construction projects 2012 - 2013 e

12
4TH ST ARROW RTE FOOTHILL BLVD BASELINE ST 19TH ST BANYAN ST ALMOND ST GROVE AV HILLSIDE RD WILSON AV 8TH ST EAST AV ETIWANDA AV ROCHESTER AV MILLIKEN AV HAVEN AV CARNELIAN ST SAPPHIRE ST ARCHIBALD AV VINEYARD AV CHERRY AV HELLMAN AV § 10 § ¨ ¦ | 210 15 DP 6840 - 23 Residential Lots on 46.0 Acres DP 7220 - 33 Residential Lots on 10 Acres DP 6118/ TR16324 81 Residential Lots on 90.04 Acres CP 7134 Relocate Waterline in Wilson Ave from East Ave to Wardman Bullock Rd DP 6118/ TR16226-1 97 Residential Lots on 34.15 Acres DP 7224 - 119 Condo Units on 18.66 Acres DP 7225 - 32 Residential Lots on 7.9 Acres CP 7095 LMWTP Project CP 7172 Sewer Main Relocation in Baseline Rd and East Ave DP 7276- 30 Single Residential Lots on 9 Acres DP 7328 - 42 Single Family Homes E CONSTRUCTION PROJECTS 2012 - 2013 Q:\GIS\1Internal\Engineering\Water\ConstructionProjects\ConstructionProjects11_Website.mxd WATER PROJECTS LEGEND RW PROJECTS DEVELOPMENT PROJECTS SEWER PROJECTS

Upload: others

Post on 18-Nov-2021

4 views

Category:

Documents


0 download

TRANSCRIPT

4TH ST

ARROW RTE

FOOTHILL BLVD

BASELINE ST

19TH ST

BANYAN ST

ALMOND ST

GROV

E AV

HILLSIDE RD

WILSON AV

8TH ST

EAST

AV

ETIW

ANDA

AV

ROCH

ESTE

R AV

MILL

IKEN

AV

HAVE

N AV

CARN

ELIA

N ST

SAPP

HIRE

ST

ARCH

IBAL

D AV

VINE

YARD

AV

CHER

RY AV

HELL

MAN

AV

§̈¦10

§̈¦

|210

15

DP 6840 - 23 Residential Lots on 46.0 Acres

DP 7220 - 33 Residential Lots on 10 Acres

DP 6118/ TR16324 81 Residential Lots on 90.04 Acres

CP 7134 Relocate Waterlinein Wilson Ave from East Ave to

Wardman Bullock Rd

DP 6118/ TR16226-1 97 Residential Lots on 34.15 Acres

DP 7224 - 119 Condo Units on 18.66 Acres

DP 7225 - 32 Residential Lots on 7.9 Acres

CP 7095 LMWTP Project

CP 7172 Sewer Main Relocation inBaseline Rd and East Ave

DP 7276- 30 Single Residential Lots on 9 Acres

DP 7328 - 42 Single Family Homes

ECONSTRUCTION PROJECTS 2012 - 2013

Q:\G

IS\1In

terna

l\Eng

ineeri

ng\W

ater\C

onstr

uctio

nProj

ects\

Cons

tructi

onPr

ojects

11_W

ebsit

e.mxd

WATER PROJECTSLEGEND

RW PROJECTS

DEVELOPMENT PROJECTS

SEWER PROJECTS

OCTOBER 2013 DP UPDATE

DP 7276 / WF 263168

Project: 30 Single Residential Lots on 9 Acres

Project Location: Stable Falls Avenue and Rodeo Drive

Developer: Lennar Homes

Construction Contractor: CP Construction

Construction Superintendant: Ryan Combs

Engineering Tech: Raymond Abeyta

Construction Inspector: Dave Pastor

Anticipated Completion Date: February 2015

TRACT NO. 18744

OCTOBER 2013 DP UPDATE

DP 7225 / WF 252676

Project: 32 Residential Lots on 7.9 Acres

Project Location: Southwest corner of East Avenue and Via Veneto Dr

Developer: Crestwood Corp.

Construction Contractor: BT Pipeline

Construction Superintendant: Mike Dorsey

Engineering Tech: Ted Munson

Construction Inspector: Tere Worsham

Anticipated Completion Date: October 2013

TRACT NO. 18096

OCTOBER 2013 DP UPDATE

DP 7224 / WF 00251238

Project: 119 Condo Units on 18.66 Acres

Project Location: Southwest corner of Archibald Avenue and 6th Street

Developer: Beizer Homes

Construction Contractor: Kana Pipeline

Construction Superintendant:

