING CONSTRUCTION USING FORMSFORMS - -
ROOFROOF
INSTALLATION OF ROOF PANELS INSTALLATION OF ROOF PANELS SUPPORTED ON THE WALLS.SUPPORTED ON THE WALLS.
INSTALLATION OF M & E FITTINGS ON INSTALLATION OF M & E FITTINGS ON THE ROOF SLAB.THE ROOF SLAB.
ROOF SUPPORTS.ROOF SUPPORTS.
INSTALLATION OF ROOF PANELS
ROOF SUPPORTS
COMPLETE INSTALLATION OF ROOF PANELS
INSTALLATION OF M & E FITTINGS ON THE ROOF SLAB
POURING CONCRETE AFTER ROOF PANELS ARE INSTALLED.
REINFORCEMENTS ARE POSITIONED AND FASTENED.
M & E FITTINGS ARE INSTALLED.
DONE WITH CONCRETE PUMP.
PUMPING OF CONCRETE
POURING CONCRETE
VIBRATING THE CONCRETE
LEVELLING OF CONCRETE
WALLS AFTER REMOVAL OF FORMS
• WALL AS OBTAINED AFTER REMOVAL OF FORM WORKS.
• SAME FINISH OBTAINED FOR CEILING.
• NO PLASTERING REQUIRED.
WALLS AFTER REMOVAL OF FORM WORKS
WALLS AFTER REMOVAL OF FORM WORKS
WALLS AFTER REMOVAL OF FORM WORKS
WALLS AFTER REMOVAL OF FORM WORKS
INTERNAL WALL FINISH
WALL FINISH ON REMOVAL OF FORMS
WALL FINISH ON REMVAL OF FORMS
BUILDING UPPER FLOORS
PREPARING TO BUILD UPPER FLOORS
UPPER FLOORS UNDER CONSTRUCTION
BUILDING UPPER FLOORS
UPPER FLOORS UNDER CONSTRUCTION
MULTI STOREY BUILDINGS UNDER CONSTRRUCTION
MULTI STOREY BUILDINGS UNDER CONSTRRUCTION
FINISHED PRODUCT
FINISHED FRONT VIEW – ROW HOUSES
FINISHED WALL
MULTI STOREY CONSTRUCTION
MULTI STOREY CONSTRUCTION
MASS HOUSING
MASS HOUSING
MAJOR DEPARTURES FROM TRADITIONAL METHOD
MAJOR DEPARTURES FROM MAJOR DEPARTURES FROM TRADITIONAL METHODTRADITIONAL METHOD
TOTAL CONCRETE TOTAL CONCRETE STRUCTURESTRUCTURE..
MAJOR DEPARTURES FROM TRADITIONAL METHOD
TOTAL CONCRETE STRUCTURE.
WALLS THICKNESS – 4 INCHES / 10 Cms.
MAJOR DEPARTURES FROM MAJOR DEPARTURES FROM TRADITIONAL METHODTRADITIONAL METHOD
TOTAL CONCRETE STRUCTURE.TOTAL CONCRETE STRUCTURE.
WALLS THICKNESS – 4 INCHES / 10 Cms.WALLS THICKNESS – 4 INCHES / 10 Cms.
IRON MESH IN WALLS.IRON MESH IN WALLS.
MAJOR DEPARTURES FROM MAJOR DEPARTURES FROM TRADITIONAL METHODTRADITIONAL METHOD
TOTAL CONCRETE STRUCTURE.TOTAL CONCRETE STRUCTURE.
WALLS THICKNESS – 4 INCHES / 10 Cms.WALLS THICKNESS – 4 INCHES / 10 Cms.
IRON MESH IN WALLS.IRON MESH IN WALLS.
NO COLUMNS OR BEAMS.NO COLUMNS OR BEAMS.
MAJOR DEPARTURES FROM MAJOR DEPARTURES FROM TRADITIONAL METHODTRADITIONAL METHOD
TOTAL CONCRETE STRUCTURE.TOTAL CONCRETE STRUCTURE.
WALLS THICKNESS – 4 INCHES / 10 Cms.WALLS THICKNESS – 4 INCHES / 10 Cms.
IRON MESH IN WALLS.IRON MESH IN WALLS.
NO COLUMNS OR BEAMS.NO COLUMNS OR BEAMS.
NO PLASTERING REQUIRED.NO PLASTERING REQUIRED.
MAJOR DEPARTURES FROM TRADITIONAL METHOD
TOTAL CONCRETE STRUCTURE.
WALLS THICKNESS – 4 INCHES / 10 Cms.
IRON MESH IN WALLS.
NO COLUMNS OR BEAMS.
NO PLASTERING REQUIRED.
