construction update of our projects · painting 80% complete •• swimming pool - excavation work...
TRANSCRIPT
![Page 1: Construction Update of Our Projects · Painting 80% complete •• Swimming Pool - Excavation work completed and 40% RCC work complete •• Compound Wall and Retaining Wall - Brickwork](https://reader030.vdocuments.us/reader030/viewer/2022011917/5ff9ed15f164217b7879c702/html5/thumbnails/1.jpg)
Construction Update of
for The Month of March, 2020
![Page 2: Construction Update of Our Projects · Painting 80% complete •• Swimming Pool - Excavation work completed and 40% RCC work complete •• Compound Wall and Retaining Wall - Brickwork](https://reader030.vdocuments.us/reader030/viewer/2022011917/5ff9ed15f164217b7879c702/html5/thumbnails/2.jpg)
Keshav Nagar, Pune
![Page 3: Construction Update of Our Projects · Painting 80% complete •• Swimming Pool - Excavation work completed and 40% RCC work complete •• Compound Wall and Retaining Wall - Brickwork](https://reader030.vdocuments.us/reader030/viewer/2022011917/5ff9ed15f164217b7879c702/html5/thumbnails/3.jpg)
• ‘A’ BUILDING:
• • RCC work completed for all floors
• • Block work completed for all floors
• • Electrical wall conducting completed for all floors
• • Internal plaster work completed
• • Gypsum work completed
• • Internal toilet concealed plumbing work completed
• • External plaster work completed
• • Bath Dado tiles, kitchen platform and bath granite frames work completed
• • Tile flooring work completed
• • Waterproofing work completed
• • 85% work done for UPVC window
• • 45% work complete of internal painting
• • 50% work complete for external painting
• • 80% work complete for external duct and terrace plumbing
• • 52% work complete for door fixing & 50% work complete for SS railing
• • Fire fighting work completed
Florida Riverwalk– March’20
![Page 4: Construction Update of Our Projects · Painting 80% complete •• Swimming Pool - Excavation work completed and 40% RCC work complete •• Compound Wall and Retaining Wall - Brickwork](https://reader030.vdocuments.us/reader030/viewer/2022011917/5ff9ed15f164217b7879c702/html5/thumbnails/4.jpg)
• ‘B’ BUILDING:
• • RCC work completed for 1st to 7th slab
• • Brick work complete for 1st and 3rd floor
• INFRASTRUCTURE:
• • Work completed for Underground Water Tank RCC
• • Club House - Excavation work completed and 55% RCC work complete
• • Transformer Room – Excavation, RCC work, brickwork and plaster completed. Painting 80% complete
• • Swimming Pool - Excavation work completed and 40% RCC work complete
• • Compound Wall and Retaining Wall - Brickwork 80% complete
• • Underground Services Drainage + Storm + Electrical - RCC piping work 90% complete
• • Fire fighting work completed
• • Road Trimix – 85% complete for A Building surrounding area
• Genset – 80% work complete
Florida Riverwalk– March’20
![Page 5: Construction Update of Our Projects · Painting 80% complete •• Swimming Pool - Excavation work completed and 40% RCC work complete •• Compound Wall and Retaining Wall - Brickwork](https://reader030.vdocuments.us/reader030/viewer/2022011917/5ff9ed15f164217b7879c702/html5/thumbnails/5.jpg)
A BUILDING
![Page 6: Construction Update of Our Projects · Painting 80% complete •• Swimming Pool - Excavation work completed and 40% RCC work complete •• Compound Wall and Retaining Wall - Brickwork](https://reader030.vdocuments.us/reader030/viewer/2022011917/5ff9ed15f164217b7879c702/html5/thumbnails/6.jpg)
![Page 7: Construction Update of Our Projects · Painting 80% complete •• Swimming Pool - Excavation work completed and 40% RCC work complete •• Compound Wall and Retaining Wall - Brickwork](https://reader030.vdocuments.us/reader030/viewer/2022011917/5ff9ed15f164217b7879c702/html5/thumbnails/7.jpg)
![Page 8: Construction Update of Our Projects · Painting 80% complete •• Swimming Pool - Excavation work completed and 40% RCC work complete •• Compound Wall and Retaining Wall - Brickwork](https://reader030.vdocuments.us/reader030/viewer/2022011917/5ff9ed15f164217b7879c702/html5/thumbnails/8.jpg)
Thank you!
-Team