Building the Future Current Activities this Week : Foundations : Area 4 Field Level – Foundations for “infill” area between Column Lines 39-1 are ongoing. Concrete Flatwork : Area 3 Field Level –Lower dock slab-on-grade is complete. Prep work for flatwork between column lines 6-4 is ongoing. Masonry : Area 1 – Field level masonry installation is ongoing in Area H, G, F, E and D. Area 2/3 – Concourse building masonry installation is ongoing. Steel Erection : Area 4 – Steel erection for “infill” area will begin 9/30/2010 (Sequence 3-3). Area 2 – Steel joist and metal decking installation for concourse buildings is ongoing. Canopy decking installation is ongoing. Canopy gutter enclosure framing installation is ongoing. Roofing and Sheetmetal : Area 1 – Permanent roofing installation at West Building is ongoing. Area 2 – Canopy gutter installation is ongoing. To: David Ficklin - OnGoal Rory O’Connor – OnGoal Lee Turner – OnGoal Andy Heitmann – Turner Dave Dudzik - Turner From: Brandon Valdez Office: Kansas City Date: 9.29.2010 Re: Wizards Stadium Project Update – Week of 9.27.2010 Field Level Area 3 – Concrete slab-on grade is placed at lower dock area. Concourse Level Area 1 – Steel joist and roof decking being installed at southwest concourse buildings. Field Level Area 1 – Subroof, storm line, framing and ceiling hanger installation continues on Field Level.

Upload: kansas-city-wizards

Post on 26-Jun-2015

220 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Construction Update 09-29-2010

Building the Future

Current Activities this Week:

Foundations:

Area 4 Field Level – Foundations for “infill” area

between Column Lines 39-1 are ongoing.

Concrete Flatwork:

Area 3 Field Level –Lower dock slab-on-grade is complete.

Prep work for flatwork between column lines 6-4 is

ongoing.

Masonry:

Area 1 – Field level masonry installation is ongoing in

Area H, G, F, E and D. Area 2/3 – Concourse building

masonry installation is ongoing.

Steel Erection:

Area 4 – Steel erection for “infill” area will begin

9/30/2010 (Sequence 3-3). Area 2 – Steel joist and

metal decking installation for concourse buildings

is ongoing. Canopy decking installation is ongoing.

Canopy gutter enclosure framing installation is ongoing.

Roofing and Sheetmetal:

Area 1 – Permanent roofing installation at West

Building is ongoing. Area 2 – Canopy gutter installation

is ongoing.

To: David Ficklin - OnGoal

Rory O’Connor – OnGoal

Lee Turner – OnGoal

Andy Heitmann – Turner

Dave Dudzik - Turner

From: Brandon Valdez

Office: Kansas City

Date: 9.29.2010

Re: Wizards Stadium Project

Update – Week of

9.27.2010

Field Level Area 3 – Concrete slab-on grade

is placed at lower dock area.

Concourse Level Area 1 – Steel joist and roof

decking being installed at southwest

concourse buildings.

Field Level Area 1 – Subroof, storm line,

framing and ceiling hanger installation

continues on Field Level.

Page 2: Construction Update 09-29-2010

Building the Future

Metal Stud Framing:

Area 1 – Metal stud framing for Field, Concourse, Suite

and Press Levels are ongoing. Exterior metal stud framing

and sheathing installation is ongoing at Field, Suite, and

Press Levels.

Glass:

Area 1 - Curtainwall framing and glass installation is

ongoing at West Building on west, south and east

elevations.

MEP Rough-in:

Area 3 – Underground MEP rough-in is ongoing.

West Building - Ductwork installation on

Concourse, Suite and Press Levels are ongoing.

Plumbing rough-in is ongoing on Suite and

Press Levels. Fire Protection rough-in is ongoing on

Concourse, Suite and Press Levels. Electrical rough-in is

ongoing on Concourse, Suite and Press Levels.

Projected Activities occurring next Week:

Foundations:

Area 3/4 Field Level – Foundations for “infill” area between

Column Lines 29-1 will be complete.

Concrete Flatwork:

Area 3 Field Level – Concrete placement for Slab-on

Grade from lower dock area to Column Line 4.

Area 3 and 4 Field Level – Installation of on-grade seating

risers and intermediate stairs will continue.

Masonry:

Area 1 – Field level masonry installation will continue in

Area H, G, F, E and D. Area 2/3 – Concourse building

masonry installation will continue.

Area 1 – Shot of the Canopy decking, gutter

installation and gutter enclosure framing at

column lines 23-20.

Concourse Level Area 1 – Curtainwall

framing installation has started at field side

of Main Club.

Roof Level Area 1 – Permanent roofing is

being installed on the West Building.

Page 3: Construction Update 09-29-2010

Building the Future

Structural Steel Erection:

Area 4 – Structural steel erection for “infill” area will

be ongoing. Area 2 – Steel joist and metal decking

installation for concourse buildings will continue.

canopy decking installation will continue. Canopy gutter

enclosure framing installation will continue.

Roofing and Sheetmetal:

Area 1 – Permanent roofing installation at West

Building will continue. Area 2 – Canopy gutter installation

will continue.

Metal Stud Framing:

Area 1 – Metal stud framing for Field, Concourse, Suite

and Press Levels will continue. Exterior Framing and

sheathing installation will continue.

Glass:

Area 1 – Curtain Framing and Glass installation around West

Building will continue. Curtainwall framing on Suite and

Press Level balconies will continue. Curtainwall framing

at Field Side of Main Concourse will continue.

MEP Rough-in:

MEP Rough-in at Concourse, Suite and Press Levels will

continue. Ductwork installation on Concourse, Suite, and

Press Level will continue. Fire Sprinkler installation will

continue on Concourse, Suite and Press Levels.

Area 4 – Shot of north elevation roof

structure and on-grading seating progress

below.

Area 1 – Shot of the west building showing

the progress of the exterior envelope.

Page 4: Construction Update 09-29-2010

Building the Future

Additional Photos:

Area 2 – Concession/Restroom building

CMU installation is ongoing.

Area 4– Foundation work has started in “fill-

in” area between Column Lines 39-1.

Area 1 – Field side of West Building showing

progress of exterior sheathing.

Concourse Level Area 4 – Reinforcing,

formwork and electrical rough-in is ongoing.

Area 1 – Shot of the West Building from the

southeast concourse.

Field Level Area 1 – Metal stud framing and

drywall is ongoing.