M & E FIXTURES INSTALLED BEFORE CASTING.
COST SAVING COST SAVING ASPECTSASPECTS
COST SAVING ASPECTSCOST SAVING ASPECTS
RE-USABILITY OF FORM WORKS – 1000 RE-USABILITY OF FORM WORKS – 1000 USES.USES.
THEREAFTER, THESE CAN BE SOLD TO THEREAFTER, THESE CAN BE SOLD TO ALLUMINUM FACTORIES.ALLUMINUM FACTORIES.
FINANCIALLY ECONOMICAL AFTER 50 FINANCIALLY ECONOMICAL AFTER 50 USES.USES.
COST SAVING ASPECTSCOST SAVING ASPECTS
FOUR INCHES CONCRETE WALLS AS FOUR INCHES CONCRETE WALLS AS AGAINST NINE INCHES THICK WALLS AGAINST NINE INCHES THICK WALLS WITH MORTAR ON ALL THE SIDES.WITH MORTAR ON ALL THE SIDES.
SPACE EFFICIENCY.SPACE EFFICIENCY.
NO REQUIREMENT FOR COLUMNS OR NO REQUIREMENT FOR COLUMNS OR BEAMS.BEAMS.
COST SAVING ASPECTSCOST SAVING ASPECTSVERY FAST CONSTRUCTION – LESS MAN - VERY FAST CONSTRUCTION – LESS MAN - DAYS REQUIRED.DAYS REQUIRED.
NO NEED FOR BRICKS / HOLLOW BLOCKS.NO NEED FOR BRICKS / HOLLOW BLOCKS.
REDUCED LABOUR REQUIREMENT.REDUCED LABOUR REQUIREMENT.
REDUCED TECHNICAL STAFF REDUCED TECHNICAL STAFF REQUIREMENT. REQUIREMENT.
COST SAVING ASPECTSCOST SAVING ASPECTS
• CONCEALED M & E FITTINGS BEFORE CONCEALED M & E FITTINGS BEFORE CASTING.CASTING.
• NO PLASTERING REQUIRED. JUST A NO PLASTERING REQUIRED. JUST A LIGHT SCREEDIS REQUIRED.LIGHT SCREEDIS REQUIRED.
• NO NEED FOR CHISELLING AND REPAIR.NO NEED FOR CHISELLING AND REPAIR.
SOME NEGATIVESSOME NEGATIVES
SOME NEGATIVESSOME NEGATIVES
HIGH INITIAL CAPITAL HIGH INITIAL CAPITAL COST.COST.
-- COST OF FORMS.COST OF FORMS.
SOME NEGATIVESSOME NEGATIVES
• HIGH INITIAL CAPITAL COST.HIGH INITIAL CAPITAL COST.
-- COST OF FORMS.COST OF FORMS.
-- COST OF MACHINES.COST OF MACHINES.
-- CONCRETE MIXER.CONCRETE MIXER.
-- CONCRETE PUMP.CONCRETE PUMP.
-- PAY LOADER.PAY LOADER.
-- AND SO ON.AND SO ON.
SOME NEGATIVESSOME NEGATIVES• HIGH INITIAL CAPITAL COST.HIGH INITIAL CAPITAL COST.
•RELATIVE RELATIVE RIGIDITY IN RIGIDITY IN DESIGN.DESIGN.
SOME NEGATIVES
HIGH INITIAL CAPITAL COST.
RELATIVE RIGIDITY IN DESIGN.
SPEED OF CONSTRUCTION Vs CASH FLOW.
SOME NEGATIVESSOME NEGATIVES
HIGH INITIAL CAPITAL COST.HIGH INITIAL CAPITAL COST.
RELATIVE RIGIDITY IN DESIGN.RELATIVE RIGIDITY IN DESIGN.
SPEED OF CONSTRUCTION Vs CASH FLOW.SPEED OF CONSTRUCTION Vs CASH FLOW.
INITIAL TRAINING OF INITIAL TRAINING OF LABOUR.LABOUR.
SOME NEGATIVES
HIGH INITIAL CAPITAL COST. RELATIVE RIGIDITY IN DESIGN. SPEED OF CONSTRUCTION Vs CASH FLOW. INITIAL TRAINING OF LABOUR.
RETENTION OF NOW TRAINED LABOUR.
SOME NEGATIVES HIGH INITIAL CAPITAL COST. RELATIVE RIGIDITY IN DESIGN. SPEED OF CONSTRUCTION Vs CASH FLOW. INITIAL TRAINING OF LABOUR. RETENTION OF NOW TRAINED LABOUR.
INTENSE BACK END PLANNING WORK.
THANK YOUTHANK YOU