Engineering Tech: Raymond Abeyta

Tract No. 18804

Construction Inspector: Dave Pastor

Anticipated Completion Date: January 2014

TRACT NO. 18804

OCTOBER 2013 DP UPDATE

DP 7220 / WF 248433

Project: 33 Residential Lots on 10 Acres

Project Location: Baseline and Shelby

Developer: LVD Rancho Cucamonga, LLC

Construction Contractor: Mayer’s Pipeline

Construction Superintendant: Ken Hardy (909) 322-0115

Engineering Tech: Raymond Abeyta

Construction Inspector: Tere Worsham

Anticipated Completion Date: January 2014 TRACT NO. 18806

OCTOBER 2013 DP UPDATE

DP 6840 / WF 228319

Project: 56 Residential Lots on 46.0 Acres

Project Location: Banyan Street East of East Avenue

Developer: K. Hovnanian Homes

Construction Contractor: King Construction

Construction Superintendant: Eric Lawson

Engineering Tech: Ted Munson

District Inspector: Tere Worsham

Anticipated Completion Date: January 2014

12” WATER PIPELINE

TRACT NO. 18782

TRACT NO. 17651

OCTOBER 2013 DP UPDATE

DP 6118 / W 0053408

Project: 81 Residential Lots on 90.04 Acres

Project Location: End of Wardman Bullock Road north of Wilson Avenue

Developer: Granite Homes

Construction Contractor: Meritage Homes

Construction Superintendant: Rick Wood

Engineering Tech: Raymond Abeyta

Construction Inspector: Tere Worsham

Anticipated Completion Date: January 2014

TRACT NO. 16324

OCTOBER 2013 DP UPDATE

DP 6118 / W 0053408

Project: 97 Residential Lots on 34.15 Acres

Project Location: Indian Wells Place west of Day Creek Boulevard

Developer: BCA Development

Construction Contractor: K Hovnanian

Construction Superintendant: Chris Courtney

Engineering Tech: Ted Munson

Construction Inspector: Tere Worsham

Anticipated Completion Date: January 2014

TRACT NO. 16226-1

OCTOBER 2013 CIP UPDATE

CP 7172/ WO 237510

Sewer Main Relocation in Baseline Road and East Avenue

The State of California, in conjunction with the City of Rancho Cucamonga, is performing a new interchange configuration at the I-15 Freeway and Baseline Road. The work includes building new on and off ramps over Baseline Road and East Avenue. The existing sewer main located within these streets are required to be relocated to make room for bridge footings for the new ramps. The City is also constructing a new storm drain facility in East Avenue from Foothill Boulevard to the storm drain basin just north or Baseline Road.

This project will relocate approximately 133 lineal feet of 8-inch vitrified clay pipe (VCP) and approximately 216 lineal feet of 15-inch VCP sewer mains in Baseline Road and East Avenue, respectively. The District is partnering with the City for the relocations of the sewer mains to be completed in conjunction with the new storm drain facilities.

Project Designer: Tuan Truong

Construction Contractor:

Contractor Contact Person:

Construction Inspector : Dave Pastor

Project is schedule to begin

August 2013

District approved CO-OP agreement with City of Rancho Cucamonga

Completion Date

December 2013

OCTOBER 2013 CIP UPDATE

CP 7134/ WF220981

Relocate Waterline in Wilson Ave from East Ave to Wardman Bullock Rd.

The City of Rancho Cucamonga plans to construct a new segment Wilson Avenue from Etiwanda Avenue to Wardman Bullock Road. This improvement will lower the existing finished surface by as much as 17-ft at various locations. The District has as existing 12-in waterline within the proposed road alignment that will be required to be lowered. Staff has analyzed this pipeline and plan to upsize the 12-in line to 24-in order to meet future demands and built transmission flexibility.

This project will construct approximately 4,600 linear feet of new waterline and abandon in place the existing waterline in Wilson Avenue from East Avenue to Wardman Bullock Road. This project must be constructed in conjunction with the City road work.

Project Designer: Tuan Truong, CVWD

Construction Contractor: H&H Construction

Contractor Contact Person:

Construction Inspector : City Inspector: Cathy Dawson

District Inspector: Dave Pastor

Start of Construction : October 2013

Completion Date: June 2014

OCTOBER 2013 CIP UPDATE

CP 7095 / WF220941

LMTP

The purpose of this project is to upgrade and improve the treatment process at the LMWTP to ensure compliance with the USEPA Stage 2 Disinfectants / Disinfection Byproduct Rule. The Surface Water Treatment Master Plan (October 2010) recommends several improvements. The contract for engineering design services for this project was awarded in March 2011. The project will be completed over a three year period. Design work is scheduled to be completed by July 2012 and construction to be completed by March 2014. The budget includes design, construction, construction management, materials testing, and specialty deputy inspections for the successful completion of the project.

Project Designer: Black & Veatch

Construction Contractor: SSC Construction

Contractor Contact Person: Kevin Anderson (B&V)

Eduardo Espinoza (CVWD)

Construction Inspector : District Inspector – Randy Rockwell

Starting Date: December 2012

• Three new ponds are completed and in use.

• New GAC & UV Building under construction.

• South decant pump station in operation.

• Sludge distribution structure north of the new ponds is near completion

• New block wall east of the property completed

• Service water line, 48” overflow & 12” sludge return line completed.

Anticipated Completion Date: February 2015

OCTOBER 2013 DP UPDATE

DP 7328 / WF 278945

Project: 43 Single Family Homes

Project Location: SEC Etiwanda and Miller

Developer: Lennar Homes

Construction Contractor: CP Construction

Construction Superintendant: Ryan Combs

Engineering Tech: Raymond Abeyta

Construction Inspector: Dave Pastor

Anticipated Completion Date: February 2015

TRACT NO. 18466